Ørsted The People Behind Offshore About Investing in the UK Ørsted

Headquartered in Denmark, We are investing heavily within the UK. Ørsted is a renewable energy £8 billion invested to date. company that takes tangible action to create a world that runs entirely on green energy.

Our aim is to develop and deploy market We will be investing at least another £4 billion leading renewable energy solutions that by the end of 2020. benefit the planet and our customers alike, driving down the cost of green energy.

We have invested significantly in the UK, where we develop, construct and operate offshore wind farms and innovative We are investing in people, growing our business waste-to-energy technology. We also with almost 900 direct employees within the UK. provide smart energy products to our commercial and industrial customers.

We are creating long term operation and maintenance Ørsted is the global leader in offshore jobs in areas near our projects. These include the Humber, Who are the wind power. We employ people with a Barrow, Brightlingsea, Ramsgate and Liverpool. wide ranging skill set in a variety of roles people behind to support the development, construction our offshore and operation of our offshore wind farms. Here, members of our team share the wind farms? routes they’ve taken through education and employment which have led to careers in offshore wind power. Ørsted wind farms Building an offshore in the UK An offshore wind farm comprises several key components. Offshore turbines generate electricity which travels through underwater cables via an offshore substation towards shore. Underground cables then 25 Years transfer the electricity to an onshore substation where it is converted Operations and to the correct voltage so that it can be transmitted to the Maintenance electricity network.

3-4 Years Construction

Walney Extension (659 MW) Westermost Rough (210 MW) Walney 1 & 2 (367 MW) Barrow (90 MW) 1 2 3 4 5 6 7 8 9 West of Duddon Sands Hornsea 1 (1,218 MW) (389 MW) Burbo Bank Extension (258 MW) Hornsea 2 (1,386 MW) T = Transformer Burbo Bank (90 MW) Hornsea 3 (up to 2,400 MW)

Renescience Northwich Lincs (270 MW) Race Bank (573 MW) 1. Wind turbine – Electricity is produced as the wind turns the rotor blades. The blades turn a shaft containing magnets inside loops of copper wires. 2. Array cables – These cables link the turbines to one another and to the offshore substation. 3. Offshore substation – Converts electricity to a higher voltage so less energy

Gunfleet is lost as it transmits to shore. Symbols Sands 1 & 2 (173 MW) 4. Export cables – Connect the offshore substation to the onshore substation 5. Project specific onshore substation – Connects the electricity supplied from In operation the offshore wind farm to the national grid.

Under construction 6. National Grid onshore substation – Converts the electricity to the voltage of  1 (630 MW) the onshore transmission network. Project Development 7. Transmission – Transmission lines carry electricity at high voltages over long

January(MW) Total wind farm Februarycapacity distances from power plants to communities. 8. Distribution – Electricity from transmission lines is reduced to lower voltages In operation at a substation prior to distribution to communities.

Under construction 9. Homes – Electricity is used to light our homes, power our appliances and make our lives more comfortable. Constructing an offshore wind farm Meet the team

Project Construction phase can Construction involves An array of professionals Managers typically last 3-4 years. between 250-1,000 are involved in the design people. and construction of the Engineers Health & Safety substations, cable routes Managers and turbines.

Offshore Stakeholder Relations Coordinators & Communications

Roles within construction More than 100 roles are Specialist Ørsted staff are varied. We employ involved in the construction design and oversee the locally, UK wide and phase from operations building of each wind from around the world to coordinators and farm. We also use a Partnerships Legal obtain the necessary electrical engineers range of contractors who expertise. through to commercial employ local people to managers and everyone help us build things like in between. the onshore substation Finance and the operation and maintenance facilities. Jason Ledden Steven Nicholson Rebecca Goff Jessica Westcott-Hayes Construction Project Manager Health Safety & Environmental Engineer Senior Maritime Specialist Senior Installation Lead Race Bank Project Race Bank Project Race Bank Project Offshore Foundations and Structures Installation My job is to manage and coordinate all I am responsible for supporting the project My job is incredibly diverse and can range Borselle 01 & 02 Project activities in the Construction Design in all matters relating to Health, Safety and from being the single point of contact for Management area with a high focus on Environment. This involves liaising with support across all east coast UK sites, to I am currently involved in the first Dutch safety, quality and programme delivery. contractors to ensure statutory compliance managing the technical management Windfarm for Ørsted; Borssele 01 & 02. I I am responsible for managing other and monitoring all construction activities. and mobilisation of our new Service am responsible for the transport and project managers, budgets, time schedule Operations Vessel, the Edda Passat. installation of the wind turbine foundations. and identifying project risks. I also Qualifications My role and responsibilities are varied manage contracts and relations with • NVQ Level 4 Diploma Occupational Qualifications and cover procurement, engineering, our suppliers. Safety and Health • BA (Hons) Business Studies; installation and handover to Operations • NEBOSH General Certificate University of Liverpool and Maintenance. More specifically, I Qualifications • IOSH Graduate Member • Commercial background in oversee and manage the foundation • HSE Commercial diver, Parts:4,3,2&1 Marketing and PR following on contractor and approve their engineering • IMCA diver Medic Previous employment from degree methods to help ensure the scope is • IMCA Diving supervisor • Offshore Rigging Supervisor at Subsea 7 • Maritime qualifications: delivered safely, on time and • NVQ Level 5 Occupational Health and • Business Owner - Fabrication/ • Master 200gt CoC (MCA) / OOW within budget. Safety practice Machinery Moving/Steel Erection • Deck 500gt • NEBOSH General Certificate • Offshore Rigging Supervisor/HSE • GMDSS GOC Qualifications • IOSH Graduate Member Coach at Subsea 7 • MCA Approved Engine Course • BSc Geology with Oceanography; • HSE Advisor at Wind Power • STCW 95 Basic Training Southampton University Previous employment • HSE Engineer on the Westermost • ENG 1 Medical Fitness Certificate • MSc Coastal Engineering and • Royal Marines Rough Project at Ørsted Environmental Studies; • Civil Engineering Diver Previous employment Southampton University • Saturation Diver (closed bell) • Vessel Master at Seacat Services • IOSH Managing Safely • Diving Coordinator • Marine Manager Race Bank Project (Wind farm construction) Previous employment • HSE package lead (Cable installation) • Project Superintendent for Dredging • Offshore facilities manager and Offshore projects at Van Oord • Deputy Construction Project Manager DMC • Project Engineer and Operations in Offshore Wind Projects at Van Oord OWP Michael Schmidt Nielsen Edward Ridgway Gordon Pope John Vernon Graduate Engineer Technical Project Manager Deputy Construction Senior Health & Safety Burbo Bank Extension Project Wind Farm Development Project Manager Environment Manager Hornsea Project One Burbo Bank Extension Project I am on the Graduate Scheme working I am part of a team that designs and as an Interface Manager for the Burbo turns future potential wind farm ideas Supporting the Construction Project My role is to provide Ørsted managers Bank Extension onshore substation. I into reality. We are constantly looking Manager, I facilitate daily coordination of and employees with advice, guidance am responsible for overseeing the at the latest technology to see how site management, HSE engineers, Offshore and direction on all aspects of health, installation of the low voltage system this can be put into our next wind farm Marine Managers and logistics and safety and environmental issues. and the cable schedule at our onshore to make it better and cheaper. My role commissioning for the construction substation, making sure we meet also looks at how we install these wind of the wind farm. Qualifications National Grid’s standards of high turbines in ever deeper water, in larger • NEBOSH Diploma (part 2) in power quality. wind farms and further away from Qualifications Occupational Safety & Health the coast. • MEng Civil Engineering; • Institute of Environmental Qualifications Glasgow University Management Certificate in • BSc Electrical Engineering; Qualifications Environmental Management Technical University of • BEng Mechanical Engineering; Previous employment • HNC Engineering Denmark (DTU) University of Edinburgh • Intern for Scottish and Southern • Chartered Member of the Institute • BSc Exchange in Singapore Energy (SSE) of Occupational Safety and Health Nanyang Technological Previous employment • Civil Engineering Manager for University (NTU) • Engineering technician at Griffin Wind farm Previous employment • MSc Electrical Engineering with Edinburgh Designs – making wave • Lead Engineer on a further three • Trainee Electronic Technician in specialization in Electric Energy machines for research institutions onshore windfarms the Royal Air Force Systems; Technical University of so they can test their models in • Project Manager, onshore 132/ • 18 Years in Plastic Manufacturing Denmark (DTU) a lab 275kV substations, Stonehaven Industry in a variety of roles • Technical Project / Sales Manager • Deputy Construction Project including: Machine operator, Previous employment at Siemens Wind Power Manager for the Walney Engineer, Safety and Systems • Work experience as an Electrician • Engineer and Project Manager at Extension Project Manager and Production Manager Pelamis Wave Power – Start-up • 8 years in a Health, Safety and Company making a device to Environment management role in harness wave energy a variety of organisations (Public Transport, NHS and Construction) • 8 years as HSE Manager (Burbo Bank Wind Farm) at Ørsted Gabriel Davies Mark West Sally Holroyd Thomas Rosier Lead Commercial Manager and Wind Turbine Installation Specialist Lead Consent Project Manager Offshore Installation Manager Head of Programme Commercial Race Bank Project Walney Extension Project Walney Extension Project Management Hornsea Project Two I manage the transfer of turbine I make sure we build the wind farm I manage the activities of our components, including the blades, nacelle without causing harm to the local contractor whilst they construct the Reporting to the Asset Director, and and tower, and installation of the wind environment. During the project wind farm. It is important that they working as part of the Hornsea Two turbines offshore. This involves managing development phase, my team is install the structures according to our Programme Leadership Team, I provide both a vessel supplier and a turbine responsible for undertaking environmental precise technical requirements, staying commercial support to the project. installation contractor to ensure that surveys and studies, along with applying for within the schedule and cost of the This includes commercial contract we erect the turbines in a safe manner, the key environmental consents. We ensure project. Keeping everyone safe, we negotiation, divestment transaction but also on time and to budget. that our onshore and offshore site adapt to the challenges of the offshore support, government subsidy contract contractors remain compliant with all environment and ensure the operations management and ongoing development Qualifications required environmental constraints. are closely controlled. of third party stakeholder engagement. • BSc Mechanical and Manufacture Engineering; Portsmouth University Qualifications Qualifications Qualifications • BSc (Hons) Applied and • MEng Engineering Design, Bristol. • BA (Hons.) American History & Previous employment Environmental Biology; Politics; University of Manchester • Field technician on high speed University of York Previous employment • Graduate Diploma and Legal rotating machinery at Angelus • MSc Crop Production in the • 3 month student placement Practice Certificate; Nottingham Machine Corp Changing Environment; Seaway Heavy Lifting, The Hague. Law School • Wind turbine technician Essex University • 12 month student placement RWE (Onshore) at Nordex • Pg. Dip Geographical Information Innogy, Swindon. Previous employment • Wind Turbine Commissioning Systems; University of Portsmouth • 2 years as Lead Commercial Engineer (Lincs Offshore Wind Manager for the Walney Farm) at RES Previous employment Extension Project • Environmental Scientist at • 6 years in private practice law firms Oakwood Environmental: EIA and specialising in major infrastructure consenting for the marine planning and energy law aggregates industry • Two years on secondment at DONG • Principal Consultant at Intertek Energy as in house legal counsel Metoc: EIA and consenting for the advising development projects on cables and marine renewables planning and commercial issues industries Operating & maintaining an offshore wind farm

Today’s offshore wind farms will produce clean electricity for 25 years. It can take around 35-100 people to operate and maintain an offshore wind farm. A large proportion of these people will be locally based.

Wind Turbine Supplier Head of Operations HSE Manager

Deputy Store Deputy Site Technical Operations Coordinator Operations Supervisor Manager Manager

Site Operations Site Assistant Planning Assistant Coordinator

Wind Turbine Wind Turbine Technicians Technicians Andrew Greenleaf Paul Hazell Nicole Read Ryan Marsland Head of Site Operations Offshore Coordinator Offshore Coordinator Technical Site Supervisor Gunfleet Sands Project Westermost Rough Project Race Bank Project West of Duddon Sands Project

I lead the team who operate Gunfleet As the Offshore Coordinator, I am I am responsible for coordinating the I provide technical support to fix turbine Sands windfarm. My team maintain, responsible for coordinating marine vessels and personnel working offshore, components, undertake maintenance repair and upgrade the site’s offshore operations via both helicopter and sea from setting up the vessels to working and find faults. I work with the technical wind turbines. My role is to ensure the vessels. I plan both proactive and on our site. I monitor safety whilst the departments such as Wind Turbine team work safely in what is a reactive maintenance, responding to team are working offshore. We ensure Systems, Diagnostics and Technical challenging offshore environment, while emergency situations. safe and effective transit to the support. I also work closely with our also motivating and facilitating my offshore assets and in the event of other wind farms so we can share people to ensure the turbines are Qualifications something going wrong coordinate lessons learnt. fully operational. • NEBOSH General Certificate emergency response. Every day brings • Facilities Management Certificate different challenges that require Qualifications Qualifications • Level 7 Diploma in Strategic fast solutions. • BSc Mechanical Engineering; • 4 year mechanical / electrical Leadership & Management University of Lancaster apprenticeship. • NVQ Level 3 Logistics Qualifications (Furness College) • HNC Electrical Engineering • Coach and Mentor • Master 200GT CoC/OOW deck 500gt • NVQ level 2 & 3. Key skills level 3 • BSc and LLB • GWO certification (First Aid, Sea • BSc (hons) Computing & Business • ONC, HNC and HND in Mechanical • MSc – Management Survival, Manual Handling, Fire • VHF/DSC GOC operator Engineering and CAE • NEBOSH qualification in safety. Awareness & Working at Heights) • STCW basic training • ENG 1 medical fitness certificate Previous employment Previous employment Previous employment • ex RNLI Crew & Navigator • 4 year Mechanical Maintenance • Various engineering roles in the • Site Planner at Siemens – (11 Months) • RYA Advanced Powerboat Instructor • Engineering Apprenticeship at a local Electricity Supply industry • Learning and development officer/ paper production and converting factory • Operational management roles in Logistics offshore/Communications Previous employment • 5 years as a shift mechanical resource EGT, NTL and Arqiva instructor in the Royal Artillery, • 12 years as windfarm CTV master • 6 years offshore turbine experience with • Senior operational management role British Army – (26 Years) Ørsted on the Siemens 3.6 MW turbine in Virgin Media. • 5 years as an Authorised Technician carrying out fault finding/trouble shooting tasks and servicing • 6 months as a Supervisory Technician before moving into the Technical Site Supervisor role Andrew Bell Tricia Percy Josh Gallacher Amy Tebbs Warehouse Manager & Coordinator Site Assistant Wind Turbine Technician Wind Turbine Technician Burbo Bank Project Westermost Rough Project Westermost Rough Project Race Bank Project

I am responsible for looking after As the Site Assistant, I am responsible for As an offshore wind turbine technician As a wind turbine technician I’m trained technicians along with ordering spare the full administrative site support, my main role and responsibility is to to carry out routine inspections, parts, Personal Protective Equipment, including management and technicians. work safely and carry out a variety of maintaining, testing and repairing tools and lifting equipment. I deal with This includes travel arrangements, manual tasks to ensure that the wind electrical and mechanical equipment. all deliveries in and out of the warehouse processing of orders and shift input, turbines are working reliably and at and work closely with local suppliers to training coordination, document maximum efficiency. We work out at Qualifications procure the necessary parts. management, monthly reporting sea fixing the complex machinery in the • NVQ electronics and analysis. wind turbines, so it is important that we • Apprenticeship Qualifications communicate effectively and • GCSEs • GSCE equivalent (History, Qualifications work together. Maths & PE) • GCSE & A level equivalents Previous employment • GWO Certification (First Aid, • RSA/Pitman typing Advanced Qualifications • Royal Navy 6 years Manual Handling, Sea Survival, • Microsoft Office • HNC Mechanical Engineering Working at Heights) (Word, Excel, PowerPoint) • ECITB Level 3 Diploma – Installing • Forklift Licence • Pondus/Qube engineering construction plant & • GWO Certification (First Aid, Sea systems (Mechanical) Previous employment Survival, Fire Awareness, Manual • Mechanical Fitting Modern • Retail Manager at Scottish Power Handling, HUET) Apprenticeship • Retail Manager at SONY Centre • Fire Warden • ACE card • Safety Rep • IRATA Level 1 rope access • NVQ Level 2 Performing Previous employment Engineering Operations • PA/Site Secretary (Instrumentation)

Previous employment • Rotating Equipment Technician at Total Lindsey Oil Refinery Tom Baker Georgia Grace Wind Turbine Technician Wind Turbine Technician Lincs Project Race Bank Project

I am part of a team that looks after the As a maintenance technician, I lead general maintenance of the offshore service teams when completing routine wind turbines, carrying out servicing, maintenance on the turbines. I am also upgrades, inspections and troubleshooting utilised as a team member during to keep them safe and running efficiently. I troubleshooting tasks and general am responsible for leading a small team turbine work. I currently work at Race as well as taking control of the turbine Bank wind farm on a 2 week on 2 week and making it safe to work on. off shift pattern working from a Service Operations Vessel. Qualifications • NVQ level 3 instrumentation from BP Qualifications • GCSEs Previous employment • NVQ level 3 wind turbine • 2 years at Humber oil refinery as an maintenance instrument technician for Phillips 66 • PEO level 2 • 4.5 years at Theddlethorpe gas terminal as a systems technician for Previous employment ConocoPhillips • Shop assistant full time • 4 year apprenticeship for Siemens in the wind industry • Service team lead for Siemens at Lincs wind farm List of Acronyms

ACE card Assuring Competence in Engineering Construction BSc Bachelor of Science Degree CAE Computer-Aided Engineering CDM Construction Design Management CoC Certificate of Competency ECITB Engineering Construction Industry Training Board EIA Environmental Impact Assessment ENG1 MCA approved medical certificate required for all crew on commercial superyachts GMDSS Global Maritime Distress and Safety Systems GOC General Operator’s Certificate GWO Global Wind Organisation HNC Higher National Certificate HND Higher National Diploma HSE Health, Safety and Environment HUET Helicopter Underwater Escape Training IOSH Institution of Occupational Safety and Health IMCA International Marine Contractors Association I R ATA Industrial Rope Access Trade Association MCA Marine Coastguard Agency MEng Masters of Engineering MSc Masters of Science Degree NEBOSH National General Certificate in Occupational Health and Safety NHS National Health Service NVQ National Vocational Qualification ONC Ordinary National Certificate Pg. Dip Post Graduate Diploma PPE Personal Protective Equipment SHE Safety Health Environment STCW Standards for Training, Certification and Watch keeping For information on current vacancies at Ørsted please visit our careers site at www.orsted.co.uk/careers

@OrstedUK

Orsted

[email protected]

Ørsted 5 Howick Place London SW1P 1WG Tel: +44 (0) 20 7811 5200

© Ørsted 2018. All rights reserved. No parts of this publication may be reproduced by any means without prior written permission from Ørsted.

All graphics in this document are for illustrative purposes. Dates are based on available information and are subject to change. Printed on FSC certified paper. orsted.co.uk

Printed on recycled paper Ørsted