CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 34)

This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the Chelmsford City Local Highways Panel. The Panel are asked to review the schemes on the attached Potential Scheme List, finalise their scheme funding recommendations for the schemes they wish to see delivered in 2018/19 and remove any schemes the Panel would not wish to consider for future funding.

There are currently potential schemes with an estimated cost of £1,206,640 as shown in the summary below -

Potential Schemes List (Version 34)

Estimated Scheme Costs Ref. Scheme Type Total 2018/19 Prioritised Schemes

1 Traffic Management £241,000 TBC (Seven schemes)

2 Walking £0 £0

3 Cycling £792,640 £102,640

4 School Crossing Patrol TBC TBC (One scheme)

5 Passenger Transport £66,000 £0

6 Public Rights of Way £107,000 £36,000

Total £1,206,640 £138,640

Page 1 of 16 CHELMSFORD CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 34)

On the Potential Schemes List the RAG column acknowledges the status of the scheme request as shown below:

RAG Description of RAG status Status

G The scheme has been validated as being feasible and is available for Panel consideration

A The scheme has been commissioned for a feasibility study which needs completing before any Panel consideration

R A scheme which is against policy or where there is no appropriate engineering solution

V A scheme request has been received and is in the initial validation process

Page 2 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

Main Road (at Lack of Village Gateway northern Broomfield Parish Parish Council has agreed for scheme to be considered once 1 Village Gateway Treatment feature to define entry to Broomfield Total scheme LCHE142002 £5,000 G Parish boundary), Council any changes at adjacent roundabout have been finalised Broomfield Broomfield

Problems at peak times with Validation - Recommendation to install KEEP CLEAR road Court Road j/w Main Traffic management 2 egress of traffic from Court Residents Broomfield Total scheme LCHE172010 £6,000 marking on Main Road to allow vehicles to turn out of Court G Road, Broomfield improvements Road onto Main Road Road onto Main Road

Church Green, Wooden sleepers need Parish 3 Kerbing Broomfield Total scheme LCHE172020 TBC In validation V Broomfield replacing Council

Signage improvements to (1) vehicular access to ERO Validation - Site (2) agreed and Site (1) not necessary as Records Chelmsford Non 4 on Navigation Road and (2) Lack of signage Councillor Total scheme LCHE142085 £500 building visible from location. Section 106 monies to be G Office, Chelmsford Parished outside pedestrian entrance considered if available to ERO

Cars park on one side of Cars mounting pavement Park Avenue, road and when two vehicles Chelmsford Non 5 causing conflict with Councillor Total scheme LCHE152016 TBC In validation V Chelmsford try to pass, they routinely Parished pedestrians mount the pavement

Validation - Option to encourage residents to apply for dropped 29-59 North Avenue, Chelmsford Non 6 Improved parking Lack of residents parking Residents Feasibility LCHE152095 £5,000 kerbs and park on their frontage for Feasibility Study/Design into G Chelmsford Parished creating parking within adjacent green area

Delivery vehicles for Validation - Recommends Feasibility Study into 7.5t Old , 7.5 tonne environmental Moulsham Street routinely Chelmsford Non environmental weight limit, to include HGV traffic surveys and 7 Residents Feasibility LCHE152096 £10,000 G Chelmsford weight limit driving through Old Parished details of any delivery vehicles using Old Moulsham to access Moulsham Moulsham Street shops

In validation - Will require approx. 30 automatic traffic counts costing £7,500 to complete validation. Four ATC carried out - Corporation Road - 30mph speed limit - East bound 26.7mph & Admirals Park West bound 27.4mph, Swiss Avenue - 30mph speed limit - East Estate, North-West Chelmsford Non 8 20mph zone Speed of vehicles Councillor Total scheme LCHE152115 TBC bound 25.5mph & West bound 27.4mph, Langton Avenue - V Chelmsford Parished 30mph speed limit - South bound 25.4mph & West bound (Boarded Barns) 24.6mph, Kings Road - 30mph speed limit - Southwest bound 25.4mph & Northeast bound 26.1 mph. Good compliance with existing 30mph speed limit. Remaining 26 ATC will cost £6,500

Page 3 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

Validation - Speed survey had to be removed after 2 days Traffic management O/s 78 to 88 Chelmsford Non following Residents noise complaints - data obtained Roxwell 9 measures to enforce 30mph Speed of traffic Councillor Total scheme LCHE152116 NA R Road, Chelmsford Parished Road - 30mph limit - East bound - 37.7mph & West bound - speed limit 18.2mph. Need speed data to assess issues.

Validation - Feasible to install directional signage on existing Magistrates Court, Directional signs to Lack of directional signs to Chelmsford Non street furniture from Bus/Train station to Magistrates Court. 10 New Street, Councillor Total scheme LCHE162140 £6,000 G Magistrates Court Magistrates Court Parished Possible Wayfinder scheme also being implemented by CCC Chelmsford may cover this signage request

Validation - Results of speed survey at two locations - Eastbound 30.0mph & 29.7mph Westbound 30.9mph & 27.6mph. Good compliance with posted 30mph speed limit. Copperfield Road is a Priority Route 2 and Dickens Place is a Local Road, traffic flow priority would be on the PR2. Would be Copperfield Road j/w against policy (Traffic Management Strategy) to hold up traffic Traffic management Chelmsford Non 11 Dickens Place, Speed of traffic Councillor Survey LCHE162143 £500 on a PR2. September 2016 - Joint site visit carried out and new G improvements Parished Chelmsford automatic traffic count carried out - 35m E of Nickleby Road - 30mph limit - East bound - 29.6mph & West bound - 30.6mph. Good compliance to speed limit, some evidence of speeding during hours of darkness. Road is a Priority Route 2 and a mini- roundabout would be against policy. Suggestion is to carry out Road Safety Assessment

Savernake Road Traffic management Chelmsford Non Feasibility Validation - Recommendation is to carry out Feasibility Study to 12 near Rossendale Review of No Entry Point Councillor LCHE162160 £3,000 G improvements Parished Study look at physical measures to enforce No Entry Point Road, Chelmsford

Cars parking too close to Chelmsford College, Pedestrian/vehicular College access and no Chelmsford Non Validation - Formalise crossing point, remove KEEP CLEAR 13 Vicarage Road, improvements to College Councillor Total scheme LCHE162167 £9,500 G defined pedestrian dropped Parished road marking and implement double yellow lines across junction Chelmsford Access kerbs

Gloucester Avenue Unable to recruit a School Validation - Degree of pedestrian conflict survey carried out and Pedestrian Crossing Chelmsford Non 14 nr j/w Brian Close Crossing Patrol officer for Councillor Total scheme LCHE162169 NA result of 0.102x10^8, does not meet criteria for pedestrain R Improvements Parished Chelmsford site crossing

King Edward VI Grammar School From Feasibility Study - From Feasibility Study Panel prefers combination of - Option 1 and Chelmsford Improvements to Speed of traffic at Chelmsford Non (Recommended) Enhanced Road Safety education for school 15 Councillor Total scheme LCHE172008 £10,000 G County High School kerbing/pedestrian guard rail pedestrian crossings Parished children and Monitoring of crossing at school times. And Option for Girls, Broomfield and signage 2 £10,000 - kerbing/guard rail/signage improvements Road, Chelmsford

Leeford j/w Partridge Chelmsford Non Validation - parking restrictions would need to be considered by 16 Parking improvements Cars parking on verges Councillor Total scheme LCHE162183 NA R Avenue, Chelmsford Parished Parking Partnership

Page 4 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

Vehicles routinely driving Road j/w In validation - Formalised vehicle crossing not approved, over footway to access Chelmsford Non 17 A1016 Westway, Pedestrian guard railing Councillor Total scheme LCHE172026 £12,500 validation being progressed with pedestrian guard railing to stop G forecourt of Brandon Tool Parished Chelmsford vehicle movements Hire

Initial validation indicates that TRO is enforceable but some High Street, Improvements to Prohibition Chelmsford Non 2017/18 18 Cyclists using High Street Residents Total scheme LCHE172023 TBC improvements could be made to TRO signage. Awaiting results A Priority Chelmsford of Cycling Signage Parished of Feasibility Study Scheme

North Avenue, Pedestrian crossing Difficult for pedestrians to Chelmsford Non 19 Councillor Total scheme LCHE162059 TBC Awaiting results of Feasibility Study A Chelmsford improvements cross road. Parished

The Meades, Measures to prevent verge Verge routinely being driven Chelmsford Non 20 Councillor Total scheme LCHE162149 TBC Awaiting results of Feasibility Study A Chelmsford damage over at S/o 1 Parished

Waterhouse Lane j/w Difficulty for vehicles turning Beeches Road and Measures to improve traffic right onto Waterhouse Lane Chelmsford Non 2017/18 21 Residents Total scheme LCHE162146 TBC Awaiting results of Feasibility Study A Priority Forest Drive, flows from Beeches Road/Forest Parished Scheme Chelmsford Drive

Church Road j/w Vehicles turning into road Parish 22 Road, No through road signage Chignal Total scheme LCHE172016 TBC In validation V then unable to turn around Council

Chignal Hall Lane jw Existing verge being overrun Parish Validation - Feasibility/design recommended into junction 23 Mashbury Road, Remove bennet junction Chignal Smealy Feasibility LCHE152093 £3,000 G dragging mud onto road Council improvement options Chignal Smealy

Width restriction on road, to Sporhams Lane, Parish In validation - need to await results of request for Quite Lane 24 prevent goods vehicles Vehicles damaging verges Danbury Total scheme LCHE142092 TBC V Danbury Council status damaging verges

Bicknacre Road, Improvements to traffic Validation - Possible improvements to traffic warning signs, 25 Speed of traffic Residents Danbury Feasibility LCHE172021 £3,000 G Danbury warning signs requires Feasibility Study/Design

Well Lane to The Vehicles routinely Parish 2017/18 26 Heights - Service One-way road parking/blocking service Danbury Total scheme LCHE152104 TBC Awaiting results of feasibility study A Priority Council Road, Danbury road Scheme

S/o Vita Bella, The Footway widening works - Validation - Feasibility Study into footway widening to consider Narrow footway for Parish East 27 Tye, East kerbing/resurfacing to open Feasibility LCHE152105 £3,000 extent of highway, statutory undertakers apparatus and fully G pedestrians Council Hanningfield Hanningfield up full width cost any scheme proposal

Page 5 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

The Tye (nr j/w Old Validation - Kerbing introduced previously on western side of Church Road/Main Kerbing and verge Vehicles over running verge Parish East road. Recommendation is for detailed design, obtaining 28 Design LCHE152113 £3,000 G Road), East reinstatement and causing damage Council Hanningfield statutory undertakers apparatus drawings and road safety audit. Hanningfield This will provide a feasible design and an accurate target cost

Old Church Road, Validation - 40mph speed limit Northeast bound 31.3mph and Traffic management Concealed entrances to Parish East 29 Near Back Lane, Total scheme LCHE162159 NA South bound 29.6mph, good speed compliance. No reported R improvements properties Council Hanningfield accidents, No concealed entrance sign within TSRGD.

Measures to stop vehicles Pryors Road, Car routinely driving along CHE/10/123 30 driving along independent Councillor Total scheme LCHE162166 £5,000 Validation - lockable bollards could be feasible G Galleywood footway 6 - £1,800 footway

Validation - Reintroduced to Panel - Speed/volume data shows HGV's usage very low. Unsuitable for HGV signage considered Goods vehicle using route as unsuitable as this road is similar to others in the vicinity and School Road, Good 7.5T environmental weight Parish 31 as an alternative route Surveys LCHE152017 £2,000 could lead to excessive blue signs. Parish Council have asked G Easter limit Council damaging road for scheme to be considered by the Panel. Next stage would be for HGV Origin and Destination Survey using Automatic Number Plate Recognition cameras

Validation - This is an access road to a small group of properties. In first instance any speeding issues should be Speed of vehicles on access Chelwater, Great Traffic management raised through Police. A street lighting survey could be carried 32 road and existing street Councillor Survey LCHE162151 £1,500 G Baddow improvements out to determine lux levels of existing lights to see if they are lighting emitting enough light, if not it could be a maintenance issue to upgrade the lighting heads

Issues with pedestrians Galleywood Road nr Pedestrian crossing trying to cross Galleywood Parish 33 jw Pertwee Drive Great Baddow Total scheme LCHE162171 TBC In validation - needs PV² survey when funding permits V improvements Road, especially when trying Council Great Baddow to access bus stop

Bell Street, Great Parish 34 Footway improvements Lack of footway Great Baddow Total scheme LCHE162179 TBC In validation V Baddow Council

Church Street/High Parish 35 Street/Vicarage Dropped kerb improvements Lack of crossing points Great Baddow Total scheme LCHE162180 TBC In validation V Council Lane, Great Baddow

Maldon Road, Great Improvements to existing Parish 36 Dropped kerb improvements Great Baddow Total scheme LCHE162181 TBC In validation V Baddow crossing point Council

Page 6 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

In validation - School pedestrian entrance is off a Public Right of Pedestrians exiting school in The Bringey, Great Pedestrian guard railing at Way (Footpath 20) with agreement of land owner staggered 37 possible conflict with Councillor Great Baddow Total scheme LCHE162185 TBC V Baddow Baddow Hall Junior School barriers could be put in front of school entrance. Need to vehicles establish who owns land between footpath and school

Cole Hill, Great Traffic management In validation - Speed data 60mph limit, South bound 35.3mph & 38 Speed of traffic Councillor Total scheme LCHE172014 TBC V Leighs improvements North bound 35.1mph

Validation - Suggested area for parking is owned by Parish Council, who could create parking on this land subject to any Hatchfields, Great Parish necessary planning/highway agreements needed. Limited 39 Parking lay-by Lack of parking within Village Total scheme LCHE162148 £3,000 G Waltham Council parking restrictions within Village. Could carry out Feasibility Study at £3,000 but scheme costs could be very high and would need any land dedicated as highway

In validation - Speed data - South of Village, Chelmsford Road 40mph buffer on approaches Parish 60mph Southeast bound 41.5 mph & Northwest bound 44.2 40 B1008 Speed of traffic Great Waltham Total scheme LCHE162164 TBC V to Village Council mph and North of Village Main Road 60mph East bound 39.9mph & West bound 37.5 mph

Validation - 10m of carriageway width required for pedestrian. refuge island. At this location 6.2m carriageway and 3.3m of Ford End - Outside Parish footway. Would require private land over significant length to re- 41 Ford End C of E Pedestrian refuge island Speed of traffic Great Waltham Total scheme LCHE162165 NA R Council align road to accommodate suggested works. Could undertake Primary School a feasibility study at £5k but scheme costs including land acquisition could be very high.

Ford End C of E Advisory 20mph speed limit Parish CHE/10/722 - 42 Primary School, Speed of traffic Great Waltham Total scheme LCHE152164 £15,000 Cabinet Member has agreed scheme can be implemented G with Wig-Wag flashing lights Council £3,300 B1008, Ford End

Pedestrian footway - 1.2m Highwood Road walkable verge, crossing Edney Common to point at Highwood Road and Lack of footway/walkable Parish Technical Note (costing £4,000) previously shared with Panel 43 Loves Green, removal of informal layby at Highwood Design LCHE142040 £3,500 G verge Council March 2015 including St Pauls St Paul's Church, estimated Church cost £105,000 next stage detailed design

Page 7 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

Validation - Three speed surveys North Hill (N) Lt Baddow (60m N of The Rodney PH) South - 31.8mph & North - 34.9mph The Ridge jw Runsell Speed Indictor Poles (x3) The Ridge (mid) Lt Baddow Lane and Fir Tree To remind traffic of 30 mph Parish 44 and Speed Indicator Device Total scheme LCHE152084 £9,000 South - 33.7mph & North - 32.1mph G Lane and Holybread speed limit Council on rotation The Ridge (s) Lt Baddow Lane, Little Baddow South - 33.2mph & North - 29.3mph. Speeds do not meet criteria for a SID. Recommendation is to review of size/number of speed limit repeater signs

In validation - The Street - Speed data 30mph North site - South bound 20.7mph & North bound 20.2mph, South site - South Brook Hill/The Street, Traffic management Parish 45 Speed of traffic Total scheme LCHE172015 TBC bound 27.6mph & North bound 27.3mph. Brook Hill - Speed V Little Waltham improvements Council data 30mph - Southeast bound - 28.1mph & Northwest bound 27.4mph

Validation - Speed data Chatham Green 60 mph South bound 21.1mph & North bound 19.8 ph - Feasible to implement a Chatham Green, 30mph speed limit through Parish 30mph speed limit but there would need to be 30mph signs at 46 Speed of traffic Little Waltham Total scheme LCHE172027 £23,000 G Little Waltham Hamlet Council either end of the new limit and repeater signs along the new limit, Change in speed limit would also require a formal consultation where objections may be made.

Validation - Signalisation of bridge could cost £160k, it is first Frequently two cars try to Bridge over River advised to carry out Road Safety Assessment of proposal to Signalisation of priority cross bridge at same time Parish 47 Crouch, Hawk Hill, Feasibility LCHE152001 £2,000 address any safety concerns/risks of signalisation. G working over bridge causing a "face to face" Council Battlesbridge Recommendation to monitor improvements to signage on stand off in middle of bridge bridge

Woodham Road Vehicles routinely "bottoming Validation - any improvement scheme would involve extending (service road nr 48 Carriageway improvements out" when turning into Councillor Rettendon Total scheme LCHE162154 NA entrance into carriageway, requiring major junction realignment R Rettendon RAB) service road which could exceed LHP budget Rettendon

A132 Burnham Lack of bus service to Road, Rettendon, Traffic management 49 Residential Park and Residents Rettendon Total scheme LCHE172009 TBC In validation - Awaiting results of A131 Route Based Strategy V O/s Hayes Country improvements pedestrian crossing facilities Park

Vicarage Road, Skreens Park Road Parish In validation - needs three automatic traffic counts when funding 50 Village Gateway treatments Speed of traffic Roxwell Total scheme LCHE172013 TBC V and Stonehill Road, Council permits Roxwell

Page 8 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

Brock Hill nr jw Traffic management Parish Validation - Recommendation to install junction warning signs 51 Wavereley Crescent, Speed of traffic near junction Total scheme LCHE162172 £3,000 G improvements Council and SLOW road markings Widford

Woodhill Road (S/O Validation - Against Officer recommendation Bollards/footway Bollards to prevent verge Parish 10/00002/FU 52 Sandon School), Vehicles parking on footway Sandon Total scheme LCHE142065 £10,500 improvements could relocate parking problem further down the G parking Council L - £700 Sandon road towards a bend

Sporhams Lane, Suggestion to be classified Narrow lane, often used as Parish In validation - awaiting impact of five Quiet Lanes currently 53 Sandon Total Scheme LCHE152012 TBC V Sandon as a Quiet Lane a "rat run" or short cut Council being implemented in County

Validation - 30mph speed limit, Southeast bound 33.5mph and School Road Northwest bound 33.5mph. Recommendation was to carry out (Crowsheath Lane to Traffic management Speed of traffic within Parish South Feasibility Study into traffic calming options. Further validation 54 Total scheme LCHE162162 £28,000 G Village Hall), improvements 30mph speed limit Council Hanningfield work now recommends three Village gateway treatments and Downham size/frequency improvements to existing 30mph speed limit repeater signage

Marsh Farm Road, Traffic management HGV's using car park at the Town South Woodham 55 South Woodham Total scheme LCHE162163 £4,500 Validation - Unsuitable for HGV signage could be considered G improvements end of Marsh Farm Road Council Ferrers Ferrers

In validation - Degree of pedestrian conflict survey carried out Lawn Lane near results 0.482x10^8 feeding into validation process. Existing tree Improved pedestrian Pedestrians having 56 junction with Orford Councillor Springfield Total scheme LCHE152002 TBC currently obscure sight line. Need to carry out new PV² at V crossing facilities difficulties crossing Crescent, Springfield adjacent crossing point 60m north of this location when funding permits

Validation - Review of road markings and implement more O/s 322 Springfield Improvements to Residents Parked vehicles routinely suitable scheme. Could be possible to remove centre hatching 57 Councillor Springfield Total scheme LCHE162158 £3,000 G Road, Springfield On Street Parking area being damaged near parking bay and introduce single centre line to show road narrows

Enhancements to existing In validation - Speed data Beaulieu Boulevard 20mph S bound Beaulieu Park, Speed of traffic within Parish 58 20mph zone - Repeater Springfield Total scheme LCHE162175 TBC 21.2mph & N bound 20.8mph, Shardelow Avenue 20mph E V Springfield 20mph zone Council signs/roundels bound 15.5mph & W bound 17.7mph

Pump Lane nr j/w Validation - Does not meet accident cluster criteria for Measures to stop cars Reports of vehicle damage 59 Rushleydale, Councillor Springfield Total scheme LCHE172019 NA intervention, as only one slight injury collision in last 3 year R loosing control to walls Springfield period.

O/s 19-33 Shelley Insufficient parking for 60 Extension of parking bays Councillor Springfield Total scheme LCHE172031 TBC In validation V Road, Chelmsford residents cars

Conflict between Canvey Walk j/w FP Traffic Management 61 pedestrians/cyclist on Councillor Springfield Total scheme LCHE172032 TBC In validation V 46, Chelmsford Improvements footpath and vehicles

Page 9 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

Tyrells School, Springfield - 2017/18 62 Tavistock Rd/Bodmin 20mph zone Speed of traffic Councillor Springfield Total scheme LCHE152066 TBC Awaiting results of Feasibility Study A Priority Rd/Taunton Rd, Scheme Springfield

Measures to prevent Chancellor Avenue vehicles loosing control on Vehicles loosing control on Parish 2017/18 63 j/w Springfield Total scheme LCHE152009 TBC Awaiting results of Feasibility Study A Priority roundabout and hitting roundabout Council Way, Springfield Scheme adjacent wall

Parish Validation - Feasibility Study suggested following request for 64 High Street, Stock Route enhancement study Speed of traffic Stock Feasibility LCHE132043 £3,000 G Council 20mph speed limit/average speed camera

Validation - Option 1 approach Parking partnership for junction Brookmans Road jw Bollards on verge to prevent Parish 65 Vehicles damaging verge Stock Total scheme LCHE142089 £25,000 protection parking restrictions, Option 2 reduce width of verge, G Back Lane, Stock verge damage Council install HGV overrun to allow easier turning for larger vehicles

Smallgains Lane nr Parish In validation - Speed data in 60mph limit, South bound 27.6mph 66 Speed reduction measures Speed of traffic Stock Total scheme LCHE162184 TBC V j/w Longacre, Stock Council & North bound 27.1mph

The Square j/w High Parish CHL/07/320 - 67 Parking improvements Lack of parking Stock Total scheme LCHE172024 TBC In validation - Parish Council looking to fund design V Street, Stock Council £2,300

In validation - Speed data in 40mph limit NE - Hall Lane, West Suggestion to be classified Parish West 68 Speed of traffic Total scheme LCHE152123 TBC 26.3mph/Average 82 vehicles a day and SW 25.7mph/Average V Hanningfield as a Quiet Lane Council Hanningfield 60 vehicles a day

Main Road nr jw Traffic management Speed of vehicles at Woodham In validation - Temporary 40mph speed limit in place. Road part 10/00016/FU 69 Workhouse Lane, improvements - bend Councillor Total scheme LCHE162152 TBC V bend/hill/cross roads Ferrers of 2018/19 Capital Surfacing scheme L - £1,950 signage

Lordship Road j/w Feasibility Study into Recommendation from Route Enhancement Study, suggestion Recommendation from Parish 70 Fox Burrows Lane, junction/carriageway Writtle Feasibility LCHE152088 £5,000 is to await results of any future development on Fox Burrows G Route Enhancement Study Council Writtle improvement Lane

Feasibility Study into Writtle College Main carriageway/footway Parish 71 Access, Lordship Speed/volume of traffic Writtle Feasibility LCHE152089 £5,000 Recommendation from Route Enhancement Study G /signing/lining/street Council Road, Writtle lighting/verge improvements

Page 10 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Traffic Management

Total Value of schemes £241,000

2018/19 Requested Scheme Estimated Section 106 Ref Location Description Problem Parish Cost Code Comments RAG priority by stage cost monies scheme

Validation - Speed data - 60mph speed limit - 150m SW of A414 - Northeast bound - 41.5mph & Southwest bound - 37.5mph, 930m SW of A414 - South bound - 46.4mph & 49.9mph, 560m Northeast of Nathans Lane - Northeast bound - Highwood Road, Parish 46.5mph & Southwest bound - 46.6mph. Based on speed data - 72 Edney Common to 50mph speed limit Speed of traffic Writtle Total scheme LCHE152124 £10,000 G Council 30mph limit near A414 not feasible as recorded speeds are too Loves Green high, also environment of road would not assist a 30mph limit as properties not apparent to drivers. It could though be possible to consider a 50mph limit, which may reduce some of the higher speeds along the road

Lodge Road/Bridge Traffic management Parish 73 Street/The Green/St Concerns around junction Writtle Total scheme LCHE162178 TBC In validation - needs three PV² surveys when funding permits G improvements Council Johns Green, Writtle

Hylands School, Validation - Degree of pedestrian/vehicle conflict survey Pedestrian crossing Pedestrian difficulty in Parish CHE/10/154 74 Chelmsford Road, Writtle Total scheme LCHE152008 NA 0.247x10^8 but would not meet National guidelines for R improvements crossing road Council 5 - £12,200 Writtle installation of a signalised crossing

Lordship Road/Ongar 11/00081/FU Road/The Feasibility Study into junction Recommendation from Parish L - £3,020 2017/18 75 Writtle Total scheme LCHE162086 TBC Awaiting results of Feasibility Study A Priority Green/Mayfield improvement Route Enhancement Study Council 10/01635/FU Scheme Road/Orchard Close, L - £11,800 Writtle

Ongar Road j/w Feasibility Study into junction Recommendation from Parish 2017/18 76 Writtle Feasibility LCHE152085 TBC Awaiting results of Feasibility Study A Priority Eastview, Writtle carriageway improvement Route Enhancement Study Council Scheme

Page 11 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Walking

Total Value of schemes £0

2018/19 Section 106 Ref Location Description Problem Requested by Parish Scheme stage Cost Code Estimated cost Comments RAG priority monies scheme

Validation - Recommendation was for £3,000 Feasibility Study to include Road, video survey top establish pedestrian Overhsot Bridge to Lack of footway/walkable usage of verge/road. Update - Parish 1 Walkable verge/footway Parish Council Danbury Feasibility LCHE153004 NA R Poplar Farm, verge Council no longer consider this a Danbury priority. Consideration should be given to footway on Penny Royal Road/Mayes Lane.

Page 12 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Cycling

Total Value of schemes £792,640

19/10/17 Section 106 Ref Location Description Problem Requested by Parish Scheme stage Estimated cost Comments RAG Sub-Group monies Decision

Validation - No recorded personal injury accidents involving cyclists in last five years. Winsford Way, Creation of shared Reports of collisions between Suggestion to cut back vegetation to open up 1 Parish Council Total scheme NA R Boreham cycleway/footway cyclists and vehicles full width of footway, possible highway rangers and enforcement of waiting restrictions.

Longstomps Improvements to National Cycle Chelmsford Non Not a priority scheme within Chelmsford 2 Cycleway, Create shared footway/cycleway Route 13, along busy section of Cycling team Total scheme £100,000 G Parished Cycling Action Plan Chelmsford Longstomps

Design of replacement footbridge West Park, Install a 3.5m replacement bridge currently not part of Highways Chelmsford Non 3 Cycling team Design £65,000 Validated by Cycling team G Chelmsford on existing alignment Network, which would need to be Parished addressed Springfield Options to improve connection of Chelmsford non Priority Scheme for LHP in terms of 4 Green/Timsons Lack of connectivity Cycling team Total scheme £298,000 G existing routes Parished Chelmsford Cycling Action Plan Lane

Chelmer Park Cycle Shared footway/cycleway on Lack of cycle network connectivity Priority Scheme for LHP in terms of 5 Route, Beehive Beehive Lane between Skinners Cycling team Galleywood Design £227,000 G to Galleywood Chelmsford Cycling Action Plan Lane, Galleywood Lane and Chelmer Car Park

Church Lane j/w Phase 1 - Cycle link/junction Draft Design presented at June 2017 Panel 2018/19 Priority 6 Lawn Lane, improvements - Warning signs & Need for cycling improvements Safer roads team Springfield Total scheme £8,500 G meeting Scheme Springfield advisory cycle lane across junction

Church Lane j/w Phase 2 - Cycle link/junction Draft Design presented at June 2017 Panel 2018/19 Priority 7 Lawn Lane, improvements - 3m shared Need for cycling improvements Safer roads team Springfield Total scheme £86,000 G meeting Scheme Springfield cycleway across Park

Writtle Cycle Route, Priority Scheme for LHP in terms of 2018/19 Priority 8 Solar lights/studs at 10m intervals Mainly rural unlit route Cycling team Writtle Total scheme £8,140 G Writtle Chelmsford Cycling Action Plan Scheme

Page 13 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

School Crossing Patrols

Total Value of schemes £0

Section 2018/19 Ref Location Description Problem Requested by Parish Scheme stage Cost Code Estimated cost Comments RAG 106 priority monies scheme

Kings Road Primary 2018/19 Bollards on service road to be School Crossing Patrol Chelmsford Non Awaiting results of 1 School on Corporation Crossing Patrol improvement Total scheme LCHE146003 TBC Priority relocated to prevent parking team Parished Feasibility Study A Road, Chelmsford Scheme

Page 14 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Passenger Transport

Total Value of schemes £66,000

19/10/17 Section 106 Ref Location Description Requested by Parish Scheme Category Cost Code Estimated cost Comments RAG Sub-Group monies Decision

Validated by Passenger Transport Stop Name Chelmsford Real time passenger Chelmsford Non team - This is a top up request to Remove from 1 Prison, Springfield Passenger Transport team Passenger Transport LCHE155028 £6,000 G information Parished existing £8k Section 106 funding of PSL Road, Chelmsford this scheme

Validation - Feasible to install Chelmsford Bus approx.30m of pedestrian guard rail. Measures to improve Chelmsford Non 2 Station, Duke Street, Bus Provider Passenger Transport LCHE165031 £6,000 As Duke Street is in a conservation G bus/pedestrian safety Parished Chelmsford area guard railing would need to reflect this (ornate/painted black)

The Street, nr Winkford Validated by Passenger Transport 3 Replacement bus shelter Parish Council Great Waltham Passenger Transport LCHE165034 £10,000 G Close, Little Waltham team

Upgrade bus stops - Raised Metsons Lane, Validated by Passenger Transport 4 kerbs and dropped crossing Passenger Transport team Highwood Passenger Transport LCHE165022 £12,000 G Highwood team point

Nr Allotments Blasford KEEP CLEAR road marking Scheme validated by Passenger 5 Parish Council Little Waltham Passenger Transport LCHE175001 £3,000 G Hill, Little Waltham in existing bus stop Transport team

Validated by Passenger Transport Heath Road, Ramsden team - Scheme includes removal of 6 Replacement bus shelter Parish Council Passenger Transport LCHE165033 £9,500 G Heath existing shelter, new base and then new shelter

Stop Name Woodham Validated By Passenger Transport 7 Hall, Main Road, New wooden bus shelter Parish Council Woodham Ferrers Passenger Transport LCHE155026 £10,000 G Team Woodham Ferrers

Pair of bus stops, raised Validated by Passenger Transport 8 Lordship Road, Writtle Passenger Transport team Writtle Passenger Transport LCHE165032 £9,500 G kerbs flags/poles team

Page 15 of 16 Chelmsford City Local Highway Panel - Potential Scheme list (Version 34)

Public Rights of Way

Total Value of schemes £107,000

Section 19/10/17 Ref Location Description Problem Requested by Parish Scheme stage Cost Code Estimated cost Comments RAG 106 Sub-Group monies Decision

Unsurfaced paths now well Clear blocked Great Baddow used urban footpaths ditches/culverts, removed Validated by Public Rights of 2018/19 Priority 1 Footpaths 11, 12 & within housing estates, PRoW team Great Baddow Total scheme LCHE158008 £22,000 G vegetation, level/edge and Way team Scheme 67 provides access to lay all weather surfacing schools/shops/bus routes.

More signs to keep walkers PRoW network, Improvement measures to on PRoW network and Validated by Public Rights of 2018/19 Priority 2 Great & Little PRoW signage and bridge bridge improvement to PRoW team Great Leighs Total scheme LCHE158005 £14,000 G Way team Scheme Leighs improvements British Accessibility Standards

Great Leighs Water meadow/natural Surfacing and Drainage Validated by Public Rights of 3 Footpath 41 (Part springs affecting a well PRoW team Great Leighs Total scheme LCHE158006 £28,000 G improvements Way team of The Essex Way) used PRoW

Surfacing and Drainage Little Waltham improvements - 365m Path is routinely very Validated by Public Rights of 4 PRoW team Little Waltham Total scheme LCHE158007 £21,000 G Footpath 28 length and average 2m muddy throughout the year Way team width

Boggy and uneven surface Bridleway 10, Mill Bridleway 10 South in sections makes Validated by Public Rights of 5 Lane Ramsden Hanningfield Surface PRoW team Total scheme LCHE158003 £15,000 G bridleway a difficult route to Way team Heath Improvements follow for some users

Footpath 63, Footpath surface Footpath surface in need Validated by Public Rights of 6 PRoW team South Hanningfield Total scheme LCHE158010 £7,000 G South Hanningfield improvements with planings of improvement Way team

Page 16 of 16