Development of Economic Corridors, Inter Corridors, Feeder Routes (Expressway) to improve the efficiency of freight movement in under Bharatmala Pariyojana (Lot-4/Pkg-4) Alternative Option Analysis

Criteria for Fixing Alignment for Greenfield Green field highway

1. The Greenfield alignment between two terminal stations should be short and straight as far as possible, but due to engineering, social and environmental considerations some deviations may be required. 2. The project should be constructible and easy to maintain; the Greenfield project should reduce the vehicle operation cost with respect to the existing option already available i.e. using the NH/SHs in combination to reach from point A to point B. 3. It should be safe at all stages i.e. during design, construction and operation stages. Safety audits at each stage should confirm the same. 4. The project initial cost, maintenance cost, and operating cost should be optimum so as to be considered economical with respect to its options. 5. The Greenfield alignment should be finalised giving due consideration to siting/location of major structures including Major/Minor Bridges, Interchanges and ROBs. The space requirement of interchanges to be kept into consideration to avoid major resettlement. 6. Tunnel / Box cutting of Hills should be considered as the last option and should be provided only when it is absolutely necessary. 7. The location of spurs for connecting the important towns to be decided while fixing the alignment Options. 8. The alignment should follow the unused / barren land to the extent possible to reduce the cost of land acquisition. 9. The proposed options in the present case connects the under developed regions of the state which would lead to the development of new growth centres along the proposed highway i.e. paving the way for economic development of the region.

Obligatory points through which Greenfield alignment options should not pass are detailed below:

Habitations: Proposed alignment is fixed in such a way that traverses at a minimum distance of 150m from built up areas and avoiding important buildings and structures. However, few isolated buildings falling along the alignment cannot be avoided due to Geometric requirements.

Wildlife Sanctuaries, National Parks, Reserve Forest and other Eco Sensitive Zones: Utmost care is taken while fixing the alignment near wildlife sanctuaries and national parks. The MOEF&CC guidelines have been adhered to and the alignment has been fixed keeping it away from WLS, Sanctuaries and Tiger Reserves. It was not possible to completely avoid the protected and reserve forest areas. However, every effort has been made to reduce the acquisition of forest area.

Water Bodies: The Greenfield alignment has been fixed taking due consideration & importance of retaining the existing water bodies as far as feasible.

Railway Crossings and Important Structures: The components which increases the project cost are the presence of the Major bridges, ROBs and other structures. In order to reduce the project cost number of structures and its length were given due consideration while finalising the Greenfield Option. Development of Economic Corridors, Inter Corridors, Feeder Routes (Expressway) to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-4) Alternative Option Analysis

The comparative statement for proposed alignment is given in below table: S. No Description Option I Option II Option III 1 Length, km 374.142 359.737 372.268 Alignment starts at Alignment starts at Alignment starts at 2 Start point Haryana/ Border (near Haryana/Rajasthan Border (near Haryana/Rajasthan Border (near Firozpur Jhirka) in . Firozpur Jhirka) in Alwar district. Firozpur Jhirka) in Alwar district. Alignment ends at Rajasthan/ M.P. Alignment ends at Rajasthan/ M.P. Alignment ends at Rajasthan/ 3 End point Border in . Border in Kota district. M.P. Border in Kota district. Alwar, Bharatpur, Karauli, Dausa, Alwar, Bharatpur, Karauli, Dausa, Alwar, Bharatpur, Dausa, Sawai 4 Districts Sawai Madhopur, Tonk, and Sawai Madhopur, Tonk, Bundi and Madhopur, Tonk, Bundi and Kota Kota Kota NH21, NH23, NH27, NH52, NH21, NH23, NH27, NH52 NH21, NH23, NH27, NH52, NH552 NH148, NH552 5 Connecting Highways SH45, SH14, SH35, SH44, SH30, SH1, SH9A, SH14, SH24, SH25, SH45, SH14, SH35, SH44, SH25, SH1, SH29, SH1, SH37A, SH33, SH51, SH25A, SH33, SH37A, SH44, SH45, SH33, SH37A, SH70, SH51, SH9A SH9A SH51, SH70 6 Design Speed, Kmph 120 120 120 7 Lane Configuration 6 lane / 8 Lane Access Controlled 8 Right of Way, m 100 100 100 9 Approx Travel Time (Hrs/Mins) 3 hrs 45 Mins 3 hrs 36 Mins 3 hrs 43 Mins 10 No of NH crossings 4 5 6 11 No of SH crossings 11 11 12 12 Access Control Access Control Expressway MJB 22 MJB 16 MJB 14 MNB 75 MNB 80 MNB 84 FLYOVER 11 FLYOVER 10 FLYOVER 10 INTERCHANGE 10 INTERCHANGE 10 INTERCHANGE 11 13 Number of structures VUP 25 VUP 35 VUP 29 LVUP 84 LVUP 97 LVUP 76 ROB 9 ROB 7 ROB 7 Viaduct 1 Viaduct 1 Viaduct 0 Development of Economic Corridors, Inter Corridors, Feeder Routes (Expressway) to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-4) Alternative Option Analysis

S. No Description Option I Option II Option III Tunnel 2 Tunnel 3 Tunnel 1 Number of settlements shall 14 28 21 11 be affected 15 Affected Forest Area (Ha) 370.49 443.98 207.23 Ranthambore Tiger Reserve, Ranthambore Tiger Reserve, Ranthambore Tiger Reserve, National Chambal Sanctuary, National Chambal Sanctuary, National Chambal Sanctuary, 16 Eco-sensitive/Protected Area Mukundra Hills National Park, Mukundra Hills National Park, Mukundra Hills National Park, Mukundra Tiger Reserve, Darrah Mukundra Tiger Reserve, Darrah Mukundra Tiger Reserve, Darrah WLS WLS WLS 1. Alignment is passing about 12.90 km & 10.58 km away from Ranthamabore National Park and 1. Passing through the agricultural and barren land Sawaimadhopur WLS respectively. 2. Alignment avoids the Amli Tiger Safari. 2. This Option is having the shortest 2. The forest area is less than 3. The forest area is least affected length and hence would require the Option 2. in this Option. shortest travel time. 17 Merits 4. Better connectivity to major towns through spurs at Alwar

utilizing existing SH-18 & NH- 248A. 5. This option deletes the requirement of another expressway from Delhi to Jaipur. 6. Minimum number of settlements affected by this Option. 1. Alignment traverses through the Amli Tiger Safari which is being built by 1. LA cost is higher than other 18 Demerits the state government and hence would not be allowed to be constructed. Options as major development Development of Economic Corridors, Inter Corridors, Feeder Routes (Expressway) to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-4) Alternative Option Analysis

S. No Description Option I Option II Option III exist near alignment. 2. Alignment traverses within 550 m 2. Alignment traverses within 5.7 km & 2.5 km from Sawai Madhopur & 8.2 Km Sawai Madhopur WLS and WLS and Ranthambore National Ranthambore National Park Park respectively. respectively. 3. The option traverses at a 3. Alignment is traversing Adjacent significant distance from to the Ranthambore National Park & Dausa/Jaipur thus not reducing the

Tiger Reserve for significant length. travel time to Jaipur from Delhi with respect to NH48. 4. The option traverses at a significant distance from Dausa/Jaipur thus not reducing the travel time to Jaipur from Delhi with respect to NH48.

Option III is best suitable due to following reasons:-

 Least affected forest Area  Better connectivity to major towns through spurs at Alwar utilizing existing SH-18 & NH-248A.  Avoids the Amli Tiger Safari, which is being developed by State Govt.  Having significant distance from Ranthambore National Park and Sawai Madhopur WLS as compare to other options.  Minimum number of settlements affected. NH-248A

Cad File No: \\GUR-AJITSING\DELHI VADODARA\01_CAD\HIGHWAYS\DRAWINGS\FOREST\ALIGNMENT OPTION LAYOUT WITH 03 OPT (16.07.2018).DWG

TO FIROZPUR JHIRKA FIROZPUR TO

NH-248A

79+011

79+011 79+011 HARYANA HARYANA

80+000 START OF PROJECT OF START

80+000

ALWAR80+000 DISTRICT

RAJASTHAN RAJASTHAN RAJASTHAN

82+000

84+000

85+000 85+000 86+000

BHARATPUR DISTRICT

88+000

RAMGARH

90+000 90+000 90+000

ALWAR DISTRICT 92+000

SH-45

94+000

95+000 SH-45 95+000

GOVIND GARH 96+000

A

54 14

SH-35

NH-248A

NH-248A TO ALWAR TO

98+000

100+000

100+000 A 100+000 TO NAGAR 54 15 SH-14 SH-14

SH-14

102+000 SH-14

104+000

105+000

106+000 105+000

108+000

110+000

SH-35

110+000 110+000

TO KATHUMAR 112+000

SH-44 114+000

LACHHMANGARH

SH-44 115+000

115+000 116+000

TO MALA KHERA 118+000

SH-35

SH-44

MALAKHERA 120+000

120+000 120+000

TO MALA KHERA 122+000

SH-25

124+000

125+000

126+000 125+000

A

54 15 128+000

A

54 11 130+000

SH-25A SH-35 130+000

130+000 SH-25A 132+000

RAJGARH TO MAHWAH

A

54 12 134+000 A 54 16

SH-35 135+000

SH-25A 135+000

136+000

TO TEHLA TO

138+000

SH-25

140+000

140+000

10.0Km Radius 140+000

142+000

144+000

ALWAR DISTRICT ALWAR

DAUSA DISTRICT DAUSA

ALWAR DISTRICT ALWAR 146+000

145+000

145+000

RESERVE SARISKA TIGER SARISKA DAUSA DISTRICT DAUSA

148+000

150+000

150+000

152+000 150+000

154+000

156+000

155+000

155+000

BANDIKUI 158+000 160+000

SH-25

160+000

160+000 162+000

A

54 12

164+000

NH-21

166+000

165+000

NH-21

TO MAHWAH TO

165+000 168+000

B

54 9 170+000

B

54 5

172+000 170+000

TO GUDHACHANDRAJI

174+000 170+000

SH-25

176+000

178+000

175+000

180+000

175+000

182+000

NH-21

NH-21

TO JAIPUR TO

184+000

180+000

186+000

DAUSA

180+000 188+000 ALIGNMENT OPTION- 03

NH-148 185+000

190+000

185+000

192+000

194+000 190+000

196+000

190+000 198+000 ALIGNMENT OPTION- 01

B

54 5 195+000

200+000

195+000 202+000 B 54 6

NH-148

200+000

204+000

206+000 200+000

ALIGNMENT OPTION- 02

208+000 205+000

TO TUNGA

210+000 205+000

SH-24

212+000

210+000

214+000

210+000

216+000

218+000 SH-24 NH-148

215+000

LALSOT

220+000

215+000 222+000

TO GANGAPUR

220+000 224+000 NH-23

NH-23

226+000 B NH-23

54 2

220+000 228+000

TO SAWAI MADHOPURSH-24

225+000

230+000

232+000

DAUSA DISTRICT DAUSA

225+000 234+000

SAWAI MADHOPUR DISTRICT MADHOPUR SAWAI B

54 7 230+000

DAUSA DISTRICT DAUSA

236+000 SH-24 MADHOPUR SAWAI

238+000 230+000 235+000

B

54 3 240+000

242+000

235+000

240+000

244+000

246+000

245+000 248+000 240+000 250+000

SH-24 252+000

SH-1 250+000 TO MALARNA DUNGAR MALARNA TO 245+000

254+000

256+000

255+000

258+000 250+000

SH-1

260+000

TIGER RESERVE TIGER RANTHOMER

262+000 260+000 B

54 8

255+000

264+000

266+000 B 265+000

54 4 268+000

260+000

270+000

NATIONAL PARK NATIONAL RANTHAMBORE

272+000

270+000

274+000 265+000

SH-1

10.0 Km Radius 276+000

275+000

278+000 270+000

SAWAI MADHOPUR 280+000

SAWAI MADHOPUR

282+000 280+000 284+000

SH-30

275+000

TO SAWAI MADHOPUR MADHOPUR SAWAI TO

286+000

NH-552 B 285+000

54 8 NH-552

SAWAI MADHOPUR DISTRICT B 288+000 54 4 C 54 5

TONK DISTRICT 280+000 10.0Km Radius

290+000 C 290+000

54 1

WLS SWAIMADHOPUR 292+000

10.0Km Radius RANTHAMBORE TIGER RESERVE

294+000

285+000 NH-552

295+000

296+000

298+000

SH-1

290+000

RANTHAMBORE TIGER RESERVE TIGER NH-552

300+000

TO TONK TO

300+000 NH-552

302+000 304+000

TO UNIARA 295+000 SAWAI MADHOPUR DISTRICT

305+000

RANTHAMBORE TIGER RESERVE RESERVE TIGER TIGER RANTHAMBORE RANTHAMBORE SH-29 306+000

TONK DISTRICT

308+000

310+000

300+000

310+000 312+000

TONK DISTRICT

BUNDI DISTRICT

314+000 RANTHAMBORE TIGER RESERVE RESERVE TIGER TIGER RANTHAMBORE RANTHAMBORE

C

54 5

316+000 KOTA DISTRICT

305+000 C 315+000 SH-1 54 1

SH-29 318+000

C

54 6 RANTHAMBORE 320+000 TIGER RESERVE TIGER

INDRAGARH 310+000

C

54

2 322+000

SH-29 320+000

324+000

RANTHAMBORE TIGER RESERVE RESERVE TIGER TIGER RANTHAMBORE RANTHAMBORE

LAKHERI

315+000

326+000

325+000 328+000

RANTHAMBORE TIGER RESERVE

330+000

332+000

SH-29

320+000

330+000

334+000

TO ITAWA TO 336+000

SH-1

SH-1 325+000

335+000

338+000

340+000 BUNDI DISTRICT BUNDI

C KOTA DISTRICT

54 6

340+000

330+000 342+000 C 54 6

C

54 2 DISTRICT BUNDI

344+000

346+000

KOTA DISTRICT KOTA

345+000

SH-33

SH-29

TO BUNDI TO 335+000 CHAMBEL SCENTUARY 348+000

SH-37A 350+000 350+000 C

54 3 CHAMBEL SCENTUARY

352+000

340+000

354+000

355+000

356+000

345+000

358+000 SH-37A SH-37A

SH-33

TO BAROD TO

360+000

360+000 SH-37A

KAPREN

362+000

350+000

364+000

365+000

366+000

SH-33 BUNDI DISTRICT BUNDI 355+000

KOTA DISTRICT SH-70

368+000

TO BAROD TO

370+000

370+000

360+000

372+000

TO KOTA TO

375+000 374+000

C

54 3

376+000

365+000 378+000

380+000 C

54 4

380+000

382+000

370+000

SH-70 TO BARAN

NH-27

385+000 NH-27

384+000 386+000

O NH-27 TO KOTA 45 16 375+000

NH-27

KOTA 388+000 390+000

NH-27

390+000

392+000

TO KOTA 380+000

SH-51 395+000

394+000

396+000

KOTA DISTRICT KOTA

385+000

398+000

400+000

400+000

402+000

KOTA DISTRICT 390+000 TO BAPAWAR

405+000

RESERVE DARRAH TIGER DARRAH

TO KOTA NH-52 404+000 SH-51 C

10.0Km Radius 10.0Km 54 4

O

45 16 NH-52 406+000

OPTION-03 OPTION-02 OPTION-01 Existing Road (NH) Existing Road (SH) District Boundary

395+000

410+000 408+000

D 54 1

P

LEGEND : 45 13

410+000

412+000

400+000 415+000

10.0Km Boundary of

Reserve Forest & WLS Forest Boundary Chambal Scentuary

414+000

416+000

405+000

418+000 420+000

CLIENT: 420+000 NATIONAL HIGHWAYS AUTHORITY OF INDIA

NH-52

G - 5 & 6, Sector 10,New Delhi 110075 Government of India (Ministry of Road, Transport & Highways) 422+000 410+000

WILD LIFE SANCTUARY 425+000 424+000

WILD LIFE SANCTUARY

426+000

DESIGN CONSULTANT: 415+000

F DBAC 428+000

Party without Authorization in Writing from Private Limited The information contained herein is Confidential & Property of Understanding that no part thereof shall be Copied or Communicated to a Third 430+000

TO RAWATBHATA

and not for Publication. The Information is Issued on the 430+000 SH-9A

D

54 1

432+000 P

Feedback Infra Private Limited 420+000 45 13 435+000 15th Floor, Tower 9B

Gurgaon 122 002 DLF Cyber City Phase-III, Services Private Limited Feedback Infrastructure

KOTA DISTRICT 434+000 Feedback Infra D

54 2 436+000

SCALE: @ DRAWN BY: BY: DESIGNED CHECKED BY: APPROVED BY: 1 : 100000

425+000 P

438+000 45 14 440+000

MAY, 2018 DATE: SK AG AG JR 440+000

TO JHALAWAR

NH-52 NH-52

SH-9A 442+000

PROJECT: DRG NO.: TITLE: STATUS 430+000

445+000

SH-9B FVPL/HW/NH/FA-TS-AP-01 444+000 ALTERNATIVE ALIGNMENT OPTIONS ON TOPO SHEET “Consultancy Services for preparation of DPR development Bharatmala Pariyojana (Lot-4/ Package-4) in Rajasthan State” of Economic Corridors, Inter Corridors and Feeder Routes to

improve the efficiency of freight movement in India under

RAMGANJ MANDI RAMGANJ

446+000

END OF PROJECT OF END

435+000

448+000

450+000

SH-9A

Plot Date: 450+000

438+548

17 July, 2018 - 2:26 PM 451+079 452+953 TO JHALAWAR ROAD REV. 0 SHEET: 841X3700