STATE OF RELEASE: IMMEDIATE 11/30/2018 DEPARTMENT OF TRANSPORTATION CONTACT: Thomas G. Bayer (718)482-4002 REGION 11 ***** T R A F F I C A D V I S O R Y *****

All lane closures listed are expected to be in place, WEATHER PERMITTING:

Bronx Arthur Sheridan Expressway 12/1/2018 • One lane closed N/B from Westchester Avenue to East 173rd Street from 9:00 a.m. to 2:00 p.m. • One lane closed S/B from East 173rd Street to Westchester Avenue from 10:00 a.m. to 3:00 p.m. 12/3/2018 – 12/7/2018 • One lane closed N/B from Westchester Avenue to East 173rd Street from 9:00 a.m. to 2:00 p.m. 12/3/2018 – 12/8/2018 • One lane closed S/B from East 173rd Street to Westchester Avenue from 10:00 a.m. to 3:00 p.m. 12/8/2018 • One lane closed N/B from Westchester Avenue to East 173rd Street from 7:00 a.m. to 3:00 p.m.

Bronx River Parkway 12/3/2018 - 12/6/2018 • One lane closed N/B between Mosholu Parkway /Allerton Avenue and Gun Hill Road from 9:30 a.m. to 3:00 p.m. • One lane closed S/B between Gun Hill Road and Mosholu Parkway /Allerton Avenue from 10:00 a.m. to 3:00 p.m. 12/3/2018 - 12/7/2018 • Right lane closed N/B between Cross Bronx Expressway and Bronxdale Avenue from 10:00 a.m. to 2:00 p.m. • Right lane closed S/B between Bronxdale Avenue and Cross Bronx Expressway from 10:00 a.m. to 2:00 p.m. 12/5/2018 – 12/6/2018 • Right lane closed N/B Service Road between Bruckner Expressway and Watson Avenue from 9:30 a.m. to 3:00 p.m. • Right lane closed N/B Service Road between Pelham Parkway and Allerton Avenue from 9:30 a.m. to 3:00 p.m. • Right lane closed S/B Service Road between East 233rd Street and East Gun Hill Road from 10:00 a.m. to 3:00 p.m. • Right lane closed S/B Service Road between Allerton Avenue and Pelham Parkway from 10:00 a.m. to 3:00 p.m. • Right lane closed S/B Service Road between Pelham Parkway and Cross Bronx Expressway from 10:00 a.m. to 3:00 p.m. • Right lane closed N/B Service Road between Cross Bronx Expressway and Pelham Parkway from 10:00 a.m. to 3:00 p.m. • Left shoulder closed S/B Service Road between Allerton Avenue and Boston Road from 10:00 a.m. to 3:00 p.m.

Bruckner Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that only one lane is open on the westbound Bruckner Expressway (I-278) ramp to the Robert F. Kennedy Bridge through March 15th, 2019. Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists of a lane shift on the westbound Bruckner Expressway from 138th Street to the Major Deegan Expressway. Motorist should procced with caution. • The New York State Department of Transportation (NYSDOT) is advising motorists of a lane shift on the eastbound Bruckner Expressway from approaching 138th Street Exit ramp to 142nd Street. Motorist should procced with caution. 12/3/2018 • One lane closed S/B near East Tremont Avenue from 10:00 a.m. to 3:00 p.m.

Bronx (continued) Cross Bronx Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that only one lane is open on the southbound Cross Bronx Expressway ramp to Major Deegan Expressway in the Bronx through July 2019. 12/3/2018 – 12/7/2018 • One lane closed Both Directions from Major Deegan Expressway to Throgs Neck Interchange from 10:00 p.m. to 5:00 a.m. 12/4/2018 – 12/7/2018 • Left lane closed S/B (Upper Level) from Alexander Hamilton Bridge to Amsterdam Avenue from 11:00 p.m. to 5:00 a.m. Note: Remove Existing Bearings at Pier #2. 12/5/2018 – 12/7/2018 • One lane closed Both Directions between Sheridan Expressway and Bronx River Parkway from 12:01 a.m. to 5:00 a.m. 12/6/2018 • One lane closed S/B at Walton Avenue exit ramp from 10:00 a.m. to 3:00 p.m.

Cross Bronx Expressway Extension 12/5/2018 – 12/6/2018 • Right lane closed N/B Service Road from Lawton Avenue to East Tremont Avenue from 10:00 a.m. to 3:00 p.m.

Hutchinson River Parkway 12/5/2018 • Right lane closed S/B at Bartow Avenue from 10:00 a.m. to 2:00 p.m. • Right shoulder closed S/B at Bartow Avenue from 10:00 a.m. to 2:00 p.m.

Major Deegan Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that only one lane is open on the northbound Major Deegan Expressway (I-87) ramp from the Robert F. Kennedy Bridge through January 15th, 2019. Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that only one lane will be open on the southbound Major Deegan Expressway ramp to Exit 7 in the Bronx through July 2019. 12/3/2018 – 12/4/2018 • Right lane closed S/B at East 138th Street from 10:00 a.m. to 2:00 p.m. 12/3/2018 – 12/6/2018 • One lane closed Both Directions between Fordham Road and Depot Place from 10:00 a.m. to 3:00 p.m. • One lane closed N/B ramp to N/B Cross Bronx Expressway from 10:00 a.m. to 3:00 p.m. 12/5/2018 – 12/7/2018 • Left lane closed N/B at West 161st Street from 10:00 a.m. to 2:00 p.m.

Bruckner Boulevard 12/1/2018 • One lane closed E/B between Cypress Avenue and 145th Street from 8:30 a.m. to 2:30 p.m. • One lane closed W/B between 145th Street and Cypress Avenue from 10:00 a.m. to 4:00 p.m. 12/3/2018 – 12/8/2018 • One lane closed E/B between Cypress Avenue and 145th Street from 8:30 a.m. to 2:30 p.m. • One lane closed W/B between 145th Street and Cypress Avenue from 10:00 a.m. to 4:00 p.m.

2 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 2 of 18 11/30/2018 Page 2 of 18 11/30/2018 Page 2 of 18 11/30/2018 Page 2 of 18 11/30/2018 Page 2 Page 2

Brooklyn Belt Parkway 12/5/2018 – 12/6/2018 • Right lane closed Both Directions Service Road between Ridge Boulevard and Bay Ridge Avenue from 10:00 a.m. to 3:00 p.m.

Brooklyn Expressway TRAVEL ADVISORY: OPENING OF NEW KOSCIUSZKO BRIDGE ► EASTBOUND AND WESTBOUND BQE TRAFFIC SHIFTED ONTO NEW BRIDGE • Motorists are advised that the New York State Department of Transportation has shifted the eastbound and westbound Brooklyn- Queens Expressway (BQE) traffic onto the New Kosciuszko Bridge. • Traffic entering the westbound BQE via ramps from the LIE and 43rd Street is also shifted onto the New Kosciuszko Bridge. • Motorists are reminded that fines are doubled for speeding in a work zone. In accordance with the Work Zone Safety Act of 2005, convictions of two or more speeding violations in a work zone could result in the suspension of an individual’s driver license. It is imperative that motorists drive carefully through construction work zones, for their own safety and the safety of workers. • For up-to-date travel information, call 511 or visit www.511NY.org. • Follow New York State DOT on Twitter: @NYSDOT_NYC. Find us on Facebook at facebook.com/NYSDOT. 12/1/2018 • One lane closed E/B between Park Avenue and Lee Avenue from 12:01 a.m. to 1:00 a.m. • Two lanes closed E/B between Park Avenue and Lee Avenue from 1:00 a.m. to 5:00 a.m. 12/3/2018 – 12/7/2018 (NEW THIS WEEK) • Right lane closed E/B between Stewart Avenue and 55th Avenue from 10:00 p.m. to 5:00 a.m. 12/4/2018 – 12/8/2018 • One lane closed E/B between Park Avenue and Lee Avenue from 12:01 a.m. to 1:00 a.m. • Two lanes closed E/B between Park Avenue and Lee Avenue from 1:00 a.m. to 5:00 a.m.

Gowanus Expressway 11/30/2018 – 12/1/2018 • One lane closed E/B between Verrazano Bridge and 70th Street from 11:00 p.m. to 1:00 a.m. • One lane closed W/B between 70th Street and Verrazano Bridge from 10:00 p.m. to 1:00 a.m. 12/1/2018 • Two lanes closed E/B between Verrazano Bridge and 70th Street from 1:00 a.m. to 6:30 a.m. • One lane closed E/B between Verrazano Bridge and 70th Street from 6:30 a.m. to 3:00 p.m. • Two lanes closed W/B between 70th Street and Verrazano Bridge from 1:00 a.m. to 6:30 a.m. 12/3/2018 – 12/7/2018 • Left lane closed E/B between 86th Street and 79th Street from 10:00 a.m. to 2:00 p.m. 12/3/2018 – 12/7/2018 • Right lane closed E/B between Verrazano Bridge and 70th Street from 9:00 a.m. to 2:00 p.m. • Right lane closed W/B between 70th Street and Verrazano Bridge from 10:00 a.m. to 3:00 p.m. • One lane closed Both Directions between Verrazano Bridge and 70th Street from 10:00 p.m. to 1:00 a.m. 12/4/2018 • Right lane closed E/B at Prospect Expressway Interchange from 10:00 a.m. to 2:00 p.m. 12/4/2018 • Right lane closed E/B between 4th Avenue and 3rd Avenue from 10:00 a.m. to 11:30 a.m. • Right lane closed W/B between 55th Street and 60th Street from 12:01 p.m. to 2:00 p.m. 12/4/2018 – 12/7/2018 • Two lanes closed Both Directions between Verrazano Bridge and 70th Street from 1:00 a.m. to 5:00 a.m. 12/5/2018 • Right lane closed E/B between 92nd Street and 86th Street from 10:00 a.m. to 2:00 a.m. 12/5/2018 – 12/6/2018 • Left lane closed E/B between 92nd Street and 86th Street from 11:00 p.m. to 1:00 a.m. • Two left lanes closed W/B between 55th Street and 60th Street from 1:00 a.m. to 3:00 a.m. 12/7/2018 • One lane closed Both Directions between 81st Street and 82nd Street from 10:00 a.m. to 2:00 p.m.

3 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 3 of 18 11/30/2018 Page 3 of 18 11/30/2018 Page 3 of 18 11/30/2018 Page 3 of 18 11/30/2018 Page 3 Page 3

Brooklyn (continued) Gowanus Expressway (continued) 12/7/2018 – 12/8/2018 • One lane closed E/B between Verrazano Bridge and 70th Street from 11:00 p.m. to 1:00 a.m. • One lane closed W/B between 70th Street and Verrazano Bridge from 10:00 p.m. to 1:00 a.m. 12/8/2018 • Two lanes closed E/B between Verrazano Bridge and 70th Street from 1:00 a.m. to 6:30 a.m. • One lane closed E/B between Verrazano Bridge and 70th Street from 6:30 a.m. to 3:00 p.m. • Two lanes closed W/B between 70th Street and Verrazano Bridge from 1:00 a.m. to 6:30 a.m.

Prospect Expressway 12/3/2018 – 12/5/2018 • Left lane closed Both Directions between 10th Avenue and Seeley Street from 10:00 a.m. to 3:00 p.m. Note: Paint Steel Repairs.

Manhattan Franklin D. Roosevelt Drive 12/2/2018 – 12/3/2018 • One lane closed Both Directions at East 42nd Street from 11:00 p.m. to 5:00 a.m. 12/3/2018 – 12/6/2018 • Two left lanes closed S/B from East 42nd Street to East 34th Street from 11:00 p.m. to 5:30 a.m. Note: Railing and Joints Repair.

I-95 12/4/2018 – 12/7/2018 • One lane closed N/B (Upper Level) from Henry Hudson Parkway to Alexander Hamilton Bridge from 11:00 p.m. to 5:00 a.m. Note: Remove Existing Bearings at Pier #2.

4 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 4 of 18 11/30/2018 Page 4 of 18 11/30/2018 Page 4 of 18 11/30/2018 Page 4 of 18 11/30/2018 Page 4 Page 4

Queens Belt Parkway 12/1/2018 • Two lanes closed E/B at Lefferts Boulevard Overpass from 12:01 a.m. to 7:00 a.m. • Two lanes closed W/B at Lefferts Boulevard Overpass from 12:01 a.m. to 6:00 a.m. 12/3/2018 – 12/7/2018 • One lane closed E/B at Lefferts Boulevard Overpass from 10:00 a.m. to 2:00 p.m. • One lane closed W/B at Lefferts Boulevard Overpass from 10:00 a.m. to 3:00 p.m. • One lane closed Both Directions at Lefferts Boulevard Overpass from 10:00 p.m. to 12:01 a.m. 12/4/2018 – 12/7/2018 • Two lanes closed Both Directions at Lefferts Boulevard Overpass from 12:01 a.m. to 5:00 a.m. 12/8/2018 • Two lanes closed E/B at Lefferts Boulevard Overpass from 12:01 a.m. to 7:00 a.m. • Two lanes closed W/B at Lefferts Boulevard Overpass from 12:01 a.m. to 6:00 a.m.

Brooklyn Queens Expressway 12/3/2018 • One lane closed E/B ramp to E/B from 9:00 a.m. to 3:00 p.m. Note: Red Flag Inspection and Built System Structures. 12/3/2018 • Right lane closed E/B between 58th Street and 65th Place from 10:00 a.m. to 3:00 p.m. 12/7/2018 – 12/8/2018 • Right lane closed W/B between 55th Avenue and Stewart Avenue from 11:00 p.m. to 5:00 a.m.

Cross Island Parkway 11/30/2018 – 12/1/2018 • All lanes closed N/B ramp to E/B Grand Central Parkway from 10:00 p.m. to 7:00 a.m. • All lanes closed N/B ramp to W/B Grand Central Parkway from 10:00 p.m. to 7:00 a.m. 12/4/2018 • Right lane closed S/B near Northern Boulevard from 10:00 a.m. to 3:00 p.m. 12/3/2018 – 12/7/2018 • All lanes closed N/B ramp to E/B Grand Central Parkway from 10:00 p.m. to 5:00 a.m. • All lanes closed N/B ramp to W/B Grand Central Parkway from 10:00 p.m. to 5:00 a.m. 12/8/2018 • All lanes closed N/B ramp to E/B Grand Central Parkway from 12:01 a.m. to 7:00 a.m. • All lanes closed N/B ramp to W/B Grand Central Parkway from 12:01 a.m. to 7:00 a.m.

Grand Central Parkway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists a lane shift that is in place on the E/B Grand Central Parkway to S/B Van Wyck Expressway, 2 lanes are be shifted to the East. 11/30/2018 – 12/1/2018 • All lanes closed E/B South Service Road ramp from Union Turnpike to E/B Grand Central Parkway entrance from 10:00 p.m. to 7:00 a.m. • All lanes closed W/B North Service Road ramp to Union Turnpike from 10:00 p.m. to 7:00 a.m. • All lanes closed W/B ramp to N/B Cross Island Parkway from 10:00 p.m. to 7:00 a.m. • All lanes closed W/B Service Road ramp to S/B Cross Island Parkway from 10:00 p.m. to 7:00 a.m. Note: Alternating ramp closures for marking out and repairs of concrete pavement and drainage areas. 11/30/2018 – 12/1/2018 • One lane closed Both Directions between Northern Boulevard and Long Island Expressway from 10:00 p.m. to 12:01 a.m. • Two lanes closed Both Directions between Northern Boulevard and Long Island Expressway from 12:01 a.m. to 5:00 a.m. • One lane closed Both Directions between Long Island Expressway and Kew Gardens Interchange from 10:00 p.m. to 12:01 a.m. • Two lanes closed Both Directions between Long Island Expressway and Kew Gardens Interchange from 12:01 a.m. to 5:00 a.m. 12/3/2018 – 12/4/2018 • Right lane closed E/B from Transit Authority Bridge (MTA) to from 9:00 p.m. to 5:00 a.m. (Boring Activities)

5 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 5 of 18 11/30/2018 Page 5 of 18 11/30/2018 Page 5 of 18 11/30/2018 Page 5 of 18 11/30/2018 Page 5 Page 5

Queens (continued) Grand Central Parkway (continued) 12/3/2018 – 12/5/2018 • Right lane closed W/B from Main Street to Transit Authority Bridge (MTA) from 9:00 p.m. to 5:00 a.m. (Boring Activities) 12/3/2018 – 12/7/2018 • All lanes closed E/B South Service Road ramp from Union Turnpike to E/B Grand Central Parkway entrance from 10:00 p.m. to 5:00 a.m. • All lanes closed W/B North Service Road ramp to Union Turnpike from 10:00 p.m. to 5:00 a.m. Note: Alternating ramp closures for marking out and repairs of concrete pavement and drainage areas. 12/3/2018 – 12/7/2018 • One lane closed W/B from Union Turnpike to Transit Authority Bridge from 10:00 a.m. to 2:00 p.m. • One lane closed E/B from S/B Van Wyck Expressway to Union Turnpike/Main Street from 10:00 a.m. to 2:00 p.m. • One lane closed W/B from Union Turnpike to Transit Authority Bridge from 11:00 p.m. to 5:00 a.m. • One lane closed E/B from S/B Van Wyck Expressway to Union Turnpike/Main Street from 11:00 p.m. to 5:00 a.m. • All lanes closed W/B ramp to (W/B) (Exit 13W) from 11:00 p.m. to 5:00 a.m. 12/3/2018 – 12/8/2018 • One lane closed Both Directions between Northern Boulevard and Long Island Expressway from 10:00 p.m. to 12:01 a.m. • One lane closed Both Directions between Long Island Expressway and Kew Gardens Interchange from 10:00 p.m. to 12:01 a.m. 12/4/2018 – 12/5/2018 • Right lane closed E/B ramp to S/B Van Wyck Expressway from 9:00 p.m. to 5:00 a.m. (Boring Activities) 12/4/2018 – 12/8/2018 • Two lanes closed Both Directions between Northern Boulevard and Long Island Expressway from 12:01 a.m. to 5:00 a.m. • Two lanes closed Both Directions between Long Island Expressway and Kew Gardens Interchange from 12:01 a.m. to 5:00 a.m. 12/5/2018 – 12/8/2018 (NEW THIS WEEK) • One lane closed E/B between 49th Street and Union Turnpike from 12:01 a.m. to 1:00 a.m. • Two lanes closed W/B between Union Turnpike and 49th Street from 12:01 a.m. to 6:00 a.m. • Two lanes closed E/B between 49th Street and Union Turnpike from 1:00 a.m. to 6:00 a.m. 12/6/2018 – 12/7/2018 • Left lane closed Both Directions from Transit Authority Bridge (MTA) to Main Street from 9:00 p.m. to 5:00 a.m. Note: Boring Activities. 12/8/2018 • All lanes closed E/B South Service Road ramp from Union Turnpike to E/B Grand Central Parkway entrance from 10:00 p.m. to 7:00 a.m. • All lanes closed W/B North Service Road ramp to Union Turnpike from 10:00 p.m. to 7:00 a.m. Note: Alternating ramp closures for marking out and repairs of concrete pavement and drainage areas. 12/8/2018 • Left lane closed E/B from Transit Authority Bridge (MTA) to Main Street from 12:01 a.m. to 5:00 a.m. (Boring Activities) • Left lane closed W/B ramp from N/B Van Wyck Expressway from 12:01 a.m. to 5:00 a.m. (Boring Activities)

Jackie Robinson Parkway 12/3/2018 – 12/7/2018 • All lanes closed E/B ramp to (W/B) Grand Central Parkway (Exit 8W) from 11:00 p.m. to 5:00 a.m.

Long Island Expressway 12/3/2018 – 12/8/2018 • One or two lanes closed Both Directions from College Point Boulevard to Clearview Expressway from 10:00 p.m. to 5:00 a.m. Note: Striping, Sawing and Sealing operations. 12/4/2018 • Left lane closed E/B from Van Dam Street to Greenpoint Avenue from 10:00 a.m. to 2:00 p.m. 12/4/2018 • One lane closed E/B between Queens Midtown Tunnel and Brooklyn Queens Expressway from 12:01 a.m. to 1:00 a.m. • Two lanes closed E/B between Queens Midtown Tunnel and Brooklyn Queens Expressway from 1:00 a.m. to 6:00 a.m. 12/4/2018 – 12/5/2018 • Two lanes closed Both Directions at 48th Street from 12:01 a.m. to 5:00 a.m. 12/5/2018 • One lane closed Both Directions at 48th Street from 10:00 a.m. to 3:00 p.m. 6 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 6 of 18 11/30/2018 Page 6 of 18 11/30/2018 Page 6 of 18 11/30/2018 Page 6 of 18 11/30/2018 Page 6 Page 6

Queens (continued) Van Wyck Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists of a New Traffic Pattern on the S/B Van Wyck Expressway from 73rd Avenue (Pedestrian Bridge) to Union Turnpike. Motorists traveling to Union Turnpike must use the right lane only. All other lanes will have access to the Jackie Robinson Parkway and Van Wyck Expressway. Motorists should proceed with caution and drive safely. This New Traffic Pattern will be in place until the end of December 2018. 11/30/2018 – 12/1/2018 • All lanes closed S/B ramp to Jackie Robinson Parkway (Exit 7) from 11:00 p.m. to 8:00 a.m. 12/3/2018 – 12/7/2018 • One lane closed Both Directions from Hoover Avenue (Pedestrian Bridge) to Jewel Avenue from 10:00 a.m. to 2:00 p.m. • One lane closed Both Directions from Hoover Avenue (Pedestrian Bridge) to Jewel Avenue from 11:00 p.m. to 5:00 a.m. • One lane closed N/B ramp to W/B Grand Central Parkway from 11:59 p.m. to 5:00 a.m. Note: Between 82nd Avenue (Pedestrian Bridge) and Union Turnpike. • One lane closed S/B ramp from E/B Grand Central Parkway from 11:59 p.m. to 5:00 a.m. Note: Between Union Turnpike and Hoover Avenue. • All lanes closed S/B ramp to Jackie Robinson Parkway (Exit 7) from 11:00 p.m. to 5:00 a.m. 12/3/2018 – 12/6/2018 • One lane closed Both Directions at Jewel Avenue from 10:00 a.m. to 2:00 p.m. 12/3/2018 – 12/7/2018 • One lane closed Both Directions at Jewel Avenue from 11:00 p.m. to 1:00 a.m. • Two lanes closed Both Directions at Jewel Avenue from 1:00 a.m. to 5:00 a.m. 12/6/2018 • Left shoulder closed N/B at entrance ramp from 8:00 a.m. to 3:00 p.m.

Astoria Boulevard 12/5/2018 – 12/6/2018 • One lane closed E/B Service Road between 112th Street and Northern Boulevard/114th Street from 10:00 a.m. to 3:00 p.m.

Laurel Hill Boulevard Traffic Pattern: • All lanes closed Both Directions from 54th Road to 56th Road (24 hour lane closure) Note: Approach Construction.

Union Turnpike 12/3/2018 – 12/7/2018 • One lane closed W/B between 138th Street and Queens Boulevard from 10:00 a.m. to 2:00 p.m. • One lane closed E/B between Queens Boulevard and 134th Street from 10:00 a.m. to 2:00 p.m. 12/5/2018 – 12/6/2018 • One lane closed E/B Service Road between 132th Street and Grand Central Parkway from 10:00 a.m. to 3:00 p.m.

54th Avenue Traffic Pattern: • All lanes closed Both Directions from 43rd Street to Laurel Hill Boulevard (24 hour lane closure) Note: Construction of phase 2 bridge.

7 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 7 of 18 11/30/2018 Page 7 of 18 11/30/2018 Page 7 of 18 11/30/2018 Page 7 of 18 11/30/2018 Page 7 Page 7

Staten Island Dr. Martin Luther King Jr. Expressway 12/6/2018 • Right lane closed S/B between Staten Island Expressway and Victory Boulevard from 12:01 p.m. to 2:00 p.m.

Korean War Veterans Memorial Parkway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists of a permanent change in traffic pattern at the Korean War Veterans Parkway (KWVP)/West Shore Expressway (WSE) Interchange approaching the Outerbridge Crossing on Staten Island. • To increase mobility and improve safety, a concrete barrier has been installed to channel westbound traffic heading to the Outerbridge Crossing to appropriate lanes, separating KWVP traffic from merging WSE traffic. Traffic on the KWVP wanting to access Arthur Kill Road will continue to use the Maguire Avenue/Bloomingdale Road /Arthur Kill Road exit, eliminating vehicles crossing two lanes of traffic to access Exit 1 (Arthur Kill Road). • This work is part of a $5.4 million safety and mobility improvement project at the Interchange, which also included construction of a new 3,000-foot sidewalk along the Korean War Veterans Parkway service road (Drumgoole West) between Bloomingdale Road and Lenevar Avenue, which opened in October. The new sidewalk complies with the Americans with Disabilities Act and improves safety and access to Bloomingdale Park and the surrounding community. The sidewalk also provides direct access to express bus stops at Bloomingdale Road. • For up-to-date travel information, call 511 or visit www.511NY.org. Follow New York State DOT on Twitter: @NYSDOT_NYC. Find us on Facebook at facebook.com/NYSDOT. 12/5/2018 • Right lane closed N/B between Huguenot Avenue and Arden Avenue from 10:00 a.m. to 2:00 p.m. 12/7/2018 • Right lane closed N/B between Huguenot Avenue and Arthur Kill Road from 10:00 a.m. to 12:01 p.m. • Right lane closed N/B between Annadale Road and Arthur Kill Road from 12:01 p.m. to 2:00 p.m.

West Shore Expressway 12/3/2018 • Right lane closed N/B between Sharrots Road and Rossville Avenue from 12:01 p.m. to 2:00 p.m. 12/4/2018 • Right lane closed N/B between Drumgoole Road and Bloomingdale Road from 12:01 p.m. to 2:00 p.m.

Veterans Road East 12/3/2018 • Left lane closed N/B between Sharrots Road and Rossville Avenue from 10:00 a.m. to 12:01 p.m. 12/4/2018 • Right lane closed N/B between Englewood Avenue and Bloomingdale Road from 10:00 a.m. to 12:01 p.m.

Willow Road West 12/6/2018 • Left lane closed S/B between Forest Avenue and Watchogue Road from 10:00 a.m. to 12:01 p.m.

8 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 8 of 18 11/30/2018 Page 8 of 18 11/30/2018 Page 8 of 18 11/30/2018 Page 8 of 18 11/30/2018 Page 8 Page 8

NYCDOT Weekeend Construction PRELIMINARY WEEKEND TRAFFIC ADVISORY Friday November 30, 2018 to Sunday December 2, 2018

As part of its citywide traffic improvement program, the Department of Transportation has compiled a list of areas where Street construction or Street events will impede the normal flow of traffic this weekend.

MANHATTAN

East 10th Street between 4th Avenue and 3rd Avenue: This street will be closed Saturday 8am to 6pm and Sunday from 9am to 6pm to facilitate water main repairs.

West 20th Street between 6th Avenue and 5th Avenue: This street will be Saturday and Sunday from 7am to 7pm to facilitate crane operation.

West 22nd Street between 7th Avenue and 6th Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation.

East 70th Street between York Avenue and FDR Drive (Dead End): This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation.

East 87th Street between East End Avenue and York Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm to facilitate crane operation.

East 126th Street between Lexington Avenue and 3rd Avenue: This street will be closed Saturday from 8am to 6pm to facilitate crane operation.

West 148th Street between Broadway and Amsterdam Avenue: This street will be closed Friday from 9am to 3pm to facilitate crane operation.

Vandam Street between 6th Avenue and Varick Street: This street will be closed from 8am to 8pm Saturday and Sunday from 9am to 6pm to facilitate crane operation.

Washington Place between Mercer Street and Broadway: This street will be closed from 7am to 7pm Saturday and Sunday to facilitate crane operation.

BROOKLYN

48th Street between 10th Avenue and Fort Hamilton Parkway: This street will be closed from 8pm Friday to 4am Saturday to facilitate crane operation.

50th Street between 9th Avenue and 10th Avenue: This street will be closed Friday from 9am to 4pm to facilitate crane operation.

Nevins Street between Livingston Street and Flatbush Avenue: This street will be closed Saturday from 6am to midnight to facilitate crane operation.

Atlantic Avenue between New York Avenue and Nostrand Avenue: This street will be fully closed Friday from 8pm to Saturday 8pm to facilitate platform work eastbound.

Adams Street between York Street and Front Street: This street will be fully closed Friday from 7am to 4pm to facilitate deliveries.

MANHATTAN/BROOKLYN

Manhattan Bridge: One of three lanes on the westbound (Manhattan-bound) Lower Roadway will be closed around the clock (24/7 closure) through Thursday, December 6, 2018 to facilitate NYCDOT Bridges rehabilitation.

9 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 9 of 18 11/30/2018 Page 9 of 18 11/30/2018 Page 9 of 18 11/30/2018 Page 9 of 18 11/30/2018 Page 9 Page 9

NYCDOT Weekeend Construction (continued) BROOKLYN/QUEENS

Metropolitan Avenue Bridge over Newtown Creek: One lane in either direction will be closed Saturdays through December 2018, from 7am to 1pm to facilitate NYCDOT Bridges repairs. At least one lane of traffic in each direction will be maintained at all times.

QUEENS

29th Street between Skillman Avenue and 47th Avenue: This street will be closed from 9:30pm to 5:30am Friday and Saturday from 7am to 7pm to facilitate crane operation.

30th Street between Thomson Avenue between 47th Avenue: This street will be closed from 9:30pm to 5:30am Friday and Saturday from 7am to 7pm to facilitate crane operation.

43rd Street between 37th Avenue and Barnett Avenue: This street will be closed from 9pm Friday through 4am Monday to facilitate removing track for LIRR West Side Access project.

Astoria Boulevard between 112th Street and 112th Place: This street will be closed Saturday from 8am to 4pm to facilitate crane operation.

BRONX

Shore Road (Pelham Bridge) over the Hutchinson River: One lane at a time, in either direction, will be closed Friday from 10am to 3pm to facilitate NYCDOT Bridges maintenance work. At least one lane in each direction will remain open to traffic at all times.

10 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 10 of 18 11/30/2018 Page 10 of 18 11/30/2018 Page 10 of 18 11/30/2018 Page 10 of 18 11/30/2018 Page 10 Page 10

NYCDOT Weekly Construction WEEKLY TRAFFIC ADVISORY Saturday December 1, 2018 to Friday December 7, 2018

The City of New York’s Department of Transportation issued a traffic alert for this week providing the locations of road construction and events where lane and street closings will affect the flow of traffic. Lane closings may also occur due to circumstances beyond our control. Major road, lane and street closings for the coming week are as follows:

EAST RIVER BRIDGE CROSSINGS

Williamsburg Bridge: There are four lanes of traffic in each direction on the bridge. Trucks are allowed on the outer roadways only. A single lane in each direction may be closed off peak hours as needed to facilitate NYCDOT bridge inspection and maintenance work.

Ed Koch/Queensboro Bridge: The North Inner Lower Roadway is Manhattan-bound with access from Queens Plaza North to Second Avenue and East 60th Street. The South Inner Lower roadway is Queens-bound with access from 2nd Avenue to Queens Plaza South. Trucks are allowed on the lower inner roadways only. Trucks are prohibited from the upper and outer roadways. The North Upper Roadway is Manhattan-bound at all times. Access is to East 62nd Street/East 63rd Street in Manhattan from Thomson Avenue, 21st Street at Queens Plaza North, and 11th Street at Queens Plaza South in Queens. The South Upper Roadway is Queens-bound except Monday to Friday from 6am to 10am when the roadway is reversed and accommodates the Manhattan bound high occupancy vehicle (HOV) lane containing two or more people. Access is to East 58th Street/East 57th Street in Manhattan from Thomson Avenue or 21st Street at 43rd Avenue in Queens. The South Outer Roadway of the lower level is open to passenger cars only with access from westbound 59th Street off of 1st Avenue to Queens Plaza South (except 9pm-6am nightly when roadway is closed to traffic). One lane at a time in either direction on the lower roadways will be closed from 12:01am to 5am through Saturday, December 1, 2018 to facilitate NYCDOT Bridge maintenance. Additionally, one of two lanes westbound (Manhattan-bound) on the lower north inner roadway will be closed from 10pm to 5am Monday night to Friday morning. One of two lanes on the eastbound (Queens-bound) south inner roadway will be closed from 11pm to 5:30am Monday night to Friday morning. These lane closures are necessary to facilitate long term NYCDOT Bridges deck replacement, and will be coordinated with the maintenance lane closures.

Manhattan Bridge: Two of three lanes on the westbound (Manhattan-Bound) Lower Roadway will be closed from 12:01am to 5am through Saturday, December 1, 2018. One of three lanes on the westbound (Manhattan-bound) Lower Roadway will be closed around the clock (24/7 closure) through 11:59pm Thursday, December 6, 2018 to facilitate NYCDOT Bridges rehabilitation.

MANHATTAN

Washington Place between Washington Square East and Greene Street: This street will be closed from 7am to 3pm Monday to Friday, 8am to 3pm Saturday and 9am to 3pm Sunday through 2018 to facilitate NYCDDC water main installation work.

West 4th Street between Greene Street and Mercer Street: This street will be closed from 7am to 3pm Monday to Friday, 8am to 3pm Saturday and 9am to 3pm Sunday through 2018 to facilitate NYCDDC water main installation work.

West 4th Street between Washington Square East and Greene Street: This street will be closed from 7am to 3pm Monday to Friday, 8am to 3pm Saturday and 9am to 3pm Sunday through 2018 to facilitate NYCDDC water main installation work.

West 4th Street between Mercer Street and Broadway: This street will be closed from 7am to 3pm Monday to Friday, 8am to 3pm Saturday and 9am to 3pm Sunday through 2018 to facilitate NYCDDC water main installation work.

Washington Square South between LaGuardia Place and Washington Square East: This street will be closed from 7am to 3pm Monday to Friday, 8am to 3pm Saturday and 9am to 3pm through 2018 to facilitate NYCDDC water main installation work.

Washington Square East between Washington Square South and Washington Square North: This street will be closed from 7am to 3pm Monday to Friday, 8am to 3pm Saturday and 9am to 3pm Sunday through 2018 to facilitate NYCDDC water main installation work.

West 33rd Street between 10th Avenue and 11th Avenue: This street is fully closed closed to facilitate long term roadway reconstruction work.

Battery Park Underpass between FDR Drive and Route 9A: The north tube will be closed Monday to Friday from 10pm to 5am and Saturday from 1am to 8am. The south tube will be closed Tuesday and Wednesday from 1am to 5am. These closures are in effect through 2018 to facilitate NYCDOT Bridges rehabilitation.

11 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 11 of 18 11/30/2018 Page 11 of 18 11/30/2018 Page 11 of 18 11/30/2018 Page 11 of 18 11/30/2018 Page 11 Page 11

NYCDOT Weekly Construction (continued) MANHATTAN

Route 9A/West Street (northbound/southbound) between Battery Place and Vesey Street: One northbound lane will be closed from 10pm to 5am Monday to Friday, 8:30pm Friday to 8am Saturday and 8:30pm Saturday to 10:30am Sunday. Two northbound lanes will be closed from 1am to 5am Monday to Friday, 2am to 7am Saturday and 12:01am to 8am Sunday. One southbound lane will be closed from 11pm to 5am nightly. Two southbound lanes will be closed from 1am to 5am Monday to Friday, 3am to 8am Saturday and 3am to 9am Sunday. These lane closures are necessary through September 2018 to facilitate NYSDOT roadway rehabilitation work.

Route 9A/West Street (northbound/southbound) between Vesey Street and Canal Street: One northbound lane will be closed from 10am to 3pm and 10pm to 5am Monday to Friday, 10pm Friday to 9am Saturday and 10pm Saturday to 9am Sunday. Two northbound lanes will be closed from 10pm to 5am Monday to Friday, 11pm Friday to 8am Saturday and 11pm Saturday to 8am Sunday. One southbound lane will be closed from 9pm to 5am Monday to Friday, 10pm Friday to 10am Saturday and 10pm Saturday to 10am Sunday. Two southbound lanes will be closed from 12:01am to 5am Monday to Friday, 1am to 9am Saturday and 2am to 10am Sunday. These lane closures are necessary through September 2018 to facilitate NYSDOT roadway rehabilitation work.

Route 9A/West Street (northbound/southbound) between Canal Street and 14th Street: One northbound lane will be closed from 9pm to 6am Monday to Friday, 8pm Friday to 11:59am Saturday and 9pm Saturday to 1pm Sunday. Two northbound lanes will be closed from 11pm to 6am Monday to Friday, 1am to 8am Saturday and 1am to 10am Sunday. One southbound lane will be closed from 10pm to 6am Monday to Friday, 12:01am to 11:59am Saturday and Sunday. Two southbound lanes will be closed from 1am to 6am Monday to Friday, 2am to 7am Saturday and 3am to 8am Sunday. These lane closures are necessary through September 2018 to facilitate NYSDOT roadway rehabilitation work.

Route 9A/West Street (northbound/southbound) between 14th Street and 24th Street: One northbound lane will be closed from 11pm to 6am Monday to Friday, 12:01am to 9am Saturday and 1am to 10am Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 7am Saturday and 3am to 8am Sunday. One southbound lane will be closed from 9pm to 6am Monday to Friday, 12:01am to 9am Saturday and 12:01am to 10am Sunday. Two southbound lanes will be closed from 12:01am to 6am Monday to Friday, 1am to 6am Saturday and 2am to 8am Sunday. These lane closures are necessary through September 2018 to facilitate NYSDOT roadway rehabilitation work.

Route 9A/West Street (northbound/southbound) between 34th Street and 47th Street: One northbound lane will be closed from 9am to 2pm and 11pm to 7am Monday to Saturday morning and 12:01am to 10am Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 8am Saturday and 2am to 10am Sunday. One southbound lane will be closed from 8pm to 6am Monday to Friday, 8pm Friday to 9am Saturday and 8pm Saturday to 11am Sunday. Two southbound lanes will be closed from 11pm to 6am Monday to Friday, 12:01am to 8am Saturday and 1am to 9am Sunday. These lane closures are necessary through 2018 to facilitate NYCT electric utility installation.

Route 9A/West Street (northbound/southbound) between 42nd Street and 50th Street: One northbound lane will be closed from 9am to 2pm and 11pm to 7am Monday to Friday, 12:01am to 10am Saturday and 12:01am to 1pm Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 8am Saturday and 2am to 10am Sunday. One southbound lane will be closed from 8pm to 6am Monday to Friday, 8pm Friday to 9am Saturday and 8pm Saturday to 11am Sunday. Two southbound lanes will be closed from 11pm to 6am Monday to Friday, 12:01am to 8am Saturday and 1am to 9am Sunday. These lane closures are necessary through September 2018 to facilitate NYSDOT roadway rehabilitation work.

Harlem River Drive Southbound Exit #19 to Second Avenue: This exit ramp will be fully closed through 2018 to facilitate completion of the Harlem River Drive southbound roadway and reconstruction of the exit ramp by NYCDOT Bridges. Motorists may use the 116th Street exit as an alternate route.

Henry Hudson Parkway (Northbound) Viaduct between West 72nd Street and West 82nd Street/ Henry Hudson Parkway (Northbound) Viaduct between West 94th Street and West 98th Street: One of three lanes will be closed Monday to Thursday from 11pm to 12pm Midnight and from 5am to 6am. Two of three lanes will be closed Monday to Thursday from 12:01am to 5am. One of three lanes will be closed Friday from 11pm to 1am and from 6:31am to 10am. Two of three lanes will be closed Friday from 1:01am to 6:30am Friday. These lane closures are necessary through May 2019 to facilitate NYCDOT Bridges rehabilitation work.

Macomb’s Dam Viaduct between Harlem River Drive and Edgecombe Avenue: The viaduct will be fully closed from 11pm Thursday to 5am Friday, and from 11:59pm Friday to 7am Saturday to facilitate long term NYCDOT Bridges structural steel repairs of the West 155th Street viaduct of the Macomb’s Dam Bridge.

12 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 12 of 18 11/30/2018 Page 12 of 18 11/30/2018 Page 12 of 18 11/30/2018 Page 12 of 18 11/30/2018 Page 12 Page 12

NYCDOT Weekly Construction (continued) MANHATTAN (continued)

West 155th Street between Bradhurst Avenue and Frederick Douglass Boulevard; West 155th Street between Frederick Douglass Boulevard and the Harlem River Drive Service Road: These streets will be fully closed from 7am to 6pm Monday to Friday through October 12, 2018, and from 9pm to 7am Thursday to Saturday through 2018 to facilitate long term NYCDOT Bridges structural steel repairs of the West 155th Street viaduct of the Macomb’s Dam Bridge.

MANHATTAN/BROOKLYN

Hugh L. Carey Tunnel: One tube will be closed nightly Monday to Friday between 8:30pm and 5:30am and Saturday from 11pm to 8am to facilitate tunnel repairs through 2018. Weekend-long single tube closures will begin Friday night from 9:30pm and continue through 5:30am Monday morning. In addition one tube will be closed for routine maintenance work Sunday night beginning at 11pm through 5:30am Monday. During these times there will be one lane in each direction in the remaining tube.

BROOKLYN

Gowanus Expressway/Belt Parkway Interchange between 86th Street and 45th Street: One of three lanes in each direction may be closed Monday to Friday from 10am to 3pm to facilitate NYSDOT long term roadway rehabilitation work.

Third Avenue between 54th Street and 5th Avenue/65th Street: One lane westbound is closed around-the clock on the inner roadway, and an additional lane may be closed from 8pm to 2pm Monday to Friday to facilitate NYSDOT long term work.

Pennsylvania Avenue Bridge over the Belt Parkway: The rightmost eastbound lane of the bridge will be closed around-the-clock through 2018 to facilitate NYCDOT Bridges protective coating of the bridge. At least one lane of traffic in each direction will be maintained at all times.

Belt Parkway under Knapp Street Bridge: One of three lanes in either direction will be closed from 10pm to 1am Monday nights to Friday mornings, 11pm Friday night to 1am Saturday morning, and from 11pm Saturday night to 2am Sunday morning. Two of three lanes in either direction will be closed from 1am to 5am Monday to Friday, 1am to 7am Saturday, and from 2am to 11am Sunday. At least one lane of traffic in each direction will be maintained at all times. Additionally, the northernmost lane of eastbound Shore Parkway (service roadway) between Knapp Street and Brigham Street will be permanently closed for the duration. These closures are required through January 2019 to facilitate NYCDOT Knapp Street Bridge protective coating operations.

MANHATTAN/QUEENS

Queens Midtown Tunnel: One tube in either direction will be closed from 11pm Friday nights to 5:30am Monday mornings. The Manhattan-bound (north) tube is closed Monday through Thursday nights, from 9:30pm to 5:30am. This is to accommodate ongoing Superstorm Sandy restoration work. One lane in each direction will always remain open in the other tube when one tube is closed.

BRONX

Major Deegan Expressway (1-87) Northbound Entrance Ramp #9 from West Fordham Road: This ramp will be fully closed to traffic from 10pm to 10am seven days per week through January 2019 to facilitate NYCDEP repairs to wastewater line. Motorists should follow the posted detour.

Hutchinson River Parkway under Westchester Avenue Bridge: Two of three lanes in each direction will be closed from 12:01am to 5am Monday to Friday to facilitate long term NYCDOT Bridges Westchester Avenue Bridge rehabilitation. The double-lane closures will be in effect from the East Tremont Avenue exit to the Pelham Parkway entrance ramp to the southbound Hutchinson River Parkway. One lane of traffic in each direction will remain open at all times. On Saturday, December 1, 2018, two of three lanes northbound will be closed from 12:01am to 11am, and a full 15-minute closure of the northbound roadway will occur between 6am and 11am, between Exit 2 (East Tremont/Westchester Avenue) and the northbound entrance ramp from Hutchinson River Parkway East. On Sunday, December 2, 2018, two of three lanes southbound will be closed from 12:01am to 10am, and a full 15-minute closure of the southbound roadway will occur between 6am and 10am, between Exit 3E (Pelham Parkway) and the southbound entrance ramp from Westchester Avenue. These closures are necessary to facilitate NYCDOT Bridges deck repairs. Motorists are encouraged to use Exit 2 (East Tremont) as a detour during full northbound roadway closures, and Exit 2 (Westchester/East Tremont Avenue) as a detour during full southbound roadway closures.

13 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 13 of 18 11/30/2018 Page 13 of 18 11/30/2018 Page 13 of 18 11/30/2018 Page 13 of 18 11/30/2018 Page 13 Page 13

NYCDOT Weekly Construction (continued) BRONX (continued)

East 149th Street Bridge over AMTRAK (between Bruckner Boulevard and Oak Point Avenue): One lane in each direction will be maintained on the bridge from 9am to 4pm weekdays from Monday, November 12, 2018 through mid-December 2018 to facilitate NYCDOT Bridges rehabilitation. During this time, trucks will be unable to turn onto the bridge from Bruckner Boulevard. Trucks will be detoured from Bruckner Boulevard to Leggett Avenue, then to Southern Boulevard, and then to East 149th Street to access the bridge.

Shore Road (Pelham Bridge) over the Hutchinson River: Both northbound or southbound lanes one direction at a time) will be closed from 11pm to 5am weeknights through Saturday, December 22, 2018 to facilitate NYCDOT Bridges under deck structural repairs. During these times, two-way traffic will maintained on the side of the bridge opposite the work zone.

BRONX/MANHATTAN

Madison Avenue Bridge: One lane at a time, in either direction, will be closed from 11pm Tuesday, December 4, 2018 to 6am Wednesday, December 5, 2018 to facilitate NYCDOT Bridge maintenance. At least one lane of traffic in each direction will be maintained at all times.

QUEENS

Grand Central Parkway between Northern Boulevard and 82nd Street: One eastbound lane will be closed from 10am to 2pm and from 10pm to 5am Monday to Friday, from 10pm Friday to 7am Saturday, from 10am to 3pm Saturday and from 10pm Saturday to 3pm Sunday. Two eastbound lanes will be closed from 11pm to 5am Monday to Friday, from 12:01am to 6am Saturday and from 1am to 9am Sunday. One westbound lane will be closed from 10am to 3pm and from 10pm to 5am Monday to Friday, from 10pm Friday to 6am Saturday, from 10am to 3pm Saturday and from 10pm Saturday to 3pm Sunday. Two westbound lanes will be closed from 11pm to 5am Monday to Friday, from 12:01am to 6am Saturday and from 1am to 9am Sunday. These closures are necessary through 2018 to facilitate Port Authority of NY/NJ LaGuardia Airport reconstruction.

Grand Central Parkway under 49th Street: One of three lanes in each direction will be closed Monday to Friday from 10am to 3pm and 10pm to 12 midnight, and two of three lanes in each direction will be closed Monday to Friday from 12:01am to 5am through January 2019 to facilitate NYCDOT Bridges rehabilitation work.

Van Wyck Expressway between Northern Boulevard and Long Island Expressway: One of three lanes in either direction will be closed from 11pm to 5am Monday night to Friday morning, 11:59pm Friday night to 5am Saturday morning, and from 11:59pm Saturday night to 9am Sunday morning. Two of three lanes will be closed, in the southbound direction only, from 12:01am to 5am Monday to Friday, 1am to 5am Saturday, and from 1am to 9am Sunday. These closures are necessary through December 21, 2018 to facilitate NYCDOT Bridge repairs to the bascule truss under the Roosevelt Avenue Bridge. Intermittent (15-minute) full roadway closures may occur from 2am to 5am.

Roosevelt Avenue Bridge over Flushing Creek: The bridge will be fully closed eastbound from 12:01am to 5am Tuesday, December 4, 2018 to Saturday, December 8, 2018 to facilitate NYCDOT Bridge rehabilitation. Motorists wishing to continue eastbound should follow the detour to Northern Boulevard. One lane westbound will continue to be maintained during this time.

STATEN ISLAND

STATEN ISLAND/NEW JERSEY CROSSINGS

Bayonne Bridge: One of two lanes in each direction is open to traffic for PANY/NJ long term navigational clearance project. No oversized or overweight vehicles are permitted. Overnight Bridge closures started January 8th, 2014 and continue through the duration of the project. The closures are: Monday through Thursday from 7pm to 5am and 10pm Friday to 3pm Sunday. No weekend closures on Sunday and holiday weekends. Weekday full closures are from 9am to 3pm Monday to Friday. During closures, motorists should use the Goethals Bridge as an alternate.

14 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 14 of 18 11/30/2018 Page 14 of 18 11/30/2018 Page 14 of 18 11/30/2018 Page 14 of 18 11/30/2018 Page 14 Page 14

MTA HENRY HUDSON BRIDGE (MTA)

MTA Bridges & Tunnels: long term construction on Henry Hudson Bridge southbound Manhattan Bound (New York) , starting in November 2017 1 lane will be closed around the clock for the removal of columns and toll islands from the old toll plaza which will improve traffic flow.

MTA Bridges & Tunnels: long term construction on Henry Hudson Bridge southbound Manhattan Bound (New York), Continuous Tuesday February 20th, 2018 9:00 PM thru Friday August 23rd, 2019 5:00 AM 1 lane closed around the clock for approximately 19 months.

HUGH L. CAREY TUNNEL (MTA)

MTA Bridges & Tunnels: road maintenance operations on Brooklyn Battery Tunnel both directions Manhattan/Brooklyn Bound (Manhattan/Brooklyn) one tube closed for maintenance with two-way traffic in the other tube, Sunday November 25th, 2018 thru Saturday December 1st, 2018 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 09:00 PM thru 05:30 AM.

MARINE PARKWAY BRIDGE (MTA)

MTA Bridges & Tunnels: Mechanical, Electrical, Structural Bridge Rehab at Marine Parkway Bridge both directions January 2018 thru December 2018, SB 24/7 one lane closed and NB 8AM-5PM two lanes closed.

QUEENS MIDTOWN TUNNEL (MTA)

MTA Bridges & Tunnels: scheduled roadwork on Queens Midtown Tunnel both directions Manhattan/Queens Bound (Manhattan/Queens) one tube closed with two-way traffic in the other tube, Monday November 26th, 2018 thru Saturday December 1st, 2018 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 PM thru 06:00 AM, Friday November 30th, 2018 thru Saturday December 1st, 2018, 11:00 PM thru 07:00 AM.

THROGS NECK BRIDGE (MTA)

MTA Bridges & Tunnels: bridge maintenance operations on Throgs Neck Bridge northbound Bronx Bound (New York), Monday November 26th, 2018 thru Friday November 30th, 2018, Monday thru Friday, 10:00 AM thru 03:00 PM, 1 lane may be closed.

WHITESTONE BRIDGE (MTA)

MTA Bridges & Tunnels: Various Structural Repairs, Steel Repair/Painting & Inspection of Selected Main Cable Panels at Bronx- Whitestone Bridge both directions March 2018 thru December 2018, off-peak lane closures weekdays/nights and additional lane closed early morning hours all during normal work hours.

MTA Bridges & Tunnels: ORT Implementation & Plaza Reconstruction at Bronx-Whitestone Bridge both directions September 2018 thru 2018 weekday off-peak lane closures as needed during normal working hours. On select weekends (TBD) 2 of 3 lanes closed 10 p.m., Friday until 5 a.m., Monday.

MTA Bridges & Tunnels: bridge maintenance operations on Bronx-Whitestone Bridge both directions Bronx/Queens Bound (New York), Monday November 26th, 2018 thru Friday November 30th, 2018, Monday thru Friday, 09:00 AM thru 02:00 PM, 1 lane may be closed.

15 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 15 of 18 11/30/2018 Page 15 of 18 11/30/2018 Page 15 of 18 11/30/2018 Page 15 of 18 11/30/2018 Page 15 Page 15

Port Authority NY/NJ BAYONNE BRIDGE (PA)

Port Authority NY/NJ: construction on Bayonne Bridge Both Directions Richmond Terrace between Morningstar Road and Newark Avenue closed, Monday November 26th, 2018 thru Saturday December 1st, 2018, Monday thru Friday, 09:00 PM thru 05:00 AM.

Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions New Jersey Side (Bayonne) to New York Side (Staten Island) , Continuous Friday November 30th, 2018 9:00 PM thru Sunday December 2nd, 2018 3:00 PM all lanes closed and detoured.

GEORGE WASHINGTON BRIDGE (PA)

Port Authority NY/NJ: long term construction on George Washington Bridge eastbound ramp to 178th Street (New York), Continuous Thursday July 26th, 2018 10:00 PM thru Saturday July 27th, 2019 11:59 PM ramp closed and detoured.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Lower Level (Fort Lee) to New York Side/Lower Level (Manhattan), Monday November 26th, 2018 thru Friday November 30th, 2018, Monday thru Friday, 10:30 AM thru 03:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee), Monday November 26th, 2018 thru Friday November 30th, 2018, Monday thru Friday, 08:30 AM thru 02:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound from New York Side/Lower Level (Manhattan) to Lower Trans Manhattan Expressway (Manhattan), Monday November 26th, 2018 thru Friday November 30th, 2018, Monday thru Friday, 10:30 AM thru 03:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound from Lower Trans Manhattan Expressway (Manhattan) to New York Side/Lower Level (Manhattan), Monday November 26th, 2018 thru Friday November 30th, 2018, Monday thru Friday, 08:30 AM thru 02:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Lower Level (Manhattan) to New Jersey Side/Lower Level (Fort Lee) , Monday November 26th, 2018 thru Friday November 30th, 2018, Monday thru Friday, 08:30 AM thru 02:30 PM, right lane closed.

Port Authority NY/NJ: construction on George Washington Bridge (New York) Southbound Broadway under G.W.B one lane closed, Monday November 26th, 2018 thru Saturday December 1st, 2018, Monday thru Friday, 11:00 PM thru 06:00 AM.

Port Authority NY/NJ: construction on George Washington Bridge (New York) Northbound Hudson Terrace between Bruce Reynolds Boulevard and Merkle Street one lane closed, Thursday November 29th, 2018 thru Friday November 30th, 2018 Thursday/ Friday, 09:00 AM thru 03:00 PM.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee), Friday November 30th, 2018 thru Sunday December 2nd, 2018 Friday/ Saturday, 10:00 PM thru 10:00 AM, 2 right lanes closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound ramp from 179th Street (New York) , Friday November 30th, 2018 thru Sunday December 2nd, 2018 Friday/ Saturday, 10:00 PM thru 10:00 AM, ramp closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound from Upper Trans Manhattan Expressway (Manhattan) to New York Side/Upper Level (Manhattan), Friday November 30th, 2018 thru Sunday December 2nd, 2018 Friday/ Saturday, 10:00 PM thru 10:00 AM, 1 lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Lower Level (Fort Lee) to New York Side/Lower Level (Manhattan), Saturday December 1st, 2018, 12:00 AM thru 08:00 AM, all lanes closed and detoured.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Upper Level (Fort Lee) to New York Side/Upper Level (Manhattan), Saturday December 1st, 2018, 12:00 AM thru 08:00 AM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Upper Level (Fort Lee) to New York Side/Upper Level (Manhattan), Sunday December 2nd, 2018, 12:00 AM thru 08:00 AM, 2 left lanes closed.

16 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 16 of 18 11/30/2018 Page 16 of 18 11/30/2018 Page 16 of 18 11/30/2018 Page 16 of 18 11/30/2018 Page 16 Page 16

Port Authority NY/NJ (continued) GEORGE WASHINGTON BRIDGE (PA) (continued)

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee) , Sunday December 2nd, 2018, 12:00 AM thru 08:00 AM, 2 left lanes closed.

GOETHALS BRIDGE

Port Authority NY/NJ: bridge construction on Goethals Bridge westbound New York Side (Staten Island) to New Jersey Side (Elizabeth), Saturday December 1st, 2018, 12:00 AM thru 08:00 AM, left and center lanes closed.

HOLLAND TUNNEL (PA)

Port Authority NY/NJ: Sandy Repairs at Holland Tunnel one tube closed one direction at a time between NY City and Jersey City overnights on weeknights and weekends. Scheduled to start sometime in the 2019 Construction Season. Traffic will be detoured to the Lincoln Tunnel or G.W. Bridge.

Port Authority NY/NJ: tunnel repairs on Holland Tunnel eastbound New Jersey Side - South Tube (Jersey City) to New York Side - South Tube (Manhattan), Tuesday December 4th, 2018 thru Friday December 7th, 2018 Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, 1 lane closed.

Port Authority NY/NJ: tunnel repairs on Holland Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Jersey City) , Wednesday December 5th, 2018 thru Friday December 7th, 2018 Wednesday/ Thursday/ Friday, 12:00 AM thru 05:30 AM, 1 lane closed.

LINCOLN TUNNEL (PA)

Port Authority NY/NJ: Repair Helix Guiderail & Relocate Manhole Recover on NJ 495 at Lincoln Tunnel both directions New Jersey Side Wednesday May 30th, 2018 thru Saturday November 30th, 2019, Monday thru Friday, 09:00 PM thru 05:00 AM, one lane closed on 495 and one to two lanes closed on JFK Boulevard East.

Port Authority NY/NJ: Remove & Replace Existing Above Ground Storage Tanks & Install 2" Electric Conduits at Lincoln Tunnel on 10th Avenue between 39th and 40th Streets (Manhattan) up to 3 lanes closed Weeknights from 10 p.m. - 6 a.m. the next morning, July 31st, 2018 thru July 31st, 2020.

Port Authority NY/NJ: construction on Lincoln Tunnel eastbound (New York) right lane closed on the Helix and the right lane closed from Park Avenue, Friday November 30th, 2018 thru Saturday December 1st, 2018, 11:00 PM thru 08:00 AM.

Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel eastbound New Jersey Side - South Tube (Weehawken Twp) to New York Side - South Tube (Manhattan), Friday November 30th, 2018 thru Sunday December 2nd, 2018 Friday/ Saturday, 11:00 PM thru 08:00 AM, all lanes closed and detoured, Thursday December 6th, 2018 thru Friday December 7th, 2018, 11:00 PM thru 05:00 AM, all lanes closed and detoured.

Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel both directions New Jersey Side - Center Tube (Weehawken Twp) to New York Side - Center Tube (Manhattan) , Sunday December 2nd, 2018 thru Thursday December 6th, 2018 Sunday/ Tuesday/ Wednesday, 11:00 PM thru 05:00 AM, all lanes closed and detoured.

Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Weehawken Twp), Monday December 3rd, 2018 thru Tuesday December 4th, 2018, 11:00 PM thru 05:00 AM, all lanes closed and detoured.

Port Authority NY/NJ: construction on New York Expressway/Dyer Avenue northbound 30th Street (New York) to 33rd Street (New York), Friday November 30th, 2018 thru Sunday December 2nd, 2018 Friday/ Saturday, 11:00 PM thru 01:00 PM, all lanes closed.

Port Authority NY/NJ: construction on New York Expressway/Dyer Avenue southbound 33rd Street to 30th Street , Friday November 30th, 2018 thru Sunday December 2nd, 2018 Friday/ Saturday, 11:00 PM thru 07:00 AM, all lanes closed.

17 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 17 of 18 11/30/2018 Page 17 of 18 11/30/2018 Page 17 of 18 11/30/2018 Page 17 of 18 11/30/2018 Page 17 Page 17

Port Authority NY/NJ (continued) OUTERBRIDGE CROSSING (PA)

Port Authority NY/NJ: long term construction on Outerbridge Crossing eastbound New York Side - Toll Plaza (Staten Island) Toll lanes 8 and 10 closed, Continuous Wednesday November 28th, 2018 10:00 PM thru Monday April 1st, 2019 11:59 PM.

Port Authority NY/NJ: construction on Outerbridge Crossing eastbound New York Side - Toll Plaza (Staten Island) Hi-Speed E Z Pass lane 4, Saturday December 1st, 2018, 12:00 AM thru 08:00 AM.

18 11/30/2018 1 11/30/20189/12/2008 Page of 18 11/30/2018 Page 18 of 18 11/30/2018 Page 18 of 18 11/30/2018 Page 18 of 18 11/30/2018 Page 18 of 18 11/30/2018 Page 18 Page 18