I) Basic information S.No Item Details

1 Name of the project/s M/s. Laxmi Infobahn Software Technology Park LLP Commercial Complex.

2 S. No. in the schedule Project Activity – 8a

Category B(B2) 3 Proposed capacity /area/ length/ tonnage to be handled/command area/lease area/ No. of Blocks with Built-up area No of the well to be drilled S. Block No. of Area N Detail Floors (Sq.Mts) o s 1 Single GROU Block ND 3860.72 FLOOR 2 1 ST 3860.72 FLOOR 3 2 ND 4372.70 FLOOR 4 3 RD 4372.70 FLOOR 5 4 TH 4372.70 FLOOR 6 5 TH 4372.70 FLOOR

7 6 TH 4372.70 FLOOR 8 7 TH 4372.70 FLOOR 9 8 TH 4372.70 FLOOR 1 9 TH 4372.70 0 FLOOR 1 10 TH 4372.70 1 FLOOR 1 11 TH 4372.70 2 FLOOR

1 12 TH 4372.70 3 FLOOR 1 13 TH 4372.70 4 FLOOR 1 14 TH 4372.70 5 FLOOR 1 15 TH 4372.70 6 FLOOR M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), (V), Gandipet(M), Ranga Reddy(D)

1 16 TH 4372.70 7 FLOOR 1 17 TH 4372.70 8 FLOOR 1 18 TH 4372.70 9 FLOOR 2 19 TH 4372.70 0 FLOOR 2 20 TH 4372.70 1 FLOOR Total 90,802.7 4

Parking: Cellar Parking area in Sq.mts Basement – 1 8288.41 Basement- 2 8288.41 Basement -3 8288.41 Basement – 4 8288.41 Total Parking 33,153.64 Area

4 New/Expansion /Modernization New Project.

5 Existing capacity/Area etc… NA

6 Category of project A or B Category B ( ‘B2’) As Area is less than 1,50,000 Square Meters, the proposed project comes under

category B2

PRIDHVI ENVIROTECH (P) LIMITED Page 1

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

7 Does it attract the general condition? If yes No please specify

8 Does it attract the specific condition? If yes No please specify

9 Location Sy. 107(P), 108(P), Plot/ survey /Khasra no Kokapet(V), Village Gandipet(M), Tehsil/Mandal Ranga Reddy(D) District State 10 Nearest Railway station/Air port along with Lingampally & Hitechcity railway the distance in kms station – 9.0 KM Rajiv Gandhi International Airport () – 21.3Km (SSE) 11 Nearest Town, City, District Headquarters This is Part of City along with distances in kms.

12 Village Panchayats Zilla Parishad Greater Hyderabad Municipal Municipal Corporation, Local body Corporation (complete postal Address with telephone no. to be given

13 Name of the applicant M/s. Laxmi Infobahn Software Technology park LLP - commercial complex 14 Registered address 8-2-682, Laxmi Cyber Centre, Road No.12, , Hyderabad- 500034 15 Address of the correspondence P. Obul Reddy Name General Manager Designation /owner/partner/CEO 8-2-682, Laxmi Cyber Centre, Road No.12, Address Banjara hills, Hyderabad- Pin code 500034 E-mail [email protected] Telephone no 040-23303449 Fax no

PRIDHVI ENVIROTECH (P) LIMITED Page 2

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

16 Details of Alternative Sites examined if No any.

Location of these sites Should be shown on a Topo sheet.

17 Interlinked Projects No

18 Whether separate application of Not Applicable interlinked projects has been submitted

19 If yes, date of submission Not Applicable

20 If no reason Not Applicable

21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given.

(a) The Forest (conservation) Act, 1980? No (b) The Wild life (protection)Act, 1972? No (c) The C.R.Z notification, 1991? No

22 Whether there is any Government No order/policy relevant/relating to the site?

23 Forest land involved (Hectares) No

24 Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up?

(a)Name of the court (b)Case no. (c) Orders/directions of the court, if any and its relevance with the proposed project.

(II) Activity

PRIDHVI ENVIROTECH (P) LIMITED Page 3

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.).

S.No. Information /Checklist Yes Details thereof (with approximate confirmation quantities /rates, wherever possible ) /No with sources of information data

1.1 Permanent or temporary change Yes The proposed project activity is in land use, land cover or construction of Commercial Complex. topography including increase in The site area is located in GHMC area. intensity of land use (with This area is earmarked as Commercial respect to local land use plan) zone as per the Master plan of HMDA.

1.2 Clearance of existing land, No There is no vegetation in the project site vegetation and buildings? requiring clearance.

1.3 Creation of new land uses? Yes The purpose of proposed project is construction of Commercial hence there will not be any change in land use 1.4 Pre-construction investigations Yes Soil bearing tests were conducted e.g. bore holes, soil testing? before construction

1.5 Construction works? Yes The project is Commercial Complex.

1.6 Demolition Works? No There are no existing buildings in the project site. 1.7 Temporary sites used for No Temporary shelters for construction construction works or housing of workers are not required as labor will be construction works? hired from the surrounding locations

1.8 Above ground buildings, Yes The proposed development is structures or earthworks Construction of Commercial Complex. including linear structures, cut Cut and fill activity will be there for and fill or excavations basement and foundations

1.9 Underground works including No Not Applicable as this is a Construction mining or tunneling? of Commercial Complex.

1.10 Reclamation Works? No Not Applicable

PRIDHVI ENVIROTECH (P) LIMITED Page 4

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

1.11 Dredging? No Not Applicable as this is a Construction of Commercial Complex.

1.12 Offshore structures? No Not Applicable as this is a Construction of Commercial Complex.

1.13 Production and manufacturing No No manufacturing activity. processes? Activity is Construction of Commercial Complex. 1.14 Facilities for storage of goods or Yes Storage space of building materials will materials? be earmarked onsite.

1.15 Facilities for treatment or Yes Solid waste generated from the disposal of solid waste or liquid construction includes rubble, used up effluents? cement, broken bricks etc, which will be used for filling up low lying areas during developmental stage. Treated liquid effluents from domestic waste water will be used for flushing and gardening and rest would be sent to municipal drains. STP Sludge will be used as manure for green belt development in the area 1.16 Facilities for long term housing of No Manpower requirement of operational operational workers? workers is nominal and will be recruited from surroundings therefore no long term housing facilities are envisaged.

1.17 New road, rail or sea traffic No Existing facilities will be used for the during construction or operation? proposed project.

1.18 New road, rail, air waterborne or No Not envisaged other transport infrastructure including new or altered routes and stations, ports, airports etc?

1.19 Closure or diversion of existing No Not envisaged transport routes or infrastructure leading to changes in traffic

PRIDHVI ENVIROTECH (P) LIMITED Page 5

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

movements?

1.20 New or diverted transmission No No diversions lines or pipelines?

1.21 Impoundment, damming, No The proposed development will not culverting, realignment or other disturb the natural terrain of the area changes to the hydrology of and will not disturb the water courses in watercourses or aquifers? any ways i.e. no drain flows through the site. Rain Water Harvesting system is proposed to recharge the GWL 1.22 Stream crossings? No There are no stream crossings the proposed site. 1.23 Abstraction or transfers of water Yes Water requirement of the project will be from ground or surface waters? met from Municipal supply.

1.24 Changes in water bodies or the No The development will be carried out with land surface affecting drainage no disturbance to major water or the or run-off? land surface, affecting drainage or runoff. 1.25 Transport of personnel or Yes Transportation of personnel or material materials for construction, will be by trucks on road operation or decommissioning?

1.26 Long-term dismantling or No Not envisaged decommissioning which could have an impact on the environment?

1.27 Ongoing activity during No Not envisaged decommissioning which could have an impact on the environment?

1.28 Influx of people to an area in Yes The project is proposed Commercial either temporarily or complex. The local area is developing permanently? at a faster pace due to development in the surrounding areas.

PRIDHVI ENVIROTECH (P) LIMITED Page 6

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

1.29 Introduction of alien species? No Not envisaged

1.30 Loss of native species or genetic No Not envisaged diversity?

1.31 Any other actions? No Nil

2.0 USE OF NATURAL RESOURCES for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S.No. Information /Checklist Yes Details thereof (with approximate confirmation quantities /rates, wherever possible) /No with sources of information data

2.1 Land especially undeveloped or No Total Plot Area 11,736.56 Sq.mts agricultural land (ha) Greenbelt Area 1537.75 Sq.mts Total Built up area 1,23,956.38 Sq.mts

2.2 Water (expected source & Yes Water Requirement : 365 KLD competing users) Unit : KLD Fresh water requirement – 175KLD Source: Municipal Supply Recycled water –190 KLD Source : S.T.P (550 KLD) 2.3 Minerals (MT) No Not Applicable as this is a construction project. 2.4 Construction material – stone, Yes Construction materials like coarse aggregates, and / soil (expected aggregate, fine aggregate, granite. Kota source- MT) stone, Dolhpur stone, Marble, bricks, sand, cement, steel will be used. The raw materials will be sourced from local dealers & traders. 2.5 Forests and timber (source – Yes Wood will be used only for preparing MT) window and door frames. The required timber will be procured from local authorized timber depots 2.6 Energy including electricity and Yes Power Required : 10000 KVA fuels (source, competing users) Source: Central Power Distribution Unit: fuel (MT), energy (MW) Company Limited (TSCPDCL). Back-up power: 7 X 2000 KVA DG sets

PRIDHVI ENVIROTECH (P) LIMITED Page 7

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

for emergency during power failures. Fuel: HSD required 300 Liters/day for 8 hours operation, will be sourced from local traders 2.7 Any other natural resources (use No No Other Natural resources are to be appropriate standard units) used

3.0 Use, storage, transport, handling or production of substances or materials which could be harmful to human health or THE ENVIRONMENT or raise concerns about actual or perceived RISKS TO HUMAN HEALTH.

S. No. Information/Checklist Yes/ Details thereof (with approximate confirmation quantities /rates, wherever possible ) No with sources of information data 3.1 Use of substance or materials, No Only HSD in small quantities will be which are hazardous (as per used for backup power DG sets. Paints MSIHC rules) to human health are used during construction or the environment (flora, fauna, and water supplies)

3.2 Changes in occurrence of No Not envisaged disease or affect disease vectors (e.g. insect or water borne diseases)

3.3 Affect the welfare or people e.g. Yes Good quality housing is proposed with by changing living conditions? good living environment for 352 families

3.4 Vulnerable groups of people No -- who could be affected by the project e.g. hospital patient’s children, the elderly etc.,

3.5 Any other causes No --

4.0 Production of SOLID WASTES during construction or operation or decommissioning (MT/ month) S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation quantities /rates, wherever possible ) with sources of information data PRIDHVI ENVIROTECH (P) LIMITED Page 8

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

No

4.1 Soil, overburden or mine wastes No There are no overburden or mine waste

4.2 Municipal waste (domestic and Yes Garbage – 1115.0 kgs/day disposed to or commercial wastes) GHMC

4.3 Hazardous wastes (as per Yes Used Oils from – 300 LPA Hazardous Waste Management Used Batteries – 7 no’s/year Rules) Transformer Oil – 100 LPA

4.4 Other industrial process wastes No Not Applicable

4.5 Surplus product No Not Applicable

4.6 Sewage sludge or other sludge Yes Sewage Sludge @ 30 kgs/d will be from effluent treatment used as manure for green belt development. 4.7 Construction or demolition Yes The amount of construction debris may wastes be generated which will be segregated and whatever re-saleable will be sold to supplier and rest waste will be used for filling up of low lying areas and development of internal roads and boundary walls etc 4.8 Redundant machinery or No Most of the equipment used for the equipment construction will be hired.

4.9 Contaminated soils or other No No soil contamination is anticipated as materials the proposed project is a construction project all the waste generated will be in the form of solid waste of reusable nature. 4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No --

5.0 Release of pollutants or any hazardous, toxic or noxious substances to AIR (Kg/hr)

PRIDHVI ENVIROTECH (P) LIMITED Page 9

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation quantities /rates, wherever possible ) No with sources of information data 5.1 Emissions from combustion of Yes Emissions will be mainly from vehicles fossil fuels from stationary or moving at the project site during mobile sources construction and operation period and secondly from the 7X1000 KVA DG set used for backup power source operated only during power failures only for a short duration. As HSD will be used for the DG sets, the main emissions will be SO2 and NOx. For Proper dispersion of pollutants, the stack height meeting CPCB Norms will be maintained. 5.2 Emissions from production NO This is not an industry to have processes emissions from production process

5.3 Emissions from materials Yes Vehicular emissions are anticipated handling including storage or both during construction and during transport operation.

5.4 Emissions from construction Yes Fugitive emissions are likely during activities including plant and construction activities from the equipment materials. These are temporary in nature. The main emissions during the construction will be PM from the loading and unloading of materials on the site. SO2 and NOx from the combustion of fossil fuels and from vehicles. 5.5 Dust or odors from handling of Yes The particulate matter will be mainly materials including construction generated from loading and unloading materials, sewage and waste. of the material at the site. Other municipal solid waste will be disposed off to the Municipal solid

PRIDHVI ENVIROTECH (P) LIMITED Page 10

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

waste dump yard. The construction material will be handled carefully to prevent any spill over or wastage. Construction labor will be provided with proper sanitation to avoid any unhygienic conditions. Therefore no odor generation is expected 5.6 Emissions from incineration of No Not envisaged waste

5.7 Emissions from burning of waste No Not envisaged in open air (e.g. slash materials, construction debris)

5.8 Emissions from any other No Not envisaged sources

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat: S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 6.1 From operation of equipment Yes Noise is anticipated during construction e.g. engines, ventilation plant, activities, movement of construction crushers material and use of machinery. These are temporary in nature and will be minimized by adopting proper maintenance such as greasing, oiling and insulations (acoustic enclosures) for DG Set. 6.2 From industrials or similar No Not applicable processes

6.3 From construction or demolition Yes The noise and vibrations are only during the construction phase and proper precautions are taken to ensure that the decibel levels are below the standards and the equipment utilized for constructions are properly serviced and

PRIDHVI ENVIROTECH (P) LIMITED Page 11

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

maintained for reducing vibration and noise levels 6.4 From blasting or piling No Not envisaged

6.5 From construction or operational Yes Noise levels of 55dB (A) are anticipated traffic. during daytime due to the vehicular movement and construction activities, but it will be of temporary nature 6.6 From lighting or cooling systems Yes The lighting systems have a major component of LED to save an energy for the whole project 6.7 From any other sources No --

7.0 Risks of CONTAMINATION OF LAND OR WATER from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea :

S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 7.1 From handling, storage, use or No Used batteries and waste oil shall be spillage of hazardous materials stored separately and shall not lead to contamination of land during normal operation.

7.2 From discharge of sewage or No The sewage shall be treated to achieve other effluents to water or the the standards prescribed by MoE&F land (expected mode and place during operation phase. While the of discharge ) discharges from temporary toilets during construction shall be sent to septic tank followed by municipal sewer lines. 7.3 By deposition of pollutants No No pollutants are emitted in to air. emitted to air into the land or Hence no deposition of pollutants into into water land or water.

7.4 From any other sources No --

PRIDHVI ENVIROTECH (P) LIMITED Page 12

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

7.5 Is there a risk of long term build No Proper Environmental management up of pollutants in the plan will be followed for air, water, noise environment from these and solid waste. Hence no long term sources? impacts are envisaged.

8.0 Risk of accidents during construction or operation of the Project, which could affect human or the environment S. No. Information /Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 8.1 From explosions, spillages, fires Yes Fire hydrant and Fire fighting systems etc from storage, handling, use will be installed and safety precautions or production of hazardous will be followed as per the safety rules. substances Only Diesel in small quantity and paints during construction phase will be flammable material used and stored. 8.2 From any other causes No Not Applicable

8.3 Could the project be affected by No The project site is located at a higher natural disasters causing elevation and the seismic zone for the environmental damage (e.g. project area is Zone-II, which is floods, earthquakes, landslides, considered safe. cloudburst etc)?

9.0 Factors which should be considered (such as consequential DEVELOPMENT) which could lead to ENVIRONMENTAL EFFECTS or the potential for cumulative impacts with other existing or planned activates in the locality

S. No. Information /Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible ) with sources of information data 9.1 Lead to development of Yes The proposed project is a supporting. utilities, ancillary construction of commercial

development or development Complex. So it leads to development stimulated by the project which of supporting facilities and ancillary & could have impact on the related activities. environment e.g.:

PRIDHVI ENVIROTECH (P) LIMITED Page 13

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

 Supporting infrastructure Yes (roads, power supply,

waste or waste water treatment, etc.) Yes

 Housing development No  Extractive industries No  Supply industries No

 Other

9.2 Lead to after use of the site, No -- which could have impact on the environment

9.3 Set a precedent for later Yes The area is developed commercial developments area.

9.4 Have cumulative effects due to No -- proximity to other existing or planned project as with similar effects )

(III) Environment Sensitivity

S. No. Areas Name/ Aerial distances (within 15 km.) Identity Proposed project location boundary

1. Areas protected under No - international conventions, national or local legislation for their ecological, landscape, cultural or other related values

PRIDHVI ENVIROTECH (P) LIMITED Page 14

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

2. Areas which are important or Yes Water Bodies: sensitive for ecological reasons – Wetlands, water courses or MuskinCheruvu – 2.84 Km(E), other water bodies, coastal Nallagandla Cheruvu – 7.35 km zone, biospheres. Mountains, forests (NW), Gopi Cheruvu – 8.15 km (N), Pedda Cheruvu – 4.82 km (EN), Pedda Cheruvu – 6.66km (W), Osman Sagar– 2.57 km (SW), Vattinagulapalli Cheruvu – 4.62 km (WN) Battemma Cheruvu – 3.24 km (EN), Durgam Cheruvu – 6.36 km (EN), Chinta Kunta – 3.20 km (NE), Himayat Sagar– 6.62 km (SE

Reserve Forests: Kottaguda R.F – 5.73Km (NNE) 3. Areas and by protected, Yes important or sensitive species of - flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or No underground waters

5. State, National boundaries No -

6. Routes or facilities used by the No public for access to recreation or other tourist, pilgrim areas 7. Defense installations No None

PRIDHVI ENVIROTECH (P) LIMITED Page 15

M/s Laxmi Infobahn Software Technology Park LLP Comercial Complex Sy.No 107(P), 108 (P), Kokapet(V), Gandipet(M), Ranga Reddy(D)

8. Densely populated or built-up Yes The area is developing into a densely area populated area.

9. Areas occupied by sensitive Yes man-made land uses (hospitals, schools, places of worship, community facilities ) 10. Areas containing important, high No - quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas susceptible to natural No -- hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) IV. Proposed Terms of Reference B-2 Category Project for EIA Studies

PRIDHVI ENVIROTECH (P) LIMITED Page 16