Dodge Park Road Resurfacing– 15 Mile Road to Metro Parkway
Construction Update 10/18/2018
Asphalt paving operations are complete and the road has reopened to traffic. Final pavement markings will be installed in the coming week.
Post Construction Picture
Construction Update 10/11/2018
Asphalt paving operations are underway today October 11 and will continue on October 12 and 13 as the contractor completes the road resurfacing on Dodge Park. All paving operations are weather dependent. A minimum of one lane of traffic will will be maintained during paving operations with flag control. Traffic delays should be expected while this road project is completed.
Construction Update 9/27/2018
Concrete repairs and asphalt base repairs have been completed on Dodge Park Road. Pavement milling operations are currently scheduled to begin on or about October 5th in preparation for the new asphalt road surface. Following the pavement milling operations the road paving will commence and should be completed in mid October.
Construction cones have been moved to the edge of the road to allow for normal traffic operations until construction resumes.
Construction Update 9/18/2018
Concrete curb replacement and asphalt base repairs are now underway on Northbound Dodge Park Road. Canterbury Drive was closed today to allow for replacement of the concrete approach on the east side of Dodge Park Road.
One lane of traffic will be maintained, but turning movements will be limited at times during construction.
Asphalt Base Repair Southbound Dodge Park
Construction Update 9/12/2018
Concrete curb removal and asphalt base repairs are underway on Southbound Dodge Park Road. Currently local road approaches are closed at Brougham and Pruehs on East side of Dodge Park Road and Warsaw Drive on the west side of Dodge Park Road for concrete replacement work.
Concrete replacement operations are also underway for portions of the Metro Parkway and Dodge Park Intersection.
One lane of traffic will be maintained, but turning movements will be limited at times during construction.
Construction Update 8/30/2018
Construction on Dodge Park Road between 15 Mile Road and Metropolitan Parkway started on August 28. The contractor is Cadillac Asphalt. The project will begin with concrete replacement work at the intersection of Dodge Park and Metro Parkway.
Concrete curb removal and asphalt base repair will also begin along the southbound lanes of Dodge Park Road. One lane of traffic will be maintained, but turning movements will be limited at times during construction. Access to parcels will be maintained at all times. Steven Drive is currently closed at Dodge Park for concrete replacement work Dodge Park may be accessed from other subdivision streets.
Pre Construction Picture