COMPLETED CONTRACTS S# CLIENT PROJECT VALUE (QR) CONTRACT DURATION 1 KENTZ OFFSHORE HALUL ISLAND – SCAFFOLD 420,000/- 01-MAR-2000 TO 28-FEB-2001 (1 YEAR) MANPOWER SUPPLY 2 QAFCO UREA 2 PRILL TOWER SHUTDOWN - 178,530/- 22-APR-2000 TO 09-MAY-2000 (18 DAYS) SCAFFOLDING WORKS 3 QATAR PETROCHEMICAL SERVICES QP OFFHSORE MAINTENANCE- SCAFFOLD 160,0000/- 01-APR-2000 TO 01-DEC-2000 (8 MONTHS) MANPOWER SUPPLY 4 TRAGS QP NGL 1, 3 & MEROX SHUTDOWN MESAIEED 950,000/- 04-AUG-2000 TO 04-NOV-2000 (3 MONTHS) SCAFFOLDING WORKS 5 CAPE EAST QAPCO SHUTDOWN MESAIEED SCAFFOLDING 320,000/- 01-AUG-2000 TO 1-NOV-2000 (3 MONTHS) WORKS 6 CCIC QVC PROJECT- SCAFFOLDING FOR COLUMN, 530,000/- 10-OCT-2000 TO 10-MAR-2001 (5 MONTHS) VESSEL, PIPERACK & PIPELINE 7 MASCO NODCO EXPANSION PROJECT -SCAFFOLDING 1,200,000/- 01-NOV-2000 TO 01-JUL-2001 (8 MONTHS) FOR INSULATION & FIREPROOFING 8 MECON QP NGL-4 EXPANSION PROJECT LNG TANK 90,000/- 01-NOV-2000 TO 15-DEC-2000 (45 DAYS) MESAIEED-INTERNAL TANK SCAFFOLD. 9 LLOYD INSULATION QAPCO MESAIEED –SCAFFOLDING FOR 2 TANKS 96,000/- 01-DEC-200 TO 01-JUN-2001 (6 MONTHS) 10 QAFCO UREA 1 PRILL TOWER SHUTDOWN MESAIIED- 1,500,000/- 10-MAR-2001 TO 18-AUG-2001 (160 DAYS) SCAFFOLDING WORKS 11 DOPET QP OFFSHORE PS 3 SHUTDOWN-SCAFFOLDING 200,000/- 15-APR-2001 TO 15-JUN-2001 (2 MONTHS) WORKS 12 GITIC ENGINEERING QP, NGL2 SHUTDOWN –SCAFFOLDING FOR 315,000/- 15-APR-2001 TO 15-JUIN-2001 (2 MONTHS) COMPRESSOR HOUSE & PIPERACK 13 DOPET AL KHALIJ FIELD DEVLPMNT PHASE2-EPIC OF 290,000/- DAY WORK CONTRACT F ROM HALUL- SCAFFOLD MANPOWER/MATERIAL 15-APR-2001 TO 15-OCT-2001(6 MONTHS) SUPPLY 14 DOPET BP/ARCO JOINT VENTURE – OIL 1,800,000/- 20-MAY-2001 TO 20-OCT-2001 (5 MONTHS) DEVELOPMENT PROJECT SCAFFOLDING 15 MECON QP, NGL 4-ARAB’D’ -SCAFFOLD 4,200,000/- DAYWORK CONTRACT FROM 01-JUN-2001 MANPOWER & MATERIAL SUPPLY 16 HYUNDAI QP, NGL 4-ARAB’D’ DUKHAN-SCAFFOLDING 3,800,000/- 01-JUL-2001 TO 01-MAR-2003 (20 MONTHS) WORKS 17 AL MUFTAH HADI HAMAMCO QP REFINERY MESAIEED SHUTDOWN 350,000/- 01-SEP-2001 TO 01-NOV-2001 (2 MONTHS) SCAFFOLDING WORKS 18 AL MUFTAH HADI HAMAMCO QP PLANT, KHATIYA SOUTH/PUMP 80,000/- 10-DEC-2001 TO 10-JUN-2002 (6 MONTHS) SATION/JELEYHA/FAHAHIL MAIN/DUKHAN SHTDWN 19 DOPET QATARGAS RASLAFFANN, SULPHUR 270,000/- 18-JAN-2002 TO 18-MAR-2002 (2 MONTHS) JETTY/CONVEYOR SCAFFOLDING WORKS 20 QBC T-9 TANK, SOUTH RETURN EFFLUENT 262,000/- 20-APR-2002 TO 20-AUG-2002 (4 MONTHS) TANK 21 QPSC QP OFFSHORE FIELD MAINTENANCE 200,000/- DAYWORK CONTRACT FROM 01-APR-2002 SCAFFOLDING WORKS 22 AMSA ENERGY QP PLANT ARAB D, KHATIYAH MAIN, KHATIYAH 340,000/- 01-JUL-2002 TO 01-JAN-2003 (6 MONTHS) SOUTH - DUKHAN SCAFFOLD WORKS 23 AIB VINCOTT QP PLANT FAHAHIL STRIPPING PLANT, FAHAHIL 180,000/- 01-JUL-2002 TO 01-DEC-2002 (5 MONTHS) MAIN JALEEHA SCAFFOLD WORKS 24 QAFCO 5 YEAR FAME CONTRACT – SCAFFOLDING 16,000,000/- 01-SEP-2002 TO 01-SEP-2007 |(5 YEARS) WORKS 25 G & H GULF W.L.L RASGAS EXPANSION PROJECT – SCAFFOLDING 3,500,000/- 01-JAN-2002 TO 01-JAN-2005 (3 YEARS) WORKS 26 DOHA MARINE SERVICE QP OFFSHORE – SCAFFOLDING WORKS 500,000/- 01-FEB-2002 TO 01-FEB-2005 (3 YEARS) 27 MANCO INTERNATIONAL RASGAS EXPANSION PROJECT – SCAFFOLDING 500,000/- 01-AUG-2002 TO 01-JUN-2003 (10 MONTH) WORKS 28 MANWEIR DGL PROJECT DUKHAN FIELDS – SCAFFOLDING 80,000/- 05-AUG-2002 TO 05-NOV-2003 ( 3 MONTHS) WORKS 29 AL MUFTAH HADI HAMAMCO QAFCO 3 SHUTDOWN – SCAFFOLDING WORKS 60,000/- 01-DEC-2002 TO 12-DEC-2002 (12 DAYS) 30 QATARGAS 3 YEAR FRAME CONTRACT – SCAFFOLDING 3,000,000/- 01-DEC-2002 TO 01-DEC-2005 ( 3 YEARS) WORKS

PAGE 1 OF 3

COMPLETED CONTRACTS S # CLIENT PROJECT VALUE (QR) CONTRACT DURATION 31 QAFCO UREA 3 PRILL TOWER SHUTDOWN – 300,000/- 08-FEB-2003 TO 24-MAR-2003 (45 DAYS) SCAFFOLDING WORKS 32 GITIC ENGINEERING QAFCO 2 SHUTDOWN – SCAFFOLDING WORKS 95,000/- 08-FEB-2003 TO 24-MAR-2003 (45 DAYS) 33 AL MUFTAH CONTRACTING COMPANY QP,DUKHAN FIELD(KHATIYA MAIN SOUTH 170,000/- 10-MAR-2003 TO 23-APR-2003 (45 DAYS) /NORTH) SHUTDOWN- SCAFFOLD WORKS 34 OFFSHORE LOCATIONS 3 YEARS MAINTENANCE 4,800,000/- 15-APR-2003 TO 15-APR-2006 (3 YEARS) CONTRACT – SCAFFOLD WORKS 35 AL MUFTAH CONTRACTING COMPANY QP-NGL 2 MESAIEED SHUTDOWN – SCAFFOLDING 550,000/- 10-MAY-2003 TO 20-JUL-2003 (70 DAYS) WORKS 36 AL MUFTAH CONTRACTING COMPANY QP REFINERY MESAIEED SHUTDOWN – 120,000/- 01-AUG-2003 TO 31-AUG-2003 (30 DAYS) SCAFFOLDING WORKS 37 SAMSUNG CORPORATION E&C GROUP NGL,MESAIEED LPG TANK PROJECT – 13,500,000/- 01-JUN-2003 TO 01-JUN-2005 (2 YEARS) SCAFFOLDING WORKS 38 ARCHIRODON CONSTRUCTION S.A EPIC OF TOPSIDE FACILITIES TO THE M.P.B. AT 1,200,000/- 01-JUN-2003 TO 01-JUN-2005 (2 YEARS) M.I.C.(MESAIEED)–SCFFLD WRKS 39 KAEFER RASLAFFAN POWER PLANT – SCAFFOLDING 250,000/- 01-AUG-2003 TO 01-FEB-2004 ( 6 MONTHS) WORKS 40 CCIC RASGAS EXPANSION PROJECT – TRAIN 3 800,000/- 01-AUG-2003 TO 01-FEB-2004 ( 6 MONTHS) SCAFFOLDING WORKS 41 MECON NGL,MESAIEED LPG TANK PROJECT – 200,000/- 10-DEC-2003 TO 10-APR-2004 (4 MONTHS) SCAFFOLDING WORKS 42 MECON RAS GAS EXPANSION PROJECT, LNG TANK – 300,000/- 01-DEC-2003 TO 01-JUN-2003 (6 MONTHS) SCAFFOLDING WORKS 43 HYUNDAI HEAVY INDUSTRIES CO. MAERSK OILFIELD OFFSHORE – SCAFFOLDING 200,000/- 10-JAN-2004 TO 10-APR-2004 (3 MONTHS) WORKS 44 AL-JABER ENGINEERING TSE TOWER WATER TANK (MESAIEED) – 400,000/- 12-JAN-2004 TO 10-APR-2004 (3 MONTHS) SCAFFOLDING WORKS 45 ANADARKO QP OFFSHORE PS4 – SCAFFOLDING WORKS 99,000/- 24-MAR-2004 TO 24-APR-2004 (1 MONTH) 46 AL MUFTAH CONTRACTING COMPANY QP REFINERY MESAIEED – SHUTDOWN 580,000/- 01-APR-2004 TO 01-JUN-2004 (2 MONTHS) SCAFFOLDING WORKS 47 AL MUFTAH CONTRACTING COMPANY QP, FSP DUKHAN FIELDS – SHUTDOWN 395,000/- 01-APR-2004 TO 01-JUN-2004 (2 MONTHS) SCAFFOLDING WORKS 48 AL MUFTAH CONTRACTING COMPANY QP, NG L 3 MESAIEED - SHUTDOWN 180,000/- 15-JUN-2004 TO 29-JUL-2004 (45 DAYS) SCAFFOLDING WORKS 49 MOSACO ( DUBAI ) C/O GARTNER AL SAAD SPORTS STADIUM (DOHA ) – 1,550,000/- 01-JUL-2004 TO 01-DEC-2004 (5 MONTHS) SCAFFOLDING WORKS FOR ROOF CLADDING 50 MID MAC/SIX CONTRACT KHALIFA SPORTS STADIUM ( DOHA ) – 480,000/- 01-SEP-2004 TO 01-JAN-2005 (4 MONTHS) SCAFFOLDING WORKS FOR ROOF CLADDING 51 CCIC RAS GAS EXPANSION PROJECT – TRAIN 4 950,000/- 01-SEP-2004 TO 01-MAR-2005 (6 MONTHS) SCAFFOLDING WORKS 52 DANEM ENGINEERING QAFCO 3 – SHUTDOWN SCAFFOLDING WORKS 160,000/- 01-NOV-2004 TO 01-JAN-2005 (2 MONTHS) 53 MOSACO-DUBAI KARAMHA BUILDING – SCAFFOLDING WORKS 650,000/- 01-DEC-2004 TO 01-MAY-2005 (5 MONTHS) FOR ENTIRE BUILDING CLADDING JOB 54 QATAR MASTERS DOHA GOLF CLUB – SCAFFOLDING WORKS & 280,000/- 15-FEB-2005 TO 15-MAR-2005 (1 MONTH) SEATING 55 MADINA GROUP QAFCO 1 – SHUTDOWN SCAFFOLDING WORKS 245,000/- 15-FEB-2005 TO 31-MAR-2005 (45 DAYS) 56 DOPET QP REFINERY MESAIEED – SHUTDOWN 2,600,000/- 01-MAR-2005 TO 01-JUN-2005 (3 MONTHS) SCAFFOLDING WORKS 57 IWI LIMITED LG PROJECT AT QP REFINERY, MESAIEED – 950,000/- 01-MAR-2005 TO 01-APR-2006 (1 YEAR) SCAFFOLDING WORKS 58 DOPET QP, OFFSHORE HALUL ISLAND – SCAFFOLDING 1,800,000/- 01-APR-2005 TO 01-JUL-2006 (15 MONTHS) WORKS 59 AL MUFTAH CONTRACTING COMPANY QP,OFFSHORE PS2/PS3/HALUL – SHUTDOWN 300,000/- 01-MAY-2005 TO 01-AUG-2005 (3 MONTHS) WORKS 60 JGC MIDDLE EAST FZE DOLPHIN ONSHORE FACILITIES EPIC PROJECT , 40,000,000/- 01-JUL-2005 TO 01-JAN-2008 (30 MONTHS) RASLAFFAN S –SCAFFOLDI WORKS 61 DANEM ENGINEERING RASLAFFAN POWER PLANT’B’ – SCAFFOLDING 1,100,000/- 20-AUG-2005 TO 20-MAY-2006 (9 MONTHS) WORKS 62 AL HASUN SE – JONG ELECTROMECH. RASLAFFAN POWER PLANT’B’ – SCAFFOLDING 3,400,000/- 01-OCT-2005 TO 01-APR-2007 (18 MONTH) WORKS

PAGE 2 OF 3

COMPLETED CONTRACTS S # CLIENT PROJECT VALUE (QR) CONTRACT DURATION 63 NORINCO RAMADA HOTEL EXPANSION PROJECT – 480,000/- 01-APR-2006 TO 01-JUL-2006 (3 MONTHS) SCAFFOLDING WORKS 64 DOPET QP OFFHSORE, HALUL ISLAND GTC 246/EF//03 – 700,000/- 01-MAY-2006 TO 01-MAY-2007 (1 YEAR) SCAFFOLDING WORKS 65 TOTAL E & P QATAR QP OFFSHORE – SCAFFOLDING WORKS 600,000/- 15-MAY-2006 TO 15-MAY-2007 (|1 YEAR) 66 TOTAL E & P QATAR QP OFFHSORE – SCAFFOLDING WORKS FOR 3,500,000/- 01-AUG-2006 TO 01-AUG-2008 (2 YEARS) MAINTENANCE 67 MARITIME INDUSTRIAL SERVICES EPIC OF HEAVY FUEL OIL BUNKERING FOR 3,000,000/- 01-NOV-2006 TO 01-NOV-2008 (2 YEARS) WOQOD, RASLAFFAN-SCAFFOLD WORKS 68 TRAGS QP, NGL MESAIEED SCAFFOLDING WORKS 600,000/- 15-APR-2007 TO 15-APR-2008 (1 YEAR) 69 DOLPHIIN DOLPHIN ONSHORE PROJECT – MAINTENANCE 1,500,000/- 15-MAY-2007 TO 15-MAY-2008 (1 YEAR) SCAFFOLDING WORKS 70 TRAGS RASGAS, RASLAFFAN – SHUTDOWN 600,000/- 01-JUN-2007 TO 01-AUG-2007 (2 MONTHS) SCAFFOLDING WORKS 71 TARGET ENGINEERING Q CHEM 2 PROJECT, MESAIEED – SCAFFOLDINGE 1,200,000/- 01-JAN-2008 TO 01-JAN-2009 (1 YEAR) WORKS 72 DANEM ENGINEERING QATAR NATIONAL CEMENT FACTORY - 300,000/- 15-FEB-2008 TO 15-APR-2008 (2 MONTHS) SHUTDOWN SCAFFOLDING WORKS 73 DANEM ENGINEERING QAFCO 1 MAJOR SHUTDOWN – SCAFFOLDING 300,000/- 20-OCT-2008 TO 20-NOV-2008 (1 MONTH) WORKS 74 DOPET QP REFINERY CABLE PULLING JOB 1020 Km 148,000/- 01-DEC-2008 TO 31-JAN-2009 (2 MONTHS) LONG 75 DOPET QP REFINERY SHUTDOWN-SCAFFOLDING WORKS 2,500,000/- 01-APR-2009 TO 30-APR-2009 |(1 MONTH) 76 WGI MIDDLE EAST QATARGAS II COMMON SULPHUR TANK (2 NoS) 396,000/- 01-APR-2009 TO 31-MAY-2009 (2 MONTHS) 77 QATARGAS QATARGAS II GTG EXHAUST STACK 165,000/- 15-JUN-2009 TO 31-JUL-2009 (45 DAYS) SCAFFOLDING 78 AL-JABER ENERGY QATARGAS II COMMON SULPHUR SCAFFOLDING 7,200,000/- 01-JUN-2007 TO 31-JAN-2010 ( 2 .5 YEARS) WORKS 79 SIMPLEX QATLUM PROJECT-MESAIEED, SCAFFOLDING 2,250,000/- 01-JUN-2008 TO 31-JAN-2010 (1.5 YEARS) WORKS 80 WGI MIDDLE EAST QATARGAS II COMMON SULPHUR SCAFFOLDING 4,200,000/- 01-APR-2009 TO 31-DEC-2009 ( 9 MONTHS) WORKS 81 PUNJ LLOYD QP REFINERY-MESAIEED, SCAFFOLDING WORKS 480,000/- 01-JUN-2009 TO 31-DEC-2009 ( 6 MONTHS)

82 AL-HUDA ENGINEERING QP REFINERY-MESAIEED, SCAFFOLDING WORKS 422,000/- 01-MAY-2009 TO 31-DEC-2009 ( 5 MONTHS) 83 DAEWOO ENGINEERING Q – CHEM II MESAIEED SCAFFOLDING WORKS. 70,000,000/- 01-JUL-2007 TO 30-APR-2010 ( 34 MONTH) 84 TECHNIMONT Q – CHEM II MESAIEED SCAFFOLDING WORKS. 3,600,000/- 01-JAN-2008 TO 30-APR-2010 (28 MONTH) 85 GOLTENS QATAR L.L.C QP OFFSHORE SCAFFOLDING WORKS 50,000/- 01-MAR-2010 TO 31-DEC-2010 ( 9 MONTHS) 86 VENTURE GULF DOLPHIN ONSHORE/OFFSHORE MAINTENANCE 4,800,000/- 01-JUN-2007 TO 31-JUN-20011 (48 MONTH) SCAFFOLING WORKS 87 DOPET QAFCO SHUTWON 1,50,000/- 01-APR-2011 TO 15-MAY-2011 (45 DAYS) 88 QAFCO 3 YEARS SCAFFOLDING WORKS FRAME 18,000,000/- 01-JUN-2008 TO 30-JUN-2001 (36 MONTHs) CONTRACT 89 GROUP 3 HAMAD MEDICAL CITY FITOUT FORMWORKS 1,500,000/- 01-MAR-2011 TO 01-JUN-2012 (15 MONTH) SCAFFOLDING FOR SLAB SUPPORT 90 TOPAZ MARINE QATARGAS OFFSHORE SCAFFOLDING WORKS 1.80.000/- 01-JUN-2011 TO 31-DEC-2012 (6 MONTHS) 91 REDCO AL-MANA QATAR FOUNDATION R&D COMPLEX 6,783,892/- 01-AUG-2013 TO 31-OCT-2015 (26 MONTH) SCAFFOLDING WORKS 92 NKOM NKOM DRY DOCKS AT RLIC – MARINE 2,250,000/- 01-MAR-2013 TO 29-FEB-2016 (36 MONTS) VESSEL/RIG MAINTENANCE SCAFFOLDING 93 QATAR PETROLEUM SCAFFOLDING SERVICES AT QP OFFHSORE 21,194,174/- 14-OCT-2012 TO 14-MAY-2016 (42 MONTH) LOCATIONS PS2/PS3/HALUL 94 TOTAL E & P QATAR SCAFFOLDING SERVICES FOR 5,002,500/- 01-APR-2012 TO 30-JUN-2017( 66 MONTHS) OFFHSORE LOCATIONS

PAGE 3 OF 3