OFFICE OF THE ASSTT. ENGINEER (PIA) IWMP P.S SANCHORE
(UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME)
BLOCK: SANCHORE DISTRICT : JALORE
TOTAL GEOGRAPHICAL AREA – 8372.68 Hac. TOTAL EFFECTIVE AREA- 7353 Hac. TOTAL COST- 1102.95 Lacs. UNIT COST- 15,000/Hac.
SUBMITTED BY
PROJECT MANAGER
DISTRICT WATERSHED DEVELOPMENT UNIT
JAORE, (RAJASTHAN) DPR TEMPLATE
Index
S.No Topics Page no.
1 Chapter
• Location
• General Features of watershed (Cost and Area details)
• Climatic and Hydrological information
• Other Development Schemes in the project area
• Details of infrastructure in the project areas
• Institutional arrangements (,DWDU,PIA,WDT,WC)
2 Chapter Basic Data ,Analysis and Scope
2.1 Demography Details
3 Development Indicators
4 Land use
5 Agriculture status and Productivity Gap Analysis
6 Horticulture/Vegetable/Floriculture status
7 Land holding pattern
8 Livestock status
9 Fodder status
10 Farm Implements
11 NREGS Status
12 Migration details
13 Livelihood Details.
14 Existing SHG
15 Ground Water details
16 Drinking Water Status
17 Water use efficiency 18 Slope details
19 Water Budgeting
20 Soil Details
21 Soil erosion status
Chapter Proposed Development Plan
Chapter Activity wise Total Abstract of cost
Chapter Annual Action Plan
Project fund
Convergence Plan
Chapter Project outcomes
Technical designs and estimates for proposed activities
Enclosures
8 .1 Maps
Location –District, block, village, watershed location map
Map of Project with Watershed Boundary demarcation in cadastral map
Land Use Land Cover map
Existing water bodies, DLT
PRA Map (along with photos & paper drawing)
GIS based intervention map
Treatment map ie proposed works on revenue map
8.2 Documents of Agreements:
Proceedings of gram sabha for EPA approval
Proceedings of gram sabha Resolution for committee constitution
Documents related to PRA exercise
Proceedings of gram sabha for DPR approval CHAPTER – I
INTRODUCTION
Location.
Jalore-(IWMP) xi Project is located in sanchore Block, of Jalore ° ° district. The project area is between the 24 56' latitudes & 71 56' longitudes. It is at a distance of 47 km from its Block head quarters and 110 Kms from the district head quarters. There are 2361 no. of habitations in the Project area and other details are given below.
General features of watershed
S.No. Name of Project(as Jalore (IWMP) per GOI) XI
(a) Name of Catchment Bijrol/ pamana
(b) Name of watershed Bijrol/ pamana area(local name)
© Project Area 8372.68 Ha.
(d) Net treatable Area 7353 Ha. e) Cost of Project 1102.95 Lac. f) Cost/hectare 15000 g) Year of Sanction 2010-11 h) Watershed Code i) No. of Gram 2 Panchayats
in project area j) No. of villages in project area 7 k) Type of Project Desert l) Elevation (metres) 210 m) Major streams n) Slope range (%) 0--3%
Name of Name of Villages Census code Area Gram Covered of villages geophical Macro/micro Panchayat (Hac)
Bijrol Bijrol kheda 02327700 1378.32
Bijrol Goleya 02327800 653.01
Jerol 0232800 935.37
Liyadara 02327900 792.00
Pamana Pamana 02327600 2031.84
Jelatra 02327500 1926.06
Marukheda 02327600 656.08
The watershed falls in Agroclimatic Zone-II B .The soil texture is sandylomy The average rainfall is 414mm.The temperatures in the area are in the range between 38--48 centigrade during summer and 20--25centigrade during winter. The major crops in the area are Bajra 85% land is under cultivation15% land fallow,.36.45% land is irrigated through Tubewell’s
990 No of households are BPL 165 are landless households 685 household are small and marginal farmers .Average land holding in the area is 3.54 ha. 91.27% area is single cropped area and 8.71% is double cropped. The main source of irrigation is Tube well’s. The average annual rainfall (5 years) in the area is 446 mm. The Major streams in the Watershed are Virodi stream. The major festivals in the village are Holi, Deewali, krishana janamaastmi, Navratra, Gangor, Raksha-bandhan. At present this village is having 12402 population with Communities like Rajput, Dewasi, Kumhar, Suthar, Megwal and Bhil. Kalbi.
Climatic and Hydrological information
1 Average Annual Rainfall(mm)
Year Average Annual Rainfall(mm)
1 2001 235 mm 2 2002 65
3 2003 752
4 2004 249
5 2005 352
6 2006 800
7 2007 327
8 2008 316
9 2009 108
10 2010 938
2 Average Monthly rainfall (last ten years)
Month Rainfall(mm) i) June 63.00 ii) July 126 .00 iii) August 142.00 iv) September 55.00
3 Maximum rainfall intensity (mm)
Duration rainfall intensity(mm)
i) 15 minute -- duration
ii) 30 minute -- duration
iii) 60 minute -- duration
4 Temperature (Degree C)
Season Max Min
i) Summer Season 48 38
ii) Winter Season 25 20
iii) Rainy Season 34 25
5 Potential Evaporation Transpiration (PET) (mm/day)
Season PET
i) Summer 1.17
ii) Winter 0.53
iii) Rainy 0.33
6 Runoff
i) Peak Rate (cum/hr)
ii) Total run off volume of rainy season (ha.m.)
iii) Time of return 5 years 10 years In-Year of maximum flood
iv)Periodicity of once Nil NIl Drought in village area
Other Development Schemes in the project area
Key Provision interventions Targeted s under Name of the under the Beneficiarie the S.No Scheme department Scheme s Scheme
MG Nadi Desilting 1 Villages Nil NREGA , Gr. Road
Common 2 TFC Villages Nil Toilets RURAL DEVELOPMEN Boundary 3 SFC Villages Nil T & Wall PANCHAYAT RAJ Community 4 BRGF DEPARTMENT Hall, Primary Villages Nil School
5 TSC Tanka Villages Nil
6 SGS Nil Villages Nil 7 IAY Awas Nirman BPL Nil
8 Mpower Tanka BPL Nil
Details of infrastructure in the project areas
Parameters Status
(i) No. of villages connected to the main road by 6 an all-weather road
(ii) No. of villages provided with electricity 7
(iii) No. of households without access to drinking 236 water
(iv) No. of educational institutions : (P) (S) (HS) (VI)
Primary(P)/ Secondary(S)/ Higher 6 Nil Nil Secondary(HS)/ vocational institution(VI) 14
(v) No. of villages with access to Primary Health 5 Centre
(vi) No. of villages with access to Veterinary 1 Dispensary
(vii) No. of villages with access to Post Office 2
(viii) No. of villages with access to Banks 1
(ix) No. of villages with access to Markets/ Nil mandis
(x) No. of villages with access to Agro-industries Nil
(xi) Total quantity of surplus milk 600 Ltr.
(xii) No. of milk collection centres (U) (S) (PA) (O)
(e.g. Union(U)/ Society(S)/ Private Nil 3 10 Nil agency(PA)/ others (O)) (xiii) No. of villages with access to Anganwadi 11 Centre
(xiv) Any other facilities with no. of villages Nil (please specify)
(xv) KVK Kesvana(Jalore)
(xvi) cooperative society 01
(xvii) NGOs Nil
(xviii Credit institutions )
(i) Bank 1
(ii) Cooperative Society 1
(xix) Agro Service Centre's Nil
Institutional arrangements (SLNA,DWDU,PIA,WDT,WC, Secretary)
DWDU Details
1 2 3
S.No Particulars Details of DWDU
PM ,DWDU Sh. R.P Vyas.
Address with contact no., website PM, DWDU District Jalore
Telephone 9530310555
Fax -
E-mail [email protected]
PIA particulars
1 2 3
S.No Particulars Details of PIA
Name of PIA Sh. Hemant vasnev Designation Assist. Engineer
Address with contact no., website AEN. (IWMP) P.S. Sanchore
Telephone 8003006447
Fax -
E-mail [email protected]
WDT Particulars:
1 2 3 4 5 6 7 8
Experi Descri ence ption S. in of Name of WDT Ag Role/ No M/F Qualificati waters profes member e Function on hed(Yr sional s) trainin g
1 Sh. Hanumana M 28 L.S.A And yes Yes Animal Ram B.A. Husbandry
2 Sh. Deva Ram M 26 M.A. Yes Yes Social scin Details of Watershed Committees (WC)
Date of Date of Gram Registratio SC/ST Name Education Landles S. Name of Sabha n as a Designa /OBC/ of al Name M/F s/MF/SF N. WCs for WC Society tion Gener UG/SH qualificati / BF (dd/mm/yy al G on yy
1 02.10.11 Preside MF nt Sh. Thanaram M OBC - Primary
Secretar MF y Sh. Kishanaram M OBC - Secondary
Member SH. Bijlaram M ST MF - -
Sh. Radmaram M ST MF - -
Sh. Parasram M SC MF - , Sh. Ramlal M SC SF -
Sh. kesharam M OBC SF -
Sh. Babulal M OBC SF -
Smt. Radha devi F OBC MF -
Smt. Diva devi F ST MF -
Smt. Kamla devi F OBC MF - - Smt. Thefi devi F SC
Smt. Mohane devi F SC
Sh. Manglaram M SC
Sh. Bhartaram M ST
Sh. Amara Vagta M SC
Preside SF nt Sh. chandan sings M GEN - Primary
Secretar MF y Sh. KIshnaram M OBC - Middle
Member SH. Bijlaram M OBC MF - -
Sh. Masararam M ST MF - - 29.06.11 Sh. Deepa ram M OBC L. Less - 2 Bijrol - Sh. Himata Ram M OBC MF -
Smt. mani Devi F ST MF -
Sh. Sonaram M OBC MF -
Sh. Natha Ram M ST MF -
Smt. Devika Devi F SC MF -
Sh. Pathu Ram M ST SF - Sh. SF
Jamataram/Veermaram M SC -
Problems and scope of improvement in the project area
The socio economic conditions of the area can be improved through increased production which can be achieved through expansion in cultivated area and productivity enhancement. The productivity gap of major crops in the area as compared with district and with areas in the same agro climatic zones indicate potential to increase the productivity. The demonstration of improved package of practices, improved varieties, increased irrigation facilities and soil conservation measures under the project can bridge this gap. Due to small land holdings in the area focus of the project would be on diversification in agriculture (horticulture, vegetables, green houses, Agro forestry, fodder crops)and diversification in Livelihoods(Agriculture, Animal husbandry, self employment)
7433 Quintal fodder scarcity can be met out through Pasture development .Improved animal Husbandry practices can increase the productivity of livestock. 950 no of persons migrate due to Employment this migration can be checked through creation of employment opportunities in the project area through increase in production and diversification in agriculture and Livelihoods as mentioned above.
CHAPTER – II
Socio economic Features, Problems and Scope
Table 2.1 Population & Household Details:
Total Population
Male Female Total SC ST
6409 4993 12402 1308 415
Household Details
BPL Small M. Total SC ST household L. Less Farmer Farmer household household household
990 238 307 378 2361 305 216
Table 2.2 Development indicators
S. No. Development State Project Area Indicators
1 Per capita income 16260 16050 (Rs.)
2 Poverty ratio 0.22 0.21
3 Literacy (%) 0.604 0.601
4 Sex Ratio 921 988
5 infant mortality rate 5.90%
6 maternal mortality 0.04% ratio
The table indicates poor socio economic conditions. Table 2.3 Land Use
Land Use Total area in Ha.
Private Panchayat Government Community Total
Agriculture 6811.17 - - - 1611.17 Land
Temporary 1011 - - - 1011 fallow
Permanent - - - - - Fallow
Cultivated 3342.17 - - - 3342.17 Rainfed
Cultivated 2458 - - - 2458 irrigated
Net Sown Area - - - - -
Net Area sown 2212 - - - 2212 more than once
Forest Land - - - - -
Waste Land - - - - -
Pastures - 394.77 - - 394.77
Others(ger 147.06 - - - 146.06 mumkin sada )
Total - - - - -
Project area of Bizrol has 1011 hac of fallow land (total 6811 ha) that can be brought under cultivation if some irrigation source can be provided through Construction of WHS like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of crops. Construction of WHS can also increase in area under irrigation which is only 36.00%
394 hac. is under vegetative cover, Pasture development the land use table shows that there is 394 hectare pasture land This emphasizes the need for taking up pastureland development works through sowing of promising species of grasses and plantation
Table 2.4 .a Agriculture and Horticulture status and fuel availability.
Cropping Status
S. Seaso Crop Rain fed Irrigated Total N n sown o
Varietie Area Producti Produc Varieti Are Produ Produ Are Produ s on tivity es a ction ctivity a ction (ha) (Ton) (kg/ha) (ha) (Ton) (kg/ha (ha) (Ton) )
1 Kharif Bajra Progro 2653 1326.50m 500 - - - - 265 1326.5 9444 t 3 0mt pionera MH-169
Moon K851, 89 53.400mt 600 kg - - - - 89 83.400 g POOSA BESAK HI
Gwar RGC 600 270mt 450kg ------936
2 Rabi Muste Datawi - - - Pusha 370 444mt 1200 370 444mt red da 26 Bold pioner
Zeera RS 1 , - - - RZ 19 100 230mt 230kg 100 230 RZ 19 0 0 /209
Whee RAJA - - - - 150 187.0 1250 150 187.05 t 555 5 kg kavere raj 3765j24
Isabg GUJRA - - - - 692 453.2 655 692 453.26 ol T 1,2RI 6 kg 89
Table 2.4.b Abstract of cropped Area(ha)
Area under Single crop 3342
Area under Double crop 2212
Area under Multiple crop -
The table 2.3 shows that only 2212 hac is double cropped area. Also the crop rotation shows that fallow lands are there. This indicates that there is scope for change in crop rotation in fields where there are fallow lands through Soil and Water conservation measures, crop demonstration and diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under cultivation can change the area under single cropping to double and multiple cropping.
Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)
Productivity kg/ha
Highest Highest Average of Average Agro Name of the in climatic Project crop India Rajasthan zone District Area
Wheat 2708 2751 2200 2200 2050
Mustured 1095 1203 1250 1250 1000
Zeera - 339 500 500 425
Isab gol - 476 600 600 545
Bajra 886 679 750 750 650
Guar - 277 400 400 300
Ground nut 866 1310 1000 1000 800
Moong - 312 450 450 360
Caster - 997 800 800 650
Analysis of the above table indicate that besides national gap there is wide gap in productivity within state and even within same agro climatic zones. The reasons for this variation are
The farmers are using varieties WCC-75,Raj.171 of Bajra. whereas the recommended varieties like HHB 67, RCB -2 provide 18 qnt. yield (write for all crops)
Lack of Availability of good quality seeds of desired crop and variety in adequate quantities and time to the farmers.
Availability of water for cultivation
The productivity gap and reasons of it indicate potential to increase the productivity through crop demonstration .Crop demonstrations would be carried out on improved crops/ varieties, improved agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini kit. Demonstration of improved methods and economics of fodder crops cultivation and also distribution foundation seeds of Forage Crops for further multiplication, introduction of fodder crops in the existing crop rotations.
Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)
Recommended Activity Area Species Varieties varieties Production
Zeera Rz19 g4 - - Horticulture - w60
Vegetables - - - - -
Floriculture - - - - -
692 Medicinal Plants Isbgol Jg49 - -
Table 2.6 Land holding Pattern in project area
Land holding (ha) Land holding (ha)Social irrigation source wise group wise Total Hous Irrigat Rain Gen SC ST OBC e ed Type of (sourc fed Farmer holds e) Total
(i)Large 705 2148.66 2455.57 4604.23 278.65 231.65 191.92 3902.01 farmer
(ii) Small 307 59.478 138.782 198.26 14.45 35.00 10.84 137.97 farmer
(iii) 378 249.855 687.995 937.845 98.74 58.07 37.53 743.505 Marginal farmer
(iv) Landless 238 ------person
(V)No. of BPL 495 - 59.65 59.65 6.80 28.45 7.95 16.45 household s
Total 2123 2458 3342 5800 398.64 353.17 248.24 4799.94
Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation source. For large farmers with no irrigation facility Horticulture/vegetables will be promoted in a part of land with farm pond/Tanka construction.
The following activities will be more beneficial for small land holdings and for diversification and income for large farmers
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier . Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation source. Also the project area has good potential for medicinal & aromatic crops like Sonamukhi, Isabgol, Ashwagandha, Khus, Mehandi etc.
Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation as wind velocity is high in the project area.
Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and fertilizers on human health the emphasis would be on cultivation of organic produce through motivating farmers and providing assistance for production of organic input, vermi compost.
Production and distribution of quality seed – There is need to ensure that good quality seed is available for cultivators for which adequate seed production would be initiated in watershed areas with the assistance of private sector and agriculture department technologies
Sprinklers and pipelines for efficient water management practices emphasis on demonstration of sprinklers with adequate financial support and convergence/private partnership.
Establishment of nurseries: Most of the planting material is procured from other parts of the State/ country. The procurement of planting material from distant places causes damage to the planting material and often results in untimely supply. Hence nursery development activity in area. Drip irrigation Drip irrigation will be promoted in all horticulture plantations, vegetables, green houses and in nurseries for rational use of irrigation higher yields and quality produce.
Table 2.7 Livestock Status - animals/milk production / average yield.
Dry matter Descripti Yield(milk/ Equ. requireme Total S.No Populatio on of mutton/Wool cow nt per year requireme . n in No. animals ) units (7Kg per nt in M.T. animal.)
1 Cows
Indigenou 1343 s 4 ltr. per day 1343 3431365 1011.78
Crossbre 396 6 ltr. per ed day 396 1011780 10115.25
2 Buffaloes 3959 7 ltr. per day 3959 10115245 958.13
3 Goat 771 2 ltr. per day 375 958125 2746.63
4 Sheep 2151 ½ kg per no. 1075 2746625 2746.63
5 Camel 51 - 51 130305 130.31
6 Poultry 0 - 0 0 0
7 Piggery 0 - 0 0 0
Total 8671 - 7199 18393445 18393.45
In spite of the large number of livestock, production is less hence increase in productivity across all species, is a major challenge. To reduce production of unproductive cattle and improve the productivity by improving the breeds by breeding management following activities will be taken up
Castration Artificial insemination
Distribution of superior Breeding bulls for use in Cattle and Buffalo
Breeding distribution crossbred rams
Besides breed improvement other animal husbandry practices like better health, hygiene and feeding practices can increase productivity of livestock. Hence Activities like Animal health camps ,Urea-Molasses treatment demonstration ,demonstration of improved methods of conservation and utilization of Forage crops are proposed.
Table 2.8 Existing area under fodder (ha)
S.No Item Unit Area/Quantity
1 Existing Cultivable Ha 674 area under Fodder
2 Production of Green Tonns/year 6740 fodder
3 Production of Dry Tonns/ 3370 fodder Year
4 Area under Pastures Ha 50 hac
5 Production of fodder Tonns/year 250 tons
6 Existing area under Ha - Fuel wood
7 Supplementary feed 1Kgs/ day 600 Kg/ day 50% for 6 moth (for pirod. Animal
8 Silage Pits No -
9 Availability of fodder Ton - i.Requirement of fodder= 18393 tonns ii. Availability of fodder = 10960 tonns.
Deficiency of fodder = 18393 - 10960 = 7433 tonns.
The table above shows there is fodder deficiency
To minimize the large and expanding gap between feed and fodder resource availability and demand there is need for
Increase in area under fodder crops Increase in productivity of fodder crops
Development of pastures
And reduction in large number of livestock production through replacement by few but productive animals
Table 2.9 Agriculture implements
1 2 3
S. No Implements Nos.
1 Tractor 666
2 Sprayers-manual/ power 80
3 Cultivators/Harrows 409
4 Seed drill 105
5 Any Other 250
Farm mechanization and seed banks: As discussed earlier 29% land holdings belong to small and marginal farmers who own only 18% of total cultivated area so owning of big farm implements by individual farmers is not economical so SHG would be promoted to buy farm implements and rent to farmer
Table 2.10 NREGA Status - No. of Card Holder, activities taken so far, employment status.
Activity taken up so far Sr. Name of Total No .of Employment no. village job cards Status
BIJROL 1 KHEDA 411 411
BJROL 2 GOLIYA 250 250 Nadi,Tanka,Greval 3 JHEROL 367 367 road,Bunding 4 PAMANA 890 890
5 JELATRA 535 535
6 LIYADRA 315 315
Table 2.11 Migration Details
Distance of destination No. of Major of Income No. of days per reason(s) migration Occupation from such Name of persons year of for from the during occupation village migrating migration migrating village (km) migration (Rs. in lakh)
Bijrol 1 45 300 14 Kheda
Bijrol 190 300 59 goliya Employment Employment & Business & Business 350-1200 Jherol 110 300 30
Liyadra 165 300 20
Pamana 150 300 6
Jelatra 100 300 129 maru 90 300 kheda
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income
of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and
diversification in livelihoods .
The existing livelihoods Village are given below
Table 2.12 (a)Major activities (On Farm)
Average annual income Name of activity No of House holds from the
cultivators 2083 636 Lac
Dairying 40 50 Lac
Poultry - -
Piggery - -
Landless Agri. 238 90 Lac Labourers Table 2.12(b)Major activities (Off Farm)
Households/indivi Average annual income Name of activity duals from the
Artisans - -
Carpenter 29 11.60 Lac
Blacksmith 26 7.8 Lac
Leather Craft - -
Porter 39 9.751 Lac
Mason 50 19.50
Others specify 18 1.50 (Cycle Repair ,STD,Craft etc)
The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals
Table 2.13( a ) Status of Existing SHG
Name of Activity Monthly Fund Assistance Source of Training S.No Members SHG involved income avai. available assistance received
Ambedkar 1 10 Saving 1000 - - - - SHG
2 Imata SHG 10 Saving 1000 - - - -
Jay shree Saving 500 3 Hadhakai 10 - - - - SHG
4 Meera SHG 10 Saving 1000 - - - - Bhramni Saving 1000 5 10 - - - - mataSHG
Jai Naklank Saving 500 6 10 - - - - SHG
Ramdeva 10 Saving 500 7 - - - - SHG
kheteshawar 10 Saving 500 8 - - - - SHG
Maha Laxmi 10 Saving 500 9 - - - - SHG
Ashapuri 10 Saving 1000 10 - - - - SHG
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance
II. Technical Features
Table 2.14 Ground Water
S.No Source No. Functional Dry Area Water depth(met irrigated availability er) (days)
i) Dug wells 25 - - - - 0
ii) Shallow tube wells 32 225mt - - 365
iii) Pumping sets - - - - -
iv) Deep Tube Wells - - - 750 365 days
Total 282 - - - -
Table 2.15 Availability of drinking water
S Name of Drinking Present No. of No. No. No. . the water availabilit drinking function require N village requireme y of water al s defunct o nt drinking sources repairs Ltrs/day water availabl Ltrs/day e
1 BJROL 20000 160000 80 80 - -
2 BJROL 18000 15000 80 80 - - GOLIYA
3 JHEROL 15000 11000 70 70 - -
4 LIYADRA 21000 18000 75 75 - -
5 PMANA 28000 25000 85 85 - -
6 JELATR 25000 23000 85 85 - - A
7 MARU 15000 12500 50 50 - - KHEDA
Table 2.16 Water Use efficiency
Area (Hectare)
through through Name of major water water Any other crop conservin saving (pl. Total g devices(Drip specify) agronomic /Sprinklers) practices#
Mustard 60% 20% - - Zeera 60% 20% - -
The tables above indicate need for judicious use of available Water.
Encouraging optimum use of water through installation of sprinklers on every operational wells
Table 2.17 Slope details.
Slope of Watershed
S.No. Slope percentage Area in hectares
1 0 to 3% 8373 Hac
2 3 to 8% -
3 8 to 25% -
4 > 25% -
As most of the area has slope less than 3% construction of contour bunds can solve the problem of water erosion in agriculture fields and protect washing of top soil and manures/fertilisers
Table 2.18 Soil details
Soil Profile
S.No. Major Soil Classes Area in hectares
1 II class 5644 2 III class 1178
3 Iv class 531
Soil Depth :
B Depth (Cms.) Area in hectares
1 0.00 to 7.50 -
2 7.50 to 45.00 5210
3 > 45.00 2143
C Soil fertility Status Kg/ha Recommended
N 100 Kg 80-90
P 20-30 40-50
K 100 Kg 20-30
Micronutrients 10-500 ppm 100-500
The analysis of table shows need to improve and maintain soil fertility. Soil health card to every farmer every crop season will be provided, which will include the recommendation for Application micro nutrient and fertilizers
Table 2.19 Erosion details
Erosion status in project Area
Average Area Run soil loss Type of affected off(mm/ (Tonnes/ Cause erosion (ha) year) ha/ year)
Water erosion a Sheet 5926 b Rill 1427 15-20 c Gully Nil
Sub-Total 7353
Wind erosion -
Total for project 7353
The need is:
To check land degradation
To reduce excessive biotic pressure by containing the number and increase of livestock
To check cultivation on sloping lands without adequate precautions of soil and water conservation measures
To discourage cultivation along susceptible nallah beds
To check Faulty agriculture techniques
To check Uncontrolled grazing and developed cattle tracks
To check Deforestation of steep slopes
To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up. CHAPTER – III
Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions
Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and wall writings etc. were carried out in all the habitations of Jalore (IWMP) IV Micro Watershed. A series of meetings were conducted with GP members, community and discussed about the implementation of IWMP programme. User groups were also formed.
Grama Sabhas were conducted for approval of EPA (Village), for selecting the watershed committee and approval of DPR.
S.no Name of the Gram Panchayat Date on which Grama Sabha approved EPA
1 BJROL 30-03-2012
2 PAMANA 05-03-2012
3 JELATRA 05-03-2012
Expenditure
incurred (lacs)
Estimated Entry Point Activities planned cost (Lacs)
Expected Actual Balance outcome outcome Tanka Solar lights Tanka + Tanka + (Lacs) (Lacs) (Lacs) S.No Names of Solar Solar village Phy Fin Phy Fin Lights Lights Amount earmarked (Lac) (Lac)
for EPA
1. BJROL 7.76 8 6.00 8 1.76 7.76 7.76 7.76 7.76 7.76
2. BJROL 1.85 1 0.75 5 1.1 1.85 1.85 1.85 1.85 1.85 GOLIYA
3. JHEROL 2.69 3 2.25 2 0.44 2.69 2.69 2.69 2.69 2.69 4. LIYADARA 6.92 6 4.50 11 2.42 6.92 6.92 6.92 6.92 6.92
5. PAMANA 11.33 11 9.35 9 1.98 11.33 11.33 11.33 11.33 11.33
6. GELATRA 11.99 11 9.35 12 2.64 11.99 11.99 11.99 11.99 11.99
7. MARU 1.51 1 0.85 3 0.66 1.51 1.51 1.51 1.51 1.51 KHEDA
Total 44.05 33.05 11.00 44.05 44.05 44.05 44.05 44.05
bZ-ih-,- vUrxZr Vkadk fuekZ.k xzke iapk;r iek.kk
bZ-ih-,- vUrxZr lksyj ykbZV xzke iapk;r iek.kk
bZ-ih-,- vUrxZr lksyj ykbZV xzke iapk;r fctjksy
The PRA exercise was carried out in all the villages on the dates shown below:
S.no Name of the village/Habitation Date on which PRA conducted
1 BJROL 14-07-2012
2 PAMANA 13-07-2012
3 JELATRA 13-07-2012
Transact walk were carried out involving the community for Social mapping, Resource mapping. Detailed discussions and deliberations with all the primary stakeholders were carried out.
Socio-economic survey was carried out covering all the households and primary data on demography, Land holdings, Employment status, Community activities etc. was collected as mentioned in chapter 2.
WAPCOSS was assigned the work of preparing various thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of geo- spatial database depicting present conditions of land (terrain), water and vegetation with respect to watershed under different ownerships at village level
Various thematic layers provided by WAPCOSS are :
Delineation of Macro/Micro watershed boundaries.
Digitised Khasara maps of the villages falling in project area.
Network of Drainage lines, existing water bodies, falling in the project area.
Base maps (transport network, village/boundaries, and settlements).
Land Use / Land cover map.
Contours at 1 meter interval, slope map
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as discussed in chapter 2) final Treatment plan on revenue map for implementation has been framed. Thus each intervention identified has been marked on revenue map (map enclosed in DPR as annexure------).The GIS based intervention map, PRA based intervention map are annexed as ------.
ih-vkj-,- vH;kl xzke iapk;r fctjksy
ih-vkj-,- vH;kl xzke iapk;r fctjksy
ih-vkj-,- vH;kl xzke iapk;r iek.kk
ih-vkj-,- vH;kl xzke tSykrjk xzke iapk;r iek.kk
PROPOSED DEVELOPMENT PLAN
STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA:7939 Hac. EFFECTIVE AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI (IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 1233.81Lacs S.N Activity Unit Unit G.P. BIZROL G.P. PAMMANA G.P.BIZROL+PAMMANA o Cost Quantit Total Cost Conver Benefi Quantity Total Cost Converg Benefi Quantit Total Cost Conver Benefi y Cost from gence ciary Cost from ence ciary y Cost from gence ciary Project Fund contri Project Fund contrib Project Fund contrib Fund bution Fund ution Fund ution 1 2 3 5 4 6 7 8 9 4 6 7 8 9 4 6 7 8 9 A I Administration cost 10% 0 0 48.30 48.30 0.00 0.00 0.00 62.00 62.00 0.00 0.00 0 110.30 110.30 0.00 0.00 II Monitoring 1% 0 0 4.83 4.83 0.00 0.00 0.00 6.20 6.20 0.00 0.00 0 11.03 11.03 0.00 0.00 III Evaluation 1% 0 0 4.83 4.83 0.00 0.00 0.00 6.20 6.20 0.00 0.00 0 11.03 11.03 0.00 0.00 Total 12% 0 0 57.96 57.96 0.00 0.00 0.00 74.39 74.39 0.00 0.00 0 132.35 132.35 0.00 0.00 Preparatory Phase (Entry Point B I Activity) 4% 0 0 19.32 19.32 0.00 0.00 0.00 24.80 24.80 0.00 0.00 0 44.12 44.12 0.00 0.00 II Institution And Capacity Building 5% 0 0 24.15 24.15 0.00 0.00 0.00 31.00 31.00 0.00 0.00 0 55.15 55.15 0.00 0.00 Preparation of Detailed Project III Report (DPR) 1% 0 0 4.83 4.83 0.00 0.00 0.00 6.20 6.20 0.00 0.00 0 11.03 11.03 0.00 0.00 Total 10% 0 0 48.30 48.30 0.00 0.00 0.00 62.00 62.00 0.00 0.00 0 110.30 110.30 0.00 0.00 C (NRM) 0 0 0.00 48.30 0.00 0.00 0.00 0.00 62.00 0.00 0.00 0 0.00 110.30 0.00 0.00 Arable Land Conservation Measures 56% 0 270 0.00 270.48 0.00 0.00 347.17 0.00 347.17 0.00 0.00 618 0.00 617.65 0.00 0.00 (1) Vegetative Contour Bund Hac. 8250 1199 106.34 98.92 0.00 7.42 1676.00 148.64 138.27 0.00 10.37 2875 254.98 237.19 0.00 17.79 (2) Earthen Bund with Pitching No. 61000 34 22.30 20.74 0.00 1.56 34.00 22.30 20.74 0.00 1.56 68 44.59 41.48 0.00 3.11 (3) Gully Control Structure(L.S.C.D) No. 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (4) Water Harvesting Tanka No. 80000 90 85.40 72.00 8.00 5.40 90.00 85.40 72.00 8.00 5.40 180 170.80 144.00 16.00 10.80 (5) Wasteweir No. 46000 23 11.37 10.58 0.00 0.79 22.00 10.88 10.12 0.00 0.76 45 22.25 20.70 0.00 1.55 Total 0 0 225.41 202.24 8.00 15.17 0.00 267.21 241.13 8.00 18.08 0 492.62 443.37 16.00 33.25 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 114 20000 24.51 22.80 0.00 1.71 40000.00 49.02 45.60 0.00 3.42 60000 73.53 68.40 0.00 5.13 (2) Contour Furrow in Pasture Land Hac. 8300 50 4.46 4.15 0.00 0.31 100.00 8.92 8.30 0.00 0.62 150 13.38 12.45 0.00 0.93 (3) Contour Furrow in Non Arable Land Hac. 8300 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (4) Plantation in pastureland No. 46 16000 7.36 7.36 0.00 0.00 20000.00 9.20 9.20 0.00 0.00 36000 16.56 16.56 0.00 0.00 (5) Over seeding in Non Arable land Hac 800 50 0.40 0.40 0.00 0.00 100.00 0.80 0.80 0.00 0.00 150 1.20 1.20 0.00 0.00 (6) Earthen Bund with Pitching No. 61000 25 16.39 15.25 0.00 1.14 25.00 16.39 15.25 0.00 1.14 50 32.79 30.50 0.00 2.29 Total 0 0 53.13 49.96 0.00 3.17 0.00 84.34 79.15 0.00 5.19 0 137.46 129.11 0.00 8.35 III Drainage Line Treatment 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 61000 25 16.39 15.25 0.00 1.14 28.00 18.36 17.08 0.00 1.28 53 34.75 32.33 0.00 2.42 (2) Bank Stabilization No. 61000 5 3.28 3.05 0.00 0.23 16.00 10.49 9.76 0.00 0.73 21 13.77 12.81 0.00 0.96 Total 0 0 19.67 18.30 0.00 1.37 0.00 28.85 26.84 0.00 2.01 0 48.53 45.14 0.00 3.39 Total Watershed Development Works 0 0 298.20 270.50 8.00 19.71 0.00 380.40 347.12 8.00 25.28 0 678.61 617.62 16.00 44.99 D Production System 10% 48 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
I Arable Land Production System 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 Crop Demonstration /Fodder (1) Demonstration No. 1122 400 5.39 4.49 0.00 0.90 1400.00 18.85 15.71 0.00 3.14 1800 24.24 20.20 0.00 4.04 (2) Agro Forestry No. 18 7500 1.62 1.35 0.00 0.27 11000.00 2.38 1.98 0.00 0.40 18500 4.00 3.33 0.00 0.67 (3) Dry land Horticulture No. 6450 40 3.10 2.58 0.00 0.52 40.00 3.10 2.58 0.00 0.52 80 6.19 5.16 0.00 1.03 (4) Homestead Kitchen Garden No. 500 400 2.40 2.00 0.00 0.40 602.00 3.61 3.01 0.00 0.60 1002 6.01 5.01 0.00 1.00 Organic Farming 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (5) i Compost Pit No. 1650 400 7.92 6.60 0.00 1.32 610.00 12.08 10.07 0.00 2.01 1010 20.00 16.67 0.00 3.33 ii Vermi Compost Unit No. 2250 216 5.83 4.86 0.00 0.97 200.00 5.40 4.50 0.00 0.90 416 11.23 9.36 0.00 1.87 (7) Water Tank. No. 50000 23 23.00 11.50 11.50 0.00 11.00 11.00 5.50 5.50 0.00 34 34.00 17.00 17.00 0.00 (8) HDPE/ PVC Pipe No. 15000 9 2.70 1.35 1.35 0.00 34.00 10.20 5.10 5.10 0.00 43 12.90 6.45 6.45 0.00 (9) Nepesek Spraier by hand No. 650 78 1.01 0.51 0.51 0.00 83.00 1.08 0.54 0.54 0.00 161 2.09 1.05 1.05 0.00 (10) Nepesek Spraier by foot mounted No. 850 75 1.28 0.64 0.64 0.00 75.00 1.28 0.64 0.64 0.00 150 2.55 1.28 1.28 0.00 (11) Hand rotetary duster No. 775 75 1.16 0.58 0.58 0.00 75.00 1.16 0.58 0.58 0.00 150 2.33 1.16 1.16 0.00 (12) Seed cum fertilizer drill No. 15000 16 4.80 2.40 2.40 0.00 16.00 4.80 2.40 2.40 0.00 32 9.60 4.80 4.80 0.00 (13) Isopam (Threser) No. 40000 4 3.20 1.60 1.60 0.00 4.00 3.20 1.60 1.60 0.00 8 6.40 3.20 3.20 0.00 Total - 0 0 63.41 40.45 18.58 4.38 0.00 78.13 54.20 16.36 7.57 0 141.54 94.66 34.93 11.95 III Live Stock Management 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 10000 6 0.72 0.60 0.00 0.12 6.00 0.72 0.60 0.00 0.12 12 1.44 1.20 0.00 0.24 (2) Mangers Distribution No. 500 250 1.50 1.25 0.00 0.25 250.00 1.50 1.25 0.00 0.25 500 3.00 2.50 0.00 0.50 (3) Animal Health Camps No. 10000 60 7.20 6.00 0.00 1.20 60.00 7.20 6.00 0.00 1.20 120 14.40 12.00 0.00 2.40 Total 0 0 9.42 7.85 0.00 1.57 0.00 9.42 7.85 0.00 1.57 0 18.84 15.70 0.00 3.14 Total Production System 0 0 72.83 48.30 18.58 5.95 0.00 87.55 62.05 16.36 9.14 0 160.38 110.36 34.93 15.09
Household Production System& Micro Enterprises-Goat and D Sheep Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 215 52.14 43.45 0.00 8.69 253.00 66.94 55.79 0.00 11.16 468 119.09 99.24 0.00 19.85 E. Consolidation 3% 0 0 14.49 14.49 0.00 0.00 0.00 18.60 18.60 0.00 0.00 0 33.09 33.09 0.00 0.00 Grand Total 0 0 543.92 483.00 26.58 34.34 0.00 689.89 619.95 24.36 45.58 0 1233.81 1102.95 50.93 79.92 CHAPTER IV ACTIVITY WISE TOTAL ABSTRACT OF COST OF GP BIZROL
STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 3058 HAC. NAME OF WATERSHED: JALORE XI(IWMP) (II) NON ARABLE LAND: 162Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 3220 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 543.92 Lacs
S.No Activity Unit Quantity Unit Total Cost Cost from Convergence Beneficiary Cost Project Fund Fund contribution
1 2 3 4 5 6 7 8 9 A I Administration cost 10% 0 0 48.30 48.30 0.00 0.00 II Monitoring 1% 0 0 4.83 4.83 0.00 0.00 III Evaluation 1% 0 0 4.83 4.83 0.00 0.00 Total 12% 0 0 57.96 57.96 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 19.32 19.32 0.00 0.00 II Institution And Capacity Building 5% 0 0 24.15 24.15 0.00 0.00 Preparation of Detailed Project Report III (DPR) 1% 0 0 4.83 4.83 0.00 0.00 Total 10% 0 0 48.30 48.30 0.00 0.00 C Watershed Development Works (NRM) 0 48.30 0.00 0.00 Arable Land Conservation Measures 56% 270.48 0 270.48 0.00 0.00 (1) Vegetative Earthen Bund Hac. 1199 8250 106.34 98.92 0.00 7.42 (2) Earthen Bund with Pitching No. 34 61000 22.30 20.74 0.00 1.56 Gully Control Structure(Loose Stone Check (3) Dam) No. 0 0 0.00 0 0.00 0.00 (4) Water Harvesting Tanka No. 90 80000 85.40 72 8.00 5.40 (5) Wasteweir No. 23 46000 11.37 10.58 0.00 0.79 Total 0 0 225.41 202.2375 8.00 15.17 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 20000 114 24.51 22.8 0.00 1.71 (2) Contour Furrow in Pasture Land Hac. 50 8300 4.46 4.15 0.00 0.31 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0.00 (4) Plantation in pastureland No. 16000 46.00 7.36 7.36 0.00 0.00 (5) Over seeding in Non Arable land Hac 50 800 0.40 0.40 0.00 0.00 (6) Earthen Bund with Pitching No. 25 61000 16.39 15.25 0.00 1.14 Total 0 0 53.13 49.96 0.00 3.17 III Drainage Line Treatment 0 0 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 25 61000 16.39 15.25 0.00 1.14 (2) Bank Stabilization No. 5 61000 3.28 3.05 0.00 0.23 Total 0 0 19.67 18.3 0.00 1.37 Total Watershed Development Works 0 0 298.20 270.50 8.00 19.71
D Production System 10% 0 48.30 0.00 0.00 0.00 I Arable Land Production System 0 0 0.00 0.00 0.00 (1) Crop Demonstration /Fodder Demonstration No. 400 1122 5.39 4.49 0.00 0.90 (2) Agro Forestry No. 7500 18 1.62 1.35 0.00 0.27 (3) Dry land Horticulture No. 40 6450 3.10 2.58 0.00 0.52 (4) Homestead Kitchen Garden No. 400 500 2.40 2.0 0.00 0.40 Organic Farming 0 0 0.00 0 0.00 0.00 (5) i Compost Pit No. 400 1650 7.92 6.6 0.00 1.32 ii Vermi Compost Unit No. 216 2250 5.83 4.86 0.00 0.97 (7) Water Tank. No. 23 50000 23.00 11.50 11.50 0.00 (8) HDPE/ PVC Pipe No. 9 15000 2.70 1.35 1.35 0.00 (9) Nepesek Spraier by hand mounted No. 78 650 1.01 0.51 0.51 0.00 (10) Nepesek Spraier by foot mounted No. 75 850 1.28 0.64 0.64 0.00 (11) Hand rotetary duster No. 75 775 1.16 0.58 0.58 0.00 (12) Seed cum fertilizer drill No. 16 15000 4.80 2.40 2.40 0.00 (13) Isopam (Threser) No. 4 40000 3.20 1.60 1.60 0.00 Total - 0 0 63.41 40.45 18.58 4.38 III Live Stock Management 0 0 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 6 10000 0.72 0.60 0.00 0.12 (2) Mangers Distribution No. 250 500 1.50 1.25 0.00 0.25 (3) Animal Health Camps No. 60 10000 7.20 6.00 0.00 1.20 Total 0 0 9.42 7.85 0.00 1.57 Total Production System 0 0 72.83 48.30 18.58 5.95 Household Production System& Micro Enterprises-Goat and Sheep E. Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 215 20210 52.14 43.45 0.00 8.69 F Consolidation 3% 0 0 14.49 14.49 0.00 0.00 Grand Total 0 0 543.92 483.00 26.58 34.34 CHAPTER IV ACTIVITY WISE TOTAL ABSTRACT OF COST OF GP PAMMANA
STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 3919 HAC. NAME OF WATERSHED: JALORE XI(IWMP) (II) NON ARABLE LAND: 214Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 4133 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 689.89 Lacs
S.No Activity Unit Quantit Unit Total Cost Cost from Convergence Beneficiary y Cost Project Fund Fund contribution
1 2 3 4 5 6 7 8 9 A I Administration cost 10% 0 0 62.00 62.00 0.00 0.00 II Monitoring 1% 0 0 6.20 6.20 0.00 0.00 III Evaluation 1% 0 0 6.20 6.20 0.00 0.00 Total 12% 0 0 74.39 74.39 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 24.80 24.80 0.00 0.00 II Institution And Capacity Building 5% 0 0 31.00 31.00 0.00 0.00
III Preparation of Detailed Project Report (DPR) 1% 0 0 6.20 6.20 0.00 0.00 Total 10% 0 0 62.00 62.00 0.00 0.00 C Watershed Development Works (NRM) 0 62.00 0.00 0.00 Arable Land Conservation Measures 56% 347.17 0 347.17 0.00 0.00 (1) Vegetative Earthen Bund Hac. 1676 8250 148.64 138.27 0.00 10.37 (2) Earthen Bund with Pitching No. 34 61000 22.30 20.74 0.00 1.56 Gully Control Structure(Loose Stone Check (3) Dam) No. 0 0 0.00 0 0.00 0.00 (4) Water Harvesting Tanka No. 90 80000 85.40 72 8.00 5.40 (5) Wasteweir No. 22 46000 10.88 10.12 0.00 0.76 Total 0 0 267.21 241.13 8.00 18.08 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 40000 114 49.02 45.6 0.00 3.42 (2) Contour Furrow in Pasture Land Hac. 100 8300 8.92 8.3 0.00 0.62 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0.00 (4) Plantation in pastureland No. 20000 46.00 9.20 9.20 0.00 0.00 (5) Over seeding in Non Arable land Hac 100 800 0.80 0.80 0.00 0.00 (6) Earthen Bund with Pitching No. 25 61000 16.39 15.25 0.00 1.14 Total 0 0 84.34 79.15 0.00 5.19 III Drainage Line Treatment 0 0 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 28 61000 18.36 17.08 0.00 1.28 (2) Bank Stabilization No. 16 61000 10.49 9.76 0.00 0.73 Total 0 0 28.85 26.84 0.00 2.01 Total Watershed Development Works 0 0 380.40 347.12 8.00 25.28
D Production System 10% 0 62.00 0.00 0.00 0.00 I Arable Land Production System 0 0 0.00 0.00 0.00 (1) Crop Demonstration /Fodder Demonstration No. 1400 1122 18.85 15.71 0.00 3.14 (2) Agro Forestry No. 11000 18 2.38 1.98 0.00 0.40 (3) Dry land Horticulture No. 40 6450 3.10 2.58 0.00 0.52 (4) Homestead Kitchen Garden No. 602 500 3.61 3.0 0.00 0.60 Organic Farming 0 0 0.00 0 0.00 0.00 (5) i Compost Pit No. 610 1650 12.08 10.065 0.00 2.01 ii Vermi Compost Unit No. 200 2250 5.40 4.5 0.00 0.90 (7) Water Tank. No. 11 50000 11.00 5.50 5.50 0.00 (8) HDPE/ PVC Pipe No. 34 15000 10.20 5.10 5.10 0.00 (9) Nepesek Spraier by hand mounted No. 83 650 1.08 0.54 0.54 0.00 (10) Nepesek Spraier by foot mounted No. 75 850 1.28 0.64 0.64 0.00 (11) Hand rotetary duster No. 75 775 1.16 0.58 0.58 0.00 (12) Seed cum fertilizer drill No. 16 15000 4.80 2.40 2.40 0.00 (13) Isopam (Threser) No. 4 40000 3.20 1.60 1.60 0.00 Total - 0 0 78.13 54.20 16.36 7.57 III Live Stock Management 0 0 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 6 10000 0.72 0.60 0.00 0.12 (2) Mangers Distribution No. 250 500 1.50 1.25 0.00 0.25 (3) Animal Health Camps No. 60 10000 7.20 6.00 0.00 1.20 Total 0 0 9.42 7.85 0.00 1.57 Total Production System 0 0 87.55 62.05 16.36 9.14 Household Production System& Micro Enterprises-Goat and Sheep D Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 253 22050 66.94 55.79 0.00 11.16 E. Consolidation 3% 0 0 18.60 18.60 0.00 0.00 Grand Total 0 0 689.89 619.95 24.36 45.58 CHAPTER IV ACTIVITY WISE TOTAL ABSTRACT OF COST
STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI(IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 1233.81Lacs S.No Activity Unit Quantity Unit Cost Total Cost Cost from Project Convergence Beneficiary Fund Fund contribution
1 2 3 4 5 6 7 8 9 A I Administration cost 10% 0 0 110.30 110.30 0.00 0.00 II Monitoring 1% 0 0 11.03 11.03 0.00 0.00 III Evaluation 1% 0 0 11.03 11.03 0.00 0.00 Total 12% 0 0 132.35 132.35 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 44.12 44.12 0.00 0.00 II Institution And Capacity Building 5% 0 0 55.15 55.15 0.00 0.00
III Preparation of Detailed Project Report (DPR) 1% 0 0 11.03 11.03 0.00 0.00 Total 10% 0 0 110.30 110.30 0.00 0.00 C Watershed Development Works (NRM) 0 0 0.00 110.30 0.00 0.00 Arable Land Conservation Measures 56% 618 0 0.00 617.65 0.00 0.00 (1) Vegetative Earthen Bund Hac. 2875 8250 254.98 237.19 0.00 17.79 (2) Earthen Bund with Pitching No. 68 61000 44.59 41.48 0.00 3.11 Gully Control Structure(Loose Stone Check (3) Dam) No. 0 0 0.00 0.00 0.00 0.00 (4) Water Harvesting Tanka No. 180 80000 170.80 144.00 16.00 10.80 (5) Wasteweir No. 45 46000 22.25 20.70 0.00 1.55 Total 0 0 492.62 443.37 16.00 33.25 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 60000 114 73.53 68.40 0.00 5.13 (2) Contour Furrow in Pasture Land Hac. 150 8300 13.38 12.45 0.00 0.93 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0.00 0.00 0.00 (4) Plantation in pastureland No. 36000 46.00 16.56 16.56 0.00 0.00 (5) Over seeding in Non Arable land Hac 150 800 1.20 1.20 0.00 0.00 (6) Earthen Bund with Pitching No. 50 61000 32.79 30.50 0.00 2.29 Total 0 0 137.46 129.11 0.00 8.35 III Drainage Line Treatment 0 0 0.00 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 53 61000 34.75 32.33 0.00 2.42 (2) Bank Stabilization No. 21 61000 13.77 12.81 0.00 0.96 Total 0 0 48.53 45.14 0.00 3.39 Total Watershed Development Works 0 0 678.61 617.62 16.00 44.99
D Production System a 10% 0 110.30 0.00 0.00 0.00 0.00 I Arable Land Production System 0 0 0.00 0.00 0.00 0.00 (1) Crop Demonstration /Fodder Demonstration No. 1800 1122 24.24 20.20 0.00 4.04 (2) Agro Forestry No. 18500 18 4.00 3.33 0.00 0.67 (3) Dry land Horticulture No. 80 6450 6.19 5.16 0.00 1.03 (4) Homestead Kitchen Garden No. 1002 500 6.01 5.01 0.00 1.00 Organic Farming 0 0 0.00 0.00 0.00 0.00 (5) i Compost Pit No. 1010 1650 20.00 16.67 0.00 3.33 ii Vermi Compost Unit No. 416 2250 11.23 9.36 0.00 1.87 (7) Water Tank. No. 34 50000 34.00 17.00 17.00 0.00 (8) HDPE/ PVC Pipe No. 43 15000 12.90 6.45 6.45 0.00 (9) Nepesek Spraier by hand mounted No. 161 650 2.09 1.05 1.05 0.00 (10) Nepesek Spraier by foot mounted No. 150 850 2.55 1.28 1.28 0.00 (11) Hand rotetary duster No. 150 775 2.33 1.16 1.16 0.00 (12) Seed cum fertilizer drill No. 32 15000 9.60 4.80 4.80 0.00 (13) Isopam (Threser) No. 8 40000 6.40 3.20 3.20 0.00 Total - 0 0 141.54 94.66 34.93 11.95 III Live Stock Management 0 0 0.00 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 12 10000 1.44 1.20 0.00 0.24 (2) Mangers Distribution No. 500 500 3.00 2.50 0.00 0.50 (3) Animal Health Camps No. 120 10000 14.40 12.00 0.00 2.40 Total 0 0 18.84 15.70 0.00 3.14 Total Production System 0 0 160.38 110.36 34.93 15.09 Household Production System& Micro Enterprises-Goat and Sheep D Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. No. 468 13000 119.09 99.24 0.00 19.85 E. Consolidation 3% 0 0 33.09 33.09 0.00 0.00 Grand Total 0 0 1233.81 1102.95 50.93 79.92 CHAPTER V ANNUAL ACTION PLAN THROUGH PROJECT FUND
STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA:7939 Hac. EFFECTIVE AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI (IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 1102.95 Lacs S.No Activity Unit Quantity Unit Total 1st year 2nd year 3rd year 4th year 5th year Cost Cost Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A I Administration cost 10% 0 0 110.30 0.00 19.85 29.78 22.059 16.544 22.059 II Monitoring 1% 0 0 11.03 0.00 1.99 2.98 2.2059 1.6544 2.2059 III Evaluation 1% 0 0 11.03 0.00 1.99 2.98 2.2059 1.6544 2.2059 Total 12% 0 0 132.35 0.00 23.82 0.00 35.74 0.00 26.47 0.00 19.85 0.00 26.47 B I Preparatory Phase (Entry Point Activity) 4% 0 0 44.12 44.12 0.00 0 0 0 II Institution And Capacity Building 5% 0 0 55.15 0.00 9.93 14.89 11.03 13.787 5.51 Preparation of Detailed Project Report 11.03 III (DPR) 1% 0 0 0.00 11.03 0.00 0 0 0 Total 10% 0 0 110.30 0.00 65.07 0.00 14.89 0.00 11.03 0.00 13.79 0.00 5.51 C Watershed Development Works (NRM) Arable Land Conservation Measures 56% 618 0 617.65 (1) Vegetative Contour Bund Hac. 2875 8250 237.19 0 0.00 1150 95 719 59.297 1006 83.02 0 0.00 (2) Earthen Bund with Pitching No. 68 61000 41.48 12 7.47 17 10 27 16.592 12 7.05 0 0.00 Gully Control Structure(Loose Stone Check (3) 0.00 Dam) No. 0 0 0 0.00 0 0 0 0 0 0.00 0 0.00 (4) Water Harvesting Tanka No. 180 80000 144.00 32 25.92 45 36 72 57.6 31 24.48 0 0.00 (5) Wasteweir No. 45 46000 20.70 8 3.73 11 5 18 8.28 8 3.52 0 0.00 Total 0 0 443.37 37.11 146.42 141.77 118.07 0.00 II Non Arable Land Conservation Measures
(1) Ditch Cum Bund Fencing Mt. 60000 114 68.40 10800 12.31 16200 18.47 24000 27.36 9000 10.26 0 0 (2) Contour Furrow in Pasture Land Hac. 150 8300 12.45 27 2.24 41 3.36 60 4.98 23 1.87 0 0 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (4) Plantation in pastureland No. 36000 46 16.56 6480 2.98 9720 4.47 14400 6.624 5400 2.48 0 0 (5) Over seeding in Non Arable land Hac 150 800 1.20 27 0.22 41 0.32 60 0.48 23 0.18 0 0 (6) Earthen Bund with Pitching No. 50 61000 30.50 9 5.49 14 8.24 20 12.2 8 4.58 0 0 Total 129.11 23.24 34.86 51.64 19.37 0.00 III Drainage Line Treatment (1) Earthen Bund with Pitching No. 53 61000 32.33 0 0.00 14 8.73 21 12.93 17 10.67 0.00 0.00 (2) Bank Stabilization No. 21 61000 12.81 0 0.00 6 3.46 8 5.124 7 4.2273 0 0.00 Total 45.14 0.00 12.19 18.06 14.90 0.00 Total Watershed Development Works 617.62 60.35 193.47 211.47 152.33 0.00 Production System and Micro D Enterprises 10% 48 I Arable Land Production System (1) 20.20 Crop Demonstration /Fodder Demonstration No. 1800 1122 0 0.00 486 5.45 450 2.02 864 12.73 0 0 (2) Agro Forestry No. 18500 18 3.33 0 0.00 4995 0.90 4625 0.33 8880 2.10 0 0 (3) Dry land Horticulture No. 80 6450 5.16 0 0.00 22 1.39 20 0.52 38 3.25 0 0 (4) Homestead Kitchen Garden No. 1002 500 5.01 0 0.00 271 1.35 251 0.50 481 3.16 0 0.00 Organic Farming 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (5) i Compost Pit No. 1010 1650 16.67 0 0.00 273 4.50 253 1.67 485 10.50 0 0.00 ii Vermi Compost Unit No. 416 2250 9.36 0 0.00 112 2.53 104 0.94 200 5.90 0 0 (7) Water Tank. No. 34 50000 17.00 0 0.00 9 4.59 9 1.70 16 10.71 0 0 (8) HDPE/ PVC Pipe No. 43 15000 6.45 0 0.00 12 1.74 11 0.65 21 4.06 0 0 (9) Nepesek Spraier by hand mounted No. 161 650 1.05 0 0.00 43 0.28 40 0.10 77 0.66 0 0 (10) Nepesek Spraier by foot mounted No. 150 850 1.28 0 0.00 41 0.34 38 0.13 72 0.80 0 0 (11) Hand rotetary duster No. 150 775 1.16 0 0.00 41 0.31 38 0.12 72 0.73 0 0 (12) Seed cum fertilizer drill No. 32 15000 4.80 0 0.00 9 1.30 8 0.48 15 3.02 0 0 (13) Isopam (Threser) No. 8 40000 3.20 0 0.00 2 0.86 2 0.32 4 2.02 0 0 Total - 94.66 0.00 25.56 9.47 59.64 0.00 III Live Stock Management 0 0 0.00 0 0.00 (1) Distribution of Buffalo bulls No. 12 10000 1.20 0 0.00 2 0.20 2 0.20 6 0.60 2 0.2 (2) Mangers Distribution No. 500 500 2.50 0 0.00 200 1.00 200 1.00 100 0.50 0 0 (3) Animal Health Camps No. 120 10000 12.00 0 0.00 12 1.20 50 5.00 48 4.80 10 1.00 Total 0 0 15.70 0 0.00 2.40 6.20 5.90 1.20 Total Production System 0 0 110.36 0 0.00 27.96 15.67 65.54 1.20 Household Production System& Micro Enterprises-Goat and Sheep E. Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 468 99.24 84 17.86 14.04 2.98 55 0 52 14.30 50 64.10 F Consolidation 3% 0 33.09 5.96 3.00 12.00 1.00 11.13 Grand Total 0 1102.95 173.07 278.03 276.64 266.80 108.42 CHAPTER V ANNUAL ACTION PLAN THROUGH CONVERGENCE
STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA:7939 Hac. EFFECTIVE AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI (IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 50.93 Lacs
S.No Activity Unit Quantity Unit Total 1st year 2nd year 3rd year 4th year 5th year Cost Cost Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A I Administration cost 10% 0 0 0.00 0.00 0.00 0.00 0 0 0 II Monitoring 1% 0 0 0.00 0.00 0.00 0.00 0 0 0 III Evaluation 1% 0 0 0.00 0.00 0.00 0.00 0 0 0 Total 12% 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 0.00 0.00 0.00 0 0 0 II Institution And Capacity Building 5% 0 0 0.00 0.00 0.00 0.00 0 0 0.00 Preparation of Detailed Project Report 0.00 III (DPR) 1% 00 0.00 11.03 0.000 0 0 Total 10% 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 C Watershed Development Works (NRM) 0 0 0.00 Arable Land Conservation Measures 56% 0 0 0.00 (1) Vegetative Contour Bund Hac. 0 0 0.00 0 0.00 0 0 0 0 0 0.00 0 0.00 (2) Earthen Bund with Pitching No. 0 0 0.00 0 0.00 0 0 0 0 0 0.00 0 0.00 Gully Control Structure(Loose Stone Check (3) 0.00 Dam) No. 0 0 0 0.00 0 0 0 0 0 0.00 0 0.00 (4) Water Harvesting Tanka No. 20 80000 16.00 4 3.20 5 4 8 6.4 3 2.40 0 0.00 (5) Wasteweir No. 0 0 0.00 0 0.00 0 0 0 0 0 0.00 0 0.00 Total 0 0 16.00 3.20 4.00 6.40 2.40 0.00 II Non Arable Land Conservation Measures 0.00 (1) Ditch Cum Bund Fencing Mt. 0 114 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (2) Contour Furrow in Pasture Land Hac. 0 8300 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (4) Plantation in pastureland No. 0 46 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (5) Over seeding in Non Arable land Hac 0 800 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (6) Earthen Bund with Pitching No. 0 61000 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 Total 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 III Drainage Line Treatment 0 0.00 0.00 0.00 0 0 (1) Earthen Bund with Pitching No. 0 61000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 (2) Bank Stabilization No. 0 61000 0.00 0 0.00 0 0.00 0 0 0 0 0 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 Total Watershed Development Works 16.00 3.20 4.00 6.40 2.40 0.00 Production System and Micro 0.00 D Enterprises 10% 48 I Arable Land Production System 0.00 (1) 0.00 Crop Demonstration /Fodder Demonstration No. 0 1122 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (2) Agro Forestry No. 0 18 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (3) Dry land Horticulture No. 0 6450 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (4) Homestead Kitchen Garden No. 0 500 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Organic Farming 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (5) i Compost Pit No. 0 1650 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 ii Vermi Compost Unit No. 0 2250 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (7) Water Tank. No. 34 50000 17.00 0 0.00 9 4.59 9 1.70 16 10.71 0 0 (8) HDPE/ PVC Pipe No. 43 15000 6.45 0 0.00 12 1.74 11 0.65 21 4.06 0 0 (9) Nepesek Spraier by hand mounted No. 161 650 1.05 0 0.00 43 0.28 40 0.10 77 0.66 0 0 (10) Nepesek Spraier by foot mounted No. 150 850 1.28 0 0.00 41 0.34 38 0.13 72 0.80 0 0 (11) Hand rotetary duster No. 150 775 1.16 0 0.00 41 0.31 38 0.12 72 0.73 0 0 (12) Seed cum fertilizer drill No. 32 15000 4.80 0 0.00 9 1.30 8 0.48 15 3.02 0 0 (13) Isopam (Threser) No. 8 40000 3.20 0 0.00 2 0.86 2 0.32 4 2.02 0 0 Total - 34.93 0.00 9.43 3.49 22.01 0.00 III Live Stock Management 0 0 0.00 0 0.00 (1) Distribution of Buffalo bulls No. 0 10000 0.00 0 0.00 2 0.00 2 0.00 6 0.00 2 0 (2) Mangers Distribution No. 0 500 0.00 0 0.00 200 0.00 200 0.00 100 0.00 0 0 (3) Animal Health Camps No. 0 10000 0.00 0 0.00 12 0.00 50 0.00 48 0.00 10 0.00 Total 0 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Total Production System 0 0 34.93 0 0.00 9.43 3.49 22.01 0.00 Household Production System& Micro Enterprises-Goat and Sheep E. Rearing,Service sector Carpentry 9% 0 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0.00 Tailoring, Blacksmith, Repair shop for Cycle. F Consolidation 3% 0 0.00 0.00 0.00 0.00 0.00 0.00 Grand Total 0 50.93 3.20 13.43 9.89 24.41 0.00 CHAPTER – VI EXPECTED OUT COMES
1 2 3 4 5 6
Unit of Pre-project Expected Post- S. No. Item Remarks measurement Status project Status
1 Status of water table (Depth to Meters 110-115 109-114 Ground water level)
2 Ground water structures repaired/ No. - - rejuvenated
3 Quality of drinking water Description salty Clean water
4 Availability of drinking water Description 6 month 10 month
5 Change in irrigated Area Ha - -
6 Change in cropping/ land use Description - - pattern
7 Area under agricultural crop Ha -
I Area under single crop Ha 3342 4000
Ii Area under double crop Ha 2212 2458
Iii Area under multiple crop Ha - -
8 Change in cultivated Area Ha 5731 5950
9 yield of Yield of Bajra q/ha 8 10 major crops Yield of Wheat q/ha 22 24 of area Yield of Gram q/ha - -
Yield of Mustard q/ha 12.5 14
10 production Production of Bajra ton 1840 2000 of major crops of area Production of Wheat ton 110 125 Production of Gram ton - -
Production of Mustard ton 500 600
11 Area under vegetation Ha 59 90
12 Area under horticulture Ha - 12
13 Area under fuel Ha 25 40
14 Area under Fodder Ha 90 130
15 Fodder production Q 10960 18393.45
16 Milk production Litres/day 1630 2200
17 SHGs Active No. - 30
18 No. of livelihoods No. - 40000
19 Income Rs.in la 0.16 0.20
20 Migration No. 950 200
21 SHG Federations formed No. - 1 Critical Assumption
No severe droughts/ unexpected floods/ natural disasters
Adequate funds are allocated for the same and released on time.
There is no significant pest/ disease attack, and if so, then it will have been contained before irreversible damage is done.
Adverse market conditions do not persist long.
Sound macro-economic and growth conditions continue and the benefits are widely distributed particularly in the rural areas.
Facilitating agencies and resource providers have the required competent staff so that timely and appropriate technical advice and services are provided to farmers whenever required.
The Capacity Building Plan is implemented, monitored and modified to address evolving needs and feedback from participants.
The execution of the Women’s Empowerment Pedagogy is regularly monitored by the District and State level Implementing Agencies
Means of Verification of indicators
Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning, mid-term and end of the project period
Annual participatory assessment by communities during project period.
Regular project monitoring reports prepared by project monitoring teams/ agencies.
Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual beneficiaries/project-related village and local bodies/PRIs.
External review missions
Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation, Animal Husbandry
MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& d`f’k Hkwfe ij vnZu caM 1 yEckbZ izfr gSDV;j 50 eh0 {kS=Qy% 01 gSDVs;j
Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 100.00 ehVj 0.47 0.47 47.00 47.00 2
feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] 92.50 ?k-eh- 84.80 84.80 7844.00 7844.00 3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 100.00 ehVj 0.60 0.60 60.00 60.00 4 /kkeu ?kkl cht 1.00 fd-xzk - 50.00 50.00 ;ksx 7951.00 8001.00 tksMk 3% dUVkstsUlh 240.03 ;ksx 8241.03 ykxr Je Hkkx 7951.00 ykxr lkexzh Hkkx 290.03 dqy ;ksx 8241.03 Say 8250.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& d`f’k Hkwfe ij vnZu caM 1 yEckbZ izfr gSDV;j 50 eh0 {kS=Qy% 01 gSDVs;j Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 2x 50 = 100 ehVj 2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk] 3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 2 x 50 = 100 eh- 4 100 ehVj @1-00 fd-xzk-@100eh0 /kkeu ?kkl cht = 1.00 fd-xzk- Say 1.00 fd-xzk- CROSS – SECTION OF VEGETATIVE BUND IN ARABLE LAND Top Width Based on Seepage line check Slope of Seepage Line 3:1 0.6 1.5:1 1:1 US DS 0.6 1 1.5 0.45 m 0.1 1.8 1.2 3.1 4.11 m