SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF ( HOUSING AND AREA DEVELOPMENT AUTHORITY,) Tel no. – 022-66405250, E-mail – [email protected] Ref no. EE/East/MSIB / etender/Labour Soc./ 18 / 2019-20

e-TENDER NOTICE for Labour Co-op. Society registered under DDR (East/West)

Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited by the Executive Engineer (East) Division, Mumbai Slum Improvement Board, (Unit of MHADA), Room no. 536, 4th floor, Griha Nirman Bhavan, Bandra (East), Mumbai 400 051 for the various work from the Labour Co-op.Society registered under appropriate class with DDR Mumbai Suburban District (East/West).

e-Tender Name of Works Estimated Security Deposit Registration Tender Time limit No. cost. Rs. 1% of Estimated (Class) of Price for cost Rs. L.C.S. under including completion Deputy 6% GST of work District in Rs. Register 1 Const. of Toilet block, Drain, Passage 686565/- 7000/-(50% Class-B & 500 + 9 Months at Manohar Nagar Rahiwashi Vikas initially & 50% Above 60=560 (Including Mandal, Pipeline, Sakivihar through bill) monsoon) Road, Powai, (W) (MLA fund) () 2 Reconst. of Toilet block, Drain, 1029848/- 11000/-(50% Class-B & 500 + 9 Months Passage at Bhuleshwar Chawl and initially & 50% Above 60=560 (Including Panchsheel Chawl, 90 feet road, through bill) monsoon) Tilak Nagar, Sakinaka, Kurla (W). (MLA fund) (Chandivali) 3 Reconst. of Toilet block at Wajid 600745/- 7000/-(50% Class-B & 500 + 9 Months Ali Compound, Khairani Road, initially & 50% Above 60=560 (Including Kurla (W). (MLA fund) through bill) monsoon) (Chandivali) 4 Const. of Toilet block, Drain, 514924/- 6000/-(50% Class-B & 500 + 9 Months Passage near house of Nitin initially & 50% Above 60=560 (Including Pawar, Mohili Village, Sakinaka, through bill) monsoon) Kurla (MLA fund) (Chandivali) 5 Reconst. of Toilet block near Ram 944027/- 10000/-(50% Class-B & 500 + 9 Months Mandir, Narayan Nagar, Kurla initially & 50% Above 60=560 (Including (W). (MLA fund) (Chandivali) through bill) monsoon) 6 Reconst. of Toilet block at Wasim 944027/- 10000/-(50% Class-B & 500 + 9 Months Compound, 90 Feet Road, Tilak initially & 50% Above 60=560 (Including Nagar, Kurla (W). (MLA fund) through bill) monsoon) (Chandivali) 7 Beautification work near Ram 1716413/- 18000/-(50% Class-B & 500 + 9 Months Manohar Tripathi Hall, Himalay initially & 50% Above 60=560 (Including Soc. Kurla (W). (MLA fund) through bill) monsoon) (Chandivali) 8 Const. of Open Sabhagruh, Drain, 600745/- 7000/-(50% Class-B & 500 + 9 Months Passage at Muslim Society, initially & 50% Above 60=560 (Including Jarimari, Kurla (W). (MLA fund) through bill) monsoon) (Chandivali) 9 Const. of Samaj Kalyan Kendra 1085631/- 11000/-(50% Class-B & 500 + 9 Months and Beautification of Garden at initially & 50% Above 60=560 (Including D'souza Complex, 90 feet Road, through bill) monsoon) Sakinaka, Kurla (W). (MLA fund) (Chandivali) 10 Const. of Drain and Ladikaran at 1287311/- 13000/-(50% Class-B & 500 + 9 Months Balgopal Mitra Mandal, Shramjivi initially & 50% Above 60=560 (Including Nagari Society, Abhinav through bill) monsoon) Rahiwashi Sangh, M.S. Patil Wadi. (MLA fund) (Chembur) 11 Const. of Drain, Passage and 2145518/- 22000/-(50% Class-A 500 + 9 Months Ladikaran at Gramsewa Mandal, initially & 50% 60=560 (Including Mahul road, Chembur, Mumbai. through bill) monsoon) (MLA fund) (Chembur) 12 Reconst. of Toilet block Opp. 514924/- 6000/-(50% Class-B & 500 + 9 Months MTNL Colony, Jay Bhim Nagar initially & 50% Above 60=560 (Including Society, Powai. (NDVSY) through bill) monsoon) (Chandivali) 13 Beautification work at Bhim Mitra 686565/- 7000/-(50% Class-B & 500 + 9 Months Mandal, Sangharsh Nagar, initially & 50% Above 60=560 (Including Chandivali Sakinaka, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 14 Beautification work near Water 429103/- 5000/-(50% Class-B & 500 + 9 Months Tank, Sangharsh Nagar, initially & 50% Above 60=560 (Including Chandivali Sakinaka, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 15 Reconst. of Vachanalay at Dr. 429060/- 5000/-(50% Class-B & 500 + 9 Months Babasaheb Ambedkar,Vachanalay, initially & 50% Above 60=560 (Including beside Chandivali Bus Stop, through bill) monsoon) Sakivihar Road, Sakinaka, Kurla. (NDVSY) (Chandivali) 16 Const. of Drain and Passage at Sai 429018/- 5000/-(50% Class-B & 500 + 9 Months Kripa Mitra Mandal, Sandesh initially & 50% Above 60=560 (Including Nagar, Bail Bazar, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 17 Const. of Drain and Passage at 1029848/- 11000/-(50% Class-B & 500 + 9 Months Janta Chawl and Babulal Chawl, initially & 50% Above 60=560 (Including Indira Nagar, Jarimari, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 18 Beautification work at Dr. 1287310/- 13000/-(50% Class-B & 500 + 9 Months Babasaheb Ambedkar Udyan, initially & 50% Above 60=560 (Including Kajupada, Pipeline, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 19 Const. of Drain/Passage at 1287267/- 13000/-(50% Class-B & 500 + 9 Months Sakharam Patil Chawl, Rosary initially & 50% Above 60=560 (Including Chawl, D'souza Chawl, Kajupada through bill) monsoon) Pipeline Kurla (W). (NDVSY) (Chandivali) 20 Const. of Drain/Passage near 428975/- 5000/-(50% Class-B & 500 + 9 Months Mangala Chauhan House, initially & 50% Above 60=560 (Including Kajupada, Pipeline, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 21 Reconst. of Toilet block, Drain/ 428932/- 5000/-(50% Class-B & 500 + 9 Months Passage at Jay Ambika Nagar, initially & 50% Above 60=560 (Including Sunder Baug, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 22 Const. of Drain/ Passage near 428889/- 5000/-(50% Class-B & 500 + 9 Months Shanti Seva Sangh, Hanuman initially & 50% Above 60=560 (Including Mandir, Netaji Nagar, Khadi No.3, through bill) monsoon) Kurla (W) (NDVSY) (Chandivali) 23 Beautification work at 428846/- 5000/-(50% Class-B & 500 + 9 Months Dr.Babasaheb Ambedkar Udyan, initially & 50% Above 60=560 (Including Powai. (NDVSY) (Chandivali) through bill) monsoon) 24 Const. of Drain/ Passage near Ram 428803/- 5000/-(50% Class-B & 500 + 9 Months Mandir, Ramlakhan Chawl, initially & 50% Above 60=560 (Including Narayan Nagar, Kurla (W). through bill) monsoon) (NDVSY) (Chandivali) 25 Const. of Drain, Passage near 600745/- 7000/-(50% Class-B & 500 + 9 Months house of Madhuri Singh, initially & 50% Above 60=560 (Including Panchkutir Powai. (Beautification through bill) monsoon) fund) (Chandivali) 26 Const. of Drain, Passage near Bedi 429104/- 5000/-(50% Class-B & 500 + 9 Months Hall Shastri Nagar, Ghas initially & 50% Above 60=560 (Including Compound, Kurla (W). through bill) monsoon) (Beautification fund) (Chandivali) 27 Const. of Drain, Passage at Babulal 1029848/- 11000/-(50% Class-B & 500 + 9 Months Chawl, Jarimari Kurla (W). initially & 50% Above 60=560 (Including (Beautification fund) (Chandivali) through bill) monsoon) 28 Const. of Drain, Passage at Sakina 429104/- 5000/-(50% Class-B & 500 + 9 Months Chawl to Bhuleshwar Chawl initially & 50% Above 60=560 (Including Rustam Market, Tilak Nagar, through bill) monsoon) Sakinaka, Kurla (W). (Beautification fund) (Chandivali) 29 Const. of Drain, Passage at 600745/- 7000/-(50% Class-B & 500 + 9 Months Gajadar Compound Gulshan initially & 50% Above 60=560 (Including Chawl, near Kachra Kundi, through bill) monsoon) Khairani Road, Kurla (W). (Beautification fund) (Chandivali) 30 Const. of Drain, Passage at Azad 600745/- 7000/-(50% Class-B & 500 + 9 Months Chawl and Bangali Chawl, initially & 50% Above 60=560 (Including Jarimari, Kurla (W). through bill) monsoon) (Beautification fund) (Chandivali) 31 Const. of Drain, Passage at Sai 429104/- 5000/-(50% Class-B & 500 + 9 Months Prerna Chawl Mohili Village, initially & 50% Above 60=560 (Including Sakinaka, Kurla (W). through bill) monsoon) (Beautification fund) (Chandivali) 32 Const. of Drain, Passage at 429104/- 5000/-(50% Class-B & 500 + 9 Months Saraswati Niwas, Sakinaka, initially & 50% Above 60=560 (Including Kurla (W). (Beautification fund) through bill) monsoon) (Chandivali) 33 Beautification work near Sanjay 429104/- 5000/-(50% Class-B & 500 + 9 Months Gandhi Bhavan, N.S.Road, Asalfa initially & 50% Above 60=560 (Including (W). (Beautification through bill) monsoon) fund) (Chandivali) 34 Const. of Drain, Passage at 1287311/- 13000/-(50% Class-B & 500 + 9 Months Bhanushali Maidan, Mahatma Phule initially & 50% Above 60=560 (Including Nagar, 90 feet road, Kurla (W). through bill) monsoon) (Beautification fund) (Chandivali) 35 Const. of Drain, Passage at Zohara 514924/- 6000/-(50% Class-B & 500 + 9 Months Estate, Jarimari Kurla (W). initially & 50% Above 60=560 (Including (Beautification fund) (Chandivali) through bill) monsoon) 36 Const. of Drain, Passage at 514924/- 6000/-(50% Class-B & 500 + 9 Months Parmanand and Ekta Society, Jafar initially & 50% Above 60=560 (Including Compound, Khadi No.3, Kurla through bill) monsoon) (W). (Beautification fund) (Chandivali) 37 Const. of Drain, Passage near 429104/- 5000/-(50% Class-B & 500 + 9 Months Shop of Imtiyaj Himalay Society, initially & 50% Above 60=560 (Including Kurla (W). (Beautification fund) through bill) monsoon) (Chandivali) 38 Const. of Drain, Passage at Wadia 429104/- 5000/-(50% Class-B & 500 + 9 Months Estate, Sandesh Nagar, Bail Bazar, initially & 50% Above 60=560 (Including Kurla (W). (Beautification fund) through bill) monsoon) (Chandivali) 39 Const. of Drain, Passage near 858207/- 9000/-(50% Class-B & 500 + 9 Months Indira Nagar Masjid, Hari Majid, initially & 50% Above 60=560 (Including near Tabela, Jarimari, Kurla (W). through bill) monsoon) (Beautification fund) (Chandivali) 40 Const. of Drain, Passage at 600745/- 7000/-(50% Class-B & 500 + 9 Months Dadubhai Chawl, Raju Nagar, initially & 50% Above 60=560 (Including Kabristan Khairani Road. through bill) monsoon) (Beautification fund) (Chandivali) 41 Const. of Drain, Passage near 686566/- 7000/-(50% Class-B & 500 + 9 Months house of Sonu Yadav Nagar, initially & 50% Above 60=560 (Including Khairani Road. through bill) monsoon) 42 Const. of Drain, Passage near 429104/- 5000/-(50% Class-B & 500 + 9 Months BMC School, Sandesh Nagar, Bail initially & 50% Above 60=560 (Including Bazar, Kurla (W). (Beautification through bill) monsoon) fund) (Chandivali) 43 Const. of Drain, Passage behind 429104/- 5000/-(50% Class-B & 500 + 9 Months Toilet block, Gaibanshaha Darga initially & 50% Above 60=560 (Including Road, Narayan Nagar, Kurla (W). through bill) monsoon) (Beautification fund) (Chandivali) 44 Const.of Drain, Passage at Subram 429104/- 5000/-(50% Class-B & 500 + 9 Months Chawl, Vijay Nagar, Jarimari, initially & 50% Above 60=560 (Including Kurla (W). (Beautification fund) through bill) monsoon) (Chandivali) 45 Const. of Drain, Passage at 686566/- 7000/-(50% Class-B & 500 + 9 Months Shamsuddhin Chawl, Vijay Nagar, initially & 50% Above 60=560 (Including Jarimari Kurla (W). through bill) monsoon) 46 Const. of Drain, Passage at 429104/- 5000/-(50% Class-B & 500 + 9 Months Shubara Patel Chawl, Satya Nagar, initially & 50% Above 60=560 (Including Safed Pool, Kurla (W). through bill) monsoon) (Beautification fund) (Chandivali) 47 Beautification work PL Chequred 2145518/- 22000/-(50% Class-A 500 + 9 Months Ladi at Matashri Alitadevi initially & 50% 60=560 (Including Vachnalaya Mauje Chembur, through bill) monsoon) Cheda Nagar, Survey No.1858 Jai Ambe Nagar, Chembur. (Beautification fund) (Chembur) 48 P/F Ladi at Ramabai Nagar, Powai 892857/- 9000/-(50% Class-B & 500 + 9 Months (MP fund) initially & 50% Above 60=560 (Including through bill) monsoon) 49 P/F Ladi at Indira Nagar, Powai 892857/- 9000/-(50% Class-B & 500 + 9 Months (MP fund) initially & 50% Above 60=560 (Including through bill) monsoon)

Sr . Stage Desc. Date of Time period No 1 Publishing Date 19.09.2019, 10.00 2 Document sale start 19.09.2019, 10.05 3 Document sale end 25.09.2019, 17.45 4 Bid Submission start 19.09.2019, 10.05 5 Bid Submission end 25.09.2019, 17.45 6 Technical Bid Opening 27.09.2019, 10.30 a.m. onward 7 Price Bid Opening 30.09.2019, 10.30 a.m. onward

1. The Complete biding process will be online (etendering) in two bid system. All the notifications and detailed terms and conditions regarding this tender notice hereafter will be published on line on website http://mahatenders.gov.in, MHADA Website – http://mhada.maharashtra.gov.in 2. Bidding documents can be loaded on the website http://mahatenders.gov.in, from Date 19.09.2019 at 10.05 to Date 25.09.2019 upto 17.45.

3. The Payment for Tender Form Fees and Earnest Money Deposit (EMD) must be made online. 4. Technical bids will be opened on 27.09.2019, 10.30, am onward & Price bids will be Opened on 30.09.2019, 10.30, am onward at the office of the Executive Engineer (East)/MSIB, Room no. 536, 4th floor, Mhada, Kalanagar, Bandra (East), Mumbai–400051 on web site http://mahatenders.gov.in, 5. Tenderer Should submit original documents (those were uploaded during bid preparation) for verification at the time of Technical Bid opening. 6. Tenderer should submit information and scanned copies in PDF format in Technical Envelope as mentioned in Technical Offer. 7. Tenderer should have valid class II/ III Digital Signature certificate (DSC) obtained from any certifying authority. 8. The Executive Engineer (East) / M.S.I.B, MHADA, Bandra (East), Mumbai – 400 051 reserves the right to accept or reject any or all tenders without assigning any reason. 9. e-Tenderer shall refer detailed tender notice regarding Performance Security & other documents to be submitted. 10. e-Tenderer should upload GST Registration Certificate. 11. Tender called is based on SSR rate year 2017-18 without GST. GST will be paid on accepted contract value. 12. In case of the rates quoted by lowest bidder less than estimated cost & L1 bidder failed to submit Additional Performance Security Deposit within 8 days, then Second lowest (L2) bidder will be asked to submit the revised offer and if L2's offer is at or below that of the rate quoted by L1 bidder then offer of 2nd Lowest bidder (L2) will be accepted. 13. Guidelines regarding e-tendering system and submission of bids can be downloaded from website http://mahatenders.gov.in,Help support:1800-307-02232 E-mail– [email protected].

Executive Engineer (East), M. S I B Board,