GREEN LAKE SMALL CRAFT CENTER DESIGN COMISSION - CONCEPT REVIEW

4 OCTOBER 2018

schacht aslani architects Concept Review schacht aslani architects ORGANIZATIONS AT THE CENTER

ASSOCIATED RECREATION COUNCIL (ARC) GROUPS AT GLSCC • Green Lake Crew • Seattle Sailing Club • Seattle and Kayak Club

ROWING ADVISORY COUNCIL (RAC) • Oversees decisions regarding budget, equipment, race development and fundraising for the ARC groups at the center • Manages instruction and training of individuals at the center • Operates under a MOU with Seattle Parks and Recreation • Leading the parallel private fundraising efforts

Concept Review schacht aslani architects EVENTS AT THE CENTER

ROWING SPECIAL EVENTS • Frostbite Regatta (November) • Green Lake Spring Regatta (April) • Summer Rowing Extravaganza (August) • Ted Houk Regatta (June)

Concept Review schacht aslani architects PROJECT GOALS

STEWARDSHIP • Provide a safe and secure place for rowing and paddling programs through improved accessibility, building upgrades & seismic compliance

PROGRAMS • Meet increased demand for public rowing and paddling programs through boat storage and program support spaces

ACCESS • Expand facilities to reach underserved populations and continue the legacy for “access for all” through accessible facilities

COMMUNITY • Foster youth activities that promote teamwork, health and bonding and create more opportunities for the public to enjoy Green Lake

Concept Review schacht aslani architects CONTEXT

Concept Review schacht aslani architects SITE CONTEXT

1

AURORA 99

8 I-5 2

9 3

5 4 6

7 N

KEY 1 GREEN LAKE PARK 3 GOLF COURSE 5 ZOO 7 GREEN LAKE WAY N 9 WEST GREEN LAKE WAY N 2 SMALL CRAFT CENTER 4 WOODLAND PARK 6 SPORTS FIELDS 8 EAST GREEN LAKE WAY N

Concept Review schacht aslani architects SITE HISTORY - OLMSTED PLAN

KEY 1 SITE

Concept Review schacht aslani architects SITE HISTORY - 1950’S/1960’S

1966 Sail Boat Facility Pier

1966 Shell Facility 1950 Launching Pier Aqua Theatre

1951 Shell House

1958 Concessions and Toilet

N 0 20 0 140

Concept Review schacht aslani architects SITE HISTORY - 1980’S

1980 1984 New Rescue Boat New wood Deck House 1980 1980 New Pier Alteration of Aqua Theater

1980 1980 Construction of new small craft center Remodel of original within the removed grandstand Shell House with a sections with a new steel truss roof new steel truss roof

N 0 20 0 140

Concept Review schacht aslani architects EXISTING SMALL CRAFT CENTER

1

5

3

2 3 8 6

7

6 N

KEY 1 GREEN LAKE PARK 3 SMALL CRAFT CENTER 5 GOLF COURSE 7 WEST GREEN LAKE WAY N 2 SHELLHOUSE 4 AQUATHEATER 6 PARKING 8 GREEN LAKE TRAIL

Concept Review schacht aslani architects EXISTING SMALL CRAFT CENTER

Concept Review schacht aslani architects EXISTING SMALL CRAFT CENTER

Concept Review schacht aslani architects SITE & BUILDING PLANNING

Concept Review schacht aslani architects EXISTING

15 14

13 12

5

9 11 2 W 1 W

C

1

7

6 4 .. 9 2 2 7 W 1 W 1 C

9

3 5 4 2 9 4 2 .. 7 3 9 .. 2 2 9 2 7 2 7 2 1 W 7 1 W 1 C 1 C

3

4

3 0 .. 9 2 2 7 1 W 1 5 C 4

8 2 .. 9 2 2 7 W 1 W 1 C C 1

3

2 9 .. 9 1 2 7 W 1 W 1 3 C

8 10 1 7 9 5 6 2 4

N KEY 1 SHELL HOUSE 4 CANOE & KAYAK 7 WORKOUT ROOM 10 SEWER PUMP 13 SHELL STORAGE 1 Level 1 P-02 1/16" = 1'-0" 2 RESTROOMS 5 OFFICES 8 CUBBIES/CHANGING 11 ERG ROOM 14 TRIP STORAGE ROOM 3 6 9 12 REPAIR/STORAGE ROOM 15 CANOE & KAYAK STORAGE RESCUE BOAT HOUSE MEETING ROOM ExistingTOILET/KITCHENETTE Floor Plan schacht aslani architects Green Lake Small Craft Center 08/17/17Concept Review schacht aslani architects P-02 SPACE NEEDS

Program Area Existing Preferred Option Multipurpose Room & Support 0 1,489 Parks Office 760 912 Boat Program Support 2,530 1,779 Boat Storage 6,995 8,110 Shared Support Spaces 465 657 Aqua Theater (unassigned) Incl. above 4,145 Total (ASF) *10,750 **17,092

* 6,605 sf in existing Boathouse and Shellhouse

** Mt Baker Rowing and Sailing Center = 17,147 sf

Concept Review schacht aslani architects SITE CONSTRAINTS

LAKE AQUA THEATER

OHM SETBACK

SHELLHOUSE PROJECT SITE

SIGNIFICANT TREES

N

Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 1

FLOATING PIER (PROPOSED) WAKELESS LAUNCH STORAGE (PROPOSED) 5

20' OHM SETBACK

2 1

50' OHM SETBACK

3 4

12,947 ASF (TOTAL) KEY 1 STORAGE/FLEX 2 CANOE/KAYAK 3 LOBBY/COUNTER 4 SHELL STORAGE - NEW 5 PIER

Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 1

1

2

3

KEY 1 VESTIBULE 2 LOBBY 3 BOAT STORAGE

Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 2

FLOATING PIER (PROPOSED) WAKELESS LAUNCH STORAGE (PROPOSED)

20' OHM SETBACK

6

50' OHM SETBACK 8 7

9

10

12,947 ASF (TOTAL) KEY 6 EXTERIOR DECK 7 PARKS OFFICE 8 MULTIPURPOSE ROOM 9 KITCHEN 10 BOAT PROGRAM

Concept Review schacht aslani architects PREFERRED OPTION - LEVEL 2

1 2

3 5 5 3 6 7 8

4 4 3 3 9

KEY 1 OFFICES 3 LOCKER ROOM 5 SHOWER 7 KITCHEN 9 ELECTRICAL 2 MULTIPURPOSE 4 RESTROOM 6 LAUNDRY 8 MEETING ROOM

Concept Review schacht aslani architects LANDSCAPE

EXISTING AQUATHEATER

PROPOSED NEW PIER

6 1 EXISTING SHELL HOUSE 8 9 7 7 6 6 2 PROPOSED NEW BUILDING 1 4 2 6 7 2 7 5 9 10 4 7 9 3

KEY 1 CIP CONCRETE RAMP 3 CIP CONCRETE 5 CRUSHED GRAVEL PATH 7 DROUGHT-TOLERANT 9 BENCH WITH HANDRAILS 1:12 PLANTING CURB GRASSES MAX. SLOPE 2 CIP CONCRETE STAIRS 4 PEDESTRIAN-SCALE 6 EXISTING TREES TO 8 BIORETENTION POND 10 OVERLOOK WITH WITH HANDRAILS LIGHT FIXTURE REMAIN GUARDRAIL

Concept Review schacht aslani architects LANDSCAPE

Drought-Tolerant Grasses DROUGHT-TOLERANTDrought-Tolerant Grasses GRASSES

Bioretention BIORETENTIONBioretention

Concept Review schacht aslani architects PREFERRED OPTION - SECTION

Concept Review schacht aslani architects SUSTAINABLE STRATEGIES BUILDING • LEED v4 Gold Certification - EPD, HPD and LEM materials credits • Natural daylighting and LED lighting • Ultra-Low flow plumbing fixtures • Ultra-high efficiency heat pumps (2x more efficient than SEC).

SITE • Native and/or drought-tolerant planting palette • Smart irrigation system to reduce water use • Paving materials designed to reduce heat island effect • On-site natural drainage bioretention for stormwater • Sewer pump station replacement

Concept Review schacht aslani architects MASS & MATERIALS

Concept Review schacht aslani architects MATERIALS

ARCHITECTURAL COLOR GUIDE

CONCRETE STOREFRONT CORRUGATED METAL WOOD SIDING POLYCARBONATE

Concept Review schacht aslani architects EXTERIOR ELEVATIONS

NORTH ELEVATION

EAST ELEVATION

Concept Review schacht aslani architects EXTERIOR ELEVATIONS

SOUTH ELEVATION

WEST ELEVATION

Concept Review schacht aslani architects NORTH ENTRY PLAZA

Concept Review schacht aslani architects WATERS EDGE

Concept Review schacht aslani architects PATH SIDE

Concept Review schacht aslani architects FROM W GREEN LAKE WAY N

Concept Review schacht aslani architects BIRD’S-EYE VIEW

Concept Review schacht aslani architects MILESTONE SCHEDULE DESIGN • July 2018 - April 2019

PERMITTING • Jan 2019 - April 2019

CONSTRUCTION • June 2019 - April 2020

GRAND RE-OPENING • May 2020