III COMMUNITY OUTREACH 5

Everyone has an opinion on transportation. Whether they drive to work, take a bus to class, or walk to the train station, the entire public has a solution for making their trip better. However, not everyone gets a chance to share these opinions, even during the planning process. Previous planning efforts for the Transportation Plan focused on large, public meetings. While a lot of effort went into these meetings, they were not always well attended, and did not represent the broad spectrum of stakeholders that live and work in McHenry County.

The goal of this plan was to hear from as many people as possible. With a larger group of participants, the plan would reflect the transportation needs and desires of the County’s residents, businesses, and leaders. A multi-faceted outreach approach was developed that would provide a number of different ways to make their voice heard. The primary way to accomplish this was to remove the barrier of entry that most public processes require.

The result of the community outreach allowed thousands of residents and workers in McHenry County to make their opinion on transportation heard. Participants ranged from the youngest to the oldest stakeholders in the County. Many ideas in this plan were derived directly from them to address many transportation challenges identified.

The following details the individual outreach activities that were conducted during the time frame of the project.

community outreach 6

Pop-Up Public Meetings Most public meetings or open houses typically occur at night and only occur once or twice during the project’s lifetime. These limitations can make it difficult for many people to attend due to other responsibilities. Regardless of the number of people that attend the public meeting, there are many more people who have an opinion on a project but can’t voice it because they can’t attend the meeting.

To remove this limitation, the outreach process was developed to go to where people already were. These “ pop-up” public meetings were held across the County in 2011 to hear from as many people as possible on the future of transportation in McHenry County. Staff set up these mini-meetings at events where people already were attending, such as the County Fair, the Senior Fair, group meetings, or local farmers markets. Each pop-up meeting US Hwy

1 included a number of activities that people could participate in and gave2 staff an opportunity to speak to stakeholders on a one on one basis to learn y 1 4 North Branch McHenry County Kenosha St St about their thoughtsN U S H w on transportation and the Long Range Plan. Maple Ave E State Rte 173 RICHMOND

Main

in St

U a FOX LAKE S Hwy M HI SPRING GROVE

1

2 HEBRON E Kuhn Rd 1• McHenry County Fair

State Rte 173

N State US Hwy 12 2• Woodstock Farmers Market Rte 3

HARVARD PÆ HI 1

7

Harvard 4 3 2I te • Huntley Fall Fest State Rte 173 W Glacial Park

S t

t S 3

7 n

1 State R te 8 M a i n

State R J^ HI 4• Centegra Senior Fair

o i s i v i D S J^ E US HwRush Creek RINGWOOD 10 y 1 4 GREENWOOD 5• Algonquin Farmers Market

3 WONDER LAKE JOHNSBUHIRG Rte 2 6• Lake in the Hills Summer Sunset Festival

N State MCCULLOM LAKE

d

R

E US Hw d

n • Marengo Family Fest State Rte 120 o 7

y 1 Brookdale W Elm S 4 t

N Richm McHenry W State 8

e 2I • Harvard Farmers Market v Rte 1

A MCHENRY HI LAKEMOOR

y

r 20

a

t S 20 t HI

te 1

n o r F 9

State R • Crystal Lake Farmers Market

n i m e S N Morraine Hills State Park BULL VALLEY Woodstock HI 2I PÆ 10• Fox Lake Oktoberfest 2 PÆ WOODSTOCK

L 11 a 1 ke Ave 11• McHenry County Economic Development HOLIDAY HILLS PÆ PÆ Hospital 9 Miles 12 Meeting J^ Airport St PÆ PRAIRIE GROVE ISLAND LAKE HI 1

7 Rd 3 Library

N State e t 12

2I • McHenry County GIS Day

4 e t R

Metra Station 13 W State

R e t a t S PÆ

Metra Line Telegraph St

e t a t S State Rte 176 S Silver Creek Railway W Grant Hwy MARENGO 13• McHenry County College HI State Rte 176 E Terra Cotta Ave E Gran OAKWOOD HILLS 4 PORT BARRINGTON t Hwy Lippold Park 2I

St CRYSTAL LAKE 6 W e st V 9 Fel-Pro RRR Pleasant Valley 14 7 i • McHenry County Council of Governments UNION rgin

S State 7 4

ia S e t PÆ t Northwest Hwy The Hollows US Hwy

LAKEWOOD

R e t a t Coral Woods S 1 HI 14 4 McHenry County Outreach Map Outreach County McHenry

1 Cary The pop-up meetings were a tremendous success. 2I

US Hwy J^ CARY

3 e t R Hoffman Park S North 2 3 0 west Hw Over 1,200 people participated in the pop-up meetings

TROUT VALLEY HI2I

e t a t S The Fen N Fox Bluff FOX RIVER GROVE y 3

R t e 2 and many thousands more were exposed to the 6 LAKE IN THE HILLS HI I- 9 S t a e 0 PÆ 3 HUNTLEY project. Hundreds of rich conversations were held HI PÆ St ALGONQUIN in 7 5 Sta HI 4 Ma te

Figure 4: Figure 4: S with a diverse range of residents. R te te BARRINGTON HILLS 6 ´ 0 2

State R

2040 McHenry County LONG RANGE Transportation Plan 7

PEDESTRIAN PUBLIC BICYCLE ROADS FACILITIES TRANSPORTATION FACILITIES Figure 5: The Big Ideas for improving transportation in McHenry County reflected the community’s desire to improve all modes of transportation.

community outreach 8 POP-UP ACTIVITIES

The Piggy Bank

The meetings also featured an activity that allowed residents to “vote” (by putting three coins in piggy banks) on what kind of improvements they would like to see in the 2040 Long Range Transportation Plan: bicycle, pedestrian, public transportation, or roadway improvements. Residents had to make the choice of spreading their coins over multiple areas or focusing on just one area for improvement. The end results Vote for Which Transportation Mode Needs Investment showed a desire to dedicate limited resources to meet a variety of transportation needs. Although certain groups may favor one type of transportation over another, the public in general recognizes the need to make improvements to all types of transportation in the County.

Information Informing McHenry County In addition to County staff, representatives from other agencies and organizations that are involved in transportation provided information and attended the meetings to engage with participants.

Your Big Idea

Participants were asked to give their one BIG transportation idea for improving transportation in McHenry County. Ideas ranged from “More scooters, more walking” improving intersections to flying cars. All of the ideas were posted on a map. 2040 McHenry County LONG RANGE Transportation Plan 9

The overall results of the pop-up events indicate a broad desire by the community to invest in all types (or modes) of transportation. The results of these exercises were surprising to the Transportation Committee of the County Board. Public transportation received the most votes, followed by bicycling improvements. Additionally, the Transportation Committee noted that economic development professionals in the area view motor vehicle needs as the most important. A pop-up event held at the Shaw Center for the McHenry County Economic Development Corporation was the only pop-up event that supported this view. At the Shaw Center, the numerous votes placed in the roads piggy bank led to the use of an additional piggy bank to distinguish road maintenance (See Figure 8). The road maintenance category received the second most votes at this event. Former Congressman Donald Manzullo, who had worked for many years to secure funding for transportation projects throughout the County, was the only person to vote for pedestrian facilities.

votes 1,022 votes Figure 6: Former Congressman Donald Manzullo 917 875 75 786 67 700 60 601 525 45

350 30 23 150 15 12 12 0 0 1 Public Bicycle Roads Pedestrian Public Bicycle Roads Pedestrian Maintenance Transportation Facilities Facilities Transportation Facilities Facilities

Figure 7: Overall Piggy Bank Results Support a Change of Current Practice Figure 8: McHenry County Economic Development Corporation results illustrate current practice

community outreach 10

Library Boards The County’s libraries are a popular gathering spot for residents of all ages. This provided another excellent opportunity to involve people in the project that typically would not participate in a planning process. The following libraries provided support for the project by allowing an interactive display to be placed:

• Algonquin Area Public • Huntley Area Public Library Library • Marengo Public Library • Cary Area Public Library • Crystal Lake Public Library • Harvard Diggins Library (pictured right) • Johnsburg Public Library • McHenry Nunda Public • McHenry Public Library Library • Nippersink Public Library • Woodstock Public Library • Hebron Public Library

At each library, the display included a large board with a map of that library district. Patrons were asked to place stickers on areas they thought needed improvements for different modes of travel. An additional display was provided at some libraries that had enough space. It asked patrons to show how long it took them to get to common destinations.

Over 1,700 stickers were placed on the maps, and each one was recorded so they could be spatially analyzed. For the eight libraries that had the travel time boards, the single most frequent response for recreation and shopping trip length was 5 - 15 minutes, while 30 - 60 minutes was the single most frequently cited trip length for work or school trips.

2040 McHenry County LONG RANGE Transportation Plan 11

Date Group Focus Groups In addition to the broad outreach campaign, focused in-depth Nov. 7, 2011 Transit conversations were held to better understand the transportation Jan. 19, 2012 McHenry County Community College needs of specific groups. These groups included businesses, Jan. 24, 2012 Transit government agencies, seniors, municipalities, residents, and Feb. 22, 2012 Engineering people who speak English as a second language, were also included as part of the planning process. Each of these stakeholder March 8, 2012 Businesses, County/Other Agency, Residents groups has a unique perspective on how transportation affects April 9, 2012 Transit their day-to-day life, and the groups were able to articulate the April 20, 2012 Seniors in Crystal Lake challenges and strengths of the County’s transportation system. For example, the business focus group discussed the absolute April 25, 2012 League of Bicyclists need for the transportation network to be able to handle freight- May 2, 2012 English as a Second Language hauling trucks efficiently and dependably. These types of insights July 24, 2012 Transit helped guide projects and goals outlined in the Plan. Aug. 22, 2012 McHenry Township Seniors Aug. 23, 2012 General Public Open House in Crystal Lake Aug. 25, 2012 Seniors in Woodstock Aug. 30, 2012 Crystal Lake Bicycle Tour Sept. 4, 2012 Environmentalists Sept. 20, 2012 Bicycle and Pedestrian Sept. 24, 2012 County/Other Agency, Residents Sept. 26, 2012 Engineers, Municipalities Oct. 24, 2012 Environmentalists Nov. 16, 2012 McHenry County Planner’s Forum in Algonquin Nov. 27, 2012 Economic Development/Municipalities Dec. 17, 2012 Horizon’s for the Blind McHenry County Economic Development Dec. 20, 2012 Corporation Jan. 26, 2013 People in Need Break-Out Session April 10, 2013 Transit April 30, 2013 Seniors in Crystal Lake Figure 9: A separate focus group was held with engineers that do Figure 10: List of Meetings Held with Specific Groups work in the County to learn from their technical expertise

community outreach 12

Student Outreach High school students are rarely considered a stakeholder group for planning projects, even though they are the future residents and business owners of the County. This project provided an opportunity to develop an innovative program that would allow students to learn about transportation planning and provide their own ideas for potential improvements. The concept of including young people in an important plan is not without precedent. For example, Daniel Burnham’s Plan of was taught in schools for years after it was written.

For the 2040 plan, students went on field trips to speak to planning organizations, and they were tasked with choosing a local street or intersection to study and make recommendations. Many students recommended safety improvements on their studied roadways and intersections, including safety improvements for bicyclists and pedestrians. A number of bold, fresh ideas came out of the conversations with the participating students. Students also participated in a field trip to Chicago to visit and hear representatives from CMAP (Chicago Metropolitan Agency for Planning), UIC School of Urban Planning and Public Affairs, Active Transportation Alliance, and CNT (Center for Neighborhood Technology) and spent a day learning at the McHenry County Division of Transportation.

A description of each of the programs at the six participating schools is listed on the following page.

Figure 11: Students presenting their “complete streets” ideas to the Transportation Committee of the County Board

2040 McHenry County LONG RANGE Transportation Plan 13

Crystal Lake Central High School Marengo Community High School

Ten students in the Honors Environmental Science class at Crystal Lake Students in the Drafting Occupations class at Marengo Community High School Central High School participated in the instruction portion of the transportation participated in the transportation program. According to their teacher, “students program. Students examined the connection of infrastructure to transportation have really been getting into what they feel are the ‘problem areas’ in Marengo.” choices, mentioning that they would be more likely to choose alternate forms Students used their knowledge to create suggestions for improvements in of transportation to travel to and from school if they felt safe doing so. The final Marengo at five corridors and intersections and two general projects on projects focused on the intersections of Crystal Lake Avenue/Walkup Road and pedestrian improvements and traffic calming. Illinois Route 31/.

Woodstock High School Prairie Ridge High School For 5 weeks, students from the Civil Engineering and Architecture class and Eighteen students in Architectural Design class at Prairie Ridge participated Engineering Design and Development (EDD) class in Woodstock High School in the eight week learning program. One particularly good discussion during class participated in the Long Range Transportation Plan program. The program the program centered on the “true cost of driving” to both the individual and was conducted by a Woodstock staff member with an engineering background. society. Students were paired up to develop their final projects, which focused on After they completed the initial program, students from the class developed a a variety of different improvements. project that focused on Complete Streets.

McHenry West High School Marian Central Catholic High School A group of Key Club students at McHenry West High School met once a week Students in the engineering club at Marian Central Catholic High School spent two after school to discuss transportation issues at and around the school. Students months learning about transportation planning issues and strategies. Students engaged in discussion and learned from County staff about transportation attend the school from across the County, so participants bring a variety of planning projects. They decided to examine the neighborhoods surrounding the experiences to the program. The club worked during December and January to school, and specifically analyzed the intersection of Dartmoor Drive and West learn about transportation planning issues and strategies. They created multiple Crystal Lake Road, south of the school, for potential improvements. Students project suggestions for the County plan. also explored ideas related to public engagement and creating and conducting successful surveys.

community outreach 14

County Board Charrettes Individual charrettes were conducted in November of 2011, for the board members in each District of McHenry County to present what staff had learned during the outreach process and get their perspective on the goals and priorities of the plan. Activities included a “build a street” workshop, and asking board members to figure out how to get to a destination if they did not own a car.

Figure 12: McHenry County Board Members give their input on the Plan

2040 McHenry County LONG RANGE Transportation Plan 15

Open House Bike Workshop A large Open House was held at the Crystal Lake City Hall on August On August 30, 2012, a bike workshop was held to discuss 23, 2012 to provide an overview of the planning process, results and learn about issues facing bicyclists and pedestrians in from the outreach events, and present the goals of the plan. Over McHenry County. DOT staff led participants on a short bike 100 people attended the Open House and provided input through a tour of Crystal Lake, stopping frequently to discuss elements variety of activities. of “Complete Streets” that make biking and walking a safer transportation option. Approximately 20 people participated in the bike workshop.

Figure 13: Open House Allowed the Public to View Outreach Results Figure 14: Bicycle Workshop Helped Inform the 2040 Plan

community outreach 16

Online Outreach An interactive website was created for the Plan, www.2040mchenrycountyplan.org. Approximately 4,000 people visited the website since it’s launch in August 2011. The site included information about the plan, alerted visitors on upcoming events, and allowed for residents to leave feedback at their own pace. The site included three transportation surveys: a survey about transit usage, a survey about issues facing bicycle and pedestrians in the County, and a survey about general transportation habits. The surveys provided insight on how residents view transportation in the County. For example, the general survey results stated that increasing traffic and aging infrastructure were the top two overall transportation concerns of participants. The transit survey resulted in participants saying the top two reasons they do not use transit more often are that services are not available to desired destinations and that they are not convenient. Lastly, the bike and pedestrian survey gave insight on popular reasons for both biking and walking.

The website also included a collaborative map for users to pick specific areas that are in need of improvements or to highlight areas that users think currently work well. The map showed users where others have left comments, and DOT staff regularly updated the online map with comments from other outreach efforts (for example, the library boards) so all requests would be in one location. The map was a modified Google map and was fully exportable, so the data could be further analyzed and incorporated into other maps.

2040 McHenry County LONG RANGE Transportation Plan 17

When asked to select the top three biggest transportation problems from a list, “Increasing traffic/congestion delays” ranked the highest, followed by “Aging and deteriorating infrastructure” and “Lack of transit options” (See Figure 16). Although parking is very commonly cited as inadequate in commercial areas, the survey respondents selected “Lack of parking” less than any other category.

These results suggest that those filling out the survey are aware of basic transportation planning principles. The transportation planning field has recognized that increasing highway congestion and rising transportation costs are linked to having a lack of transit, bicycling, and walking opportunities. These conditions are made worse by a development pattern consisting of large residential, commercial, and industrial areas built separately from each other. The public’s concern of aging and deteriorating infrastructure indicates an Figure 15: McHenry County Residents are Hoping for Options understanding of underinvestment in the highways and/or financial stress of the agency’s responsible for maintenance. This understanding is correct. Funding Transportation Problem Total Selections for highway infrastructure is declining in terms of total tax receipts, while material and labor costs are increasing. This problem has been described as a problem Increasing traffic/congestion delays 86 of revenue and building more highway infrastructure than can be adequately Aging and deteriorating infrastructure 66 maintained. Lack of transit options 63 In short, the three biggest problems indicated by the on-line survey are related Suburban development pattern 42 and their solutions are related. This demonstrates the need for a plan aimed Rising transportation costs 40 at understanding how short-comings in one area of transportation can be Travel needs of the elderly 20 compensated by strengths in another area. Given the pop-up event, library kiosk, focus group, high school engagement, and website results, six goals were Safety 18 created for the plan to comprehensively consider and address the County’s Increasing truck traffic on our highways 17 transportation short-comings and advantages. Reliability of our public transportation system 13 Increasing distances we have to travel 13 Other 7 Lack of parking 5 Figure 16: Three biggest problems survey results

community outreach