www.mclarens.com

Corporate: 5555 Triangle Parkway, Suite 200 Norcross, Georgia 30092 O: 800.813.McLarens

Bob Li BIOGRAPHY Manager Bob Li graduated from Water Conservancy & Hydropower College in 1997 with an associates degree in hydro-electrical engineering. Immediately following his graduation, Bob joined Sino-Hydro Engineering Bureau 6th Co. Ltd. In his 9 years with the company, he undertook various roles in different departments, from site construction and construction management to contract plan management. During this time, he gained significant experience in construction programmes, engineering, and project budgeting.

Major construction projects that Bob has participated include the Wanjiazhai Power Station, Phase I&II pump station of the Yellow River Diversion in Shanxi, Jinshao Power Station (Liaoning), Nierji Hydropower Station (Inner Mongolia), and 2# Road & Diversion Tunnel of Xiluodu Hydroelectric Power Station (Yunnan).

In 2006, Bob joined an international loss adjusting company CONTACT as a deputy engineering manager. In the following 5 years, he 12/F, Room 1202,03,05, Enterprise handled many major engineering claims involving various types of Square projects including: Zagunao River Cascade Development 228 Meiyuan Road, Jing’an Hydroelectrical Station, Daduhe River Cascade Development Hydro- 200070, electrical Station, Guandi-Jinping-Tongzilin Power Stations,- - Highway, Leshan- Highway, - O: +86 (0)21 6381 1133 Highway, and Guangyuan- Highway. In this time, Bob M: +86 159 2809 2218 also handled a number of major property claims and enjoys strong E: [email protected] support in the local market. Bob joined McLarens as a Manger of the Chengdu Service Center in SPECIALITIES April 2011. Bob is also a member of the National Engineering Team. Construction & Engineering Bob is a PRC Certified Supervision Engineer, Consulting Engineer, Property and CIRC Licensed Adjuster. OTHER EXPERTISE Contractors All Risk NOTABLE ASSIGNMENTS Erection All Risks • Flood claim for a power station in Sichuan (RMB 13 Million) Machinery Breakdown • Flood claim for a power station in Guizhou (RMB 35 Million) • Earthquake claim for a power station in Sichuan (RMB 300 Million) • Rainstorm claim for one section of -Sichuan Railway (RMB 57 Million) • Flood claim for one section of Lanzhou-Sichuan Railway (RMB 55 Million) • Flood claim for a power station in the north of Sichuan (RMB 50 Million) • Flood claim for a hydroelectric station in Fujian (RMB 5 million)