OFFICE OF THE ASSTT. ENGINEER (PIA) IWMP P.S SANCHORE

(UNDER INTEGRATED WATERSHED MANAGEMENT PROGRAMME)

BLOCK: SANCHORE DISTRICT :

TOTAL GEOGRAPHICAL AREA – 8372.68 Hac. TOTAL EFFECTIVE AREA- 7353 Hac. TOTAL COST- 1102.95 Lacs. UNIT COST- 15,000/Hac.

SUBMITTED BY

PROJECT MANAGER

DISTRICT WATERSHED DEVELOPMENT UNIT

JAORE, () DPR TEMPLATE

Index

S.No Topics Page no.

1 Chapter

• Location

• General Features of watershed (Cost and Area details)

• Climatic and Hydrological information

• Other Development Schemes in the project area

• Details of infrastructure in the project areas

• Institutional arrangements (,DWDU,PIA,WDT,WC)

2 Chapter Basic Data ,Analysis and Scope

2.1 Demography Details

3 Development Indicators

4 Land use

5 Agriculture status and Productivity Gap Analysis

6 Horticulture/Vegetable/Floriculture status

7 Land holding pattern

8 Livestock status

9 Fodder status

10 Farm Implements

11 NREGS Status

12 Migration details

13 Livelihood Details.

14 Existing SHG

15 Ground Water details

16 Drinking Water Status

17 Water use efficiency 18 Slope details

19 Water Budgeting

20 Soil Details

21 Soil erosion status

Chapter Proposed Development Plan

Chapter Activity wise Total Abstract of cost

Chapter Annual Action Plan

Project fund

Convergence Plan

Chapter Project outcomes

Technical designs and estimates for proposed activities

Enclosures

8 .1 Maps

Location –District, block, village, watershed location map

Map of Project with Watershed Boundary demarcation in cadastral map

Land Use Land Cover map

Existing water bodies, DLT

PRA Map (along with photos & paper drawing)

GIS based intervention map

Treatment map ie proposed works on revenue map

8.2 Documents of Agreements:

Proceedings of gram sabha for EPA approval

Proceedings of gram sabha Resolution for committee constitution

Documents related to PRA exercise

Proceedings of gram sabha for DPR approval CHAPTER – I

INTRODUCTION

Location.

Jalore-(IWMP) xi Project is located in sanchore Block, of Jalore ° ° district. The project area is between the 24 56' latitudes & 71 56' longitudes. It is at a distance of 47 km from its Block head quarters and 110 Kms from the district head quarters. There are 2361 no. of habitations in the Project area and other details are given below.

General features of watershed

S.No. Name of Project(as Jalore (IWMP) per GOI) XI

(a) Name of Catchment Bijrol/ pamana

(b) Name of watershed Bijrol/ pamana area(local name)

© Project Area 8372.68 Ha.

(d) Net treatable Area 7353 Ha. e) Cost of Project 1102.95 Lac. f) Cost/hectare 15000 g) Year of Sanction 2010-11 h) Watershed Code i) No. of Gram 2 Panchayats

in project area j) No. of villages in project area 7 k) Type of Project Desert l) Elevation (metres) 210 m) Major streams n) Slope range (%) 0--3%

Name of Name of Villages Census code Area Gram Covered of villages geophical Macro/micro Panchayat (Hac)

Bijrol Bijrol kheda 02327700 1378.32

Bijrol Goleya 02327800 653.01

Jerol 0232800 935.37

Liyadara 02327900 792.00

Pamana Pamana 02327600 2031.84

Jelatra 02327500 1926.06

Marukheda 02327600 656.08

The watershed falls in Agroclimatic Zone-II B .The soil texture is sandylomy The average rainfall is 414mm.The temperatures in the area are in the range between 38--48 centigrade during summer and 20--25centigrade during winter. The major crops in the area are Bajra 85% land is under cultivation15% land fallow,.36.45% land is irrigated through Tubewell’s

990 No of households are BPL 165 are landless households 685 household are small and marginal farmers .Average land holding in the area is 3.54 ha. 91.27% area is single cropped area and 8.71% is double cropped. The main source of irrigation is Tube well’s. The average annual rainfall (5 years) in the area is 446 mm. The Major streams in the Watershed are Virodi stream. The major festivals in the village are Holi, Deewali, krishana janamaastmi, Navratra, Gangor, Raksha-bandhan. At present this village is having 12402 population with Communities like Rajput, Dewasi, Kumhar, Suthar, Megwal and Bhil. Kalbi.

Climatic and Hydrological information

1 Average Annual Rainfall(mm)

Year Average Annual Rainfall(mm)

1 2001 235 mm 2 2002 65

3 2003 752

4 2004 249

5 2005 352

6 2006 800

7 2007 327

8 2008 316

9 2009 108

10 2010 938

2 Average Monthly rainfall (last ten years)

Month Rainfall(mm) i) June 63.00 ii) July 126 .00 iii) August 142.00 iv) September 55.00

3 Maximum rainfall intensity (mm)

Duration rainfall intensity(mm)

i) 15 minute -- duration

ii) 30 minute -- duration

iii) 60 minute -- duration

4 Temperature (Degree C)

Season Max Min

i) Summer Season 48 38

ii) Winter Season 25 20

iii) Rainy Season 34 25

5 Potential Evaporation Transpiration (PET) (mm/day)

Season PET

i) Summer 1.17

ii) Winter 0.53

iii) Rainy 0.33

6 Runoff

i) Peak Rate (cum/hr)

ii) Total run off volume of rainy season (ha.m.)

iii) Time of return 5 years 10 years In-Year of maximum flood

iv)Periodicity of once Nil NIl Drought in village area

Other Development Schemes in the project area

Key Provision interventions Targeted s under Name of the under the Beneficiarie the S.No Scheme department Scheme s Scheme

MG Nadi Desilting 1 Villages Nil NREGA , Gr. Road

Common 2 TFC Villages Nil Toilets RURAL DEVELOPMEN Boundary 3 SFC Villages Nil T & Wall PANCHAYAT RAJ Community 4 BRGF DEPARTMENT Hall, Primary Villages Nil School

5 TSC Tanka Villages Nil

6 SGS Nil Villages Nil 7 IAY Awas Nirman BPL Nil

8 Mpower Tanka BPL Nil

Details of infrastructure in the project areas

Parameters Status

(i) No. of villages connected to the main road by 6 an all-weather road

(ii) No. of villages provided with electricity 7

(iii) No. of households without access to drinking 236 water

(iv) No. of educational institutions : (P) (S) (HS) (VI)

Primary(P)/ Secondary(S)/ Higher 6 Nil Nil Secondary(HS)/ vocational institution(VI) 14

(v) No. of villages with access to Primary Health 5 Centre

(vi) No. of villages with access to Veterinary 1 Dispensary

(vii) No. of villages with access to Post Office 2

(viii) No. of villages with access to Banks 1

(ix) No. of villages with access to Markets/ Nil mandis

(x) No. of villages with access to Agro-industries Nil

(xi) Total quantity of surplus milk 600 Ltr.

(xii) No. of milk collection centres (U) (S) (PA) (O)

(e.g. Union(U)/ Society(S)/ Private Nil 3 10 Nil agency(PA)/ others (O)) (xiii) No. of villages with access to Anganwadi 11 Centre

(xiv) Any other facilities with no. of villages Nil (please specify)

(xv) KVK Kesvana(Jalore)

(xvi) cooperative society 01

(xvii) NGOs Nil

(xviii Credit institutions )

(i) Bank 1

(ii) Cooperative Society 1

(xix) Agro Service Centre's Nil

Institutional arrangements (SLNA,DWDU,PIA,WDT,WC, Secretary)

DWDU Details

1 2 3

S.No Particulars Details of DWDU

PM ,DWDU Sh. R.P Vyas.

Address with contact no., website PM, DWDU District Jalore

Telephone 9530310555

Fax -

E-mail [email protected]

PIA particulars

1 2 3

S.No Particulars Details of PIA

Name of PIA Sh. Hemant vasnev Designation Assist. Engineer

Address with contact no., website AEN. (IWMP) P.S. Sanchore

Telephone 8003006447

Fax -

E-mail [email protected]

WDT Particulars:

1 2 3 4 5 6 7 8

Experi Descri ence ption S. in of Name of WDT Ag Role/ No M/F Qualificati waters profes member e Function on hed(Yr sional s) trainin g

1 Sh. Hanumana M 28 L.S.A And yes Yes Animal Ram B.A. Husbandry

2 Sh. Deva Ram M 26 M.A. Yes Yes Social scin Details of Watershed Committees (WC)

Date of Date of Gram Registratio SC/ST Name Education Landles S. Name of Sabha n as a Designa /OBC/ of al Name M/F s/MF/SF N. WCs for WC Society tion Gener UG/SH qualificati / BF (dd/mm/yy al G on yy

1 02.10.11 Preside MF nt Sh. Thanaram M OBC - Primary

Secretar MF y Sh. Kishanaram M OBC - Secondary

Member SH. Bijlaram M ST MF - -

Sh. Radmaram M ST MF - -

Sh. Parasram M SC MF - , Sh. Ramlal M SC SF -

Sh. kesharam M OBC SF -

Sh. Babulal M OBC SF -

Smt. Radha devi F OBC MF -

Smt. Diva devi F ST MF -

Smt. Kamla devi F OBC MF - - Smt. Thefi devi F SC

Smt. Mohane devi F SC

Sh. Manglaram M SC

Sh. Bhartaram M ST

Sh. Amara Vagta M SC

Preside SF nt Sh. chandan sings M GEN - Primary

Secretar MF y Sh. KIshnaram M OBC - Middle

Member SH. Bijlaram M OBC MF - -

Sh. Masararam M ST MF - - 29.06.11 Sh. Deepa ram M OBC L. Less - 2 Bijrol - Sh. Himata Ram M OBC MF -

Smt. mani Devi F ST MF -

Sh. Sonaram M OBC MF -

Sh. Natha Ram M ST MF -

Smt. Devika Devi F SC MF -

Sh. Pathu Ram M ST SF - Sh. SF

Jamataram/Veermaram M SC -

Problems and scope of improvement in the project area

The socio economic conditions of the area can be improved through increased production which can be achieved through expansion in cultivated area and productivity enhancement. The productivity gap of major crops in the area as compared with district and with areas in the same agro climatic zones indicate potential to increase the productivity. The demonstration of improved package of practices, improved varieties, increased irrigation facilities and soil conservation measures under the project can bridge this gap. Due to small land holdings in the area focus of the project would be on diversification in agriculture (horticulture, vegetables, green houses, Agro forestry, fodder crops)and diversification in Livelihoods(Agriculture, Animal husbandry, self employment)

7433 Quintal fodder scarcity can be met out through Pasture development .Improved animal Husbandry practices can increase the productivity of livestock. 950 no of persons migrate due to Employment this migration can be checked through creation of employment opportunities in the project area through increase in production and diversification in agriculture and Livelihoods as mentioned above.

CHAPTER – II

Socio economic Features, Problems and Scope

Table 2.1 Population & Household Details:

Total Population

Male Female Total SC ST

6409 4993 12402 1308 415

Household Details

BPL Small M. Total SC ST household L. Less Farmer Farmer household household household

990 238 307 378 2361 305 216

Table 2.2 Development indicators

S. No. Development State Project Area Indicators

1 Per capita income 16260 16050 (Rs.)

2 Poverty ratio 0.22 0.21

3 Literacy (%) 0.604 0.601

4 Sex Ratio 921 988

5 infant mortality rate 5.90%

6 maternal mortality 0.04% ratio

The table indicates poor socio economic conditions. Table 2.3 Land Use

Land Use Total area in Ha.

Private Panchayat Government Community Total

Agriculture 6811.17 - - - 1611.17 Land

Temporary 1011 - - - 1011 fallow

Permanent - - - - - Fallow

Cultivated 3342.17 - - - 3342.17 Rainfed

Cultivated 2458 - - - 2458 irrigated

Net Sown Area - - - - -

Net Area sown 2212 - - - 2212 more than once

Forest Land - - - - -

Waste Land - - - - -

Pastures - 394.77 - - 394.77

Others(ger 147.06 - - - 146.06 mumkin sada )

Total - - - - -

Project area of Bizrol has 1011 hac of fallow land (total 6811 ha) that can be brought under cultivation if some irrigation source can be provided through Construction of WHS like Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of crops. Construction of WHS can also increase in area under irrigation which is only 36.00%

394 hac. is under vegetative cover, Pasture development the land use table shows that there is 394 hectare pasture land This emphasizes the need for taking up pastureland development works through sowing of promising species of grasses and plantation

Table 2.4 .a Agriculture and Horticulture status and fuel availability.

Cropping Status

S. Seaso Crop Rain fed Irrigated Total N n sown o

Varietie Area Producti Produc Varieti Are Produ Produ Are Produ s on tivity es a ction ctivity a ction (ha) (Ton) (kg/ha) (ha) (Ton) (kg/ha (ha) (Ton) )

1 Kharif Bajra Progro 2653 1326.50m 500 - - - - 265 1326.5 9444 t 3 0mt pionera MH-169

Moon K851, 89 53.400mt 600 kg - - - - 89 83.400 g POOSA BESAK HI

Gwar RGC 600 270mt 450kg ------936

2 Rabi Muste Datawi - - - Pusha 370 444mt 1200 370 444mt red da 26 Bold pioner

Zeera RS 1 , - - - RZ 19 100 230mt 230kg 100 230 RZ 19 0 0 /209

Whee RAJA - - - - 150 187.0 1250 150 187.05 t 555 5 kg kavere raj 3765j24

Isabg GUJRA - - - - 692 453.2 655 692 453.26 ol T 1,2RI 6 kg 89

Table 2.4.b Abstract of cropped Area(ha)

Area under Single crop 3342

Area under Double crop 2212

Area under Multiple crop -

The table 2.3 shows that only 2212 hac is double cropped area. Also the crop rotation shows that fallow lands are there. This indicates that there is scope for change in crop rotation in fields where there are fallow lands through Soil and Water conservation measures, crop demonstration and diversification in agriculture.

Soil and Water conservation measures besides putting fallow lands under cultivation can change the area under single cropping to double and multiple cropping.

Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)

Productivity kg/ha

Highest Highest Average of Average Agro Name of the in climatic Project crop Rajasthan zone District Area

Wheat 2708 2751 2200 2200 2050

Mustured 1095 1203 1250 1250 1000

Zeera - 339 500 500 425

Isab gol - 476 600 600 545

Bajra 886 679 750 750 650

Guar - 277 400 400 300

Ground nut 866 1310 1000 1000 800

Moong - 312 450 450 360

Caster - 997 800 800 650

Analysis of the above table indicate that besides national gap there is wide gap in productivity within state and even within same agro climatic zones. The reasons for this variation are

The farmers are using varieties WCC-75,Raj.171 of Bajra. whereas the recommended varieties like HHB 67, RCB -2 provide 18 qnt. yield (write for all crops)

Lack of Availability of good quality seeds of desired crop and variety in adequate quantities and time to the farmers.

Availability of water for cultivation

The productivity gap and reasons of it indicate potential to increase the productivity through crop demonstration .Crop demonstrations would be carried out on improved crops/ varieties, improved agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini kit. Demonstration of improved methods and economics of fodder crops cultivation and also distribution foundation seeds of Forage Crops for further multiplication, introduction of fodder crops in the existing crop rotations.

Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)

Recommended Activity Area Species Varieties varieties Production

Zeera Rz19 g4 - - Horticulture - w60

Vegetables - - - - -

Floriculture - - - - -

692 Medicinal Plants Isbgol Jg49 - -

Table 2.6 Land holding Pattern in project area

Land holding (ha) Land holding (ha)Social irrigation source wise group wise Total Hous Irrigat Rain Gen SC ST OBC e ed Type of (sourc fed Farmer holds e) Total

(i)Large 705 2148.66 2455.57 4604.23 278.65 231.65 191.92 3902.01 farmer

(ii) Small 307 59.478 138.782 198.26 14.45 35.00 10.84 137.97 farmer

(iii) 378 249.855 687.995 937.845 98.74 58.07 37.53 743.505 Marginal farmer

(iv) Landless 238 ------person

(V)No. of BPL 495 - 59.65 59.65 6.80 28.45 7.95 16.45 household s

Total 2123 2458 3342 5800 398.64 353.17 248.24 4799.94

Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation source. For large farmers with no irrigation facility Horticulture/vegetables will be promoted in a part of land with farm pond/Tanka construction.

The following activities will be more beneficial for small land holdings and for diversification and income for large farmers

Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier . Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation source. Also the project area has good potential for medicinal & aromatic crops like Sonamukhi, Isabgol, Ashwagandha, Khus, Mehandi etc.

Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation as wind velocity is high in the project area.

Setting of Vermi Compost Units - Keeping in view the side effect of residues of chemicals and fertilizers on human health the emphasis would be on cultivation of organic produce through motivating farmers and providing assistance for production of organic input, vermi compost.

Production and distribution of quality seed – There is need to ensure that good quality seed is available for cultivators for which adequate seed production would be initiated in watershed areas with the assistance of private sector and agriculture department technologies

Sprinklers and pipelines for efficient water management practices emphasis on demonstration of sprinklers with adequate financial support and convergence/private partnership.

Establishment of nurseries: Most of the planting material is procured from other parts of the State/ country. The procurement of planting material from distant places causes damage to the planting material and often results in untimely supply. Hence nursery development activity in area. Drip irrigation Drip irrigation will be promoted in all horticulture plantations, vegetables, green houses and in nurseries for rational use of irrigation higher yields and quality produce.

Table 2.7 Livestock Status - animals/milk production / average yield.

Dry matter Descripti Yield(milk/ Equ. requireme Total S.No Populatio on of mutton/Wool cow nt per year requireme . n in No. animals ) units (7Kg per nt in M.T. animal.)

1 Cows

Indigenou 1343 s 4 ltr. per day 1343 3431365 1011.78

Crossbre 396 6 ltr. per ed day 396 1011780 10115.25

2 Buffaloes 3959 7 ltr. per day 3959 10115245 958.13

3 Goat 771 2 ltr. per day 375 958125 2746.63

4 Sheep 2151 ½ kg per no. 1075 2746625 2746.63

5 Camel 51 - 51 130305 130.31

6 Poultry 0 - 0 0 0

7 Piggery 0 - 0 0 0

Total 8671 - 7199 18393445 18393.45

In spite of the large number of livestock, production is less hence increase in productivity across all species, is a major challenge. To reduce production of unproductive cattle and improve the productivity by improving the breeds by breeding management following activities will be taken up

Castration Artificial insemination

Distribution of superior Breeding bulls for use in Cattle and Buffalo

Breeding distribution crossbred rams

Besides breed improvement other animal husbandry practices like better health, hygiene and feeding practices can increase productivity of livestock. Hence Activities like Animal health camps ,Urea-Molasses treatment demonstration ,demonstration of improved methods of conservation and utilization of Forage crops are proposed.

Table 2.8 Existing area under fodder (ha)

S.No Item Unit Area/Quantity

1 Existing Cultivable Ha 674 area under Fodder

2 Production of Green Tonns/year 6740 fodder

3 Production of Dry Tonns/ 3370 fodder Year

4 Area under Pastures Ha 50 hac

5 Production of fodder Tonns/year 250 tons

6 Existing area under Ha - Fuel wood

7 Supplementary feed 1Kgs/ day 600 Kg/ day 50% for 6 moth (for pirod. Animal

8 Silage Pits No -

9 Availability of fodder Ton - i.Requirement of fodder= 18393 tonns ii. Availability of fodder = 10960 tonns.

Deficiency of fodder = 18393 - 10960 = 7433 tonns.

The table above shows there is fodder deficiency

To minimize the large and expanding gap between feed and fodder resource availability and demand there is need for

Increase in area under fodder crops Increase in productivity of fodder crops

Development of pastures

And reduction in large number of livestock production through replacement by few but productive animals

Table 2.9 Agriculture implements

1 2 3

S. No Implements Nos.

1 Tractor 666

2 Sprayers-manual/ power 80

3 Cultivators/Harrows 409

4 Seed drill 105

5 Any Other 250

Farm mechanization and seed banks: As discussed earlier 29% land holdings belong to small and marginal farmers who own only 18% of total cultivated area so owning of big farm implements by individual farmers is not economical so SHG would be promoted to buy farm implements and rent to farmer

Table 2.10 NREGA Status - No. of Card Holder, activities taken so far, employment status.

Activity taken up so far Sr. Name of Total No .of Employment no. village job cards Status

BIJROL 1 KHEDA 411 411

BJROL 2 GOLIYA 250 250 Nadi,Tanka,Greval 3 JHEROL 367 367 road,Bunding 4 PAMANA 890 890

5 JELATRA 535 535

6 LIYADRA 315 315

Table 2.11 Migration Details

Distance of destination No. of Major of Income No. of days per reason(s) migration Occupation from such Name of persons year of for from the during occupation village migrating migration migrating village (km) migration (Rs. in lakh)

Bijrol 1 45 300 14 Kheda

Bijrol 190 300 59 goliya Employment Employment & Business & Business 350-1200 Jherol 110 300 30

Liyadra 165 300 20

Pamana 150 300 6

Jelatra 100 300 129 maru 90 300 kheda

The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income

of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and

diversification in livelihoods .

The existing livelihoods Village are given below

Table 2.12 (a)Major activities (On Farm)

Average annual income Name of activity No of House holds from the

cultivators 2083 636 Lac

Dairying 40 50 Lac

Poultry - -

Piggery - -

Landless Agri. 238 90 Lac Labourers Table 2.12(b)Major activities (Off Farm)

Households/indivi Average annual income Name of activity duals from the

Artisans - -

Carpenter 29 11.60 Lac

Blacksmith 26 7.8 Lac

Leather Craft - -

Porter 39 9.751 Lac

Mason 50 19.50

Others specify 18 1.50 (Cycle Repair ,STD,Craft etc)

The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals

Table 2.13( a ) Status of Existing SHG

Name of Activity Monthly Fund Assistance Source of Training S.No Members SHG involved income avai. available assistance received

Ambedkar 1 10 Saving 1000 - - - - SHG

2 Imata SHG 10 Saving 1000 - - - -

Jay shree Saving 500 3 Hadhakai 10 - - - - SHG

4 Meera SHG 10 Saving 1000 - - - - Bhramni Saving 1000 5 10 - - - - mataSHG

Jai Naklank Saving 500 6 10 - - - - SHG

Ramdeva 10 Saving 500 7 - - - - SHG

kheteshawar 10 Saving 500 8 - - - - SHG

Maha Laxmi 10 Saving 500 9 - - - - SHG

Ashapuri 10 Saving 1000 10 - - - - SHG

The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance

II. Technical Features

Table 2.14 Ground Water

S.No Source No. Functional Dry Area Water depth(met irrigated availability er) (days)

i) Dug wells 25 - - - - 0

ii) Shallow tube wells 32 225mt - - 365

iii) Pumping sets - - - - -

iv) Deep Tube Wells - - - 750 365 days

Total 282 - - - -

Table 2.15 Availability of drinking water

S Name of Drinking Present No. of No. No. No. . the water availabilit drinking function require N village requireme y of water al s defunct o nt drinking sources repairs Ltrs/day water availabl Ltrs/day e

1 BJROL 20000 160000 80 80 - -

2 BJROL 18000 15000 80 80 - - GOLIYA

3 JHEROL 15000 11000 70 70 - -

4 LIYADRA 21000 18000 75 75 - -

5 PMANA 28000 25000 85 85 - -

6 JELATR 25000 23000 85 85 - - A

7 MARU 15000 12500 50 50 - - KHEDA

Table 2.16 Water Use efficiency

Area (Hectare)

through through Name of major water water Any other crop conservin saving (pl. Total g devices(Drip specify) agronomic /Sprinklers) practices#

Mustard 60% 20% - - Zeera 60% 20% - -

The tables above indicate need for judicious use of available Water.

Encouraging optimum use of water through installation of sprinklers on every operational wells

Table 2.17 Slope details.

Slope of Watershed

S.No. Slope percentage Area in hectares

1 0 to 3% 8373 Hac

2 3 to 8% -

3 8 to 25% -

4 > 25% -

As most of the area has slope less than 3% construction of contour bunds can solve the problem of water erosion in agriculture fields and protect washing of top soil and manures/fertilisers

Table 2.18 Soil details

Soil Profile

S.No. Major Soil Classes Area in hectares

1 II class 5644 2 III class 1178

3 Iv class 531

Soil Depth :

B Depth (Cms.) Area in hectares

1 0.00 to 7.50 -

2 7.50 to 45.00 5210

3 > 45.00 2143

C Soil fertility Status Kg/ha Recommended

N 100 Kg 80-90

P 20-30 40-50

K 100 Kg 20-30

Micronutrients 10-500 ppm 100-500

The analysis of table shows need to improve and maintain soil fertility. Soil health card to every farmer every crop season will be provided, which will include the recommendation for Application micro nutrient and fertilizers

Table 2.19 Erosion details

Erosion status in project Area

Average Area Run soil loss Type of affected off(mm/ (Tonnes/ Cause erosion (ha) year) ha/ year)

Water erosion a Sheet 5926 b Rill 1427 15-20 c Gully Nil

Sub-Total 7353

Wind erosion -

Total for project 7353

The need is:

To check land degradation

To reduce excessive biotic pressure by containing the number and increase of livestock

To check cultivation on sloping lands without adequate precautions of soil and water conservation measures

To discourage cultivation along susceptible nallah beds

To check Faulty agriculture techniques

To check Uncontrolled grazing and developed cattle tracks

To check Deforestation of steep slopes

To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge Ground Water structures life Earthen check dams, gully plugs, Bank Stabilisation, Loose stone check Dams, Gabions, Earthen embankment (Nadi) and Anicuts would be taken up. CHAPTER – III

Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions

Preparatory phase activities Capacity Building Trainings and EPA

The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and wall writings etc. were carried out in all the habitations of Jalore (IWMP) IV Micro Watershed. A series of meetings were conducted with GP members, community and discussed about the implementation of IWMP programme. User groups were also formed.

Grama Sabhas were conducted for approval of EPA (Village), for selecting the watershed committee and approval of DPR.

S.no Name of the Gram Panchayat Date on which Grama Sabha approved EPA

1 BJROL 30-03-2012

2 PAMANA 05-03-2012

3 JELATRA 05-03-2012

Expenditure

incurred (lacs)

Estimated Entry Point Activities planned cost (Lacs)

Expected Actual Balance outcome outcome Tanka Solar lights Tanka + Tanka + (Lacs) (Lacs) (Lacs) S.No Names of Solar Solar village Phy Fin Phy Fin Lights Lights Amount earmarked (Lac) (Lac)

for EPA

1. BJROL 7.76 8 6.00 8 1.76 7.76 7.76 7.76 7.76 7.76

2. BJROL 1.85 1 0.75 5 1.1 1.85 1.85 1.85 1.85 1.85 GOLIYA

3. JHEROL 2.69 3 2.25 2 0.44 2.69 2.69 2.69 2.69 2.69 4. LIYADARA 6.92 6 4.50 11 2.42 6.92 6.92 6.92 6.92 6.92

5. PAMANA 11.33 11 9.35 9 1.98 11.33 11.33 11.33 11.33 11.33

6. GELATRA 11.99 11 9.35 12 2.64 11.99 11.99 11.99 11.99 11.99

7. MARU 1.51 1 0.85 3 0.66 1.51 1.51 1.51 1.51 1.51 KHEDA

Total 44.05 33.05 11.00 44.05 44.05 44.05 44.05 44.05

bZ-ih-,- vUrxZr Vkadk fuekZ.k xzke iapk;r iek.kk

bZ-ih-,- vUrxZr lksyj ykbZV xzke iapk;r iek.kk

bZ-ih-,- vUrxZr lksyj ykbZV xzke iapk;r fctjksy

The PRA exercise was carried out in all the villages on the dates shown below:

S.no Name of the village/Habitation Date on which PRA conducted

1 BJROL 14-07-2012

2 PAMANA 13-07-2012

3 JELATRA 13-07-2012

Transact walk were carried out involving the community for Social mapping, Resource mapping. Detailed discussions and deliberations with all the primary stakeholders were carried out.

Socio-economic survey was carried out covering all the households and primary data on demography, Land holdings, Employment status, Community activities etc. was collected as mentioned in chapter 2.

WAPCOSS was assigned the work of preparing various thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of geo- spatial database depicting present conditions of land (terrain), water and vegetation with respect to watershed under different ownerships at village level

Various thematic layers provided by WAPCOSS are :

Delineation of Macro/Micro watershed boundaries.

Digitised Khasara maps of the villages falling in project area.

Network of Drainage lines, existing water bodies, falling in the project area.

Base maps (transport network, village/boundaries, and settlements).

Land Use / Land cover map.

Contours at 1 meter interval, slope map

Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as discussed in chapter 2) final Treatment plan on revenue map for implementation has been framed. Thus each intervention identified has been marked on revenue map (map enclosed in DPR as annexure------).The GIS based intervention map, PRA based intervention map are annexed as ------.

ih-vkj-,- vH;kl xzke iapk;r fctjksy

ih-vkj-,- vH;kl xzke iapk;r fctjksy

ih-vkj-,- vH;kl xzke iapk;r iek.kk

ih-vkj-,- vH;kl xzke tSykrjk xzke iapk;r iek.kk

PROPOSED DEVELOPMENT PLAN

STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA:7939 Hac. EFFECTIVE AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI (IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 1233.81Lacs S.N Activity Unit Unit G.P. BIZROL G.P. PAMMANA G.P.BIZROL+PAMMANA o Cost Quantit Total Cost Conver Benefi Quantity Total Cost Converg Benefi Quantit Total Cost Conver Benefi y Cost from gence ciary Cost from ence ciary y Cost from gence ciary Project Fund contri Project Fund contrib Project Fund contrib Fund bution Fund ution Fund ution 1 2 3 5 4 6 7 8 9 4 6 7 8 9 4 6 7 8 9 A I Administration cost 10% 0 0 48.30 48.30 0.00 0.00 0.00 62.00 62.00 0.00 0.00 0 110.30 110.30 0.00 0.00 II Monitoring 1% 0 0 4.83 4.83 0.00 0.00 0.00 6.20 6.20 0.00 0.00 0 11.03 11.03 0.00 0.00 III Evaluation 1% 0 0 4.83 4.83 0.00 0.00 0.00 6.20 6.20 0.00 0.00 0 11.03 11.03 0.00 0.00 Total 12% 0 0 57.96 57.96 0.00 0.00 0.00 74.39 74.39 0.00 0.00 0 132.35 132.35 0.00 0.00 Preparatory Phase (Entry Point B I Activity) 4% 0 0 19.32 19.32 0.00 0.00 0.00 24.80 24.80 0.00 0.00 0 44.12 44.12 0.00 0.00 II Institution And Capacity Building 5% 0 0 24.15 24.15 0.00 0.00 0.00 31.00 31.00 0.00 0.00 0 55.15 55.15 0.00 0.00 Preparation of Detailed Project III Report (DPR) 1% 0 0 4.83 4.83 0.00 0.00 0.00 6.20 6.20 0.00 0.00 0 11.03 11.03 0.00 0.00 Total 10% 0 0 48.30 48.30 0.00 0.00 0.00 62.00 62.00 0.00 0.00 0 110.30 110.30 0.00 0.00 C (NRM) 0 0 0.00 48.30 0.00 0.00 0.00 0.00 62.00 0.00 0.00 0 0.00 110.30 0.00 0.00 Arable Land Conservation Measures 56% 0 270 0.00 270.48 0.00 0.00 347.17 0.00 347.17 0.00 0.00 618 0.00 617.65 0.00 0.00 (1) Vegetative Contour Bund Hac. 8250 1199 106.34 98.92 0.00 7.42 1676.00 148.64 138.27 0.00 10.37 2875 254.98 237.19 0.00 17.79 (2) Earthen Bund with Pitching No. 61000 34 22.30 20.74 0.00 1.56 34.00 22.30 20.74 0.00 1.56 68 44.59 41.48 0.00 3.11 (3) Gully Control Structure(L.S.C.D) No. 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (4) Water Harvesting Tanka No. 80000 90 85.40 72.00 8.00 5.40 90.00 85.40 72.00 8.00 5.40 180 170.80 144.00 16.00 10.80 (5) Wasteweir No. 46000 23 11.37 10.58 0.00 0.79 22.00 10.88 10.12 0.00 0.76 45 22.25 20.70 0.00 1.55 Total 0 0 225.41 202.24 8.00 15.17 0.00 267.21 241.13 8.00 18.08 0 492.62 443.37 16.00 33.25 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 114 20000 24.51 22.80 0.00 1.71 40000.00 49.02 45.60 0.00 3.42 60000 73.53 68.40 0.00 5.13 (2) Contour Furrow in Pasture Land Hac. 8300 50 4.46 4.15 0.00 0.31 100.00 8.92 8.30 0.00 0.62 150 13.38 12.45 0.00 0.93 (3) Contour Furrow in Non Arable Land Hac. 8300 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (4) Plantation in pastureland No. 46 16000 7.36 7.36 0.00 0.00 20000.00 9.20 9.20 0.00 0.00 36000 16.56 16.56 0.00 0.00 (5) Over seeding in Non Arable land Hac 800 50 0.40 0.40 0.00 0.00 100.00 0.80 0.80 0.00 0.00 150 1.20 1.20 0.00 0.00 (6) Earthen Bund with Pitching No. 61000 25 16.39 15.25 0.00 1.14 25.00 16.39 15.25 0.00 1.14 50 32.79 30.50 0.00 2.29 Total 0 0 53.13 49.96 0.00 3.17 0.00 84.34 79.15 0.00 5.19 0 137.46 129.11 0.00 8.35 III Drainage Line Treatment 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 61000 25 16.39 15.25 0.00 1.14 28.00 18.36 17.08 0.00 1.28 53 34.75 32.33 0.00 2.42 (2) Bank Stabilization No. 61000 5 3.28 3.05 0.00 0.23 16.00 10.49 9.76 0.00 0.73 21 13.77 12.81 0.00 0.96 Total 0 0 19.67 18.30 0.00 1.37 0.00 28.85 26.84 0.00 2.01 0 48.53 45.14 0.00 3.39 Total Watershed Development Works 0 0 298.20 270.50 8.00 19.71 0.00 380.40 347.12 8.00 25.28 0 678.61 617.62 16.00 44.99 D Production System 10% 48 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00

I Arable Land Production System 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 Crop Demonstration /Fodder (1) Demonstration No. 1122 400 5.39 4.49 0.00 0.90 1400.00 18.85 15.71 0.00 3.14 1800 24.24 20.20 0.00 4.04 (2) Agro Forestry No. 18 7500 1.62 1.35 0.00 0.27 11000.00 2.38 1.98 0.00 0.40 18500 4.00 3.33 0.00 0.67 (3) Dry land Horticulture No. 6450 40 3.10 2.58 0.00 0.52 40.00 3.10 2.58 0.00 0.52 80 6.19 5.16 0.00 1.03 (4) Homestead Kitchen Garden No. 500 400 2.40 2.00 0.00 0.40 602.00 3.61 3.01 0.00 0.60 1002 6.01 5.01 0.00 1.00 Organic Farming 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (5) i Compost Pit No. 1650 400 7.92 6.60 0.00 1.32 610.00 12.08 10.07 0.00 2.01 1010 20.00 16.67 0.00 3.33 ii Vermi Compost Unit No. 2250 216 5.83 4.86 0.00 0.97 200.00 5.40 4.50 0.00 0.90 416 11.23 9.36 0.00 1.87 (7) Water Tank. No. 50000 23 23.00 11.50 11.50 0.00 11.00 11.00 5.50 5.50 0.00 34 34.00 17.00 17.00 0.00 (8) HDPE/ PVC Pipe No. 15000 9 2.70 1.35 1.35 0.00 34.00 10.20 5.10 5.10 0.00 43 12.90 6.45 6.45 0.00 (9) Nepesek Spraier by hand No. 650 78 1.01 0.51 0.51 0.00 83.00 1.08 0.54 0.54 0.00 161 2.09 1.05 1.05 0.00 (10) Nepesek Spraier by foot mounted No. 850 75 1.28 0.64 0.64 0.00 75.00 1.28 0.64 0.64 0.00 150 2.55 1.28 1.28 0.00 (11) Hand rotetary duster No. 775 75 1.16 0.58 0.58 0.00 75.00 1.16 0.58 0.58 0.00 150 2.33 1.16 1.16 0.00 (12) Seed cum fertilizer drill No. 15000 16 4.80 2.40 2.40 0.00 16.00 4.80 2.40 2.40 0.00 32 9.60 4.80 4.80 0.00 (13) Isopam (Threser) No. 40000 4 3.20 1.60 1.60 0.00 4.00 3.20 1.60 1.60 0.00 8 6.40 3.20 3.20 0.00 Total - 0 0 63.41 40.45 18.58 4.38 0.00 78.13 54.20 16.36 7.57 0 141.54 94.66 34.93 11.95 III Live Stock Management 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 10000 6 0.72 0.60 0.00 0.12 6.00 0.72 0.60 0.00 0.12 12 1.44 1.20 0.00 0.24 (2) Mangers Distribution No. 500 250 1.50 1.25 0.00 0.25 250.00 1.50 1.25 0.00 0.25 500 3.00 2.50 0.00 0.50 (3) Animal Health Camps No. 10000 60 7.20 6.00 0.00 1.20 60.00 7.20 6.00 0.00 1.20 120 14.40 12.00 0.00 2.40 Total 0 0 9.42 7.85 0.00 1.57 0.00 9.42 7.85 0.00 1.57 0 18.84 15.70 0.00 3.14 Total Production System 0 0 72.83 48.30 18.58 5.95 0.00 87.55 62.05 16.36 9.14 0 160.38 110.36 34.93 15.09

Household Production System& Micro Enterprises-Goat and D Sheep Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 215 52.14 43.45 0.00 8.69 253.00 66.94 55.79 0.00 11.16 468 119.09 99.24 0.00 19.85 E. Consolidation 3% 0 0 14.49 14.49 0.00 0.00 0.00 18.60 18.60 0.00 0.00 0 33.09 33.09 0.00 0.00 Grand Total 0 0 543.92 483.00 26.58 34.34 0.00 689.89 619.95 24.36 45.58 0 1233.81 1102.95 50.93 79.92 CHAPTER IV ACTIVITY WISE TOTAL ABSTRACT OF COST OF GP BIZROL

STATE: RAJASTHAN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 3058 HAC. NAME OF WATERSHED: JALORE XI(IWMP) (II) NON ARABLE LAND: 162Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 3220 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 543.92 Lacs

S.No Activity Unit Quantity Unit Total Cost Cost from Convergence Beneficiary Cost Project Fund Fund contribution

1 2 3 4 5 6 7 8 9 A I Administration cost 10% 0 0 48.30 48.30 0.00 0.00 II Monitoring 1% 0 0 4.83 4.83 0.00 0.00 III Evaluation 1% 0 0 4.83 4.83 0.00 0.00 Total 12% 0 0 57.96 57.96 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 19.32 19.32 0.00 0.00 II Institution And Capacity Building 5% 0 0 24.15 24.15 0.00 0.00 Preparation of Detailed Project Report III (DPR) 1% 0 0 4.83 4.83 0.00 0.00 Total 10% 0 0 48.30 48.30 0.00 0.00 C Watershed Development Works (NRM) 0 48.30 0.00 0.00 Arable Land Conservation Measures 56% 270.48 0 270.48 0.00 0.00 (1) Vegetative Earthen Bund Hac. 1199 8250 106.34 98.92 0.00 7.42 (2) Earthen Bund with Pitching No. 34 61000 22.30 20.74 0.00 1.56 Gully Control Structure(Loose Stone Check (3) Dam) No. 0 0 0.00 0 0.00 0.00 (4) Water Harvesting Tanka No. 90 80000 85.40 72 8.00 5.40 (5) Wasteweir No. 23 46000 11.37 10.58 0.00 0.79 Total 0 0 225.41 202.2375 8.00 15.17 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 20000 114 24.51 22.8 0.00 1.71 (2) Contour Furrow in Pasture Land Hac. 50 8300 4.46 4.15 0.00 0.31 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0.00 (4) Plantation in pastureland No. 16000 46.00 7.36 7.36 0.00 0.00 (5) Over seeding in Non Arable land Hac 50 800 0.40 0.40 0.00 0.00 (6) Earthen Bund with Pitching No. 25 61000 16.39 15.25 0.00 1.14 Total 0 0 53.13 49.96 0.00 3.17 III Drainage Line Treatment 0 0 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 25 61000 16.39 15.25 0.00 1.14 (2) Bank Stabilization No. 5 61000 3.28 3.05 0.00 0.23 Total 0 0 19.67 18.3 0.00 1.37 Total Watershed Development Works 0 0 298.20 270.50 8.00 19.71

D Production System 10% 0 48.30 0.00 0.00 0.00 I Arable Land Production System 0 0 0.00 0.00 0.00 (1) Crop Demonstration /Fodder Demonstration No. 400 1122 5.39 4.49 0.00 0.90 (2) Agro Forestry No. 7500 18 1.62 1.35 0.00 0.27 (3) Dry land Horticulture No. 40 6450 3.10 2.58 0.00 0.52 (4) Homestead Kitchen Garden No. 400 500 2.40 2.0 0.00 0.40 Organic Farming 0 0 0.00 0 0.00 0.00 (5) i Compost Pit No. 400 1650 7.92 6.6 0.00 1.32 ii Vermi Compost Unit No. 216 2250 5.83 4.86 0.00 0.97 (7) Water Tank. No. 23 50000 23.00 11.50 11.50 0.00 (8) HDPE/ PVC Pipe No. 9 15000 2.70 1.35 1.35 0.00 (9) Nepesek Spraier by hand mounted No. 78 650 1.01 0.51 0.51 0.00 (10) Nepesek Spraier by foot mounted No. 75 850 1.28 0.64 0.64 0.00 (11) Hand rotetary duster No. 75 775 1.16 0.58 0.58 0.00 (12) Seed cum fertilizer drill No. 16 15000 4.80 2.40 2.40 0.00 (13) Isopam (Threser) No. 4 40000 3.20 1.60 1.60 0.00 Total - 0 0 63.41 40.45 18.58 4.38 III Live Stock Management 0 0 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 6 10000 0.72 0.60 0.00 0.12 (2) Mangers Distribution No. 250 500 1.50 1.25 0.00 0.25 (3) Animal Health Camps No. 60 10000 7.20 6.00 0.00 1.20 Total 0 0 9.42 7.85 0.00 1.57 Total Production System 0 0 72.83 48.30 18.58 5.95 Household Production System& Micro Enterprises-Goat and Sheep E. Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 215 20210 52.14 43.45 0.00 8.69 F Consolidation 3% 0 0 14.49 14.49 0.00 0.00 Grand Total 0 0 543.92 483.00 26.58 34.34 CHAPTER IV ACTIVITY WISE TOTAL ABSTRACT OF COST OF GP PAMMANA

STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 3919 HAC. NAME OF WATERSHED: JALORE XI(IWMP) (II) NON ARABLE LAND: 214Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 4133 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 689.89 Lacs

S.No Activity Unit Quantit Unit Total Cost Cost from Convergence Beneficiary y Cost Project Fund Fund contribution

1 2 3 4 5 6 7 8 9 A I Administration cost 10% 0 0 62.00 62.00 0.00 0.00 II Monitoring 1% 0 0 6.20 6.20 0.00 0.00 III Evaluation 1% 0 0 6.20 6.20 0.00 0.00 Total 12% 0 0 74.39 74.39 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 24.80 24.80 0.00 0.00 II Institution And Capacity Building 5% 0 0 31.00 31.00 0.00 0.00

III Preparation of Detailed Project Report (DPR) 1% 0 0 6.20 6.20 0.00 0.00 Total 10% 0 0 62.00 62.00 0.00 0.00 C Watershed Development Works (NRM) 0 62.00 0.00 0.00 Arable Land Conservation Measures 56% 347.17 0 347.17 0.00 0.00 (1) Vegetative Earthen Bund Hac. 1676 8250 148.64 138.27 0.00 10.37 (2) Earthen Bund with Pitching No. 34 61000 22.30 20.74 0.00 1.56 Gully Control Structure(Loose Stone Check (3) Dam) No. 0 0 0.00 0 0.00 0.00 (4) Water Harvesting Tanka No. 90 80000 85.40 72 8.00 5.40 (5) Wasteweir No. 22 46000 10.88 10.12 0.00 0.76 Total 0 0 267.21 241.13 8.00 18.08 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 40000 114 49.02 45.6 0.00 3.42 (2) Contour Furrow in Pasture Land Hac. 100 8300 8.92 8.3 0.00 0.62 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0.00 (4) Plantation in pastureland No. 20000 46.00 9.20 9.20 0.00 0.00 (5) Over seeding in Non Arable land Hac 100 800 0.80 0.80 0.00 0.00 (6) Earthen Bund with Pitching No. 25 61000 16.39 15.25 0.00 1.14 Total 0 0 84.34 79.15 0.00 5.19 III Drainage Line Treatment 0 0 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 28 61000 18.36 17.08 0.00 1.28 (2) Bank Stabilization No. 16 61000 10.49 9.76 0.00 0.73 Total 0 0 28.85 26.84 0.00 2.01 Total Watershed Development Works 0 0 380.40 347.12 8.00 25.28

D Production System 10% 0 62.00 0.00 0.00 0.00 I Arable Land Production System 0 0 0.00 0.00 0.00 (1) Crop Demonstration /Fodder Demonstration No. 1400 1122 18.85 15.71 0.00 3.14 (2) Agro Forestry No. 11000 18 2.38 1.98 0.00 0.40 (3) Dry land Horticulture No. 40 6450 3.10 2.58 0.00 0.52 (4) Homestead Kitchen Garden No. 602 500 3.61 3.0 0.00 0.60 Organic Farming 0 0 0.00 0 0.00 0.00 (5) i Compost Pit No. 610 1650 12.08 10.065 0.00 2.01 ii Vermi Compost Unit No. 200 2250 5.40 4.5 0.00 0.90 (7) Water Tank. No. 11 50000 11.00 5.50 5.50 0.00 (8) HDPE/ PVC Pipe No. 34 15000 10.20 5.10 5.10 0.00 (9) Nepesek Spraier by hand mounted No. 83 650 1.08 0.54 0.54 0.00 (10) Nepesek Spraier by foot mounted No. 75 850 1.28 0.64 0.64 0.00 (11) Hand rotetary duster No. 75 775 1.16 0.58 0.58 0.00 (12) Seed cum fertilizer drill No. 16 15000 4.80 2.40 2.40 0.00 (13) Isopam (Threser) No. 4 40000 3.20 1.60 1.60 0.00 Total - 0 0 78.13 54.20 16.36 7.57 III Live Stock Management 0 0 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 6 10000 0.72 0.60 0.00 0.12 (2) Mangers Distribution No. 250 500 1.50 1.25 0.00 0.25 (3) Animal Health Camps No. 60 10000 7.20 6.00 0.00 1.20 Total 0 0 9.42 7.85 0.00 1.57 Total Production System 0 0 87.55 62.05 16.36 9.14 Household Production System& Micro Enterprises-Goat and Sheep D Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 253 22050 66.94 55.79 0.00 11.16 E. Consolidation 3% 0 0 18.60 18.60 0.00 0.00 Grand Total 0 0 689.89 619.95 24.36 45.58 CHAPTER IV ACTIVITY WISE TOTAL ABSTRACT OF COST

STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI(IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 1233.81Lacs S.No Activity Unit Quantity Unit Cost Total Cost Cost from Project Convergence Beneficiary Fund Fund contribution

1 2 3 4 5 6 7 8 9 A I Administration cost 10% 0 0 110.30 110.30 0.00 0.00 II Monitoring 1% 0 0 11.03 11.03 0.00 0.00 III Evaluation 1% 0 0 11.03 11.03 0.00 0.00 Total 12% 0 0 132.35 132.35 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 44.12 44.12 0.00 0.00 II Institution And Capacity Building 5% 0 0 55.15 55.15 0.00 0.00

III Preparation of Detailed Project Report (DPR) 1% 0 0 11.03 11.03 0.00 0.00 Total 10% 0 0 110.30 110.30 0.00 0.00 C Watershed Development Works (NRM) 0 0 0.00 110.30 0.00 0.00 Arable Land Conservation Measures 56% 618 0 0.00 617.65 0.00 0.00 (1) Vegetative Earthen Bund Hac. 2875 8250 254.98 237.19 0.00 17.79 (2) Earthen Bund with Pitching No. 68 61000 44.59 41.48 0.00 3.11 Gully Control Structure(Loose Stone Check (3) Dam) No. 0 0 0.00 0.00 0.00 0.00 (4) Water Harvesting Tanka No. 180 80000 170.80 144.00 16.00 10.80 (5) Wasteweir No. 45 46000 22.25 20.70 0.00 1.55 Total 0 0 492.62 443.37 16.00 33.25 II Non Arable Land Conservation Measures 0 0 0.00 0.00 0.00 0.00 (1) Ditch Cum Bund Fencing Mt. 60000 114 73.53 68.40 0.00 5.13 (2) Contour Furrow in Pasture Land Hac. 150 8300 13.38 12.45 0.00 0.93 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0.00 0.00 0.00 (4) Plantation in pastureland No. 36000 46.00 16.56 16.56 0.00 0.00 (5) Over seeding in Non Arable land Hac 150 800 1.20 1.20 0.00 0.00 (6) Earthen Bund with Pitching No. 50 61000 32.79 30.50 0.00 2.29 Total 0 0 137.46 129.11 0.00 8.35 III Drainage Line Treatment 0 0 0.00 0.00 0.00 0.00 (1) Earthen Bund with Pitching No. 53 61000 34.75 32.33 0.00 2.42 (2) Bank Stabilization No. 21 61000 13.77 12.81 0.00 0.96 Total 0 0 48.53 45.14 0.00 3.39 Total Watershed Development Works 0 0 678.61 617.62 16.00 44.99

D Production System a 10% 0 110.30 0.00 0.00 0.00 0.00 I Arable Land Production System 0 0 0.00 0.00 0.00 0.00 (1) Crop Demonstration /Fodder Demonstration No. 1800 1122 24.24 20.20 0.00 4.04 (2) Agro Forestry No. 18500 18 4.00 3.33 0.00 0.67 (3) Dry land Horticulture No. 80 6450 6.19 5.16 0.00 1.03 (4) Homestead Kitchen Garden No. 1002 500 6.01 5.01 0.00 1.00 Organic Farming 0 0 0.00 0.00 0.00 0.00 (5) i Compost Pit No. 1010 1650 20.00 16.67 0.00 3.33 ii Vermi Compost Unit No. 416 2250 11.23 9.36 0.00 1.87 (7) Water Tank. No. 34 50000 34.00 17.00 17.00 0.00 (8) HDPE/ PVC Pipe No. 43 15000 12.90 6.45 6.45 0.00 (9) Nepesek Spraier by hand mounted No. 161 650 2.09 1.05 1.05 0.00 (10) Nepesek Spraier by foot mounted No. 150 850 2.55 1.28 1.28 0.00 (11) Hand rotetary duster No. 150 775 2.33 1.16 1.16 0.00 (12) Seed cum fertilizer drill No. 32 15000 9.60 4.80 4.80 0.00 (13) Isopam (Threser) No. 8 40000 6.40 3.20 3.20 0.00 Total - 0 0 141.54 94.66 34.93 11.95 III Live Stock Management 0 0 0.00 0.00 0.00 0.00 (1) Distribution of Buffalo bulls No. 12 10000 1.44 1.20 0.00 0.24 (2) Mangers Distribution No. 500 500 3.00 2.50 0.00 0.50 (3) Animal Health Camps No. 120 10000 14.40 12.00 0.00 2.40 Total 0 0 18.84 15.70 0.00 3.14 Total Production System 0 0 160.38 110.36 34.93 15.09 Household Production System& Micro Enterprises-Goat and Sheep D Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. No. 468 13000 119.09 99.24 0.00 19.85 E. Consolidation 3% 0 0 33.09 33.09 0.00 0.00 Grand Total 0 0 1233.81 1102.95 50.93 79.92 CHAPTER V ANNUAL ACTION PLAN THROUGH PROJECT FUND

STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA:7939 Hac. EFFECTIVE AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI (IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 1102.95 Lacs S.No Activity Unit Quantity Unit Total 1st year 2nd year 3rd year 4th year 5th year Cost Cost Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A I Administration cost 10% 0 0 110.30 0.00 19.85 29.78 22.059 16.544 22.059 II Monitoring 1% 0 0 11.03 0.00 1.99 2.98 2.2059 1.6544 2.2059 III Evaluation 1% 0 0 11.03 0.00 1.99 2.98 2.2059 1.6544 2.2059 Total 12% 0 0 132.35 0.00 23.82 0.00 35.74 0.00 26.47 0.00 19.85 0.00 26.47 B I Preparatory Phase (Entry Point Activity) 4% 0 0 44.12 44.12 0.00 0 0 0 II Institution And Capacity Building 5% 0 0 55.15 0.00 9.93 14.89 11.03 13.787 5.51 Preparation of Detailed Project Report 11.03 III (DPR) 1% 0 0 0.00 11.03 0.00 0 0 0 Total 10% 0 0 110.30 0.00 65.07 0.00 14.89 0.00 11.03 0.00 13.79 0.00 5.51 C Watershed Development Works (NRM) Arable Land Conservation Measures 56% 618 0 617.65 (1) Vegetative Contour Bund Hac. 2875 8250 237.19 0 0.00 1150 95 719 59.297 1006 83.02 0 0.00 (2) Earthen Bund with Pitching No. 68 61000 41.48 12 7.47 17 10 27 16.592 12 7.05 0 0.00 Gully Control Structure(Loose Stone Check (3) 0.00 Dam) No. 0 0 0 0.00 0 0 0 0 0 0.00 0 0.00 (4) Water Harvesting Tanka No. 180 80000 144.00 32 25.92 45 36 72 57.6 31 24.48 0 0.00 (5) Wasteweir No. 45 46000 20.70 8 3.73 11 5 18 8.28 8 3.52 0 0.00 Total 0 0 443.37 37.11 146.42 141.77 118.07 0.00 II Non Arable Land Conservation Measures

(1) Ditch Cum Bund Fencing Mt. 60000 114 68.40 10800 12.31 16200 18.47 24000 27.36 9000 10.26 0 0 (2) Contour Furrow in Pasture Land Hac. 150 8300 12.45 27 2.24 41 3.36 60 4.98 23 1.87 0 0 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (4) Plantation in pastureland No. 36000 46 16.56 6480 2.98 9720 4.47 14400 6.624 5400 2.48 0 0 (5) Over seeding in Non Arable land Hac 150 800 1.20 27 0.22 41 0.32 60 0.48 23 0.18 0 0 (6) Earthen Bund with Pitching No. 50 61000 30.50 9 5.49 14 8.24 20 12.2 8 4.58 0 0 Total 129.11 23.24 34.86 51.64 19.37 0.00 III Drainage Line Treatment (1) Earthen Bund with Pitching No. 53 61000 32.33 0 0.00 14 8.73 21 12.93 17 10.67 0.00 0.00 (2) Bank Stabilization No. 21 61000 12.81 0 0.00 6 3.46 8 5.124 7 4.2273 0 0.00 Total 45.14 0.00 12.19 18.06 14.90 0.00 Total Watershed Development Works 617.62 60.35 193.47 211.47 152.33 0.00 Production System and Micro D Enterprises 10% 48 I Arable Land Production System (1) 20.20 Crop Demonstration /Fodder Demonstration No. 1800 1122 0 0.00 486 5.45 450 2.02 864 12.73 0 0 (2) Agro Forestry No. 18500 18 3.33 0 0.00 4995 0.90 4625 0.33 8880 2.10 0 0 (3) Dry land Horticulture No. 80 6450 5.16 0 0.00 22 1.39 20 0.52 38 3.25 0 0 (4) Homestead Kitchen Garden No. 1002 500 5.01 0 0.00 271 1.35 251 0.50 481 3.16 0 0.00 Organic Farming 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (5) i Compost Pit No. 1010 1650 16.67 0 0.00 273 4.50 253 1.67 485 10.50 0 0.00 ii Vermi Compost Unit No. 416 2250 9.36 0 0.00 112 2.53 104 0.94 200 5.90 0 0 (7) Water Tank. No. 34 50000 17.00 0 0.00 9 4.59 9 1.70 16 10.71 0 0 (8) HDPE/ PVC Pipe No. 43 15000 6.45 0 0.00 12 1.74 11 0.65 21 4.06 0 0 (9) Nepesek Spraier by hand mounted No. 161 650 1.05 0 0.00 43 0.28 40 0.10 77 0.66 0 0 (10) Nepesek Spraier by foot mounted No. 150 850 1.28 0 0.00 41 0.34 38 0.13 72 0.80 0 0 (11) Hand rotetary duster No. 150 775 1.16 0 0.00 41 0.31 38 0.12 72 0.73 0 0 (12) Seed cum fertilizer drill No. 32 15000 4.80 0 0.00 9 1.30 8 0.48 15 3.02 0 0 (13) Isopam (Threser) No. 8 40000 3.20 0 0.00 2 0.86 2 0.32 4 2.02 0 0 Total - 94.66 0.00 25.56 9.47 59.64 0.00 III Live Stock Management 0 0 0.00 0 0.00 (1) Distribution of Buffalo bulls No. 12 10000 1.20 0 0.00 2 0.20 2 0.20 6 0.60 2 0.2 (2) Mangers Distribution No. 500 500 2.50 0 0.00 200 1.00 200 1.00 100 0.50 0 0 (3) Animal Health Camps No. 120 10000 12.00 0 0.00 12 1.20 50 5.00 48 4.80 10 1.00 Total 0 0 15.70 0 0.00 2.40 6.20 5.90 1.20 Total Production System 0 0 110.36 0 0.00 27.96 15.67 65.54 1.20 Household Production System& Micro Enterprises-Goat and Sheep E. Rearing,Service sector Carpentry Tailoring, Blacksmith, Repair shop for Cycle. 9% 468 99.24 84 17.86 14.04 2.98 55 0 52 14.30 50 64.10 F Consolidation 3% 0 33.09 5.96 3.00 12.00 1.00 11.13 Grand Total 0 1102.95 173.07 278.03 276.64 266.80 108.42 CHAPTER V ANNUAL ACTION PLAN THROUGH CONVERGENCE

STATE: RAJASTH AN UNIT COST: RS. 15000/- Hac. DISTRICT: JALORE GEOGRAPHICAL AREA:7939 Hac. EFFECTIVE AREA: NAME OF THE BLOCK: SANCHORE (I) ARABLE LAND: 6977 HAC. NAME OF WATERSHED: JALORE XI (IWMP) (II) NON ARABLE LAND: 376 Hac. CATEGORY OF WATERSHED: DESERT AREA TOTAL : 7353 Hac IRRIGATION PERCENTAGE: 36% TOTAL COST: 50.93 Lacs

S.No Activity Unit Quantity Unit Total 1st year 2nd year 3rd year 4th year 5th year Cost Cost Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 A I Administration cost 10% 0 0 0.00 0.00 0.00 0.00 0 0 0 II Monitoring 1% 0 0 0.00 0.00 0.00 0.00 0 0 0 III Evaluation 1% 0 0 0.00 0.00 0.00 0.00 0 0 0 Total 12% 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 B I Preparatory Phase (Entry Point Activity) 4% 0 0 0.00 0.00 0.00 0 0 0 II Institution And Capacity Building 5% 0 0 0.00 0.00 0.00 0.00 0 0 0.00 Preparation of Detailed Project Report 0.00 III (DPR) 1% 00 0.00 11.03 0.000 0 0 Total 10% 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 C Watershed Development Works (NRM) 0 0 0.00 Arable Land Conservation Measures 56% 0 0 0.00 (1) Vegetative Contour Bund Hac. 0 0 0.00 0 0.00 0 0 0 0 0 0.00 0 0.00 (2) Earthen Bund with Pitching No. 0 0 0.00 0 0.00 0 0 0 0 0 0.00 0 0.00 Gully Control Structure(Loose Stone Check (3) 0.00 Dam) No. 0 0 0 0.00 0 0 0 0 0 0.00 0 0.00 (4) Water Harvesting Tanka No. 20 80000 16.00 4 3.20 5 4 8 6.4 3 2.40 0 0.00 (5) Wasteweir No. 0 0 0.00 0 0.00 0 0 0 0 0 0.00 0 0.00 Total 0 0 16.00 3.20 4.00 6.40 2.40 0.00 II Non Arable Land Conservation Measures 0.00 (1) Ditch Cum Bund Fencing Mt. 0 114 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (2) Contour Furrow in Pasture Land Hac. 0 8300 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (3) Contour Furrow in Non Arable Land Hac. 0 8300 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (4) Plantation in pastureland No. 0 46 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (5) Over seeding in Non Arable land Hac 0 800 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 (6) Earthen Bund with Pitching No. 0 61000 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0 Total 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 III Drainage Line Treatment 0 0.00 0.00 0.00 0 0 (1) Earthen Bund with Pitching No. 0 61000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 (2) Bank Stabilization No. 0 61000 0.00 0 0.00 0 0.00 0 0 0 0 0 0.00 Total 0.00 0.00 0.00 0.00 0.00 0.00 Total Watershed Development Works 16.00 3.20 4.00 6.40 2.40 0.00 Production System and Micro 0.00 D Enterprises 10% 48 I Arable Land Production System 0.00 (1) 0.00 Crop Demonstration /Fodder Demonstration No. 0 1122 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (2) Agro Forestry No. 0 18 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (3) Dry land Horticulture No. 0 6450 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (4) Homestead Kitchen Garden No. 0 500 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Organic Farming 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (5) i Compost Pit No. 0 1650 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 ii Vermi Compost Unit No. 0 2250 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0 (7) Water Tank. No. 34 50000 17.00 0 0.00 9 4.59 9 1.70 16 10.71 0 0 (8) HDPE/ PVC Pipe No. 43 15000 6.45 0 0.00 12 1.74 11 0.65 21 4.06 0 0 (9) Nepesek Spraier by hand mounted No. 161 650 1.05 0 0.00 43 0.28 40 0.10 77 0.66 0 0 (10) Nepesek Spraier by foot mounted No. 150 850 1.28 0 0.00 41 0.34 38 0.13 72 0.80 0 0 (11) Hand rotetary duster No. 150 775 1.16 0 0.00 41 0.31 38 0.12 72 0.73 0 0 (12) Seed cum fertilizer drill No. 32 15000 4.80 0 0.00 9 1.30 8 0.48 15 3.02 0 0 (13) Isopam (Threser) No. 8 40000 3.20 0 0.00 2 0.86 2 0.32 4 2.02 0 0 Total - 34.93 0.00 9.43 3.49 22.01 0.00 III Live Stock Management 0 0 0.00 0 0.00 (1) Distribution of Buffalo bulls No. 0 10000 0.00 0 0.00 2 0.00 2 0.00 6 0.00 2 0 (2) Mangers Distribution No. 0 500 0.00 0 0.00 200 0.00 200 0.00 100 0.00 0 0 (3) Animal Health Camps No. 0 10000 0.00 0 0.00 12 0.00 50 0.00 48 0.00 10 0.00 Total 0 0 0.00 0 0.00 0.00 0.00 0.00 0.00 Total Production System 0 0 34.93 0 0.00 9.43 3.49 22.01 0.00 Household Production System& Micro Enterprises-Goat and Sheep E. Rearing,Service sector Carpentry 9% 0 0.00 0 0.00 0 0.00 0 0 0 0.00 0 0.00 Tailoring, Blacksmith, Repair shop for Cycle. F Consolidation 3% 0 0.00 0.00 0.00 0.00 0.00 0.00 Grand Total 0 50.93 3.20 13.43 9.89 24.41 0.00 CHAPTER – VI EXPECTED OUT COMES

1 2 3 4 5 6

Unit of Pre-project Expected Post- S. No. Item Remarks measurement Status project Status

1 Status of water table (Depth to Meters 110-115 109-114 Ground water level)

2 Ground water structures repaired/ No. - - rejuvenated

3 Quality of drinking water Description salty Clean water

4 Availability of drinking water Description 6 month 10 month

5 Change in irrigated Area Ha - -

6 Change in cropping/ land use Description - - pattern

7 Area under agricultural crop Ha -

I Area under single crop Ha 3342 4000

Ii Area under double crop Ha 2212 2458

Iii Area under multiple crop Ha - -

8 Change in cultivated Area Ha 5731 5950

9 yield of Yield of Bajra q/ha 8 10 major crops Yield of Wheat q/ha 22 24 of area Yield of Gram q/ha - -

Yield of Mustard q/ha 12.5 14

10 production Production of Bajra ton 1840 2000 of major crops of area Production of Wheat ton 110 125 Production of Gram ton - -

Production of Mustard ton 500 600

11 Area under vegetation Ha 59 90

12 Area under horticulture Ha - 12

13 Area under fuel Ha 25 40

14 Area under Fodder Ha 90 130

15 Fodder production Q 10960 18393.45

16 Milk production Litres/day 1630 2200

17 SHGs Active No. - 30

18 No. of livelihoods No. - 40000

19 Income Rs.in la 0.16 0.20

20 Migration No. 950 200

21 SHG Federations formed No. - 1 Critical Assumption

No severe droughts/ unexpected floods/ natural disasters

Adequate funds are allocated for the same and released on time.

There is no significant pest/ disease attack, and if so, then it will have been contained before irreversible damage is done.

Adverse market conditions do not persist long.

Sound macro-economic and growth conditions continue and the benefits are widely distributed particularly in the rural areas.

Facilitating agencies and resource providers have the required competent staff so that timely and appropriate technical advice and services are provided to farmers whenever required.

The Capacity Building Plan is implemented, monitored and modified to address evolving needs and feedback from participants.

The execution of the Women’s Empowerment Pedagogy is regularly monitored by the District and State level Implementing Agencies

Means of Verification of indicators

Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning, mid-term and end of the project period

Annual participatory assessment by communities during project period.

Regular project monitoring reports prepared by project monitoring teams/ agencies.

Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual beneficiaries/project-related village and local bodies/PRIs.

External review missions

Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation, Animal Husbandry

MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& d`f’k Hkwfe ij vnZu caM 1 yEckbZ izfr gSDV;j 50 eh0 {kS=Qy% 01 gSDVs;j

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 100.00 ehVj 0.47 0.47 47.00 47.00 2

feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

92.50 ?k-eh- 84.80 84.80 7844.00 7844.00 3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 100.00 ehVj 0.60 0.60 60.00 60.00 4 /kkeu ?kkl cht 1.00 fd-xzk - 50.00 50.00 ;ksx 7951.00 8001.00 tksMk 3% dUVkstsUlh 240.03 ;ksx 8241.03 ykxr Je Hkkx 7951.00 ykxr lkexzh Hkkx 290.03 dqy ;ksx 8241.03 Say 8250.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& d`f’k Hkwfe ij vnZu caM 1 yEckbZ izfr gSDV;j 50 eh0 {kS=Qy% 01 gSDVs;j Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 2x 50 = 100 ehVj 2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 2 x 50 = 100 eh- 4 100 ehVj @1-00 fd-xzk-@100eh0 /kkeu ?kkl cht = 1.00 fd-xzk- Say 1.00 fd-xzk- CROSS – SECTION OF VEGETATIVE BUND IN ARABLE LAND

Top Width Based on Seepage line check Slope of Seepage Line 3:1

0.6 1.5:1 1:1 US DS

0.6

1 1.5 0.45 m 0.1 1.8 1.2 3.1 4.11 m

CS = × CS = 1.85 Sq.M.

Average Cross Section 1.85 Sq.m

Length 1.00 m.

Quantity 1.85 Cu.m.

DESIGN OF VEGETATIVE BUND IN ARABLE LAND

V.I. = 0.305 *XS+Y) 0.305 (0.8 x 2 + 1.0) V.I. = 0.549 V.I Vertical Interval X = Rain Fall Factor 0.8 Y = Factor due to soil infiltration & Crop cover 1 S = Percent slope 1 ×/ He = / He = 0.6199 He = Depth of impounding Re = 24 Hour rainfall excess in Cms. for 10 year recurrence interval 35 V.I = Vertical interval 0.549 Total Height of Bund = 0.6 + 0.4 1.00 m Top width of Bund = 0.6 m Bottom Width of Bound = 3.1 m Cross selection Bund = × ℎ .. X Section = 1.00 X Section = 1.85 Sq.m.

MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&vukj Qynkj ikS/kksa dh ;wfuV {kS=Qy% 0-20 gSDVs;j¼80 ikS/ks@;wfuV½ Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh]

17.28 ?k-eh- 82.00 82.00 1416.96 1416.96 2 xkscj dh [kkn 800 fd-xzk- - 2.50 - 2000.00 3 lqqijQkLQsV 20 fd-xzk- - 3.50 70.00 4 iksVk'k - fd-xzk- - 4.00 - - 5 ;wfj;k 20 fd-xzk- - 5.00 - 100.00 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ ¼,UMkslYQku 4% pw.kZ½ 8 fd-xzk- - 12.00 96.00 7 ikS/ks jksi.k djuk 80 la[;k 3.00 3.00 240.00 240.00 8 ikS/kksa dh dher 80 la[;k - 15.00 - 1200.00 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj - 360.00 - 90.00 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 160 la[;k 0.21 0.21 33.60 33.60 ;ksx 1690.56 5246.56 tksMk 3% dUVkstsUlh 157.40 ;ksx 5403.96 ykxr Je Hkkx 1690.56 ykxr lkexzh Hkkx 3713.40 dqy ;ksx 5403.96 Say 5400.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&vukj Qynkj ikS/kksa dh ;wfuV {kS=Qy% 0-20 gSDVs;j¼80 ikS/ks@;wfuV½ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 80x0.60x0.60x0.60= 17.28 ?k-eh 2 xkscj dh [kkn 80 xMMs~ @ 10 fd-xzk-@xM~Mk =800 fd-xzk- 3 lqqijQkLQsV 80 xMMs~ @ 0.25 fd-xzk-@xM~Mk =20.00 fd-xzk- 4 iksVk'k - 5 ;wfj;k 80 xMMs~ @ 0.25 fd-xzk-@xM~Mk =20.00 fd-xzk- 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ ¼,UMkslYQku 4% pw.kZ½ 80 xMMs~ @ 0.10 fd-xzk-@xM~Mk =8.00 fd-xzk- 7 ikS/ks jksi.k djuk 80 8 ikS/kksa dh dher 80 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj-@;wfuV 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 160 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&d`f"k Hkwfe ij okfudh ikS/kkjksi.k ikS/kksa dh la[;k % 100 Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 45x45x45 lseh- eki ds xM~Ms djuk dBksj feV~Vh A 400 xM~Ms@gSDVj 100 xM~Ms 2 ikS/ks jksi.k djuk 100 ikS/ks 3 ikS/kksa dh dher 108 ikS/ks (100+8=108) 8% HkjkbZ ,oa [kkyh djkbZ [kjkck 4 ikS/kksa dk ifjogu ikS/ks HkjkbZ ,oa [kkyh djkbZ lfgr 5 fd0eh- nwjh rd ds fy, 108 ikS/ks 5 ikS/ks jksi.k ds le; Mh,ih Mkyuk 100 ikS/ks@ 0.03 fd-xzk-@ikS/kk = 3 fd-xzk- 6 2x100 ikS/ks@ 0.05 fd-xzk-@ikS/kk = 10 fd-xzk- nhed fu;U=.k gsrq ,UMksalYQku 4% pw.kZ ¼2 o"kZ rd izfr o"kZ 1 ckj½ 7

ikS/kks esa moZjd ,oa dhV uk”kd nokbZ Mkyuk 100 ikS/ks MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&d`f"k Hkwfe ij okfudh ikS/kkjksi.k ikS/kks dh la[;k% 100

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 45x45x45 lseh- eki ds xM~Ms djuk dBksj feV~Vh 1 400 xM~Ms@gSDVj

100 la[;k 6.80 6.80 680.00 680.00

2 ikS/ks jksi.k djuk 100 la[;k 3.00 3.00 300.00 300.00 3

ikS/kksa dh dher 108 la[;k - 5.00 - 540.00 4 ikS/kksa dk ifjogu ikS/ks HkjkbZ ,oa [kkyh djkbZ la[;k lfgr 5 fd0eh- nwjh rd ds fy, @1000 108 - 908.21 98.09 5 ikS/ks jksi.k ds le; Mh,ih Mkyuk 3 fd-xzk- - 10.00 - 30.00 6

nhed fu;U=.k gsrq ,UMksalYQku 4% pw.kZ 10 fd-xzk- - 12.00 - 120.00 7 ikS/kks esa moZjd ,oa dhV uk”kd nokbZ Mkyuk 100 la[;k 0.21 0.21 21.00 21.00 ;ksx 1001.00 1789.09 tksMk 3% dUVkstsUlh 53.67 ;ksx 1842.76 ykxr Je Hkkx 1001.00 ykxr lkexzh Hkkx 841.76 dqy ;ksx 1842.76 Say 1800.00 Say 18 : @ ikS/kk MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& ukyk fLFkjhdj.k yEckbZ 100 ehVj ¼cSd LVfcykbZts'ku½

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd ¼ft-Lr-nj- vuq-2010i`-la025 dz-la- 182½ 200.00 ehVj 0.47 0.47 94.00 94.00 2

feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

410.00 ?k-eh- 84.80 84.80 34768.00 34768.00 3 cht cqokbZ cuk;s x;s fjt ij ¼ 200.00 ehVj 0.60 0.60 120.00 120.00 4 fMofyax fof/k ls okfudh chp cqokbZ dk;Z 670.00 ux@100 9.92 9.92 66.46 66.46 5 chtks dh ek=k 1- ?kke.k ?kkl cht 2.00 fd-xzk - 50.00 - 100.00 6 okfudh cht 2.00 fd-xzk - 40.00 - 80.00 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 23.00 ?k-eh- 199.00 1045.00 4577.00 24035.00 ;ksx 35048.46 59263.46

tksMk 3% dUVkstsUlh 1777.90 ;ksx 61041.37 ykxr Je Hkkx 35048.46 ykxr lkexzh Hkkx 25992.90 dqy ;ksx 61041.37 Say 61000.00 : 610 @ehVj MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& ukyk fLFkjhdj.k yEckbZ 100 ehVj ¼cSd LVfcykbZts'ku½ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 2x 100 = 200 ehVj 2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

= 410. ?k-eh-

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 2 x 100 = 200 eh- 4

fMofyax fof/k ls okfudh chp cqokbZ dk;Z = 100x100 = 666.66 say 670 15 5 chtks dh ek=k 1- ?kke.k ?kkl cht 200 ehVj @ 1 fdyks@100 ehVj =2 fdyks 6 okfudh cht 200 ehVj @ 1 fdyks@100 ehVj =2 fdyks 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 100x0.23 x1.0=23 ?k-eh- MODEL ESTIMATE

uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& pjkxkg Hkwfe ij o`{kkjksi.k dk;Z

100 ikS/ks Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy v vfxze enk dk;Z %& 1 45x45x45 lseh- eki ds xM~Ms djuk dBksj feV~Vh 400 xM~Ms@gSDVj

100 la[;k 6.80 6.80 680.00 680.00 c okuLifrd dk;Z%& 2 ikS/ks jksi.k djuk

100 la[;k 3.00 3.00 300.00 300.00 3 ikS/kksa dh dher 108 la[;k 0 5.00 0 540.00 4 ikS/kks dks miyC/k ikuh fiykuk 15 yhVj@ikS/kksa ikS/kksjksi.k ds le;

100 la[;k 1.80 1.80 180.00 180.00 5 ikS/ks jksi.k ds le; Mh,ih Mkyuk 3.00 fd-xzk- 0.00 10.00 0.00 30.00 6 ikS/kksa dk ifjogu ikS/ks HkjkbZ ,oa [kkyh djkbZ lfgr la[;k@ 5 fdeh nwjh rd ds fy, 1000 108 0.00 908.21 0.00 98.09 7 Fkkoyk cukuk de ls de 50 lseh v)Z O;kl dk lk/kkj.k tehu esa

100 la[;k 1.80 1.80 180.00 180.00 8 j[kj[kkc%& ikS/kksa dks miyC/k ikuh fiykuk 15 yhVjA ikS/kksa

800 la[;k 1.80 1.80 1440.00 1440.00 9 ikS/kksa dh fujkbZ xqMkbZ djuk 15 lseh xgjkbZ rd ,oa 45 lseh v)ZO;kl rd

400 la[;k 1.20 1.20 480.00 480.00 10 ikuh dk ifjogu 5 fdeh nwjh rd ds fy, yhVj@ 12000 1000 0 29.83 0 357.96 11 nhed fu;U=.k gsrq ,UMksalYQku 4% pw.kZ 10 fd-xzk- 0 15.00 0 150.00 12 ikS/kks esa moZjd ,oa dhV uk”kd nokbZ Mkyuk

200 la[;k 0.21 0.21 42.00 42.00 ;ksx 3302.00 4478.05 tksMk 3% dUVkstsUlh 134.34 ;ksx 4612.39 ykxr Je Hkkx 3302.00 ykxr lkexzh Hkkx 1310.39 dqy ;ksx 4612.39 Say 4600.00 46@izfr ikS/kk MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& pjkxkg Hkwfe ij o`{kkjksi.k dk;Z

100 ikS/ks Ø-la- fooj.k y-xpkS-xx- = dqy ek=k v vfxze enk dk;Z %& 100 xM~Ms 1 45x45x45 lseh- eki ds xM~Ms djuk dBksj feV~Vh 400 xM~Ms@gSDVj

c okuLifrd dk;Z%& 100 ikS/ks 2 ikS/ks jksi.k djuk

3 ikS/kksa dh dher 108 (100+8 8% ikS/kksa dk mrjkbZ HkjkbZ [kjkck) 4 ikS/kks dks miyC/k ikuh fiykuk 15 yhVj@ikS/kksa 100 ikS/kksjksi.k ds le;

5 ikS/ks jksi.k ds le; Mh,ih Mkyuk 100 ikS/ksa @0.03 fd-xzk-@ikS/kk =3.00 fd-xzk-

6 ikS/kksa dk ifjogu ikS/ks HkjkbZ ,oa [kkyh djkbZ lfgr 108 5 fdeh nwjh rd ds fy, 7 Fkkoyk cukuk de ls de 50 lseh v)Z O;kl dk 100 lk/kkj.k tehu esa

8 j[kj[kkc%& 2x4x100=800 ikS/kksa dks miyC/k ikuh fiykuk 15 yhVjA ikS/kksa (2 o"kZ rd izfr o"kZ 4 ckj ikuh fiykuk )

9 ikS/kksa dh fujkbZ xqMkbZ djuk 15 lseh xgjkbZ rd ,oa 2(2x100)=400 45 lseh v)ZO;kl rd (2 o"kZ rd izfr o"kZ 2 ckj fujkbZ xqMkbZ djuk )

10 ikuh dk ifjogu 5 fdeh nwjh rd ds fy, 8x100=800 @ 15yhVj@izfr ikS/kk 12000 yhVj ¼ 2 o"kZ rd pkj&pkj ckj ikuh fiykuk½

11 nhed fu;U=.k gsrq ,UMksalYQku 4% pw.kZ [email protected] fd-xzk-@ikS/kk =10 fd-xzk- 2 o"kZ rd

12 ikS/kks esa moZjd ,oa dhV uk”kd nokbZ Mkyuk 2x100=200 ikS/kk ¼2 ckj½ MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&pjkxkg Hkwfe ij ?kkl cht cqokbZ dk;Z

{kS=Qy% 1-00 gSDVj

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy

2 1.00 gSDV;j 55.35 431.35 55.35 431.35 1

2 cht dh jkf'k ¼/kke.k½ 8.00 fd-xzk- - 50.00 - 400.00

;ksx 55.35 831.35 tksMk 3% dUVkstsUlh 24.94 ;ksx 856.29 ykxr Je Hkkx 55.35 ykxr lkexzh Hkkx 800.94 dqy ;ksx 856.29 Say 800.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke & pjkxkg Hkwfe ij ?kkl cht cqokbZ dk;Z {kS=Qy% 1-00 gSDVj Ø-la- fooj.k y-xpkS-xx- = dqy ek=k

pjkxkg gsrq ?kkl cht cqokbZ dk;Z 6 ls 8 fd- 1 xzzk-@gsSDVj VªsDVj }kjk tqrkbZ ls 1 gSDV;j

2 cht dh jkf'k ¼/kke.k½ 8 fdyks izfr gSDV;j MODAL ESTIMATE

Name of watershed – Jalore XI (IWMP) Name of Work– Home stead kitchen graden

S.No Name of Vegitable Seed Quantity Rate Amount

1 Tomato 10 gm 130/10gm 130.00

2 Brinjal 10 gm 20/10gm 20.00

3 Lady finger 100 gm 100/500gm 20.00

4 Onion 20 gm 100/100gm 20.00

5 Radish 10 gm 20/10gm 20.00

6 Chilli 10 gm 80/10gm 80.00

7 Caaliflower 10 gm 210/10gm 210.00 Total 500.00

Rs. 500 Per No. MODAL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke & oehZ dEiksLV ;wfuV

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk 1 [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 0.49 ?k-eh 82.00 82.00 40.18 40.18 2 izFke Js.kh dh bZVksa dh 112fe0eh0 rFkk 75 fe0eh0 eksVkbZ esa uhoa rFkk vf/kjpuk esa lhesUV&ctjh elkyk 1%4 esa fpukbZ dk dk;Z djuk e; rjkbZ ds A 3.30 oxZ eh- 77.40 402.00 255.42 1326.60 3 dspqvkas dh ek=k e; dYpj lfgr 5.00 fd-xzk- - 150.00 - 750.00 4 IykfLVd “khV uhps fcNkus gsrq 2.81 oxZ eh- - 25.00 - 70.25 ;ksx 295.60 2187.03 tksMk 3% dUVkstsUlh 65.61 ;ksx 2252.64 ykxr Je Hkkx 295.60 ykxr lkexzh Hkkx 1957.04 dqy ;ksx 2252.64 Say 2250.00 2250@ ;wfuV MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke & oehZ dEiksLV ;wfuV

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd 2x1.85 x0.12 x0.075=0.033 ?k-eh- fuLrkj.k djukA 2x0.90 x0.12 x0.075=0.016 ?k-eh- l[r]fpduh] ;ksx = 0.049 ?k-eh-

2 2x1.85 x0.60=2.22 oxZ ehVj izFke Js.kh dh bZVksa dh 112fe0eh0 rFkk 75 2x0.90 x0.60=1.08 oxZ ehVj fe0eh0 eksVkbZ esa uhoa rFkk vf/kjpuk esa lhesUV&ctjh elkyk 1%4 esa fpukbZ dk dk;Z ;ksx = 3.30 oxZ ehVj djuk e; rjkbZ ds A 3 dspqvkas dh ek=k e; dYpj lfgr 5 fdyks 4 IykfLVd “khV uhps fcNkus gsrq 1x2.25 x1.25=2.81 oxZ ehVj MODAL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke & dEiksLV fiV ;wfuV

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk 1 [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] dadj] feV~Vh esaA

2x3-00x2-00x0-90=10-80 ?k-eh

10.80 ?k-eh 82.00 82.00 885.60 885.60 2 flaxy lqij QkLQsV 150.00 fd-xzk- - 3.60 - 540.00 3 ;wfj;k 30.00 fd-xzk- 5.00 - 150.00 4 dYpj iSfdaV 3.00 la[;k - 10.00 - 30.00 ;ksx 885.60 1605.60 tksMk 3% dUVkstsUlh 48.17 ;ksx 1653.77 ykxr Je Hkkx 885.60 ykxr lkexzh Hkkx 768.17 dqy ;ksx 1653.77 Say 1650.00 1650@ fiV ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Work –Fruit plant unit Name of Village : PAMMANA, MARUKEDA, JELATRA (sauki dani)

S.No. Name of Activity Quntity Unit Rate Amount 1

Ber 20 No. 6200 124000 2

Leamon 20 No. 6700 134000 3

Anaor(Pomgranate) 0 No. 5400 0

Total 258000 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Work –– Household Production & Name of Village : PAMMANA, MARUKEDA, JELATRA sau ki dani Micro Enterprises

S.No. Name of Activity Quntity Unit Rate Amount

1 Service sector :- 1. Carpenter 40 No. 4000 160000

2. Black smith 33 No. 6000 198000

3. Cycle repair 30 No. 6000 180000

4.Potter 20 No. 12000 240000

5. Mason 50 No. 2000 100000

6. Foot wear 10 No. 12000 120000 2 Small Live Stock (25+1=26 No) (i) Sheep(20+1=21No.) 15 No. 38000 570000 No. 28000 (ii) Goat(10+1=11No.) 15 420000 3 Other Micro Enterprises. 40 No. L.S. 3591000

TOTAL 253 5579000 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Work –– Crop/Folder Area: 0.40 Hac./Crop Demo., Area: 0.20 Hac./Fodd.Demostration Name of Village : PAMMANA, MARUKEDA, JELATRA S.No. Name of Activity Quntity Unit Rate Amount

A Crop Demonstration :- 1 Moong. 250 No. 975 243750

2 Guar 190 No. 775 147250

3 Moong+Bajra 822 No. 1300 1068600

4 Mustered 128 No. 750 96000

Total -- 1555600 B Fodder Demonstration 5 Lucern 10 No. 1525 15250

Grant Total - - - 1570850 Say 1571000 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Village : PAMMANA, MARUKEDA, JELATRA sau ki dani

Arable Land Production Measures

S.No. Items Area/No. Amount(Lacs)

1 Crop/ Fodder Demonstration 1400 15.71 2 Homestead Kitchen Garden 602 3.00 3 Agro Forstry Plant 11000 1.98 4 Dry Land Horticulture Plant 40 2.58 5 Compost Pit 610 10.07 6 Vermi Compost Unit 200 4.5 7 Household Production& Micro - enterprices 253 55.79 8 Live stock management - 7.85

Total 101.48 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Area: 4133Hac. Area:

Arable Land Production Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Pammana 1524.29 29.64 2 Maru keda 591.34 11.5 3 Jelatra sau ki dani 1749 34.00

Total 75.14 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Area: 4133Hac. Area:

Non Arable Land Production Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Pammana 50 5 2 Maru keda 25 2.50 3 Jelatra sau ki dani 25 2.5

Total 10 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Village : PAMMANA, MARUKEDA, JELATRA sau ki dani Area: 100 HAC

Non Arable Land Production Measures

S.No. Items Area/No. Amount(Lacs)

1

Overseeding on pasture land 100 0.8 2

Plantation on pasture land 20000 9.20

Total - 10.00 ABSTRACT OF COST

Name of Village : PAMMANA, MARUKEDA, JELATRA Area: 4133Hac. Area:

Arable Land Conservation Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Pammana 1524.29 98.26 2 Maru keda 591.34 38.12 3 Jelatra sau ki dani 1749 112,75

Total 3864.63 249.13 ABSTRACT OF COST

Name of Village : PAMMANA, MARUKEDA, JELATRA Area: 4133Hac. Area:

Non Arable Land Conservation Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Pammana 50 58.67 2 Maru keda 25 29.34 3 Jelatra sau ki dani 25 29.335 4 Total 117.34 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Work –Fruit plant unit Name of Village : Bizrolkheda, bizrol goliya,jerol, liyagra

S.No. Name of Activity Quntity Unit Rate Amount 1

Ber 20 No. 6200 124000 2

Leamon 20 No. 6700 134000 3

Anaor(Pomgranate) 0 No. 5400 0

Total 258000 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Work –– Household Production & Name of Village : Bizrolkheda, bizrol goliya,jerol, liyadra Micro Enterprises

S.No. Name of Activity Quntity Unit Rate Amount

1 Service sector :- 1. Carpenter 40 No. 4000 160000

2. Black smith 25 No. 6000 150000

3. Cycle repair 20 No. 6000 120000

4.Potter 10 No. 12000 120000

5. Mason 45 No. 2000 90000

6. Foot wear 10 No. 12000 120000 2 Small Live Stock (25+1=26 No) (i) Sheep(20+1=21No.) 15 No. 38000 570000 No. 28000 (ii) Goat(10+1=11No.) 20 560000 3 Other Micro Enterprises. 30 No. L.S. 2457000

TOTAL 215 4347000 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Work –– Crop/Folder Area: 0.40 Hac./Crop Demo., Area: 0.20 Hac./Fodd.Demostration Name of Village : Bizrolkheda, bizrol goliya,jerol, liyadra S.No. Name of Activity Quntity Unit Rate Amount

A Crop Demonstration :- 1 Moong. 145 No. 975 141375

2 Guar 25 No. 775 19375

3 Moong+Bajra 190 No. 1300 247000

4 Mustered 25 No. 750 18750

Total -- 426500 B Fodder Demonstration 5 Lucern 15 No. 1525 22875

Grant Total 400 - - 449375

Say 449000 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Name of Village : Bizrolkheda, bizrol goliya,jerol, liyadra

Arable Land Production Measures

S.No. Items Area/No. Amount(Lacs)

1 Crop/ Fodder Demonstration 400 4.49 2 Homestead Kitchen Garden 400 2.00 3 Agro Forstry Plant 7500 1.35 4 Dry Land Horticulture Plant 40 2.58 5 Compost Pit 400 6.60 6 Vermi Compost Unit 216 4.86 7 Household Production& Micro - enterprices 215 43.47 8 Live stock management - 7.85

Total 73.20 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Area: 3220Hac. Name of Village : Bizrolkheda, bizrol goliya,jerol, Area:liyadra

Arable Land Production Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Bizrolkheda 804.35 14.95 2 Bizrol goliya 623.48 11.58 3 Jerol 876.17 16.286 4 Liyadra 754 14.015

Total 3058 56.84 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Area: 3220Hac. Name of Village : Bizrolkheda, bizrol goliya,jerol, Area:liyadra

Non Arable Land Production Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Bizrol keda 30 4.65 2

Bizrol goliya - - 3 Jerol 20 3.10 4 Liyadra -

Total 50 7.76 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Area: 50 HAC Name of Village : Bizrolkheda, bizrol goliya,jerol, liyadra

Non Arable Land Production Measures

S.No. Items Area/No. Amount(Lacs)

1

Overseeding on pasture land 50 0.4 2

Plantation on pasture land 16000 7.36

Total - 7.76 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Area: 3220Hac. Name of Village : Bizrolkheda, bizrol goliya,jerol, Area:liyadra

Arable Land Conservation Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Bizrol keda 804.35 55.18 2 Bizrol goliya 623.48 42.77 3 Jerol 876.17 60.11 4 Liyadra 754 51.72

Total 3058 209.78 ABSTRACT OF COST

Name of watershed – Jalore XI(IWMP) Area: 3220Hac. Name of Village : Bizrolkheda, bizrol goliya,jerol, Area:liyadra

Non Arable Land Conservation Measures

S.No. Name of Village Area/No. Amount(Lacs)

1 Bizrol keda 142 33.15 2 Bizrol goliya - - 3 Jerol 20 4.67 4 Liyadra

Total 162 37.82 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& d`f’k Hkwfe ij vnZu c.M 2 vkSlr yEckbZ 100 ehVj

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 200.00 ehVj 0.47 0.47 94.00 94.00 2

feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

410.00 ?k-eh- 84.80 84.80 34768.00 34768.00 3 cht cqokbZ cuk;s x;s fjt ij 200.00 ehVj 0.60 0.60 120.00 120.00 4 fMofyax fof/k ls okfudh chp cqokbZ dk;Z 670.00 ux@100 9.92 9.92 66.46 66.46 5 chtks dh ek=k 1- ?kke.k ?kkl cht 2.00 fd-xzk - 50.00 - 100.00 6 okfudh cht 2.00 fd-xzk - 40.00 - 80.00 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 23.00 ?k-eh- 199.50 1045.00 4588.50 24035.00 ;ksx 35048.46 59263.46

tksMk 3% dUVkstsUlh 1777.90 ;ksx 61041.37 ykxr Je Hkkx 35048.46 ykxr lkexzh Hkkx 25992.90 dqy ;ksx 61041.37 Say 61000.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& d`f’k Hkwfe ij vnZu c.M vkSlr yEckbZ 100 ehVj Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 2x 100 = 200 ehVj 2 feV~Vh dk dk;Z cU/k esa ¼lw[kh ;k xhyh½ 15 lseh ijr esa Mkyuk]

= 410. ?k-eh-

3 /kkeu@?kkl cht cqokbZ cuk;s x;s fjt ij nks ykbZuksa esa 2 x 100 = 200 eh- 4

fMofyax fof/k ls okfudh chp cqokbZ dk;Z = 100x100 = 666.66 say 670 15 5 chtks dh ek=k 1- ?kke.k ?kkl cht 200 ehVj @ 1 fdyks@100 ehVj =2 fdyks 6 okfudh cht 200 ehVj @ 1 fdyks@100 ehVj =2 fdyks 7 15 ls 30 lseh eksVs] gFkkSMs ls rjkls gq,s ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ lfgr 100x0.23 x1.0=23 ?k-eh- MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& tylaxzg.k Vkadk

{kerk 35000 yhVj

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k djukA

i l[r] fpduh]dadj feV~Vh esa 14.96 ?k-eh- 82.00 82.00 1226.72 1226.72 ii fo?kfVr p~Íku ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 5 vkbZVe la- 2c l n½ 17.61 ?k-eh- 130.00 130.00 2289.30 2289.30 2 i feV~Vh dh 1-5 eh- ls 4-5 eh- vfrfjDr mBku ds fy, 17.61 ?k-eh- 23.50 23.50 413.84 413.84 3 lhesUV dkadzhV uhao ;k Q”kZ esa 40 fe-eh- ek dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV]4 jsr % 8 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA ¼ft-Lr-nj-vuq-2010la”kks- ist la-6 vkbZVe la- 11v½ 7.50 ?k-eh- 255.05 1835.00 1912.88 13762.50 4 lsUVfjax&”kVfjax dk vkj-lh-lh- Nr] Lysc] che]NTts fyUVy vkfn Mkyus ds fy, yxuk 4-5 ehVj ÅapkbZ rd ds fy, rFkk gVkuk vkfn fo”ks’k fooj.k ds vuqlkj ¼ft-Lr-nj-vuq-2010 la”kks- ist la-10 vkbZVe la- 45½ 32.08 o-eh- 27.25 121.00 874.18 3881.68 5 lhesUV dkdzhaV 1%1%5%3 feJ.k dh izofyr lhesaV dkdzhaV esa Mkyuk rFkk vkiwfrZ djuk] Nr dh Lyse] NTts] che] fyVy vkfn esa]nckuk] rjkbZ djuk rFkk lrg dks 1 % 3 lhesUV elkys ls lery djuk lesar ijUrq LVªh rFkk “kVfjax dh dher vyx ls ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 9 vkbZVe la- 37½

5.05 ?k-eh- 602.10 3719.00 3040.61 18780.95 6 uhao rFkk dqlhZ esa izFke Js.kh bZVks dh fpukbZ lhesUV ctjh 16 ;k 18 elkys esa e; cxy dh f>jh can djus rFkk rjkbZ lesrA lhesUV elkyk 1%6 ¼ft-Lr-nj-vuq-2010la”kks- ist la-7 vkbZVe la-16 v½ 4.88 ?k-eh- 366.00 2954.00 1786.08 14415.52 7 lhesUV IykLVj nhokj ij 1%4 vuqikr esa lhesUV ctjh feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 20 fe- eh- ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 13 vkbZVe la- 67c½ 38.67 o-eh- 42.60 104.00 1647.34 4021.68 8 iRFkj ds fljny ¼fyVy½ dh vkiwfrZ dj] fpukbZ esa mi;ksx dh xbZ elkys esa mls yxkukA ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 8 vkbZVe la- 31½ 2.10 o-eh- 162.00 1020.00 340.20 2142.00 9 vOoy ntsZ dh iRFkj dh ifÍ;ks dh Nr Mkyuk]Åij RkFkk uhps ls tksMks esa iRFkj dh phi ds lkFk 1%4 vuqikr esa lhesUV elkys ls Hkjuk ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 9 vkbZVe la- 36½ 9.41 o-eh- 243.00 796.00 2286.63 7490.36 10 50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk rFkk rjkbZ vkfn lesrA ¼ft-Lr-nj-vuq-2010 la”kks- ist la- 11 vkbZVe la- 58v½ 16.71 o-eh- 84.00 218.00 1403.64 3642.78 11 lhesaV IykLVj nhokj ij 1%6 vuqikr esa lhesaV&ctjh feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh- eh ¼ft-Lr-nj-vuq-2010la”kks-istla-13vkbZVe la- 68c½ 62.68 o-eh- 42.60 89.00 2670.17 5578.52 12 ,Y;wfefu;e dk

i l[r] fpduh]dadj feV~Vh esa /4×(3.35)2×1.50=13.21 ?k-eh-

ii fo?kfVr p~Íku 13-21 ?ku-eh-

2 i feV~Vh dh 1-5 eh- vfrfjDr mBku ds fy, 120 ehVj @1-00 fd-xzk-@100eh0 = 1.20 fd-xzk- Say 1.00 fd-xzk-

ii feV~Vh dh 3-0 eh- vfrfjDr mBku ds fy, 13-21 ?ku-eh- 4.4 ?ku-eh- ;ksx=17-61?k-eh 3 lhesUV dkadzhV uhao ;k Q”kZ esa 40 fe-eh- ek dh iRFkj Vakdk& /4×(3.35)2×0.15=1.32?k-eh- feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV]4 jsr % 8 vkxksj /4×[(8.05)2 &(3.50)2]×0.15=6.18?k-eh- feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk ;ksx=7.50 ?k-eh rjkbZ lesrA

4 lsUVfjax&”kVfjax dk vkj-lh-lh- Nr] Lysc] che]NTts ×3.05×3.35=32.08 o-eh fyUVy vkfn Mkyus ds fy, yxuk 4-5 ehVj ÅapkbZ rd ds fy, rFkk gVkuk vkfn fo”ks’k fooj.k ds vuqlkj

5 lhesUV dkdzhaV 1%1%5%3 feJ.k dh izofyr lhesaV /4×[(3.35)2 &(3.05)2]×3.35=5.05?k-eh- dkdzhaV esa Mkyuk rFkk vkiwfrZ djuk] Nr dh Lyse] NTts] che] fyVy vkfn esa]nckuk] rjkbZ djuk rFkk lrg dks 1 % 3 lhesUV elkys ls lery djuk lesar ijUrq LVªh rFkk “kVfjax dh dher vyx ls 6 uhao rFkk dqlhZ esa izFke Js.kh bZVks dh fpukbZ lhesUV /4×[(3.50)2 &(3.05)2]×0.60=1.38?k-eh- ctjh 16 ;k 18 elkys esa e; cxy dh f>jh can /4×[(8.50)2 &(8.05)2]×0.60=3.50?k-eh- djus rFkk rjkbZ lesrA ;ksx=4.88 ?k-eh lhesUV elkyk 1%6

7 lhesUV IykLVj nhokj ij 1%4 vuqikr esa lhesUV ctjh ×3.05×3.35 =32.08 o-eh- feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 20 fe- ×3.50×0.60 = 6.59 o-eh- eh- ;ksx=38.67 o-eh-

8 iRFkj ds fljny ¼fyVy½ dh vkiwfrZ dj] fpukbZ esa 2×3.50×0.30=2.10 o-eh- mi;ksx dh xbZ elkys esa mls yxkukA

9 vOoy ntsZ dh iRFkj dh ifÍ;ks dh Nr Mkyuk]Åij /4×(3.50)2=9.61 o-eh- RkFkk uhps ls tksMks esa iRFkj dh phi ds lkFk 1%4 ?kVk;k 0-45×0.45 =0.20 o-eh- vuqikr esa lhesUV elkys ls Hkjuk =9.41 o-eh-

10 50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa /4×(3.05)2=7.30 o-eh- 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- /4×(3.50)2=9.61 o-eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk ;ksx= 16.71 o-eh- rFkk rjkbZ vkfn lesrA ?kVk;k 0-45×0.45 =0.20 o-eh- =16.71 o-eh-

11 lhesaV IykLVj nhokj ij 1%6 vuqikr esa lhesaV&ctjh /4×[(8.50)2 &(3.50)2]=47.10 o-eh- feykdj tksMks dks dqjsnus rFkk rjkbZ lesrA ¼c½ 20 eh- 8.50×0.30=8.00 o-eh- eh 8.05×0.30=7.58 o-eh- ;ksx =62.68 o-eh-

12 ,Y;wfefu;e dk

MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& osLV os;j

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh nwjh rd fuLrkj.k 1- l[r] fpduh]dadj feV~Vh esa 4.52 ?k-eh- 82.00 82.00 370.64 370.64 2 lhesUV dkadzhV uhao ;k Q”kZ esa 20 fe-eh- ek dh iRFkj feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV 3 jsr % 6 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk rjkbZ lesrA

1.00 ?k-eh- 260.50 2444.00 260.50 2444.00 3 ,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh elkys esa uho esa vf/kjpuk esa 18.63 ?k-eh- 509.30 2082.00 9488.26 38787.66 4 osj)k iRFkj dk 23 ls-eh- mpkbZ esa [kMatk yxkuk rFkk feV~Vh ls Hkjuk rFkk [kaMts dk gksnk ess ls fudyh vfrfjDr feV~Vh dk 50 eh0 rd fuLrkj.k djukA lq[ks iRFkj esaA 2.19 o-eh- 154.00 325.00 337.26 711.75 5 lhesUV IykLVj nhokj ij 1%6 vuqikr esa lhesUV ctjh feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 25 fe- eh- 7.13 o-eh- 77.65 159.00 553.64 1133.67 6 50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk rFkk rjkbZ vkfn lesrA 5.08 o-eh- 91.00 230.00 462.28 1168.40 ;ksx 11472.58 44616.12 tksMk 3% dUVkstsUlh 1338.48 ;ksx 45954.60 ykxr Je Hkkx 11472.58 ykxr lkexzh Hkkx 34482.02 dqy ;ksx 45954.60 say 46000.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke& osLV os;j

Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 uhao] [kkbZ rFkk ukyk vkfn ds fy, 1-5 eh- xgjkbZ H.W. 1x7.50x2.50x2.00=37.50 ?ku fQV rd feV~Vh dh [kqnkbZ djuk] ry dks dwVuk]ikuh S.W.2x9.00x2.00x2.00=72.00 Mkyuk cxy dks laokjuk [kqnh feV~Vh dks ckgj W.W. 4x2.00x2.00x2.00=32.00 fudkyuk uhao Hkjus ds ckn [kkyh LFkkuks dks iqu% A.P.1x7.50x3.25x0.75x=18.28 feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj dh 159.78 ?ku fQV nwjh rd fuLrkj.k l[r] fpduh]dadj feV~Vh esa 4.52 ?ku ehVj

2 lhesUV dkadzhV uhao ;k Q”kZ esa 20 fe-eh- ek dh iRFkj H.W. 1x7.5x2.5x0.15=9.37 ?ku fQV feV~Vh@bZVs lhesUV jsr elkyk esa 1 lhesUV]3 jsr % 6 S.W.2x9.0x2.0x0.15=18.00 feV~Vh vuqikr esa feykdj Mkyuk rFkk dqVkbZ djuk W.W. 4x2.00x2.00x0.15=8.00 rjkbZ lesrA 35.37 ?ku fQV 1.00 ?ku ehVj

3 ,uhdV gsrq iRFkjksa dh fpukbZ 1%4 lhesUV ctjh H.W. 1x7.5x2.5x1.50=28.12 ?ku fQV elkys esa S.W.2x9.0x2.0x1.5=54.00 uho esa W.W. 4x2.00x2.00x1.5=24.00 vf/kjpuk esa H.W. 1x7.5x2.5+1.50/2x1.00=15.00 2 S.W.2x9.0x1.50x1.00=27.00 S.W. 2x9.00+3.00/2x1.50=40.50 2 W.W. 4x2.00x1.50x1.00=12.00 200.62 say 18.63 ?ku0eh-

4 osj)k iRFkj dk 23 ls-eh- mpkbZ esa [kMatk yxkuk rFkk feV~Vh ls Hkjuk rFkk [kaMts dk gksnk ess ls fudyh vfrfjDr feV~Vh dk 50 eh0 rd fuLrkj.k djukA lq[ks iRFkj esaA 1x7.50x3.15=23.62 o-fQV- Say 2.19 o-eh- 5

H.W. 1x7.50x1.00=7.50 o-fQV H.W. 1x7.50x1.50=11.25 S.W2x9.00x1.00=18.00 lhesUV IykLVj nhokj ij 1%4 vuqikr esa lhesUV ctjh S.W.2x9.00+3.00x2.15=30.00 feykdj dj tksMks dks dqjsnus rFkk rjkbZ lfgr 25 fe- 2 eh- W.W.4x3.50x1.00=14.00 80.75 ?kVk;k 2x2.5+1.5x1.00=4.00 2 =76.75 say 7.13 o-eh- 6 H.W 1x7.50x1.50=11.25 o-fQV- 50 eh-eh- eksVkbZ esa lhesUV dadzhV 1%2%4 feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh ;k bZV dh 12 eh- S.W 4x3.75x1.50=22.50 S.W.2x3.00x1.50=9.00 ukHkh; fxV~Vh ds lkFk feykdj Mkyuk]dwVuk]nckuk W.W.4x2.00x1.50=12.00 rFkk rjkbZ vkfn lesrA = 54.75 say 5.08 CROSS SECTION OF THE WESTWEAIR

3.50 7.50 3.50

2.5 HEADWALL SIDE WALL

1.5

3-50 WING WALL PLAN

3.00

2.00

1.5

1.00

2.00 3.50 3.5 2.00

2.5

MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&pjkxkg Hkwfe ij [kkbZ Qsaflax

yEckbZ 100 ehVj

Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd 200 ehVj 0.47 0.47 94.00 94.00 2 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r feV~Vh esaA [kkbZ gsrq

110 ?k-eh- 82.00 82.00 9020.00 9020.00 3 fMcfyax fof/k ls okfudh cht cqokbZ dk;Z 2000 ux@100 9.92 9.92 198.40 198.40 4 okfudh chtksa dh jkf'k 2.00 fd-xzk - 40.00 80.00 5 15 lseh xgjh VªsUp [kksndj Fkksj yxkuk 100 ehVj 16.67 16.67 1667.00 1667.00 ;ksx 10979.40 11059.40 tksMk 3% dUVkstsUlh 331.78 ;ksx 11391.18 ykxr Je Hkkx 10979.40 ykxr lkexzh Hkkx 411.78 dqy ;ksx 11391.18 Say 11400.00

Rs.114 / meter MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&pjkxkg Hkwfe ij [kkbZ Qsaflax 100 ehVj ¼ 1 gSDV;j½ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 1 gSDV;j @ 100 eh0@gSDVs;j Mkx csfyax 2-5 ls 5 lseh- xgjkbZ rd =100 ehVj 2x100 ehVj = 200 ehVj

2 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd 200x(1.60+0.60)x1.0 fuLrkj.k djukA 2 l[r feV~Vh esaA [kkbZ gsrq = 110.00 ?k-eh

3 rhu ykbzuksa esa 15&15 lseh nwjh ij

fMcfyax fof/k ls okfudh cht cqokbZ dk;Z 3x100=300x100 15 =2000 uax 4 okfudh chtksa dh ek=k 100 eh0 @ 2 fdyks@100 eh0

=2 fd-xzk

5 15 lseh xgjh VªasUp [kksndj Fkksj yxkuk 100 ehVj CROSS SECTION OF DITCH CUM BUND FENCINGH

...... G.L

1.0

0.60

Cross Sec.= ((1.60+0.0.60) )x1.00 2 = 1.10 Sqm

MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&vd`f"k Hkwfe ij dUVwj QjksZ {kS=Qy% 1-00 gSDVj Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 , Qsze ysoy ls 8 ls 15 ehVj {kSfrt vUrjky esa leksPp js[kk ij ys vkmV dk dk;Z

1 gSDV;j @ 800eh0@gSDVs;j=800 eh0 2 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd ¼ft-Lr-nj-vuq-2010i`-la0 25 dz-la- 182½ 800 eh- 3 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukAl[r]fpduh] dadj] feV~Vh esaA uhoa gsrq

800 ehx1/2x0.60x0.30=72.00 ?ku0eh0 4 cht cqokbZ cuk;s x;s fjt ij 800 eh- 5 cht dh ek=k ¼/kke.k½ 800 eh- @ 1 fd-xzk-@100 ehVj=8 kg MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&vd`f"k Hkwfe ij dUVwj QjksZ {kS=Qy% 1-00 gSDVj Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 , Qsze ysoy ls 8 ls 15 ehVj {kSfrt vUrjky esa leksPp js[kk ij ys vkmV dk dk;Z

800 eh- 1.15 1.15 920.00 920.00 2 Mkx csfyax 2-5 ls 5 lseh xgjkbZ rd

800 eh- 0.47 0.47 376.00 376.00 3 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukAl[r]fpduh] dadj] feV~Vh esaAuhoa gsrq

72 ?k-eh- 82.00 82.00 5904.00 5904.00 4 cht cqokbZ cuk;s x;s fjt ij 800 eh- 0.60 0.60 480.00 480.00 5 cht dh ek=k ¼/kke.k½ 8 fd-xzk- - 50.00 - 400.00 ;ksx 7680.00 8080.00 tksMk 3% dUVkstsUlh 242.40 ;ksx 8322.40 ykxr Je Hkkx 7680.00 ykxr lkexzh Hkkx 642.40 dqy ;ksx 8322.40 Say 8300.00

CROSS SECTION OF CONTOUR FURROW

...... G.L

0.30

Cross Sec.= 1/2x0.60x0.30

= 0.09 sqm. MODAL ESTIMATE

Name of Watershed Jalore XI (IWMP) Name of Work : Crop/Fodder Demonstration

DetailsArea/ Seed D.A.P MOP Urea Insectisides Culture Amount/ Demo. Demo S.No. Qty.(kg.) Amt. Qty.(kg.) Amt. Qty.(kg.) Amt. Qty.(M.L) Amt. Qty.(M.L) Amt. No. of Amt. (Hec.) Packt. Kharif Session 1. Single crop 0.04 8 440.00 35.00 350.00 0 0 0 0 500 175.00 1 10.00 (i) Moong 975.00

(ii) Cluster Bean 777.00 (Guar) 0.04 8 192.00 10.00 400.00 0 0 0 0 500 175.00 1 10.00 Say 675 A 2. Intercropping 4 1295.00 Moong + + 0.04 250.00 80.00 800.00 0 0 10 50.00 500 175.00 2 20.00 1 Say 1300 Bajra

Rabi Session 750.00 B (i) Mustered 0.04 1.50 75.00 25.00 250.00 10 40.00 40 200.00 500 175.00 1 10.00

Fodder Demos. 1526.00 C (i) Lucern 0.02 3 1250.00 0.00 0.00 60 216.00 10 50.00 0.00 0.00 1 10.00 Say 1525 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&uhcwa Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20 gSDVs;j¼55 ikS/ks@;wfuV½ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh]

55x0.90x0.90x0.90= 40.09 ?k-eh 2 xkscj dh [kkn 55 xMMs~ @ 10 fd-xzk-@xM~Mk =550 fd-xzk- 3 lqqijQkLQsV 55 xMMs~ @ 0.25 fd-xzk-@xM~Mk=13.75 fd-xzk-say 14 fd-xzk- 4 iksVk'k 55 xMMs~ @ 0.05 fd-xzk-@xM~Mk=2.75 fd-xzk-say 3.00 fd-xzk- 5 ;wfj;k 55 xMMs~ @ 0.10 fd-xzk-@xM~Mk=5.50 fd-xzk-say 6.00 fd-xzk- 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ ¼,UMkslYQku 4% pw.kZ½ 55 xMMs~ @ 0.10 fd-xzk-@xM~Mk=5.50 fd-xzk-say 6.00 fd-xzk- 7 ikS/ks jksi.k djuk 55 8 ikS/kksa dh dher 55 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj-@;wfuV 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 110

10 ;wfuV MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&uhcwa Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20 gSDVs;j¼55 ikS/ks@;wfuV½ Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh]

40.09 ?k-eh- 82.00 82.00 3287.38 3287.38 2 xkscj dh [kkn 550 fd-xzk- - 2.50 - 1375.00 3 lqqijQkLQsV 14 fd-xzk- - 3.50 49.00 4 iksVk'k 3.00 fd-xzk- - 4.00 - 12.00 5 ;wfj;k 6 fd-xzk- - 5.00 - 30.00 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ ¼,UMkslYQku 4% pw.kZ½ 6 fd-xzk- - 12.00 72.00 7 ikS/ks jksi.k djuk 55 la[;k 3.00 3.00 165.00 165.00 8 ikS/kksa dh dher 55 la[;k - 25.00 - 1375.00 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj - 360.00 - 90.00 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 110 la[;k 0.21 0.21 23.10 23.10 ;ksx 3475.48 6478.48 tksMk 3% dUVkstsUlh 194.35 ;ksx 6672.83 ykxr Je Hkkx 3475.48 ykxr lkexzh Hkkx 3197.35 dqy ;ksx 6672.83 Say 6700.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&csj Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20 gSDVs;j¼55 ikS/ks@;wfuV½ Ø-la- nj jkf”k fooj.k ek=k bdkbZ Je dqy Je dqy 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh]

40.09 ?k-eh- 82.00 82.00 3287.38 3287.38 2 xkscj dh [kkn 550 fd-xzk- - 2.50 - 1375.00 3 lqqijQkLQsV 20 fd-xzk- - 3.50 70.00 4 iksVk'k 5.00 fd-xzk- - 4.00 - 20.00 5 ;wfj;k 12 fd-xzk- - 5.00 - 60.00 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ ¼,UMkslYQku 4% pw.kZ½ 6 fd-xzk- - 12.00 72.00 7 ikS/ks jksi.k djuk 55 la[;k 3.00 3.00 165.00 165.00 8 ikS/kksa dh dher 55 la[;k - 15.00 - 825.00 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj - 360.00 - 90.00 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 110 la[;k 0.21 0.21 23.10 23.10 ;ksx 3475.48 5987.48 tksMk 3% dUVkstsUlh 179.62 ;ksx 6167.10 ykxr Je Hkkx 3475.48 ykxr lkexzh Hkkx 2691.62 dqy ;ksx 6167.10 Say 6200.00 MODEL ESTIMATE uke ty xzg.k {ks=& tkyksj XI ¼I.W.M.P½ dk;Z dk uke&csj Qynkj ikS/kksa dh ;wfuV ;wfuV dk {kS=Qy% 0-20gSDVs;j¼55 ikS/ks@;wfuV½ Ø-la- fooj.k y-xpkS-xx- = dqy ek=k 1 uho] [kkbZ ijukyk esa 1-5 xgjkbZ rd feVV~h dk [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk]cxy dks laokjuk][kqnh feV~Vhdks ckgj fudkyuk] uhoa Hkjus ds ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk cph gqbZ feV~Vh dks 50 ehVj nwjh rd fuLrkj.k djukA l[r]fpduh] 55x0.90x0.90x0.90= 40.09 ?k-eh 2 xkscj dh [kkn 55 xMMs~ @ 10 fd-xzk-@xM~Mk =550 fd-xzk- 3 lqqijQkLQsV 55 xMMs~ @ 0.35 fd-xzk-@xM~Mk =19.25 fd-xzk- say 20 fd-xzk- 4 iksVk'k 55 xMMs~ @ 0.08 fd-xzk-@xM~Mk =4.4 fd-xzk- say 5.00 fd-xzk- 5 ;wfj;k 55 xMMs~ @ 0.22 fd-xzk-@xM~Mk=12.10 fd-xzk- say 12.00 fd-xzk- 6 nhed dh jksdFkke gsrq dhVuk'kd nokbZ ¼,UMkslYQku 4% pw.kZ½ 55 xMMs~ @ 0.10 fd-xzk-@xM~Mk =5.50 fd-xzk- say 6.00 fd-xzk- 7 ikS/ks jksi.k djuk 55 8 ikS/kksa dh dher 55 9 ikS/kks ij yxus okys dhMs edksMks ds fu;aU=.k gsrq eksuksdzksVksQkWl 36 b-lh 0.25 yhVj-@;wfuV 10 ikS/kksa essa moZjd ,oa nokbZ Mkyuk 110

10 ;wfuV izksMD'ku xfrfof/k vUrxZr fd;s tkus okys dk;ksZa dk QksVksxzkfQd fooj.k

gkÅl gksYM izksMD'ku xfrfof/k vUrxZr Ms;jh lapkyu dk dk;Z xzke iapk;r iek.kk

gkÅl gksYM izksMD'ku xfrfof/k vUrxZr ykSgkjh dk dk;Z xzke iapk;r iek.kk

izksMD'ku xfrfof/k vUrxZr fd;s tkus okys dk;ksZa dk QksVksxzkfQd fooj.k

gkÅl gksYM izksMD'ku xfrfof/k vUrxZr flykbZ dk dk;Z xzke iapk;r iek.kk

gkÅl gksYM izksMD'ku xfrfof/k vUrxZr lqFkkjh dk dk;Z xzke iapk;r iek.kk

izksMD'ku xfrfof/k vUrxZr fd;s tkus okys dk;ksZa dk QksVksxzkfQd fooj.k

gkÅl gksYM izksMD'ku xfrfof/k vUrxZr

eksckbZy fjis;j dk dk;Z xzke iapk;r fctjksy

gkÅl gksYM izksMD'ku xfrfof/k vUrxZr iapj fjis;j dk dk;Z xzke iapk;r fctjksy ukjk ys[ku ,oa isfUVax ds dk;Z dk QksVksxzkfQd fooj.k

ys[ku dk dk;Z xzke iapk;r fctjksy

isfUVax dk dk;Z

xzke iapk;r fctjksy 71°55'0"E 71°56'0"E 71°57'0"E 71°58'0"E 71°59'0"E Sanchor IWMP-7 (2010-11) Base Map 25°1'0"N

Legend Type Area (Ha) Village Boundary 7564.31

Settlement 164.19 #0 Tank For Irrigation 16 Nos Service 17 Nos Tourist Interest 11 Nos Other 5 Nos

Village Road 2.09 Other Road 64.58

25°0'0"N

RAJKIYA PRATHMIK VIDALAYA kj HANUMANJI KA MANDIR kj 25°0'0"N

BHILARI DAM kj

VIKARDI NADI ON BHUTEL ROAD kj

VEYAI NADI kj POWER HOUSE kj Legend Village Name Area (Ha) UP SVASTHYA KENDRA & ANGANVADI KENDRA kj Bijrol Goliya 660.99

SWAMI NARAYAN MANDIR Bijrol Khera 1337.66 kj RAJKIYA UCHH PRATHMIK VIDALAYADUDHESWAR MAHADEV MANDIR kj kj Jelatra 1943.76 Jerol 938.09 JELATRA Liyadra 800.81

Pamana 2736.65

24°59'0"N 24°59'0"N

Hanumangarh

Ganganagar

GOCHAR NADI Bikaner Churu kj Jhunjhunun TREATED_AREA Alwar Sikar

Jodhpur Nagaur Jaisalmer RAJKIYA PRATHMIK VIDALAYA Jaipur Dausa kj

Ajmer Karauli

Tonk Rajsamand

Barmer Pali Bhilwara Bundi

Chittaurgarh Rajsamand Jalor Baran Rajsamand Kota

Sirohi

Udaipur Jhalawar

Banswara

BIJROL GOLIYA 24°58'0"N BIJROL GOLIYA & DEVDA VILL. KI SARHAD kj

24°58'0"N ¨¦§97 «¬97

SARVJANIK KOOP PURANI ABADI kj

Sanchor

RAJKIYA UCHH PRATHMIK VIDALAYA kj JELATRA

SARVJANIK TANKA NEAR VISHNOIYO KI DHANI MAMAJI KA THAN /VILL. SARHAD kj kj

RAJKIYA PRATHMIK VIDALAYA NEAR BHEDA NADI BIJROL KHERA kj PAMANA BHEDA NADI ON JAILATRA ROAD kj 1 centimeter = 100 meters

NAVODAYA JAMBESHWAR NADI kj 00.25 0.5 1 MAHADEVJI KA MANDIR TREATED_AREA GOCHAR LAND NEAR ROAD kj kj KM µ KHETESHWAR MAHARAJ KA MANDIR kj KABOI NADI kj RAJKIYA PRATHMIK VIDALAYA kjkjSARVJANIK TANKA NEAR MAHADEV MANDIR SARVJANIK KOOP MAHADEVJI KA MANDIR 24°57'0"N kj RAJKIYA UCHH PRATHMIK VIDALAYAkj kj GRAM PANCHAYAT BHAVAN Watershed Development & Soil Conservation, kj RAJKIYA UCHH PRATHMIK VIDALAYAPOWER HOUSE kj kj Pant Krishi Bhawan, Jaipur 24°57'0"N TREATED_AREA SARVJANIK MELATAL NADI kj WAPCOS LIMITED 76-C, SECTOR-18,INSTITUTIONAL AREA, SANDEDI MATAJI KA MANDIR kj

BALA NALA NEAR SANDEDI MATAJI MANDIR GURGAON - 122015 (HARYANA) kj 71°55'0"E 71°56'0"E 71°57'0"E 71°58'0"E 71°59'0"E 72°0'0"E

kj

kj kj

kj kj

kj

kj

kj

kj

kj kj kj

kj

kj kj kj

kj

kj

kj kj kj kj kj kj

71°59'0"E 72°0'0"E 72°1'0"E 72°2'0"E 72°3'0"E 72°4'0"E Sanchor IWMP-7 (2010-11)

24°59'0"N Base Map 24°59'0"N

TREATED_AREA

Legend Type Area (Ha) Village Boundary 7564.31

Settlement 164.19 kj Tank For Irrigation 16 Nos JELATRA #0 Service 17 Nos kj Tourist Interest 11 Nos Other 5 Nos

Village Road 2.09 Other Road 64.58

kj

24°58'0"N JELATRA

kj 24°58'0"N

kj

kj kj

Legend Village Name Area (Ha)

Bijrol Goliya 660.99 RAJKIYA PRATHMIK VIDALAYA NEAR BHEDA NADI kj BHEDA NADI ON JAILATRA ROAD kj Bijrol Khera 1337.66

Jelatra 1943.76 kj Jerol 938.09

Liyadra 800.81 kj kj Pamana 2736.65 kj kj kjkj kj kj kj kj kj kj 24°57'0"N

kj 24°57'0"N

kj kj

PAMANA Hanumangarh

Ganganagar GUNDARIYA TALAB

kj Bikaner Churu Jhunjhunun

Alwar

Sikar

Jodhpur Nagaur Jaisalmer Jaipur Dausa

SARVJANIK PANI KA TANKA Karauli Tonk kj kjRAJKIYA MADAYAMIK VIDALAYA Rajsamand

Barmer Pali GRAM PANCHAYAT BHAVAN Bhilwara Bundi

kj Chittaurgarh Rajsamand ANGANVADI BHAVAN Jalor Baran kj Rajsamand Kota

Sirohi

Udaipur Jhalawar

Banswara kj 24°56'0"N ¨¦§97 «¬97 kj 24°56'0"N

DAM ON BHED KI NADI(KHARA ROAD kj

Sanchor

kj

1 centimeter = 100 meters

00.25 0.5 1 JEROL KM µ

Watershed Development & Soil Conservation,

24°55'0"N Pant Krishi Bhawan, Jaipur

kj kj 24°55'0"N kj WAPCOS LIMITED kj 76-C, SECTOR-18,INSTITUTIONAL AREA, GURGAON - 122015 (HARYANA) 71°59'0"E 72°0'0"E 72°1'0"E 72°2'0"E 72°3'0"E 72°4'0"E

kj kj kj

kj

kj

kj kj

kj

kj kj kj

kj

kj

kj

kj

kj

kj kj

kj kj

kj

kj kj

kj kj kjkj kj kj kj kj 71°55'0"E 71°56'0"E kj kj 71°57'0"E 71°58'0"E 71°59'0"E

TREATED_AREA 24°57'0"N Sanchor IWMP-7 (2010-11)

SARVJANIK MELATAL NADI kj Base Map

SANDEDI MATAJI KA MANDIR kj

BALA NALA NEAR SANDEDI MATAJI MANDIR kj

TREATED_AREA

kj Legend Type Area (Ha) Village Boundary 7564.31

Settlement 164.19 kj kj #0 Tank For Irrigation 16 Nos kj Service 17 Nos kj Tourist Interest 11 Nos Other 5 Nos

Village Road 2.09 BIJROL KHERA GOCHAR LAND PAMANA Other Road 64.58 kj

24°56'0"N 24°56'0"N

PAKKA DAM NEAR JHEROL SARHAD kj

DAM ON BHED KI NADI(KHARA ROAD kj

RAJKIYA PRATHMIK VIDALAYA kj

LIYADRA Legend Village Name Area (Ha)

Bijrol Goliya 660.99

Bijrol Khera 1337.66

Jelatra 1943.76

Jerol 938.09

Liyadra 800.81 Pamana 2736.65

24°55'0"N

JEROL 24°55'0"N

SARVJANIKkj TANKA RAJKIYA UCHH PRATHMIK VIDALAYAkj kj MAHADEVJI KA MANDIR GAVAI TALAB kj

JHEROL & KHARA VILL KI SARHAD kj

Hanumangarh

Ganganagar

Bikaner Churu Jhunjhunun

Alwar

Sikar

Jodhpur Nagaur Jaisalmer Jaipur Dausa

Ajmer Karauli

Tonk Rajsamand

Barmer Pali Bhilwara Bundi

Chittaurgarh Rajsamand Jalor Baran Rajsamand Kota

Sirohi

Udaipur Jhalawar

Banswara 24°54'0"N 24°54'0"N

¨¦§97 «¬97

Sanchor

1 centimeter = 100 meters

00.25 0.5 1 KM 24°53'0"N µ

24°53'0"N Watershed Development & Soil Conservation, Pant Krishi Bhawan, Jaipur

WAPCOS LIMITED 76-C, SECTOR-18,INSTITUTIONAL AREA, GURGAON - 122015 (HARYANA) 71°55'0"E 71°56'0"E 71°57'0"E 71°58'0"E 71°59'0"E 72°0'0"E 71°55'0"E 71°56'0"E 71°57'0"E 71°58'0"E 71°59'0"E Sanchor(IWMP)7/2010-11 25°1'0"N LULC Map 25°1'0"N

Legend Type Area (Ha)

Village Boundary 8417.95

Khasara Boundary 8442.70 Location Points 53 Nos

Water Body 16.82 Settlement 164.19

Land Without Scrub 175.15

Land With Scrub 777.17 9 Gullied/Ravines 1.78

14 13 8 Crop Land 909.90 12 7 Fallow Land 5423.09

10 65/300 63 Agriculture Land With Rabi Crop 1672.01 15 65 65/301 11 5 174 171 4 6 110 167 62/1435 62 9999 Agriculture Land With Kharif Crop 849.28 111 1 11/1539 64 112 60 170 Agriculture Land With Kharif + Rabi 2342.07 2 1/1433 70 68/1503 115 172 61 64/1436 116 6/1408 68 117 3 123 166 17 16 53 54 69 59 71 67 169 168 118 20 52 57 18 362 21 19 51 75 179 369 371 50/1503 178 177 423 49 165 50 22 364 372 370 361/1413 424 23/153223 56 58 118 151 55 150 368/1414 121 363 213 80 84 181 425 48 436437 73 76 151 180 361 368 212 426 81 122 182 373 438 46 164 24 162 365 25°0'0"N 367 422 439 214/1555 211 214 120119 45 163 360 366/1530 162/1506 374 85 123 215/1496 9999 79 161 410/1531 421 216 183 440 149 356/1420 366 427 435 215 209 160 356 217 102/1434 207 88 158 208 103 156 44 153 359 420 219 123/1431 357/1440 222 102 206 219/1492 220 101 159 223 225 87 375 108 126 148 154 25°0'0"N 184 358 410 205 155 157 218 226 25 100 419 42 125 176 443 124 146/1505 411 417 227 418 357 229 131 185 186 41 91 401 104 130 411/1512416 430 455 228 230 453 146 409 43 127 129 400 412 430/1444 441 456 90 147 355 442 40 200/1507 89 414 428 434 191 376 402 408 451 454 26/1501 99 132 145/1438 413 429 26 452 231 190 189 399 431 450 39 233 128 187 430/1445 398 407 377 449/1497 27 34 38 232 444 200 92 354 344 403 33 93 133 406 238 94 28 145 397 188 404 467 378 35 98 136 136/1437 343 457 405 95 351 395 96 135 393 36 200/1565 188/1439 353 1576/345 394 473 449 466 9999 37 353/1419 234 468 470 237 97 144 472 32 199 107 390 392 9999 389 448 475 1721/36 134 347 348 30 31 106 350 391 476 239 349 464 105 192 344/1441 465 471/1566 239/1412 396 448/1498 1720/32 387 388 432 463 474 143 462 469 137 345 458 29 471 477 198 346 245 235 386 446 196 459 140 447 460 461 471/1451 236 478 240 197 195 141 340 240/1413 142 379 527 246 241 137/1574 525 249 138 139 342 433 479 244 194 528 526/1 243 385 1618/524 383 281 480 247 242 384 445 279 306 526 522 483 282 1616/524 522/1514 306/1506 193 278 305 304 529 250 385/1442 524 295 484 483/1450 338 300 307 607 296 524/1448 481 530 538 277 303 335 341 523 251 337 382 336 432/1443 532 302 339 432/1448 283 298 293 482 308 332 331 533 380 276 333 381 485 251/1421 334 531 520 521 Legend Village Name Area (Ha) 606 537 523/1424 301 605 276/1508 329 330 252 311 523/1424/1513 254 284/1411 535 289 322 486 487 327 545 539/1495 299 309 621 534 284 328 536 Bijrol Goliya 660.99 323 325 326 324 610 608 273 275 620 546 272 290

292 547 297 600 609 543 255 310 321/1512 603 519 490 274 291 619 491 Bijrol Khera 1337.66 271 539 489 604 321 488 286 288 622 552 256 262 549 551 553/1417 285 287 548 257 312 261 268 320 618 Jelatra 1943.76 269 267 667 518 258 270 591 550 260 263 266 663 659 623 259 658 319 542 675 264 265 639 662 318 624 541 676 664 625 517/1491 313 627 657 848849 Jerol 938.09 314 628 626 540 641 493 660 640 315 847 851 666/1454 666 656 553 678 629 852 668 638 492 317 554 Liyadra 800.81 674 637 630 853 618/1462 559 665 642 854 1108 583 517 556 JELATRA512 516 701 643 1086/1521 698/1516 636 316 566 669 557 560 635 631 855 Pamana 2736.65 653 566/1445 514 698 700 655 858 679 1578/699 644 562 494 673/1535 634 632 561 513 702 652 856 567 868 654 867/1465 645 867 857 671 706 563 511/1496 495 564 699 646 1582/655 703 647 633 865 565 648 874/1463 869/1469 568 673/1534 651 745 511 741 862 581 697 708 649 864 704 82 1607/874 9999863 496 681 716 650 673/1457 705 709 743 1083 754 746

24°59'0"N 569 673 755/1517 747 752 1603/865 672 696 1577/657 577 680 742 510 504 717 719 885 9999 80 1581/712 710 721/1 875 876 749 748 870 693/1456 707 740 874 712 872 871 81 755 502 503 79 83 886 576 571 509 711 721 718 750 873 505 682/1455 695 507 506 575 501 713 497 85 84 694 751 884 1614/1083dup 508 86 693 720 756 1369 9999 438/124 77 714 753 1602/874

722/1 24°59'0"N 682 883 84/708437/123 722 500 432/46 87 880 499 88/409 691 724 881 1374 692 727 758 846 690/1461 739 dup 1544/1373 75 124 498 431/76 78 1572/882 11605/1081 71 684 727/1461 757 683 887 882 1081 119/360 123 1371 88 725 1373 73 123/363 728/1460 1545/739 1377 76 72 121/363 726 121 897 1375 121/362 690 729/1449 728 1372 738 764 119 887/1414 74 120/361 685 1376 67 120 729 1378 735 759 89 734 733 94/354 739 737 888 896 898 1379 125 730 118/381 895 70 689 1584/730 761 1386 890 1385 69 90 762 760 902 763 891 1380 889 903 434/6465 92 157/364 732 91 686 765 899 68 93 688 1585 68/407 118 126 9999 894 1069 1585/732 1587/788 904 1078 433/66 9999 1384/1 773 94/356 94/355 1074 Hanumangarh 94 901 1574/905 786/1 1575/906 794 115 892 1078/1 1072 117 127/369 9999 792 893 Ganganagar 445/113 9999 790 768 9596 94/357 772 1384 64 159 793 774 113 786 1070 97 63 116 127/365 785 906 Churu 163/372 784 905 1068 Bikaner 160 783 771 1068/1484 128 791 770 Jhunjhunun 98 920 1369/2 129/412 1369/3 1382 Alwar 795 1271 446/114 1052 1273 1381 1148 Bharatpur 62 114 769 1162 1389 Sikar 99 163 796 1067 1390 1383 112 797 907 129 165/378 1267 162 131 922 Jodhpur Nagaur 161 775 919 1388 61 776 1066 1269 Jaisalmer 57/406 100 446/114 130 782 777 1266 Jaipur Dausa 1051 1403 132/414 1065 1274 Dhaulpur 135 921 1303 1391 164/375 Karauli Jalor 164 779 846/1468 Ajmer 114/357 918 132 165 Tonk Sanchor 57 60 101 10641064/1445 TREATED_AREA 1150 1268 7 908 1404 164/376 778 944 1054 1392 Barmer 133 1151 Pali 59 134 798 1264 Bhilwara 111 1082 6 917 1053 Bundi 1050 1055 1393 1405 57/356 102 166 924/1430 Chittaurgarh 1265 Jalor 102/411 1302 Baran 136 Rajsamand 166/377 840 Kota 8 58 111/338 781 780 1301 1267 136/359 1062 1278 172 923 916 1405/1543 Sirohi 1061 1275 1405/1529 5 9 108 167 909 1056 841 1402 Udaipur 109 169 842 924 1279 Jhalawar 11 1049 1276 103 838 1670/1265 915 1402/1542 1268 2 168 139 910 1057 10 111/388 137 1060 1263 1281 1672/1266 Dungarpur 171 839 911 1047 1299 1 104 845 1283 1277 1394 1265 4 110 140 173 141 912 1048 1264 138 1058 1293 799 1300 1266/1536 Banswara 107 170 837 1296 1269 3 12 1401 925 913 1669/1266 1/405 1280 1297 1400/1550 157 844 13 843 1043 1294 174 177 202 1396 1399 144 142 835 943 1398 14 914 1284 1298 800 1045 106 143 174/416 178 201 928 1046 180 836 946 927 1044 1292 176175 832 1398/1 1270 801 1286 1266 180/417 1397 1540 1271 17 56 145 945 1295 1296/1539 203 204 442/146 831 1285 1272 15/407 36 105 202/380 830 834 1035 1295/1538 181 146 1177 1193 926 929 35 179 1034 34 204 147 205 804 802 829 828 185 182/426 1279 206 833 947948 1030 1288 1278 187/428 211 1042 16 187/397 1038 1289 148 803 942 1192 1191 1273 1280 821 1039 9999 1274 1275 930 1290 1196 210 1287 1194 15 1029 1195 149 19 183 210/420 969 1033 1036 1041 947 949 1016 155 149/412 210 820 827 1291 1190 931 282 37 182 950 1017 1189 1276 213 1181/1425 281 1178 1187 1263 813 819 1031 1262 207 952 1197 1281 806 1028 1032 1040 1291/1537 18 33 187 805 826 150 208 814 951 822 941 1285 184 1186 812 1026 1239 1198 1283 152/415 1027 1182 1284 151 823 280 9999 212 811 825 1020 1221 1204 1239/1490 1180 153 BIJROL GOLIYA 940 1025 1018 207/382 954 279 1179 186 1201 1285/1579

24°58'0"N 1205 11991258 824 1261 32 152 818 1203 953 1241 285 1183

209 939 932 1206 1185 1286 284 1177 1200 216 815 817 1024 1021 1240 9999 1260 1261 808/1518 97 20 154 192 16 807 1209 277 97 15 286 ¬ 278 « 46 816 818/1432 1019 1220 § 1022 ¨¦ 45 47 148 1202 243 1184 38 193 188 216/421 214 14 1023 283 1261/1578 189 810 938 12031202 17 44 5152 1219 190 191 201 9999 1014 156 193/443 12 13 20 769/151 1262 194 9999 53 49 1207 242 31 215 1206 193/419 219 808 274 1259 444/194 8 22 220 9999 18 9999 1208 272 195 1212 276 271 1349 221 217 218/303 21 41 958 269 1201 233 273 1176 24°58'0"N 157/393 4243 133 147 1210 268 1205 34 151 936 933 196 23 19 246244 156/396 40 63 73/700 971 1011 1211 275 1257 30 218/428 6566 48 1009 247 270 199/394 245 9999 2 50 1207 1350 38 54 937 249 809 241 253 1204 1256 1200 223 6 64 146 239 287 156/395 234 28 1254 1358 9999 767/151 240 1207/1622 157/392 67 132 980 235 252 1207/1525 223/422 39 1196 1199 232 266 1210/1612 1255 156/361 1198 254 22 29 230222 238 24 134 Sanchor 229 218 33 62 251 1253 199/392 225 39 199 770/151 1195 1197 255 1348 27 151DUP 259 265 1210 1252 21 26 231 68 231 258 267 228 1186 25 224 3536 145 237 315 198 49 61 144 1194 1211 441/199 232 5 1192 1193 288 234 37 135 250 31 230 41 70 224 198 1 60/701 152 195 1191 197 233 226 316 58 768/151 257 1208 52 25 136 1004 1209 1347 48 51 60 55 1190 226 41/387 50 30 72 143 228 199/388 69 229 1251 23 235 317 149 1212 1345 227/423 318 150 153 197 1189 225 221/1524 55 73 71 55/685 154/686 207 29 196 199 200 289 23/389 236 57 24 237 26 142 41/436 53 263 264 54 227 193/689 227 256 314 27 76 75 74 59 137 240 56 153/688 1188 319 1013 290 123124 262 238 141 194/690 1214 1250 1343 28 131 JELATRA 331 1187/1427 41/388 242 241 4 1005 291 239 77 177 201 1003 1187 178 260 1220 9999 140 983 205 208 223 40 81 106 1007 1006 59/684 1213 245 200/672 982 206 1218 1247 320 987/1 1249 330 139 154 202 292 109 138 1002 1216 244 333 335 203 1217 243 105 233 261 221 1215 1287 335 107 154/702 204 1246 309 126 978 293 334 126/686 193 209 246 308/342 329 205 1248 79 103 987 1001 176 121 222 293/1579 1219 321 985 988 1000 175 1244 328/385 332 102 108 996 110 997/1 174 203 294 80 999 210 249 104 989 179 42 328/384 101 111/644 122 232 997 313 322 100 998 173 211 1221 46 248 111 47 994 299 1243 4344 338 192 191 312 98 112 763/157 984 99 235 295 1222 1340 45 336 65 181 204 220 1175 328 337 247 323 190 194 172 218 326 157 305 324/424 9999 296 1242/1625/1643 113 9999 189 9999 82 9999 64 219 1242 1339 251 9999 9999 300 231 202 324 9999 9999 986 216 1237 296 327 83 9999 9999 230 993 9999 9999 990 307 1224/1642 206 306 250 188 63 297 1224 180 213/1566 1242/1625 308/399 62 1223 1235 182 298 304 1241 339 308 252 308 992 217 296/398 311 310 214 361 301 309 1225/1644 1236 9999 183 295 9999 181/9999 261 1248/1626 297 343 9999 61 171 325 340 363 310 313 68 1225 325/427 58 1240 308/349 1233 215 311 1234 254 265 302 312 9999 212 PAMANA 364 BIJROL KHERA 1239 213 253 342 362 344 1335 200 365 360 314 128 54 57 69 255 1238 1232 9999 75 293 303 242 186 366 1226 130/704 127 9999 9999 228 9999 201 341 60 1 centimeter = 100 meters 304 214 315 1227 307 73 367 184 359 260 53 66 368 292/347 261 74 337 72 67 1231 256 266 223 9999 170 372 318 257 260 292 225 1230 305 55 185 270 182 187 199 212 71 165 196 373 269 303 306 276/698 213 59 354 336 316 130 243 319 1229 1293 259/403 211 169 369 51 161 1332 180 188 357 1228 241 374 210 52/9999 42 164 358 338 1172 00.25 0.5 1 276 170 256 189 355 353 339 299 415 335 186 9999 163 52 166 198 413 270 168 195 277 359/705 50 56 179 9999 226 162 369/1577 356 1288 414 334 1289 168 194 197 301 177 371 352 258 TREATED_AREA 430/300 1171 302 167 KM 9999 160 320 263 9999 70 375 1294 282 9999 76 3 167 190 370 356/1847 333 178 246 43 159 1173 259 µ 271 174 9999 222 44 193 351 331 264 45 411 349 350 283 41 158 412 340 9999 46 191 376 298 245 249 158/1554 410/1549 289 175 250 1 40 332 321 1174 97 348 9999 9999 4 410 342 1291 9999 157 1290 252 49 330 1292 266 2 375/1521 377 347 329 1299 9999 416 341 272 192 408 409 9999 756/218 47 99 344 322 9999 220 417/1548 428 327 26 408/1522 417 418 35 39 265 380 419 381 378 343 324 24°57'0"N 48 328 101 247 109/1553 98 379/1520 Watershed Development & Soil Conservation, 253 345 9999 96/1638 100 9999 5 27 9999 6 38 156 407 430 528 258 34 420 346 9999 532 407/9999 25 96/1539 102 377/1551 429 346/237 28 36 109 368D 77 24 37 96 383 406 325 1300 9999 326 Pant Krishi Bhawan, Jaipur 454 427 426425 431 255 541/697 257 110 103 405 31 32 379 404 536 9999 23 382 385 1170 541 7 432 TREATED_AREA 33 384 17 403 529 81/9999 527 18 92 111 421 424 24°57'0"N 542 755/253 30 104 533 543 1301 1324 9999 16 29 108 8/1592 22 107 386 531 588/733 8 95 107/9999 1306/1615 747/537 459DUP 21/1514 534 11/1535 11 15 93 112 387 12 433 9 10 91 13 19 132 378/9999 1321 15/1593 434 WAPCOS LIMITED 447 446 448 14 21/1512 540 449 113 105 392 402 550 549 544 155 391 530/706 20 81 122 535 537 450 21/1513 530 545 388 423 1304 1306 456 389 94 115 114 393 1302 455 21 90 106 134 435 76-C, SECTOR-18,INSTITUTIONAL AREA, 390 573 454 539 445 78 133 422 1305 451 1675/122 126 599 131 394 467 90/1567 125 437 9999 116 538 551 548 80 83 82 135 547 546 459 130 395 401 455/1539 84 121 438 GURGAON - 122015 (HARYANA) 473 460 453 467/9999 466 465 117 147 1674/1347 71°55'0"E 71°56'0"E 71°57'0"E 71°58'0"E 71°59'0"E 72°0'0"E 71°59'0"E 72°0'0"E 72°1'0"E 72°2'0"E 72°3'0"E

514 493 553 566 517 494 604 557 562 561 567 513

563 511/1496 495 564 565 568 511 Sanchor(IWMP)7/2010-11 581

496

569 577 510 504 LULC Map 502 503 576 571 509 505 507 506 575

24°59'0"N 501 497 508 1369 9999

500

499 1374

1544/1373 498

1371 24°59'0"N 1373 1377 1375 1372

1376 1378

1379 1386 1385 1380 Legend Type Area (Ha) 1384/1 1074 Village Boundary 8417.95 1072 1384 Khasara Boundary 8442.70 1070 TREATED_AREA 1369/2 Location Points 53 Nos 1369/3 1382 1271 1148 1273 1381 1162 1389 1390 1383 Water Body 16.82 1267 1388 1066 1266 1269 1274 1403 Settlement 164.19 1303 1391

1150 1065 1268 Land Without Scrub 175.15 1404 1151 JELATRA 1392 1264 1064/1445 1393 1064 1405 Land With Scrub 777.17 1265 1062 1302 1301 1267 1278 1405/1543 Gullied/Ravines 1.78 1275 1405/1529 1402 1279 1276 1670/1265 1402/1542 1268 Crop Land 909.90 1281 1263 1299 1672/1266 1283 1277 1394 1265 1264 1293 1300 1266/1536 Fallow Land 5423.09 1296 1269 1401 1669/1266 1280 1297 1400/1550 1294 1396 1398 1399 Agriculture Land With Rabi Crop 1672.01 1284 1298

1292 1398/1 1286 1266 1270 Agriculture Land With Kharif Crop 849.28 1397 1540 1271 1295 1296/1539 1285 1272 1295/1538 1193 Agriculture Land With Kharif + Rabi 2342.07 1177

1279 1288 1278 1289 1192 1191 1273 1280 1275 1290 9999 11961274 1287 1194 1195

1291 282 1190 1189 1276 281 1178 1187 1262 1263 1197 1281 1291/1537

1285 1186 1239 1198 1283 1182 280 1284 1221 1204 1239/1490 1180 279 1179 1201 1285/1579 1205 1261 11991258 1203 1241 285 1183 1286 1206 1185 284 1177 1200 1354 1240 9999 1260 1261 1209 277 13531355 286 1220 278 1352 1356 1202 243 1184 1351 283 1261/1578 1219 12031202

24°58'0"N 1262 1207 242 1206 274 1259 1208 272 1212 276 271 269 1349 1201 233 1176 1210 273 268 1205 1350 1211 246244 275 1257 1357 247 245 270 1207 1358 241 249 253 1204 1256 1200 234 239 287 1207/1622 1254 235 240 1207/1525 1199 252 266 1360 232 254 1210/1612 1255 JELATRA 1198 238 1196 1359 24°58'0"N 251 1253 1195 1197 255 1348 259 265 1210 1252 1362 231 258 267 1186 237 1194 1211 1193 1192 250 288 230 1361/1545 1191 224 1361 1004 257 1208 1209 1347 1190 226 1363 228 229 1212 1251 1345 1679/1366 1189 225 221/1524 207 289 1364 263 264 1365 227 256 1366/1610 1188 290 262 1214 1250 1003 1344 1366 291 1343 177 1187 178 260 1220 1367 205 208 223 1375 1213 206 1247 1218 1249 292 1216 1217 1187/1427 221 261

1002 1215 293 1246 209 1370 1248 1287 1376 176 1001 222 293/1579 1219 175 1244 174 203 294 210 1369 179 1342 1372 173 211 1221 1243 1340 1373 299 1341 1368 295 1222 65 181 1175 204 220 1338 218 172 305 1374 296 1242/1625/1643 219 1242 300 1371 202 216 1237 307 1224/1642 306 297 1224 180 213/1566 1242/1625 1339 1223 1235 182 298 304 1241 Legend Village Name Area (Ha) 308 217 214 361 301 309 1225/1644 1236 183 181/9999 1248/1626 171 1337 Bijrol Goliya 660.99 363 310 313 1334 215 1225 1336 68 1240 1233 311 312 1234 364 302 212 213 1335 Bijrol Khera 1337.66 362 1239 200 365 360 314 1238 1232 69 303 186 201 366 1226 Jelatra 1943.76 1377 1378 315 1227 367 66 184 368 359 337

67 1231 170 372 318 Jerol 938.09 1230 185 187 199 1332 165 196 373 354 336 316 1379 319 1229 1293 169 161 369 1331 73 1380 Liyadra 800.81 188 374 357 1228 164 358 338 1172 189 355 353 339 415 335 1382 163 166 198 413 1381 195 1383 Pamana 2736.65 162 369/1577 414 356 1288 334 1289 1329 168 194 197 371 352 1171 1385 160 320 1295 1296 1384 70 375 167 190 370 356/1847 333 1294 159 1173 1386 76 1413/1572 193 351 331 411 349 350 1387 1384/1617 158 412 340 191 1328/1559 158/1554 376 410/1549 332 321 1174 97 348 77 410 1291 342 1298 1388 1413/1570 157 1290 330 1292 1328 375/1521 1297 347 1413 377 341 329 192 409 416 99 408 344 322 417/1548 428 327 408/1522 417 418

1299 1327/1581 1412 380 419 381 378 343 328 324 109/1553 98 101 379/1520 345 96/1638 100 1327 1390 1389 1413/1571 1414 156 407 430 96 420 346 407/9999 96/1539 109 102 377/1551 429 1417 383 406 325 1300 427 426 326 425 431 9999

24°57'0"N 110 103 405 1418 379 404 382 385 432 1326 95 384 403 1411 111 421 424 1416 104 1301 1325 108 1419 1421 107 386 1324 1410 107/9999 1306/1615 1679/14211420 387 1402

112 9999 433 1680/1421 132 378/9999 1391 1321 1422 434 1323 113 105 392 402 24°57'0"N 1322 1423 122 391 1409 388 1306 115 389 114 393 423 106 134 390 1320 1424 1302 1395 155 422 1305 1675/122 126 133 435 125 394 116 13181319 1431 1170 131 1317 1394 121 130 1304 1674/1347 123 124 127 437 1408 1433 119 120 128 1316 1397/1527 684 686 772 129 135 399 681 683 401 1315/1614 1392 395 1307 1315 1397 1396 685 129/1595 1303 682 773 147 1393 775 146 774 143 438 1394/1444 667/1664 771 142 619 136 139 400 1314 1425 Hanumangarh 138 1398 444 137 439 436 1309 1399 783 140 151 141 Ganganagar 687 782 784 144 145 1407 769 785 786 148 150 398 440 1400 776 787 149 788 1313 676 792 791 790 396 770 793 789 152 154 677 766 814 765 767 813/1654 813 1430 768 815/1596 153 441 9999 794 442/1606 1311 Bikaner Churu 815 397 442 1312 818 1401 Jhunjhunun 678 778 781 1169 9999 819 1308 1436 Alwar 1406 817 PAMANA Bharatpur 820443 1428 Sikar 672 9999 764 821 816 Nagaur 810 1676/1441 Jodhpur 674 780 1167 Jaisalmer 673 795 1757/812 1168 Jaipur Dausa 688 1429 1676/3441 9999 1427 1677/1441 1166/1613 1311/1586 Dhaulpur 777 812 675 1403 Karauli 779 811 1405 Jalor 741 802 1438 Ajmer 796 1404 1437 Tonk Sanchor 797 9999 763 822 1677/1441 1463 1666/739 823 1426 1440 1462/1598 761 1166 1464 Barmer 1448 Pali 798 801 1442 1462 Bhilwara 742 762 Bundi 803 1447 1449 1439/1599 1461 1465 689 1164/1536 1164 744 Jalor Chittaurgarh 739 743 799 Baran 9999 1165 1469 Rajsamand Kota

690 759/9999 800 1446 1461/1601 740 1445 1450 1451 1452 1466 1472 Sirohi 809 823/1597 1443 9999 824 737 727 9999 1461 Udaipur 760 825 1444 1476 Jhalawar 735 738 745 758 826 1649/1443 14541453 1164/1602 14561455 736/1555 759 806/9999 1162 9999 9999 9999 1457 1475 9999 9999 9999 Dungarpur 833 99999999 1458 1459 1473 734 807 832 827 736 1162/9999 1467 692 757 1160 1484/1603 808 1479 Banswara 805 1459/1560 728 1484 693 726 837 1477 1480 836 822/9999 1485 746 831 828 733 756 1486 1161/1616 1161/1604 1491 1488 1478 845 829 932 1487 1504 729 702 748 830 933 1508 730 938/1529 936 842 838/9999 937 1481 834 1483 732 835 933/1604 747 938 755 841 843 1482 703 844 838 839 1489 846 940 754 934 941 1503 1506 731 939 1159 840 1498 701 847 945 1490 1502 9999 749 9999 943 1507 715 723 848 725 942 721 722 724 750 753 948 1499 704 716 751 1508 752 720 849 947 1161 713 718 944 705 914 915 717 946 719 913 912 952 850 911 953 1500 712 907 909 916 955 954 706711 931961/1591 949 1497 714 908 961 906 1081/1607 707 708 910/1561 917 1132 1156 9999 930 961/1621 1157 700 951 97 1495 97 709 1133 «¬ 918 956 § 919 ¨¦ 710 910 957 1147 905 1137 959 699 929 962 1494

24°56'0"N 1155 851 698 920 935 1131 854 882 927 1136 960 1493 904 1144 852 903 958 853 923 950 881 902 922 963 1146 868 901 1135 865 921 869 928 1153 1492 1658/923 1145 1154 1137 867 900 1130 964 880 926 Sanchor

1029 24°56'0"N 1010 899 1031 866 883 870 965 1009 863 1012 924 1138 1148 879 1030 1028 1129

272 1008 1068 898 871 1027 1152 863/1589 895 925 1126 1114 884 1007 1011 1069 873 966 1125 1127 1006 1143 872 885 1141 967 1005 1120 968 874 1026 1013 1023 1119 875 1067 1070 893 1123 1123/1534 897 968/9999 1024 891 894 1073 1134 886 896 1014 1022 1066 1142 277 1021 1025 1071 1004 1019 1121 878 1113 1151 1122 1150 887 877 890 1020 969 1065 1076 1072

1074 275 889/1574 1064 276 990 1117 888/1525 1018 1063 1112 278 1003 876 889/1575 1015 1075 1114 298 991 279 303 970 1102 1062 1149 889 1077 1002 971 299 302 888 301 1015/1618 1016 1017 300 989 988 1115 296 1059 1110 987 1107 1101 1678/888 972 1111 992 1032 1061 1103 985 1001 986 993 1104 1100 1060 1108 975 1079/1532 973 983 297 1089 1000 1105 1078 974 1058 304 984 995 994 1106 999 1057 976 1089 1088 11089 975/1620 982 1057/1631 1087 295 306 1079 1109 307 996 331 1054 998 1056/1630 305 332 1053 1081 1056 1097 1080 308 1090 980 1055 1085 1 centimeter = 100 meters 293 981 1049 977 978/1623 1091 1096 1086 1052 1084/1580 309 1050 323 997 1657/978 1048 979 1092 1093 1039 1084 1095 00.25 0.5 1

330 1038 1033 1094/1533 310 978 1051 334

1034 1051/1531 329 KM JEROL 1094 1047 µ 1035 311 1083 312 1046 1044 328 1041 1045 336 1036 1037 1082 313

327 1040 1040/1530 335 Watershed Development & Soil Conservation, 1042 336/452 9999 1043 326 337 325 319 Pant Krishi Bhawan, Jaipur 314 320

24°55'0"N 322 333 315

318 316

407 317 405 406 408 WAPCOS LIMITED 411 413 24°55'0"N 484/378 412 76-C, SECTOR-18,INSTITUTIONAL AREA, 409 404 410 GURGAON - 122015 (HARYANA) 71°59'0"E 72°0'0"E 72°1'0"E 72°2'0"E 72°3'0"E 71°55'0"E 71°56'0"E 71°57'0"E 71°58'0"E 71°59'0"E

265 312 9999 182 215 360 1225 1239 58 311 252 308/349 340 128 200 214 363 312 255 54 183 308 9999 242 186 314 293 311 9999 9999 171 213 1230 130/704 9999 127 228 68 364 1226 BIJROL GOLIYA 9999 304 253 307 310 341 343 344 57 212 365 303 315 1227 214 1175 297 75 66 184 368 366 359 261 260 53 367 292/347 74 69 201 337 9999 72 67 256 60 170 372 318 266 305 223 257 292 306 225 55 185 270 182 212 187 199 Sanchor(IWMP)7/2010-11 165 373 71 73 196 316 269 276/698 213 59 354 336 1228 130 243 319 211 169 369 BIJROL GOLIYA 51 161 180 188 357 241 374 210 52/9999 42 164 358 338 1172 276 170 256 189 355 353 339 BIJROL GOLIYA 299 415 335 186 52 163 198 413 9999 166 270 168 195 1174 359/705 277 179 9999 226 50 56 162 356 369/1577 414 334 260 168 194 197 301 177 371 352 258 430/300 1171 LULC Map 167 302 9999 160 320 263 9999 70 375 282 9999 76 3 167 190 370 333 178 356/1847 1173 246 43 159 259 271 174 9999 222 44 193 351 331 264 45 411 349 350 283 41 158 412 340 9999 46 191 376 298 245 249 158/1554 410/1549 TREATED_AREA 289 175 250 1 40 332 321 97 348 9999 9999 410 4 157 342 9999 1290 252 49 330 266 2 375/1521 377 347 329 9999 416 341 272 192 408 409 9999 756/218 47 99 344 322 9999 220 417/1548 428 327 26 408/1522 417 418 265 35 39 380 419 343 24°57'0"N 48 381 378 328 324 9999 247 109/1553 98 101 379/1520 345 9999 253 100 5 27 96/1638 6 38 156 407 430 258 34 420 346 9999 532 BIJROL KHERA 25 407/9999 96/1539 102 377/1551 429 346/237 28 36 109 24 77 406 528 37 96 383 326 325 454 9999 427 426425 431 255 541/697 257 110 103 405 31 32 379 404 536 9999 23 382 385 541 7 432 17 33 384 529 81/9999 403 24°57'0"N 527 18 92 111 421 424 542 755/253 30 104 533 543 16 29 9999 8/1592 22 108 1301 531 588/733 8 107 107/9999 386 Legend Type Area (Ha) 459DUP 21/1514 534 747/537 11/1535 11 15 93 95 112 387 12 433 9 10 13 91 378/9999 15/1593 19 132 1304 447 446 434 1302 448 14 21/1512 1170 Village Boundary 8417.95 540 449 113 105 392 402 550 549 544 391 530/706 20 81 122 537 450 21/1513 388 530 545 535 456 389 94 115 114 393 423 435 Khasara Boundary 8442.70 455 21 90 106 134 390 454 539 445 78 155 422 451 1675/122 126 133 125 394 Location Points 53 Nos 83 116 9999 90/1567 573 538 457 455/1539 80 131 458 465 82 121 130 453 466 117 124 127 437 452 84 120 123 128 599 460 118 119 686 129 135 399 Water Body 16.82 551 463 85 684 772 401 462 79 89 681 683 459 605 86 680 395 467/9999 87 88 609 561 546 606 608 618/1594 685 129/1595 473 461 607 682 773 147 576 548 610 775 774 146 467 611 143 438 547 618 771 142 Settlement 164.19 562 667/1664 444 139 400 612 136 138 526 524 439 436 523 783 137 140 151 468 617 141 598 687 782 784 144 145 596 769 785 786 148 150 398 440 Land Without Scrub 175.15 601 472 613 619 776 787 149 469 671 788 525 9999 552 476 792 791 790 603 477 474 604 676 770 793 152 396 TREATED_AREA 616 677 766 789 154 595 813/1654 814 602 471 765 767 813 815/1596 153 441 575 768 794 470 9999 442/1606 Land With Scrub 777.17 604 591 678 397 580 479 577 670 815 442 1169 600 563 818 582 778 781 606 615 9999 583 602603 9999 819 605 560 443 597 601 1673/670 672 817 820 Gullied/Ravines 1.78 563/696 553 554 480 478 576 590 592 475 614 564D 584 764 821 697 578 816 1167 485 481 664 810 598 673 780 1166/1613 Crop Land 909.90 494D 600 666 575 795 1757/812 564 482 688 558 593 674 579 672/1506 777 559 589 665 812 9999 572 779 811 585 486 483 675 741 802 Fallow Land 5423.09 669 668 520 599 796 1166 555 587 594 797 1162 763 822 595 484 565 571 580 667 1666/739 823 574 761 Agriculture Land With Rabi Crop 1672.01 368D 565 487 798 801 762 742 803 689 557 573 610/660 744 489 566 739 743 799 Agriculture Land With Kharif Crop 849.28 564 588 585 9999 566 658 759/9999 800 586 740 586 809 570 659 690 823/1597 556 569 488 727 9999 824 396 737 760 825 Agriculture Land With Kharif + Rabi 2342.07 738 567 735 826 394 745 758 514D 569 627/738 736/1555 759 806/9999 592D 584 691 9999 613 582 661 614/726 9999 660 833 615 734 807 326 518/730 628 9999 490 832 827 394/668 397 614 9999 568 736 624 583 692 757 487 508 808 392 398 513 9999 568 518D 626 587 567 655 805 399 629 728 481 657 616 591 570 726 837 400/680 9999 590 836 822/9999

9999 PAMANA 746 831 491 552 693 828 390/671 485 655/1518 733 756 412 9999 9999 663 388 400 654 829 932 424D 471 515/695 589 845 393 514 627 553 662 729 408 482 617 702 748 830 933 563 654/1516 730 842 838/9999 391 424 512 653 835 834 938/1529 340 678 474 631 592 732 933/1604 938 473 656 695/1584 747 630 694 755 841 843 1770/715 703 844 838 384 385 623 560 554 839 403 473/674 492 498/1568/1641 561 652 754 846 515 571 498/1568 341 9999 478 645 349 389 572 562 402 522D 559/1636 551 731 390 477 409 636 936 475 646 840 934 474/673 647 493 558 945 9999 847 377 406 407 650 749 9999 344 382 516 492/1568/1651 350 475/677 676 649 383 9999 741 557 695 9999 618 559 701 9999 648/698 555 715 723 848 374 376 722 724 725 480 620 721 750 753 948 351 1651/1568 704 716 698 492/1609 9999 751 651 720 752 375 649/760 204 517 637 648 849 947 501/1516 494 713 718 632 501/1624 373 742/306 518 650 556 550 915 495/1557 705 914 946 944 496 495 717 719 913 912 952 352 203 205 354 219 647 850 911 953 907 404 202 222 500 538 696 712 954 381 217 638 649 9999 539 632 630 711 909 916 931 955 218 619 497 706 961/1591 949 405 656 501 499 714 908 961 24°56'0"N

223 906 360 359 212 221 646 707 353 201 640 708 917 357 379 910/1561 930 209 9999 537 9999 961/1621 211 224 631 951 700 210 652 709 362 220 226 644 549 490/167 165 628 910 919 918 956 208 225 639 721 643 697 710 207 536 629 957 227 504 905 361 356 367D 372 216 641 498 959 549/1582 699 962 358 9999 540 929 206 228 9999 635/1510 167 643 503 644 851 364 363 229 634 653 635 698 215 660D 633 654 920 927 371 543 882 960 854 852 904 9999 644/670 535 542 640 627 903 958 24°56'0"N 367 503/1611 548 639 634 853 9999 9999 902 923 9999 213 283 544 547 642 860/1574 881 922 963 502 645 864 369 230 659 641 864/1588 868 901 502/158 505 921 626 855 928 935 365 508 638 865 869 286 511 534 637 368 231 636 1658/923 366 233 288 486/213 541 856 860 861 501/150 9999 657 506 532 862 867 900 950 168 285 504/155 9999 232 9999 623 859 860/1588 964 625 9999 506/1562 1677/533 880 926 197 621/703 509 531 622 858 1029 158 660 9999 196 287 655/656 1010 9999 142 214 234 510 857 9999 9999 899 1031 293 863 866 505/155 870 883 965 289 507 546 624 1009 5/499 9999 284 270 1012 198 506/286 879 924 290 1679/531 1030 282 281 621 1028 1676/531 1008 658 620 9999 1068 512 545 272 898 186 291 871 1027 1 155 268 863/1589 895 925 5/500 9999 884 1007 1011 99999999 9999 195 1069 279 278 292 873 194 9999 271 966 665 9999 9999 1006 9999 143 235 623D 872 885 621 523 967 280 1678/531 1005 9999 968 1081/1607 9999 1026 1161 187 328 622 874 1013 1023 9999 512/1540 251 5 141 9999 9999 875 1067 2 192 529 250 893 1070 4 273 897 1134 528 530 267 1024 140 526 894 968/9999 9999 237 524 891 1073 294 295 265 189 522 886 896 9999 236 9999 256 249 277 1014 1022 1066 519 247 1113 298 330 181 1021 1025 1071 182 248 1004 1019 9999 188 223/484 277 304 9999 518/1442 527 878 9999 521 255 264 193 303 525 302 329 503/1541 180 301 518 520 179 877 887 890 306/1 1020 1072 6 190 238 274 9999 9999 274 969 1065 1076 Legend Village Name Area (Ha) 139 299300 325 183 9999 178 254 3 240 239 177 266 275 889/1574 1074 191 1064 532/442 305 495/264 276 990 297 9999 257 534/442 9999 331 515 246 888/1525 1018 1063 1112 126 252 1003 138 129 327 278 876 889/1575 1015 1075 Bijrol Goliya 660.99 516 173 25.3 491/263 306/438 9999 517 169 298 991 125 273 171 326 279 303 970 131 516/1558 1062 8 245 258 889 1077 127 322 332 240/451 1002 130 129/401 272/466 306 513 244 124 272 495/326 176 175174 172 160/465 299 302 971 Bijrol Khera 1337.66 296 331/453 514 888 1017 323 9999 16 134 275 301 1015/1618 1016 132 128 243 9999 300 989 533/17 332/449 262 1110 276 309 307 324 333 259 988 7 135 123 308 168 170 1059 15 531/17 133 321 170/415/450 1678/888 987 1111 9999 176/449 972 1032 130/455 122 992 Jelatra 1943.76 136 282 1061 312 320 335 170/416 296 261 985 1001 986 993 17 14 13 336 243 281 266/467 319 240 1060 137 119 121 170/417 280 975 983 1079/1532 241 242 334 170/415 973 118 244 271/465 313 297 Jerol 938.09 266 1000 311 506/348 2 18 530/14 12 120 265 348 1078 260 974 270 271 1058 337 241 304 984 995 22/443 24 318 269 338 239 242 994 25 347 170/418 999 1089 Liyadra 800.81 524/22 115 310 154 183/461 1057 116 976 22 19 349 295 1088 26 975/1620 1087 23 247 267 1 238 208 306 982 1057/1631 245 315 167 1079 117 314 307 996 20 350 331 1054 Pamana 2736.65 21 268 150 998 1056/1630 263 42/452 114 264 1053 332 1081 527/40 262 1056 52 37 237 1080 522/244 339 152 308 51 30 207206 286 980 31 113 354 346 151 153 164 166 284283 292 1055 40 285 1085 LIYADRA 260 153/494 294 981 1049 112 250 251 316/460 3 481/9999 36 32 290 977 42 528/37 27 293 53 29 209 978/1623 261 316 344 148 183/460 1086 28 1084/1580 249 248 252 343 163 1052 250/468 369 345 165 289 309 1050 525/336 526/40 485/255 339/462 323 111 110 233 48 9999 33 523/254 352 291 997 56 43/451 340 204 1657/978 9999 259 351 155 236 1048 45 35 149 979 1092 514/56 41 353 4 82 355 287 1039 55 370 342 1084 1093 9999 163/447 231 524/35 9999 34 254 255 258 235234 50 330 1038 519/64 147 1033 49 162 978 1051 516/56 256 156 310 49/453 253 371 230 334 9999 317 257 373 518/56 64 81/454 365 341 57 1051/1531 66 368 183/464 232 210 305 1034 161 329 496/66 366 203 505/57 374 356 9999 145 146 213 212 54 518/60 65 229 45/441 516/57 358 201 336/452 513/60 67 92 357 202 1047 46 380 376 1035 496/64 76497/67 108 109 379 157 338 311 68 144 160 214 1083 5859 143 336 63 81 372 367 5 1046 60 50/450 47 7 142 211 312 378 228 217 77 72/44769 339 1044 75 72 375 227 218 328 139 158 1041 61 1045 511/74 5/423 1036 78 71 345 62 521/85 74 73 9999 1037 367/440 359 200 337 520/74 141 226 219 340 70 224 215 346/448 313 1082 364 159 221 216 83 84 377 225 327 1040 1040/1530 407 223 79 491/80 106 381 363 335 24°55'0"N 107 382 408 362 13 184 186 410 222 346 1042 411 11 9999 1043 80 185 220 342 341 12 138 343 413 360 8 326 325 409 187 346/468 383 347 319 198 414 361 184/445 199 349 344 314 10 320 94 19/422 384 404 412 9 14 324 322 85 95 406 19 188 9999 333 383/479 188/446 416 415 195 JEROL 350 315 93 15 348 86 377

376 24°55'0"N 17 99 389 21 354 385 197 355 351 318 316 100 189 191 196 194 97 24 23 20 9999 417 418 193 353 356 482 484/378 407 317 386 405 192 375 405 406 408 Hanumangarh 91 388 22 136/1 352 101 390 9999 18 9999 387 190/479 411 413 87 96 391 392 136 357 16 137/476 Ganganagar 9999 135 483/9999 98 134 190 371 373 374 393 25 482/378 26 137/474 372 9999 9999 369 394/480 409 Churu 89 25/424 Bikaner 88 368 27 133/473 370 412 Jhunjhunun 394 25/425 410 133 378/421 485/378 27/441 Alwar 395 132/470 137/469 358 378 25/426 103 9999 Sikar Bharatpur 102 28 90 9999 367 404

31 137 488/421 9999 28/442 366 365 Jodhpur Nagaur Jaisalmer 364 Jaipur Dausa 363 Dhaulpur 105 403 380 403 Karauli Jalor 132 Ajmer 396 402 Sanchor 104 379 393 Tonk 9999 9999 401 9999 402 Barmer 362 Pali 31 400 Bhilwara 381 Bundi 360 399 401 359 Jalor Chittaurgarh 397 9999 Baran 9999 Rajsamand 131 398 Kota 382 397 29 361 Sirohi 400 9999 127 30 45 391 396 Udaipur Jhalawar 43 382/444 390 395 398 480/386 Dungarpur 399 42 44 33 388 394 392 40 129 39 54 Banswara 34/466 383 384 128 32 41 389 56 386 38 129/443 52 53 479/51 9999

385 126 46 131/454 55 57 51 130 496/51 34 50 131/455 124 123 387 37 497/80 60

81 80 61 110

79 494/58 9999 83 62 77 36 84 111 112 37/457 58 122 82 63 113 36/456 59 114 121 78 76 120 65 473/58 67 117 35 85 86 106 116 108 82/438 64 118 87 66 109/458 119

75 492/67 85/439 67/434 115 47 87/448 74 68 105 97 74/435 97 71 ¨¦§ «¬

70/453 73 92 69 109 107/431 103 72/437 72/436 73/426 48 70

91 72 104 104/432 109/467

24°54'0"N 72/433 Sanchor 100

70/429 99 101 100/430

102 98 477/9999 98/431

96 24°54'0"N

97

93 94

95

1 centimeter = 100 meters 00.25 0.5 1 KM µ

Watershed Development & Soil Conservation, Pant Krishi Bhawan, Jaipur

24°53'0"N WAPCOS LIMITED 76-C, SECTOR-18,INSTITUTIONAL AREA, GURGAON - 122015 (HARYANA) 71°55'0"E 71°56'0"E 71°57'0"E 71°58'0"E 71°59'0"E 72°0'0"E 24°53'0"N