STRIP CHART FOR PROJECT CORRIDOR SH-2 Tarkeswar (overlapped with SH-15) SH9 Jn. Shibdanda More SH9 Jn. (overlapped with SH9) Gopalpur More SH3 Jn., Basirhat Chowrangi Market,Taki Champadanga, SH15 Jn. Bamondanga More Kholapota More SH3 Jn., Basirhat (overlapped with SH-3) Malancha Bazar SH3 Jn. Burdwan Road, Arambag SH7 Jn. (0.9 km overlapped with SH7) NH2 Underpass Near Singur Baidyabati Netaji More SH13 Jn. Dankuni More NH2 Jn. (overlapped with SH-13) Danlop More Barrackpore ROB SH2 Jn. (overlapped with SH-1) Barasat Champadali More NH35 Jn. Pohabagan NH60A Jn., Hatirampur SH4 Jn. Petrol pump More SH4 Jn. (overlapped with SH4) Bishnupur Rly. Station More SH60 Jn. Bishnupur More SH60 Jn. Ambika Nagar Tokipur Baro kalitala Madhyampur Muthadanga Hamiragachi Bangla NH34 Overpass SH15 SH13 SH9 Sibdanga More SH7 SH3 Schematic Plan of NH34 SH1 Baduria SH2 SH 2/4 SH2 SH 2/9 SH2 NH60 SH2 SH2 SH 2/15 SH2 SH2 SH 2/13 SH2 SH 1/2 SH2 SH2 SH 2/3 SH2 Hasnabad SH2 the project Stretch * * * * * * * * * SH3 SH3 SH1 NH2 Underpass more NH34 (0.190m Overlap) NH35 (0.110m Overlap) SH4 SH15 SH4 SH9 SH7 Haroa Bangla 2.800 2.700 Distance(Km) 23.780 10.280 26.160 16.370 23.564 58.116 22.380 6.220 24.830 8.433 14.489 6.540 13.400 14.122 Rajarhat 33.516 2.136 17.679 20.909

Chainage(Km) 0.000 23.780 34.060 60.220 76.590 100.154 158.270 180.650 186.870 211.700 220.133 234.622 241.162 254.562 268.684 302.200 304.336 322.015 342.924 Homogeneous Sections Section-1 Section-2 Section-3 Section-4 Section-5 Section-6 Section-7 Section-8 Section-9 Section-10 Section-11 Section-12 Section-13 Section-14 Section-15 Section-16 Section-17 Section-18

Kolkata, North 24 North 24 North 24 North 24 North 24 District Bankura Bankura Bankura Bankura Bankura Bankura, Hooghly Hooghly Hooghly Hooghly Hooghly Hooghly, Hooghly Kolkata North 24 Parganas Parganas Parganas Parganas Parganas Parganas Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Traffic Volume Count ADT Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs Numbers PCUs (in pcu and nos) 6897 7228 4026 4861 8247 8237 7615 6965 1364 1386 9026 13066 10317 17668 10027 12891 8479 12025 8082 11416 - - - - 55555 62078 17863 16595 11312 14249 13243 15626 5227 4703 4408 3766 Commercial Vehicle Per Day (in nos) 1377 1062 1255 1057 183 3274 4468 2777 2957 2814 - - 10305 2223 3190 2988 600 332 Peak hour traffic (PCUs/hr) 674 597 714 684 140 858 1248 1089 793 1139 - - 3930 1100.5 965.5 1124 381 339.5 Four Laning Under Avg. C/W Width (m) 5.5 5.5 3.0 / 5.0 5.5 3.0 / 3.5 5.5 / 6.0 / 7.0 6.5 7.0 7.0 7.0 Construction 7.0 / 12.5 7.0 7.5 5.5 5.5 5.5 7.0 Avg. Shoulder Width (m) Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 0.5 / 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 - Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 Earthen 1.0 Volume/Capacity ratio (v/c) 0.80 0.54 1.37 0.77 0.35 0.64 0.64 0.53 1.47 0.53 0.51 - 0.89 0.89 1.58 1.74 0.78 0.63 Average Journey Speed (Kmph) 57.17 43.35 52.77 30.77 55.84 52.52 52.32 50.35 56.7 55.4 23.01 52.23 30.77 40.86 47.53 47.24 54.64 52.48 Major Bridges 2 - - - 1 1 4 - 1 - - 1 - 1 - - - 2 Minor Bridges 3 - 1 - 2 - 19 1 7 3 3 1 - 1 6 - - 1 ROB /RUB /VUP /VOP / Railway LC - - - RUB-2 - - VUP-1, LC-2 - ROB-1 FLY-2, VUP-6, VOP-4 VUP- 2, LC-1, RUB-1 ROB-1, LG-1 LC-1 - - VOP-1 - - RUB-2 Connectivity to Major Bankura, Bankura, Mukutmanipur, Bankura, Bishnupur Bishnupur, Tarkeswar Tarkeswar, Tarkeswar - - Dakshineswar, Dakhineswar, Barrackpur, - Basirhat Taki, Malancha Builtup area / famous Mukutmanipur, Mukutmanipur, Jhargram Joypur Forest Joyrambati, Belur Math, Belur Math Barasat Hasnabad religious / tourist spots Jhilimili Jhilimili Kamarpukur Kolkata

LEGEND Project Corridor Other State Highway National Highway * Traffic Volume Count Station Underpass / Overpass

Drawn By : Chanchal Sarkar Consultancy service for preparation of base line master plan and STRIP CHART OF SH-2 Date: May, 2015 Strategic Option Study for prioritization for development of Checked By : Sudipta Pal 6*'+0(4#5647%674'2'12.' State Highway network of , Pakage -B (1615 km) RITES LIMITED DWG NO: RITES/HW/KOL/WB-SOS/PKG B/RT330-00005/SC/SH2/01 Approved By : Tarun Sengupta Rev. No. R0