GREENKO HATKOTI ENERGY PVT. LTD.

Corporate Office: Plot no.1071, Road no.44, Jubilee Hills, Hyderabad – 500 033, Ph: + 91(40) 4030100 E – Mail: [email protected] CIN: U40101HP2008PTC030958

Ref: GHEPL/Addl div /2015-16/02 Dated: 05/02/2016

To The Nodal Officer- cum-AP CCF (FCA) O/o. The Principal Chief Conservator of Forests, district, HP (HOFF)

Sub: Diversion of 0.6943ha of additional forest land for Paudital Lassa SHEP in , HP - M/s. GHEPL - reg.

Ref: 1. Letter from your office no: Ft.48-2152/2010(FCA) dated 5th Jan 2016 2. Our Point wise replies to above Ref: GHEPL/Addl div /2015-16/01 dated 25th Jan 2016 3. Approval from your good offices for withdrawing the proposal dated 6th Feb 2016

Respected sir,

In continuation to above, the revised application is uploaded in compliance to observations raised by your good offices.

As our required additional forest land is less than 1ha i.e. 0.6943ha; we were unable to access the last page of application form i.e. L and M options except for Save and Lock button. Thus, the required details such as various NOC’s (Encl: 1 to 6), NPV undertaking (Encl: 7) is uploaded as a separate folder named Additional information.

Kindly acknowledge the receipt of the same and accord us with the approval for diversion of required forest land at the earliest.

Thanking you

Yours faithfully,

For Greenko Hatkoti Energy Private Limited

Authorized Signatory

Encl: as above

Shimla office: 2nd floor, Plot no.B-2, Lane 4, Sector 2, New Shimla, Shimla district, – 171 009 Site office: House no: 95, Housing Board colony, , Shimla District, H.P.

'+l'"Rff~ 411fq,(01 10i q.:r JCj;::;lllC'lll

"i.3m ~ Cf)llIfC'lll ~ ~24-25 ~ 1'fT1f

~31~ 'q 0\4)IIit> 160030 ~ ~:-9-HPB635/2010-CHA ~ 25.07.2012

~~, f6li l'q C'l ~ ~,q.:r fcr'l1PT, ~ *lfilqlC'lll, fulic;rr I

fcr:m:- Diversion of 4.8916 hectare of forest land in favour of M/s Greenko Harkoti Energy Private Limited, Plot No. 1071, Road No. 44, Jublee Hills, Hyderabad for the construction of24 MW Paudital- Lassa Hydro Electric Project, within the jurisdiction of Rohroo Forest Division, Distt. Shimla, Himachal Pradesh.

cpmT ~ ~ ~ ~ ~ ~ 10i ~ q.:r ~ (FCA), fulic;rr ~ ~ "ffism

Ft. 48-2152/2010 (FCA) ~ 07.10.2010 & 13.06.2012"Cf)T 3lqC'l1Cf)"'1qR- t ~ q.:r (~) ~, 1980 ~ tfRT- 2 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ lft1ft 1"l{ ~ I

XTWl ~ ~ >ffifTCT"Cf)TUlI"'1cr:fCf)3l"~ m ~~ ~ ~ ~ 4.8916 ~ q.:r ~ ~ ~ ~ ~ "'(1/lfli" ~ ~ ~ frI~fc;jftld "ffil ~ m 1:['(" ~ ~ \Jf[(ff ~:-

1. q.:r~~fcrm~~~~ I 2. )ffifTCf ~ ~ ~ crlff 6fT~ ~ ~ 31d": ~ crlff Cf)fCf ~ ~ I 3. ~ LfT~>ffifTCT ~ ~ UF Manoo Panoo ~ wITmT ~ ~ ml:d" ~ 9,67,800/- (~~ *lfll*ld 6\ifR 3lTO ~ ~ ) ~ ~ ~ ~ 10.00 ~ frlkjlpd q.:r ~ ~ LfTu WTTCPX fcpm ~ I ~ Tfiuffiqur ~ ~ ~ UJrtt ~ qft ~ ~ ~ CJlf ~ ~ m \1fFIl ~ I 4. >T

6. ~ ~ ~ wm m 1:['(" 3lPt d"~ 1fuJ Wl1"ffism d"~ \fCP ~ ~ ~ ~ ~ ~ ~ m,

>rr

c=fix1:['(" ~ ~ ~ Cf)11If~ 1I"'1 ~ 'ij)frI~ d ~ d"~ <:[6 'l{l 'ij)frI~ d ~ ftp l'fC'16I1 ~ "Cf)T~ ~ ~ X1trR Cl?X~ 7l

9. q;:f ~ cpr ~ >ffifTCl ~ ~ ~ ~ 3RWlT ~ fcpx:fi ~ ~ ~ 4tf fcpm ~ I 10. ~ m ~ ~ ~/~/frn:r::r/"l11111&111 ~/~ 3llfG ~ >ffifTCl LR 'CWl m-g ~ ~ 3Tr.tf.:r ~ ~ ~ ~ ~ ~ R>1~ClI{) NrtT I

~ 'ffiif 1l ~ ~ lft ~ 'ij)J ij)llIf'illH ,{Hl1tHIc; ~ 'tJf.t -q"{' B;::;jl<."lll ~ ~ col ~m ClR ~ ~ I ~ mcIlR CA fcn:rrq ~ l'fl'UI'll ~ ~ 'ffiif qft 311ql<."l"'11 'tj~f?iJd ~ I

( ~ fi15'

3ILR q;:f Ji15I~~~Iij) (FC), 411fCl,

2. ~trR ~ q;:f ~, f%Ji I"Cl &1 m ~ t q;:f fcT'lWT, ~, ftr:R;rr I 3. Divisional Forest Officer, Rohroo Forest Division, Distt. Shimla, Himachal Pradesh. 4. Shri P .R. Jhingta, Dy. General Manager, Greenko Harkoti Energy Pvt. Ltd, Jhingta Niwas, Shimla Road, Rohroo, Distt. Shimla, Himachal Pradesh. 5. 'llTt $ I

Y Himachal Pradesh Dated:-j-tr-/t

Plot No. 107 l,Road No.44,Jubilee Hills, Hyderbad, Site Office:JhingtaNiwas RohrqDistt.Shimla.

Subject- Issueof 'T.{oobjection certificate" for constructionof Paudital-I^assaShep (24MW).

In the light of the approval as convenedby Superintending \.,, EngineerIPH Circle Rohru vide his letter No-IPH-RC-WS-DemandA.loDemand-2778- 81 dated 29.7.2010for issuanceof N.O.C. for constuction of the subject cited project. This office has no objectioq if the water is tappedfrom PabberRiver for constructionof Paudital-LassaShep (24MW). subject to the fulfillment of terms and conditions of the legal agreementas executed between your firm and this department at Rohru Distt. Shirnlaon dated 3-8-2010and attested on 3-8-2010

Copy forwardedto the following for information 1. The SuperintendingEngineer IPH Circle Rohru for information w.r.t his leiler referredto aboveplease. 2. The AssistantEngineer,IPH Sub Division Rohru.

ExecutiveEngineer IPH Division Rohru.

DIRECTORATEOF ENERG\ GOVERNMENT OF IIIMACHAL PRADESII SHANTI BHAWAN, PHASE-III, SECTOR.VI, NEW SHIMLA-171009(IIP)

OFFICE ORDER

In supersessionto Chief Engineer(P&M),HPSEBL, Shirnla, Office Orderendorsement No. HPSEB(Sectt)/401/PuditalLassa/2006-45041-54 dated 29.07.06,Dlectorate of Energy (DOE), Govemmentof Himachal hadesh, is pleasedto accord revisedTechno Economic Clearance(TEC)to PuditalLassa SHP(24.00MW) on Pabberriver a tributary of Tonsriver in Yamuna basin,Distt. Shimla,Himachal Pradesh, of "lVf/S GreenkoHatkoti EnergyPvt. Ltd., Plot No. 1071,Road No. 44, JubileeHills, Hyderabad-500033(AP)"at an estimatedcost of Rs. 210.00crore(Rupees two hundredten crore) only including lnterestDuring Construction (IDC), Escalation,Financial Charges(FC) and LADC @ l.50qo of total project cost with the following stipulations: f.i) The completioncost shall not exceedthe abovecost except on accountof the following: a) InterestDuring Construction(IDC)and Financial ChargesffC) shall be asper actualsbut not exceedingthe amountas indicatedat Annex-I, unlessrevised by DOE, GoHP while accordingconcurrence under Section-8 of IndianElectricity Act 2003after review of the financialpackage. b) Changein ratesof Indiantaxes and dutiessuch as ExciseDuty, SalesTax/VAT, Custom Duty and levy of any other taxes/dutiessubsequent to issue of Techno Economic Clearance. c) Changein Indian1aw resulting in changein thecost. ii) The abstractof the EstimatedCost approvedby DOE, GoIIP is fumished at Annex-I, summaryof the FinancialPackage as consideredby DOE, GoI{P is at Annex-II and the SalientFeatures of the schemeare at Annex-III. 2. The Techno-EconomicClearance(TEC) is subject to the fulfillment of the following conditions: i) CompletedcosVTechno-Economic Clearance (TEC) shall not be re-openeddue to the following: a) Non acquisitionof land. b) Non- finalization of Power PurchaseAgreement (PPA) c) Delay furfinancial closure. ii) The final financial arrangement shall not be inferior to the financing arrangement projected in the Detailed Project Report (DPR) for TEC. iii) The costof the projectcleared by the DOE, GoIIP is indicativeand shallhave no binding on the regulatorwhile fixing the tariff. The tariff of the Foject shall be regulatedby the appropriateElectricity Regulatory Commission. iv) The public issue expenses,if any, shall be reconsideredat the time of approvalof completioncost based on documentaryproof and in accordancewith SecurityExchange Boardof India (SEBI) guidelinesregarding regulation of public issueexpenses. v) Fulfillment of conditions stipulated in Central Electricity Authority(CEA) /Central Water Commission(CWC)guidelines in respect of civil works at the stage of detailed designs/execution. vi) Any increasein the cost estimatedue to designmodifications and geologicalsurprises would be absorbedby the IndependentPower Producer(IPP) i.e. "Nf/S GreenkoHatkoti EnergyPvt. Ltd., Hyderabad-500033(AP). vii) No additionalcost shall be alloweddue to Resettlement& Rehabilitation(R & R) Plan. viii) Normal operationlife of the hydro power plant shall be as per provisionsof CWC/CEA guidelinesor CERC/IIPERCregulations. ix) The Techno Economic Clearance(TEC)is subject to clearanceof the project and transmissionline by MoEF from environmentaland forests angle. The statutoryand administrative clearances as per Annex-IV shall be obtained before execution/ implementationof the project. x) The interconnection point with the State grid and interconnection facilities at the interconnectionpoint shall be provided, operated and maintained atthe cost ofthe lPP. xi) Thecost of providingand/or strengtheningiadditions etc.ofthe systemat andbeyond the InterconnectingSub-station which may also include the cost of replacementof switchgear/protection and provision of shuntcapacitors, strengthening of bus bars, apart from otherworks requiredat injectionvoltage level and other one or more successively higher voltages, civil works relocation of existing bays etc. shall be recoveredby HPSEBL,HPPTCL,as per the regulationsof HPERCread with the clarifications/decisions by HPERCand/or any othercompetent authority as may be finally applicable.The share of IPPon thisaccount shall be paid by theIPP to HPSEBL/HPPTCLas perthe final decision of thecompetent authority. xii) Whereasthe FIPSEBL/HPPTCLshall endeavorto providethe evacuationsystem at the earliest,the scheduleddate for providingevacuation arrangements shall be spelt out in the PPAson caseto casebasis inter-alia, keeping in view the time lines indicatedin the relevantplan and approved by HPERC. xiii) The powerhousegenerating equipment as well as other electrical equipmentto be providedby the developershall be compatiblefor paralleloperation with the State8tid afterinterfacing. The IPPshall be responsiblefor any lossofgeneration on this account. xiv) O&M chargesfor maintenanceof interconnection facilities at the interconnectionsub- stationshall be paidby theIPP to HPSEBL/HPPTCLthroughout the period, the IPPruns theproject and the same shall be reviewed at thebeginning of every financialyear. xv) For evacuationof power the IPP shall interfacethis project with 220 kV switchingsub stationat Hatkotito be constructedby HPPTCLat 220 kV level. xvi) The project line shall be provided,operated and maintainedby the IPP at his cost as per normalconditions after obtaining approval ofHP Govt.under Section 68(l) of Electricity Act,2003. xvii) The abovementioned evacuation arrangements shall be subjectto the HPERCapproval of "Comprehensivearea wise plan for augmentingand establishing of transmission/sub- transmissionsystem for evacuationof powerfrom small HEPs" which hasalready been submiftedto HPERC.The Transmission/Distribution Licensee may however also evolve alternatesystem(s) depending on the siteconditions and subsequentdevelopments with the approvalof HPERC. xviii)The IPP shall developoperate and maintainthe Project includingthe dedicated transmissionsystem subject to compliancewith thefollowing: a) Gridcode and standards ofgrid connectivity. b) Technicalas well asMechanical standards for constructionofElectrical lines. c) Normsof SystemOperation ofthe concernedState Load Dispatch Center (SLDC) or RegionalLoad DispatchCenter (RLDC). d) Directionsof the concernedSLDC or RLDC regardingoperation of dedicated transmission line. e) The IPP shallonly be allowedto injectpower in HP systemwith the undertakingthat necessaryaction to providetele-metering to SLDC shall be providedby them and specificationsrequired to be got approvedfrom the office of SE(SLDC),HP Load DespatchSociety, Totu, Shimla from compatibilitypoint of view with existingSCADA system. xix) The conditionson theselines shall have to be suitablyincluded by the developerin the PPAetc. apart from otherstandard conditions. xx) The observationsof DOE, GoHP and repliesthereof shall form an integralpart of the DPR. xxi) The IPPshall carry out the detailed Geological explorations as per CEA/CWC guidelines and as suggestedby the Geologistbefore taking up projectconstruction and submitthe reoortto theDOE. GoHP. xxii) Minimum l50%release of waterimmediately downstream of diversionstructure shall be ensuredall the timesincluding lean season as per PowerPolicy of HP Govt.,2006 and subsequentamendments thereof. The necessarymonitoring equipment as prescribedby thePollution Control Board for thesame shall be installedbv theIPP durine execution of the pro.ject. xxiii)LADC/LADF amountand activitiesshall be implementedas per powerpolicy of Hp Govt.,2006 and subsequentamendments thereof. xxiv) The additional l%(one percent)free power from the project shall be provided and earmarked for a Local Area DevelopmentFund(LADF) as per Hp Govt.Noiification No. MPP-F(l)-2l2005-Vdated 30. I 1.2009. xxv) The TEC is basedon the reportsand data fumishedby the Ipp in the DpR and it is presumed that information furnishedis correct and has been collectedreliablv after carryingout detailedfield^ investigations and surveys under the supervisionof competent personnel. Thescrutiny ofDpR doesnot cover the examination ofthe detaileddesigns & working drawings of project componentsin regard to their structural,hydrauril and mechanicalperformance & safetywhich shalrbe ensuredby the projectauthority/rpp.

3. The project shall be completed within 36 months from the date of start of the constructionwork(Zero date). 4. The completioncost of the schemeshall be submittedto DoE, GoHp for approvalwithin 3 monthsfrom the CommercialOperation Date (COD) of the plant. 5. The ProjectPromoters/Project Authorities shall give free accissibilityto the officersand staff of DoE, GoHPto haveon the spotassessment ofvarious aspectiofthe project. 6. Tl9.firm financial packageand tie-up of baranceinputs/cl.*un""s shan be completed within_the period as stipulatedin the Hp Govt. power policy, 2006 and subsequent amendmentsthereof /lmplementation Agreement, 7. In casethe time gap betweenthe Techn-o-EconomicClearance ofthe schemeand actual startof work on the projectis threeyears or more,a freshrechno-Economic clearance shallbe obtainedfrom DOE, GoHp beforestart ofactual work. 8' Monthly ProgressReport of the projectshall be submittedto the DoE, GoHp. Three(3) copies of the semi-annualphysical progressreport of the schemeand expenditure actually incurred,duly certified by statutoryauditors shall be submittedto t'he DoE. GoHPtill the CommercialOperation of the plant. 9. The DOE, GoHP reservethe right to revokethe concurrenceif the conditionsstinulated aboveare not compliedwith to the satisfactionof the CoHp. BY ORDER OF THE GoHP

\ Di Directorate of Energy, GoHP, W New Shimla-171009(HP). No.DOE/CI(Energy)/TEC-Puditat Lassa/2012-2fl ?t-t( n"tea'3\1-\ 12 Copyfor informationand necessary action to the: l. PrincipalSecretary (MPP & Power)to H.p.covt., Shimla-171002. 2. PrincipalSecretary (NES) to H.P.Govt., Shimla-171002. 3. Secretary,Ministry of Non-ConventionalEnergy Sources(MNES),Block No.14, CGOComplex, Lodhi Road, New Delhi-l10003. 4. Director, Environmental& ScientificTechnologies, Narayan Villa, Near wood villa Palace,Shimla-l 7l 002. GeneralManager(C&D), HPPTCL, Borowalia House, Khalini, Shimla- 171002. 6. ChiefEngineer (P&M), HPSEB Ltd, VidyutBhawan, Shimla-171004. 7. ChiefEngineer(SP), HPSEB Ltd, VidyutBhawan, Shimla-171004. 8. ChiefEngineer(Commercial), HPSEB Ltd, Vidyut Bhawan, Shimla -l 71004. 9. M/S GreenkoHatkoti Energy PW. Ltd., plot No. 1071,Road No. 44, leeHills, Hyderabad-500033(AP).

New Shimla-171009(HP). ANNEXURE-I

Paudital-LassaSIIP (24.00 MW) in District Shirnla of Himachal Pradesh of *lWS Greenko Ilatkoti Energr Pyt. Ltd., Plot No. 1071, Road No. 44, Jubilee Ilills, Ilyderabad-500033(AP)'

ABSTRACTOF COSTESTIMATE

Sr. No. Description of works Amount (a) (In Rs. crore) 1. Civil works i/c otherMisc. Expenses 11e.46) I Pricekvel 2. Elecuo Mechanical works s2.92| I August,2011 J. Transmissionworks z.rsI Sub Total (a) 174.53) (b) 1. Interest During Construction(IDC) 30.88

2. Escalation Nil

3. Financial Charges(FC) 1.51 Sub Total (b) 32.39

Total (a+b) 206.92

(c) LADC @ I.5OVo of (a+b) 3.10

GRAND TOTAL (a+b+c) 2t0.02 Say Rs. 210.00 crore

(Rupees two thousand ten crore only)

I tJ lrv,,- ,/--/ tr Dir6ctor, \ Directorateof Energr,GoHP, --,,"1_- NewShimla-171009(IIP). t - -^-^at 2..\- I ANNEXURE-II

Paudital-LassaSIIP (24.00 MW) in District Shimla of Himachal Pradesh of "lWS Greenko Ilatkoti Energr Pvt. Ltd., Plot No 1071, Road No. 44, Jubilee Hills, Hyderabad-500033(AP)".

I. TentativeFinancialPackage

Debt:Equity - 70:30

Sr. No. Description Amount (Rs.in crore) Equity 63.00 B Debt.from Financiallnstitutions t47.00 Total(Debt. + Equiry) 210.00

il. Terms of Loan

Sr. No. Item Package

I Sourceof Debt. Financial Institutions

z. Loan Amount (Rs. in crore) 147.00

3. Rate of Interest l2.OOVo ^ RepaymentPeriod 10 Years Moratarium Period 3 years

Nrf'-.-' \ nft:*{ \, 1 - Dir6ctorate of Energr, GolIP, NewShimla-171009(IIP)' ry ANNEXURE-III pauditaFlassa SIIP (24.00 MW) in District Shimla of Hirnachal Pradesh of "M/s Greenko Hatkoti Energy Pvt, Ltd., Plot No. 1071, Road No. 44' Jubilee Hills' Hyderabad-500033(AP)". SALIENTFEATURES

Rohru/ Lassa- Dogri village

Accessibility Road 125km f,omShimla on Shimla-Rohru SH ratta fnCl - 215km, Shimla(NG)- 125 km Jubberhatti,Shimla - 150km. Diversion site Power House

:t" 0z':0"N 3l' 19'l0" N Altitude (C/L of Turbine) EL+ l4l7 .20

Nameof the stream Tributaryof / Basin Tonsriver/ Yamuna basin 100.00sq km (uPtodiversion site) Slopeof streamin proposedstretch 4l .58cumecs DesignFlood discharge DesignEnergy in 75% DeP.Yr. tZSX UUiet eS%plant availability) Annualrainfall (At Rohru) Winter:fC to 3oC, Summer:25"C to 35"C PROJECTCOMPONENTS DIVERSION STRUCTURE AcrossPabber River near Paudital CatedWeir with UnderSluice ba 64J0 *m""t i/c flushingdischarge

t-enett- OS.SOm, Width- 7.00m EL + 1494.00m U/S & D/S Floor Level EL+ 1493.50m

t-ensth-ZS.SO m , Width-6.50m Numberof Bays EL+ 1492.00m EL+ 1492.55m INTAKE STRUCTTIRE t-engtfr-+Z.SO m. Width- 7.25m 64.00cumecs i/c flushingdischarge Numberof Bays/gates \-,r- FloorLevel EL+ 1493.30m CrestLevel EL+ 1493.80m c WATER CONDUCTOR SYSTEM a. CONVEYANCE CHANNEL (from Intake structure to desiltingtank) Type RCCRectangular channel LengthofChannel 17.00m Sizeof Channel 7.50x11.60m Bed gradientof channel I :2500 b. DESILTINGTANK Type Dufourtype surface desilting tank Lengh 136.00m i/c inletand outlet transitions. Numberof Bays Two Width of gated structure 7.50m each Width of eachbay 10.00m Total width 23.00m (includingbifurcation wall) Depth 8.50m Sizeof inlet andoutlet sates 3.25mx4.10m Type of gates Vertical lift roller Gate Hoistofgates RopeDrum Hoist c. POWER CHANNEL (from Desiltingtank to tunnel intake) Type RCC Rectansularchannel LengthofChannel 7.34m Sizeof Channel 7.50x11.60m Bed gradientofchannel I :2500 d. HEAD RACE TUIINEL Type/Shape HorseShoe shape tunnel SizeofTunnel 4.50m dia. Liningthickness 0.25m Lengthofthe Tunnel 5752.00m DesignDischarge 50.81Cumecs Numberof Adits Two Lengthofthe Adits 296.41and 282.00 m Sizeof Adits 4.00m dia.,"D" shapedtunnels D SURGESHAFT Type RCClined Circular Size 20.00m dia.,53.67 m height Invert level EL+ 1453.33m Sill levelat inlet EL+ 1454.90m Top Level EL + 1507.00m MaximumSurse Level EL + 1506.00m MinimumSurge Level EL+ 1462.00m E PENSTOCK Type Tunnel/Surfacesteel Denstock Shape Circular Size/Lengthof tunnelpenstock 5.00mdia. / 72.90m leneth Size/Lensthof SurfacePenstock 4.00mdia. / 55.86m length Flow PressureFlow. Numberof branches Three F POWERHOUSE Location Leftbank of PabberRiver. Tvpe Surface Capacity 24.00MW (3 Unitsof 8000kW each) GrossHead 73.83m Designnet Head 68.41m SizeofPH (i/c ServiceBay) 21.50mx40.10m Sizeof ServiceBay 21.50m x 10.00m Sizeof Unit Bay 15.00mX30.10m Sizeof Controlroom / SGroon . 6.50mx30.10m Elevationof TurbineC/L EL+ 1417.20m GeneratorFloor Level EL+ l419.80 m ControlRoom Floor Level EL + 1427.50 m Drall Tubefloor Level EL + 1412.77m Turbines . Type Verticalshaft Francis Turbine . Number Three . RatedCapacity 8333kW each . RatedDischarge 13.86cumecs per unit . RatedSpeed 3 75 rpm . RunnerDia. 1500mm Generators . Type SynchronousCenerator . Number Three . RatedOutput 8000kW each . CenerationVoltage ll kv o RatedSpeed 375mm . Frequency 50Hz. o Powerfactor 0.9las . Overloadcapacity l0 Yo G TAIL RACE POOL Length 23.12m HighFlood Level EL + 1426.50 width Varinsfrom 25.00m to 29.63m Designdischarge 50.81Cumecs Bed Slope I in 4(Reverse) BedLevels Varvinsfrom EL+1412.77mto EL+1418.55m H TAIL RACE CHANNEL Type Rectangularchannel Length 600.00m width 25.00m Longitudinal slope I in 1000 Maxm.TWL E,L+ l4l 9.08m

New Shimla-171009(HP). ANNEXURE-IV

Paudital-LassaSIIP (24.00 MW) in District Shimla of Ilimachal Pradesh of "ltUS Greenko Hatkoti Energr Pvt. Ltd., Plot No 1071, Road No. 44, Jubilee Hills, Hyderabad-5fi)033(AP)".

LIST OF STATUTORY AND ADMINISTRATIVE CLEARANCESREQUIRED

SR. ITEM AGENCY REMARKS NO. l. WATER 1. StateGovt. Interaction between State Govt. AVAILABILITY 2. CWC Dep't. & CWC required.Relevant Inigation Act of the State & CentralWater Commission. 2. SEB CLEARANCE 1. SEB Section 44, E (S) Act, 1948 2. StateGovt. repealedby ElectricityAct, 2003. 3. POLLUTION State/ Central Water (Prevention & Control of CLEARANCE WATER PollutionControl Pollution) Act, 1974, Air AND AIR Board (Prevention& Control of Pollution) Act, 1981. ^ FOREST CLEARANCE 1. StateGovt. Coordination with State Forest 2. Min. & E&F Dep't./ Min. of Environ. & Forest GOI (MOE&F) regarding Forest (Conservation)Act, 1980. ENVIRONMENT l. StateGovt. As per item (3) & (4) & Govt. 2. Min. of E&F Policyin force. GOI fr. REGISTRATION Registrar of Under Indian Companies Act, Companies 1950. 7. REIIABILITATION & 1. StateGovt. RESETTLEMENT OF 2. Min. of E&F DISPLACED GOI FAMILIES BY LAND ACQUISITION 8. EQUFMENT DGTD, CCI&E knport & ExportActs. PROCUREMENT

--/ td' ,'/' \ Dir"Ltor/' \. . Directorateof Energr,GoHP, \rl^-zL1i NewShimla-l7l00e(HP)

CERTIFICATE OF UNDERTAKING

M/s Greenko Hatkoti Energy Private Limited (Paudital Lassa HEP) hereby gives undertaking to pay Net Present Value (NPV) as per norms of “Forest Conservation Act-1980 and its amendments” as fixed by Department of Forest, Government of Himachal Pradesh and pay the additional amount of NPV if determined by the Hon’ble Supreme Court of India in respect of diversion of forest land required for construction of 24MW Paudital Lassa Hydro Electric Project in Shimla District of Himachal Pradesh.

Date: 29.01.2016 Signature

Authorized Signatory