Application of Space Technology in Rural Road Projects under PMGSY Of Alwar and Jaipur Districts, Rajasthan State
Before Implementing PMGSY After Implementing PMGSY
Centre for Geo-Informatics Application in Rural Development (CGARD), NIRD & PR, MoRD, Govt of India, Hyderabad
PREFACE
The development of any country depends on the infrastructural facilities available therein. Good road network facilities play major a crucial role. The developed countries have good road infrastructure not because of the fact that they are wealthy; but because of good road infrastructure. Realizing this fact, an ambitious and biggest ever infrastructure development project in India, namely as Pradhan Mantri Gram Sadak Yojna (PMGSY), under Ministry of Rural Development, was conceptualized and launched on 25th December, 2000, with an objective to provide basic access by way of all-weather roads to the all habitations having population “250 or above in desert and tribal areas” and “500 or above for the rest of habitations” by year 2007 in a phased manner. The role of Rural Roads is very important in a country like India where majority of the population reside in rural areas and the main source of their earning is based on agriculture products. Rural roads provide the access to basic amenities and means of transporting agricultural products to nearest market centers. Implementation of PMGSY scheme poses major challenges. It is very difficult and hard to manage this massive programme using traditional methods of project management, as these methods are not only tedious and time consuming, but also difficult to retrieve the desired information. To overcome these difficulties, use of geoinformatics will help in better planning, decision making and monitoring of PMGSY scheme. Geo-informatics is a advance technology and science which emerged very strongly in past 10-15 years, which includes Geographic information System (GIS), Remote Sensing, Global Positioning System, Communication, programming, statistics, geo processing, image processing, digital photogrammetry etc. GIS is a key component of geo-informatics and is a computer assisted system for capturing, storing, checking, integrating, manipulating, analyzing and displaying, data which are spatially referenced to the Earth for solving complex planning, decision making and management problems. GIS allows us to manipulate and display geographical knowledge in a new and exciting ways. GIS integrates spatial and other kinds of information in a single system like spatial information and its attribute information within a single system. Similar to other information system, GIS also depends on the computerize information content input, and requires spatial processing. In this regard, C-GARD, National Institute of Rural development & Panchayati Raj (NIRD&PR) in collaboration with National Remote Sensing Centre (NRSC) ISRO, Hyderabad having the technical expertise on the use of Space Technology, a proof of concept under PMGSY was undertaken in Mehboobnagar district, Telangana. The Satellite imageries obtained from NRSC spread over different time series were analyzed to derive progress related information on PMGSY road construction on the Maddur to Mominapur Road (Via Renavepla and Chennareddipally). The progress reported by the State Government on the Online Management Monitoring & Accounting System (OMMAS), the MIS of PMGSY, was cross verified with the progress of implementation in the construction of PMGSY road, which was actually made on ground with the help of Satellite imageries. Based on the proof of concept, the Ministry of Rural Development intends to upscale the project using the Application of Space Technology. The current project involves the Application of Rural Road Projects under the PMGSY, which involves the temporal changes for monitoring roads taken up under PMGSY. The present study is taken up to check the feasibly of the proposed alignment of Roads in terms of its cost effectiveness and other geo-morphological constraints and facilitate real-time monitoring of PMGSY Roads using satellite imageries and bring a comparative statement showing deviations, if any.
(CGARD TEAM)
ACKNOWLEDGEMENT
The CGARD, NIRDPR Study Team expresses sincere thanks to Shri Jitendra Shankar Mathur, Secretary (RD) for evincing keen interest and encouragement in the Project. The CGARD Team is highly grateful to Shri. Rajesh Bhushan, JS (RC & IEC), DG, NRRDA and CVO, for providing an opportunity to work on Application of Space Technology in Rural Road Projects under PMGSY. The CGARD Team extends its sincere thanks to Shri P. Manoj Kumar, Director (RC) and Dr. I. K. Pateriya, Director (Tech), NRRDA, for their expert suggestion and guidance in the study. The CGARD Team is extremely thankful to Dr. W. R. Reddy, Director General, NIRDPR who gave motivation and inspiration for coming out with remarkable options and initiatives in effective implementation of PMGSY and bringing optimum benefit to the rural people, by the application of Space Technology in Rural Road Projects under PMGSY. The CGARD Team is extremely thankful to all District PIU’s for their help and coordination in the project. Heartful thanks to all CGARD staff for their cooperation and help extended during the course of project work.
(CGARD TEAM) Contents S. No Title Page No
1 Introduction 1
2 Objectives 3
3 Study Area 4
4 Methodology 8
5 Result and Discussion of satellite imagery based analysis 9
Alwar District roads
5.1 Analysis of the road from Bhiwadi Road to Chandwas 10
5.2 Analysis of the road from AlwarBhiwadi to Majra Ki Dhani road 18
5.3 Analysis of the road from Sahapura Road to Sarada Bas 28
5.4 Analysis of the road from Berkhera Road to Thanawala Bas 35
5.5 Analysis of the road from Burja to SaperokiDhani 47
5.6 Analysis of The road from Hodiyali Mod to Motibas 54
5.7 Analysis of the Road from Kamdaka to Kahadka Ki Dhani 64
5.8 Analysis of the Road from MundawarSaria to DhaniGusai 73
5.9 Analysis of the Road from Narhent to BhadanaKa Bas 78
5.10 Analysis of the Road from Newada Road to Newadi 95
5.11 Analysis of the Road from Nevada Road to Sammanpur 100 5.12 Analysis of the road from NitniKa Bara to KhotiKa Bas 108
5.13 Analysis of the Road From Poonkher to Ahir Bas 114
5.14 Analysis of the Road from Poonkher to ParshadiKa Bas 122
Analysis of The Road from PratapgarhtalaDhola Road to Pachpadi 5.15 128
5.16 Analysis of the Road from Sawadi Road to SukalKa Bas 138
Analysis of the Road from SH-25A Km.29 to AmkiwalUpperwali 5.17 146
Analysis of the Road from SodawasAjarka to Phushi Ki Dhani 5.18 154
5.19 Analysis of the road from TijaraFirajpur Road to Budi Baghor 160
5.20 Analysis of the road from Toolera Road to Ahir Bas 166
Jaipur District roads
5.21 Analysis of the road from Amarsar road to DhaniTabawali 174
5.22 Analysis of the road from BadnagarBhankiri road to DhaniThalodaki 187
5.23 Analysis of the road from Baisana to MangaldaskiDhani 195
5.24 Analysis of the road from Begus to Saran kiDhani 201
5.25 Analysis of the road from Bhambhori to DhaniIndokiya 214
5.26 Analysis of the road from Blindarpur to HardakawaliDhani 225
5.27 Analysis of the road from BlindarpurKhejrali to BagdokiDhani 233
5.28 Analysis of the road from Chomo Ajitgarh to MaliyokiDhani 239 5.29 Analysis of the road from Hanutpura to GangasagarkiDhani 249
Analysis of the road from Jaid mod Sanachauwad Road to 5.30 258 KumharonkiDhani
5.31 Analysis of the road from Tulsipura to SwamiyokiDhani 265
Analysis of the road from Sarnachaud Panchayat Bhawan to 5.32 274 BaliyonkiDhani
5.33 Analysis of the road from Pragpura to Dhani Mohandas 281
5.34 Analysis of the road from NH 8 to DhaniDharedaki 286
Analysis of the road from NavodyaVidhalaya Road to 5.35 295 MachawaliDhani
5.36 Analysis of the road from S.H.37 Devi kiTalai to Narayan kiDhani 304
5.37 Analysis of the road from Parmanpura to SwamiyokiDhani 311
6 Conclusion based on Satellite image Analysis 317
APPLICATION OF SPACE TECHNOLOGY IN RURAL ROAD PROJECT UNDER PMGSY
1. Introduction:
The development of any country depends on the infrastructural facilities available therein. Good road network facilities plays major role here. The developed countries have good road infrastructure not because of the fact that they are wealthy; instead they become developed because of good road infrastructure. Realizing this fact an ambitious and biggest ever infrastructure development project in India named as PradhanMantri Gram SadakYojna (PMGSY) under ministry of Rural Development was conceptualized and launched on 25th December, 2000. The objective was to provide basic access by way of all-weather roads to the all habitations having population “250 or above in desert and tribal areas” and “500 or above for the rest of habitations” by year 2007 in phased manner. The role of Rural Roads is very important in a country like India where majority of the population resides in rural areas and the main source of their earning is based on agriculture products. Rural roads provide the access to basic amenities and means of transporting agricultural products to nearest market centers. The Rural Roads can be classified as Other District Roads (ODR) and Village Roads (VR). ODR are those roads which connects the rural areas to market centers, Block, tehsil/taluka HQ or main roads while VR are those roads which connects villages and group of villages and each other or to the market place or with the nearest road of higher category.PMGSY scheme is becoming very popular among rural areas because of the specifications and quality aspect adopted for construction of roads. Although it is a Rural Road Connectivity Project but it has well designed working system, clear guidelines and streamlined efficient monitoring and execution strategy.PMGSY envisages providing single all weather connectivity to all the eligible habitations in the country. The eligibility for New Connectivity is defined in terms of population of the habitation, which is decided to be 500 in case of plain areas and 250 in case of hill states, tribal (Schedule V) and desert areas. It is also the mandate that all roads proposed, either for New Connectivity or for upgradation, shall be a part of the Core Network, identified for this purpose starting from the block and making a mosaic of the block maps at
1 district level.In order to get the updated connectivity status / surface condition of the rural roads, there is an immediate need to update the Core network data, incorporating the latest status of the connectivity of habitations as well as the surface type and condition of the existing rural roads duly considering the roads constructed under PMGSY as well as those taken in the other programmes such as NABARD and other state sponsored programmes.
Need of using Geo-informatics in Planning, Monitoring & Management:
Implementation of PMGSY scheme poses major challenges .It is very difficult and hard to manage this giant project using traditional methods of project management as these methods are not only tedious and time consuming but also difficult to retrieve the desiredinformation. To overcome these difficulties use of geoinformatics will help in better planning,decision making and monitoring of PMGSY scheme. Geo-informatics is a advancetechnology and science which emerged very strongly in past 10-15 years, it includesGeographic information System (GIS), Remote Sensing, Global Positioning System,Communication, programming, statistics, geo processing, image processing, digital photogrammetry etc.GIS is a key component of geo-informatics is a computer assisted system for capturing,storing, checking, integrating, manipulating, analyzing and displaying, data which are spatially referenced to the Earth for solving complex planning, decision making and management problems. GIS allows us to manipulate and display geographical knowledge in a new and exciting ways. GIS integrates spatial and other kinds of information in a single system like spatial information and its attribute information within a single system. Similar to other information system, GIS also depends on the information content input in computer but this information system requires special processing.
The spirit and the objective of PMGSY is to provide single all-weather road connectivity to the eligible unconnected rural habitations in the Core Network. The ministry felt the need for a robust mechanism to detect the variance between the progress of implementation of the scheme and the progress reported
2 manually/electronically by the states, on a real time basis. Establishing such a mechanism would ensure appropriate and timely corrective action. In this regard, C- GARD, National Institute of Rural development in collaboration with National Remote Sensing Centre (NRSC), Hyderabad having the technical expertise on the use of Space Technology, a proof of concept under PMGSY was undertaken in Mehboobnagar district, Telangana. The Satellite imageries obtained from NRSC spread over different time series were analysed to derive progress related information on PMGSY road construction on the Maddur to Mominapur Road (Via Renavepla and Chennareddipally). The progress reported by the State Govt. on the Online Management Monitoring & Accounting System (OMMAS), the MIS of PMGSY, was cross verified with the progress of implementation in the construction of PMGSY road, which was actually made on ground with the help of Satellite imageries. Based on the proof of concept, the Ministry intends to upscale the project as per following activities by using the application of Space Technology. The current project involves the Application of Rural Road Projects under the PMGSY which involves the temporal changes for monitoring roads taken up under PMGSY.
2. Objectives: The present study is taken up with the following objectives: A. Check the feasibly of the proposed alignment of Roads in terms of its cost effectiveness and other geo-morphological constraints. B. Check the progress reported by the States (manual or OMMAS) with respect to; Reported alignment, i.e. Habitations covered. C. To facilitate real-time monitoring of PMGSY Roads using satellite imageries and bring a comparative statement showing deviations, if any. D. To assess the Physical Progress of the Roads using the Satellite imageries by CGARD, NIRD&PR. E. To verify whether the road is being laid as per approved DPR and approved alignment. F. To decide the Resolution of the Satellite imagery in such a way that it helps in monitoring the progress. G. To verify whether the road actually connects the targeted habitation/habitations as per approved DPR. H. To mark the Culverts and Causeways and crosscheck with the DPR
3
3. Study Area: In Rajasthan State, Jaipur and Alwar Districts are taken up in this project. The list of roads taken under each district is enclosed below:
The above image shows the study area of Jaipur and Alwar District of Rajasthan.
4
The list of roads taken up for the study in the Alwar district is given below for reference.
Road Work (Km) Physical Progress
BT
E/W C.C.
CDW
S. No.
WBM
Upgrad
New. Conn.
e e of Road Adm.Sanct.
Package No.
Name block of
Total Total (BT+CC)
Achievement %
Name of Agency
Nam
MP Constituency
CompletionStatus
MLA ConstituencyMLA
Date award work of
Date tender ofnotice
Name ofConnected Village
Total expenditure month theTotal to expenditure
No. work Village of Completed in
Expendature at the End of Expendature 31.3.15 theof at End
No. Connected village/Habitation of
Stipulated Date Stipulatedof Date Comm/Completion
San.Amt.After scruitny by San.Amt.After CRRI/STA scruitny by
RJ-02- Akbarpur kali Khol Road 17.2.13/16 48. 48.6 0. 1. 1. Alwar Al M/s L.N. 1 Umrain WB-28 to Gopalpura 1.4 50 50 .12.13 67 7 07 33 4 1 1 Gopalpura Comp Rural war Agarwal K.G. RJ-02- Alwar Bhiwadi road to 36. 36. 17.2.13/16 25. 26.3 0. 0. 0. F.B. Alwar Al M/s L.N. 2 Bas WB-18 Chandwas 1.3 5 5 .10.13 54 6 37 55 92 1 1 Chandwas Paid Rural war Agarwal RJ-02- Alwar Bhiwadi to Majra 84. 84. 23.2.13/22 97. 101. 0. 2. 3. F.B. Al M/s R.K. 3 Tijara WB-20 ki Dhani 3.5 3 3 .12.13 49 57 6 9 5 1 1 Majra ki nDhani paid Tijara war Const.co. RJ-02- Alwar Sahapura Road to 50. 50. 17.2.13/16 51. 51.8 0. 1. 2. Alwar Al M/s L.N. 4 Umrain WB-28 Sarada Bas 2.1 66 66 .12.13 86 6 3 82 12 1 1 Sardara ka Bas Comp Rural war Agarwal Laxman RJ-02- Baroda Meo Bhatpura to 12. 12. 21.3.13/20 11. 11.6 0. 0. 0. Ramgar Al M/s L.N. 5 garh WB-17 Meena ka Bas 0.55 66 66 .11.13 64 4 24 24 48 1 1 Meena ka Bas Comp h war Agarwal RJ-02- Berkhera road to 35. 35. 23.2.13/22 41. 44.0 0. 1. 1. Bandhwali Dhani,Dalla ka Bas,Dher f.B.P Alwar Al M/s R.K. 6 Umrain WB-27 thanawala bas 1.4 82 82 .12.13 94 7 34 06 4 1 4 Bas, Thanawala Bas aid rural war Const.co. Kotkasi RJ-02- Bilaheri to bailaheri ki 48. 48. 23.2.13/22 21. 39.9 0. 0. 1. F.B. K.G. Al M/s R.K. 7 m WB-20 Dhani 1.8 53 53 .12.13 09 4 4 95 35 1 1 Bilaheri Ki Dhani paid bas war Const.co. RJ-02- 42. 42. 21.3.13/20 33. 33.5 0. 1. 1. F.B.P Alwar Al M/s L.N. 8 Umrain WB-29 Burja to Sapero Ki Dhani 1.63 5 5 .1.14 28 7 3 33 63 1 2 Gujar ka Bas, Saperon Ka Bas aid Rural war Agarwal
5
RJ- 02- Hodiyali Raj WB Mod to 2.6 17.2.13/16.12. 2.3 2.6 F.B. Laxmanga Alw M/s L.N. 9 Raigarh -23 Motibas 1 2 64.44 64.44 13 65.65 0 65.65 0.3 2 2 1 1 Motibas paid rh ar Agarwal RJ- Jaisinghpu 02- ra to Laxmanga WB Jaisinghpu 0.5 21.3.13/20.11. 0.2 0.2 0.5 Alw M/s L.N. 10 rh -17 ra chhota 1 5 14.81 14.81 13 13.34 0 13.34 6 8 4 1 1 Jaisingh Pura Chotta Comp Ramgarh ar Agarwal RJ- Kandaka 02- to WB Kahadka 1.6 23.2.13/22.12. 0.3 1.2 Bhaniya ki Dhani, F.B. Alw M/s R.K. 11 Kotkasim -20 ki Dhani 1 3 42.37 42.37 13 40.32 0 5.22 45.54 5 5 1.6 1 2 Khadka ki dhani Paid K.G. bas ar Const.co. RJ- Mundawar 02- Sarai to WB Dhani 0.8 17.2.13/16.12. 13.3 0.4 0.2 0.6 Dhani kanjar, Dhani Alw M/s L.N. 12 Mundawar -21 Gusai 1 3 24 24 13 10.49 7 23.86 5 3 8 1 1 Gusai Comp Mundawar ar Agarwal RJ- Chokidaro ki Dhani, M/s 02- Narhet to handeva ki Dhani, kali laxminath WB Bhadana 2.9 Pahadi ki Dhani, Bhadana Daus infrastructu 13 Thanagazi -26 Ka Bas 1 5 76.88 76.88 7.3.13/6.1.14 62.56 0.82 63.38 0.4 2 2.4 1 4 ka Bas Comp Thanagazi a re pvt. Ltd RJ- Dhop Singh ka bas, Grata 02- Newada Miya ka aBas, Gulld ka WB road to 17.2.13/16.12. Bas, Hola ka Bas, Jhuma Alw M/s L.N. 14 Ramgarh -24 Newadi 1 1.3 33.14 33.14 13 30.87 0 30.87 0.2 1.1 1.3 1 6 ka Bas, Newadi Comp Ramgarh ar Agarwal RJ- Newada 02- road to WB Sammanp 17.2.13/16.12. Alw M/s L.N. 15 Ramgarh -24 ur 1 3 79.76 79.76 13 77.23 0 77.23 0.5 2.5 3 1 2 Sammanpur, Goojarpur Comp Ramgarh ar Agarwal Nitni ka Bara RJ- Malakhara 02- Road to WB Khoti Ka 17.2.13/16.12. 0.2 0.7 Alwar Alw M/s L.N. 16 Umrain -28 bas 1 1 25.5 25.5 13 18.97 0 18.97 2 8 1 1 1 Kothi Bas Comp Rural ar Agarwal Plasana Dhani, Sanjaynath Dhani, RJ- Bawariya Dhani, maliyo M/s 02- ki Dhani,Nohara laxminath WB Partapgarh 7.5 194.0 194.0 123.1 127.4 0.9 7.5 Gojrjaran ki Dhani, Daus infrastructu 17 Thanagazi -26 to Plasana 1 5 7 7 7.3.13/6.1.14 5 4.26 1 5 6.6 5 1 6 Ramsar ki dhani, Comp Thanagazi a re pvt. Ltd RJ- 02- Poonkher WB to Ahir 23.2.13/22.12. 0.3 2.6 Ramesh Mali ki F.B. Alwar Alw M/s R.K. 18 Umrain -27 bas 1 3 77.18 77.18 13 89.71 0 2.03 91.47 3 7 3 1 3 Dhani,Sukal Ka bas Paid Rural ar Const.co. RJ- Poonkher 02- to WB Parshadi 3.0 23.2.13/22.12. 0.3 2.6 3.0 Dubbi ka Bas, Gokul ka F.B.Pai Alw M/s R.K. 19 Umrain -27 ka bas 1 3 76.83 76.83 13 92.42 0 2.98 95.4 5 8 3 1 3 Bas, Parsadi ka Bas d Alar Rural ar Const.co. RJ- Pratapgarh M/s 02- tala Dhola laxminath WB road to 0.1 0.4 Daus infrastructu 20 Thanagazi -26 Pachpadi 1 0.6 16.32 16.32 7.3.13/6.1.14 12.42 0.18 12.6 5 5 0.6 1 1 Pachpadi Comp Thanagazi a re pvt. Ltd RJ- Rajgarh 02- jamodil to Raj WB Amkiwal 17.2.13/16.12. 0.2 0.5 F.B. laxmangar Alw M/s L.N. 21 Raigarh -23 Nichewali 1 0.8 20.31 20.31 13 17.29 0 17.29 5 5 0.8 1 1 Amkiwal Nichewali Paid h ar Agarwal
6
RJ - 02- Laxm W 0. 16 16 0. 0. 0. Al angar B- Ramgarh govindgarh to 6 .5 .5 21.3.13/2 16 16 2 4 6 Com Ramgar wa M/s L.N. 22 h 17 Barwada ki Dhani 1 5 4 4 0.11.13 .1 0 .1 5 3 8 1 1 Barada Ki Dhani p h r Agarwal RJ - 02- W 1. 44 44 0. 1. Al Umra B- Sawadi Road to Sukal 5 48 48 17.2.13/1 .1 .1 4 1. 5 Sukal ka Bas, Ahir bas, Ramesh Com Alwar wa M/s L.N. 23 in 28 Ka Bas 1 5 .5 .5 6.12.13 1 0 1 5 1 5 1 3 Mli ki Dhani p Rural r Agarwal RJ - 02- W 53 53 43 43 0. 1. Raj Al Raiga B- SH-25A km. 29 to 2. .8 .8 17.2.13/1 .9 .9 4 6 2. F.B. laxmang wa M/s L.N. 24 rh 23 Amkiwal Upperwalii 1 1 1 1 6.12.13 5 0 5 5 5 1 1 1 Amkial Uperwali Paid arh r Agarwal RJ - 02- W 0. 19 19 0. 0. 0. Raj Al Raiga B- SH-25Akm.24 to 8 21 21 17.2.13/1 .4 .4 2 6 8 F.B. laxmang wa M/s L.N. 25 rh 23 Banjara bas 1 5 .9 .9 6.12.13 7 0 7 3 2 5 1 1 Banjara bas paid arh r Agarwal RJ - 02- W 57 57 27 28 56 Al Mund B- Sodawas Ajarka to 2. .4 .4 17.2.13/1 .9 .8 .4 0. 2. Com Mundaw wa M/s L.N. 26 awar 21 phusi ki Dhani 1 3 3 3 6.12.13 6 6 4 3 2 3 1 1 Pushi ki Dhani p ar r Agarwal RJ - 02- W 29 29 31 33 Al B- Tijara Firojpur road to 1. .5 .5 23.2.13/2 .3 2. .6 0. 0. 1. F.B wa M/s R.K. 27 Tijara 20 Budi Baghor 1 1 9 9 2.12.13 9 0 27 6 4 8 2 1 1 Budi Baghor Paid Tijara r Const.co. RJ - 02- W 41 41 24 24 0. 1. Al Umra B- 1. .2 .2 17.2.13/1 .0 .0 3 2 1. Ahir Bas, Bhuru Bas, Bhopat ka Com Alwar wa M/s L.N. 28 in 30 Toolera to Ahir Bas 1 6 1 1 6.10.13 1 0 0 1 7 3 6 1 4 Bas, Chander Yadav Bas p Rural r Agarwal RJ - 02- W 40 40 11 18 30 0. 0. 1. BT Al Neem B- Majri-Neemrana road 1. .4 .4 25.3.13/2 .5 .5 .1 2 9 2 Don Mundaw wa M/s karan 29 rana 22 to Kundansinghpura 1 5 9 9 4.11.13 3 9 2 5 9 4 e 1 Kundansinghpura BT ar r yadav RJ - 02- W 1. 48 48 23 30 1. Al Mund B- 8 .0 .0 17.2.13/1 6. .4 .0 2 Mundaw wa M/s L.N. 30 awar 21 Majri khola to Bapdoli 1 3 7 7 6.12.13 56 5 1 5 0 0 0 1 1 Dhani bandala Bapdoli BT ar r Agarwal
7
The list of roads taken up for the study in the Jaipur district is given below for reference.
Sanction Package sanction Cost in Work Strat Work End Actual length BT in CC in Road Name Block Name length in No. lakhs from Date in Km Km Km km. Jaid mod Sanachauwad road to Kumharon ki Rj-16- dDhani Jotwara WB-44 1.4 45 26-07-2013 22-12-2014 1.525 1.475 0.05 Sarnachaud Panchayat Bhawan to Baliyon ki Rj-16- Dhani(Narika Bas) Jotwara WB-44 3.2 107 26-07-2013 22-12-2014 2.813 2.55 0.258 Rj-16- Bhambhori to Dhani Indokiya Jotwara WB-97 3.5 107.33 26-02-2014 24-09-2015 3.5 3.195 0.314 Rj-16- Begus to Saran ki Dhani Jotwara WB-17 2.41 75.61 15-01-13 23-11-2013 2.41 2.11 0.38 Rj-16- Parmanpura to Swamiyo ki Dhani Shahpura WB-30B 1.45 51.62 8/6/2014 7/2/2015 1.05 0.705 0.4 Rj-16- Blindarpur khejrali to Bagdo ki Dhani Shahpura WB-30A 1.8 46.12 1/6/2014 31-12-2015 1.17 0.8 0.37 Rj-16- Bilandarpur to Hardaka wali Dhani Shahpura WB-79 2 79.88 19-07-2014 25-11-14 2 1.7 0.3 Rj-16- Hanutpura to Gangasagar ki Dhani Shahpura WB-106 2.75 84.4 11/9/2014 10/5/2015 2.1 1.55 0.55 Rj-16- Amarsar Road to Dhani Tabawali Shahpura WB-80 2.5 89.12 21-07-2014 20-03-2015 2.5 2.06 0.44 Rj-16- Chomo Ajitgarh to Maliyo ki Dhani Shahpura WB-80 1.25 47.31 21-07-2014 20-03-2015 1.25 0.85 0.4 Rj-16- S.H.37 Devi ki talai to Narayan ki Dhani Govindgarh WB-36 1.5 55.43 26-06-2014 27-02-2015 1.27 1.23 0.04 Rj-16- Tulsipura to Swamiyo ki Shani Kotputili WB-57 4.15 128.35 19-07-2015 18-03-2016 4 3.74 0.26 Rj-16- Badnagar Bhankiri road to Shani thaloda ki Kotputili WB-51 3.05 94.51 4/8/2014 3/4/2015 2.385 1.958 0.427 Navodya Vidhyalaya Road to Macha Wali Rj-16- Dhani Kotputili WB-52 2.3 78.86 26-07-2014 25-03-2015 2.325 2.075 0.25 Rj-16- NH 8 to Dhani Dhareda ki Kotputili WB-48 1.55 58.11 26-07-2015 25-03-2016 1.535 1.385 0.15 Rj-16- Pragpura to Dhani mohandas Kotputili WB-68 3.6 114 4/8/2014 3/4/2015 3.598 3.198 0.4 Rj-16- Baislana to Mangaldas ki Dhani Kotputili WB-68 4.4 129.17 4/8/2014 3/4/2015 4.1 3.544 0.556
8
4. Methodology: For the execution of this project, the teams went to the district and collected the List of roads to be taken up for the study. Based on the information given by the State government officials the Alignment of the road is captured. For procuring the satellite data the GPS coordinates of the roads are taken and based on the year of completion the pre and post imageries of the road are procured. The image analysis is done based on the Images of Bing Maps Cartosat data procured from NRSC and other high resolution satellite data. For the analysis, the length of the road is marked from the imagery and the BT and CC portion are distinguished from the imageries based on the reflectance values and visual interpretation. The length of the road under BT and CC portion is calculated from the imageries and compared with the OMMAS data of the respective road. The width of the road is calculated from the imagery using the image processing software and the numbers of culverts constructed are captured from the imagery along with the length.
Digital Image Processing
Digital image processing is carried for the extracting information from satellite imagery. Following operations were carried for obtaining the same.
Importing Image
Images which were in the compressed format, for extracting images of IRS satellites generic binary option provided with Image Processing Software Import Tool is used. Number of Bands, data arrangement format such as BIL, BSQ, etc, rows and number of pixels such information obtained from CDINFO were used to extract image from the compressed format. Extracted images were automatically saved into ‘.img’ format compactable to Image Processing software.
Georeferencing
The images were georeferenced using tool ‘Geometric correction’ tools provided with Image Processing Software, polynomial transformation and Geographic projection with Modified Everest spheroid were used for Georeferncing. Identical points (places) were identified in image as well as in reference image (Toposheets
9 were used for inputting reference points) and georeferenced. Four ground control points (GCP) are required for first order polynomial transformation.
Subsetting Study Area
Georeferenced images were used for sub-setting the study area, Area of interest i.e., Study area was defined using vector data – Boundary, and subsetted images that covers the study area.
Image Enhancement
For improving image contrast and brightness of image enhancement process like histogram equalization were used.
Change Detection
Change detection analysis was carried out with the help of Change Detection Matrix provided with Image Processing software. By image of two different periods as input, the model automatically finds out the area where changes are happened.
5. Result and Discussion of satellite imagery based analysis:
The present study is an attempt for Generating Monitoring Progress Report of existing PMGSY Roads. In this study, the pre and post Remote Sensed Data (Temporal Imageries) is, to observe the temporal changes happened before Starting and After Completing Road Network and also for Cross Drainage Networks with Detailed Project Report (DPR).
The Satellite data for different years is procured and analyzed for the PMGSY Roads. The analysis is done by using Cartosat and other high resolution satellite data. The study area was divided into different segments based on road. Based on the satellite image analysis, the road length under Black Top and concrete Cement road were calculated and compared with the road details which is given in OMMAS. The number of culverts, road width and road alignment was verified and cross checked with the details given in the DPR.
10
5.1 Analysis of the road from Bhiwadi Road to Chandwas:
Name of Road Alwar Bhiwadi to Chandwas Name of Block K.G.Bas Habitations Covered Bhiwadi, Chandwas Year of Sanction 2013 Road Length sanctioned 0.92 km. Sanctioned Cost 36.50 Lakhs.
Actual Alignment
(a) Chandwas
(b) Bhiwadi
Satellite Image in the year of 2014
10
The snap shot of image shows the alignment of road from Alwar Bhiwadi to Chandwas.The total length of the road is 0.92 km.The entire road is divided into different segments named as A to B, B to C, C to D, and D to E etc. The road type is BT from A to B and from C to D it is CC from B to C and D to E, etc. The snap shot of the road is enclosed below:
Monitoring of Progress from the imagery E
CC CC
B C D
BT A BT
The Satellite image shows the road from A to B which is the Black Top road constructed under thePMGSY.
11
The satellite image of the year 2014
B
A
Block Top Road
The satellite image shows the road from A to B which is BT road after implementation of PMGSY as seen in the imageof February 2014.
B
A
Non Block Top Road
The Satellite image shows the road from A to Bwhich is Non BT roadbefore implementation of PMGSY, as seen in the image of February 2013.
12
B C
Concrete Cement road
The satellite image shows the road from B to C which is CC road after implementation of PMGSY as seen in the image of February 2014.
B C
Non-CC road
The Satellite image shows the road from B to C which is Non CC road before implementation of PMGSY, as seen in the image of February 2013.
13
C
Black top road
D
The satellite image shows the road from C to D which is BT road after implementation of PMGSY as seen in the image of February 2014.
C
Non-Black top road
D
The Satellite image shows the road from C to D which is Non BT road before implementation of PMGSY, as seen in the image of February 2013.
14
E
Concrete Cement road
D
The satellite image shows the road from D to E which is CC road after implementation of PMGSY as seen in the image of February 2014.
E
Non Concrete Cement road
D
The Satellite image shows the road from D to E which is Non CC road before implementation of PMGSY, as seen in the image of February 2013.
15
MONITORING PROGRESS FROM THE IMAGERY
E
0.13
0.17 B 0.09 D C
A 0.35
The above image shows that A to B is Black Top road with a length of 0.35 km, and B to Cis concrete road with a length 0.17 km, C to D is BT road with a length of0.09 km, and D to E is CC with a length of 0.13 km. The overall road length is 0.74 km in based on the Analysis of NIRDPR.
16
STATE GOVERNMENT AND NIRDPR
Bhiwadi Road to Chandwas
OMMAS NIRD & PR 1 Bhiwadi 1 Bhiwadi
Habitation connected 2 Chandwas 2 Chandwas
Road length completed in Km 0.92 0.74 BT Road- 0.55 BT Road- 0.44 CC Road- 0.37 CC Road- 0.30
Against OMMAS report of 0.92 Km, the NIRD & PR analysis showed (0.35+ 0.17+ 0.66+ 0.09+ 0.13) 0.74 Km.
The Name of the road is Alwar Bhiwadi road to Chandwas which is in KG.Bas Block, under Alwar District. This road is sanctioned in the year of 2013, where the length of the road is 0.92 km. The sanctioned cost of the road is 36.50 lakhs. The road includes both BT and CC. Bhiwadi and Chandwas habitations are interconnected by these roads.Based on OMMAS analysis, the length of the road is 0.92 km, in which BTis 0.55 km and CC is 0.37 km. Based on NIRDPR analysis, the length of the road is 0.74 km, in which BT is 0.44 km and CC is 0.30 km. The OMMAS Analysis when compared with NIRDPR is not matching.
17
5.2 Analysis of the road from Alwar Bhiwadi to Majra Ki Dhani road
Name of Road Alwar Bhiwadi to Majra Ki Dhani Road Name of Block Tijara Habitations Covered Bhiwadi, Majra Ki Dhani Year of Sanction 2013 Road Length sanctioned 3.50 km. Sanctioned Cost 84.30 Lakhs.
Actual Alignment
Alwar Bhiwadi a
Majra Ki Dhani b
The Satellite image in the year of 2013
18
The snap shot of Image shows the alignment of road from Alwar Bhiwadi to Majra Ki Dhani road in the December 2013.The total length of the road is 3.50 km. There are 2 culverts with the length of 30 m. The entire road is divided in to different segments named as A to B, B to C, C to D. The road type is BT from A to B and C to D and CC from B to C. The snap shot of the road is enclosed below:
Road Network with Culvert Location The Satellite image in the year of December 2013
Alwar Bhiwadi
30 m 1 2 30 m
Majra Ki Dhani
The above image shows the road with culverts, Alwar Bhiwadi to Majra Ki Dhani in the year of 2014.
19
Monitoring of Progress from the imagery
A
B C
Cement Concrete road
Block TopRoad
D
Satellite image in the year of 2013 The image shows Concrete cement road from B to C and Black top road from Ato B and C to D, which is the implementation of PMGSY as seen in the image, during December 2013.
20
The Satellite image shows the road from A to B which isNon Block Top Road before implementation of PMGSY during July 2012.
A
Non Block TopRoad
B
The satellite image shows that the road from A to B which isBlock top road after implementation ofduring July 2013.
A
Block TopRoad
B
21
C
Block TopRoad D
The image shows that the road from C to D which is Block top road after implementation of during July 2013.
C
Non Block TopRoad D
The Satellite image shows the road from C to D which is Non Block Top Road before implementation of PMGSY during July 2012.
22
B
Concrete CementRoad C
The Satellite image shows the road from B to C which is CC Road after implementation of PMGSY during July 2013.
B
Non-Concrete C CementRoad
The satellite image shows the road from C to D which is Non-cc road before implementation of during July 2012.
23
Temporal changes in Culvert works observed by the Satellite imagery
The snap shot given above shows the location of the non-exist culvert inDecember 2010.
1 30 m
The snap shot given above shows the location of the culvert inDecember 2013.
.
24
The snap shot given above shows the location of the non-exist culvert inDecember 2010.
2 30 m
The snap shot given above shows the location of the culvert inDecember 2013.
25
Monitoring of Progress from the imagery. A BT 0.24 B 0.40 CC C
BT 2.84
D
The above image shows that the length of the road from A to B is 0.24 km, B to C is 0.40 km, and C to D is 2.84 km. The overall road length is 3.50 km based on the analysis of NIRDPR.
26
STATE GOVERNMENT AND NIRDPR
Alwar Bhiwadi to Majra Ki Dhani
OMMAS NIRD & PR 1 Alwar Bhiwadi 1 Alwar Bhiwadi
Habitation connected 2 Majra Ki Dhani 2 Majra Ki Dhani
Road length completed in Km 3.50 3.50 BT Road- 2.90 BT Road- 3.10* CC Road- 0.60 CC Road- 0.40
Against OMMAS report of 3.50 Km, the NIRD & PR analysis showed (0.24+ 0.40+ 2.86) 3.50 km, whereBT road include the total length of two culverts with length of 30 m each.
The Name of the road is Alwar Bhiwadi to Majra Ki Dhani road which is in Tijara Block, under Alwar District. This road is sanctioned inthe year 2013, where the road length is 3.50 km. The sanctioned cost of the road is 84.30 lakhs. The road includes both BT and CC. Bhiwadi and Majra Ki Dhani habitations are interconnected by these roads. Based on OMMAS analysis, the total length of the road is 3.50 km in which BT is 2.90 km and CC is 0.60 km. Based on NIRDPR analysis, the total length of the road is3.50 km. in which BTis 3.10 km and CC is 0.40 km. The analysis of OMMAS appears to be same as NIRDPR.
5.3 Analysis of the road is Alwar Sahapura Road to Sarada Bas:
27
Name of Road Alwar Sahapura Road to Sarada Bas Name of Block Umrain Habitations Covered Sahapura, Sarada Ka Bas Year of Sanction 2013 Road Length sanctioned 2.12 Km. Sactioned Cost 50.66 Lakhs.
Actual Alignment
a
Sahapura
Sarada Ka Bas b
Satellite image in the year of 2015
The snap shot of Image shows the alignment of road from Alwar Sahapura toSarada Basin the year of 2015.The total length of the road is 2.12 km.The entire road is divided into
28 different segments named as A to B, B to C, and C to D. The road type is BT from A to B and C to D and CC from B to C. The snap shot of the road is enclosed below:
Monitoring of Progress from the imagery
A BT B
CC
Black top road
C
CC road BT
D
The satellite image shows the year of 2015
29
A
Black top road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during 2015
A
Non-Black top road
B
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during November 2013.
30
B
Concrete Cement road
C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during February 2012.
B
Non-CC road
C
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during November 2013.
31
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
C
Block Top road
D
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during November 2013.
C Non Block Top
D
32
Monitoring of Progress From the imagery
A
1.33
B 0.39
C
0.46 D
The above image shows that A to B is 1.33 km, B to C is 0.39 km, and C to D is 0.46 km. The overall road length is 2.18 km based on analysis of NIRDPR.
1.33 33
STATE GOVERNMENT AND NIRDPR
Sahapura Road to Sarada Bas
OMMAS NIRD & PR 1 Sahapura Road 1 Sahapura Road
Habitation connected 2 Sarada Bas 2 Sarada Bas
Road length completed in Km 2.12 2.18 BT Road- 1.82 BT Road- 1.79 CC Road- 0.30 CC Road- 0.39
Against OMMAS report of 2.12 Km, the NIRD & PR analysis showed (1.33+ 0.39+ 0.46) 2.18 km.
The Name of the road is Alwar Sahapura road to Sarada Bas inUmrain Block, under Alwar District. The road is sanctioned inthe year of 2013. The length of the road is 2.12 km and the sanctioned cost is 50.66 lakhs. The road includes both BT and CC. Sahapura and Saradas Ka Bas habitations are interconnected by these roads. Based on OMMAS Analysis the total length of the road is2.12 km in which BT is 1.82 km and CC is 0.30 km. Based on NIRDPR analysis the total length of the road is 2.18 km in which BT is1.79 km and CC is 0.39 km. OMMAS Analysis when compared with NIRDPR is not matching.
34
5.4 Analysis of the road from Berkhera Road to Thanawala Bas
Berkhera Road to Thanawala Bas Name of Road Umrain Name of Block Bandhwali Dhani, Dalla Ka Bas, Dher Bas, Thana Wala Bas Habitations Covered Year of Sanction 2013 Road Length sanctioned 1.40 Km. 35.82 Lakhs. Sactioned Cost
Actual Alignment The Satellite image in the year of 2015
a Thanawala
The snap shot of Image shows the alignment of road from Berkhera to Thanawala Bas in the year of 2015.The total length of the road is 1.40 km. The entire road is divided in to different segments named as A to B, B to C, C to D, and D to E , E to F, F to G, G to H, H to
35
I . The road type is BT from A to B and C to D, E to F, G to H. and CC from B to C and D to E, H to I. The snap shot of the road is enclosed below: Monitoring of Progress The Satellite image of 2015
A
B C
E D
Concrete Cement Road F
G
Black top Road H
I
The image shows Black Top road from A to B, C to D, E to F, G to H and Concrete cement road from B to C, D to E, F to G, H to I which is the implementation of PMGSY as seen in the image, during 2015.
36
A njoooooo
nnnnnnnnnnnnnnnnnnn Block Top Road B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during February 2015.
B
A Non Block Top Road
B
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during February 2012.
37
B
C
Concrete Cement road
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during February 2015.
B
C
Non Concrete Cement road
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during October 2010.
38
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
C
D Black Top Road
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during October 2010
C D
Non Black Top Road
39
The Satellite image shows the road from D to E which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
D
Concrete Cement Road
E
The Satellite image shows the road from D to E which is Non Concrete cement road before implementation of PMGSY as seen in the image during October 2010.
D
Non Concrete Cement Road
E
40
The Satellite image shows the road from E to F which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
E
Black Top Road
F
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during October 2010.
E
Block Top Road
F
41
The Satellite image shows the road from F to G which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
Concrete cement Road F
G
The Satellite image shows the road from F to G which is Non Concrete cement road before implementation of PMGSY as seen in the image during during October 2010.
F
Non Concrete cement Road
G
42
The Satellite image shows the road from G to H which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
G Black Top Road
H
The Satellite image shows the road from G to H which is Non Black Top road before implementation of PMGSY as seen in the image during October 2010.
G Non Black Top Road
H
43
The Satellite image shows the road from H to I which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
H
Concrete cement road
I
The Satellite image shows the road from H to I which is Non Concrete cement road before implementation of PMGSY as seen in the image during October 2010.
H
Non Concrete cement road
I
44
Monitoring of Progress from the imagery
A
0.44 0.05 B D C 0.08 E 0.12 0.29
F
0.11 G
0.32
H
0.05 I
The above image shows, that length from A to B is 0.44 km, and B to C is 0.08 km, C to D is 0.05 km, D to E is 0.12 km, E to F 0.29, F to G 0.11 km, G to H 0.32 km and H to I 0.05 KM. . The overall road length is 1.46 km based on the analysis of NIRDPR.
45
STATE GOVERNMENT AND NIRDPR
Berkhera Road to Thanawala Bas
OMMAS NIRD & PR 1 Berkhera Road 1 Berkhera Road
Habitation connected 2 Thanawala Bas 2 Thanawala Bas
Road length completed in Km 1.40 1.46 BT Road- 1.06 BT Road- 1.10 CC Road- 0.34 CC Road- 0.36
Against OMMAS report of 1.40 Km, the NIRD & PR analysis showed (0.44+ 0.08+ 0.05+0.12+0.29+0.11+0.32+0.05) 1.46 Km.
The Name of the road is Berkhera road to Thanawala Bas. Umrain Block, under Alwar District. The road is sanctioned the year of 2013. The lengthof the road is 1.40 km. the sanctioned the cost is 35.82 lakhs. The roads include both BT and CC roads. Bandhwali Dhani, Dalla Ka Bas, Dher Bas, and Thanawala Bashabitations are interconnected by these roads. Based on OMMAS Analysis the total length of the road is 1.40 kmin which BT 1.06 km. and CC is 0.34 km. Based on the NIRDPR analysis is 1.46 kmin which BTis 1.10 km and CC is 0.36 km. OMMAS Analysis when compared with NIRDPR is not matching.
46
5.5 Analysis of the road from Burja to Sapero ki Dhani
Burja to Sapero ki Dhani Name of Road
Umrain Name of Block
Gujar Bas, Sapero ki bas Habitations Covered
2013-2014 Year of Sanction
1.63 Km. Road Length sanctioned
42.50 Lakhs. Sactioned Cost
Actual Alignment
a Sapero Ki Dhani
The Satellite image shows the year of 2014
47
The above the image showsthat alignment of road from Burja to Sapera Ki Dhani in the year of February 2014.The total length of the road is 1.36 km.The entire road is divided in to different segements named as A to B, and C to D. The road type id BT from B to Cand CC from A to B and C to D etc. The snap shot of the road is enclosed below:
MONITORING OF PROGRESS FROM THE IMAGERY
BT CC B A
C D CC
48
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during May 2014.
MONITORING OF PROGRESS The Satellite Image of 2014
B A
Cement Concrete Road
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during February 2013.
A B
lack toproad is from B to C during February 2014
Non Cement Concrete Road
49
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during May 2014.
B
Block Top Road
C
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during 2013.
B
Non Block Top Road
C
50
The Satellite image shows the road from C to D which is Concrete cement road after implementation of PMGSY as seen in the image during June 2014.
D
Concrete Cement Road
C
The Satellite image shows the road from C to D which is Non Concrete cement road before implementation of PMGSY as seen in the image during October 2013.
D
C Non Concrete Cement Road
51
MONITORING OF PROGRESS FROM THE IMAGERY
B 0.92 A 0.38
0.72
C
D
The image shows that length of the road fromA to B is 0.29 km, and B to C is 0.38 km and C to D is 0.05 km. the overall road length is 0.742 km,based on the Analysis of NIRDPR.
52
STATE GOVERNMENT AND NIRDPR
Burja to Sapero ki Dhani
OMMAS NIRD & PR 1 Burja 1 Burja
Habitation connected 2 Sapero ki Dhani 2 Sapero ki Dhani
Road length completed in Km 1.63 0.72 BT Road- 1.33 BT Road- 0.38 CC Road- 0.30 CC Road- 0.34
Against OMMAS report of 1.63 Km, the NIRD & PR analysis showed (0.29+ 0.38+ 0.05) 0.72 km.
The Name of the road is Burja road to Sapero Ki Dhani. Umrain Block, under Alwar District.This sanctioned the year of 2013-14. Where the road length is 1.63 km. the sanctioned the cost of the road is 42.50 lakhs. The road includes both BT and CC. Gujar Bas and Sapero Ki Dhani habitations interconnected by these roads.Based on OMMAS analysis, the length of the road is 1.63 km, in which BT is 0.38 km and CC is 0.34 km. Based on NIRDPR analysis, the length of the road is 0.72 km, in which BT is 0.44 km and CC is 0.30 km.OMMAS Analysis when compared with NIRDPR is not matching.
53
5.6 Analysis of The road from Hodiyali Mod to Motibas
Hodiyali Mod to Motibas Name of Road Rajgarh Name of Block Motibas Habitations Covered
2013 Year of Sanction
2.62 Km. Road Length sanctioned 64.4 Lakhs. Sactioned Cost
Actual Alignment
(A) Khanki
30 m
(B) Motibas
Satellite image in the Year of February 2014
54
The snap shot of Image shows the alignment of road from Hodiyali Mod to Motibas in the year of 2014.The total length of the road is 2.62 km. The number of culverts is 1. The entire road is divided in to different segements named as A to B, B to C, C to D, and D to E, E to F etc. The road type id BT from A to B and C to D, E to F. and CC from B to C and D to E. The snap shot of the road is enclosed below:
Road Network with Culvert Location
Road Network with Culvert Location
30 m
Satellite Image in the Year of February 2014
55
MONITORING OF PROGRESS FROM THE IMAGERY
A
B C
Black top road
D E
Concrete Cement Road
F
Satellite image in the year of February 2014
56
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during February 2014.
A
Black top road
B
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during June 2012.
A
Non Black top road
B
57
B
Concrete Cement Road
C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during February 2014.
B
Non Concrete Cement Road
C
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during June 2012.
58
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during February 2014.
C
D
Black top road Black top road
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during June 2012.
C
D
Non-Black top road
59
The Satellite image shows the road from D to E which is Concrete cement road after implementation of PMGSY as seen in the image during February 2014.
D
cc road E
The Satellite image shows the road from D to E which is Non Concrete cement road before implementation of PMGSY as seen in the image during June 2012.
D D
E Non cc road
E
60
The Satellite image shows the road from E to F which is Black Top road after implementation of PMGSY as seen in the image during February 2014.
E
Black top road
F
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during June 2012.
E
Non-Black top road
F
61
Temporal changes in Culvert works observed by the Satellite imagery
The snap shot given above shows the location of the non-exist culvert inJune 2012.
30 m
The snap shot given above shows the location of the culvert inFebruary 2014.
62
MONITORING OFPROGRESS FROM THE IMAGERY
A A
0.95 0.72 BB
0.050.05 CC
0.74
D 0.74
0.25 D 0.25 E E
0.82 0.82
F F
This image shows that length of the road from A to B is 0.95 km, and B to C is 0.05 km, C to D is 0.74 km, D to E is 0.25 km and E to F is 0.82 km.The overall road length is 2.81 km, based on the analysis of NIRDPR.
63
STATE GOVERNMENT AND NIRDPR
Hodiyali Mod to Motibas
OMMAS NIRD & PR 1 Hodiyali Mod Hodiyali Mod
Habitation connected 2 Motibas 2 Motibas
Road length completed in Km 2.62 2.81 BT Road- 2.32 BT Road- 2.51* CC Road- 0.30 CC Road- 0.30
Against OMMAS report of 1.63 Km, the NIRD & PR analysis showed (0.95+ 0.05+ 0.74+0.25+0.82) 2.80 Km.fromBT Road length include culvert with length of 30 m.
The Name of the road is Alwar Hodiyali Mod to Motibas which is in Rajgarh Block, under Alwar District. This road sanctioned the year of 2013. Where the length of the road is 2.62 km. the sanctioned cost of the road is 64.4 lakhs. The roads include both BT and CC roads. Motibashabitation are interconnected by these roads. Based on OMMAS Analysis, the road length of the road is 2.62 km., in which BT is 2.32 km. and CC is 0.30 km. Based on NIRDPR analysis, the length of the road is 2.81 km, in which BT 2.51 km and CC is 0.30 km. include BT road Culvert Covered with 30 m. OMMAS Analysis when compared with NIRDPR is not Matching.
64
5.7 Analysis of the Road from Kamdaka to Kahadka Ki Dhani
Kamdaka to Kahadka Ki Dhani Name of Road
Kotkasim Name of Block
Bhsniya Ki Dhani, Kahadka Ki Habitations Covered
Year of Sanction 2013
1.60 Km. Road Length sanctioned
42.37 Lakhs. Sactioned Cost
Actual Alignment
aKahadka Ki
Satellite image in the year of April 2014
65
The snap shot of Image shows the alignment of road from Kamdaka toKahadka Ki in the year of 2013.The total length of the road is 1.60 km.The number of culverts is 1. The entire road is divided in to different segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from B to C and D to E and CC from A to B and C to D, etc. The snap shot of the road is enclosed below:
Road Network with Culvert Location
30 m
This image shows the road include the culvert is Kamdaka to Kahadka Ki Dhani in the year of April 2014.
66
MONITORING OF PROGRESS FROM THE IMAGERY
B
D C BT A
Concrete Cement Road
BT
Black top road
E
Satellite image in the year of 2014
This image shows Concrete cement road from A to B, C to D, and Black Top Road from B to C, and D to E.
67
C D
B A
The Satellite image shows the road from A to B and C to Dwhich is Concretecement Roadafter implementation of PMGSY as seen in the image duringApril 2014.
D C
B A
The Satellite image shows the road from A to B and C to D which is Non Concrete cement Roadbefore implementation of PMGSY as seen in the image during November 2011.
68
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during April 2014.
D
Black top road
E
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during Nov 2011.
D
Non Black top road
E
69
Temporal changes in Culvert works observed by the Satellite imagery
The snap shot given above shows the location of the non-exist culvert inNovember 2011.
30 m
The snap shot given above shows the location of the culvert inthe year of April 2014. 70
MONITORING OF PROGRESS FROM THE IMAGERY
C D 0.12 0.06 0.04 B A
1.13
E
The image shows the length of the road, from A to B is 0.06 km, and B to C is 0.12 km, C to D is 0.04 km, and D to E is 1.13 km. Then finally calculated the overall road length is 1.35 km based on the analysis of NIRDPR.
71
STATE GOVERNMENT AND NIRDPR
Kamdaka to Kahadka Ki Dhani
OMMAS NIRD & PR 1 Kamdaka 1 Kamdaka
Habitation connected 2 Kahadka Ki Dhani 2 Kahadka Ki Dhani
Road length completed in Km 1.60 1.35 BT Road- 1.25 BT Road- 1.25* CC Road- 0.35 CC Road- 0.10
Against OMMAS report of 1.60 Km, the NIRD & PR analysis showed (0.06+ 0.12+ 0.04+1.13) 1.34 Km, where BT road include the total length of one culvert with length of 30 m each.
The Name of the road is Kamdaka to Kahadka Ki Dhani road which is in Kotkasim Block, under Alwar District. This road is sanctioned in the year of 2013. Where the road length is 1.60 km. the sanctioned the cost of the road is 42.37 lakhs. The road includes both BT and CC roads. Bhsniya Ki Dhani, Kahadka Ki, habitations are interconnected by these roads. Based on OMMAS Analysis the total length of the road 1.60 km, in which BT 1.25 km. and CC is 0.35 km. Based on NIRDPR analysis the total length of the road is 1.35 km. in which BT 1.25 include one Culvert with the length of 30 m and CC is 0.10 km.The analysis of OMMAS appears to be same as NIRDPR.
72
5.8 Analysis of the Road from Mundawar Saria to Dhani Gusai
Name of Road Mundawar Saria to Dhani Gusai Name of Block Mundawar Habitations Covered Dhani Kanjar, Dhani Gusai Year of Sanction 2013 Road Length sanctioned 0.68 Km. Sactioned Cost 24 Lakhs.
Actual Alignment
eDani Gusa
Satellite image in the year of April 2015 MONITORING OF PROGRESS FROM THE IMAGERY
cc B
A BT C Concrete Cement Road Black top road
73
The snap shot of image shows the alignment of road from Mundawar Saria to Dhani Gusai. The total length of the road is 0.68 km. The entire road is divided into different segments named as A to B, B to C, C to D, and D to E etc. The road type is BT from B to C and CC from A to B. The snap shot of the road is enclosed below:
A
B
CC road
The Satellite image shows the road from B to C which is Concrete cement road before implementation of PMGSY as seen in the image during May 2015.
A Non CC road
B
The Satellite image shows the road from B to C which is Non Concrete cement road after implementation of PMGSY as seen in the image during November 2013.
74
B
BT road C
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during May 2015.
B
C Non BT road
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during November 2013.
75
MONITORING OF PROGRESS FROM THE IMAGERY
CC
A
B
0.14 BT
0.23
This image shows the road lengths are A to B is 0.14 km, and B to C is 0.23 km. The overall road length is 0.37 km in NIRDPR Based on the Analysis. C
76
STATE GOVERNMENT AND NIRDPR
Mundawar Saria to Dhani Gusai
OMMAS NIRD & PR 1 Mundawar Saria 1 Mundawar Saria
Habitation connected 2 Dhani Gusai 2 Dhani Gusai
Road length completed in Km 0.68 0.37 BT Road- 0.23 BT Road- 0.23 CC Road- 0.45 CC Road- 0.14
Against OMMAS report of 0.68 Km, the NIRD & PR analysis showed (0.14+0.23) 0.37 Km.
The Name of the road is Mundawar Saria road to Dhani Gusai which is in Mundawar Block, under Alwar District. This road sanctioned in the year of 2013. Where the road length is 0.68km.The sanctioned cost of the road is24 lakhs. The road includes both BT and CC roads. Dhani Kanjar and Dhani Gusai habitations are interconnected by these roads.Based on OMMAS Analysis the total length of the road is 0.68 km, in which BTis 0.23 km. and CC is 0.45 km. Based on NIRDPR analysis the total length of the road is 0.7 km. in which BT is 0.23 km and CC is 0.14 km. The analysis of OMMAS compared with NIRDPR is not matching.
77
5.9 Analysis of the Road from Narhent to Bhadana Ka Bas
Name of Road Narhent to Bhadana Ka Bas Name of Block Thanagazi Chokidaro Ki Dhani, Handeva Ki Dhani, Kali Pahadi Ki Habitations Covered Dhani, Year of Sanction 2013-2014 Road Length sanctioned 2.40 Km. Sactioned Cost 76.88 Lakhs.
Actual Alignment
a Narhent
Bhadana Ka Bas b
The Satellite image in the year of December 2015
78
The snap shot of Image shows the alignment of road from Narhent to Bhadana Ka Bas in the year of 2013-14. The total length of the road is 2.40 km. The number of culverts 4. The entire road is divided in to different segments named as A to B, D to E, C to D, and D to E etc. The road type id BT from A to B and C to D, E to F, G to H, and CC from B to C and D to E, I to J etc. The snap shot of the road is enclosed below:
Road Network with Culvert Locations
1 20 m
2 50 m
3 15 m
4 20 m
The Satellite Image in the year of December 2015 This image shows the road with culverts, Narhent to Bhadana Ka Bas in the year of December 2015.
79
MONITORING OF PROGRESS FROM THE IMAGERY
A
Black top road
B C
E D
G F H I Concrete cement road J
80
A
Black top road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
A A
Non Black top road
B
The SatelliteB image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
81
The Satellite image shows the road from B to C which is Concrete cement road before implementation of PMGSY as seen in the image during Dec 2015.
B
CC road
C
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during Feb 2014
B
Non CC road
C
82
The Satellite image shows the road from C to D which is Concrete cement road before implementation of PMGSY as seen in the image during Dec 2015.
C
Concrete cement Road
D
The Satellite image shows the road from C to D which is Non Concrete cement road before implementation of PMGSY as seen in the image during Feb 2014.
C
Non Concrete cement Road
D
83
The Satellite image shows the road from D to E which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
D
Block Top Road
E
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
D
E
Non Block Top Road
84
The Satellite image shows the road from E to F which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
E
Block Top Road
F
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
Non Block Top Road E F
85
The Satellite image shows the road from F to G which is Concrete cement road before implementation of PMGSY as seen in the image during Dec 2015.
F
Concrete cement Road G
The Satellite image shows the road from F to G which is Non Concrete cement road before implementation of PMGSY as seen in the image during Feb 2014.
F
Non Concrete cement Road G
86
The Satellite image shows the road from G to H which is Non Concrete cement road before implementation of PMGSY as seen in the image duringFeb 2014.
H
Non CC Road G
The Satellite image shows the road from G to H which is Concrete cement road before implementation of PMGSY as seen in the image during Dec 2015.
G
CC Road
H
87
The Satellite image shows the road from H to I which is Concrete cement road before implementation of PMGSY as seen in the image during Dec 2015.
H
CC Road
I
The Satellite image shows the road from H to I which is Non Concrete cement road before implementation of PMGSY as seen in the image duringFeb 2014.
H
I Non- CC road
88
The Satellite image shows the road from I to J which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
I
Block Top Road
J
The Satellite image shows the road from I to J which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
I
Non Block Top Road
J
89
Temporal changes in Culvert works observed by the Satellite imagery
No Culvert
The snap shot given above shows the location of the non-exist culvert inFebruary 2014.
1
20 m
The snap shot given above shows the location of the culvert inthe year of December 2015.
90
The snap shot given above shows the location of the non-exist culvert in February 2014.
2
50 m
Cross Drainage & BT Roadserved in December 2015
The snap shot given above shows the location of the culvert inthe year of December 2015.
91
MONITORING OF PROGRESS FROM THE IMAGERY
A
1.43
B 0.05 C 0.11 0.10 E D 0.09 0.05 G F H 0.06
I 0.12 0.12
J This image shows that length of road from A to B is 1.43 km, and B to C is 0.05 km, C to D is 0.10 km, and D to E is 0.11, E to F is 0.05, F to G is 0.09 km, G to H is 0.06 km, H to I is 0.12 km, I to J is 0.12 km. Then finally calculated the overall road length is 2.13 km based on the analysis ofNIRDPR.
92
STATE GOVERNMENT AND NIRDPR
Narhent to Bhadana Ka Bas
OMMAS NIRD & PR 1 Narhent 1 Narhent
Habitation connected 2 Bhadana Ka Bas Bhadana Ka Bas
Road length completed in Km 2.40 2.13 BT Road- 2.00 BT Road- 1.76 CC Road- 0.40 CC Road- 0.37
Against OMMAS report of 2.40 Km, the NIRD & PR analysis showed (1.43+0.05+0.10+0.11+0.05+0.09+0.06+0.12+0.12) 2.13 Km. BT Road length include four culvert’s with length of 20 m, 50 m, 15 m and 20 m respectively.
The Name of the road is Narhent to Bhadana Ka Bas road which is in Thanagasi Block, under Alwar District. This road sanctioned in the year of 2013-14. Where the road length is 2.40 km. whether the road thesanctioned cost of the road is 76.88 lakhs. The roads include both BT and CC roads. Chokidaro Ki Dhani, Handeva Ki Dhani, Kali Pahadi Ki Dhani, and Bhadana Ka Bas habitations are interconnected by these roads.Based on OMMAS Analysis the total length of the road is 2.40 km. Based on NIRDPR Analysis, the total length of the road is 2.00 km. in which BT is 1.76 km, and CC is 00.37 km. The analysis of OMMAS compared with NIRDPR is not matching.
93
5.10 Analysis of the Road from Newada Road to Newadi
Name of Road Newada Road to Newadi Name of Block Ramgarh Habitations Dhoop Singh Ka Bas, Grata Miyan Ka Bas,Gulid Ka Bas,Hola Ka Covered Bas,Jhuma Ka Bas,N Year of Sanction 2013 Road Length 1.30 Km. sanctioned Sactioned Cost 33.14 Lakhs.
Actual Alignment
a Newadi
Satellite Image in the Year of November 2015 The snap shot of Image shows the alignment of road from Newada Road to Newadi in the year of November 2015. The total length of the road is 1.30 km. The entire road is divided into different segments named as A to B, and B to C. The road type is BT from A to B and CC from B to C. The snap shot of the road is enclosed below:
94
MONITORING OF PROGRESS FROM THE IMAGERY
C
B
Road as shown Block Top road as seen from the image CC road BT road A
The satellite image shows the Black top road is from A to B and CC road from B to C during November 2015.
95
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
B
BT road A
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during July 2012.
B
A
Non BT road
96
C
CC road B
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
C
Non CC road
B
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during July 2012.
97
MONITORING OF PROGRESS FROM THE IMAGERY
C
0.25
B
0.95
A
This image shows that length of the road from A to B is 0.95 km, and B to C is 0.25 km. Then finally calculated the overall road length is 1.20 km. Based on the analysis of NIRDPR.
98
STATE GOVERNMENT AND NIRDPR
Newada Road to Newadi
OMMAS NIRD & PR 1 Newada Road 1 Newada Road Habitation connected 2 Newadi 2 Newadi Road length completed in Km 1.30 1.20 BT Road- 1.10 BT Road- 0.95
CC Road- 0.20 CC Road- 0.25
Against OMMAS report of 1.30 Km, the NIRD & PR analysis showed (0.95+0.25) 1.20 Km.
The Name of the road Newada Road to Newadi road in Ramgarh Block, under Alwar District. This road sanctioned in the year of 2013. The length of the road is 1.30 km. and sanctioned the cost of the road is33.14 lakhs. The road includes Both BT and CC roads. These roads interconnected the habitation is Dhoop Singh Ka Bas, Grata Miyan Ka Bas, Gulid Ka Bas, Hola Ka Bas, and Jhukam Ka Bas. Based on OMMAS Analysis the total length of the road is 1.30 km. in which BT is 1.10 km. and CC is 0.20 km. Based on NIRDPR analysis the total length of the road is 1.20 km. in which BT is 0.95 km and CC is 0.25 km. The analysis of OMMAS compared with NIRDPR is not matching.
99
5.11 Analysis of the Road fromNevada Road to Sammanpur Actual Alignment
Sammanpur a
The Satellite in the year of March 2015 The snap shot of Image shows the alignment of road from Nevada Road to Sammanpur in the year of 2015.The total length of the road is 1.30 km. The number of culverts is 2. The entire road is divided in to different segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from A to B CC from B to C etc. The snap shot of the road is enclosed below:
Road Network with Culvert Locations
80 m 1
2 15 m
Satellite Image in the Year of March 2014
100
MONITORING OF PROGRESS FROM THE IMAGERY
B
A
C
Cement Concrete Block TopRoad road
The Satellite image in the year of 2014
The above image shows Black Top road from A to B and Concrete cement Road from B to C, which is the implementation of PMGSY as seen in the image, during March 2014.
101
A
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during March 2014.
A
B
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during July 2012.
102
B
Concrete cement road
C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during March 2014.
B
Non- Concrete cement road
C
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during July 2012.
103
Temporal changes in Culvert works observed by the Satellite imagery
The snap shot given above shows the location of the non-exist culvert in July 2012
1 80 m
Cross Dr
The snap shot given above shows the location of the culvert inthe year of March 2014.
104
The snap shot given above shows the location of the non-exist culvert in July 2012.
2
15 m
The snap shot given above shows the location of the culvert inthe year of March 2014.
105
MONITORING OF PROGRESS FROM THE IMAGERY
0.30
B Block Top Road
A Non Block Top C Road
2.42
This image shows that length of the road from A to B is 2.42 km, and B to C is 0.3km. The overall road length is 2.72 km based on the analysis of NIRDPR.
106
STATE GOVERNMENT AND NIRDPR
Newada Road to Sammanpur
OMMAS NIRD & PR 1 Newada Road 1 Newada Road
Habitation connected 2 Sammanpur 2 Sammanpur
Road length completed in Km 3.00 2.72 BT Road- 2.50 BT Road- 2.42 CC Road- 0.50 CC Road- 0.30
Against OMMAS report of 3.00 Km, the NIRD & PR analysis showed (2.42+0.30) 2.72 Km.Then theBT Road include two culverts with length of 80 m & 15 m.
The Name of the road is Newada Road to Sammanpur which is in Ramgarh Block, under Alwar District. This road sanctioned in the year of 2013. Where the road length is 3.00 km. the sanctioned the road length cost is 79.76 lakhs. The road includes both BT and CC roads. These roads interconnected the habitation is Sammanpur and Goojarpur. Based on OMMAS Analysis the total length of the road 3.00 km.in which BT is 2.50 km. and CC is 0.50 km. and NIRDPR analysis the total length of the road is 2.72 km. in which BT is2.42 km and CC is 0.30 km. The analysis of OMMAS compared with NIRDPR is not matching.
107
5.12 Nitni Ka Bara - Malakhara Road to Khoti Ka Bas
Name of Road Nitni Ka Bara - Malakhara Road to Khoti Ka Bas Name of Block Umrain Habitations Covered Khoti Ka Bas Year of Sanction 2013 Road Length sanctioned 1.00 Km Sactioned Cost 25.50 Lakhs.
Actual Alignment
a Khoti Ka Bas
The Satellite image of the year May 2015
108
The snap shot of Image shows the alignment of road from Nitni Ka Bar Malakhara in the year of 2013.The total length of the road is 1.00 km.The entire road is divided in to different segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from A to B and CC from B to C.The snap shot of the road is enclosed below:
MONITORING OF PROGRESS FROM THE IMAGERY
C
Concrete Cement Road B
Black top road
A The Satellite image in the Yearof 2015
The above image shows Black Top road from A to B and Concrete cement Road from B to C, which is the implementation of PMGSY as seen in the image, during May 2015.
109
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during May 2015.
B
Black top road
A
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during November 2013.
B
Non-Black top road
A
110
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during May 2015.
C
CC road
B
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during November 2013.
C
Non CC road B 111
MONITORING OF PROGRESS FROM THE IMAGERY
C Non Block Top Road
0.22
B
Block Top Road 0.51
A The above image shows that length of the road from A to B is 0.51 km, and B to C is 0.22 km.The overall road length is 0.73 km based on the analysis of NIRDPR.
112
STATE GOVERNMENT AND NIRDPR
Nitni Ka Bara -Malakhara Road to Khoti Ka Bas
OMMAS NIRD & PR 1 Malakhara Road 1 Malakhara Road Habitation connected 2 Khoti Ka Bas 2 Khoti Ka Bas Road length completed in Km 1.00 0.73 BT Road- 0.78 BT Road- 0.51
CC Road- 0.22 CC Road- 0.22
Against OMMAS report of 1.00 Km, the NIRD & PR analysis showed (0.51+0.22) 0.73 Km.
The Name of the road is Nitni Ka Bara- Malakhara Road to Khoti Ka Bas is in Umrain Block, under Alwar District. This road sanctioned in the year of 2013. Where the road length is 1.00 km.The sanctioned cost of the road length is 25.50 lakhs. The road includes BT and CC roads. These roads interconnected the habitation is Khoti Ka Bas. Based on OMMAS Analysis the total length of the road is 1.00 km. in which BT is 0.78 km. and CC is 0.22 km. based on the NIRDPR analysis the total length of the road is 0.73 km. in which BT0.51 km and CC is 0.22 km. The analysis of OMMAS compared with the NIRDPR is not Matching.
113
5.13 Analysis of the Road From Poonkher to Ahir Bas Name of Road Poonkher to Ahir Bas Name of Block Umrain Habitations Covered Ramesh Mali ki Dhani, Sukal ka Year of Sanction 2013 Road Length sanctioned 3.00 Km. Sactioned Cost 77.18 Lakhs.
Actual Alignment
Ahir Bas a
Satellite image in the year of February 2014
114
The snap shot of Image shows the alignment of road from Poonkher toAhir Bas in the year of 2014.The total length of the road is 3.00 km.The number of culverts is 1 .The entire road is divided in to different Segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from A to B and CC from B toC. The snap shot of the road is enclosed below:
Road Network with Culvert Location
7.5 m
115
MONITORING OF PROGRESS FROM THE IMAGERY
C
B
Concrete Cement Road
BT Road
A
The above image shows Black Top road from A to B and Concrete cement Road from B to C, which is the implementation of PMGSY as seen in the image, during April 2014.
116
A
BT Road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during Feb 2014.
A
Non BT Road
B
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during Jan 2007.
117
C
B
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during Feb 2014.
C
B
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during Jan 2007.
118
Temporal Changes in Culvert worksObserved by Satellite Imagery
Pipe Culvert
The snap shot given above shows the location of the non-exist culvert inJanuary 2007
Pipe Culvert
7.5 m
The snap shot given above shows the location of the culvert inthe year of February 2014
119
MONITORING OF PROGRESS FROM THE IMAGERY
E 0.08
D
2.10
Block Top Road
C
B 0.22 0.62 Non Block Top Road
A
This image shows that length of the road from A to B is 0.62 km, and B to C is 0.22 km, C to D is 2.10 km, and D to E is 0.08 km. The overall road length is 3.00 km based on the analysis of NIRDPR.
120
STATE GOVERNMENT AND NIRDPR
Poonkher to Ahir Bas
OMMAS NIRD & PR 1 Poonkher 1 Poonkher Habitation connected 2 Ahir Bas 2 Ahir Bas Road length completed in Km 3.00 3.00 BT Road- 2.67 BT Road- 2.70
CC Road- 0.37 CC Road- 0.30
Against OMMAS report of 3.00 Km, the NIRD & PR analysis showed (0.62+0.22+2.10+0.08) 3.00Km. BT Road includes a pipe Culvert with the length of 7.5 m.
The Name of the road is Poonkher to Ahir Bas is in Umrain Block, under Alwar District. This road sanctioned in the year of 2013. Where the road length is 3.00 km.The sanctioned the cost of the road is 77.18 lakhs. The road includes both BT and CC roads. These roads interconnected the habitation is Bhiwadi and Chandwas. Based on OMMAS Analysis the total length of the road BT is 2.70 km include a pipe Culvert with the length of 7.5 m. and CC is 0.37 km. Based on the NIRDPR analysis the total length of the road is 3.00 km. in which BT is2.70 km and CC is 0.30 km. The analysis of OMMAS appears to be same as NIRDPR
121
5.14 Analysis of the Road from Poonkher to Parshadi Ka Bas
Name of Road Poonkher to Parshadi Ka Bas Name of Block Umrain Habitations Covered Dubbi Ka Bas, Gokul ka Bas, Parsadi Ka Bas Year of Sanction 2013 Road Length sanctioned 3.03 Km. Sactioned Cost 76.83 Lakhs
Actual Alignment
Parshadi Ka Bas a
The Satellite image of the year February 2014
122
The snap shot of Image shows the alignment of road from Poonkher to Parshadi Ka Bas in the year of 2014.The total length of the road is 0.03 km. The entire road is divided in to different segments named as A to B, B to C, C to D, and D to E etc. The road type id BT from B to C and CC from A to B and C to D, etc. The snap shot of the road is enclosed below:
MONITORING OF PROGRESS FROM THE IMAGERY
D
C
Concrete Cement Road
Black top road
B
A
The above image shows Black Top road from B to C and Concrete cement Road from A to B and C to D which is the implementation of PMGSY as seen in the image, during February 2014.
123
B
Concrete Cement road is from A to B during Feb 2014 A
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during Feb 2010.
B
A
The Satellite image shows the road from A to B which is Non Concrete cement road before implementation of PMGSY as seen in the image during Jan 2007.
124
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during Feb 2014
C
Black Top road
B .
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during Jan 2007.
C
Non Black Top road
B
125
MONITORING OF PROGRESS FROM THE IMAGERY
D
C 0.13
2.67
Black Top Road B
0.23 A
0.23 This image shows that length of the road from A to B is 0.23 km, B to C is 2.67 km and C to D is 0.13 km. The overall road length is 3.03 km based on the analysis of NIRDPR.
126
STATE GOVERNMENT AND NIRDPR
Poonkher to Parshadi Ka Bas
OMMAS NIRD & PR 1 Poonkher 1 Poonkher Habitation connected 2 Parshadi Ka Bas 2 Parshadi Ka Bas Road length completed in Km 3.03 3.03 BT Road- 2.68 BT Road- 2.67
CC Road- 0.35 CC Road- 0.36
Against OMMAS report of 3.03 Km, the NIRD & PR analysis showed (0.23+2.67+0.36) 3.03Km.
The Name of the road is Poonkher to Parshadi Ka Bas. Umrain Block is in under Alwar District. This road sanctioned in the year of 2013. Where the road length is 3.03 km.The sanctioned the cost of the road length is76.83 lakhs. The roads include both BT and CC roads. These roads interconnected the habitation is Dubbi Ka Bas, Gokul Ka Bas and Parshadi Ka Bas. Based on the OMMAS Analysis the total length of the road is 3.03 km. in which BT is 2.68 km. and CC is 0.35 km. Based on The NIRDPR analysis the total length of the road is 3.03 km. in which BT is 2.67 km and CC is 0.36 km. The analysis of OMMAS appears to be same as NIRDPR.
127
5.15 Analysis of The Road from Pratapgarh tala Dhola Road to Pachpadi
Name of Road Pratapgarh tala Dhola Road to Pachpadi Name of Block Umrain Habitations Covered Pachpadi Year of Sanction 2013 Road Length sanctioned 0.60 Km. Sactioned Cost 16.32 Lakhs.
Actual Alignment
a Pachapadi
The Satellite image of the year December 2015
128
The snap shot of Image shows the alignment of road from PratapgarhTala Dhola Road to Pachpadi in the year of 2013-14.The total length of the road is 0.60 km. The number of culverts is1. The entire road is divided in to different segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from B to C and D to E and CC from A to B and C to D, etc. The snap shot of the road is enclosed below:
Road Network with Culvert Location
The above image shows the road with culverts, T-05 to Domadih in the year of December 2015.
129
MONITORING OF PROGRESS FROM THE IMAGERY
A
B
Concrete Cement Road
C
D
Black top road
E satellite image in the year of 2015
The above image shows Concrete cement road from A to B, C to D and Black Top Road from B to C, D to E,which is the implementation of PMGSY as seen in the image, during December 2015.
130
B
Black top road
C
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during Dec 2015.
B
Non Black top road
C
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during Feb 2014.
131
A
CC road
B
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during Dec 2015.
A
Non CC road
B
The Satellite image shows the road from A to B which is Non Concrete cement road before implementation of PMGSY as seen in the image during during Feb 2014.
132
C
CC road D
The Satellite image shows the road from C to D which is Concrete cement road after implementation of PMGSY as seen in the image during Dec 2015.
C
D Non CC road
The Satellite image shows the road from C to D which is Non Concrete cement road before implementation of PMGSY as seen in the image during during Feb 2014
133
D
Black top road
E
The Satellite image shows the road from D to E which is Black Top road after implementation of PMGSY as seen in the image during Dec 2015.
D
Non Black top road
E
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during Feb 2014.
134
Temporal changes in Culvert works observed by the Satellite imagery
The snap shot given above shows the location of the non-exist culvert inFebruary 2014
10 m
The snap shot given above shows the location of the culvert inthe year of December 2015
135
MONITORING OF PROGRESS FROM THE IMAGERY
A
B
Non Black top road as seen from the image
C
D
Black top road as seen from the image
E
This image shows that length of the road from A to B is 0.08 km, and B to C is 0.18 km, C to D is 0.10 km, and D to E is 0.20 km. The overall road length is 0.56 km based on the analysis of NIRDPR.
136
STATE GOVERNMENT AND NIRDPR
Pratapgarh tala Dhola Road to Pachpadi
OMMAS NIRD & PR 1 Pratapgarh tala Dhola 1 Pratapgarh tala Dhola road road Habitation connected 2 Pachpadi 2 Pachpadi Road length completed in Km 0.60 0.56 BT Road- 0.45 BT Road- 0.38
CC Road- 0.15 CC Road- 0.18
Against OMMAS report of 0.60 Km, the NIRD & PR analysis showed (0.08+0.18+0.10+0.20) 0.56Km.BT road include a culvert with length of 10 m.
The Name of the road is Pratapgarh tala Dhola road to Pachpadi is in Umrain Block, under Alwar District. This road sanctioned in the year of 2013-14. Where the road length is 0.60 km. the road sanctioned the cost is 16.32 lakhs. The roads include both BT and CC roads. These roads interconnected the habitation is Pachpadi. Based on OMMAS Analysis the total length of the road is 0.60 km. in which BT is 0.45 km. and CC is 0.15 km. Based on NIRDPR analysis the total length of the road is 0.56 km. covered by BT 0.38 km and CC is 0.18 km. The analysis of OMMAS compared with NIRDPR is not matching.
137
5.16 Analysis of the Road from Sawadi Road to Sukal Ka Bas Name of Road Sawadi Road to Sukal Ka Bas Name of Block Umrain Habitations Covered Sukal Ka Bas, Ahir Bas, Ramesh Mali ki Dhani Year of Sanction 2013 Road Length sanctioned 1.55 Km. Sactioned Cost 48.50 Lakhs.
Actual Alignment
a
Sukal Ka Bas
The Satellite image in the year of June 2014
138
The snap shot of Image shows the alignment of road from Sawadi Road toSukal Ka Bas in the year of 2014.The total length of the road is 1.55 km. The number of culverts is 1. The entire road is divided in to different Segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from B to C and D to E, and E to G. and CC from A to B and C to D, and E to F etc. The snap shot of the road is enclosed below:
Road Network with Culvert Location
20 m
139
MONITORING OF PROGRESS FROM THE IMAGERY
E F D
C G
Concrete Cement Road
Black top road
B
Satellite image in the year of 2014.
A
The above image shows Concrete cement road from A to B, C to D, E to F and Black Top Road from B to C, D to E, F to Gwhich is the implementation of PMGSY as seen in the image, during June 2014.
140
B
CC road
A
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during June 2014.
B
Non- CC road
A
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during November 2013.
141
E F BT road
D G
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during June 2014.
F E Non BT road
D
G
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during November 2013.
142
Temporal changes in Culvert works observed by the Satellite imagery
The snap shot given above shows the location of the non-exist culvert inNovember 2013.
20 m
The snap shot given above shows the location of the culvert inthe year of June 2014.
143
MONITORING OF PROGRESS FROM THE IMAGERY
F E 0.18 D 0.03 MONITORING OF PROGRESS 0.04 C
G 0.06
0.78
B
0.35
A
This image shows the A to B is Cement concrete roadwith a length of 0.35 km, and B to C is BT road 0.78 km, C to D is Cement Concrete road with 0.06 km, and D to E is BT road with0.18 km, E to F is Cement Concrete roadwith 0.04 km and F to G is BT road with0.03 km. The overall road length is 1.44 km based on the analysis of NIRDPR.
144
STATE GOVERNMENT AND NIRDPR
Sawadi Road to Sukal Ka Bas
OMMAS NIRD & PR
1 Sawadi road 1 Bhiwadi Habitation connected 2 Sukal Ka Bas 2 Sukal Ka Bas Road length completed in Km 1.55 1.44 BT Road-1.1 BT Road- 0.99
CC Road- 0.45 CC Road- 0.45
Against OMMAS report of 1.55 Km, the NIRD & PR analysis showed(0.35+0.78+0.06+0.18+0.04+0.03) 1.44Km.BT Road include a culvert with length of 20 m.
The Name of the road is Sawadi road to Sukal Ka Bas is in Umrain Block, under Alwar District. This road sanctioned in the year of 2013. Where the road length is 1.55 km. the road sanctioned the cost is 36.50 lakhs. The road includes both BT and CC roads. These roads interconnected the habitation is Sukal Ka Bas, Ahir Bas and Ramesh Malik Dhani.Based on OMMASanalysis the total length of the road is 1.55 km. in which BTis 1.10 km. and CC is 0.45 kmin which NIRDPRanalysis the total length of the road is 1.44 km. BT is 0.99 km and CC is 0.45 km.The analysis of OMMAS compared with NIRDPR is not matching.
145
5.17 Analysis of the Road from SH-25A Km.29 to Amkiwal Upperwali Name of Road SH-25A Km.29 to Amkiwal Upperwali Name of Block Rajgarh Habitations Covered Amkiwal Upperwali Year of Sanction 2013 Road Length sanctioned 2.10 Km. Sactioned Cost 53.81 Lakhs.
Actual Alignment
Aamkiwal a
Satellite Image in the Year of Feb 2014
146
The snap shot of Image shows the alignment of road from SH 25 A Km 29 to Amkiwal Upperwali in the year of 2014.The total length of the road is 2.10 km. The number of culverts is 1. The entire road is divided in to different segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from A to B and CC from B to C and D to E.The snap shot of the road is enclosed below:
Road Network with Culvert Location
30 m
The above image shows the road with culvert, T-05 to Domadih in the year of February 2014.
147
MONITORING OF PROGRESS FROM THE IMAGERY
A
Black top road
B
Concrete Cement Road
C The Satellite image in the year of 2014
The above image shows Black Top road from A to B and Concrete cement Road from B to C, which is the implementation of PMGSY as seen in the image, during February 2014.
148
A
Black top road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during Feb 2014.
A
Non Black top
road
B
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during during Jan 2007.
149
B
CC road
C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image Feb 2014.
B
Non CC road
C
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image Jan 2007.
150
Temporal changes in Culvert works observed by the Satellite imagery
The snap shot given above shows the location of the non-exist culvert inJanuary 2007.
30 m
The snap shot given above shows the location of the culvert inthe year of February 2014.
151
MONITORING OF PROGRESS FROM THE IMAGERY
A
0.71
B
0.26
C
The above image shows that length of the road from A to B is BT road from the length of 0.71 km, and B to C is concrete road 0.26 km.The overall road length is 0.74 km based on the analysis of NIRDPR.
152
STATE GOVERNMENT AND NIRDPR
SH-25A km. 29 to Amkiwal Upperwali
OMMAS NIRD & PR
1 SH-25A km.29 1 SH-25A km.29 Habitation connected 2 Amkiwal Upperwali 2 Amkiwal Upperwali Road length completed in Km 2.10 0.97 BT Road- 1.65 BT Road- 0.71
CC Road- 0.45 CC Road- 0.26
Against OMMAS report of 2.10 Km, the NIRD & PR analysis showed (0.71+0.26) 0.97Km.BT Road include a culvert with length of 30 m.
The Name of the road is SH-25A.km.29 and Amkiwal Upperwali is in Raigarh Block, under Alwar District. This road sanctioned in the year of 2013. Where the road length is 2.10 km.The sanctioned the cost of the length is53.81 lakhs. The roads include both BT and CC roads. These roads interconnected the habitation is Amkiwal and Upperwali. completed in based on OMMAS analysis the total length of the road is 2.10 km. in which BT is 1.65 km include with the length of culvert is 30 m, and CC is 0.45 km. Based on NIRDPR analysis the total length of the road is 0.97 km. in which BT is 0.71 km and CC is 0.26 km.The Analysis of OMMAS Analysis compared with NIRDPR is not matching.
153
5.18 Analysis of the Road from Sodawas Ajarka to Phushi Ki Dhani Name of Road Sodawas Ajarka ti to Phushi Ki Dhani Name of Block Mundawar Habitations Covered Phushi Ki Dhani Year of Sanction 2013 Road Length sanctioned 2.30 km. Sactioned Cost 57.43 Lakhs.
Actual Alignment
a Phoosa Ki Dhanai
The Satellite image in the year of May 2015
154
The snap shot of Image shows the alignment of road from Sodawas Ajarka to Pushi Ki Dhani in the year of 2014.The total length of the road is 2.30 km. The entire road is divided in to different segments named as A to B, B to C, C to D, and D to E etc. The road type id BT from B to C and CC from A to B. The snap shot of the road is enclosed below:
MONITORING OF PROGRESS FROM THE IMAGERY
A
B Concrete Cement Road
Black top road
C The Satellite image in theyear of 2015
155
B
Black top road
C
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during May 2015.
B
Non Black top road
C
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during Nov 2013.
156
A
CC road
B
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during May 2015.
A
Non CC road
B
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during Nov 2013.
157
MONITORING OF PROGRESS FROM THE IMAGERY
A 0.30
B
1.87
C
The above image shows the A to B is Concrete cement road from the length of 0.30 km, and B to C is BT road with 1.87 km. The overall road length is 2.17 km based on analysis of NIRDPR
158
STATE GOVERNMENT AND NIRDPR
Sodawas Ajarka to Phushi Ki Dhani
OMMAS NIRD & PR
1 Sodawa Ajarka 1 Sodawa Ajarka Habitation connected 2 Phushi Ki Dhani 2 Phushi Ki Dhani Road length completed in Km 2.30 2.17 BT Road- 2.00 BT Road- 1.87
CC Road- 0.30 CC Road- 0.30
Against OMMAS report of 2.30 Km, the NIRD & PR analysis showed (0.30+1.87) 2.17Km.
The Name of the road is Sodawa Ajarka road to Phushi Ki Dhani which is in Mundawar Block, under Alwar District. The roadwas sanctioned in the year 2013.The road length is 2.30 km. the road sanctioned the cost is 57.43 lakhs. The roads include both BT and CC roads. These roads interconnected the habitation is Pushi Ki Dhani. Based on OMMAS analysis the total length of the road is 2.30 km. covered by BT is 2.00 km and CC is 0.30 km. Based on the NIRDPR analysis the total length of the road is 0.74 kmin which BTis 0.44 km and CC is 0.30 km.The OMMAS Analysis when compared with NIRDPR is not matching.
159
5.19 Analysis of the road from Tijara Firajpur Road to Budi Baghor:
Name of Road Tijara Firojpur Road to Budi Baghor Name of Block Tijara Habitations Covered Budi Baghor Year of Sanction 2013 Road Length sanctioned 1.20 km. Sactioned Cost 29.59 Lakhs.
Actual Alignment
a Budi Baghor
Satellite image in the year of November 2013.
160
The snap shot of Image shows the alignment of road Tijara Firajpur to Budi Baghor in the year of 2013.The total length of the road is 1.20 km.The entire roads is divided in to different segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from A to B and and CC from B to C, etc. The snap shot of the road is enclosed below:
MONITORING OF PROGRESS FROM THE IMAGERY
A
Black top road as seen from the image
B
C Concrete Cement Road as shown
The Satellite image in the year of 2013
161
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during November 2013.
B
Black top road
A
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during July 2012.
B
Non-Black top road
A
162
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during November 2013.
B
Concrete Cement road
C
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during July 2012.
B
Non- CC road
C
163
MONITORING OF PROGRESS FROM THE IMAGERY
A
0.70
B
0.30
C
The above image shows the A to B is BT road with a length of 1.25 km, and B to C is concrete road with 0.30 km. The overall road length is 1.00 km based on the analysis of NIRDPR.
164
STATE GOVERNMENT AND NIRDPR
Tijara Firojpur Road to Budi Baghor
OMMAS NIRD & PR
1 Tijara Firajpur 1 Tijara Firajpur Habitation connected 2 Budi Baghor 2 Budi Baghor Road length completed in Km 1.20 1.00 BT Road- 0.80 BT Road- 0.70
CC Road- 0. 40 CC Road- 0.30
Against OMMAS report of 1.20 Km, the NIRD & PR analysis showed (0.70+0.30) 1.00Km.
The Name of the road is Tijara Firajpur road to Budi Baghor which is in Tijara Block, under Alwar District. The road was sanctioned in the year of 2013. The road length is 1.20 km. The road sanctioned the cost is 29.59 lakhs. The roads includes both BT and CC roads. Budi Baghor habitations are interconnected by these roads. Based on OMMAS Analysis the total length of the road is 1.20 km. in which BT is 0.80 km and CC is 0.40 km. Based on NIRDPR analysis the total length of the road is 1.00 km. in which BTis 0.70 km and CC is 0.30 km.The OMMAS Analysis when compared with NIRDPR is not matching.
165
5.20 Analysis of the road from Toolera Road to Ahir Bas:
Name of Road Toolera Road to Ahir Bas Name of Block Umarain Habitations Covered Ahir Bas, Bhuru Bas, Bhopat Ka Bs, Chander Yadav Bas, Year of Sanction 2013 Road Length sanctioned 1.60 km. Sactioned Cost 41.21 Lakhs.
Actual Alignment
Ahir Bas a
The Satellite Image in the year of June 2014.
166
The snap shot of Image shows the alignment of road from Toolera Road to Ahir Bas in the year of 2014.The total length of the road is 1.60 km. The entire road is divided in to different segements named as A to B, B to C, C to D, and D to E etc. The road type id BT from B to C and D to E and CC from A to B and C to D etc. The snap shot of the road is enclosed below:
MONITORING OF PROGRESS FROM THE IMAGERY
A
Concrete Cement Road B
Black top road
E C D
Satellite image in the year of 2014
167
A
CC road
B
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during June 2014.
A
Non CC road
B
The Satellite image shows the road from A to B which is Non Concrete cement road before implementation of PMGSY as seen in the image during May 2013.
168
B
Black top road
C
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during June 2014.
B
Non Black top road
C
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during May 2013.
169
The Satellite image shows the road from C to D which is Concrete cement road after implementation of PMGSY as seen in the image during June 2014.
C
D
CC road
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during May 2013.
C
Non CC road
D
170
E
Black top road
D
The Satellite image shows the road from D to E which is Black Top road after implementation of PMGSY as seen in the image during June 2014.
E
Non Black top road D
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during May 2013.
171
MONITORING OF PROGRESS FROM THE IMAGERY
A
0.21
B
0.44
E 0.08 0.13 C D
The above image shows that length of the road fromB to C is 0.44 km,D to E is 0.08 km. and A to B is 0.21 km, and C to D is 0.13 km.The overall road length is 0.86 km based on the analysis of NIRDPR .
172
STATE GOVERNMENT AND NIRDPR
Toolera to Ahir Bas
OMMAS NIRD & PR
1 Toolera 1 Toolera Habitation connected 2 Ahir Bas 2 Ahir Bas Road length completed in Km 1.60 0.86 BT Road- 1.23 BT Road- 0.52
CC Road- 0.37 CC Road- 0.34
Against OMMAS report of 1.60 Km, the NIRD & PR analysis showed (0.21+0.44+0.13+0.08) 0.86Km.
The Name of the road is Toolera road to Ahir Bas which is in Umrain Block, under Alwar District. The road was sanctioned in the year of 2013. The road length is 1.60 km. The sanctioned cost of the road is 41.21 lakhs. The roads includeboth BT and CC roads. Ahir Bas, Bhuru Bas, Bhopat Ka Bas, Chander Yadav Bas habitations are interconnected by these roads.Based on OMMAS analysis the total length of the road is 1.60 kmin which BTis 1.23 km and CC is 0.37 km. Based on NIRDPR analysis the total length of the road is0.86 kmin which BTis 0.52 km and CC is 0.32 km.The OMMAS Analysis when compared with NIRDPR is not matching.
173
5.21 Analysis of the road from Amarsar road to Dhani Tabawali:
Name of Road Amarsar road to Dhani Tabawali Name of Block Shahpura Habitations Covered Dhani Tabawali Year of Sanction 2014 Road Length sanctioned 2.5 km. Sanctioned Cost 89.12 Lakhs.
Actual Alignment
(a) Dhani Tabawali
Satellite Image in the Year of 2015
The snap shot of Image shows the alignment of road from Amarsar road to Dhani Tabawali in November 2015.The total length of the road is 2.50 km. The entire road is divided in to different segments named as A to B, B to C, C to D. D to E, E to F, F to G, D to H, H to I and E to J. The road type is BT from A to B, C to D, D to E, E
174 to F, D to H, E to J and CC from B to C, F to G, H to I. The snap shot of the road is enclosed below:
Monitoring of Progress from the imagery
J G I F H Black Top Road E D C
B
Concrete cement Road
A
Satellite image in the year of 2015
Black Top road from A to B, C to D, D to E, E to F, D to H, E to J and Concrete Cement road from B to C, F to G, H to I. which is the implementation of PMGSY as seen in the image, during 2015.
175
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014. B
Non-Black Top Road
A
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
B
Black Top Road
A
176
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
C
B Non-Concrete cement Road
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
C
B
Concrete cement Road
177
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
D
C
Non-Black Top Road
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
D
C
Black Top Road
178
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
E
Non-Black Top Road D
The Satellite image shows the road from D to E which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
E
D
Black Top Road
179
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
F
E
Non-Black Top Road
The Satellite image shows the road from E to F which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
F
E
Black Top Road
180
The Satellite image shows the road from F to G which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
G
F Non-Concrete cement Road
The Satellite image shows the road from F to G which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
G
F
Concrete cement Road
181
The Satellite image shows the road from D to H which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
H
Non-Black Top Road
D
The Satellite image shows the road from D to H which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
H
Black Top Road
D
182
The Satellite image shows the road from H to I which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
I
H
Non-Concrete cement Road
The Satellite image shows the road from H to I which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
I
H
Concrete cement Road
183
The Satellite image shows the road from E to J which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
J
Non-Black Top Road
E
The Satellite image shows the road from E to J which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
J
Black Top Road
E
184
Monitoring of Progress from the imagery
J G 0.14 0.20 I F 0.03 H 0.15 E 0.17 D 0.32 0.30 C 0.46
B
A
The above image shows that A to B is Black Top road with the length of 0.73 km, B to C is Concrete Cement road with the length of 0.46 km, C to D is Black Top road with the length of 0.30 km, D to E is Black Top road with the length of 0.31 km, E to F is Black Top road with the length of 0.15 km, F to G is Concrete Cement road with the length of 0.14 km, D to H is Black Top Road with the length of 0.17 km, H to I is Concrete Cement Road with the length of 0.03 km, and E to J is Black Top road with the length of 0.20 km. The overall road length is 2.50 km based on the Analysis of NIRDPR.
185
STATE GOVERNMENT AND NIRDPR
Amarsar Road to Dhani Tabawali
OMMAS NIRD & PR
1 Amarsar Road 1 Amarsar Road Habitation connected 2 Dhani Tabawali 2 Dhani tabawali Road length completed in Km 2.50 2.50 BT Road- 2.06 BT Road- 1.87
CC Road- 0.44 CC Road- 0.63
Against OMMAS report of 2.50 Km, the NIRD & PR analysis showed (0.73+0.46+0.30+0.32+0.15+0.14+0.17+0.03+0.20) 2.50 km.
The Name of the road is Amarsar Road to Dhani Tabawali which is in Shahpura Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 2.50 km. The sanctioned cost of the road is 89.12 lakhs. The road includes both BT and CC. Dhani Tabawali habitations are interconnected by these roads. Based on OMMAS analysis, the total length of the road is 2.50 km in which BT is 2.06 km and CC is 0.44 km. Based on NIRDPR analysis, the total length of the road is 2.50 km. in which BT is 1.87 km and CC is 0.63 km. OMMAS Analysis when compared with NIRDPR is same appear.
186
5.22 Analysis of the road from Badnagar Bhankiri road to Dhani Thaloda ki: Name of Road Badnagar Bhankiri Road to Dhani Thaloda ki Name of Block Kotputili Habitations Covered Dhani Thaloda ki Year of Sanction 2013-14 Road Length sanctioned 3.05 km. Sanctioned Cost 94.51 Lakhs.
Actual Alignment
(b) Dhani Thaloda ki
Satellite Image in the Year of December 2015
187
The snap shot of Image shows the alignment of road from Badnagar Bhankiri road to Dhani Thaloda ki in the December 2015.The total length of the road is 3.050 km. The entire road is divided in to different segments named as A to B, B to C, C to d and D to E. The road type is CC from A to B, C to D and BT from B to C, D to E. The snap shot of the road is enclosed above:
Monitoring of Progress from the imagery
E D
C
Concrete cement Road
Black Top Road
B
A
Satellite image in the year of 2015 The above image shows Concrete cement road from A to B, C to D and Black Top Road from B to C, D to E. which is the implementation of PMGSY as seen in the image, during 2015.
188
The Satellite image shows the road from A to B which is Non Concrete cement road before implementation of PMGSY as seen in the image during February 2014.
B
Non-Concrete cement Road
A
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
B
Concrete cement Road
A
189
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
C
Non-Black Top Road
B
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
C
Black Top Road
B
190
The Satellite image shows the road from C to D which is Non Concrete cement road before implementation of PMGSY as seen in the image during February 2014.
D
Non-Concrete cement Road
C
The Satellite image shows the road from C to D which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
D
Concrete cement Road C
191
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014. E
Non-Black Top Road
D
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during December 2015. E
Black Top Road
D
192
Monitoring of Progress from the imagery.
E D
C
B
A
The above image shows that A to B is CC road with the length of 0.24 km, B to C is BT road with the length of 1.61 km, C to D is CC road with the length of 0.16 km and D to E is BT road with the length of 0.36 km. The overall road length is 2.37 km based on the Analysis of NIRDPR.
193
STATE GOVERNMENT AND NIRDPR
Badnagar Bhankiri Road to Dhani Thaloda ki
OMMAS NIRD & PR 1 Badnagar Bhankiri 1 Badnagar Bhankiri Road Road Habitation connected 2 Dhani Thaloda ki 2 Dhani Thaloda ki Road length completed in Km 2.385 2.370 BT Road- 1.958 BT Road- 1.97
CC Road- 0.427 CC Road- 0.40
Against OMMAS report of 2.385 Km, the NIRD & PR analysis showed (0.24+1.61+0.16+0.36) 2.370 km.
The Name of the road is Badnagar Bhankiri Road to Dhani thaloda ki which is in Kotputili Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 3.05 km. The sanctioned cost of the road is 94.51 lakhs. The road includes both BT and CC. Dhani Thaloda ki habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 2.385 km in which BT is 1.958 km and CC is 0.427 km. Based on NIRDPR Analysis, the total length of the road is 2.370 km. in which BT is 1.97 km and CC is 0.40 km. OMMAS Analysis when compared with NIRDPR is not matching.
194
5.23 Analysis of the road from Baisana to Mangaldas ki Dhani: Name of Road Baisana to Mangaldas ki Dhani Name of Block Kotputili Habitations Covered Mangaldas ki Dhani Year of Sanction 2013-14 Road Length sanctioned 4.40 km. Sanctioned Cost 129.17 Lakhs.
Actual Alignment
(a) Mangaldas ki Dhani
Satellite Image in the Year of December 2015 The snap shot of Image shows the alignment of road from Baislana to Mangaldas ki dhani in the December 2015. The total length of the road is 4.4 km. The
195 entire road is divided in to different segments named as A to B, B to C, C to D and D to E. The road type is BT from A to B, C to D and CC from B to C, D to E. The snap shot of the road is enclosed below: Monitoring of Progress from the imagery
A C B
Concrete Cement road
Black Top Road
D E
Satellite image in the year of 2015
The above image shows Black top road from A to B, C to D and Concrete cement Road from B to C, D to E. which is the implementation of PMGSY as seen in the image, during December 2015.
196
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during February 2014.
B
Non-Concrete Cement Road C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
B
Concrete cement C Road
197
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
C
Non-Black Top Road
D
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
C
Black Top Road
D
198
Monitoring of Progress from the imagery.
A C B
0.08 D E
The above image shows that A to B is BT road with the length of 0.05 km, B to C is CC road with the length of 0.15 km, C to D is BT road with length of 3.51 km and D to E is CC road with length of 0.08 km. the overall road length is 3.79 km based on the Analysis of NIRDPR.
199
STATE GOVERNMENT AND NIRDPR
Baisana to Mangaldas ki Dhani
OMMAS NIRD & PR
1 Baisana 1 Baisana Habitation connected 2 Mangaldas ki Dhani 2 Mangaldas ki Dhani Road length completed in Km 4.1 3.79 BT Road- 3.544 BT Road- 3.56
CC Road- 0.556 CC Road- 0.23
Against OMMAS report of 4.1 Km, the NIRD & PR analysis showed (0.05+0.15+3.51+0.08) 3.79 km.
The Name of the road is Baislana to Mangaldas ki Dhani which is in Kotputili Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 4.4 km. The sanctioned cost of the road is 129.17 lakhs. The road includes both BT and CC. Mangaldas ki Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 4.1 km in which BT is 3.544 km and CC is 0.556 km. Based on NIRDPR Analysis, the total length of the road is 3.79 km. in which BT is 3.56 km and CC is 0.23 km. OMMAS Analysis when compared with NIRDPR is not matching.
200
5.24 Analysis of the road from Begus to Saran ki Dhani: Name of Road Begus to Saran ki Dhani Name of Block Jotwara Habitations Covered Saran ki Dhani Year of Sanction 2013-14 Road Length sanctioned 2.41 km. Sanctioned Cost 75.61 Lakhs.
Actual Alignment
(a) Saran ki Dhani
Satellite Image in the Year of 2015
The snap shot of image shows the alignment of road from Begus to Saran ki Dhani in the October 2015.The total length of the road is 2.41 km. The entire road is divided into different segments named as A to B, B to C, C to D. D to E, E to F, F to G, G to H, H to I and I to J. The road type is BT from A to B, C to D, E to F, G to H, I to J and CC from B to C, D to E, F to G, H to I. The snap shot of the road is enclosed below:
201
Monitoring of Progress from the imagery.
J
Concrete Cement road H I F G
E D
C B Black Top Road
A
Satellite image in the year of 2015
The above image shows Black top road from A to B, C to D, E to F, G to H, I to J and Concrete cement Road from B to C, D to E, F to G, H to I, which is the implementation of PMGSY as seen in the image, during October 2015.
202
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during May 2013.
B
Non- Black Top road
A
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during June 2015.
B
Black Top road
A
203
The Satellite image shows the road from B to C which is Non Concrete Cement road before implementation of PMGSY as seen in the image during May 2013.
C
B
Non- Concrete Cement road
The Satellite image shows the road from B to C which is Concrete Cement road after implementation of PMGSY as seen in the image during June 2015.
Concrete Cement road C
B
204
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during May 2013.
D
Non-Black Top road C
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during June 2015.
D
Black Top road
C
205
The Satellite image shows the road from D to E which is Non Concrete Cement road before implementation of PMGSY as seen in the image during May 2013.
E D
Non-Concrete Cement road
The Satellite image shows the road from D to E which is Concrete Cement road after implementation of PMGSY as seen in the image during June 2015.
E
D
Concrete Cement road
206
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during May 2013.
F
Non-Black Top road E
The Satellite image shows the road from E to F which is Black Top road after implementation of PMGSY as seen in the image during June 2015.
F
Black Top road E
207
The Satellite image shows the road from F to G which is Non Concrete Cement road before implementation of PMGSY as seen in the image during May 2013.
G F
Non-Concrete Cement road
The Satellite image shows the road from F to G which is Concrete Cement road after implementation of PMGSY as seen in the image during June 2015.
G
F
Concrete Cement road
208
The Satellite image shows the road from G to H which is Non Black Top road before implementation of PMGSY as seen in the image during May 2013.
H
G
Non-Black Top road
The Satellite image shows the road from G to H which is Black Top road after implementation of PMGSY as seen in the image during June 2015.
H
G
Black Top road
209
The Satellite image shows the road from F to G which is Non Concrete Cement road before implementation of PMGSY as seen in the image during May 2013.
I H
Non-Concrete Cement road
The Satellite image shows the road from F to G which is Concrete Cement road after implementation of PMGSY as seen in the image during June 2015.
I
H
Concrete Cement road
210
The Satellite image shows the road from I to J which is Non Black Top road before implementation of PMGSY as seen in the image during May 2013.
J
Non-Black Top road I
The Satellite image shows the road from I to J which is Black Top road after implementation of PMGSY as seen in the image during June 2015.
J
Black Top road I
211
Monitoring of Progress from the imagery.
J H I F G
E D
B C
A
The above image shows that A to B is BT road with the length of 0.39 km, B to C is CC road with the length of 0.07 km, C to D is BT road with length of 0.80 km and D to E is CC road with length of 0.10 km, E to F is BT road with the length of 0.42 km, F to G is CC road with the length of 0.05 km, G to H is BT road with length of 0.15 km and H to I is CC road with length of 0.09 km and I to J is BT road with the length of 0.38 km. the overall road length is 2.45 km based on the Analysis of NIRDPR.
212
STATE GOVERNMENT AND NIRDPR
Begus to Saran ki Dhani
OMMAS NIRD & PR
1 Begus 1 Begus Habitation connected 2 Saran ki Dhani 2 Saran ki Dhani Road length completed in Km 2.41 2.45 BT Road- 2.11 BT Road- 2.14
CC Road- 0.38 CC Road- 0.31
Against OMMAS report of 2.41 Km, the NIRD & PR analysis showed (0.39+0.07+0.80+0.10+0.42+0.05+0.15+0.09+0.38) 2.45 km.
The Name of the road is Begus to Saran ki Dhani which is in Jotwara Block, under Jaipur District. This road was sanctioned in the year 2012-13, where the road length is 2.41 km. The sanctioned cost of the road is 75.61 lakhs. The road includes both BT and CC. Saran ki Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 2.41 km in which BT is 2.11 km and CC is 0.38 km. based on NIRDPR Analysis, the total length of the road is 2.45 km in which BT is 2.14 km and CC is 0.31 km. OMMAS Analysis when compared with NIRDPR is not matching.
213
5.25 Analysis of the road from Bhambhori to Dhani Indokiya:
Name of Road Bhambhori to Dhani Indokiya Name of Block Jotwara Habitations Covered Dhani Indokiya Year of Sanction 2013-14 Road Length sanctioned 3.5 km. Sanctioned Cost 107.33 Lakhs.
Actual Alignment
(a) Dhani Indokiya
Satellite Image in the Year of October 2015
214
The snap shot of Image shows the alignment of road from Bhambhori to Dhani Indokiya in the October 2015. The total length of the road is 3.5 km. The entire road is divided in to different segments named as A to B, B to C, C to D, D to E, E to F, F to G and G to H. The road type is BT from A to B, C to D, E to F, G to H and CC from B to C, D to E, F to G. The snap shot of the road is enclosed below: Monitoring of Progress from the imagery.
A
Concrete Cement road
B C Black TopRoad D E
G F H
Satellite image in the year of 2015
The above image shows Black Top road from A to B, C to D, E to F, G to H and Concrete cement Road from B to C, D to E, F to G, which is the implementation of PMGSY as seen in the image, during October 2015.
215
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during January 2015. A
Non- Black Top road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during October 2015. A
Black Top road
B
216
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2015.
B
Non- Concrete cement road
C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during October 2015.
B
Concrete cement road
C
217
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during January 2015.
C
Non-Black Top road
D
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during October 2015.
C
Black Top road
D
218
The Satellite image shows the road from D to E which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2015.
D Non-Concrete cement Road
E
The Satellite image shows the road from D to E which is Concrete cement road after implementation of PMGSY as seen in the image during October 2015.
D
Concrete cement Road E
219
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during January 2015.
E
Non-Black Top road
F
The Satellite image shows the road from E to F which is Black Top road after implementation of PMGSY as seen in the image during October 2015.
E
Black Top road
F
220
The Satellite image shows the road from F to G which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2015.
G F
Non-Concrete cement Road
The Satellite image shows the road from F to G which is Concrete cement road after implementation of PMGSY as seen in the image during October 2015.
G F
Concrete cement Road
221
The Satellite image shows the road from G to H which is Non Black Top road before implementation of PMGSY as seen in the image during January 2015.
G
Non-Black Top road
H
The Satellite image shows the road from G to H which is Black Top road after implementation of PMGSY as seen in the image during October 2015.
G
Black Top road
H
222
Monitoring of Progress from the imagery.
A
B C
D E
G F H
The above image shows that A to B is BT road with the length of 1.78 km, B to C is CC road with the length of 0.10 km, C to D is BT road with length of 0.33 km and D to E is CC road with length of 0.15 km, E to F is BT road with the length of 0.68 km, F to G is CC road with the length of 0.06 km and G to H is BT road with length of 0.40 km. the overall road length is 3.5 km based on the Analysis of NIRDPR.
223
STATE GOVERNMENT AND NIRDPR
Bhambhori to Dhani Indokiya
OMMAS NIRD & PR
1 Bhambhori 1 Bhambori Habitation connected 2 Dhani Indokiya 2 Dhani Indokiya Road length completed in Km 3.5 3.5 BT Road- 3.19 BT Road- 3.19
CC Road- 0.31 CC Road- 0.31
Against OMMAS report of 3.5 Km, the NIRD & PR analysis showed (1.78+0.10+0.33+0.15+0.68+0.06+0.40) 3.5 km.
The Name of the road is Bhambhori to dhani Indokiya which is in Jotwara Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 3.5 km. The sanctioned cost of the road is 107.33 lakhs. The road includes both BT and CC. Dhani Indokiya habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 3.5 km in which BT is 3.19 km and CC is 0.31 km. Based on NIRDPR Analysis, the total length of the road is 3.5 km. in which BT is 3.19 km and CC is 0.31 km. OMMAS Analysis when compared with NIRDPR is matching.
224
5.26 Analysis of the road from Blindarpur to Hardaka wali Dhani: Name of Road Blindarpur to Hardaka wali Dhani Name of Block Shahpura Habitations Covered Hardaka wali Dhani Year of Sanction 2013-14 Road Length sanctioned 2.00 km. Sanctioned Cost 79.88 Lakhs.
Actual Alignment
(a) Haradaka wali Dhani
Satellite Image in the Year of December 2015 The snap shot of Image shows the alignment of road from Bilandarpur to Hardaka wali Dhani in the December 2015.The total length of the road is 2.00 km. The entire road is divided in to different segments named as A to B and B to C, C to d and D to E. The road type is BT from A to B, C to D and CC from B to C, D to E. The snap shot of the road is enclosed above
225
Monitoring of Progress from the imagery.
E
D
A Block Top Road
B
C Concrete Cement road
Satellite image in the year of 2015
The above image shows Black Top road from A to B, C to D and Concrete cement Road from B to C, D to E, which is the implementation of PMGSY as seen in the image, during December 2015.
226
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during April 2013.
Non-Black Top road A
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
A Black Top road
B
227
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during April 2013.
B
C Non Concrete cement road
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
Concrete cement road B
C
228
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during April 2013. D
Non-Black Top road
C
The Satellite image shows the road from C to D, which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
D
Black Top road
C
229
The Satellite image shows the road from D to E which is Non Concrete cement road before implementation of PMGSY as seen in the image during April 2013.
E
D
Non Concrete cement road
The Satellite image shows the road from D to E which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
E
D
Concrete cement road
230
Monitoring of Progress from the imagery.
E 0.04 D
A
B
C
The above image shows that A to B is BT road with the length of 0.28 km, B to C is CC road with the length of 0.40 km, C to D is BT road with the length of 1.28 km, D to E is CC road with the length of 0.04 km. The overall road length is 2.00 km based on the Analysis of NIRDPR.
231
STATE GOVERNMENT AND NIRDPR
Bilandarpur to Hardaka wali Dhani
OMMAS NIRD & PR
1 Bilandarpur 1 Bilandarpur Habitation connected 2 Hardaka wali Dhani 2 Hardaka Wali Dhani Road length completed in Km 2.00 2.00 BT Road- 1.7 BT Road- 1.56
CC Road- 0.3 CC Road- 0.44
Against OMMAS report of 2.00 Km, the NIRD & PR analysis showed (0.28+0.40+1.28+0.04) 2.00 km.
The Name of the road is Bilandarpur to Hardaka wali Dhani which is in Shahpura Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 2.00 km. The sanctioned cost of the road is 79.88 lakhs. The road includes both BT and CC. Hardaka wali Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 2.00 km in which BT is 1.7 km and CC is 0.3 km. Based on NIRDPR Analysis, the total length of the road is 2.00 km. in which BT is 1.56 km and CC is 0.44 km. OMMAS Analysis when compared with NIRDPR is matching.
232
5.27 Analysis of the road from Blindarpur Khejrali to Bagdo ki Dhani: Name of Road Blindarpur Khejrali to Bagdo ki Dhani Name of Block Shahpura Habitations Covered Bagdo ki Dhani, Bural Year of Sanction 2013-14 Road Length sanctioned 1.8 km. Sanctioned Cost 46.12 Lakhs.
Actual Alignment
(a) Bagdo ki Dhani
(b) Bural
Satellite Image in the Year of December 2015
The snap shot of Image shows the alignment of road from Blindarpur Khejrali to Bagdo ki Dhani in the December 2015.The total length of the road is 1.17 km. The entire road is divided in to different segments named as A to B and B to C. The road
233 type is CC from A to B and BT from B to C. The snap shot of the road is enclosed above: Monitoring of Progress.
C
Cement Concrete road Black Top Road
B A
Satellite image in the year of 2015
The above image shows CC Road from A to B, and Black Top Road from B to C, which is the implementation of PMGSY as seen in the image, during December 2015.
234
The Satellite image shows the road from A to B which is Non Concrete cement road before implementation of PMGSY as seen in the image during April 2013.
Non-Concrete Cement road
A B
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
Concrete Cement road
A B
235
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during April 2013. C
Non-Black Top road
B
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during December 2015. C
Black Top road
B
236
Monitoring of Progress from the imagery.
C
A B
The above image shows that A to B is CC road with the length of 0.36 km, B to C is BT road with the length of 0.81. The overall road length is 1.17 km based on the Analysis of NIRDPR.
237
STATE GOVERNMENT AND NIRDPR
Blindarpur Khejrali to Bagdo ki Dhani
OMMAS NIRD & PR
1 Blindarpur Khejrali 1 Blindarpur Khejrali Habitation connected 2 Bagdo ki Dhani 2 Bagdo ki Dhani Road length completed in Km 1.17 2.18 BT Road- 0.80 BT Road- 0.81
CC Road- 0.37 CC Road- 0.36
Against OMMAS report of 1.17 Km, the NIRD & PR analysis showed (0.36+0.81) 1.17 km.
The Name of the road is Blindarpur khejrali to Bagdo ki Dhani which is in Shahpura Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 1.8 km. The sanctioned cost of the road is 46.12 lakhs. The road includes both BT and CC. Bagdo ki Dhani and Bural habitations are interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 1.17 km in which BT is 0.80 km and CC is 0.37 km. Based on NIRDPR Analysis, the total length of the road is 1.17 km in which BT is 0.81 km and CC is 0.36 km. OMMAS Analysis when compared with NIRDPR is same appear.
238
5.28 Analysis of the road from Chomo Ajitgarh to Maliyo ki Dhani: Name of Road Chomo Ajitgarh to Maliyo ki Dhani Name of Block Shahpura Habitations Covered Maliyo ki Dhani Year of Sanction 2013-14 Road Length sanctioned 1.250 km. Sanctioned Cost 47.31 Lakhs.
Actual Alignment
(a) Maliyo ki Dhani
Satellite Image in the Year of November 2015 The snap shot of Image shows the alignment of road from Chomo Ajitgarh to Maliyo ki Dhani in the November 2015. The total length of the road is 1.250 km. The entire road is divided in to different segments named as A to B, B to C, C to D, D to E and E to F and D to G. The road type is BT from A to B, C to D, D to E and CC from B to C, E to F, D to G. The snap shot of the road is enclosed below:
239
Monitoring of Progress.
F
E
Black Top Road
D G C B
Concrete Cement road A
Satellite image in the year of 2015
The above image shows Black Top Road from A to B, C to D, D to E and Concrete Cement Road from B to C, E to F, D to G, which is the implementation of PMGSY as seen in the image, during November 2015.
240
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
B Non-Black Top road
A
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
B Black Top road
A
241
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
Non-Concrete Cement D road
B
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
Concrete Cement road C
B
242
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
D
Non-Black Top road
C
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
D Black Top road
C
243
The Satellite image shows the road from D to G which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
Non-Concrete Cement road D
G
The Satellite image shows the road from D to G which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
Concrete Cement road
D
G
244
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014. E
Non-Black Top road
D
The Satellite image shows the road from D to E which is Black Top road after implementation of PMGSY as seen in the image during November 2015. E
Black Top road
D
245
The Satellite image shows the road from E to F which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
F
Non-Concrete Cement E road
The Satellite image shows the road from D to G which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
F Concrete Cement road
E
246
Monitoring of Progress from the imagery.
F
E
D G C B
A
The above image shows that A to B is BT road with the length of 0.39 km, B to C is CC road with the length of 0.08 km and C to D is BT road with the length of 0.11 km, D to E is BT road with length of 0.37 km and E to F is CC road with length of 0.07 km and D to G is CC road with the length of 0.23 km. The overall road length is 1.25 km based on the Analysis of NIRDPR.
247
STATE GOVERNMENT AND NIRDPR
Chomo Ajitgarh to Maliyo ki Dhani
OMMAS NIRD & PR
1 Chomo Ajitgarh 1 Chomo Ajitgarh Habitation connected 2 Maliyo ki Dhani 2 Maliyo ki Dhani Road length completed in Km 1.25 1.25 BT Road- 0.850 BT Road- 0.87
CC Road- 0.450 CC Road- 0.38
Against OMMAS report of 1.25 Km, the NIRD & PR analysis showed (0.39+0.08+0.11+0.37+0.07+0.23) 2.96 km.
The Name of the road is Chomo Ajitgarh to maliyo ki Dhani which is in Shahpura Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 1.25 km. The sanctioned cost of the road is 47.31 lakhs. The road includes both BT and CC. Maliyo ki Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 1.25 km in which BT is 0.850 km and CC is 0.40 km. Based on NIRDPR Analysis, the total length of the road is 1.25 km. in which BT is 0.87 km and CC is 0.38 km. OMMAS Analysis when compared with NIRDPR is Same appear.
248
5.29 Analysis of the road from Hanutpura to Gangasagar ki Dhani: Name of Road Hanutpura to Gangasagar ki Dhani Name of Block Shahpura Habitations Covered Hanutpura, Gangasagar ki Dhani Year of Sanction 2013-14 Road Length sanctioned 2.75 km. Sanctioned Cost 84.40 Lakhs.
Actual Alignment
(a) Hanutpura
(b) Gangasagar ki Dhani
Satellite Image in the Year of November 2015
249
The snap shot of Image shows the alignment of road from Hanutpura to Gangasagar ki Dhani in the November 2015.The total length of the road is 2.1 km. The entire road is divided in to different segments named as A to B, B to C, C to D, B to E and C to F. The road type is CC from A to B, B to C and BT from B to E, C to F, C to D. The snap shot of the road is enclosed below: Monitoring of Progress from the imagery
Concrete Cement road A
B C
D
E
Black Top Road
F
Satellite image in the year of 2015 The image shows Concrete cement road from A to B, B to C and Black Top Road from B to E, C to F, C to D, which is the implementation of PMGSY as seen in the image, during November 2015.
250
The Satellite image shows the road from A to B which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
Non-Concrete Cement A road
B
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
Concrete Cement road A
B
251
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
Non-Concrete Cement road B
C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during November 2015.
Concrete Cement road B
C
252
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
C Non Black Top road
D
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
Black Top road C
D
253
The Satellite image shows the road from B to E which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
B
Non-Black Top road
E
The Satellite image shows the road from B to E which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
B
Black Top road
E
254
The Satellite image shows the road from C to F which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
C
Non-Black Top road
F
The Satellite image shows the road from C to F which is Black Top road after implementation of PMGSY as seen in the image during November 2015.
C
Black Top road
F
255
Monitoring of Progress from the imagery.
A
0.18 B C 0.15 D
E
F
The above image shows that A to B is CC road with the length of 0.34 km, B to C is CC road with the length of 0.18 km and C to D is BT road with the length of 0.15 km, B to E is BT road with length of 0.46 km and C to F is BT road with length of 0.99 km. The overall road length is 2.12 km based on the Analysis of NIRDPR.
256
STATE GOVERNMENT AND NIRDPR
Hanutpura to Gangasagar ki Dhani
OMMAS NIRD & PR
1 Hanutpura 1 Hanutpura Habitation connected 2 Gangasagar ki Dhani 2 Gnagasagar ki Dhani Road length completed in Km 2.10 2.12 BT Road- 1.55 BT Road- 1.60
CC Road- 0.55 CC Road- 0.52
Against OMMAS report of 2.10 Km, the NIRD & PR analysis showed (0.34+0.18+0.15+0.46+0.99) 2.12km.
The Name of the road is Hanutpura to Gangasagar ki Dhani which is in Shahpura Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 2.75 km. The sanctioned cost of the road is 84.4 lakhs. The road includes both BT and CC. Hanutpura and Gangasagar ki Dhani habitations are interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 2.10 km in which BT is 1.55 km and CC is 0.55 km. Based on NIRDPR Analysis, the total length of the road is 2.12 km. in which BT is 1.60 km and CC is 0.52 km. OMMAS Analysis when compared with NIRDPR is not matching.
257
5.30 Analysis of the road from Jaid mod Sanachauwad Road to Kumharon ki Dhani: Name of Road Jaid mod to Kumharon ki Dhani Name of Block Jotwara Habitations Covered KUmharon ki Dhani Year of Sanction 2013-14 Road Length sanctioned 1.4 km. Sanctioned Cost 45 Lakhs.
Actual Alignment
(a) Kumharon ki Dhani
Satellite Image in the Year of October 2015 The snap shot of Image shows the alignment of road from Jaid mod Sanachauwad road to Kumharon ki Dhani in the October 2015.The total length of the road is 1.52 km. The entire road is divided in to different segments named as A to B, B to C, C to D, D to E and D to F. The road type is CC from B to C and Black Top Road from A to B, C to D, D to E, D to F. The snap shot of the road is enclosed below:
258
Monitoring of Progress.
F
Concrete Cement road A
B C E D
Black Top Road
Satellite image in the year of 2015
The image shows Concrete cement road from B to C and Black Top Road from A to B, C to D, D to E, D to F, which is the implementation of PMGSY as seen in the image, during October 2015.
259
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during November 2014.
A
B
Non-Black Top road
The Satellite image shows the road from A to B which is Block Top road after implementation of PMGSY as seen in the image during June 2015.
A
B
Black Top road
260
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during November 2014.
Non-Concrete Cement road
B
C
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during June 2015.
B
C
Concrete Cement road
261
The Satellite image shows the road from C to D to E which is Non Black Top road before implementation of PMGSY as seen in the image during November 2014.
F
Non-Black Top road
C
D E
The Satellite image shows the road from C to D to E, which is Black Top road after implementation of PMGSY as seen in the image during June 2015.
F
Black Top road
C
D E
262
Monitoring of Progress from the imagery.
F
A
B C E D
The above image shows that A to B is BT road with the length of 0.70 km, B to C is CC road with the length of 0.10 km, C to D is BT road with the length of 0.12 km, D to E is BT road with length of 0.18 km and D to F is BT road with length of 0.42 km. The overall road length is 1.52 km based on the Analysis of NIRDPR.
263
STATE GOVERNMENT AND NIRDPR
Jaid mod Sanachauwad Road to Kumharon ki Dhani
OMMAS NIRD & PR
1 Jaid mod 1 Jaid mod Habitation connected 2 Kumharon ki Dhani 2 Kumharon ki Dhani Road length completed in Km 1.52 1.52 BT Road- 1.47 BT Road- 1.42
CC Road- 0.05 CC Road- 0.10
Against OMMAS report of 1.52 Km, the NIRD & PR analysis showed (0.70+0.10+0.12+0.18+0.42) 1.52 km.
The Name of the road is Jaid mod Sanauchawad road to Kumharon ki Dhani which is in Jotwara Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 1.4 km. The sanctioned cost of the road is 45 lakhs. The road includes BT and CC road. Kumharon ki Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 1.52 km in which BT is 1.47 km and CC is 0.05 km. Based on NIRDPR Analysis, the total length of the road is 1.52 km in which BT is 1.42 km and CC is 0.10 km. OMMAS Analysis when compared with NIRDPR is same appear.
264
5.31 Analysis of the road from Tulsipura to Swamiyo ki Dhani:
Name of Road Tulsipura to Swamiyo ki Dhani Name of Block Kotputili Habitations Covered Swamiyo ki Dhani Year of Sanction 2013-14 Road Length sanctioned 4.15 km. Sanctioned Cost 128.35 Lakhs.
Actual Alignment
Swamiyo ki Dhani (a)
Satellite Image in the Year of 2015
The snap shot of Image shows the alignment of road from Tulsipura to Swamiyo ki Dhani in December 2015.The total length of the road is 4.15 km. The entire road is divided in to different segments named as A to B, B to C, C to D, D to E and E to F. The road type is BT from A to B, C to D, E to F and CC from B to C, D to E. The snap shot of the road is enclosed below:
265
Monitoring of Progress from the imagery
B Black Top Road A C
D E
Concrete Cement F Road
Satellite image in the year of 2015
The above image shows Black Top road from A to B, C to D, E to F, and Concrete Cement road from B to C, D to E, which is the implementation of PMGSY as seen in the image, during 2015.
266
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
A
Non-Black Top Road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
A
Black Top Road
B
267
The Satellite image shows the road from B to C which is Non Concrete Cement road before implementation of PMGSY as seen in the image during February 2014.
B C
Non-Concrete Cement Road
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
C B
Concrete Cement Road
268
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
D Non-Black Top Road
C
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
D
C Black Top Road
269
The Satellite image shows the road from D to E which is Non Concrete Cement road before implementation of PMGSY as seen in the image during February 2014.
D
Non-Concrete Cement Road
E
The Satellite image shows the road from D to E which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
D
Concrete Cement Road E
270
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
E
Non-Black Top Road F
The Satellite image shows the road from E to F which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
E
F
Black Top Road
271
Monitoring of Progress from the imagery
0.03 C A B 0.42 1.5
D E 0.23 1.82
F
The above image shows that A to B is Black Top road with the length of 0.42 km, B to C is Concrete Cement road with the length of 0.03 km, C to D is Black Top road with the length of 1.50 km, D to E is Concrete Cement road with the length of 0.23 km, E to F is Black Top road with the length of 1.82 km. The overall road length is 4.00 km based on the Analysis of NIRDPR.
272
STATE GOVERNMENT AND NIRDPR
Tulsipura to Swamiyo ki Dhani
OMMAS NIRD & PR
1 Tulsipura 1 Tulsipura Habitation connected 2 Swamiyo ki Dhani 2 Swamiyo ki Dhani Road length completed in Km 4.00 4.00 BT Road- 3.74 BT Road- 3.74
CC Road- 0.26 CC Road- 0.26
Against OMMAS report of 4.00 Km, the NIRD & PR analysis showed (0.42+0.03+1.50+0.23+1.82) 4.00 km.
The Name of the road is Tulsipura to Swamiyo ki Dhani which is in Kotputili Block, under Jaipur District. This road was sanctioned in the year 2014-15, where the road length is 4.00 km. The sanctioned cost of the road is 128.35 lakhs. The road includes both BT and CC. Swamiyo ki Dhani habitation is interconnected by these roads. Based on OMMAS analysis, the total length of the road is 4.00 km in which BT is 3.74 km and CC is 0.26 km. Based on NIRDPR analysis, the total length of the road is 4.00 km. in which BT is 3.74 km and CC is 0.26 km. OMMAS Analysis when compared with NIRDPR is same appear.
273
5.32 Analysis of the road from Sarnachaud Panchayat Bhawan to Baliyon ki Dhani: Name of Road Sarnachaud Panchayat Bhawan to Baliyon ki Dhani Name of Block Jotwara Habitations Covered Balaiyo ki Dhani, Kasva ki Dhani Year of Sanction 2013-14 Road Length sanctioned 3.2 km. Sanctioned Cost 107 Lakhs.
Actual Alignment
kasva ki dhani (b)
(a) Balaiyo ki dhani
Satellite Image in the Year of 2015 The snap shot of Image shows the alignment of road from Sarnachaud Panchayat bhawan to Baliyon ki dhani in the June 2015.The total length of the road is 3.20 km. The entire road is divided in to different segments named as A to B, B to C, C to d and D to E. The road type is CC from A to B, C to D and BT from B to C, D to E. The snap shot of the road is enclosed above:
274
Monitoring of Progress from the imagery
C Concrete Cement Road D B
A Black Top Road
Satellite image in the year of 2015
The above image shows Concrete Cement road from B to C and Black Top Road from A to B and C to D. which is the implementation of PMGSY as seen in the image, during 2015.
275
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during March 2013. B
Non-Black Top Road
A
The Satellite image shows the road from A to B which Black Top road after implementation of PMGSY as seen in the image during December 2015.
B
Black Top Road
A
276
The Satellite image shows the road from B to C which is Non Concrete Cement road before implementation of PMGSY as seen in the image during February 2014.
C B
Non Concrete Cement Road
The Satellite image shows the road from B to C which Concrete Cement Road after implementation of PMGSY as seen in the image during October 2015.
C
B
Concrete Cement Road
277
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during November 2014. D
C
Non Black Top Road
The Satellite image shows the road from C to D which is Black Top road before implementation of PMGSY as seen in the image during October 2015.
D
C Black Top Road
278
Monitoring of Progress from the imagery.
D B C
A
The above image shows that A to B is BT road with the length of 2.43 km, B to C is CC road with the length of 0.25 km and C to D is BT road with the length of 0.09 km The overall road length is 2.8 km based on the Analysis of NIRDPR.
279
STATE GOVERNMENT AND NIRDPR
Sarnachaud Panchayat bhawan to Baliyon ki dhani
OMMAS NIRD & PR Sarnachaud Panchayat Sarnachaud Panchayat bhawan bhawan 1.balaiyo ki dhani, 1.balaiyo ki dhani, Habitation connected 2.kasva ki dhani 2.kasva ki dhani Road length completed in Km 2.8 2.77 BT Road- 2.55 BT Road- 2.52
CC Road- 0.25 CC Road- 0.25
Against OMMAS report of 2.8 Km, the NIRD & PR analysis showed (2.43+0.09+0.25) 2.77 km.
The Name of the road is Sarnachaud Panchayat bhawan to Baliyon ki dhani Road which is in Jotwara Block, under Jaipur District. This road was sanctioned in the year 2013- 14, where the road length is 3.2 km. The sanctioned cost of the road is 107 lakhs. The road includes both BT and CC. Kasva ki Dhani, Balaiyo ki Dhani habitations are interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 2.8 km in which BT is 2.55 km and CC is 0.25 km. Based on NIRDPR Analysis, the total length of the road is 2.770 km. in which BT is 2.52 km and CC is 0.25 km. OMMAS Analysis when compared with NIRDPR is not matching.
280
5.33 Analysis of the road from Pragpura to Dhani Mohandas: Name of Road Pragpura to Dhani Mohandas Name of Block Kotputili Habitations Covered Pragpura,Dhani Mohan das Year of Sanction 2013-14 Road Length sanctioned 3.6 km. Sanctioned Cost 114 Lakhs.
Actual Alignment
(b) Dhani Mohandas
(c) Pragpura
Satellite Image in the Year of December 2015 The snap shot of Image shows the alignment of road from Pragpura to Dhani Mohandas in the December 2015. The total length of the road is 3.6 km. The entire road is divided in to different segments named as A to B, B to C, C to D, D to E and E to F. The road type is BT from B to C, D to E and CC from A to B, C to D and E to F. The snap shot of the road is enclosed below:
281
Monitoring of Progress from the imagery
A Concrete Cement road
D B A F C E
Black Top Road
Satellite image in the year of 2015
The above image shows Concrete cement Road from A to B, C to D, E to F and Black Top Road from B to C, D to E. which is the implementation of PMGSY as seen in the image, during December 2015.
282
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
E
D
Non- Black Top Road
The Satellite image shows the road from D to E which is Black Top road before implementation of PMGSY as seen in the image during December 2015.
Black Top Road E
D
283
The Satellite image shows the road from E to F which is Non Concrete Cement road before implementation of PMGSY as seen in the image during February 2014.
F
Non Concrete Cement Road
E
The Satellite image shows the road from E to F which is Concrete Cement road after implementation of PMGSY as seen in the image during December 2015.
F
Concrete Cement Road
E
284
Monitoring of Progress from the imagery.
A
D F B A E C
The above image shows that A to B is CC road with the length of 0.297 km, B to C is BT road with the length of 0.91 km, C to D is CC road with length of 0.066 km and D to E is BT road with length of 2.231 km. The overall road length is 3.56 km based on the Analysis of NIRDPR.
285
STATE GOVERNMENT AND NIRDPR
Pragpura to Dhani Mohandas
OMMAS NIRD & PR
1 Pragpura 1 Pragpura Habitation connected 2 Dhani Mohandas 2 Dhani Mohandas Road length completed in Km 3.598 3.56 BT Road- 3.198 BT Road- 3.144
CC Road- 0.4 CC Road- 0.416
Against OMMAS report of 3.59 Km, the NIRD & PR analysis showed (0.297+0.913+0.066+2.231+0.053) 3.56 km.
The Name of the road is Pragpura to dhani Mohandas which is in Kotputili Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 3.6 km. The sanctioned cost of the road is 114 lakhs. The road includes both BT and CC. Dhani Mohandas habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 3.59 km in which BT is 3.198 km and CC is 0.4 km. Based on NIRDPR Analysis, the total length of the road is 3.56 km. in which BT is 3.144 km and CC is 0.416 km. OMMAS Analysis when compared with NIRDPR is not matching.
286
5.34 Analysis of the road from NH 8 to Dhani Dhareda ki: Name of Road NH 8 to Dhani Dhareda ki Name of Block Kotputili Habitations Covered Dhani Dhareda ki Year of Sanction 2014-15 Road Length sanctioned 1.55 km. Sanctioned Cost 58.11 Lakhs.
Actual Alignment
(b) Dhani Dhareda Ki
Satellite Image in the Year of 2015
The snap shot of image shows the alignment of road from NH 8 to Dhani Dhareda ki in the December 2015.The total length of the road is 1.55 km. The entire road is divided into different segments named as A to B, and B to C. The road type is BT from A to B, C to D and CC from B to C, D to E. The snap shot of the road is enclosed below:
287
Monitoring of Progress from the imagery.
Cement E D Concrete road C
Block Top Road
B A
Satellite image in the year of 2015
The above image shows Black top road from B to C, D to E and Concrete Cement Road from A to B, C to D, which is the implementation of PMGSY as seen in the image, during December 2015.
288
The Satellite image shows the road from A to B which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2014.
B
A Non- Concrete Cement road
The Satellite image shows the road from A to B which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
B
A
Concrete Cement road
289
The Satellite image shows the road from B to C which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
C
Non- Black Top road
B
The Satellite image shows the road from B to C which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
C
Black Top road
B
290
The Satellite image shows the road from C to D which is Non Concrete cement road before implementation of PMGSY as seen in the image during December 2012.
C
D Non-Concrete Cement road
The Satellite image shows the road from C to D which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
C
D
Concrete Cement road
291
The Satellite image shows the road from D to E which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
D
E
Non-Black Top road
The Satellite image shows the road from D to E which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
D
E Black Top road
292
Monitoring of Progress from the imagery.
E 0.285 D 0.077 C
B
A
The above image shows that A to B is CC road with the length of 0.097 km, B to C is BT road with the length of 1.069 km, C to D is CC road with length of 0.077 km and D to E is BT road with length of 0.285 km. the overall road length is 1.53 km based on the Analysis of NIRDPR.
293
STATE GOVERNMENT AND NIRDPR
NH 8 to Dhani Dhareda ki
OMMAS NIRD & PR
1 NH 8 1 NH 8 Habitation connected 2 Dhani Dhareda ki 2 Dhani Dhareda ki Road length completed in Km 1.53 1.53 BT Road- 1.38 BT Road- 1.36
CC Road- 0.15 CC Road- 0.17
Against OMMAS report of 1.53 Km, the NIRD & PR analysis showed (0.11+ 1.069+0.06+0.28) 1.53 km.
The Name of the road is NH 8 to Dhani Dhareda ki which is in Kotputili Block, under Jaipur District. This road was sanctioned in the year 201-15, where the road length is 1.55 km. The sanctioned cost of the road is 58.11 lakhs. The road includes both BT and CC. Dhani Dhareda ki habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 1.53 km in which BT is 1.38 km and CC is 0.15 km. based on NIRDPR Analysis, the total length of the road is 1.53 km. in which BT is 1.36 km and CC is 0.17 km. OMMAS Analysis when compared with NIRDPR is matching.
294
5.35 Analysis of the road from Navodya Vidhalaya Road to Macha wali Dhani: Name of Road Navodya Vidhyalaya Road to Macha Wali Dhani Name of Block Kotputili Habitations Covered Macha Wali Dhani Year of Sanction 2013-14 Road Length sanctioned 2.3 km. Sanctioned Cost 78.86 Lakhs.
Actual Alignment
(b) Macha Wali dhani
Satellite Image in the Year of December 2015 The snap shot of Image shows the alignment of road from Navodya Vidhyalaya Road to Macha Wali dhani in the December 2015.The total length of the road is 2.3 km. The entire road is divided in to different segments named as A to B, B to C, C to D, D to E, E to F and F to G. The road type is BT from A to B, C to D, E to F and CC from B to C, D to E, F to G. The snap shot of the road is enclosed below:
295
Monitoring of Progress from the imagery.
G
F Black Top Road
D E
B C
Cement Concrete A road
Satellite image in the year of 2015
The above image shows Black Top road from A to B, C to D, E to F and Concrete cement Road from B to C, D to E, F to G, which is the implementation of PMGSY as seen in the image, during December 2015.
296
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during January 2014.
B Non- Black Top road
A
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
B Black Top road
A
297
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during January 2015.
Non- Concrete cement road
C
B
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during December 2015.
Concrete cement road C
B
298
The Satellite image shows the road from C to D which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
Non-Black Top road D
C
The Satellite image shows the road from C to D which is Black Top road after implementation of PMGSY as seen in the image during December 2015.
D Black Top road
C
299
The Satellite image shows the road from E to F which is Non Black Top road before implementation of PMGSY as seen in the image during February 2014.
Non Black top Road
F
E
The Satellite image shows the road from E to F which is Black top road after implementation of PMGSY as seen in the image during December 2015.
Black Top Road
F
E
300
The Satellite image shows the road from F to G which is Non Concrete Cement road before implementation of PMGSY as seen in the image during January 2014.
G
Non Concrete Cement Road
F
The Satellite image shows the road from F to G which is Concrete Cement road before implementation of PMGSY as seen in the image during December 2015.
G
Concrete Cement Road
F
301
Monitoring of Progress from the imagery.
G 0.0683 F
0.970 D E
C B A
The above image shows that A to B is BT road with the length of 0.207 km, B to C is CC road with the length of 0.146 km, C to D is BT road with length of 0.843 km, D to E is CC road with length of 0.015 km, E to F is BT road with length of 0.970 km and F to G is CC road with length of 0.068 km. The overall road length is 2.252 km based on the Analysis of NIRDPR.
302
STATE GOVERNMENT AND NIRDPR
Navodya Vidhyalaya Road to Macha Wali Dhani
OMMAS NIRD & PR
1 Navodya Vidhyalaya 1 Navodya Vidhyalaya Habitation connected 2 Macha Wali dhani 2 Macha Wali dhani Road length completed in Km 2.325 2.252 BT Road- 2.075 BT Road- 2.020
CC Road- 0.25 CC Road- 0.229
Against OMMAS report of 2.325 Km, the NIRD & PR analysis showed (0.207+0.146+0.843+0.015+0.970+0.068) 2.252 km.
The Name of the road is Navodya Vidhyalaya Road to Macha Wali Dhani which is in Kotuputili Block, under Jaipur District. This road was sanctioned in the year 2013- 14, where the road length is 2.3 km. The sanctioned cost of the road is 78.86 lakhs. The road includes both BT and CC. Macha Wali Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 2.32 km in which BT is 2.075 km and CC is 0.25 km. Based on NIRDPR Analysis, the total length of the road is 2.25 km. in which BT is 2.02 km and CC is 0.22 km. OMMAS Analysis when compared with NIRDPR is not matching.
303
5.36 Analysis of the road from S.H.37 Devi ki Talai to Narayan ki Dhani: Name of Road S.H.37 Devi ki Talai to Narayan ki Dhani Name of Block Govindgarh Habitations Covered Narayan ki Dhani Year of Sanction 2013-14 Road Length sanctioned 1.5 km. Sanctioned Cost 55.43 Lakhs.
Actual Alignment
(b) Narayan ki Dhani
Satellite Image in the Year of January 2016 The snap shot of Image shows the alignment of road from S.H.37 Devi ki talai to Narayan ki Dhani in the January 2016. The total length of the road is 1.5 km. The entire road is divided in to different segments named as A to B, B to C and B to D. The road type is BT from A to B, B to D and CC from B to C. The snap shot of the road is enclosed above:
304
Monitoring of Progress from the imagery.
A
C Concrete Cement B Road
Black Top Road
D
Satellite image in the year of 2016
The above image shows Black Top road from A to B, B to D and Concrete Cement Road from B to C, which is the implementation of PMGSY as seen in the image, during January 2016.
305
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during March 2014.
A
Non-Black Top Road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during January 2016.
A
Black Top road
B
306
The Satellite image shows the road from B to C which is Non Concrete cement road before implementation of PMGSY as seen in the image during March 2015.
C
B Non Concrete cement road
The Satellite image shows the road from B to C which is Concrete cement road after implementation of PMGSY as seen in the image during January 2016.
C
B Concrete Cement Road
307
The Satellite image shows the road from B to D which is Non Black Top road before implementation of PMGSY as seen in the image during March 2015.
B
Non Black Top Road
D
The Satellite image shows the road from B to D which is Concrete cement road after implementation of PMGSY as seen in the image during January 2016.
B
Black Top Road
D
308
Monitoring of Progress from the imagery.
A
C B
D
The above image shows that A to B is BT road with the length of 0.2974 km, B to C is CC road with the length of 0.035 km and B to D is BT road with the length of 0.937. The overall road length is 1.27 km based on the Analysis of NIRDPR.
309
STATE GOVERNMENT AND NIRDPR
S.H.37 Devi ki Talai to narayan ki dhani
OMMAS NIRD & PR
1 Devi ki Talai 1 Devi ki Talai Habitation connected 2 Narayan ki Dhani 2 Narayan ki Dhani Road length completed in Km 1.27 1.27 BT Road- 1.23 BT Road- 1.2350
CC Road- 0.004 CC Road- 0.0352
Against OMMAS report of 1.27 Km, the NIRD & PR analysis showed (0.2974+0.0352+0.9376) 1.27 km.
The Name of the road is S.H.37 Devi ki Talai to Narayan ki Dhani which is in Govindgarh Block, under Jaipur District. This road was sanctioned in the year 2013- 14, where the road length is 1.5 km. The sanctioned cost of the road is 55.43 lakhs. The road includes both BT and CC. Narayan ki Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 1.27 km in which BT is 1.23 km and CC is 0.004 km. Based on NIRDPR Analysis, the total length of the road is 1.27 km. in which BT is 1.2350 km and CC is 0.035 km. OMMAS Analysis when compared with NIRDPR is matching.
310
5.37 Analysis of the road from Parmanpura to Swamiyo ki Dhani: Name of Road Parmanpura to Swamiyo ki Dhani Name of Block Shahpura Habitations Covered Swamiyo ki Dhani Year of Sanction 2013-14 Road Length sanctioned 1.45 km. Sanctioned Cost 51.62 Lakhs.
Actual Alignment
(a) swamiyo ki dhani
Satellite Image in the Year of January 2016
The snap shot of Image shows the alignment of road from Parmanpura to Swamiyo ki Dhani in the January 2016.The total length of the road is 1.45 km. The entire road is divided in to different segments named as A to B and B to C. The road type is CC from B to C and CC from A to B. The snap shot of the road is enclosed above.
311
Monitoring of Progress from the imagery A
Black Top Road
B
Concrete Cement road C
Satellite image in the year of 2016
The above image shows CC Road from B to C and Black Top Road from A to B, which is the implementation of PMGSY as seen in the image, during January 2016
312
The Satellite image shows the road from A to B which is Non Black Top road before implementation of PMGSY as seen in the image during May 2015.
A
Non Black Top Road
B
The Satellite image shows the road from A to B which is Black Top road after implementation of PMGSY as seen in the image during January 2016.
A
Black Top Road
B
313
The Satellite image shows the road from B to C which is Non Concrete Cement road before implementation of PMGSY as seen in the image during April 2015.
B
Non-Concrete Cement Road
C
The Satellite image shows the road from B to C which is Concrete Cement road after implementation of PMGSY as seen in the image during January 2016.
B
Concrete Cement Road
C
314
Monitoring of Progress from the imagery.
A
0.6135
B
0.3259
C
The above image shows that A to B is BT road with the length of 0.6135 km and B to C is CC road with the length of 0.3259 km. The overall road length is 0.93947 km based on the Analysis of NIRDPR.
315
STATE GOVERNMENT AND NIRDPR
Parmanpura to swamiyo ki dhani
OMMAS NIRD & PR
1 Parmanpura 1 Parmanpura Habitation connected 2 swamiyo ki dhani 2 swamiyo ki dhani Road length completed in Km 1.05 0.93 BT Road- 0.70 BT Road- 0.61
CC Road- 0.4 CC Road- 0.32
Against OMMAS report of 1.05 Km, the NIRD & PR analysis showed (0.6135+0.32) 0.93km.
The Name of the road Parmanpura to Swamiyo ki Dhani which is in Shahpura Block, under Jaipur District. This road was sanctioned in the year 2013-14, where the road length is 1.45 km. The sanctioned cost of the road is 51.62 lakhs. The road includes both BT and CC. Swamiyo ki Dhani habitation is interconnected by these roads. Based on OMMAS Analysis, the total length of the road is 1.05 km in which BT is 0.70 km and CC is 0.4 km. Based on NIRDPR Analysis, the total length of the road is 0.939 km. in which BT is 0.613 km and CC is 0.325 km. OMMAS Analysis when compared with NIRDPR is not matching.
316
6. Conclusion based on Satellite Image analysis: Based on the satellite image analysis of the roads in Rajasthan state covering Alwar and Jaipur districts, the following observation were made:
A total of 50 roads were taken up for the study out of which 37 roads are analyzed based on the availability of satellite data. The Procurement of satellite data for remaining roads is in process. The summary of findings for 37 roads in the 2 districts is as follows:
In Rajasthan state two Districts, namely Alwar and Jaipur were selected for the study, in which around 20and 17roads were analyzed respectively. From the analysis, in Alwar district, it is observed that 10 roads are having variations in length out of total 20 roads analyzed and the in Jaipur district, it is observed that 3 roads are having variation in length out of 17 roads analyzed. The below tables 6.1 and 6.2 show the road that are having variations in length in Alwar and Jaipur Districts respectively.
Table 6.1: List of roads having variations in Alwar district
S.No Name of the Road OMMAS NIRDPR 1. Burja to Sapero ki Dhani 1.63 0.72 2. SH-25Akm 29 to Amkiwal Upperwali 2.10 0.97 3. Toolera to Ahir Bas 1.60 0.86 4. Bhiwadi to Chandwas 0.92 0.74 5. Kamdaka to Kahadka Ki Dhani 1.60 1.35 6. Mundawar Saria to Dhani Gusai 0.68 0.37 7. Narhent to Bhandana Ka Bas 2.40 2.13 8. Nevada Road to Sammanpur 3.00 2.72 9. Nitni Ka Bara-Malakhara Road to 1.00 0.73 khoti Ka Bas 10. Tijara Firajpur to Budi Baghor 1.20 1.00
317
Table 6.2: List of roads having variations in Jaipur district
S.No Name of the Road OMMAS NIRDPR 1. Baislana to Mangaldas ki Dhani 4.1 3.79 2. Navodya Vidhyalaya Road to Macha 2.325 2.252 Wali Dhani 3. Parmanpura to Swamiyo ki Dhani 1.05 0.93
The rest of the parameters like number of culverts, road width was matching with Detailed Project Report.