TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT CONSTRUCTION AT JALAN DAMANSARA (KL & SPRINT HIGHWAY-BOUND) AND JALAN CHERAS (KL & KAJANG-BOUND) 28 JUNE 2016

1. SLIP ROAD CLOSURE FROM LDP HIGHWAY INTO JALAN DAMANSARA Date 1 July 2016 – 14 July 2016 Time 11:00PM - 6:00AM Duration 14 nights Reason To facilitate painting, cables installation and related construction works for the special span and future MRT TTDI Station

There will be a continuation of the short-term night Traffic Management Plan (TMP) implemented in the vicinity of the Interchange from 1 July 2016 – 14 July 2016, INTERMITTENTLY. The closures (as indicated in RED in the map) are as follows:

(i) Full slip road from Jalan Leong Yew Koh leading to Jalan Damansara (KL/ SPRINT Highway- bound) and to the underpass at the TTDI Interchange (ii) The road exiting Jalan Leong Yew Koh to LDP Highway

The following diversions will take place:

· Motorists from LDP Highway wanting to turn into Jalan Damansara (KL / SPRINT Highway-bound): Take the flyover and head towards LDP Highway (SS2-bound) to go to SPRINT Highway at the Interchange OR ( ) Turn left into Jalan Leong Yew Koh where they can access the TTDI area via Jalan Datuk Sulaiman and exit back into Jalan Damansara.

· Motorists wanting to exit Jalan Leong Yew Koh to access SS2 or make a U-turn at the TTDI Interchange: ( ) Turn back to Jalan Datuk Sulaiman to exit to Jalan Damansara via Jalan Tun Mohd Fuad where they can turn right and proceed ahead to access SS2 and make a U-turn at the Damansara Utama Interchange to access SS21 residential area or go towards Kepong.

· Motorists on LDP Highway (from Kepong) wanting to turn into Damansara Utama (SS21) using the TTDI Interchange Underpass: ( ) Take the flyover and head towards LDP Highway (SS2-bound) and do a U-turn at the Damansara Utama Interchange. Motorists on LDP Highway from SS2 heading to Jalan Damansara (KL / SPRINT Highway-bound) will not be affected

Page 1 of 7

MAP 1: SLIP ROAD CLOSURE FROM LDP HIGHWAY INTO JALAN DAMANSARA

Page 2 of 7

2. CLOSURE OF U-TURN TO TTDI AND ACCESS ROAD TO JALAN DAMANSARA FROM SS2 Date 1 July 2016 – 14 July 2016 Time 11:00PM to 6:00AM Duration 14 nights Reason Mobilisation of construction vehicles for installation of sound barrier works, noise barrier works at Pinggir Zaaba, reinstatement of TTDI Interchange and related works for TTDI MRT Station and Entrances.

The traffic management plan will involve the closure of the U-turn to TTDI as well as the closure of the access road to Jalan Damansara from SS2 from 1 July 2016 – 14 July 2016 , INTERMITTENTLY. During the closure, the following diversions will take place:

( ) Motorists on Jalan Damansara wanting to take a U-turn to access TTDI: Turn right earlier at the Jalan Tun Mohd Fuad traffic light junction and use Jalan Datuk Sulaiman and Jalan Leong Yew Koh. ( ) Motorists from SS2 wanting to turn right into Jalan Damansara (KL/ SPRINT Highway- bound): Motorists will be diverted to take the flyover and do a U-turn at the interchange or a U-turn at the Damansara Perdana Interchange (should the earlier U-turn be closed for the Bandar Utama station works).

MAP 2: CLOSURE OF U-TURN TO TTDI AND ACCESS ROAD TO JALAN DAMANSARA FROM SS2

Page 3 of 7

3. TWO-NIGHT ROAD CLOSURE AT JALAN CHERAS NEAR CHERAS SENTRAL MALL Date 1 July 2016 -3 July 2016 Time 12:00AM – 5:00AM Duration 3 days Reason To facilitate the launching of steel truss bridge for Taman Connaught MRT Station

There will be a two-night closure at Jalan Cheras near Cheras Sentral from 1 July 2016 – 3 July 2016 starting 12:00AM – 5:00AM. The closure will be implemented in two stages.

Stage 1 (12:00AM to 2:00AM)  Closure of right-most lane at the stretch of Jalan Cheras (Kajang-bound) main line opposite Cheras Sentral Mall for a stretch of 800 meter from KM 6.0 to KM 6.5. Two lanes will be made available to motorists heading to Kajang.  Closure of three-lanes at the stretch of Jalan Cheras (-bound) main line opposite Cheras Sentral Mall from CLQ MRT towards Kuala Lumpur for a stretch of 800 meter. One lane will be made available to motorists heading to Kuala Lumpur.

Stage 2 (2:00AM to 5:00AM)  Full lane closure at the stretch of Jalan Cheras (Kuala Lumpur-bound) main line opposite Cheras Sentral Mall from CLQ MRT towards Kuala Lumpur for a stretch of 800 meter.

( ) Motorists from Kajang (on Jalan Cheras) going to Kuala Lumpur will be diverted to the underpass towards East-West Link Expressway and make a U-turn at the Junction at Desa Tun Tun Razak opposite Kwang Tong Chinese Cemetery and turn left after Taman Connaught to head to Jalan Cheras.

Motorists from Kajang heading towards via Underpass East-West Link Expressway are not affected.

Page 4 of 7

MAP 3: TWO-NIGHT ROAD CLOSURE AT JALAN CHERAS NEAR CHERAS SENTRAL MALL

Page 5 of 7

4. CONTINUATION OF LONG TERM LANE REALIGNMENT AT JALAN CHERAS NEAR TAMAN PERTAMA (KAJANG-BOUND) Date 1 July 2016 - 17 September 2016 Time 24 hours Duration 79 days Reason To facilitate the construction of pedestrian link bridge to Taman Pertama MRT Station

A continuation of long term lane realignment will be implemented at Jalan Cheras (Kajang-bound) after Cheras Roundabout heading towards Taman Pertama from 1 July 2016 to 17 September 2016, for 24 hours, daily.

Motorists from the Cheras Roundabout heading towards Taman Pertama (Kajang-bound) will be diverted to a new constructed lane. The number of lanes remains unaffected (2 lanes available).

MAP 4: CONTINUATION OF LONG TERM LANE REALIGNMENT AT JALAN CHERAS NEAR TAMAN PERTAMA (KAJANG-BOUND)

Page 6 of 7

5. CONTINUATION OF LANE CLOSURES ALONG JALAN CHERAS BETWEEN BULATAN CHERAS AND CHERAS SENTRAL (KL-BOUND AND KAJANG-BOUND)

Date 1 July 2016 - 26 October 2016 Time 11:00pm – 5:00am Duration 118 days Reason To facilitate the launching of steel truss for link bridge, construction of retaining wall, reinstatement and landscape works & construction of MRT Taman Pertama, Taman Midah, Taman Mutiara & Taman Connaught Station.

There will be a continuation of long-term night lane closures and lane narrowing along Jalan Cheras (both KL-bound & Kajang-bound) from 1 July 2016 – 26 October 2016 from 11:00PM to 5:00AM. During this closure, one lane will be made available for motorists.

MAP 5: CONTINUATION OF LANE CLOSURES ALONG JALAN CHERAS BETWEEN BULATAN CHERAS AND CHERAS SENTRAL (KL-BOUND AND KAJANG-BOUND)

For media enquiries, please contact: Adeline De Cruz (Item 1 &2) Tel: +6012 217 2017 [email protected] Irynn Eng (Item 3, 4, 5) Tel: +603 9174 0978 [email protected] Siti Fadzillah (Item 1-5) Tel: +603 7493 3965 [email protected]

Page 7 of 7