ONGOINGProjects construction underway (Projects added for the current month are highlighted and in bold face type) GAS – The Americas BRUCE ALLEN INC. – (6/17) Diameter: 48 inches Owner: Dominion Transmission Location: Sinton, TX – Corpus Christi, TX U.S. Project: Transco to Charleston Project Docket: CP12-508 Type: Project will include the construction of Completion: 2019 AMERICAN MIDSTREAM – (8/17) new pipeline including the following: two Comments: Pipeline will allow for the interconnection Operator: High Point Gas Transmission LLC new natural gas transmission pipelines, points with interstate and intrastate Project: Venice to Toca Pipeline Abandonment upgrades to an existing compressor natural gas transmission pipelines in South Project station and the addition of a new , including Tennessee Gas Pipeline, Type: Project includes pipeline abandonment compressor station Southcross, Kinder Morgan Tejas Pipeline and valve modifications Length: 60 miles and Transcontinental Gas Pipeline. The Length: 62 miles Diameter: 4 and 12 inches line will terminate at the proposed Corpus Diameter: 12 to 22 inches Location: Charleston, Dillon, Lexington and Christi Liquefaction Plant Location: Plaquemines and St. Bernard parishes, LA Marlboro counties, SC Docket: CP16-474 Completion: November 2017 Contractor: Associated Pipe Line Comments: Project has been approved by FERC. Type: Project includes pipeline construction ANR PIPELINE CO. – (1/17) Project will consist of the following Project: Collierville Expansion Project facilities: Moore to Chappells Pipeline; COLUMBIA GAS TRANSMISSION LLC – (5/17) Type: Project includes the addition of a 4,700 Dillon Pipeline; Moore Compressor Project: Line WB2VA Integrity Project hp compressor stations and modification Station; and Dor Compressor Stations Type: Project includes the installation of various of an existing meter station pieces of auxiliary equipment, including Location: Shelby County, TN CANYON MIDSTREAM launchers and receivers, replacement of Comments: Project will increase the delivery capability PARTNERS II LLC – (5/17) existing mainline valves, replacement of of the Collierville Meter Station by 200 Project: Redcliff Plant an existing dual pipe river crossing, and MDth/d to 300 MDth/d Type: Project includes the construction of a replacement of short sections of existing new natural gas processing facility (the pipeline within or proximate to existing APEX PIPELINE SERVICES – (3/16) Redcliff Plant) and a gas gathering system, compressor stations, to create a common Owner: EQT Midstream Partners LP including of 20-inch steel trunkline, diameter pipeline from beginning to end Project: Maco Pipeline multiple field compression stations and that can be internally inspected using Type: Pipeline will involve the construction low-pressure gathering pipelines smart pigs of pipeline and installation of 32,000 Length: 70 miles Location: Hardy County, WV - Greene County, VA horsepower of compression Location: Woodward County, OK Comments: The goal of this pipeline integrity project is to modify portions of the existing Length: 32 miles Completion: 2018 WB2VA line to facilitate the use of the Location: Pennsylvania Comments: Once completed, the project will provide smart pig inline inspection technology Start: 2016 its customers with 200 MMcf/d of Completion: 2017 cryogenic gas processing capacity and Project: Line SM-80 MAOP Project Comments: The project will be completed in two access to premium residue gas markets on Type: Project includes the abandonment phases ANR and Southern Star Central of a segment of existing pipeline and the replacement of the segment by BLACK HILLS ENERGY – (6/17) CAPSTONE ENERGY/WILLBROS/ constructing and operating a 30-inch- Project: Northeast Nebraska Line PUMPCO – (5/17) diameter pipeline Type: Line will run from Bancroft to Norfolk Owner: Energy Transfer Length: 3.8 miles Length: 50 miles Project: Revolution Pipeline Location: Wayne County, WV Location: Bancroft, NE - Norfolk, NE Type: Project includes the construction of Comments: The replacement pipeline would allow Completion: Project completion date has been a 24-inch and 30-inch pipeline and that segment of Line SM-80 to operate at extended fractionation facility its original maximum allowable operating Length: 86 miles pressure BLUE FLAME PIPELINE – (3/17) Location: Butler County, PA – Revolution Plant Owner: Antero Midstream Comments: Project will have a capacity in excess of COLUMBIA MIDSTREAM – (7/17) Project: Marcellus Gathering System Pipeline 440 MMcf/d Contractor: InterCon Construction Inc. Type: Project includes the construction of Sub: Lone Star Directional Drilling 24-inch and 20-inch pipeline CENTRAL NEW YORK OIL & Project: Big Pine System Extension Length: 8 miles GAS CO. LLC – (12/16) Type: Project includes the installation of 3,300 Location: Doddridge, Tyler and Ritchie counties, WV Project: MARC II Pipeline feet of pipeline via HDD Type: Project includes the construction of a new Diameter: 20 inches BRAZOS MIDSTREAM – (6/17) natural gas pipeline gathering header Location: Westmoreland and Indiana counties, PA Project: Comanche II Plant Length: 30 miles Supt: David Chesney Type: Project includes the construction of a Location: Luzerne County, PA second gas processing plant Completion: 4Q 2017 COLUMBIA PIPELINE GROUP – (7/17) Location: Reeves County, TX Comments: Crestwood has received non-binding Project: Leach XPress Project Completion: 1Q 2018 indications of interest for firm Type: Project includes the construction of Comments: Project will add 200 MMcf/d of transportation on the proposed MARC II natural gas pipeline and compression incremental processing capacity and will Pipeline in excess of 700 MMcf/d facilities increase Brazos’ total operated processing Length: 160 miles capacity in the Basin to 260 CHENIERE CORPUS CHRISTI PIPELINE LP – Diameter: 30 and 36 inches MMcf/d (5/17) Location: Fairfield, Perry, Noble and Monroe Project: Corpus Christi Pipeline counties, OH; Marshall County, WV; and Type: Project includes pipeline construction Greene County, PA Length: 23 miles Capacity: 1.5 Bcf/d www.pipeline-news.com • September 2017 • Pipeline News 29 ONGOINGProjects construction underway Contractor: Associated Pipe Line Contractors Inc. DCP MIDSTREAM LP – (7/17) EASTERN SHORE NATURAL GAS – (1/17) Sub: Pedero Pipe Support Systems USA Project: Sand Hills Pipeline Extension (Phase II) Owner: Eastern Shore Natural Gas Project: Project: Leach XPress Project Type: Project includes the partial looping of the Reliability Expansion Project Type: Project includes providing spray breakers pipeline and the addition of seven new Type: Project involves the construction of 15 and pillows on pipeline pump stations in the initial phase of the miles of 16-inch pipeline and two loops HQ: Lancaster, OH extension (Dover and Porter) Supt: Mark Nail and James Silva Capacity: 85 Mbpd Length: 15 miles Cost: $500 million Location: New Castle, Kent and Sussex counties, DE Contractor: Associated Pipe Line Contractors Inc. Location: Mont Belvieu, TX Start: 2016 Project: Leach XPress Project Completion: 2Q 2018 Type: Project includes the installation of pipeline Comments: Future expansion could include the EM ENERGY PIPELINE PENNSYLVANIA LLC – Length: 44.3 miles addition of a full loop of Sand Hills, which (7/17) Diameter: 36 inches could increase capacity by over 100 Mbpd Contractor: MG Dyess Location: Noble, Muskingum, Morgan and Perry to a minimum of 550 Mbpd Project: Constellation Pipeline Extension Project counties, OH Type: Project includes the installation of welded Foremen: Charles Beddingfield and Michael Steward Project: Sand Hills Pipeline Extension (Phase I) steel natural gas pipeline Type: Project includes the expansion of existing Length: 21 miles Contractor: Apex Pipeline Services Inc. pipeline through the addition of four Diameter: 8, 20 and 24 inches Project: Leach XPress Project pump stations and a pipeline loop Location: Butler County, PA Type: Project includes anomaly digs and Location: Mont Belvieu, TX pipeline modifications Completion: 4 Q2017 ENABLE MIDSTREAM PARTNERS LP – (6/17) Diameter: 4 to 36 inches Comments: Project will increase pipeline capacity by Project: Wildcat Pipeline Location: Edinburg, VA 30 percent to 365 Mbpd Type: Project includes the construction of new Foremen: Brandon Sampson and Matthew Steward pipeline and will connect DOMINION ENERGY – (7/17) natural gas production to existing Contractor: Price Gregory International Project: Eastern Market Access Project processing and pipeline capacity outside Project: Leach XPress Project Type: Project includes adding compression the state Type: Project includes the installation of pipeline and auxiliary facilities along Dominion’s Location: Oklahoma (SCOOP/STACK) Length: 28 miles existing interstate natural gas transmission Completion: 2Q 2018 pipeline Diameter: 36 inches Comments: Project will move up to 400 MMcf/d of Location: Charles County, MD, Loudoun and Fairfax natural gas to a processing plant and Location: Monroe and Noble counties, OH counties, VA pipeline hub in north Texas Foremen: Stan Campbell and Colby Steward Capacity: 294 MDth/d Docket: CP17-24 Project: Kingfisher Extension Project: Rayne XPress Project Completion: 4Q 2018 Type: Project includes the construction of Type: Project involves the construction of two new compressor stations along the a new transmission line to connect Contractor: Minnesota Ltd. LLC existing Columbia Gulf System southeast Kingfisher County with EOIT’s Type: Project includes the installation of 1,400 Location: Marshall County, WV - Pennsylvania - existing mainline facilities that deliver to feet of pipeline Ohio - Wayne County, WV Bennington, OK Diameter: 30 inches Completion: 2017 Location: Kingfisher County, OK – Bennington, OK Location: Loudoun County, VA Comments: Project will increase capacity up to 1.0 Comments: Project is currently in the evaluation HQ: Leesburg, VA Bcf/d of natural gas to efficiently transport stage and will provide access to Enable Supt: Roman McKown Marcellus and Utica production to markets Oklahoma Intrastate Transmission’s in the Gulf Coast region and beyond on-system power, LDC and industrial end DOMINION EOG – (7/17) users and EOIT’s East Pool Contractor: Minnesota Ltd. LLC CONSUMERS ENERGY – (7/17) Project: Pipeline Infrastructure Replacement Project: Enable Gas Transmission Expansion/ Contractor: Welded Construction LP Program Enable Oklahoma Intrastate Transmission Sub: Phillips & Jordan Inc. Type: Project includes the installation of 2,700 Expansion Project: Saginaw Pipeline feet of pipeline Type: Project includes the expansion of two Type: Project includes the clearing of pipeline Length: 30 miles existing pipelines right-of-way Location: Cuyahoga County, OH Location: Oklahoma (SCOOP/STACK) Length: 18 miles HQ: Dover, OH Comments: The expansions will utilize existing Diameter: 24 inches Supt: Gary Hawk capacity on EGT and EOIT along with Location: Genesee and Saginaw counties, MI the installation of certain new facilities HQ: Mount Morris, MI DOMINION TRANSMISSION – (1/17) to provide over 600 MDth/d of new, firm Supt: Mark Smith Project: Leidy South Project natural gas transportation service Type: Project includes the addition of 48,120 CRESTWOOD EQUITY PARTNERS LP – (7/17) hp of compression and new metering Project: Cana and STACK Expansion (CaSE) Project Project: Bear Den Plant / Bear Den West Pipeline and regulation equipment to an existing Type: Project includes the expansion of existing Type: Project includes the construction of a interstate pipeline transmission system pipeline new processing plant and an associated Length: .2 miles Location: Oklahoma (SCOOP/STACK) pipeline Location: Pennsylvania and Virginia Completion: 2018 Location: McKenzie County, ND Completion: 2017 Comments: Project is expected to launch at an initial Completion:4Q 2017 Comments: Project will have a capacity of 155 MMcf/d capacity of 45 MDth/d, growing to the Comments: Project will have a capacity of 30 MMcf/d full 205 MDth/d of contracted capacity by of gas and will meet increasing production DTE ENERGY – (8/17) 4Q 2018 volumes from producers on the Arrow Contractor: Gabe’s Construction Co. Inc. system and acreage surrounding the Fort Type: Project includes pipeline installation ENBRIDGE – (7/17) Berthold Indian Reservation Length: .4 miles Project: Berne Compressor Station Diameter: 16 inches Type: Project includes the construction of a new Location: Susquehanna County, PA compressor station Contact: Steve Huibregtse Location: Monroe County, OH Superintendent Completion: 3Q 2017

30 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway Comments: Project is part of the Access South, EQUITRANS LP – (6/17) FEMACA – (7/16) Adair Southwest and Lebanon Extension Project: Plasma Interconnect Owner: CFE projects Type: Project includes the construction of a Project: Encino-La Laguna Pipeline 30-inch diameter pipeline (H-310 line), Type: Pipeline will transport gas from southern – (2/17) the Plasma Compressor Station and two Texas and supply northern Chihuahua and Project: Revolution Pipeline header pipelines Durango states Type: Project involves the construction of 100 Length: 35 miles Length: 263 miles miles of 24- and 30-inch pipeline Location: Monroe County, OH Location: Texas - Chihuahua and Durango Length: 100 miles Comments: Project is part of the Ohio Valley Start: 2015 Location: Butler County, PA Connector Project and will create 850 Completion: 2017 Start: 2016 MDth/d of new firm transportation service Owner: CFE ENLINK MIDSTREAM – (2/17) ETC KATY INTRASTATE PIPELINE – (7/16) Project: San Isidro-Samalayuca Pipeline Project: Chisholm III Type: Project includes the construction of Type: Pipeline will transport gas from southern Type: Project includes a new 200 MMcf/d 24-inch pipeline Texas to the new Norte III power plant in processing expansion of its existing Length: 32 miles Chihuahua State system Location: Pennsylvania Length: 14 miles Location: Oklahoma Completion: 2017 Location: Texas - Chihuahua Completion: 2017 Comments: Project will have a capacity of 500 Mcf/d Start: 2015 Comments: Upon completion of the Chisholm III Completion: 2017 expansion, EnLink’s Central Oklahoma EXCEL ENERGY – (7/17) processing capacity will total Contractor: Snelson Cos. Inc./KR Swerdfeger GULF SOUTH PIPELINE – (1/17) approximately 1 Bcf/d, which represents Construction/SiteWise Corp./Q3 Project: Katy Lateral Project nearly a three-fold increase from the 350 Contracting Type: Project includes the take up and relay of MMcf/d of capacity operated in 2015 Project: Residential Gas Service Replacement 30-inch pipeline Program Length: 1.25 miles EQT & RANGE RESOURCES – (5/17) Type: Project includes integrity management Location: Fort Bend County, TX Project: Mako Pipeline – Phase II and maintenance work on existing Start: 3Q 2017 Type: Project includes the construction of pipeline 24-inch pipeline Location: Henderson, CO GULF STATE ENGINEERING – (5/16) Length: 20 miles Comments: The program will result in the replacement Owner: Kinder Morgan Inc. Location: Pennsylvania of 600 miles of natural gas pipeline Project: Mier-Monterrey Pipeline Comments: Pipeline will provide more than .5 Bcf/d of throughout Colorado, with nearly 100 Type: Project includes the looping of the firm capacity and is backed by a long-term miles residing in the Denver metro area existing system and construction a new firm capacity reservation commitment lateral

www.pipeline-news.com • September 2017 • Pipeline News 31 ONGOINGProjects construction underway Location: Pesquería, Nuevo León, Mexico IROQUOIS GAS TRANSMISSION Contractor: Snelson Companies Inc. Completion: 2017 SYSTEM LP – (REV 2/16) Project: Balfour Interchange Project Comments: Pipeline connects to a 1,000-megawatt Owner: Tennessee Gas Pipeline Co. LLC Type: Project includes the installation of 450 power plant complex and to the Pemex Project: South-to-North feet of gas utility lines natural gas transportation system Type: Project includes the reverse flow on Diameter: 2 and 3 inches existing pipeline Location: Contra Costa County, CA Owner: Kinder Morgan Inc. Location: Canajoharie, NY; Brookfield, CT; and HQ: Richmond, CA Project: Utica Marcellus Texas Pipeline Wright, NY Supt: David Wix Type: Project includes abandonment and Completion: 2017 Comments: Project is part of the relocation of utility conversion of 964 miles of natural gas Comments: Project would transport up to 300 MDth/d lines and a pump station for the Contra service on the Tennessee Gas Pipeline, the of natural gas Costa Transportation Authority’s Balfour construction of new pipeline and laterals Interchange Project to provide basin connectivity KINDER MORGAN – (7/17) Length: 320 miles Operator: Tennessee Gas Pipeline Co. LLC Contractor: Henkels & McCoy Inc. Location: Louisiana – Texas Contractor: Henkels & McCoy Inc. Project: Connecticut Expansion Completion: 2018 Project: Orion Project Type: Project includes the fabrication and Comments: Project will be designed to transport Type: Project includes the construction installation of pipeline looping propane, butanes, natural gasoline, of pipeline looping (i.e., installation Length: 13.4 miles y-grade and condensate in batches along of additional pipe adjacent to and Diameter: 24 and 36 inches the system, with a maximum design connecting with the existing pipeline) Location: Albany County, NY, Berkshire and capacity of 430 Mbpd and minor modifications to one existing Hampden counties, MA and Hartford compressor station County, CT HENKELS & MCCOY – (2/17) Length: 13 miles Capacity: 72.1 MDth/d Owner: Spectra Energy Diameter: 36 inches Cost: $93 million Project: Atlantic Bridge Location: Pike and Wayne counties, PA Foremen: Timothy Hathaway and Mark Steward Type: Project includes the take up, relay and Capacity: 135 MDth/d Completion: 4Q 2017 new lays of 12-inch to 42-inch pipeline Cost: $143 million and compressor station work HQ: Honesdale, PA Project: Gulf Coast Southbound Expansion Phase I Length: 35 miles Supt: Chad Simmons Type: Project includes the construction of Location: Westchester County, NY; Fairfield, New Foremen: Jason Steed and Mark Steward a new compressor station, modifying Haven and New London counties, CT; Completion: 3Q 2018 existing valve sites and replacement of Norfolk County, MA a minimal length of pipeline facilities, as Completion: 2017 Project: UTOPIA East Project well as modifications to NGPL’s existing Comments: Project will have a peak capacity of Type: Project includes construction of the first compressor station facilities 132,700 Dth/d two spreads of the 12-inch pipeline Location: Cass, Victoria, Wharton and Angelina Length: 215 miles counties, TX; White County, AR HOWARD MIDSTREAM ENERGY Location: Harrison County, OH - Fulton County, OH Capacity: 460 MDth/d PARTNERS LLC – (1/17) Completion: 2018 Completion: 4Q 2018 Operator: Nueva Era Pipeline LLC Comments: UTOPIA will transport previously refined Project: Nueva Era Pipeline or fractionated natural gas liquids, Project: Gulf Coast Southbound Expansion Phase Type: Project includes the construction of two including ethane and propane, with an II 30-inch pipeline laterals— 17 miles in initial 50 Mbpd of capacity, which is Type: Project includes construction of additional Webb County, TX (Impulsora Pipeline) and expandable to more than 75 Mbpd compression facilities at NGPL’s new 171 miles in Mexico (Midstream de Mexico) compressor station Length: 190 miles Contractor: Minnesota Ltd. LLC Location: Chicago Market, IL - Agua Dulce Hub, LA Location: Webb County, TX - Escobedo, Nuevo Project: Utopia Pipeline Capacity: 250 MDth/d León Type: Project includes metering station Completion: 4Q 2019 Completion: 2018 upgrades and pipe fabrication Comments: Project will provide seamless Diameter: 2 to 12 inches LATEX CONSTRUCTION – (5/17) transportation service for 600 MMcf/d of Location: Tuscarawas County, OH Owner: PSNC Energy natural gas (expandable to 900 MMcf/d), HQ: Dover, OH Project: T-001A Gas Pipeline connecting producers in South Texas Supt: Gary Hawk Type: Project involves the construction of directly with end-users in northern Mexico 24-inch and 8-inch pipeline Contractor: Letourneau Enterprises LLC Length: 50 miles Operator: Impulsora Pipeline LLC Project: Utopia Pipeline Location: Cleveland, Rutherford and Polk counties, Project: Impulsora Pipeline Type: Project includes the clearing, grubbing NC Type: Project includes the construction and and matting of pipeline right-of­-way operation of new border crossing pipeline Length: 4 miles MARKWEST – (7/17) facilities station Diameter: 12 inches Contractor: Apex Pipeline Services Inc. Length: 17 miles Location: Harrison County, OH Project: Sherwood Expansion Diameter: 30 inches HQ: Cadiz, OH Type: Project includes the installation of Location: Webb County, TX Supt: Tyson L. Shook pipeline Docket: CP16-70 Length: 3 miles Contractor: Minnesota Ltd. LLC Diameter: 30 inches INFRASOURCE CONSTRUCTION LLC – (5/17) Project: Kinder Morgan Illinois Pipeline Project Location: Doddridge County, WV Owner: Dominion East Ohio Type: Project includes the hydrotesting of an Capacity: 600 MMcf/d Type: Project includes the construction of existing pipeline and installation of a HQ: Sherwood, WV 24-inch and 16-inch pipeline launcher and receiver Supt: Roman McKown Length: 10 miles Diameter: 24 and 30 inches Location: Mehoning and Trumball counties, OH Location: Will, Cook and Kankakee counties, IL MEADE – (6/17) HQ: Big Lake, MN Owner: NIPSCO Supt: Kerry Schott Project: LaPorte to Gary Aetna Natural Gas Line Upgrade

32 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway Type: Project includes the replacement of MICHELS – (5/17) MOGAS PIPELINE LLC – (5/17) existing 22-inch natural gas transmission Owner: Northern Natural Gas Project: MoGas Pipeline line with a 24-inch line Project: Northern Lights 2017 Expansion Type: Project includes looping the MoGas Length: 30 miles Type: Project includes the construction of natural gas pipeline to add incremental Location: LaPorte County, IN 5.3 miles of 16-inch pipeline (Chisago firm capacity Comments: Work will be conducted in existing Interconnect Loop), the construction of Location: Missouri NIPSCO easements and construction will 1.3 miles of 6-inch pipeline (Belle Plaine Comments: Project is currently undergoing an open begin on the La Porte side of the route Loop Extension) and the construction of season and move west toward Gary 2.8 miles of 12-inch pipeline (St. Cloud Loop Extension) NATIONAL FUEL GAS SUPPLY CORP. – (5/17) MG DYESS – (5/17) Length: 10 miles Project: Line T2KNY Install, Line TNY Replacement, Owner: Texas Eastern Transmission Location: Chisago, LeSueur, Scott and counties, MN and Line KNY Abandonment Project: Adair Southwest Extension / Access South Comments: Project will transport an incremental Type: Project includes the installation of 1.2 Type: Project includes 16 miles of 36-inch peak day firm service load of 76 MDth/d miles of new 20-inch natural gas pipeline pipeline relay or loop within or adjacent through the addition of the pipeline and (Line T2KNY), replacement of 6.7 miles of to existing Texas Eastern right-of-way, compression facilities on Northern’s 20-inch bare steel pipeline with 7 miles additional compression at existing existing system of 24-inch coated natural gas pipeline stations, three existing receipt meters (Line TNY), abandonment of 14.9 miles converted for bi-directional flow and Owner: Spectra Energy of 20-inch bare steel natural gas pipeline various other modifications to existing Project: Lebanon Extension (Line KNY), modifications at two existing facilities Type: Project includes the construction of meter and regulator stations (North Length: 16 miles 36-inch pipeline Boston and East Eden), and modifications Location: Pennsylvania, West Virginia, Ohio and Length: 2.1 miles at the existing Zoar Compressor Station Kentucky Location: Monroe County, OH Length: 14 miles Completion: 2Q 2017 Location: Erie County, NY Comments: Project will have a capacity of MINNESOTA LTD. – (5/17) Comments: Project will provide an additional 200 MDth/d of natural gas Owner: Columbia Pipeline Group 2.6 MDth/d of new firm capacity Project: Tri-County Bare Steel Project, Phase II Owner: Tennessee Gas Pipeline Type: Project includes the construction of GAS CO. – (8/17) Project: Southwest Louisiana Supply 20-inch pipeline Project: Taos Mainline Re-route Project Type: Project includes the installation of two Length: 8.3 miles Type: Project includes take up and relay of 36-inch pipeline laterals and compressor Location: Washington County, PA existing pipeline stations Owner: Kinder Morgan Inc. Length: 6 miles Length: 4 miles Diameter: 12 inches Location: Madison and Richland parishes, LA Cost: $14 million

www.pipeline-news.com • September 2017 • Pipeline News 33 ONGOINGProjects construction underway

Location: Pilar, NM new reservoir and a compressor station Supt: Norman Glenn Completion:4Q 2017 Length: 13 miles Contact: [email protected] Diameter: 16 inches Contractor: Crossfire LLC Location: Portland, OR Contractor: Snelson Companies Inc. Type: Project includes pipeline replacement Capacity: 2.5 Bcf/d Type: Project includes hydrotesting on existing Cost: $125 million pipeline and the installation of two NICOR GAS CO. — (8/17) Completion: 4Q 2018 launchers and three mainline valves Project: Dubuque Pipeline Replacement Length: 27 miles Type: Pipeline includes pipeline installation, Contractor: Fluor Diameter: 34 inches abandonment and station Type: Project includes front-end engineering Location: Kern County, CA interconnections and design HQ: Mojave, CA Length: 8 miles Cost: $125 million Supt: Marv LaRue Diameter: 30 inches Location: Kane County, IL Contractor: Snelson Companies Inc. PASO NORTE PIPELINE GROUP – (REV 8/14) Completion: 3Q 2017 Type: Project includes pipeline installation Project: Paso Norte Pipeline Contact: David Wix Type: Project includes the construction of Contractor: Henkels & McCoy Superintendent 30-inch pipeline Type: Pipeline installation, abandonment and Length: 340 miles station interconnections Project: PG&E’s Pipeline Safety Enhancement Plan Location: Deming, NM - Mexico/Chihuahua Contact: Bryant “Tubby” Long Type: Project includes pipeline transmission Comments: The pipeline will have a capacity of 366 Superintendent line work as part of ongoing gas-system MMcf/d of natural gas improvements NISOURCE INC.– (REV 8/17) Location: California PIPELINE SYSTEMS INC. – (4/17) Operator: Columbia Gas of Pennsylvania Project: Tenaska Westmoreland Pipeline Project: Columbia Gas of Pennsylvania Gas Contractor: InterCon Construction Inc. Owner: Tenaska Pennsylvania Partners Pipeline Replacement Project Type: Project includes pipeline hydrotesting, Type: Project includes mainline construction on Type: Project includes pipeline replacement installation of two launchers and three 20-inch pipeline Length: 5 miles mainline valves Length: 9.5 miles Diameter: 16 inches Length: 27 miles Location: Westmoreland County, NE Completion: 1Q 2018 Diameter: 34 inches Comments: Project will run from an existing Texas Location: Kern County, CA Eastern pipeline and connect to a new Contractor: InfraSource LLC Contact: Mary LaRue electric power generator Type: Project includes pipeline relocation Superintendent Length: .9 miles PRICE GREGORY INC. – (4/17) Location: Washington County, PA Contractor: Snelson Companies Inc. Owner: Tennessee Gas Pipeline Co. LLC Contact: Matt Ranson Project: P&GE Gas Pipeline Replacement Program Project: Triad Expansion Project Superintendent Type: Project includes a station meter upgrade Type: Project involves the expansion of 36-inch Diameter: 12 inches pipeline looping along existing line right- NORTHWEST NATURAL GAS CO. – (7/17) Location: San Juaquin County, CA of-way Contractor: Snelson Co. Supt: Matt Groeneveld Length: 7 miles Sub: Primoris Services Corp. Location: Susquehanna County, PA Project: North Mist Expansion Contractor: Snelson Companies Inc. Completion: 2017 Type: Project includes removing and replacing Project: P&GE Gas Pipeline Replacement Program Comments: Project will have an additional capacity of natural gas pipe, removing and replacing Type: Project includes the replacement of a 180 MDth/d fourteen mainline valves, and automating valve seventeen mainline valves Diameter: 12 inches Owner: UGI Length: 15 miles Location: Monterey County, CA Project: Sunbury Pipeline Comments: Primoris will also hydrotest 20.5 miles Supt: Jeff Gregory Type: The 35-mile, 20-inch Sunbury Pipeline of 30-inch pipeline after the pipeline will run from Lycoming County to a plant replacement is completed Contractor: Snelson Companies Inc. near Shamokin Dam in Snyder County, PA Project: P&GE Gas Pipeline Replacement Program Length: 35 miles OTIS EASTERN – (1/17) Type: Project includes the replacement of 77 Location: Lycoming County, PA - Snyder County, PA Operator: Rice Energy feet of pipeline Completion: 2017 Project: Ohio Gathering Pipeline Diameter: 12 inches Type: Project includes the construction of Location: Monterey County, CA Owner: Energy Transfer Partners LP/Regency 16-inch pipeline Supt: Jeff Gregory Energy Partners LP Length: 12 miles Project: Roadrunner Gas Transmission Pipeline Location: Monroe County, OH Contractor: Snelson Companies Inc. Type: Project includes the construction of Start: 2017 Project: P&GE Gas Pipeline Replacement Program 30-inch pipeline Type: Project includes the installation of 6,500 Length: 200 miles Owner: National Fuel feet of pipeline Location: Coyanosa, TX – Mexico Contractor: T.G. Mercer/SpreadBoss/Mercer Diameter: 36 inches Completion: 2019 Project: Seneca Gathering Location: San Juaquin County, CA Comments: First phase of the pipeline project for 170 Type: Project includes the construction of Supt: Lou McMullen MMcf/d of available capacity is expected 8-inch and 12-inch pipeline to be completed by 1Q 2016. The second Length: 4 miles Contractor: Snelson Companies Inc. phase, which will increase the pipeline’s Location: Smethport, PA Project: P&GE Gas Pipeline Replacement Program available capacity to 570 MMcf/d, is Start: 2016 Type: Project includes the removal of a leaking expected to be completed by 1Q 2017. valve, abandonment of 16 feet of pipe, The third and final phase of the project PACIFIC GAS AND ELECTRIC CO. – (8/17) capping an existing steel line and the is expected to be completed in 2019 and Operator: Northwest Natural Gas Co. testing of a 3-foot pipe spool will increase available capacity on the Project: North Mist Expansion Project Diameter: 3 and 8 inches pipeline to 640 MMcf/d Type: Project includes pipeline construction, a Location: Modesto, CA

34 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway Owner: Columbia Pipeline Group Diameter: 16 inches SENDERO MIDSTREAM PARTNERS LP – (2/17) Projects: Gibraltar Pipeline/Buffalo Creek Project Location: Cameron and Monroe counties, OH Type: Project includes the construction of a Type: Projects include the construction of Capacity: 350 Mcf/d natural gas gathering and processing 16-inch and 36-inch pipeline HQ: Cameron, OH system consisting of both low and high Length: 25 miles Supt: Dana Keaton pressure gas gathering pipelines, a Location: Claysville, PA - Houston, PA highly-efficient 130 MMcf/day cryogenic Completion: 2017 RLA UTILITIES – (6/17) processing plant and a natural gas liquids Comments: Both projects will run adjacent to Owner: Duke Energy takeaway pipeline Columbia Gas Transmission’s Line 1758 Type: Project includes the construction of Location: Eddy County, NM 12-inch pipeline Completion: 2017 Owner: Williams Partners LP (3/16) Length: 10.5 miles Project: Hillabee Expansion Location: Walton, KY - Big Bone, KY SHELL PIPELINE – (12/16) Type: Project involves a multi-phase project to Project: Falcon Pipeline add a total of 1.13 MM Dth/d of capacity ROCKFORD CORP. – (5/17) Type: Project includes the construction of new Location: Florida Owner: Williams pipeline Start: 2016 Type: Project includes the construction of Length: 94 miles Completion: 2017 16-inch, 20-inch and 24-inch pipeline Location: Pennsylvania, West Virginia and Ohio Comments: Project is part of an expansion of the Length: 21.7 miles Completion:2018 Transco interstate natural gas pipeline Location: Montrose, PA Comments: Project will collect ethane from MarkWest Energy Partners LP’s Houston Processing RICE ENERGY — (8/17) SEMGROUP CORP. – (6/17) and Fractionation facility in Washington Contractor: InterCon Construction Inc. Project: Canton Pipeline County, PA and from its Cadiz Complex in Project: Prometheus Pipeline Type: Project includes the construction of Harrison County, OH Type: Project includes pipeline installation 24-inch pipeline Length: .5 miles Length: 50 miles SIERRITA GAS PIPELINE LLC – (12/16) Diameter: 16 inches Location: Woods County, OK - Blaine County, OK Project: Sierrita Gas Pipeline Location: Monroe County, OH Completion: 4Q 2017 Type: Project includes the construction of Contact: Joe Schmelzer Comments: Project will have an initial capacity of 200 36-inch pipeline Superintendent MMcf/d and, with additional compression, Length: 60 miles could be expanded up to 400 MMcf/d Location: Tucson, AZ - Sasabe, AZ Contractor: Apex Pipeline Services Completion: 2017 Project: Utica Gathering Line Comments: Project will provide 200 MMcf/d of firm Type: Project includes the construction of a transportation capacity gathering pipeline and an interconnect Length: 12 miles

www.pipeline-news.com • September 2017 • Pipeline News 35 ONGOINGProjects construction underway SNC-LAVALIN – (1/17) Length: 168 miles Project: Mariner East II Owner: Crestwood Equity Partners LP Location: Aqua Dulce Hub, Nueces County, TX Type: Project includes hydro-seeding on Type: Project includes the engineering, Capacity: 2.6 Bcf/d pipeline right-of-way procurement, construction and Completion: 2Q 2018 Length: 2.5 miles operations of multiple gas compression Comments: Valley Crossing’s transportation services Diameter: 8 inches and dehydration facilities (over 100,000 will provide new market opportunities Location: Tioga County, PA horsepower of compression, inlet for Texas gas producers and help Mexico Supt: Jim Pratt separation and filtration, gas dehydration, meet its growing electric generation and station measurement and controls) needs as generators shift away from fuel Contractor: Welded Construction LP Location: Permian Basin oil and imported LNG Sub: ProFoam LLC Project: Mariner East II SOUTHEAST CONNECTIONS LLC – (2/17) Owner: Spectra Energy Type: Project includes providing foam breakers Owner: Atlanta Gas Light Project: Jackfish Lake Expansion on pipeline Project: Cumming Lateral Type: Project includes the construction of two Length: 25 miles Type: Project includes the construction of 36-inch loops to expand to the Fort St. Diameter: 20 inches 16-inch pipeline John mainline. Two compressor station Location: Westmoreland and Allegheny counties, PA Length: 11 miles additions will also be built to move the HQ: Smithtown, PA Location: Cumming, GA increased volume of gas Supt: Phillip Cox Start: late 2016 Length: 22 miles Location: Taylor - Chetwynd Contractor: Stupp Owner: AGL Resources Comments: The project will add 137.5 MMcf/d of Sub: T. G. Mercer Consulting Services Inc. Project: Suwanee to Friendship Pipeline transportation capacity to Spectra Project: Mariner East II Type: Project includes the construction of a Energy’s BC Pipeline Type: Project includes the offloading and 12-inch high-pressure transmission line racking of pipe Length: 12 miles SUNLAND CONSTRUCTION – (1/17) Length: 49 miles Location: North Gwinnett and South Hall counties, Operator: Gulf South Pipeline LP Diameter: 16 inches GA Project: Coastal Bend Header Location: York County, PA Comments: Pipeline is part of the Georgia STRIDE Type: Project includes the construction of Supt: Michael Magee program 36-inch pipeline, three compressor stations and seven meter stations Contractor: Michels Corp. SOUTHERN CALIFORNIA GAS CO. – (4/17) Length: 66 miles Sub: Atlas Trenchless LLC Type: Project includes the construction of Location: Wharton and Brazoria counties, TX Project: Mariner East II 8-inch pipeline from an existing pipeline Start: 2017 Type: Project includes the installation of 12,000 to a new CR&R Environmental anaerobic feet of pipeline via HDD digestion facility Owner: Boardwalk Pipeline Partners Diameter: 16 and 20 inches Length: 1.4 miles Project: Sasol & Evangeline Location: Blair County, PA Location: Perris, CA Type: Project involves the construction of Supt: Jim Lagios Completion: 2017 12-inch and 16-inch pipeline Comments: Renewable natural gas from the digestion Length: 25 miles Contractor: Welded Construction facility will be designated specifically to Location: Sulphur, LA Project: Mariner East II power CR&R’s fleet of approximately 900 Start: 2016 Type: Project includes the dual lay of pipeline waste hauling trucks Length: 34 miles LOGISTICS – (7/17) Diameter: 16 and 20 inches SOUTH JERSEY GAS – (4/17) Contractor: Precision Pipeline LLC Location: Morgantown, PA Project: South Jersey Gas Pipeline Project: Mariner East II Foremen: Boyd Catching Jr., Steward Guffey and Type: Project includes the construction of an Type: Project includes the installation of pipeline Daniel Heath underground 24-inch pipeline Length: 51 miles Length: 22 miles Diameter: 20 inches Contractor: Welded Construction Location: Maurice River Township, NJ – Upper Location: Cumberland and Dauphin counties, PA Project: Mariner East II Township, NJ Capacity: 345 Mbpd Type: Project includes the new lay of pipeline Completion: 2019 Supt: Ronnie Michalkovich Length: 27 miles Comments: Project has been approved by the Completion: 3Q 2017 Diameter: 12 and 20 inches Pinelands Commission and will serve Location: Washington, PA more than 140,000 customers Contractor: Precision Pipeline LLC Foremen: Anthony Loggins and Timothy Steward Sub: Atlas Trenchless LLC SPECTRA ENERGY – (8/16) Project: Mariner East II Contractor: Welded Construction Owner: Comisión Federal de Electricidad Type: Project includes the installation of 5,259 Project: Mariner East II Project: Nueces-to-Brownsville Pipeline feet of pipeline via HDD Type: Project includes the new lay of pipeline Type: Project includes constructing and Diameter: 16 and 20 inches Length: 25 miles operating a header system Location: Cumberland and Dauphin counties, PA Diameter: 20 inches Length: 168 miles Supt: Jim Lagios Location: Smithton, PA Location: Nueces County, TX – Brownsville, TX Foremen: Gary Weems and Edward Steward Start: 2016 Contractor: Precision Pipeline LLC Completion: 2018 Sub: Northern Clearing Inc. TENNESSEE GAS PIPELINE CO. LLC – (7/17) Comments: The pipeline will connect with the Sur de Project: Mariner East II Contractor: Precision Pipeline LLC Texas – Tuxpan Pipeline, which will extend Type: Project includes the clearing of pipeline Sub: Northern Clearing Inc. into Mexico right-of-way Project: Susquehanna West Project Diameter: 16 and 20 inches Type: Project includes clearing of pipeline right- STRIKE CONSTRUCTION – (5/17) Location: Perry, York and Dauphin counties, PA of-way Owner: Spectra Energy Supt: Duanne Kmieciak Length: 14 miles Project: Valley Crossing Diameter: 6, 8, 12 and 16 inches Type: Project includes the construction of Contractor: Precision Pipeline LLC Location: Bradford and Tioga counties, PA 36-inch or 42-inch pipeline header system Sub: Penn Line Services Inc.

36 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway Contractor: Price Gregory International Inc. TEXAS EASTERN TRANSMISSION LP – (5/17) Length: .5 miles Project: Susquehanna West Project Project: Marshall County Mine Panel 17W Project Location: Linden, NJ Type: Project includes the construction of Type: Project includes the excavation and Start: 2017 36-inch pipeline looping and piping elevation of sections of Texas Eastern’s modifications lines 10 (30-inch diameter), 15 (30-inch Project: Northern Supply Access Length: 8.2 miles diameter), 25 (36-inch diameter) and Type: Project includes the modification of Location: Tioga County, PA 30 (36-inch diameter) to minimize and existing facilities and construction of Comments: Project will provide 145 MDth of additional monitor potential strains on the pipelines a new 23,877 horsepower compressor capacity for one customer due to anticipated longwall mining station activities of Marshall Coal Location: Indiana, Ohio, Kentucky, Tennessee, and Project: Abandonment & Capacity Restoration Location: Marshall County, WV Mississippi Project Comments: Once the mining-induced subsidence Completion: 2017 Type: Project includes the construction of and the 2017-2018 heating season have Comments: Project will provide efficient north-to- 36-inch pipeline both finished, the two sections of Lines south natural gas transportation on Texas Length: 7.6 miles 10 and 15 located within wetlands will be Gas’ existing system, while maintaining Location: Carter and Lewis Counties, KY removed and the four elevated pipeline the current south-to-north flow sections will be re-installed below ground, Project: Expansion Project hydrostatically tested, and placed back TRANSCANADA CORP. – (8/17) Type: Project includes the construction of into service Operator: ANR Pipeline Co. four new compressor stations and the Project: Wisconsin South Expansion Project modification of two existing compressor Project: TEAL Type: Project includes installation of a new stations by replacing existing capacity Type: Project includes the construction of compressor unit, lateral replacements and with new, higher-rated horsepower two 36-inch and 30-inch pipelines, new capacity enhancements at existing meter compression units compressor stations and upgrades to stations Length: 2.6 miles existing compressor stations Location: Kendall and Kane counties, IL; Rock Location: Kanawha County, VA; Davidson County, Length: 5 miles County, WI TN; Madison County, KY Location: Alabama and Ohio Capacity: 230 MDth/d Comments: Project will have a capacity of 200 MMcf/d Start: 2017 Cost: $57.7 million and will expand transportation capacity of Comments: One pipeline will tie into NEXUS Docket: CP17-9 natural gas on the existing Tennessee Gas Pipeline system Project: Bayway Lateral Operator: ANR Pipeline Type: Project includes the construction of Contractor: Minnesota Ltd. LLC 24-inch pipeline, meter and regulating Type: Project includes the replacement of stations pipeline

www.pipeline-news.com • September 2017 • Pipeline News 37 ONGOINGProjects construction underway Diameter: 22 and 30 inches WASHINGTON GAS LIGHT – (7/17) northeastern Marcellus producing region Location: Lake County, IN Contractor: InfraSource LLC to the Transco mainline near Station 195. Supt: Kerry Schott Project: WGL Loop Replacement Additional Transco facilities are also being Superintendent Type: Project includes the replacement of a added or modified to allow gas to flow pipeline loop and 10,500 feet of pipeline bi-directionally Contractor: Henkels & McCoy Inc. Length: 20 miles Length: 207 miles (183 miles of greenfield pipeline Type: Project includes take-up and installation Diameter: 20 inches and two pipeline loops - the Chapman of pipeline Location: Clarke County, VA Loop and Unity Loop - totaling 12 miles) Length: .8 miles HQ: Front Royal, VA Location: Pennsylvania, Maryland, Virginia, North Diameter: 24 inches Supt: Jason Nash Carolina and South Carolina Contact: Andrew Lurkin Comments: Project is part of a 40-year plan to Comments: Project has been approved by the Federal Superintendent replace gas main and service lines called Energy Regulatory Commission (FERC) and PROJECTpipes, which was approved by will add 1.7 MMDth/d of pipeline capacity TRANSWESTERN PIPELINE CO. LLC – (7/16) the Public Service Commission of the to the existing Transco system Project: Malaga Lateral District of Columbia in Order No. 17602 Type: Project includes construction of pipeline, Project: Atlantic Sunrise one meter station and other ancillary WBI ENERGY INC. – (REV 5/17) Segment: Central Penn Line facilities Project: Demicks Lake Pipeline Type: Project includes construction of pipeline Length: 15 miles Type: Project involves the construction of a Length: 177 miles Location: Eddy and Lea counties, NM 24-inch lateral Diameter: 42 inches Completion: 2017 Length: 22 miles Location: Susquehanna County, PA - Lancaster Location: North Dakota County, PA TRISTREAM ENERGY LLC – (6/16) Completion: 2017 Capacity: 1.7 MMDth/d Project: Candilight Junction Comments: Project will have an additional capacity of Cost: $410 million Type: Project includes the construction of a new 222 MMcf/d Docket: CP15-138 pipeline injection facility Location: East Texas WESTERN GAS PARTNERS LP – (10/16) Project: Leidy Southeast Expansion Start: 2016 Type: Project includes the construction of Type: Project consists of construction of new Completion: 2017 36-inch and 42-inch pipeline pipe within or parallel to existing pipeline Length: 80 miles and utility rights-of-way, horsepower TROY CONSTRUCTION – (REV 6/17) Location: Reeves, Loving and Ward counties, TX additions at existing compressor stations Owner: Williams Partners Start: 2016 and existing facility modifications along its Project: Virginia Southside Expansion Project II Comments: Additional receipt connections may mainline Type: Project includes the construction of new potentially be added at the tailgates of the Length: 30 miles 24-inch pipeline, one delivery metering MiVida Gas Processing Plant and Bone Location: Pennsylvania and New Jersey and regulator station, an additional unit Spring Gas Processing Plant Comments: Project will expand the Leidy Line’s at a compressor facility station and an currently subscribed firm transportation additional electric motor for an existing WHC ENERGY SERVICES – (2/17) capacity of 1.7 MMDth by about 30 Transco compressor station Owner: ONEOK/Fermaca percent Length: 4 miles Type: Project includes the construction of Location: Brunswick County, VA - Greensville 30-inch pipeline Owner: Williams Partners LP County, VA Length: 200 miles Project: Garden State Expansion Completion: 4Q 2017 Location: Coyanosa, TX – Tarahumara, Mexico Type: Project involves an expansion to deliver Comments: FERC has approved Williams’ request to Comments: Pipeline will connect to the Tarahumara 180 MDth/d of additional natural gas use an additional 1.26 acres of temporary Pipeline capacity workspaces at six existing Transco meter Location: Burlington County, NJ and regulator stations. Once completed, WHITEWATER MIDSTREAM – (4/17) Start: 2016 project will provide 250 MDth/d of firm Project: Agua Blanca Pipeline Completion: 2017 transportation capacity to a delivery point Type: Project includes construction of pipeline Comments: Project is part of an expansion of the on a new lateral Length: 77 miles Transco interstate natural gas pipeline Diameter: 36 inches VELOCITY CENTRAL OKLAHOMA Location: Orla, TX - Waha Hub WPX ENERGY – (8/17) PIPELINE LLC – (4/17) Capacity: 1.25 Bcf/d Operator: Howard Energy Partners Type: Project includes the construction of Completion: 4Q 2018 Project: Stateline oil gathering and gas processing an 8-inch pipeline and four terminal projects expansions WILLIAMS TRANSCONTINENTAL – (7/17) Type: Project includes construction of a Length: 41 miles Contractor: Henkels & McCoy Inc. gathering system and associated pipelines Location: Cushing, OK (SCOOP play) Type: Project includes the replacement of two Length: 50 miles Completion: mid-2017 pipeline valves Diameter: 36 inches Comments: Project will allow producers to transport Length: 17 miles Location: Lea and Eddy counties, NM; up to 100 Mbpd of truck injected or Diameter: 30 inches Reeves and Loving Counties, TX pipeline gathered barrels Location: Chester and Montgomery counties, PA Capacity: 400 MMcf/d HQ: Coatesville, PA Cost: $863 million VESTA MIDSTREAM PARTNERS LLC – (4/17) Supt: Gary Seidel Completion: 2Q 2018 Project: Oil City Gathering and Processing System Comments: JV plans to add a second train to double Type: Project includes the construction of low Project: Atlantic Sunrise capacity of the complex by 2Q 2019 and high-pressure gas gathering and Contractor: Latex Construction – Spread 4 / Welded – processing system for newly developed Spread 7 SCOOP wells Type: Project consists of compression and Location: Carter County, OK looping of the Transco Leidy Line in Pennsylvania along with a greenfield pipeline segment, referred to as the Central Penn Line, connecting the

38 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway

and approximately 180 Mbpd of existing Length: 22 miles Canada delivery capacity to third-party diluent Diameter: 48 inches PEMBINA PIPELINE CORP. – (4/17) delivery pipelines Location: Edson, AB Owner: Chevron Canada Ltd. Type: Project includes the construction and Project: Duvernay I Section: Liege Lateral Loop 2 – Pelican Lake operation of gas gathering pipelines and Type: Project includes the construction Section processing facilities, liquids stabilization and operation of a new 100 MMcf/d Type: Project includes construction of pipeline facilities and supporting infrastructure shallow cut gas plant and supporting looping Location: Fox Creek, Alberta infrastructure, including condensate, gas Length: 35 miles and water field handling, a gas gathering Diameter: 30 inches Project: NEBC Expansion trunk line and a fuel line Location: Wabasca, AB Type: Project includes the construction of Length: 12 miles 12-inch pipeline with a base capacity Location: Tony Creek, AB - Fox Creek, AB Section: Kettle River Lateral Loop – Christina River Start: 2017 of up to 75 Mbpd that will parallel the Section Comments: Project is expected to have NGL extraction Type: Project includes construction of pipeline company’s Blueberry Pipeline capacity of 5,500 bpd looping Length: 99 miles Length: 12 miles Location: Blair Creek, B.C. TRANSCANADA PIPELINES – (REV 8/17) Diameter: 24 inches Comments: Project will transport condensate and Operator: NOVA Gas Transmission Ltd. Location: Fort McMurray, AB natural gas liquids for various producers in Project: 2017 NGTL System Expansion Project the liquids-rich Montney resource play Type: Project includes construction of five Section: Loop – Boundary Lake Section pipeline sections and two compression Type: Project includes construction of pipeline Project: Canadian Diluent Hub facilities looping Type: Project includes the construction of Length: 143 Length: 56 miles 600 Mbbls of above ground storage, Diameter: 24, 30 and 36 inches Diameter: 36 inches multiple inbound and outbound pipe-line Location: Alberta Location: Clear Hills County, AB connections, plus associated pumping Capacity: 443 MMcf/d and metering facilities Cost: $1.3 billion Section: Northwest Mainline Loop No. 2 – Bear Location: Fort Saskatchewan Filing: 443 MMcf/d Canyon Section Completion: 2017 Completion: 2Q 2018 Type: Project includes construction of pipeline Comments: Project is designed to augment Pembina’s looping existing diluent handling facilities in the Section: Grande Prairie Mainline Loop 2 – McLeod Length: 18 miles Fort Saskatchewan area which includes River Section Diameter: 36 inches 20 Mbpd of rail import capacity, 500 Type: Project includes construction of pipeline Location: Saddle Hills County, AB Mbbls of underground diluent storage looping

“SAFETY FIRST - SERVICE ALWAYS”

• Pipeline Stringing - 60’ + 80’ pipe

• Unloading/Stockpiling Pipe from rail sidings

•Ship discharge/Project Pipe

• General/Heavy Hauling (Nationwide)

•Logistics/Cost Estimates

Contact: Jimmy Montgomery Jimmy@mtilogistics Phone: (877) 787-4644, (713) 592-6766 Fax: (713) 592-6769 Website: MTILOGISTICS.COM

www.pipeline-news.com • September 2017 • Pipeline News 39 ONGOINGProjects construction underway Section: Alces River Compressor Station Unit TIPIEL S.A. – (6/15) NGL – The Americas Addition Owner: Consorcio Constructor Ductos del Sur Type: Project includes the addition of a Type: Project includes the front-end engineering U.S. compressor unit design and detailed engineering design of Location: Grande Prairie, AB a new 32-inch pipeline ENTERPRISE PRODUCTS Length: 1,056 mikes PARTNERS LP – (6/17) Section: Otter Lake Compressor Station Unit Location: Camisea field - Southern Peru Project: Shin Oak NGL Pipeline Addition Comments: Project will improve the existing Peruvian Type: Project includes the construction of Type: Project includes the addition of a Energy Network, contributing to the 24-inch pipeline compressor unit development of an Energy Node and Length: 571 miles Location: Manning, AB Petrochemical Hub in Southern Peru Location: Gaines County, TX - Mont Belvieu, TX Completion: 2Q 2019 Operator: NOVA Gas Transmission Ltd. Comments: Project will have an initial design capacity Project: Towerbirch Expansion Project Mexico of 250 Mbpd, expandable to 600 Mbpd Type: Project includes construction of two pipelines, two meter stations, valve sites FERMACA – (6/16) PIPELINE LTD. – (11/16) Owner: Comisión Federal de Electricidad and launcher/receiver facilities Owner: Pembina Type: Project involves building and operating a Length: 75 miles Project: Northeast B.C. Expansion / Plateau natural gas pipeline Diameter: 30 and 36 inches Pipeline Length: 290 miles Cost: $439 million Type: Project includes the expansion of existing Location: Durango - Zacatecas - Aguascalientes Filing: A79841 pipeline and construction of new pipeline Start: 2016 Completion: 4Q 2017 Length: 100 miles Completion: 2018 Location: Wonowon to Taylor Project: Vaughan Mainline Expansion Project Comments: Expansion will add 75 Mbpd of condensate Type: Project includes construction of pipeline INFRAESTRUCTURA ENERGÉTICA NGLs to the company’s system, while the Length: 7.2 miles NOVA SAB DE C.V. – (9/15) Eagle Gas pipeline is another step towards Diameter: 42 inches Owner: Comisión Federal de Electricidad constructing B.C.’s first liquefied natural Location: Vaughan, Ontario Type: Project includes the construction and gas export terminal Filing: A78823 operation of a 42-inch natural gas pipeline Length: 127 miles PUMPCO INC./STRIKE WILLBROS GROUP INC. – (5/17) Location: Ojinaga - El Encino, Chihuahua CONSTRUCTION – (8/15) Completion: 3Q 2017 Type: Project includes the construction of new Owner: Energy Transfer Partners LP/Regency Comments: Project will have a design capacity capable 48-inch pipeline Energy Partners LP of transporting approximately 1.4 Bcf/d of Length: 5 miles Project: Lone Star NGL Pipeline natural gas Completion:3Q 2017 Type: Project includes the construction of Comments: The contract was awarded to Willbros’ 24-inch and 30-inch pipeline Canada segment JACOBS ENGINEERING GROUP INC. – (6/16) Length: 533 miles Owner: TransCanada Corp. Location: Bosque County, TX - Mont Belvieu, TX Type: Project includes the construction of new Project: Tuxpan-Tula Pipeline Completion: 2017 transmission line Type: Project involves engineering, procurement Comments: The new pipeline is being built to Length: 110 miles and field engineering support for the accommodate Lone Star’s contracted NGL Completion: 3Q 2017 installation of a compressor station, a transportation volumes that will exceed Comments: The contract was awarded to Willbros’ meter station and associated pipeline Lone Star’s existing 290 Mbpd of capacity Utility Transmission and Distribution appurtenances from the Permian Basin segment Length: 155 miles Location: Tuxpan, Veracruz - Tula VERESEN INC. – (3/17) Start: 2016 Project: South Central Liquids Hub Project Caribbean/South & Completion: 2018 Type: Project includes the construction of a new Comments: TransCanada Corp. was awarded a Central America gathering system contract to build and operate the pipeline Location: British Columbia CFPS ENGENHARIA E PROJETOS S.A. – (4/15) in November 2015 Project: KA North Condensate Pipeline Completion: 2017 Type: Project includes the construction of a Comments: Project will have the option for expansion TRANSCANADA CORP. – (6/16) in the future 6-inch pipeline and a second 10-inch Owner: Comisión Federal de Electricidad raw gas pipeline (KA North II) to accept Project: Tula - Villa de Reyes Pipeline Project: Tower Liquids Hub Project additional gas production Type: Project involves building and operating Length: 5 miles Type: Project includes the construction of the 261-mile, 36-inch pipeline infrastructure to deliver the NGLs into a Location: Maranhão, Brazil Length: 261 miles Completion: 2017 third-party system Location: Tula, Hidalgo - Villa de Reyes, San Luis Location: British Columbia Comments: Project will have approximately 17 Mbpd Potosí of capacity Completion: 2017 Start: 2016 Comments: Part of the project will include capacity Completion: 2018 to handle third party NGLs that could be ENARSA/VERTÚA/HELPORT/CPC/TECHINCT/ Comments: The project will interconnect with CONTRERAS HERMANOS/PANEDILE/ either trucked in or connected directly by TransCanada’s Tamazunchale and Tuxpan a future pipeline ROVELLA CARRANZA/CHEDIACK/UCSA/ - Tula pipelines as well as with other CONTA WALTER MARIO/BTU/ESUCO/ transporters in the region WHC ENERGY SERVICES – (2/17) VICTOR CONTRERAS/JCR – (2/16) Owner: EnLink Midstream Owner: Argentine Government Project: Ascension Pipeline Project: Noreste Argentino Pipeline Type: Project includes the construction of Type: Project includes the construction of trunk 12-inch pipeline lines and branch lines Length: 35 miles Length: 2,574 miles Location: Geismar, LA - Garyville, LA Location: Buenos Aires - Uruguay Start: 2016 Start: 2016

40 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway

Comments: Project will increase Cajun-Sibon Pipeline capacity by an additional 50 Contractor: KSJV Mbpd of raw-make NGL Project: Magnolia LNG Export Terminal Type: Project includes the engineering, procurement, construction, commissioning, start-up and performance testing of the terminal LNG – The Americas Cost: $4.3 billion U.S. PUGET SOUND ENERGY INC. – (REV 8/17) FREEPORT LNG DEVELOPMENT LP – (5/17) Project: Puget Sound Energy LNG Facility Operator: Freeport LNG Development LLC Type: Project includes construction of an LNG storage tank, infrastructure Project: Freeport LNG Quintana Regas Terminal Expansion for loading marine vessels, mooring dolphins and distribution Type: Project includes construction of three liquefication trains pipelines Location: Quintana Island, TX Location: Port of Tacoma, WA Capacity: 13.4 MMtpa Capacity: 30 Mcm Cost: $12.5 billion Cost: $310 million Docket: CP12-29 Contact: Shirley Schultz Completion: 2019 Project Manager Comments: Companies that have agreed to purchase gas from Freeport LNG (253) 591-5121 include Osaka Gas Co., a Japanese gas supplier; Chubu Electric Power [email protected] Co., a Japanese electricity provider; and BP Energy Company, which Completion: 4Q 2019 provides gas and power to U.S. utilities and industries Contractor: CB&I Segment: Freeport LNG Pipeline Facilities Project: Puget Sound Energy LNG Facility Type: Project includes pipeline construction and facility modifications Type: Project includes the engineering, procurement, fabrication and Length: 11 miles construction of a storage tank, liquefier and vaporizer Diameter: 42 inches Cost: $200 million Comments: Pipeline will connect the terminal with the Sratton Ridge Meter Station TRANSCANADA CORP. – (5/17) Contractor: Burns & McDonnell Owner: Cameron LNG Type: Project includes design of the terminal Project: Cameron Access Project Type: Project includes the installation of pipeline Contractor: Zachry Group Length: 34 miles Type: Project includes construction of the terminal Diameter: 34 and 36 inches Location: Lake Arthur, LA GREATER LAFOURCHE PORT Start: 2016 COMMISSION – (4/17) Completion: 2018 Project: Galliano LNG Plant Type: Project includes the construction of a LNG plant and export terminal Location: Port Fourchon, LA Comments: Project will produce up to 2 million tons of LNG per year for export

IHI E&C – (7/16) Owner: Kinder Morgan Project: Elba Liquefaction Project Type: Project includes modifications to the existing Elba facilities and will include compression for vapor handling and new pumps for loading the LNG on vessels for export Location: Savannah, GA Completion: 2018

LAKE CHARLES LNG – (2/16) Project: Lake Charles LNG Type: Project includes the construction and operation of a natural gas liquefaction and export facility Location: Lake Charles, LA Completion: 2020 Comments: Lake Charles LNG Project is expected to be one of the largest LNG export initiatives in the U.S.

LIQUEFIED NATURAL GAS LTD. – (REV 8/17) Operator: Magnolia LNG LLC Project: Magnolia LNG Export Terminal Type: Project includes the development of four LNG production trains, two LNG tanks, and LNG ship and truck loading facilities Location: Lake Charles, LA Capacity: 8 Mtpa Docket: CP14-347 Completion:2Q 2018 Comments: Project entered into a Precedent Agreement for 20-year binding pipeline capacity with Kinder Morgan Louisiana Pipeline LLC to deliver gas to the site for the full capacity of the terminal

www.pipeline-news.com • September 2017 • Pipeline News 41 ONGOINGProjects construction underway

Canada ENERGY TRANSFER PARTNERS – (7/17) Diameter: 42 inches Operator: Rover Pipeline LLC Location: Defiance, Henry, and Fulton, OH; PIERIDAE ENERGY CANADA – (12/14) Project: Rover Pipeline Lenawee, Washtenaw, and Livingston, MI Type: Project includes a liquefaction plant, Type: Project includes construction of two dual Supt: James Junker Jr., Cory Strandlien and storage facilities and marine jetty for mainlines, four mainline compressor Toby Prawl loading LNG stations, eight supply laterals, eight supply Location: Goldboro, Nova Scotia lateral compressor stations and other Contractor: Precision Pipeline LLC Completion: 2018 ancillary facilities Segment: Berne Lateral Comments: The company expects the facility to Length: 713 miles Type: Supply lateral construction produce five million metric tons of LNG Diameter: 24, 30, 36 and 42 inches Length: 3.7 miles per year with an onsite storage capacity of Location: Ashland, OH - Howell, MI Diameter: 24 inches 420 Mcm of LNG Capacity: 3.25 Bcf/d Location: Noble and Monroe, OH Cost: $4.2 billion Supt: Adam Minigh Docket: CP15-93 OIL - The Americas Status: Construction has started on Phase II of Contractor: Precision Pipeline LLC the project Segment: Majorsville Lateral U.S. Start: 1Q 2017 Type: Supply lateral construction AMERICAN MIDSTREAM Completion: 4Q 2017 Length: 24 miles PARTNERS LP – (4/17) Diameter: 24 inches Owner: Contractor: AECOM Location: Marshall, WV and Belmont, OH Project: DAPL interconnect Type: Front-end engineering and design Supt: Dennis Bergman Type: Project includes the construction of a Contractor: Precision Pipeline LLC pipeline interconnect Contractor: Ariel Corp. Segment: Sherwood Lateral Location: Watford City, ND Type: Compressor supply Type: Supply lateral construction Comments: The new DAPL interconnect project will Cost: $42 million Length: 54 miles tie into American Midstream’s Bakken Diameter: 36 inches crude oil gathering system, which consists Contractor: Berg Steel Pipe Corp. Location: Doddridge, Tyler, and Wetzel, WV; of interstate pipelines with capacity to Type: Pipe supply Monroe, OH transport up to roughly 40 Mbpd of crude Length: 620 miles Diameter: 36 and 42 inches Supt: Jim Nierenda oil Contractor: Sheehan Pipeline Construction Inc. Contractor: Precision Pipeline LLC BAKKENLINK PIPELINE – (11/16) Spread: 1, 2 Segment: CGT Lateral Project: Dry Creek to Beaver Lodge Pipeline Segment: Mainline A and B Type: Supply lateral construction Type: Project includes the construction of Type: Pipeline construction Length: 5.7 miles 16-inch pipeline Length: 78 miles Diameter: 24 inches Length: 37 miles Diameter: 42 inches Location: Doddridge, WV Location: Dry Creek, ND – Tioga, ND Location: Carroll, Tuscarawas, Stark, Wayne, Start: 2016 Ashland, Richland, Crawford, Seneca, Contractor: Michels Comments: Pipeline would be designed with an initial Hancock, Wood, Henry, and Defiance, OH Segment: Burgettstown Lateral capacity of 100 Mbpd and will tie into the Type: Supply lateral construction Garden Creek Pipeline Contractor: U.S. Pipeline Length: 52 miles Spread: 3 Diameter: 36 inches BLUEKNIGHT ENERGY PARTNERS LP – (12/15) Segment: Mainlines A and B Location: Washington, PA; Hancock, WV; Jefferson Project: Oklahoma Condensate Pipeline Type: Pipeline construction and Carroll, OH Type: Project includes the conversion of a Length: 70 miles Supt: Rick Zavitz portion of its existing Oklahoma Mainline Diameter: 42 inches System to meet growing demand for HQ: St. Clairsville and Dennison, OH Contractor: Latex Construction dedicated condensate service Supt: Jason West, Greg Norman and Dane Segment: Seneca Lateral Location: Maysville, OK – Cushing, OK Hilsabeck Type: Supply lateral construction Completion: 2016 Length: 26 miles Comments: Blueknight’s Cushing Oil Terminal Contractor: Michels Diameter: 42 inches provides shippers and producers direct Spread: 4 Location: Noble and Monroe, OH access to several key connecting Segment: Mainlines A and B Supt: Adam Minigh terminals, refiners, as well as the Type: Pipeline construction important Gulf Coast market Length: 101 miles Contractor: U.S. Pipeline Diameter: 42 inches Segment: Cadiz Lateral COUNTRYMARK PIPELINE – (7/17) Supt: Rick Zavitz Type: Supply lateral construction Contractor: Foltz Welding Ltd. Length: 3 miles Type: Project includes the installation of Contractor: Precision Pipeline LLC Diameter: 30 inches pipeline Spread: 5, 6 Location: Harrison, OH Length: 17 miles Segment: Mainlines A and B Supt: Jason West Diameter: 6 inches Type: Pipeline construction Location: Marion County, IL Length: 208 miles Contractor: U.S. Pipeline Supt: Joe Pennington Diameter: 42 inches Segment: Clarington Lateral Supt: Bobby Poteete, Tommy Haynes and JW Type: Supply lateral construction ENBRIDGE – (7/17) Morgan Length: 32.6 miles Contractor: Minnesota Ltd. LLC Diameter: 42 inches Project: Line 78 Project Contractor: Precision Pipeline LLC Location: Monroe, Belmont and Harrison, OH Type: Project includes the removal of pipeline Spread: 7, 8 Supt: Wayne Fontenot Diameter: 24 inches Segment: Market Segment Pipeline Location: Will County, IL Type: Pipeline construction Project: Trunkline Backhaul Project Supt: Kerry Schott Length: 99 miles Type: Project includes upgrades and

42 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway modifications at existing compressor Location: Greeley, CO NOBLE MIDSTREAM – (5/17) stations to allow for bi-directional flow Completion: 1Q 2018 Type: Project includes the construction of a of natural gas on their existing pipeline Comments: All oil produced from the 22-well site 24-inch pipeline to deliver crude to the systems will be moved out through the pipeline, Advantage Pipeline Location: Wayne County, IL; Massac County, IL; eliminating the expected truck traffic Length: 15 miles Dyer County, TN; Tate County, MI that would have co-mingled with Location: Reeves County, TX Capacity: 750 MMcf/d neighborhood traffic Completion: 2017 Cost: $50.8 million Docket: CP15-96 M2 INFRASTRUCTURE LLC – (5/17) OASIS MIDSTREAM SERVICES LLC – (REV Comments: Project will interconnect with the Rover Operator: TransCanada Corp. 4/17) Pipeline Type: Project includes the construction of 6.2 Project: Johnson’s Corner Pipeline Project million barrels of new crude oil storage at Type: Project includes the construction of Project: Panhandle Backhaul Project TransCanada’s existing terminal 10-inch pipeline Type: Project includes upgrades and Location: Cushing, OK Length: 19 miles modifications to allow for bi-directional Completion: 2017 flow of natural gas on their existing MEDALLION MIDSTREAM LLC – (1/17) Comments: Project has an anticipated operating pipeline systems Type: Project includes the construction of a new capacity of 50 Mbpd Location: Allen, Hamilton, Vermillion and Parke 16-inch Delaware Basin crude oil pipeline counties, IN; Douglas County, IL; Lenawee system, including crude oil storage and PARADIGM ENERGY PARTNERS LLC – (4/16) County, MI truck unloading facilities Type: Project includes the construction of a new Capacity: 750 MMcf/d Length: 45 miles gathering system Cost: $50.8 million Location: Pecos and Reeves counties, TX Length: 23 miles Docket: CP15-94 Completion: 2017 Location: Palermo, ND Comments: Project will interconnect with the Rover Comments: Pipeline will have an initial capacity of 100 Comments: From Palermo, producers can access Pipeline Mbpd east and west coast markets via the BNSF Railway, as well as downstream markets Contractor: BigInch Fabricators and Construction Inc. MICHELS CORP./LOENBRO/ near Stanley, ND, where Paradigm has Type: Project includes the installation of pipeline PRECISION PIPELINE – (REV 5/16) existing pipeline connections Length: 24 miles Owner: NorthStar Midstream Diameter: 2 and 24 inches Project: NST Express Pipeline PLAINS ALL AMERICAN PIPELINE LP – (6/17) Location: Hamilton County, IN Type: Project includes the construction of Project: Cactus Pipeline Expansion HQ: Montezuma, IN 12-inch and 30-inch pipeline, including a Type: Project includes pipeline expansion via Supt: Jim Shepler storage facility manifold and metering enhancements Length: 1,134 miles Location: McCamey, TX - Gardendale, TX Contractor: BigInch Fabricators and Construction Inc. Location: Bakken/Three Forks area - Patoka, IL Capacity: 390 Mbpd Type: Project includes the installation and Completion: 2018 Completion: 3Q 2017 station fabrication of various pipeline Comments: Michels will have spreads 1-3 and Diameter: 2 to 36 inches Precision will have spreads 4-6. The Owner 2: Phillips 66 Partners LP Location: Parke County, IN pipeline will transport 450 Mbpd with a Project: STACK Pipeline HQ: Montezuma, IN capacity as high as 570 Mbpd or more Type: Project includes the expansion of the Supt: Frank Ayers – which could represent approximately STACK Pipeline by constructing a truck half of Bakken current daily crude oil station and a pipeline lateral Contractor: Northern Indiana Public Service Co. production Length: 55 miles Type: Project includes the replacement of 1,800 Location: Cushing, OK feet of pipeline via HDD and in-line facility NAVIGATOR ENERGY SERVICES – (3/17) Start: 2016 modifications Project: Big Spring Gateway Pipeline Expansion Comments: Plains contributed an existing terminal Diameter: 24 inches Type: Project includes the construction of with 200 Mbbls of crude oil storage Location: Cass, Miami and Wabash counties, IN a new 50-mile mainline and 25 miles Supt: Tim Dunn of pipeline laterals to connect to new PRICE GREGORY INTERNATIONAL – (7/16) Midland destinations: Centurion Pipeline Operator: SemGroup ENERGY TRANSFER PARTNERS/PHILLIPS 66/ and Permian Express Terminal (formerly Contractor: Quanta Services Inc. SUNOCO LOGISTICS – (7/17) SunVit) Project: Maurepas Pipelines Contractor: Troy Construction (spreads one and two)/ Length: 75 miles Type: Project includes the construction of 34.2 Sunland Construction (spreads three and Location: Midland, TX miles of 24-inch pipeline, 35 miles of four) Capacity: 140 Mbpd 12-inch pipeline and 34 miles of 6-inch Project: Bayou Bridge Expansion Completion: 2017 pipeline Type: Project will be built in two phases and Comments: Upon completion of the expansion, the Location: St. James & St. Charles parishes, LA includes the construction of new pipeline system will include more than 650 miles Completion: 2Q 2017 Length: 155 miles of installed pipeline and a total system Diameter: 12 and 16 inches deliverability of 600 Mbpd of crude oil PRIMORIS/HOLLOMAN CORP./ Location: Lake Charles, LA - St. James, LA PUMPCO – (5/17) Completion: 4Q 2017 NC CONTRACTORS – (5/17) Owner: Enterprise Products Partners LP Owner: Enterprise Products Pipeline LP Contractor: Primoris Pipeline has been awarded EVX MIDSTREAM PARTNERS LLC – (11/16) Project: ECHO Phase II spreads 1 and 2, Holloman Corp. has been Type: Project includes the construction of a Type: Project includes the extension the 30-inch awarded spreads 3 and 4, and Pumpco crude oil gathering system ECHO Pipeline Inc. has been awarded spread 5 Location: Frio, La Salle and McMullen counties, TX Length: 80 miles Project: Midland-to-Sealy Pipeline Location: Wilson County, TX – Gardendale, TX Type: Project includes the construction of EXTRACTION OIL & GAS – (7/17) Completion: 2017 24-inch pipeline Project: Triple Creek Pipeline Comments: Project will increase capacity to Length: 416 miles Type: Project includes the construction of a 350 Mbpd Location: Midland, TX - Sealy, TX pipeline to move oil from the 22-well Completion: 2018 Triple Creek site Comments: Pipeline will have the capability to provide

www.pipeline-news.com • September 2017 • Pipeline News 43 ONGOINGProjects construction underway

up to 540 Mbpd of take-away capacity Diameter: 20 inches Length: 214 miles for growing volumes of crude oil, and Location: Sorrento, LA - Breaux Bridge, LA Location: Kirby Lake condensate from the Permian Basin Comments: Enterprise will also upgrade rail receipt Comments: The in-service date of the project has points at Mont Belvieu to handle as many been delayed until 2017 due to changes RICE ENERGY – (7/17) as 100 refinery grade propylene cars per in production estimates from oil sands Contractor: C.J. Hughes Pipeline day operations Sub: InterCon Construction Inc. Type: Project includes the installation of 1,000 Owner: TransCanada Corp./Magellan Midstream ENBRIDGE – (3/17) feet of pipeline via HDD Project: HoustonLink Project: Enbridge Line 10 Westover Segment Diameter: 16 inches Type: Project includes the construction of a Replacement Project Location: Washington County, PA 24-inch pipeline Type: Project includes the replacement of Supt: John Jones Length: 9 miles 12-inch pipeline with new 20-inch Location: Houston, TX pipeline and three new sections for SADDLEHORN PIPELINE LLC – (12/16) Start: 2016 proposed reroutes from existing right-of- way Project: Laramie County Pipeline Completion: 2017 Length: 35 miles Type: Project includes the construction of a new Comments: Project will provide TransCanada’s Location: Ontario (Westover Terminal - Nanticoke pipeline lateral customers access to Magellan’s Houston Junction Facility) Length: 10 miles and Texas City crude oil distribution Completion: 2018 Location: Laramie County, WY system Comments: The National Energy Board (NEB) has Start: 2016 TALLGRASS ENERGY – (7/17) approved the project and has imposed Completion: 2017 a total of 46 conditions covering a wide Contractor: Minnesota Ltd. LLC Comments: Project will have an initial design capacity range of matters, including emergency Project: REX Compressor Station of 10 Mbpd management and environmental Type: Project includes the installation of a meter protection SEABROOK LOGISTICS – (3/17) station Type: Project includes the construction of Diameter: 12 inches INTER PIPELINE – (2/17) a 24-inch bi-directional pipeline and Location: Hendricks County, IN Project: Kirby North Project storage facilities Supt: Kerry Schott Type: Project includes the construction of Location: Seabrook, TX 16-inch and 8-inch pipeline laterals, as Completion: 2018 TALL OAK MIDSTREAM LLC – (7/15) well as a new pumping and metering Project: Eagle Ford JV Pipeline System Expansion facility Owner: Magellan Midstream Partners LP/LBC Tank Type: Project includes the construction of a Length: 15 miles Terminals LLC 20-inch condensate gathering system and Location: Conklin, AB Type: Project includes the construction of expansion on an existing pipeline system Comments: Project will produce up to 100 Mbpd of 270 Mcm of additional crude oil and Length: 125 miles bitumen and require bitumen blend and condensate storage and the construction Location: Gardendale, TX - Corpus Christi, TX diluent transportation capacity over the of a 24-inch bi-directional pipeline Completion: 2017 long term Location: Seabrook, TX Comments: Project includes a new terminal on the Completion: 2018 Corpus Christi ship channel to support PEMBINA PIPELINE CORP. – (5/17) Comments: If warranted by market demand, Seabrook the increased volumes to be shipped via Project: Phase IV Expansion Logistics could construct an additional pipeline to the region Type: Project involves the expansion of the Fox 480 Mcm of storage, a second 24-inch Creek and Namao Pipeline through two diameter pipeline between the Seabrook WELSPUN TUBULAR/PUMPCO/ new pump stations Logistics’ facility and Magellan’s Houston STRIKE – (10/16) Location: Fox Creek - Namao crude oil distribution system and a second Owner: Diamond Pipeline LLC Completion: 2018 Aframax ship dock Project: Diamond Pipeline Comments: Project will expand the pipeline by 180 Type: Project includes the construction of a new Mbpd SEMGROUP/NGL ENERGY PARTNERS – (3/17) pipeline Project: Glass Mountain Pipeline Extension Length: 440 miles Project: Phase V Expansion Type: Project includes the extension of 215 Location: Cushing, OK - Memphis, TN Type: Project involves the expansion of capacity between Lator and Fox Creek miles of existing pipeline Comments: The pipeline will be capable of Location: Lator and Fox Creek Length: 44 miles transporting 200 Mbpd of domestic crude Completion: 2018 Location: Cushing, OK oil from the storage hub in Cushing to Comments: Project will expand the pipeline by 260 Completion: 2017 Valero’s refinery in Memphis Mbpd and the clearing of the right-of-way Comments: The extension will deliver crude oil from is almost complete north-central Oklahoma’s STACK resource Canada play to Cushing, OK Project: Vantage Pipeline Expansion BANISTER PIPELINE – (7/16) Type: Project includes the installation of SPECTRA ENERGY TRANSMISSION – (7/17) Owner: Access Pipeline Inc. mainline pump stations and the Contractor: Mears Group Inc. Project: Northeast Expansion construction of a new 8-inch gathering Sub: BigInch Fabricators and Construction Inc. Type: Project includes the construction of lateral Type: Project includes pipeline integrity, 42-inch pipeline Length: 50 miles re-coating and guided wave direct Length: 185 miles Location: Tioga, ND - Empress, Alberta examination of various size pipelines Location: Conklin, Alberta – Redwater, Alberta Completion: 2017 Location: Huntington and Bucks counties, PA Start: 2016 Comments: Expansion will increase the pipeline’s Supt: Matt Ranson Completion: 2018 mainline capacity from 40 Mbpd to 68 Mbpd SUNLAND CONSTRUCTION – (5/17) ENBRIDGE ATHABASCA – (REV 6/17) Owner: Enterprise Products Partners LP Project: Athabasca Pipeline Twinning TRANSCANADA CORP. – (10/15) Project: RGP Pipeline and Rail Terminal Expansion Type: Project includes: a new pump station at Project: Grand Rapids Pipeline Type: Project includes construction of a pipeline the existing Kirby Lake Terminal; a new Type: Project includes the construction of new lateral pump station at the existing Bonnyville pipeline Length: 65 miles Station; and a new 36-inch pipeline Length: 287 miles

44 Pipeline News September 2017 • www.pipeline-news.com ONGOINGProjects construction underway

Location: Fort McMurray, Alberta - Edmonton Canada SUBSEA 7 – (5/17) Comments: Project will have an ultimate capacity to Owner: BP move up to 900 Mbpd of crude oil and ENBRIDGE INC. – (10/15) Project: Mad Dog 2 development 330 Mbpd of diluent Project: Norlite System Type: Project includes the engineering, Location: Cheecham procurement, construction and Start: 2017 installation of the subsea umbilicals, risers PRODUCTS – Comments: System will be capable of transporting and pipeline systems and associated The Americas 270 Mbpd of diluent from Edmonton into subsea architecture for the project the oil sands region and has the potential Location: Offshore New Orleans U.S. to be further expanded with the addition BUCKEYE PARTNERS LP – (REV 6/17) of pump stations to an ultimate capacity TECHNIP FMC – (5/17) Project: Michigan/Ohio Pipeline Expansion Project of over 400 Mbpd Owner: Shell Offshore Inc. (Phase II) Project: Kaikias deep water project Type: Project includes the reversal on a portion OFFSHORE – Type: Project includes the delivery, integration, of the existing Laurel Pipeline to facilitate and installation of the subsea production the transportation of refined petroleum The Americas system and subsea riser, jumper and flowline equipment for phase one of the products U.S. Location: Pittsburgh, PA project Completion: 2018 AUDUBON ENGINEERING Location: Gulf of Mexico SOLUTIONS – (6/16) Project: Michigan/Ohio Pipeline Expansion Owner: Phillips 66 Co. (Phase I) Type: Project involves various pipeline, Mexico Type: Project includes the reversal of a portion measurement, rotating equipment, truck SAIPEM – (11/14) of the existing Laurel Pipeline rack and marine terminal, and tank Project: Lakach Field Location: Detroit, MI, Lima, OH and Midland, PA integrity projects Type: Project includes engineering, Comments: This phase of the project is in addition to Location: Eastern and Gulf Coast procurement, construction, and the first phase, which offered expanded Start: 2016 installation of the system connecting transportation services from Midwestern Completion: 2019 the off-shore field with the onshore gas origin points to destination points as far conditioning plant east as the Pittsburgh area INFRAESTRUCTURA MARINA DEL GOLFO – Length: 120 miles (7/17) Location: Veracruz, Mexico MAGELLAN MIDSTREAM PARTNERS LP/ Operator: TransCanada Corp. Completion: 2017 TRANSMONTAIGNE PARTNERS LP – (6/16) Partner: IEnova Comments: Saipem will develop the subsea, Owner: Magellan Midstream Partners LP and Project: Sur de Texas-Tuxpan Pipeline umbilicals, risers, and flowlines facilities, TransMontaigne Partners LP Type: Project includes the engineering, which include subsea equipment, infield Type: Project involves the construction of a 150- procurement, construction, operation and umbilicals, flexibles, and trees and control mile, 16-inch diameter pipeline capable of maintenance of an underwater pipeline system installation transporting 150 Mbpd Length: 497 miles Length: 150 miles Diameter: 42 inches Location: Corpus Christi, TX - Brownsville, TX Capacity: 2.6 MMcf/d Caribbean/South & Completion: 2018 Cost: $1.3 billion Central America Location: Gulf of Mexico - Tuxpan, Veracruz TROY CONSTRUCTION – (4/16) Completion: 4Q 2019 ESSO EXPLORATION AND PRODUCTION Owner: Dow Pipeline Co. Comments: The subsea gas pipeline will interconnect GUYANA LTD.– (7/17) Type: Project includes the construction of a with the Nueces-Brownsville Pipeline and Contractor: Saipem 12-inch pipeline the Tuxpan-Tula Pipeline Project: Liza Project Type: Project includes the engineering, Length: 78 miles procurement, construction and Location: Freeport, TX - Mont Belvieu, TX Contractor: Allseas Sub: First Subsea installation of the subsea umbilicals, Project: Sur de Texas-Tuxpan Pipeline risers and flowlines and associated Mexico Type: Project includes the supply a Ballgrab structures and jumpers. Project also Pipeline Recovery Tool (PRT) for a subsea consists of transportation and installation NUSTAR ENERGY LP – (8/17) pipeline of umbilicals, manifolds and associated Project: New Burgos Pipeline foundations for the gas injection systems Type: Project includes construction of pipeline Contractor: Nippon Steel & Sumitomo Metal Corp./ Location: offshore Guyana Length: 34 miles Mitsui & Co. Ltd. Start: 2019 Diameter: 10 inches Project: Sur de Texas-Tuxpan Pipeline Comments: Located 120 miles offshore Guyana at a Location: Reynosa, Mexico - Edinburg, TX Type: Project includes the supply of a 600,000 depth of 1,800 meters, the Liza field is a Capacity: 108 Mbpd ton steel order consisting of large subsea development estimated to contain Comments: Project will parallel the existing Burgos diameter welded steel pipe and plate as more than 1 billion BOE Pipeline raw material for the pipeline Length: 242 miles BP TRINIDAD & TOBAGO LLC – (7/17) TRANSCANADA CORP. – (9/16) Diameter: 42 and 48 inches Contractor: McDermott Type: Project involves the development of Project: Angelin gas field storage and transportation infrastructure, Contractor: Shawcor Ltd. Type: Project includes the design, procurement, including a marine terminal, storage hub Project: Sur de Texas-Tuxpan Pipeline fabrication, transportation, installation and pipeline Type: Project includes the coating of pipe with and commissioning of a six-slot wellhead Length: 165 miles the application of concrete weight coating platform and subsea pipeline Location: Mexico in a variety of thicknesses (2.25, 2.75 and Diameter: 26 inches Comments: The 100 Mbpd refined products pipeline 3.5 inches) and the installation of 5,000 Location: offshore Trinidad and Tobago will parallel TransCanada’s recently sacrificial anodes Capacity: 600 MMcf/d awarded Tuxpan-Tula natural gas pipeline Comments: The contract follows the successful project completion of a multi-phase

www.pipeline-news.com • September 2017 • Pipeline News 45 ONGOINGProjects construction underway

engineering contract, including pre- Contractor: ProFoam LLC front end engineering design, front-end Type: Project includes unloading pipeline and engineering design, and pre-execution pre-construction activities engineering contracts previously awarded Location: Marshall County, WV to McDermott for the initial design and Contact: Kevin Smith execution planning of Angelin Superintendent

Project: Lakach Field Type: Project includes the design, detailed engineering, procurement, construction, load out, and mechanical completion of 4,300-ton topsides that can process 590 MMcf/d of gas, and a 6,100-ton jacket. Contract will also cover the design, detailed engineering, procurement, fabrication, transport, installation, and pre-commissioning of 10-inch and 8-inch inside-diameter flexible flowlines; 26-inch-outside-diameter, 6-mile concrete-coated rigid subsea pipeline; a diving campaign to support LNG train and field turnarounds; and a large number of subsea structures and tie-in spools Location: Trinidad Comments: Technip’s S-Lay pipelay vessel, the G-1200, will install the rigid pipelines OTHER – The Americas U.S. ENTERPRISE PRODUCTS PARTNERS LP – (6/17) Type: Project includes the construction of a new 12-inch diameter ethylene pipeline and re-purposing of a large, high-capacity ethylene storage well expansion Length: 24 miles Location: Mont Belvieu, TX Completion: 2018 Comments: Upon project completion, the 5.3-million- barrel cavern will be able to inject/ withdraw ethylene at a rate of 2 Mbph expandable to 4 Mbph

TARRANT REGIONAL WATER DISTRICT – (8/17) Project: Integrated Pipeline Project Type: Project includes construction of a water transmission pipeline, three lake pump stations, and three booster pump stations Length: 150 miles Diameter: 84 to 108 inches Location: Fort Worth, TX - Anderson, TX Capacity: 50 MMgpd Cost: $1.6 billion Completion: 2018

XCL MIDSTREAM LLC — (8/17) Project: XCL Appalachia Connector Pipeline Phase I Type: Project includes construction of a gas header system, wet gas system and a parallel fresh water pipeline Length: 100 miles Diameter: 24 inches Location: West Virginia Capacity: 800 MMcf/d Completion: 2Q 2018 Comments: Project will have interconnections with TL-590, Leach Xpress, Mountaineer Xpress and TETCO M2 pipelines

46 Pipeline News September 2017 • www.pipeline-news.com