FLAGSHIP PROJECTS : : : of berths Deadline: of Uganda and Kenya and Kenya Main work: Government South Sudan strengthening Government of Deepening and End of 2017 Governments of Zambia, Zambia, Project sponsors Project sponsors Project sponsors

400 kV 4 years Durée : Length: Benefits: Capacity: 400 MW lThe road is is Projections: Installation of 614.71 km The expected in three phases transmission line conveyor systems construction period supposed to be built as a regional corridor double circuit Zambia-Tanzania-Kenya Total Total cost: cost: Juba Torit Kapoeta Nadapal Eldoret Juba Torit Total Tanzania and the neighbouring countries Tanzania could gain about US $ 2.6 billion per year if of the port of the efficiency were equal to that of the port of . cost: Serenge-Nakonde Road Total cost: The road will reduce the cost of road transport for passengers and goods on the North-South corridors and towards Dar es Salaam. will promote energy interconnection throughout the continent and facilitate the creation of a pan-African energy market. This project will facilitate the integration of South Sudan in regional markets and will support the State of South Sudan. in The road is a vital link between Juba, in Uganda. and , South Sudan, This line of two-way power transmission

Dar es Salaam Port Expansion

Kampala Jinja Road Upgrading

Length: estimated estimated estimated estimated 2.206 km 14. Road Project 11. 10. 13. Transmission Line 12. Transmission US $ 420 million US $ 384 million US $ 674 million US $ 74 millions Mauritus Seychelles Réunion (Fr.) : and Chad Governments of African Republic Cameroon, Central Cameroon, Project sponsors Status: Madagascar already included Some sections are in national projects installée : Somalia Puissance 1600 MW Dar es Salaam Modernisation • Port • New SPM Oil Terminal Mbwamaji and Kunduchi • New Berths Vijibweni, • New Container Terminal cost: Construction of a transmission line 2,700 km long with a Construction of a transmission capacity of 500 megawatts from Morocco to Egypt through and Libya. Tunisia Algeria, road and The construction of the bridge, railway line will not only link the three but also countries (Cameroon-Chad-CAR), accelerate regional integration. Douala Bangui Ndjamena North Africa Transmission Corridor North Africa Transmission Estimated Dar es Salaam 15. Corridor Road - Rail Project 16. during the US $ 356 million Creation of Ethiopia 1,200 Kenya per year during construction phase Impact: implementation phase and 6,000 permanent jobs Eritrea Eldoret Mozambique Nadapal OSBP Tanzania Total cost: This project involves the installation of eight 200 megawatt units whose power is shared equally beatween Zambia and Zimbabwe. ZTK Transmission Transmission ZTK Interconnectors estimated Batoka Gorge Hydropower Project US $ 6 billion 9. Lilongwe Malawi Kampala Nakonde Nadapal Isaka Kapoeta Uganda Serenje - Nakonde Road Torit Jinja Swaziland Juba Juba - Torit - Torit Juba - Kapoeta - Nadapal Road Kampala - Jinja Road Dar es Salaam - Isaka Sudan Zimbabwe Standard Gauge Railway Serenje South Sudan Egypt Batoka Gorge Hydropower Ruzizi III Lesotho Hydropower Lusaka Fibre-optic Link Fibre-optic Lusaka - Lilongwe Zambia Botswana C. African R. R.D. Congo South Africa Chad Libya Angola N’Djamena Brazzaville - Kinshasa Road/Rail Bridge Garoua Boulaï - N’Gaoundéré Road Congo Garoua Boulaï Namibia Douala - Bangui Douala - N'Djamena Multimodal Corridor Transport Power Transmission Corridor Transmission Power North Africa North Brazzaville - Kinshasa OSBP Gabon Ngaoundéré : Douala Bridge Cameroon - Niger Nigeria Douala Eq. Guinea Tunisia Impact: electricity people with 107 million Republic of Congo Republic of Congo Project sponsors Governments of the and the Democratic Calabar Hassi R’Mel Lagos : Nigeria-Algeria Pipeline Installed capacity: in the DRC 147 MW Objectives: African Republic between Central and South Africa and South Sao Tome. & P. Sao Tome. Creation of a rail link Benin of Zambia and Malawi Government Togo Abidjan - Lagos Transport Coastal Corridor Project sponsors Algeria cost: cost: Totale Brazzaville Kinshasa Road Rail stimated Ruzizi III Hydropower Project Estimated

Construction of a road, a combined railway Construction of a road, bridge and a one-stop border post at which the railway line will be connected to the Lubumbashi - Ilebo line. Third in a series of four hydroelectric Ruzizi III is a 147-megawatt hydro projects, power plant with three power units. 4. Bridge Project and the Kinshasa Illebo Railways 6. US $ 1.65 billion Mali US $ 600 million Ghana Ouagadougou lThe project Burkina Faso will create per year in construction phase Abidjan - Ouagadougou/Bamako Transport Multimodal Corridor Impact: 225 permanent jobs Abidjan Morocco Ivory Coast Total cost: Bamako Lusaka-Lilongwe ICT estimated

This project aims to install a 10Gbit fiber channel from the technical center in Lilongwe to the border with Zambia. 8. Fibre Optic Terrestrial US $ 1.5 million Dakar - Bamako - Niamey Transport Multimodal Corridor Guinea Liberia Sambangalou Hydropower Mauritania Sierra Leone Western Sahara Senegal Gambia : : 3 - Guinea Bissau Dakar Volume: Ivory Coast Burkina Faso Ivory Coast and water reservoir Governments of 3.8 billion m Togo, Ghana and Togo, of Nigeria, Benin, of Nigeria, The governments Project sponsors Project sponsors Cape Verde of 500 km Capacity: 128 MW Objectives: 1,028 km 1,200 km existing railw Total length: Total of motorway and Modernize of Capacity: 30 billion The governments 108 billion cost: cost: cubic meters . Project sponsors: Total cost: of Senegal and Mali natural gas per year 1 Sambangalou Hydropower Abidjan Ouagadougou Abidjan-Lagos Coastal Corridor Estimated Estimated estimated

peace in the region. The project will contribute to the moderniza tion and rehabilitation of the multimodal corridor that has suffered disasters during the civil war in Ivory Coast. The project will provide sustainable electricity in three neighboring countries (Gambia, allow to control the Guinea and Senegal), level of water in the river basin and promote The road corridor will reduce border crossing It will also reduce the hassle and costs. time, costs of transportation and logistics. 3. Project 5. Road-Rail Projects 7. US $ 600 million US $ US $ 50.4 million About Length: Length: 1,234 km 4,400 km 16 MEGA-PROJETS 16 MEGA-PROJETS Total cost: Total cost: Modernization of Dakar-Bamako Modernization of Dakar-Bamako estimated Nigeria-Algeria Gas Pipeline estimated

economic opportunities. The project will improve connectivity and intra-African trade between Dakar and and other countries to promote Bamako, regional integration and help create Trans-Saharan Gas Pipeline from Qua Ibom Trans-Saharan terminal in Calabar (Nigeria) to Hassi R'Mel The project will also help to recover (Algeria). the equivalent of 220,000 barrels per day of flared gas. US $ 3 billion

N Energy Transport Telematics Rail Line Line 2. Rail US $ 10 billion 1. 300 miles at the equator key TO TRANSFORM AFRICA TO TRANSFORM NEPAD: NEPAD:

12