GREEN LAKE SMALL CRAFT CENTER SEATTLE DESIGN COMISSION - CONCEPT REVIEW
4 OCTOBER 2018
schacht aslani architects Concept Review schacht aslani architects ORGANIZATIONS AT THE CENTER
ASSOCIATED RECREATION COUNCIL (ARC) GROUPS AT GLSCC • Green Lake Crew • Seattle Sailing Club • Seattle Canoe and Kayak Club
ROWING ADVISORY COUNCIL (RAC) • Oversees decisions regarding budget, equipment, race development and fundraising for the ARC groups at the center • Manages instruction and training of individuals at the center • Operates under a MOU with Seattle Parks and Recreation • Leading the parallel private fundraising efforts
Concept Review schacht aslani architects EVENTS AT THE CENTER
ROWING SPECIAL EVENTS • Frostbite Regatta (November) • Green Lake Spring Regatta (April) • Summer Rowing Extravaganza (August) • Ted Houk Regatta (June)
Concept Review schacht aslani architects PROJECT GOALS
STEWARDSHIP • Provide a safe and secure place for rowing and paddling programs through improved accessibility, building upgrades & seismic compliance
PROGRAMS • Meet increased demand for public rowing and paddling programs through boat storage and program support spaces
ACCESS • Expand facilities to reach underserved populations and continue the legacy for “access for all” through accessible facilities
COMMUNITY • Foster youth activities that promote teamwork, health and bonding and create more opportunities for the public to enjoy Green Lake
Concept Review schacht aslani architects CONTEXT
Concept Review schacht aslani architects SITE CONTEXT
1
AURORA 99
8 I-5 2
9 3
5 4 6
7 N
KEY 1 GREEN LAKE PARK 3 GOLF COURSE 5 WOODLAND PARK ZOO 7 GREEN LAKE WAY N 9 WEST GREEN LAKE WAY N 2 SMALL CRAFT CENTER 4 WOODLAND PARK 6 SPORTS FIELDS 8 EAST GREEN LAKE WAY N
Concept Review schacht aslani architects SITE HISTORY - OLMSTED PLAN
KEY 1 SITE
Concept Review schacht aslani architects SITE HISTORY - 1950’S/1960’S
1966 Sail Boat Facility Pier
1966 Shell Facility 1950 Launching Pier Aqua Theatre
1951 Shell House
1958 Concessions and Toilet
N 0 20 0 140
Concept Review schacht aslani architects SITE HISTORY - 1980’S
1980 1984 New Rescue Boat New wood Deck House 1980 1980 New Pier Alteration of Aqua Theater
1980 1980 Construction of new small craft center Remodel of original within the removed grandstand Shell House with a sections with a new steel truss roof new steel truss roof
N 0 20 0 140
Concept Review schacht aslani architects EXISTING SMALL CRAFT CENTER
1
5
3
2 3 8 6
7
6 N
KEY 1 GREEN LAKE PARK 3 SMALL CRAFT CENTER 5 GOLF COURSE 7 WEST GREEN LAKE WAY N 2 SHELLHOUSE 4 AQUATHEATER 6 PARKING 8 GREEN LAKE TRAIL
Concept Review schacht aslani architects EXISTING SMALL CRAFT CENTER
Concept Review schacht aslani architects EXISTING SMALL CRAFT CENTER
Concept Review schacht aslani architects SITE & BUILDING PLANNING
Concept Review schacht aslani architects EXISTING
15 14
13 12
5
9 11 2 W 1 W
C
1
7
6 4 .. 9 2 2 7 W 1 W 1 C
9
3 5 4 2 9 4 2 .. 7 3 9 .. 2 2 9 2 7 2 7 2 1 W 7 1 W 1 C 1 C
3
4
3 0 .. 9 2 2 7 1 W 1 5 C 4
8 2 .. 9 2 2 7 W 1 W 1 C C 1
3
2 9 .. 9 1 2 7 W 1 W 1 3 C
8 10 1 7 9 5 6 2 4
N KEY 1 SHELL HOUSE 4 CANOE & KAYAK 7 WORKOUT ROOM 10 SEWER PUMP 13 SHELL STORAGE 1 Level 1 P-02 1/16" = 1'-0" 2 RESTROOMS 5 OFFICES 8 CUBBIES/CHANGING 11 ERG ROOM 14 TRIP STORAGE ROOM 3 6 9 12 REPAIR/STORAGE ROOM 15 CANOE & KAYAK STORAGE RESCUE BOAT HOUSE MEETING ROOM ExistingTOILET/KITCHENETTE Floor Plan schacht aslani architects Green Lake Small Craft Center 08/17/17Concept Review schacht aslani architects P-02 SPACE NEEDS
Program Area Existing Preferred Option Multipurpose Room & Support 0 1,489 Parks Office 760 912 Boat Program Support 2,530 1,779 Boat Storage 6,995 8,110 Shared Support Spaces 465 657 Aqua Theater (unassigned) Incl. above 4,145 Total (ASF) *10,750 **17,092
* 6,605 sf in existing Boathouse and Shellhouse
** Mt Baker Rowing and Sailing Center = 17,147 sf
Concept Review schacht aslani architects SITE CONSTRAINTS
LAKE AQUA THEATER
OHM SETBACK
SHELLHOUSE PROJECT SITE
SIGNIFICANT TREES
N
Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 1
FLOATING PIER (PROPOSED) WAKELESS LAUNCH STORAGE (PROPOSED) 5
20' OHM SETBACK
2 1
50' OHM SETBACK
3 4
12,947 ASF (TOTAL) KEY 1 STORAGE/FLEX 2 CANOE/KAYAK 3 LOBBY/COUNTER 4 SHELL STORAGE - NEW 5 PIER
Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 1
1
2
3
KEY 1 VESTIBULE 2 LOBBY 3 BOAT STORAGE
Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 2
FLOATING PIER (PROPOSED) WAKELESS LAUNCH STORAGE (PROPOSED)
20' OHM SETBACK
6
50' OHM SETBACK 8 7
9
10
12,947 ASF (TOTAL) KEY 6 EXTERIOR DECK 7 PARKS OFFICE 8 MULTIPURPOSE ROOM 9 KITCHEN 10 BOAT PROGRAM
Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 2
1 2
3 5 5 3 6 7 8
4 4 3 3 9
KEY 1 OFFICES 3 LOCKER ROOM 5 SHOWER 7 KITCHEN 9 ELECTRICAL 2 MULTIPURPOSE 4 RESTROOM 6 LAUNDRY 8 MEETING ROOM
Concept Review schacht aslani architects LANDSCAPE
EXISTING AQUATHEATER
PROPOSED NEW PIER
6 1 EXISTING SHELL HOUSE 8 9 7 7 6 6 2 PROPOSED NEW BUILDING 1 4 2 6 7 2 7 5 9 10 4 7 9 3
KEY 1 CIP CONCRETE RAMP 3 CIP CONCRETE 5 CRUSHED GRAVEL PATH 7 DROUGHT-TOLERANT 9 BENCH WITH HANDRAILS 1:12 PLANTING CURB GRASSES MAX. SLOPE 2 CIP CONCRETE STAIRS 4 PEDESTRIAN-SCALE 6 EXISTING TREES TO 8 BIORETENTION POND 10 OVERLOOK WITH WITH HANDRAILS LIGHT FIXTURE REMAIN GUARDRAIL
Concept Review schacht aslani architects LANDSCAPE
Drought-Tolerant Grasses DROUGHT-TOLERANTDrought-Tolerant Grasses GRASSES
Bioretention BIORETENTIONBioretention
Concept Review schacht aslani architects PREFERRED OPTION - SECTION
Concept Review schacht aslani architects SUSTAINABLE STRATEGIES BUILDING • LEED v4 Gold Certification - EPD, HPD and LEM materials credits • Natural daylighting and LED lighting • Ultra-Low flow plumbing fixtures • Ultra-high efficiency heat pumps (2x more efficient than SEC).
SITE • Native and/or drought-tolerant planting palette • Smart irrigation system to reduce water use • Paving materials designed to reduce heat island effect • On-site natural drainage bioretention for stormwater • Sewer pump station replacement
Concept Review schacht aslani architects MASS & MATERIALS
Concept Review schacht aslani architects MATERIALS
ARCHITECTURAL COLOR GUIDE
CONCRETE STOREFRONT CORRUGATED METAL WOOD SIDING POLYCARBONATE
Concept Review schacht aslani architects EXTERIOR ELEVATIONS
NORTH ELEVATION
EAST ELEVATION
Concept Review schacht aslani architects EXTERIOR ELEVATIONS
SOUTH ELEVATION
WEST ELEVATION
Concept Review schacht aslani architects NORTH ENTRY PLAZA
Concept Review schacht aslani architects WATERS EDGE
Concept Review schacht aslani architects PATH SIDE
Concept Review schacht aslani architects FROM W GREEN LAKE WAY N
Concept Review schacht aslani architects BIRD’S-EYE VIEW
Concept Review schacht aslani architects MILESTONE SCHEDULE DESIGN • July 2018 - April 2019
PERMITTING • Jan 2019 - April 2019
CONSTRUCTION • June 2019 - April 2020
GRAND RE-OPENING • May 2020