Water Pipe line position as on 04.08.2020. Sl. File No. Name of the work & Present status. No. Address . Permission for laying Final permission 1. J/W.372/16/30/11. 355mm dia DI given to the water pipe line encased party on with 800 mm dia MS pipe 16.02.2016. across the Railway track at km.655/200-300 near Ferok Railway Station by the Executive Engineer, KWA/CLT Permission for laying Approval 2. J/W.372/19/36/11 damaged/over flowing awaited from sewer pipe line in the CBE vide this storm water drain office letter of beneath Railway Bridge even near Mangalore Central No.dtd.04.04.201 Railway Station 6. (chainage – 884/248). By the Executive Engineer, No.2. Division, MCC Cell, KUDCEMP, Mangalore Permission for laying under Final permission 3. J/W.372/11/38/11. ground pipe line crossing given to the KWA with 350mm dia M.S. pipe on 08.04.2016. across the Rly. Track between km. 535/15-17 (Modified GAD between PLL – PGT Rly. sent to KWA vide Stations. By the letter Exec. Engineer, PH.Dn, dtd.28.09.2016). KWA.PGT. Permission for laying Final permission 4. water pipe line 75mm given to the part J/W.372/KLGD/08/12 dia DI encased with on 08.03.2016. 250mm dia MS pipe across the Rly. Track at km.21/6-7 near Br. No.47 between Meenachipuram and Muthalamadai Rly. Stations by Sri. M.Jayaraman/POY. Sri. M.Jayaraman, 10, Masayappa Gounder Street, Nanje Goundenpudur, Akhilandapuram, Pollachi. Permission for lying 300mm Final permission 5. J/W.372/18/01/ 13. dia D.I water pipe line given to the party encased with 600mm dia M.S on 25.02.2016. pipe across the Rly. Track at km. 751/300-400 between CAN- CS Rly.Stations by the Executive Engineer/KWA/CAN. Permission for laying GAD resubmitted 6. J/W.372/19/3/2014. treated water pipe line to through ‘E office’ from Bajal STP to Kavoor on 03.06.2020. STP at chainage 6.625 km. near MAQ by MAQ SE oZ ltd. Permission for laying Proposal not 7. J/W.372/17/4/2014. water pipe line feasible and through Rly. Land party advised vide letter near Payyoli Rly. dt.05.07.2016. Station. T km.701/500-600. by the Secretary/ Payyoli Grama Panchayat. Permission for laying Final permission 8. J/W.372/16/08/14. water pipe line across given to the the Rly. Track at km. party vide letter 674/100-200 between dtd.15.05. 2017. ETR and WH Rly. Stations. By the Executive Engineer, PH.Dn, KWA/CLT. Permission for laying Final permission 9. J/W.372/KGQ/10/14. underground pipeline given to the crossing across Rly. Track at party on km. 817/500-700 near LC No.274/A at KZE – Iqbal 09.03.2016(File High School Road by the put up to Executive DEN/West on Engineer/KWA/KGQ. 09.03.2016). Permission for laying D1 When the 10. J/W.372/KLGD/Pipe water pipe line proposal was put line/5/2015. crossing 90 mm dia (2 up to DRM on Nos) 11.03.2016 for encased with 250 mm approval and the MS pipe same is across the Railway track personally given at Railway kilometer 2/0- to Sr.DEN/East 100 near Level Crossing on 11.03.2016 No.3 between Pollachi – without Anamalai Railway mentioning any Stations remarks. The file by the Executive is kept pending . Officer, Zaminuthukuli Town Panchayat, Pollachi.

Registration started from 01.04.2015 onwards.(Sl. No.11 to). Permission for Proposal not feasible 11. J/W.372/19/Pipe laying drainage and advised to party line/6/2015. pipe line vide letter dtd.08.03. (1) 2016. through Rly. Culvert near MAQ Central Rly. Station 886/540 near MAQ Central Rly. Station. Permission for Final permission J/W. 372/KLGD/7/ laying D.I water given to the party on Pipeline/ 2015. pipe line crossing 18.01.2016. 200 mm dia 12. across the Rly. (2). Track at ROB No.144 at km. 48/2-3 between Pudunagaram – PGTN Rly.Stns by the Executive Engineer, W.S. Project division, KWA/PGT. J/W.372/KLGD/8/20 Permission for Final permission 13. 15. laying water pipe given to the party on (3). line across the 20.09.2016. Rly. Land at km. 15/060- 070 near LC No. 14 near Meenachipuram Station by Sri. V.P. Nallathambi/Poll achi. Permission for Final permission 14. J/W.372/11/Pipe laying water pipe given to the party on (4). line/9/2015. line crossing at 13.01.2016. km.558/68-69 near Lakkidi Rly. Station by the Secretary/Lakkidi Perur Grama Panchayat Jalanidhi Jalavitharna Scheme. Permission for Proposal cancelled since 15. J/W.372/PAY/ Pipe relaying of damaged there is no response (5). line/10/2015. pipe line at received from this office Nileshwar between based on this office letter km. 807/4-5 by the dtd. 20.07.2016. Executive Engineer/KWA, PH sub – Dn/KGQ. Permission for Final permission 16. J/W.372/18/11/2016. laying given to the party vide (6). 250mm dia MS letter dtd.16.02.2017. water pipe line encased with 500mm dia MS pipe across the Rly. Track at km. 765/1-2 between Pappinisseri and Kannapuram Railway Stations by the Executive Engineer, KWA/Kannur. 17. J/W.372/11/Pipe Permission for Final permission (7). line/12/2016. laying water pipe given to the party on lien crossing at 05.06.2018. km. 523/21-22. (Executive Engineer, KWA/PGT). 18. J/W.372/19/Pipe Permission for Party advised to (8). line/13/2016. laying water pipe submit a consent letter (ID Ref:- SR- PGT-2016- 66 lien crossing at from the authority dtd.14.06.2016). km. 17/00-100. maintaining the RUB vide letter dtd. 11.05.2017 (Executive and reminded on Engineer, 22.06.2017 and again (RDWS & reminded to party on S)/MAQ. 18.09.2017 to submit the consent letter within 15 days on receipt of this letter again reminded on 26.10.2017, 19.02.2018 and reminded on 11.04.2018. (Proposal cancelled, since there is no response from the party). 19. J/W.372/19/Pipe Permission for Agt.forms sent to (9). line/14/2016. laying water pipe party vide letter (ID Ref:- SR- PGT-2016-68 lien crossing at dtd.07.11.2018. dtd.14.06.2016 km. 20/300-400. (Executive Party advised to Engineer, remit the required (RDWS & amount along with S)/MAQ agreement within 15 . days on receipt of this office letter vide letter dtd.18.10.2019. 20 J/W.372/19/Pipe Permission for (i).Dy.CSTE /CN/ERS (10). line/15/2016. laying water pipe has been advised to (ID Ref:- SR- PGT-2016-67 lien crossing at furnish the construction clearance vide letter dtd.14.06.2016). km. 20/300-400. dtd.24.10.2016and (Executive reminded on 05.01.2017. Engineer, (ii).Party advised to sign (RDWS & the GAD vide letter S)/MAQ. dtd.03.08.2017. (iii). Village officer/Pudushedde Village has been advised to furnish the market value vide letter dtd.03.08.2017. (iv). Reminded to party to attend office along with market value vide letter dtd.18.09.2017 and reminded on 16.02.2018. Proposal cancelled on 28.08.2019(‘on line’), since there is no response from the RDWS & S/MAQ till date.

21. J/W.372/KLGD/Pipe Permission for Proposal cancelled (11). line/16/2016. laying water pipe based on the party’s (ID ref: SR- PGT-2016-82.). line crossing at request dtd. km.14/300- 400 18.10.2016. between Minatchipuram and Anamalai Road by Smt. Kalamani/POY. 22. J/W.372/KLGD/Pipe Permission for Final permission (12). line/17/2016. laying given to the party on (ID ref: SR- PGT-2016-102.). drainage/sewera 03.05.2017. ge pipe line at km.122/20-50 between POY and Kinathukadavu Rly.Station by the Executive Engineer/TWAD Board/Udumalpe t. 23. J/W.372/KLGD/Pipe Permission for Final permission (13). line/18/2016. laying given to the party on (ID ref: SR- PGT-2016-106.). drainage/sewera 07.06.2017. ge pipe line at km.1/00-1/26 between POY and Anamalai Rly.Station by the Executive Engineer/TWAD Board/Udumalpe t. 24. J/W.372/KLGD/Pipe Permission for laying Final permission drainage/sewerage pipe (14) line/19/2016. line at km.123/400-500 given to the party vide (ID ref: SR- PGT-2016-105.). between POY and letter dtd.03.05.2017. Kinatthukadavu Rly.Station by the Executive Engineer/TWAD Board/Udumalpet. 25. J/W.372/KLGD/Pipe Permission for Final permission (15). line/20/2016. laying given to the party vide (ID ref: SR- PGT-2016-99.). drainage/sewera letter dtd.03.05.2017. ge pipe line at km.123/30 and123/70 between POY and Kinatthukadavu Rly.Station by the Executive Engineer/TWAD Board/Udumalpe t. 26. J/W.372/KLGD/Pipe Permission for Final permission (16). line/21/2016. laying given to the party vide (ID ref: SR- PGT-2016-100.). drainage/sewera letter dtd.03.05.2017. ge pipe line at km.123/30 and123/70 between POY and Kinatthukadavu Rly.Station by the Executive Engineer/TWAD Board/Udumalpe t. 27. J/W.372/KLGD/Pipe Permission for Final permission (17). line/22/2016. laying given to the party vide (ID ref: SR- PGT-2016-101.). drainage/sewera letter dtd.03.05.2017. ge pipe line at km.122/300-400 between POY and Kinatthukadavu Rly.Station by the Executive Engineer/TWAD Board/Udumalpe t. 28 J/W.372/KLGD/23/ Permission for Final permission (a). Pipeline/2016 (new ID ref: laying water pipe given to the party on (18). SR- PGT- 2018-21 dtd. 28.05. line crossing at 18.02.2020. 2018). km.14/200-300 between Minatchipuram and Anamalai Road by Smt. Kalamani/POY 29. J/W.372/18/24/Pipeline/201 Permission for Proposal not feasible (19) 6. laying water pipe and party advised vide line crossing at letter dtd.02.12.2016. (ID ref: SR- PGT- 2016-115). km. 749/800-900 between CS – ETK Rly.Stations by Sri.P.Ashokan/K annur. 30. J/W.372/W/PGT/25/ Pipe Permission for laying Proposal cancelled, (20). line/2016. water pipe line since there is no crossing at km.552/1- 2 by the Executive response by (ID: SR- PGT-2016-121). Engineer/KWA/ KWA/PGT from this Kalmandapam/PGT office letter dtd.13.11.2017.

31. J/W.372/18/26/Pipeline/ Permission for Final permission (21). 2016. laying water pipe given to the party on line crossing at 16.03.2018. (ID ref: SR- PGT- 2016-114). km. 736/800-900 between TLY- DMD Rly.Stations by the Executive Engineer/KWA/ Kannur. 32. J/W.372/West/PGT/ Permission for Final permission (22). Pipeline/27/2016. laying water pipe given to the party on (ID ref: SR- PGT- 2016-118). line crossing at 23.10.2017. km. 540/3-5 between Parali and Palghat Jn Rly.Stations by the Secretary/Parali Grama Panchayat. 33. J/W.372/KLGD/Pipe Permission for laying Final permission (23) line/28/2016. drainage/sewerage given to the party vide pipe line at (ID ref: SR- PGT-2016- 123). km.122/400 between letter dtd.29.12.2017. POY and Kinatthukadavu Rly.Station by the Executive Engineer/TWAD Board/Udumalpet J/W.372/17/Pipeline/29/ Permission for Final permission 34. 2016. laying 350mmd ia given to the party on (24). (ID ref: SR- PGT-2016-131). MS pipe line 02.04.2019. encased with 700mm dia MS pipe across the Rly.track at km.689/800-900 between Quilandy and Vellarakkad Rly.Stations.(Execut ive Engineer, KWA/CLT). 35. J/W.372/KLGD/Pipeline/ Permission for Proposal cancelled (25). 30/2017. laying water vide letter dtd. (ID ref: SR- PGT-2017/ pipeline 08.12.2017, since 03 dtd.11.01.2017). crossing at there is no km.18/00- response from the 18/100 between party’s side based Minatchipuram on this office letters and dtd.27.04.2017 & Muthalamada 09.11.2017. Rly. Stations by Sri.Subramaniam, 7/39, Gandhi Nagar, Moolakadai, DIWAN SIR, Pudur(P.O), Pollachi, Tamil Nadu- 642001. 36. J/W.372/15/Pipeline/31/ Permission for Proposal not (26). 2017. laying water feasible and party (ID ref: SR- PGT-2017/02 pipeline crossing advised vide letter dtd. 11.01.2017). at km.58/900 and 59/000 bet:VNB- dtd.17.07.2017. NIL Rly.Stations by Sri.K.C.Abdullak utty/VNB. 37. J/W.372/11/Pipeline/32/ Permission for Final permission (27). 2017. (ID ref: SR- PGT-2017- laying water pipe given to the party 07 dtd.12.01.2017). line crossing at vide letter dtd. km.523/500-600 between 04.04.2017. Kanjikode and Kottekad Rly. Stations by 38. J/W.372/TIR/Pipeline/ Permission for Final permission (28). 33/2017. (ID ref: SR- PGT- laying water pipe given to the party vide 2016-135 dtd.27.12.2016). line crossing at letter dtd.01.11.2018. km.620/5-6 between Tirunnavaya and Rly.Stations(Exec utive Engineer/KWA/ Malappuram).

39. J/W.372/11/Pipeline/34/ Permission for Final permission (29). 2017.(ID: SR-PGT-2017-15). laying water pipe given to the party vide line xing through letter dtd.11.10.2018. Rly.track at km. 54/800-900 between PGTN Jn and PGTN Rly. Stations ( Executive Engineer,KWA/P GT). 40. J/W.372/17/Pipeline/35/ Permission for Proposal not 2017. laying drainage feasible and (30) (ID ref: SR- PGT-2017-18 /sewerage Municipality dtd.09.03.2017). pipeline crossing through Rly.alnd advised vide at km. 711/6 and letterdtd.19.12. 712/6 near 2017. Rly.Station. (Revised proposal received from the Secretary/Vadakar a Municipality has been sent to SSE/P.Way/QLD vide letter dtd.31.12.2019 for furnishing the feasibility report). 41. J/W.372/11/Pipeline/36/ Permission for Agt.forms sent to (31). 2016. laying water party vide letter (ID ref: SR- PGT-2017-19 pipeline crossing dtd.14.03.2018. dtd.21.03.2017). through Rly. Land at km. Secretary/Parli Grama 545/17-19 Panchayat has been advised to remit the way between Parli leave charges and and Makara submit the agreement Rly.Stations by within 15 days on receipt of this office letter vide the letter dtd.18.10.2019. Secretary/Parli Grama Panchayat. 42. J/W.372/KLGD/Pipe Permission for (i). Provisional (32). line/37/2017 dtd. 04.05.2017. laying water permission given to the (ID: SR- PGT-2017-28 dtd. pipeline xing at party on 01.12.2017. (ii).Signed agt. forms 27.04.2017 – this ID km. 44/0-100 sent to party vide letter cancelled and New ID No. near dtd.24.01.2018. SR- PGT- 2017-78 dtd. Pudunagaram 05.12.2017). yard.(Secretary/P eruvemba Grama Panchayat). 43. J/W.372/17/Pipeline/38/ Permission for Final permission given to (33). 2017. laying water the party on 20.07.2018. pipeline xing at km. 715/0-100) between BDJ – Mahe Rly. Stations by Jalanidhi Project, Chorode Grama Panchayath, Vadakara. 44. J/W.372/11/Pipeline/39/ Permission for Final permission given to (34). 2017. laying water the party vide letter dtd. pipeline xing at 10.10.2018. km. 525/9 to 526 between Kottekad and Kanjikode Rly.Stations by the Asst .Executive Engineer/PGT. 45 J/W.372/11/Pipeline/40/ Permission for This proposal is clubbed ((35). 2017. laying water to File pipeline xing at No.J/W.372/11/Pipeline/ km. 523/6-7 41/2017. (File between with Sri.K.S.Reji). Kottekad and Kanjikode Rly.Stations by the Asst.Executive Engineer/PGT.

46. J/W.372/11/Pipeline/41/ Permission for 1.Final permission (36). 2017. laying water given to the party on pipeline xing at 10.10.2018.. km. 523/6-7 between 2. KWA authorities Kottekad and has been advised to Kanjikode contact Rly.Stations by SSE/P.Way/East/PG the Asst. T for carryout the Executive work vide letter Engineer/PGT. dtd.12.04.2019.

47. J/W.372/18/Pipeline/42/ Permission for Proposal not feasible ( (37). 2017. laying water since CS yard) and pipeline xing at KWA/Kannur advised vide letter dtd.20.11.2017. km. 750/600-700 between CS & CAN Rly. Stations by the Executive Engineer/KWA/ Kannur. 48. J/W.372/18/Pipeline/43/ Permission for Agt.forms sent to (38). 2017. laying water party vide letter pipeline xing at dtd.21.03.2019. km. 757/300-400 between Kannur Party reminded to and Chirakkal. remit the way leave Stations by the charges along with Executive agt. Within 15 days on Engineer/KWA/ receipt of this letter Kannur vide letter dtd.18.10.2019. 49. J/W.372/18/Pipeline/44/ Permission for 1.Final permission (39). 2017. laying water given to the party on pipeline xing at 26.04.2019. km. 755/900- 2. Copy of letters 755/00 between received from Kannur and KWA/Kannur are sent Chirakkal. to SSE/P.Way/CAN Stations by the vide letter Executive dtd.09.05.2019. Engineer/KWA/ Kannur File put up to DEN/West on 01.11.2019 based on the letter received from the Executive Engineer/KWA vide letter dtd. 28.10.2019 (about caution). 50. J/W.372/KLGD/Pipeline/ Permission for Proposal dropped (40). 45/ 2017. laying water (SSE/P.Way/KLGD has pipeline xing at advised that the Irrigation departmenthas dropped km. 43/800-900 the above proposal vide between SSE’s/P.Way/KLGD Peruvambu and letter dtd.02.04.2018). Palakkad Rly. Stations by the Asst. Executive Engineer/Irrigati on Sub – division/Chittur. 51. J/W.372/19/Pipeline/46/ Permission for Final permission given to (41). 2017. replacement of the party on 24.09.2019. sewer pumping main of 450mm dia CI pipe with 450mm DI K9 Class pipe at chainage :3/100 through pushing method by the Commissioner/ MCC/MAQ. 52. J/W.372/11/Pipeline/47/ Permission for Final permission (42). 2017. laying water pipe given to the party line crossing at on 04.05.2019. km. 531/2-3 by the Executive Engineer/KWA/ PGT. 53. J/W.372/11/Pipeline/48/ Permission for Proposal not feasible and (43). 2017. laying water party advised on pipeline crossing 19.02.2018. at km. 531/2-3 by the Secretary/OTP Municipality. 54. J/W.372/TIR/Pipeline/ Permission for Proposal not feasible and (44). 49/2017. laying water KWA has advised to pipeline crossing submit the revised location as suggested by through Rly.track SSE vide letter at km. 645/6-7 dtd.21.02.2018.(now the bet. Vallikunnu proposal has been and Kadalundi cancelled on 28.08.2019, Rly.Stations by that there is no response the Asst. from the KWA on till date). Engineer/KWA/ PGI. 55. J/W.372/17/27/06 Permission for Permission already given (45). (Old file). laying water on 11.11.2009 and pipeline across 25.01.2011 . Now the KWA has advised that the work the Rly. track at could not be taken up due km.656/200-300 to their reasons and they between Kallayi – have requested to give permission now. Rly.Stations Therefore, SSE/P.Way/CLT has (File No. been advised to inspect J/W.372/16/11 the site and furnish /06) and km. remarks vide letter 670/300-400 dtd.06.12.2017 and reminded on 03.01.2018. between West Hill – Elathur Rly.Stations by KWA/CLT. 56. J/W.372/18/Pipeline/50/ Permission for Final permission given to (46). 2018. laying water the party on 14.06.2019. pipeline crossing (SSE/P.Way/CAN has through Railway been advised to supervise land at the work vide letter km.743/400-300 dtd.10.07.2019) between Kannur South and Etakkot Rly.Stations by the Executive Engineer/KWA/ CAN.

57. J/W.372/19/Pipeline/51/ Permission for Final permission (47). 2018. laying water given to the party on pipeline crossing 14.06.2019. through Rly.land at km.21/600 and 22/300 between Panambur and Padil Rly.Stations by the Chief Officer/Mulki Town Panchayath. J/W.372/11/Pipeline/52/ Permission for Proposal not feasible 58. 2018. laying water vide letter dtd. (48). pipeline xing at 19.07.2018. km.550/68 and 558/69 between MNY – LDY Rly.Stations by the Secretary/Lakkid i Perur Grama Panchayat. 59. J/W.372/12/53/Pipeline/ Permission for Feasibility report (49). 2018. laying water called for from pipeline crossing SSE/P.Way/SRR vide through Rly land letter dtd.20.08.2018 at km. 571/9 and and reminded on 572/2 by the 11.06.2019, 04.11.2019. Executive Engineer /LSGD/PGT. 60. J/W.372/11/Pipeline/54/ Permission for Final permission (50). 2018. laying water given to the party on pipeline crossing 28.06.2019. through Rly.track at km. 552/100- 200 between Mankara and Lakkiti Rly. Stations by the Executive Engineer/KWA/ PGT. 61. J/W.372/11/West/PTJ/ Permission for Agt.forms sent to (51). Pipeline/55/2018. laying water pipe party vide letter line crossing dtd.16.09.2019. through Rly. track at km.506/25-27 by Sri.S.Sampathku mar/CBE. 62. J/W.372/11/West/PGT/ Permission for Final permission (52). Pipeline/56/2018. laying water pipe given to the party vide line crossing letter dtd.14.11.2018.. through Rly. track at km.543/42-44 by the Secretary/Parali Grama Panchayat. 63. J/W.372/KGQ/Drain/ Permission to Agt. Forms sent to (53). 57/2018. construct party vide letter drainage through dtd.18.03.2020. Rly. land at km. 840/300-400 between Kasaragod and Kumbla Rly. Stations by the Secretary/KGQ Municipality. 64. J/W.372/15/Pipeline/ Permission for Final permission (54). 58/2018. laying water given to the party vide pipeline crossing letter dtd.28.10.2019. through Rly. track at km.31/6 between Angadippuram and Pattikkad Rly.Stations by the Secretary/ Keezhattur Grama Panchayat.

65. J/W.372/17/59/2018. Permission to 1. Party advised to (55). construct attend office to sign drainage at km. the GAD vide letter 732/400-600 near dtd.02.04.2019. . 2. Village Officer, TLY Taluk has been advised to furnish the market value vide letter dtd.02.04.2019.

(3). Reminded to the Executive Engineer/TLY to attend office and to sign the GAD along with Market value vide letter dtd. 28.06.2019.

66. J/W.372/11/60/2018. Permission to Final permission (56). construct given to Municipality drainage at km. on 20.12.2019. 53/800-54/000 within Palakkad Town Railway Station yard. 67. J/W.372/11/61/2018. Permission to 1.Proposal returned (57). construct by SSE/LM and SSE drainage at km. has informed that 53/780 and some encroachments 57/870 between exist along the Rly. PGT – PGTN boundary in the form Rly.Stations. of building. Hence, ADEN/PGT has been advised to furnish the details of name of encroachers, addresses etc. vide letter dtd.29.01.2020. After evicting the encroachments, the proposal will be processed. File kept pending with Land Section on 29.01.2020 onwards.

2. PGT Municipality has been advised to furnish some details vide letter dtd.18.02.2020. 68. J/W.372/11/62/2018. Permission to After getting the (58). construct details from drainage at km. SSE/Works/PGT, the 53/780 proposal is put up to SSE/Drg./LM on 23.12.2019. 69. J/W.372/West- Permission for Mavuthampathi (59). PTJ/Pipeline/63/2018. laying water village has been pipeline crossing advised to submit the at km.500/520 market value vide and 509/590 letter dtd.28.05.2019. between WRA- ETMD Rly. Stations by Mata Amritanandamay i Matha/ETMD. 70. J/W.372/KLGD/Pipeline/ Permission for GAD resubmitted to (60). 64/2018. laying water CBE through ‘E’ pipeline crossing Office on 21.07.2020. through Rly. track at km. 139/3-4 near Kinattukadavu Rly.Station by the Executive Engineer/TWAD Bord/CBE. 71. J/W.372/KLGD/Pipeline/ Permission for Final (61). 01/2019. laying water permission pipeline crossing given to the through Rly.track party on at km. 13/500-600 23.09.2019. by Smt.D.Lakshmi/ POY.

72. J/W.372/West- Permission for Agt.forms sent to (62). PTJ/Pipeline/02/2019. laying party vide letter drainage/sewera dtd.21.05.2020. ge pipeline crossing through Rly. track at km. 488/900- 489/000 by the Executive Engineer/TWAD Board/CBE. 73. J/W.372/West- Permission for Agt.forms sent to (63). PTJ/Pipeline/03/2019. laying party vide letter drainage/sewera dtd.21.05.2020. ge pipeline crossing through Rly. track at km. 488/900-489/000 by the Executive Engineer/TWAD Board/CBE. 74. J/W.372/West- Permission for After getting the trail (64). PTJ/Pipeline/04/2019. laying water pit particulars from pipeline crossing TWAD, the proposal through Rly. put up to track at km. SSE/Drg./LM on 488/300 by the 15.06.2020. Executive Engineer/TWAD Board/CBE.

(Revised location 488/972). 75. J/W.372/KLGD/Pipeline/ Permission for Final permission (65). 05/2019. laying water given to the party vide pipeline crossing letter dtd.19.08.2019. through Railway track at km.15/200-300 for agriculture purpose by Smt. M.V. Sri Devi/POY.

76. J/W.372/TIR/Pipeline/ Permission for 1. Water (66). 06/2019. laying water Authority has been pipeline crossing advised to remit centage charges through Railway along with trail pit track at km. particulars vide 627/700-800 letter between Tirur dtd.02.07.2019. and Tanur Rly. 2. SSE/P.Way/TIR Stations by the has been advised Executive to furnish the distance of the Engineer/KWA/ Rly. boundary Project division/ from the toe of Malappuram. embankment vide letter dtd.02.07.2019. 77. J/W.372/TIR/Pipeline/ Permission for 1. Kerala Water (67). 07/2019. laying water Authority has been pipeline crossing advised to remit centage charges through Railway along with trail pit track at km. particulars vide 633/2-3 between letter TA and PGI dtd.02.07.2019. Rly.Stations by the Executive 2.SSE/P.Way/TIR has been advised to Engineer/KWA/ submit revised Project division/ Feasibility report Malappuram. along with sketch based on the revised sketch submitted by the KWA vide letter dtd.05.08.2019 and reminded on 25.10.2019. 78. J/W.372/12/Pipeline/08/ Permission for Final permission (68). 2019. laying water given to the party on pipeline crossing 16.01.2020. near SRR Rly. Station by Sri.R.Sukumaran / SRR. 79. J/W.372/12/Pipeline/09/ Permission for Final permission (69). 2019. laying water given to the party on pipeline crossing 11.12.2019. near SRR Rly. Station by Sri.C.Vinod kumar/ SRR. 80. J/W.372/12/Pipeline/10/ Permission for Final permission (70). 2019. laying water given to the party on pipeline crossing 16.01.2020. near SRR Rly. Station by Smt. M.Santhi/ SRR. 81. J/W.372/ Permission for (71). TIR/Pipeline/11/ 2019. laying water Final permission pipeline crossing given to the party on through Rly. 27.01.2020. track at km. 615/2-3 by the Executive Engineer/KWA/ Malappuram. 82. J/W.372/19/Sewer Permission for Party advised to send (72). Pipeline/12/2019. laying sewer a revised pipeline crossing proposal(since the at km. 0/730 to proposed laying of 0/930 by MCC. sewage pipeline parallel to track) vide letter dtd.17.12.2019. 83. J/W.372/19/Sewer Permission for SSE/P.Way/MAQ (73). Pipeline/13/2019. laying sewer has been advised to pipeline crossing furnish some at km. 2/800 to additional details vide 3/000 by MCC. letter dtd.02.09.2019 and reminded on 22.10.2019. 84. J/W.372/19/Sewer Permission for Proposal cancelled, (74). Pipeline/14/2019. laying sewer since there is no pipeline crossing response from the at km. 3/200 to party as advised vide 3/600 by MCC. this office letter dtd.18/10/2019. 85. J/W.372/19/Sewer Permission for The proposal not (75). Pipeline/15/2019. laying sewer feasible, since the pipeline crossing proposed crossing at km. 2/000 to along the Railway 2/600 by MCC. land vide letter dtd.03.09.2019. 86. J/W.372/KLGD/Pipeline/ Permission for Based on the KWA’s (76). 16/2019. laying water request dtd. pipeline crossing 04.09.2019, the through Rly. land proposal has been at km. 50/700-800 cancelled. between Palakkad Town and Pudunagaram Rly. Stations by the Executive Engineer/KWA/ PGT. 87. J/W.372/11/Pipeline/ 17/2019. Permission for Water authorities has (77). laying water been advised to remit pipeline crossing centage charges along through Rly. land with trail pit particulars at km. 528/2-3 vide letter between Palghat dtd.11.12.2019. and Kottekad Rly.Stations by the Executive Engineer/KWA/ PGT. 88. J/W.372/East- Permission for SSE/Works/PGT has (78). PGT/Pipeline/18/2019. laying water been advised to furnish pipeline crossing some additional details through Rly. land vide letter at km. 53/780 and dtd.22.10.2019. 57/870 between PGTN – PGT Jn Rly. Stations by the Executive Engineer/KWA/ WSP/ PGT. 89. J/W.372/11/Culvert/19/2019. Permission to Feasibility report called (79). construct a Culvert for from through Rly. land SSE/P.Way/East/PGT at km.54/300-360 vide letter dtd.19.08.2019 between PGT – reminded on 21.10.2019. PGTN Rly. Stations by the Secretary/ PGT Municipality.

90. J/W.372/KLGD/Water Permission for Final (80). Pipeline/20/2019. laying water permission pipeline xing given to the through Rly. land party on at km. 14/400- 18.05.2020. 14/500 between Minatchipuram and Anamalai Rly. Stations by Sri.Udhayakumar/ POY. 91. J/W.372/19/Sewer Pipeline/21/ Permission for The proposal not (81). 2019. laying sewer feasible, since the pipeline crossing proposed laying of through Rly.land sewage pipeline at km.0/600 and parallel to track vide 1/00 between letter dtd.18.12.2019. Mangalore Central and Mangalore Junction Rly.Stations by M/s.MCC. 92. J/W.372/19/Sewer Pipeline/22/ Permission for F.R called for from (82). 2019. laying sewer SSE/P.Way/MAQ vide pipeline crossing letter dtd.22.11.2019. through Rly.land at km.0/730 and 0/930 between Mangalore Central and Mangalore Junction Rly.Stations by M/s.MCC. 93. J/W.372/19/Sewer Pipeline/23/ Permission for F.R called for from (83). 2019. laying sewer SSE/P.Way/MAQ vide pipeline crossing letter dtd.25.11.2019. through Rly.land at km.3/100 and 3/600 between Mangalore Central and Mangalore Junction Rly.Stations by M/s.MCC.

94. 372/16/11/06(Old File) .Permission for Remarks has been (84). laying water called for from pipeline across the SSE/P.Way/CLT vide Rly. track at km. letter dtd.02.12.2019. 650/500-600 between Kadalundi and Ferok Rly. Station by the Executive Engineer/KWA/ CLT. 95. J/W.372/19/Drainage/01/2020. Permission to Feasibility report called (85). construct a drain for from at km. 17/02 and SSE/P.Way/MAQ vide 17/100 between letter dtd.14.01.2020. Padil and Jokatte Rly. Stations by the Assistant Execuitve Engineer/MAQ. 96. J/W.372/18/Pipeline/02/2020. Permission to Feasibility report called (86). construct the for from existing water pipe SSE/P.Way/CAN vide line at km. letter dtd.14.01.2020. 750/700-800 between Kannur south and Kannur Rly.Stations by the Executive Engineer, KWA/Kannur. 97. J/W.372/18/Culvert/03/2020. Permission to Feasibility report called (87). construct a for from Culvert at km. SSE/P.Way/CAN vide 762/0-1 between letter dtd.07.07.2020. PPNS and VAPM Rly. Stations by the Secretary/PPNS Grama Panchayat.