1

2

ACKNOWLEDGEMENT

Brewarrina Shire Council acknowledges and pays its respect to the traditional owners and their nations of the Brewarrina local government area including the Ngemba, Murri Warri, Euahlayi, Weilwan, Ualari and Barranbinya people.

The contributions of earlier generations, including the elders, who have fought for their rights in managing the land, is valued and respected. Brewarrina Shire Council acknowledges that the traditional owners and their nations of the Brewarrina shire have a deep cultural, social, environmental, spiritual and economic connection to their land.

Brewarrina Shire Council understands the need for recognition of traditional owner knowledge and cultural values in the development of the Brewarrina Community Strategic Plan and supports the belief that by working together we can provide beneficial outcomes for traditional owners and all people of the Brewarrina shire.

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 3

CONTENTS

Acknowledgement 2 Message from the Mayor and General Manager 4 Introduction to Brewarrina Shire 8 Visions and Values (Community and Council) 10 Integrated Planning and Reporting 12 What is Council’s role? 14 The Councillors 15 Council Meetings and Committees 16 The Executive Management Team 17 Organisational Structure 18 Brewarrina’s Strategic Priorities 19 Brewarrina CSP and the NSW State Plan 20 How the Community Strategic Plan, Delivery Program and Operational Plan work together 26 How to Read the Strategy and Action Tables 27 Delivery Program and Operational Plan 30 Theme 1. A Growing Economy 30 Theme 2. A Healthy Natural Environment 59 Theme 3. A Caring Community 82 Theme 4. A Community with Integrated Leadership 115 Revenue Policy 131 Fees and Charges 2012/13 141 Budget 2012/13 172 Capital Works Budget 2012/13 213 Technical Services Works Program 2012/17 214

3

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 4

MESSAGE FROM THE MAYOR AND GENERAL MANAGER

It is with pleasure that Brewarrina Shire Council presents its first Delivery Program and one year Operational Plan in the new Integrated Planning and Reporting guidelines required by State Government Legislation. This fresh approach commenced in 2009 with community consultations and the development of community priorities as set out in the Brewarrina Community Strategic Plan. Since then, Council has developed a resourcing strategy that identifies Council’s current resources and the formulation of management plans for Council assets, finances and human resources for the next 10 years.

These documents inform the Delivery Program which sets out Council’s strategic direction for the next five years. This document balances Council’s obligation to deliver services the community wants, using the resources Council has and can afford to deliver.

These plans have highlighted the need for Council to find more efficient and effective ways of doing business. Putting this simply, Council either has to generate more income, become more efficient at delivering services to meet community expectations, or lower service levels in keeping with Council and community affordability. These are the challenges for Council in its endeavour to keep Brewarrina Shire viable and sustainable. Although there are many activities identified in the 20 year Community Strategic Plan, it is difficult for Council to fulfil community expectation with limited resources.

At this point, it is necessary to acknowledge that the Delivery Program and the Operational Plan are road maps to guide our shire into the future. Sometimes no matter how hard we plan there are always going to be unexpected and uncontrollable road blocks that challenge our way forward. Flood events and the uncertainty of annual grant incomes have a huge impact on Council’s operations and often require community priorities and resources to be scrutinised and re‐allocated. Council and the community have to make allowances for the unexpected, be realistic about what is achievable and apply a level of flexibility to the Delivery Program and the Operational Plan.

A frustration for Council is the expanding need to maintain and improve our road infrastructure to support economic growth of agricultural industry and services to our towns and villages. The recent 2012 flood magnified the inadequacy of the Brewarrina shire road network to transport products and services in and out of our shire, both during and after the flood event. More funding for roads is essential to sustain our local economy.

OPERATION PLAN 2012/2013

Major Events The two major events for Council will be;

1. Local Government Elections ‐ September 2012 The elections will provide another opportunity for the community to express its desires for the future. We encourage civic‐minded citizens to nominate for Council and have a say in setting the future direction for your community. Councillors role is to act as a member of the governing body of Council and balance the obligation to represent the interests of individual constituents with the 4

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 5

need to make decisions on behalf of the whole community. It will be the new Council’s task to review the Delivery Program before 30 June 2013 and set the strategic direction for a further four years.

2. Brewarrina’s sesquicentennial (150 year) celebrations – 20th to 28th April 2013 Council recognises indigenous inhabited the Brewarrina area 40,000 years before the State of NSW proclaimed Brewarrina a town in 1863. Brewarrina’s history predates back to pre‐ historic times however our sesquicentennial anniversary is a celebratory milestone for our modern history. Council is working with the sesquicentennial committee to deliver activities from the 20th to 28th April 2013 and encourages the community to get involved.

Income In looking to the future, and in order to fund its service delivery requirements in increasingly difficult economic times, Council has implemented the following changes to its rating structure for the 2012/13 financial year.

1 General fund rate increase Brewarrina Shire has one of the smallest rate bases in NSW, with a general rate income in 2011/12 of $882,540. Council has considered and adopted a rate increase of 3.6% for the 2012/13 financial year, which is the maximum increase allowable under the State Government’s rate pegging legislation. In real‐terms this rate increase will only generate an additional income of $31,770 per year and for the average town dweller, will result in an increase of around $10.00.

2 User‐pays filtered water Council has installed water meters to all households receiving a filtered water service which will generate a user‐pays water charge instead of the historical flat water rate for each rateable property. Unfiltered water will not be metered and a common access charge will be applied to all connected properties. Water meter billing will commence on the 1st July 2012 and conservative water users can expect to see savings and those who use filtered water more liberally can expect to pay for the privilege. It will operate in exactly the same way as your electricity account in that the more you use, the more you pay.

Expenditure Highlights Within this document, Council has identified priorities and capital works projects for completion in the 2012/13 financial year.

1 Repairs and maintenance to the Brewarrina Community Centre Council has applied to borrow funds of $250,000, to repair and maintain the Brewarrina Community Centre.

2 Upgrade of Brewarrina sand filter As a matter of urgency, Council has applied to borrow funds of $250,000, to replace the Brewarrina sand filter and ensure the future water quality for Brewarrina town residents.

5

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 6

3 Upgrade of local rural roads and regional rural roads Council has allocated; ƒ $633,567 to re‐sheet local rural roads including the Monkey Bridge, Narran Lake and Goodooga‐Langboyd Roads ƒ $203,763 to reseal sections of road on the Jobs Gate and Goodooga Roads ƒ $328,883 to gravel sections of the Goodooga Road

4 Upgrade of town streets Council has allocated $35,492 to reseal existing pavement on Bourke St (Between Darling and Sandon St) and Bathurst St (between Young and Belmore St).

5 Customer service standards Council will develop and adopt customer service standards across the organisation to ensure staff and residents / ratepayers have a clear understanding of what Council’s level of customer service is.

6 Corporate governance and risk management Council will ensure corporate governance compliance and risk management obligations are met.

7 Achieve best practice in water and sewer management During 2012/13, Council will achieve best practice in water and sewer services as outlined by the Lower Macquarie Water Users Association.

8 Waste management strategy Council will adopt and implement a waste management strategy to control waste in our towns and villages

9 Review of Brewarrina town master plan Council will work with business owners in the Brewarrina CBD to review and develop a Brewarrina Town Master Plan that focuses on the aesthetics of our business district.

It is a busy, yet exciting year ahead for Council. Brewarrina shire is full of opportunities and we to look forward to working with you to make our shire the best place to live and work for our residents and ratepayers.

Matthew Slack‐Smith Rod Shaw Mayor General Manager

6

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 7

Below: , “6 Mile” between Brewarrina and Walgett. Damages sustained during February 2012 flood (pictures 1 and 2) and repairs to the road in April 2012 (picture 3).

1

2

3 7

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 8

INTRODUCTION TO BREWARRINA SHIRE

Brewarrina is a rural and remote community located in the north west region of on the banks of the Barwon River, 800 km’s north west of Sydney.

The shire has a total population of 1944 persons (ABS 2006), spread over an area of 19,000 sq km’s and boarders the state line of to the north and is surrounded by the shires of Walgett, Warren, Bogan and Bourke. The nearest major population and regional centre is the city of Dubbo, approximately 400 km’s southeast of Brewarrina.

Brewarrina Shire covers approx. 2.4% of the total area of NSW and contains less than 0.036% of the total population, with one person for every 8.7 squ kms. In comparison Sydney, which covers 1.5 % of the total area of NSW, contains 62% of the total state’s population.

BREWARRINA SHIRE Brewarrina is the largest centre in the Shire, consisting of two Aboriginal reserves situated close to town (West Brewarrina and Barwon Four). The population of Brewarrina represents about 55% of the total population of the Brewarrina Shire.

In addition to Brewarrina, there are four other populated centres within the shire. The largest is the village of Goodooga in the north east of the shire with a population of approximately 265 residents. Not far from Goodooga on the north east border of the shire is the village of Angledool with an estimated population of 40 people. A further community of 63 people live at Weilmoringle in the north west of the shire, whilst a small fluctuating settlement of between 10‐40 persons reside at the village of Gongolgon 45 km south of Brewarrina. There is an estimated population of 400 persons living on rural properties (ABS 2006).

The shire population has steadily declined over the past eight census counts, with 320 persons leaving the district since 1991. As at the last census date the majority of the Brewarrina population were under 45 years of age, with one third younger than 15 years. A greater proportion of these younger people are amongst the Aboriginal population.

During 2006, Aboriginal people constituted the majority in each population grouping within the shire, with the exception of the rural locations, with a total Aboriginal population of 1279. The Aboriginal population of the shire has increased over the past ten years, as shown in the last three Census counts, with an increase of 216 between 1991 and 2006, representing 59.5% of the population at the time of the 2006 census.

The Brewarrina Shire is home to the Ngemba, Murri Warri, Euahlayi, Weilwan, Ualari and Barranbinya people. Brewarrina has great historical significance to the Aboriginal people of the region as the town was one of the great inter‐tribal meeting places of eastern with the unique fisheries or "Nghunhu”, sustaining hundreds of Aboriginal people during the tribal gatherings held prior to european settlement.

8

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 9

The fisheries are elaborate man made stone constructions in the riverbed designed to trap fish. The Brewarrina Fish Traps is an Australian heritage listed site and are of spiritual significance to Aboriginal people.

Brewarrina had a strong river boat culture during early colonial days and the historic Brewarrina lift span bridge, built in 1888‐1889 is still standing today. This bridge is one of the few remaining lift‐span bridges of its kind along the Barwon‐ system.

Agriculture is a strong sector of the Brewarrina economy and the area is a major producer of wool, livestock and a significant producer of cotton and wheat.

9

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 10

VISIONS AND VALUES

COMMUNITY VALUES The Integrated Planning and Reporting process has identified that the Brewarrina shire community values the following;

A relaxed lifestyle: through mateship, friendship, social interactions and the open spaces of our lands, the community has a self confidence and an acceptance of others;

A safe and secure community: Brewarrina shire residents seek equity and understanding within our diverse community;

Reaching our potential: we have so many opportunities ahead of us and through teamwork and perseverance we can succeed.

COMMUNITY VISION STATEMENT “A united and inspired community, valuing country and our heritage, working together for the future of our people and land”.

COUNCIL CORE VALUES Brewarrina Shire Council has adopted the following values as a guide on how it will deliver services; • Provide excellent customer service • Provide excellence in communications • Services provided by the organisation will be carried out with efficient allocation of resources • Be a fair and equitable employer and provider of services • Displaying commitment and cohesion between community, elected members and staff • Have a professional approach to work with the highest ethical standards and a businesslike manner across the organisation • Foster the development of staff through training • Reliance ‐ ensuring that the community, elected council and staff can rely upon each other • Maintain a clear focus on the vision and agreed goals • Earning and retaining the respect of the community

COUNCIL VISION STATEMENT “Build on the economic and social sustainability in order to preserve the rich heritage of the community.”

COUNCIL MISSION STATEMENT “To provide local employment, investment opportunities, enhanced lifestyle and an improved social framework by encouraging the development of the local community and its infrastructure”.

10

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 11

COUNCIL CHARTER Brewarrina Shire Council operates under the NSW Local Government Act 1993 charter, which contains a set of principles that guide the council in carrying out its functions to provide services to property and people.

Brewarrina Shire Council adopted, for its charter, Section 8 of the NSW Local Government Act (1993).

a. To provide directly or on behalf of other levels of government, after due consultation, adequate, equitable and appropriate services and facilities for the community and to ensure that those services and facilities are managed efficiently and effectively b. To exercise community leadership c. To exercise its functions in a manner that is consistent with and actively promotes the principles of multiculturalism d. To promote and to provide and plan for the needs of children e. To properly manage, develop, protect, restore, enhance and conserve the environment of the area for which it is responsible, in a manner that is consistent with and promotes the principles of ecologically sustainable development f. To have regard to the long term and cumulative effects of its decisions g. To bear in mind that it is the custodian and trustee of public assets and to effectively account for and manage the assets for which it is responsible h. To facilitate the involvement of councillors, members of the public, users of facilities and services and council staff in the development, improvement and co‐ordination of local government i. To raise funds for local purposes by the fair imposition of rates, charges and fees, by income earned from investments and, when appropriate, by borrowings and grants j. To keep the local community and the State government (and through it, the wider community) informed about its activities k. To ensure that, in the exercise of its regulatory functions, it acts consistently and without bias, particularly where an activity of the council is affected l. To be a responsible employer.

A Council, in the exercise of its function, must pursue its charter but nothing in the charter or this section gives rise to, or can be taken into account in, any civil cause of action.

11

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 12

INTEGRATED PLANNING AND REPORTING

Integrated planning and reporting is the framework for planning and reporting introduced by local governments across New South Wales from 2010. It aims to ensure that councils become better at reflecting community aspirations within their activity base. In order to ensure that this occurs, a new approach is being taken to develop annual budgets and programs.

Historically councils have developed a draft management plan and budget to look at a particular year’s activities and the community was asked to comment on this. Integrated planning is a long term outlook (10 years), based around a Community Strategic Plan reflecting the community’s aspirations.

In order to ensure this occurs the integrated planning model advocates a ‘three tier’ hierarchy of plans consisting of a Community Strategic Plan, a Delivery Program and an Operational Plan (see diagram below).

Long‐term Financial Plan Asset Management Plan Workforce Management Plan

Integrated planning and reporting framework

12

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 13

COMMUNITY STRATEGIC PLAN A requirement of the integrated planning and reporting (IP&R) framework is for all local councils in NSW to have a Community Strategic Plan (CSP) developed and adopted by 1 July 2012.

“The Community Strategic Plan provides a vehicle for expressing long‐term community aspirations. However, these will not be achieved without sufficient resources – time, money, assets and people – to actually carry them out”. Source: IPR Guidelines

The Community Strategic Plan should be developed and delivered as a partnership between council, state agencies, community groups and individuals. It should address a broad range of issues that are relevant to the whole community.

DELIVERY PROGRAM The Delivery Program outlines the principal activities council will undertake to achieve objectives set out in the Community Strategic Plan within the resources identified in council’s resourcing strategy.

The Delivery Program must include a method to measure the effective delivery of activities and includes how objectives will be met.

Each newly elected council will develop a Delivery Program that covers their 4‐year term outlining principal activities of the council, commencing on 1 July following the election

The General Manager is to report to Council on progress of the Delivery Program at least every 6 months.

OPERATIONAL PLAN The Operational Plan is a more detailed plan and explains how council will deliver activities identified in the Delivery Plan for a 12 month period.

The Operational Plan must: • Be adopted before the beginning of each financial year • Include the Statement of revenue policy • Be publicly exhibited for at least 28 days and public submissions can be made to council during this period for council to consider prior to adopting • Once adopted, the plan must be placed on the council’s website within 28 days

The General Manager will report to Council on the progress of the Operational Plan every 3 months.

13

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 14

WHAT IS COUNCIL’S ROLE?

Brewarrina Shire Council is a multi‐functional organisation which is responsible for more than just ‘rates, roads and rubbish’. Council’s now have a broader social mandate which means they have statutory responsibilities which extend into a wide range of activities. Activities undertaken by Brewarrina Shire Council in 2011/12 include;

ENVIRONMENT HEALTH AND BUILDING • Collect and manage the responsible disposal of residential and commercial waste • Control noxious weeds • Monitor water quality • Provide and operate swimming pool • Carry out functions to ensure the maintenance of acceptable public health standards (eg inspection of food premises, water analysis, reportable diseases) • Comply with legislative obligations in terms of planning and reporting • Control the keeping of companion animals • Install and maintain local playgrounds • Manage, maintain and operate community assets and infrastructure • Provide and maintain street signs and street lighting • Operate the local animal pound • Process planning and development applications • Process applications made under the Local Government Act 1993 (eg zoning, rates) • Operate and maintain local cemeteries throughout the shire

TECHNICAL SERVICES • Build and maintain roads, footpaths and bridges • Provide and maintain parks, reserves and sportsgrounds • Provide water supply and sewerage disposal for the shire • Respond to significant local emergencies • Provide and maintain urban stormwater systems • Assist SES, road authorities and other councils in keeping the public informed of floods, road closures • Operate and maintain aerodromes • Provide and maintain public toilets • Maintain levee systems to protect urban communities • Treat sewage effluent for beneficial reuse

CORPORATE AND COMMUNITY SERVICES • Preserve heritage sites • Facilitate community events such as NAIDOC Week, Australia Day and citizenship ceremonies • Provide library, RMS and Centrelink services • Provide access to dental services and support health services in the community • Listen to community views and advocate on their behalf • Support tourism services and provide visitor information services • Encourage economic development • Comply with legislative obligations in terms of reporting • Lobbying on behalf of the community

14

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 15

BREWARRINA SHIRE COUNCILLORS 2008 – 2012

Brewarrina Shire Council consists of nine democratically elected councillors to represent the residents and ratepayers of Brewarrina. NSW Local Government Elections are in September 2012, when a new Council is elected for a four‐year term.

Cr Matthew Slack‐Smith Cr Robert Wason, Cr Jenny Barker Mayor Deputy Mayor

Cr Mark Brown Cr John Burke Cr Angus Geddes Deceased 20 February 2012

Cr Angelo Pippos Cr Wayne Neale Cr Wulf Reichler

Brewarrina Shire Council would like to acknowledge the contribution from Cr John Burke who passed th away on 20 February 2012. Cr Burke was a valued colleague and friend, missed by his fellow councillors and staff of Brewarrina Shire Council.

15

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 16

COUNCIL MEETINGS AND COMMITTEES

Councillors make decisions regarding policies and programs within council meetings. Councillors are expected to attend all council and committee meetings, unless special leave is approved.

The General Manager and members of the Executive Management Team attend council meetings to provide information or advice as required.

Regular meetings of council are called 'ordinary meetings' and under the Local Government Act, councils are required to meet at least 10 times per year. 'extraordinary meetings' of council may be called to enable it to discuss and decide upon urgent matters.

The agenda for the meeting, ordinary Brewarrina Shire Council meetings are held in the Council Chambers, 57 Bathurst St, Brewarrina, on the fourth Friday of the month, commencing at 10.00am. Usually the May ordinary meeting is held at Weilmoringle and the October ordinary meeting is held at Goodooga.

Members of the public and the media are welcome to attend council meetings and view from the gallery, unless a matter under discussion is of a confidential nature. Council encourages public interest to promote transparent decision‐making and accountability to the community.

Deputations and representations are welcomed by council however notice to address council must be received in writing one week prior to the scheduled meeting or in an emergency, at the Mayor’s discretion.

16

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 17

THE EXECUTIVE MANAGEMENT TEAM The General Manager is the most senior employee of council and is the only member of staff selected and appointed by councillors. It is the General Managers responsibility to effectively and efficiently run day‐to‐ day operations, implement decisions without undue delay and exercise functions as delegated by council.

The role of Directors is to support the General Manger, manage the day‐to‐day operations of their respective business units and other functions as delegated by the General Manger.

Rod Shaw General Manager

• Governance • Economic and corporate development • Heritage services • Organisational strategic planning and reporting • Human resources • Integrated planning and reporting

Lynne Moore George Warne Director of Corporate & Community Services Director Technical Services

• Finance • Traffic management • Administration • Transport network • Records • Water and sewer supply and • Customer services treatment • Business services • Parks and gardens and reserves • Tourism and visitor services • Emergency management • Community information and events • Aerodromes • Community development • Infrastructure management • RMS services • Public health and environment • Centrelink services • Urban design and development • Library services • Waste management • Healthy communities program • Information technology • Brewarrina News • Risk management

17

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 18

ORGANISATIONAL STRUCTURE

18

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 19

BREWARRINA’S STRATEGIC PRIORITIES

COMMUNITY PRIORITIES

Council’s community consultation identified the following future priorities; ƒ Increase pride in our towns and villages ƒ Attract visitors to stop and stay and new residents to move to Brewarrina ƒ Maintain current services and improve access for residents to services ƒ Promote our point of difference as a community ƒ Create employment opportunities ƒ Conserve water and energy ƒ Foster a safe community ƒ Encourage residents to engage in community ƒ Involve our children and youth in decisions and activities ƒ Build community respect ƒ Build unity of purpose within the community ƒ Improve our sporting and recreational infrastructure ƒ Encourage residents and ratepayers to have a say in decisions affecting the community ƒ Develop local leaders

COMMUNITY STRATEGIC PLAN THEMES

These issues and challenges are organised in the following Community Strategic Plan themes and resonate through council’s Delivery Program and Operational Plan;

Theme 1 – A Growing Economy – strategies to grow the shire population so that local businesses can confidently grow and expand their workforce.

Theme 2 – A Healthy Natural Environment – strategies to improve the health of all rivers within the shire.

Theme 3 – A Caring Community – strategies to build increased pride and respect into our community.

Theme 4 – A Community with Integrated Leadership – strategies to promote co‐operation and integrated leadership within the community.

19

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 20

BREWARRINA CSP AND NSW STATE PLAN

NSW2021 – “A Plan to Consideration within Brewarrina Community Strategic Plan make NSW Number 1” Theme Outcome Objective Page number State Priority / Goals No. in CSP Rebuild the Economy 1 Improve the 1 Increase population, • Promote Brewarrina Shire as a 19 performance of the expand business and destination with a point of NSW economy grow the community to difference 21 achieve sustainability • Maximise tourism opportunities for the Brewarrina Shire

2 Rebuild State 1 Increase population, • Attract and retain business and 21 finances expand business and industry grow the community to • Promote local product achieve sustainability 3 Drive economic 1 Increase population, • Promote industry, investment 21 growth in NSW expand business and and new business opportunities grow the community to achieve sustainability

3 “Stop accepting • Incentives for employers mediocrity”. Respecting 24 ourselves and taking pride in our community are essential to move forward 4 Increase the 1 Increase population, • Attract and retain business and 21 competitiveness of expand business and industry doing business in grow the community to NSW achieve sustainability 5 Place downward 4 Inclusive community • Benchmarking quality of life 29 pressure on the cost decision making with and reporting of living stakeholders willing to take part and respect alternate ideas, enabling our community to move forward to allocate limited funds and resources for optimum results 6 Strengthen the NSW 1 Increase population, • Local and sustainable 22 skills base expand business and employment opportunities for grow the community to residents of the Brewarrina achieve sustainability Shire

20

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 21

Return Quality Services

TRANSPORT 7 Reduce travel times 1 Increase population, • Sustainable and viable public 22 expand business and transport to service community grow the community to need achieve sustainability 8 Grow patronage on 1 Increase population, • Transport links between towns, 22 public transport by expand business and villages and larger centres making it a more grow the community to attractive choice achieve sustainability 9 Improve customer 1 Increase population, • Residents of Brewarrina will 22 experience with expand business and have transport to ensure access transport services grow the community to to services achieve sustainability 10 Improve road safety 1 Increase population, • Set priorities to improve roads 21 expand business and in the Shire grow the community to achieve sustainability

HEALTH 11 Keep people healthy 3 “Stop accepting • A healthy community 26 and out of hospital mediocrity”. Respecting • Medical and dental services 27 ourselves and taking • Access to healthy foods pride in our community are essential to move forward 12 Provide world class 3 “Stop accepting • Health services of a 1st world 26 clinical services with mediocrity”. Respecting standard timely access and ourselves and taking effective pride in our community infrastructure are essential to move forward

FAMILY & COMMUNITY SERVICES 13 Better protect the 1 Increase population, • Sustainable employment for 22 most vulnerable expand business and Aboriginal and non‐Aboriginal members of our grow the community to residents of Brewarrina Shire community and achieve sustainability

break the cycle of 25 disadvantage 3 “Stop accepting • Child protection 26 mediocrity”. Respecting • Child safety ourselves and taking • Law and order 24 pride in our community are essential to move forward

21

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 22

14 Increase 3 “Stop accepting • Alternative and non‐traditional 24 opportunities for mediocrity”. Respecting educational pathways people with a ourselves and taking • Children with special needs will 25 disability by pride in our community have access to services providing supports are essential to move that meet their forward individual needs and realise their potential

EDUCATION 15 Improve education 1 Increase population, • Sustainable and viable public 22 and learning expand business and transport to service outcomes for all grow the community to community need students achieve sustainability

3 “Stop accepting • Education for all 24 mediocrity”. Respecting • Alternate secondary school ourselves and taking options pride in our community • Equitable access to education are essential to move • Access to before and after forward School activities • Engage youth in education 25

POLICE & JUSTICE 16 Prevent and reduce 3 “Stop accepting • Crime prevention 25 the level of crime mediocrity”. Respecting • Community justice ourselves and taking • Security and Policing pride in our community are essential to move forward 17 Prevent and reduce 3 Stop accepting • Community standards 25 the level of re‐ mediocrity”. Respecting offending ourselves and taking pride in our community are essential to move forward 18 Improve community 3 Stop accepting • A safe community 25 confidence in the mediocrity”. Respecting justice system ourselves and taking pride in our community are essential to move forward

22

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 23

Renovate Infrastructure

19 Invest in critical 1 Increase population, • Develop, enhance and maintain 19 infrastructure expand business and private and public tourism grow the community to infrastructure achieve sustainability • Set priorities to improve roads 21 in the shire 2 Improve the health of our water sources, maintain • Viable and sustainable shire and improve essential infrastructure and services infrastructure that will enable our adaption to 23 the changing world and climate 20 Build liveable 1 Increase population, • Present our towns and villages 20 centres expand business and as clean, tidy, inviting and grow the community to visitor friendly achieve sustainability

3 “Stop accepting • Skill development, parents as 24 mediocrity”. Respecting role models, accepted and ourselves and taking understood work ethic pride in our community are essential to move forward 21 Secure portable 2 Improve the health of our • Adapt to water deficiencies 23 water supplies water sources, maintain and improve essential infrastructure that will

enable our adaption to the changing world and climate • Water access 27 3 “Stop accepting mediocrity”. Respecting ourselves and taking pride in our community are essential to move forward Strengthen our Local Environment and Communities

22 Protect our natural 2 Improve the health of our • Residents of Brewarrina seek to 23 environment water sources, maintain live in a healthy, natural and improve essential environment infrastructure that will • Recycle waste 24 enable our adaption to the changing world and climate

23

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 24

23 Increase 2 Improve the health of our • Murray Darling Maintenance 23 opportunities for water sources, maintain Force people to look after and improve essential their own infrastructure that will neighbourhood and enable our adaption to environment the changing world and climate 24 Make it easier for 3 “Stop accepting • Community ownership and 26 people to be mediocrity”. Respecting stewardship involved in their ourselves and taking • Activities for all communities pride in our community • Volunteerism 27 are essential to move forward 25 Increase 3 “Stop accepting • Activities for seniors 27 opportunities for mediocrity”. Respecting seniors in NSW to ourselves and taking fully participate in pride in our community community life are essential to move forward 26 Fostering 1 Increase population, • Sustainable employment for 22 opportunity and expand business and Aboriginal residents partnerships with grow the community to Aboriginal people achieve sustainability 27 Enhance cultural, 3 “Stop accepting • Activities for all 26 creative, sporting mediocrity”. Respecting • Parks and recreational areas and recreation ourselves and taking • Youth activities 27 opportunities pride in our community are essential to move forward 28 Ensure NSW is ready 3 “Stop accepting • Effective emergency 26 to deal with major mediocrity”. Respecting management emergencies and ourselves and taking natural disasters pride in our community are essential to move forward Restore Accountability to Government

29 Restore confidence 4 Inclusive community • Integrated local leadership 28 and integrity in the decision making with • CSP integrates with NSW State planning system stakeholders willing to Plan take part and respect • Continuous improvement alternate ideas, enabling our community to move forward to allocate limited funds and resources for optimum results

24

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 25

30 Restore trust in 4 Inclusive community • Effective delivery of State and 29 State and Local decision making with Federal Government funds Government as a stakeholders willing to • Accountability to the service provider take part and respect community alternate ideas, enabling • Accountability to the NSW our community to move Government forward to allocate limited funds and resources for optimum results 31 Improve 4 Inclusive community • Improve corporate governance 29 government decision making with skills transparency by stakeholders willing to • Accountability to the increasing access to take part and respect community government alternate ideas, enabling • Accountability to the NSW information our community to move Government forward to allocate limited funds and resources for optimum results 32 Involve the 4 Inclusive community • Integrated local leadership 28 community in decision making with • Community leadership decision making on stakeholders willing to • Leadership succession planning 29 government policy, take part and respect services and projects alternate ideas, enabling our community to move forward to allocate limited funds and resources for optimum results

25

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 26

HOW THE COMMUNITY STRATEGIC PLAN, DELIVERY PROGRAM AND OPERATIONAL PLAN WORK TOGETHER

Community Strategic Plan • Takes a 20 year outlook • Defines community priorities • Outlines strategies to achieve community priorities

OUTCOMES

STRATEGIES

Delivery Program • Normally takes a four year outlook – the length of a council’s term. A new Delivery Program is adopted by each new council • Looks at community priorities and the activities council will undertake to achieve them • Sets medium timelines to achieve community priorities

ACTIVITIES (PROGRAMS AND PROJECTS)

Operational Plan • Takes a one year outlook • Looks at activities (programs and projects) council will undertake to achieve the community Priorities during a specific financial year • Sets the performance measures to ensure the activities are being achieved

26

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 27

HOW TO READ THE STRATEGY AND ACTION TABLES

The Community Strategies 2022 (dark red) and Community Priorities 2012–2017 (dark blue) have been taken directly from the Community Strategic Plan (CSP).

Note: Even though this is council's Delivery and Operational Plan the tables include all the priorities listed by the community in the Community Strategic Plan, even those the community considers to be the responsibility of other agencies.

Council Actions 2012–2013 (light blue) are what council intends to do over the next five years to try and achieve the community priorities.

Responsible Agency/Officer (green) identifies the organisation responsible for undertaking the strategy or action. If council is responsible for the strategy or action, the responsible officer(s) is also listed.

Capital Works Projects indicated in the current Operational Plan are identified as CWP (in orange).

Measures and Targets (Grey) indicates how we are going to measure whether or not we’ve achieved the actions.

The stars indicate the year or years in which the action(s) will be carried out.  ‐ 2012/13

 ‐ 2013/14

 ‐ 2014/15

 ‐ 2015/16

 ‐ 2016/17

 ‐ 2017/18

27

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 28

ABBREVIATIONS AND ACRONYMS – Lead Agencies

ACRONYM STAKEHOLDER AHS Area Health Service (State Government) CWP Community Working Party BEA Brewarrina Enterprise Alliance WCMA Western Catchment Management Authority (State Government) BSC Brewarrina Shire Council (Local Government) DECCW Department of Environment, Climate Change and Water (Australian Government) DEEWR Department of Education, Employment and Workplace Relations (Australian Government) DET Department of Education and Training (State Government) I&I NSW Industry and Investment (State Government) LALC Local Aboriginal Land Council RMS Roads and Maritime Services (State Government) DPI NSW Department of Primary Industry (State Government) TAFE Technical and Further Education (State Government) RTO Regional Tourism Organisation (State Government) BBC Brewarrina Business Centre NFPO Not for Profit Organisations DLHPA Darling Livestock Health and Pest Authority DAA Department of Aboriginal Affairs (State Government) ICC Indigenous Co‐ordination Centre (Australian Government) RFDS Royal Flying Doctors Service DoCS Department of Community Services (State Government) AG NSW Attorney General's Department (State Government) FaCSIA Family and Community Services Indigenous Affairs (Australian Government) SES NSW State Emergency Services (State Government) RFS NSW Rural Fire Service (State Government) NFS NSW Fire Service (State Government)

28

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 29

ABBREVIATIONS AND ACRONYMS – Responsible Council Officers

ACRONYM COUNCIL POSITION NAME IN FULL GM General Manager MANEX Executive Management Team DCCS Director Corporate and Community Services DTS Director of Technical Services EA Executive Assistant HR Human Resource Manager EDO Economic and Corporate Development Officer TM Tourism Manager TO Tourism Officer FM Finance Manager AMC Administration Co‐ordinator RMS / Admin Road and Maritime Service / Administration Officer CDO Community Development Officer HCC Healthy Communities Co‐ordinator NE Newspaper Editor IT Information & Technology / Assets Officer RO Risk / Workplace Health and Safety Officer Tran Man Transport Manager UM Utilities Manager MEH&B Manager Environment, Health and Building EHBO Environment, Health and Building Officer WSS Water and Sewer Supervisor

29

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 30 DELIVERY PROGRAM AND OPERATIONAL PLAN

THEME 1: A GROWING ECONOMY The outcome we seek is to increase population, expand businesses and grow the community to achieve sustainability Our Key Challenges Performance Indicators We will track the achievement of our goals and strategies IMPROVE PRIDE IN OUR TOWNS AND VILLAGES through reporting and measurement indicators. This includes: improved appearance of our towns and villages ‐ to provide improved signage, to provide improved access to river facilities, to encourage business owners to improve their properties, Theme 1: Key performance indicators and to develop an improved identity through a new culture of pride and respect Results of a community survey, conducted within three years and then every four years for the life of the Community Strategic ATTRACT VISITORS TO STOP, STAY AND ATTRACT MORE RESIDENTS Plan, measuring community satisfaction and perceptions A dollar invested in our businesses will be circulated in the community many times over. Our task is regarding efforts to improve community connectedness and to ensure we provide reasons for visitors to head in our direction, to be welcoming when they arrive community wellbeing. and encouraged to stop, stay and invest in our businesses. Find reasons for people to come, live, and work in the shire so we increase our population and sustain and grow our services and facilities. Outcome Performance indicators for Community SHOPPING LOCAL Increase visitation to the Brewarrina Visitor Encourage businesses to re‐locate to our towns and villages and encouraging local residents to Information and Cultural Centre support those businesses and keep money local rather than spending in other towns. Increased number of ‘hits’ on Brewarrina tourism website PROMOTING OUR POINT OF DIFFERENCE Increase number of businesses in Brewarrina LGA Our location and our heritage provides an opportunity for Brewarrina to develop a point of difference Reduce unemployment figures for the Brewarrina to other competing river towns – decide on an image and brand and actively promote that identity. LGA

CREATE EMPLOYMENT Increased levels of investment/development in This is the most significant challenge facing the Shire for the future – how to increase employment Brewarrina shire across the Shire, particularly within the Aboriginal community? We need employment stability – Increased levels of retail spending providing long‐term opportunities rather than short‐term contract commitments.

27

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 31

THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 E1. Promote Brewarrina Shire as a destination with a point of difference E1.1 Make E1.1.1 Promote Brewarrina’s features, Council, Local Brewarrina a facilities and events media preferred E1.1.1.1 Identify, develop and mentor Council: TO Number of products 3       place to stop potential product identified / year and stay

E1.1.1.2 Promote identified product and Council: TO Stock photo database       facilities to enhance the vision of developed

a stop and stay destination • Stock photo database for promotional material • Promote the Shire through advertising

E1.1.1.3 Coordinate and / or promote Council: TM Community and visitor       community and civic events, satisfaction and

including attendance • Australia Day • International Men’s and Women’s Days • Carols By Candlelight 28

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 32 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 • Farmers’ Markets

E1.1.1.4 Develop and maintain Brewarrina Council: TM / EA Website developed       Shire Council Website Web maintenance Weekly

occurring Number of visitors to TBD website % increase in visitors to 10% website – per annum

E1.1.1.5 Explore appropriate electronic Council: TM Number (occasions) & TBD  and social marketing strategies type of electronic &

and implement as resources social marketing permit strategies implemented – per annum

E1.1.1.6 Integrate electronic and social Council: TM Electronic & social marketing strategies  marketing strategies into reflected in strategy

Tourism and Events Strategy

E1.1.1.7 Produce print media to promote Council: NE Produce 24 papers a year       Brewarrina and the Brewarrina

Shire via: • Development of human interest stories and historical stories to 29

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 33 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 peak the interest of the travelling public E1.1.2 Promote and restore Brewarrina’s Council: EDO heritage and places of historical value

E1.1.2.1 Promote, co-ordinate and acquit Complete annually   Brewarrina Shire Council’s annual Heritage Fund E2. Maximise tourism opportunities for the Brewarrina Shire

E2.1 Develop E2.1.1 Develop Brewarrina as a destination Council a tourism (and (stop and stay) by linking it with events) other tourism products strategy E2.1.1.1 Maintain partnerships with Memberships with 2 per year       tourism organisations tourism organisations

E2.1.1.2 Identify and develop tourism Council: TM Number of Products 1 per year      products in Brewarrina and the developed

local region

E2.1.1.3 In line with E1.1.1.1, consider Council: TM Number of 2 per year       opportunities for: opportunities identified

• Supporting the development of and pursued

30

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 34 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 Aboriginal tourism operators by       promoting product to visitors

• Other local government area product that links to Aboriginal history and potential product

E2.1.1.4 Develop new and existing Council: TM Number of new 1 per year

products which will enhance products developed

Brewarrina as a stopover such as Number of existing 1 per year  self-guided walks or drives products developed  through the Shire  • Public art  • Bike tours • Historical tour • Biame’s fountain

E2.1.1.5 Develop, implement and evaluate Council: TM Strategy implemented TBD      Tourism and Events Strategy and outcomes achieved

annually and amend as required E2.1.2 Celebrate and promote our river Council / WCMA systems / Community

E2.1.2.1 Identify opportunities for the Council: TM Number of 2 per year       celebration and promotion of our opportunities identified

31

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 35 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 river systems, including: Number of 1 per year   • Sesquicentennial (150 year) opportunities celebrations implemented • The Biennial Festival of the Fisheries

E2.1.2.2 Elevate the importance of rivers

in the Brewarrina Shire to

residents and visitors • Include our rivers when developing a promotional strategy and promotional material for the Brewarrina Shire • Where resources and funding are available support events that focus on our river culture (Carp competition, events at the fishtraps) • Identify links between river culture and Aboriginal history and promote E2.1.3 Promote tourism opportunities for Council Opportunities reflected 1       Brewarrina and the Region in strategy

E2.1.3.1 Where resources are available Council: TM

32

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 36 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 promote tourism opportunities as Council: TO part of tourism and events

strategy. Develop self-drive walks   or drives that include villages and areas of interest outside of Brewarrina (Cobb & Co pub crawl) • Link Bourke, Brewarrina and Lightning Ridge to create regional tourism product E2.2 Develop E2.2.1 Identify river culture and Indigenous Council a theme, history brand and E2.2.1.1 Conduct community stakeholder Council: TM / Number of 5  identity for consultation on theme, brand and EDO / consultations held Brewarrina identity for Brewarrina Shire and Corporate Number of attendees at 50 Shire implement consultations (total of all events % stakeholders & 25% / 75% community involved in consultations Number of people 30 involved in focus

33

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 37 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 testing % stakeholders & 25% / 75% community involved in consultations E2.3 Promote E2.3.1 Develop a promotional strategy for Council       tourism using local tourism product a collaborative E2.3.1.1 Establish a local sponsored Council: TM approach Tourism Network and establish a Number and % of TBD / 50% service level for members of stakeholders attending sponsored tourism network network meetings Number of 1 per month communications with network outside of meetings E2.4 Increase E2.4.1 Develop a Plan of Management for 4 Council access to Mile Camping Ground current E2.4.1.1 Develop a plan of management Council: UM  recreational for the 4 Mile camping ground areas on the and consider the following river suggested community actions: • Level pads for caravan parking

34

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 38 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 in conjunction with Plan of Management • Install a new boundary fence at 4 mile E2.4.2 Upgrade Park Infrastructure at Weir Council Park   E2.4.2.1 Develop a Service Agreement Council: Service agreement to be negotiated & with the BBC outlining the GM/DCCS drawn up between BSC and Weir Park expectation of Council’s support Trustees for the Weir Precinct  E2.4.2.2 Develop a plan of management Council: UM As per service agreement develop a for Weir Park and consider the park plan and works program for Weir following community suggested Park actions; Council: UM Implement park plan Targets as • Remove dead tree in Weir and works program for per plan Park Weir Park • Repair / replace lookout over Weir and fish traps • Install garbage bins in Weir Park E2.4.3 Maintain and improve facilities at the Council Boat Ramp

35

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 39 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7

E2.4.3.1 Develop a plan of management Council: UM  for the boat ramp park and consider the following community suggested actions; • toilet facilities • Install irrigation system for lawn areas • Provide access to filtered water • Build a small boat jetty • Install a caravan waste disposal dump E2.5 Enhance E2.5.1 Brewarrina Aboriginal Museum be a BBC / Museum and maintain primary tourism attraction Steering private tourist Committee  infrastructure E2.5.1.1 Council to write to primary Council: GM stakeholder and inform them of CSP priority E2.5.2 Ensure the Brewarrina Aboriginal BBC / Museum Museum is effectively managed and it is Steering financially sustainable committee

 E2.5.2.1 Council to write to and inform Council: GM

36

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 40 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 them of CSP priority E2.5.3 Work together to pool resources and BBC / Museum support the Brewarrina Aboriginal Museum Steering to reach its potential committee  E2.5.3.1 Council to write to primary Council: GM stakeholder and inform them of CSP priority E2.6 Enhance E2.6.1 Investigate the relocation of the Council and maintain Brewarrina Caravan Park to the river public tourist adjacent to Weir Park  Infrastructure E2.6.1.1 Investigate the relocation, which Council: MANEX would include lobbying and applying for funds from external sources as opportunity arises

E2.6.2 Improve tourism attractions and Council interpretive signage  E2.6.2.1 Develop a Service Agreement Council: GM / with the BBC outlining the MANEX expectation of Council’s support Weir / Fishtrap Precinct

37

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 41 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7

      E2.6.2.2 Develop and maintain visitor Council: TO Number of visitors, on TBD

information services in the VICC, average per month including: % increase in visitors, 10% • Tourism promotion and services per annum • Retail • Meeting and conferencing Number of conferences 50 facilities & meetings held, per • Art Gallery space annum • Access to public toilets • Accommodation and tour booking services

E2.6.2.3 In consultation with Tourism Council: TM Works identified and 1

Network, community and other prioritised

stakeholders, identify and Works Plan developed 1

prioritise local tourism  infrastructure for inclusion in Council’s Asset Management Plan. • Watering system around VIC and plants • VIC Kitchen • Electricity to the auditorium back 38

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 42 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 room • Replace asbestos roof on bowling shed      E2.6.2.4 Identify and pursue funding Council: TM Number of 4

opportunities to enhance local opportunities identified tourism infrastructure and & pursued, per annum projects Number & amount of • Outback Regional Art Gallery grants received, per annum E2.6.3 Seal the Goodooga Road, through to Council the State boundary      E.2.6.3.1 Lobby for funding and Council: DTS

implement as funds are available

E2.7 E2.7.1 Businesses to attract, retain and Tourism Sustainable develop managers / management systems Operators tourism to support sustainable tourism businesses E2.7.1.1 Council to identify and write to Council: GM Letters written to key TBD  and product s and inform them of CSP tourism stakeholders priority

39

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 43 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 E2.8 Present E2.8.1 Review the 2001 Brewarrina Town Council our towns and Master Plan and Implement villages as E2.8.1.1 Undertake review of the Town Council: TM /   clean, safe, Master Plan with business EDO / UM tidy, inviting owners to develop an aesthetic and visitor plan for the Brewarrina CBD friendly E2.8.2 Open the Tourist Information Centre Council on weekends       E2.8.2.1 Review funding and develop Council: TM Open 100% of the scheduled opening

schedule of opening times hours as per plan E2.8.3 Improve the aesthetics of town and Council village entrances by erecting welcome signs as budget allows  E2.8.3.1 Develop a signage plan for Council: TM / Integrate into strategy 1 town and village entrances Tran Man

      E2.8.3.2 Identify specific areas to erect Council: TM / Integrate into strategy 1

signage Tran Man

      E2.8.3.3 Identify and erect types of Council: TM / Integrate into strategy 1

40

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 44 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 signage that will be best suited Tran Man to the identified area E2.8.4 Improve the aesthetics of town and Council villages by planting trees   E2.8.4.1 When reviewing the Brewarrina Council: UM Implement park plan Targets as master plan, consideration is to and works program for per plan be given to the development of: tree plantings • Works plans for recreational areas and parks • A tree species planting list  E2.8.4.2 Develop plans of management Council: UM for Brewarrina and Goodooga cemeteries and consider the following community suggested actions; • Re-turf beam section at the cemetery  E2.8.4.3 Develop plans of management Council: UM

for Brewarrina and Goodooga racecourse grounds and consider the following community suggested actions; 41

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 45 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 • Upgrading toilet facilities at the showground (septic and sewer) • Installing irrigation at showground

E2.8.4.4 Develop plans of management Council: UM  for Brewarrina and Goodooga

parks and gardens and consider

the following community

suggested actions;

• Extending irrigation in Memorial Park to cover all grassed area (2" pipe larger) • Installing irrigation system at tennis court park • Installing irrigation system at Pat White park • Installing irrigation at Navena St Park • Installing irrigation at High St Park

E2.8.4.5 Develop management plans for  Geoff New Oval Brewarrina and Magpie Oval Goodooga and

42

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 46 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 consider; • Irrigation at Geoff New Oval • Repairing and maintaining toilets and change rooms at Geoff New Oval

E2.8.4.6 Develop plans of management Council: UM  for the entrances to Brewarrina

and villages in the Brewarrina

shire in conjunction with

E2.8.3.1

• Coolabah entrance • Walgett entrance • Bourke entrance E2.8.5 Improve the aesthetics of the Council Brewarrina Main street by planting more trees and flower beds

E2.8.5.1 Undertake review of the Council: EDO

Brewarrina master plan with the  business owners to develop an aesthetic plan for the Brewarrina CBD (see E2.8.1.1). Project to include; 43

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 47 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 • Street banners E2.8.6 Improve the aesthetics of the Council Brewarrina levee bank

E2.8.6.1 Develop / review levee bank Council: Tran M Implement levee bank Targets as  maintenance plans for maintenance plan and per plan Brewarrina and Goodooga and works program consider options for aesthetics including; • Plant native vegetation

E2.8.7 Ensure our towns and villages are Council clean and tidy  E2.8.7.1 Develop parks, gardens and Council: UM Implement park plans Targets as recreational reserve plans of and works program per plan management       E2.8.7.2 Maintain public open space and Council: UM Dangerous defects in parks responded

recreational facilities throughout to within 5 working hours the Shire Sportsground grass length maintained at less than 100mm Park grass length maintained at less than 150mm

44

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 48 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7       E2.8.7.3 Investigate concerns or Council: MEHB 90% of complaints responded to within

complaints in relation to 48 hours overgrown allotments and buildings in a state of disrepair       E2.8.7.4 Inspect food premises and other Council: MEHB All food premises inspected at least

premises to ensure the annually maintenance of good public health programs       E2.8.7.5 Conduct random litter control Council: MEHB Random litter patrols conducted

patrols to reduce the incidence annually of littering  E2.8.7.6 Design, develop and implement Council: CDO Implement campaign and measure “No Butts” campaign results

E2.8.8 Remove rubbish from businesses Council and private homes   E2.8.8.1 Develop a community clean up Council: MEHB 1 campaign conducted per year strategy that includes public education campaigns aimed at reducing the incidences of littering and removal of rubbish

45

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 49 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 from business and private homes E2.8.9 Remove rubbish visible to the public, Council from businesses and private homes       E2.8.9.1 Enter into correspondence or Council: MEHB 90% of complaints responded to within

issue notices, as required, to 48 hours clean up town blocks E2.8.10 Removal of untidy security bars and Council shutters from business premises and move to a uniform alternative   E2.8.10.1 Work with and support the Council: EDO / Brewarrina Enterprise Alliance TM / UM to develop a aesthetic program for the CBD (E2.8.5.1) E2.8.11 Encourage retailers to provide BEA / Business excellent customer service and welcome customers  E2.8.11.1 Council write to BEA and inform Council: GM them of CSP priority E2.8.12 Residents of Brewarrina Shire to BEA / Business welcome tourists and encourage them to

46

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 50 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 stay and spend       E2.8.12.1 Council to develop newspaper Council: NE

articles about the benefits of Two articles per year tourism to the local economy

E2.8.13 Improve public BBQ facilities Council  E2.8.13.1 Develop parks, gardens and Council: UM Implement park plans Targets as

recreational reserve plans of Capital Works and works program per plan management E2.9 Promote E2.9.1 Promote primary industry products – Farmers Local Product wheat, meat, cotton and wool

      E2.9.1.1 Council to develop newspaper Council: NE

articles about the benefits of Two articles per year agriculture to the local economy E2.9.2 Promote retailers and service BEA providers

 E2.9.2.1 Council write to BEA and inform Council: GM Letters written to key TBD them of CSP priority stakeholders E2.10 Set E2.10.1 Identify a hierarchy for road Council

47

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 51 THEME 1: A GROWING ECONOMY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “E”. Community Priorities 2012–2017 Responsible 201 201 201 201 201 Community 2017 Agency/Officer 2 to 3 to 4 to 5 to 6 to Strategies Council Actions 2012–2013 Measures and Targets for Council to 201 201 201 201 201 2012 - 2022 2018 3 4 5 6 7 priorities to maintenance and improvement  improve local E2.10.1.1 Develop a road maintenance Council: DTS / Communicate road priorities and levels roads plan in conjunction with the MANEX of service to the public Asset Management Plan and implement as determined

48

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 52

E2.10.2 Maintain existing highway, regional Council road and rural road infrastructure in the Shire       E2.10.2.1 Develop a road maintenance Council: DTS / Publicise road priorities and levels of

plan in conjunction with the MANEX service Asset Management Plan and implement as determined

 RURAL ROADS - Local   • Monkey Bridge Road - Gravel section of  road  • Narran Lake Road - Gravel section of road  • Goodooga-Langboyd Road - Gravel  section of road  • Monkey Bridge Road - Gravel section of 

road   • Collerina Road - Gravel section of road  • Goodooga-Langboyd Road - Gravel 

 section of road  • Goodooga-Langboyd Road - Gravel 

section of road 

• Goodooga-Langboyd Road - Gravel 

section of road   • Brenda Road - Gravel section of road 

• Brenda Road - Gravel section of road 

• Cowga Road - Gravel section of road   • Kahmoo-Dunsandle Road - Gravel

section of road  • Collerina Road - Gravel section of road 49

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 53  • Monkey Bridge Road - Gravel section of   road  • Monkey Bridge Road - Gravel section of   road  • Fingerpost Road - Gravel section of road

• Goodooga-Langboyd Road - Gravel

section of road

• Narran Lake Road - Gravel section of road 

• Yarrawin Road - Gravel section of road

• Collerina Road - Gravel section of road 

• West Culgoa Road - Gravel section of

 road

• Collerina Road - Gravel section of road  • Jobs Gate Road (Beyond) - Gravel section 

of road 

RURAL ROADS - Regional 

• Jobs Gate Road (to) - Reseal section of

road 

• Goodooga Road - Gravel section of road 

Stages 1& 2

• Goodooga Road - Reseal section of road 

• Goodooga Road - Reseal section of road  • Jobs Gate Road (to) - Reseal section of road

• Goodooga Road - Gravel section of road 

• Goodooga Road - Gravel section of road  • Goodooga Road - Gravel section of road

Stages 1 to 5 



TOWN STREETS

• Bourke St (Darling to Sandon) - Reseal 

Existing Pavement 50

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 54  • Bathurst St (Young to Belmore) - Reseal

Existing Pavement

• Adams St (Walgett to Brenda) - Reseal  Existing Pavement  • Adams St (Chandos to Walgett) - Reseal Existing Pavement • Adams St (Bankeet to Queensland) - Reseal Existing Pavement • Wilson St (Byron to Young) - Reseal Existing Pavement • Adams St (Brenda to Bankeet) - Reseal Existing Pavement • Adams St (Goodooga to Chandos) - Reseal Existing Pavement • Brenda St (Hammond to Doyle) - Reseal Existing Pavement • Brenda St (Adams to Hammond) - Reseal Existing Pavement • Bathurst St (Darling to Sandon) - Reseal Existing Pavement • Wilson St (Tarrion to Bokhara) - Reseal Existing Pavement • Brenda St (Bokhara to Adams) - Reseal Existing Pavement • Belmore St (Doyle to Bathurst) - Reseal Existing Pavement • Belmore St (Bourke to Wilson) Reseal Existing Pavement • Bathurst St (Young to Belmore) - Reseal Existing Pavement • Bathurst St (Sandon to Young) - Reseal Existing Pavement 51

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 55

LANEWAY SEALING PROGRAM • TSB 006.4L (Belmore to Tarrion) • TSB 026.2L (Young to Belmore)

E3. Promote industry, investment and new business opportunities

Attract and E3.1.1 Encourage new business to the Shire Council  retain E3.1.1.1 Develop a BSC economic Council: EDO Develop Policy and adopt business and development policy with industry consideration to: • Identify businesses opportunities for Brewarrina • Identify & work with organisations who support business (NSW I&I and RDA ) • Identify what incentives can be made available to new businesses and advertise

E3.1.2 Promote and sustain existing Council businesses    E3.1.2.1 Develop a strategy, highlighting Council : EDO Host Darling Every 2 years

businesses and services Agricultural Field Day provided in the area • Darling Agricultural Field Day

52

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 56       E.3.1.2.2 Facilitate and attract funding for Council : EDO Where available apply 1

mentoring and training for local for business training business people annually • I&I travelling experts program

      E3.1.2.3 Work with BEA to support local Council : EDO Bre Christmas 1

business incentives Promotion annually       • Buy Bre Christmas promotion Provide secretariat As needed

support to the BEA       E3.1.2.4 Provide Economic Development Council : EDO Services to the Brewarrina Shire E3.2 Support E3.2.1 Support network for Farmers with NSW Farmers / rural industry regular meetings Darling LHPA  E3.2.1.1 Council write to and inform Council: GM Letters written to key TBD them of CSP priority stakeholders E3.2.2 Facilitate education and development NSW Farmers / opportunities for the rural industry Darling LHPA  E3.2.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholders CSP priority E3.3 Attract E3.3.1 Ensure people are welcomed and Council and retain integrated into the Brewarrina community       new residents E3.3.1.1 Develop a strategy to identify Council: CDO Develop information As needed to Brewarrina new residents and their needs packs / community Shire and deliver relevant information booklet and distribute to new residents E4 Local and sustainable employment for residents of the Brewarrina Shire

53

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 57 E4.1 E4.1.1 Set employment targets for CWP / LALC Sustainable Aboriginal residents  employment E4.1.1.1 Council to write to primary Council: GM Letters written to key TBD for Aboriginal stakeholder and inform them of stakeholders residents CSP priority E4.1.2 Encourage, promote and support CWP / LALC Aboriginal employment incentives for business  E4.1.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholders CSP priority E4.2 E4.2.1 Set full-time employment targets for CWP / LALC Sustainable towns and villages in the Shire  employment E4.2.1.1 Council to write to primary Council: GM Letters written to key TBD for residents stakeholder and inform them of stakeholders CSP priority E4.2.2 Pursue every opportunity to create Council sustainable employment opportunities for local residents       E5.1.2 E4.2.2.1 Ensure Develop appropriate a BSC transporteconomic for NSWCouncil Ministry : EDO of Develop Policy and adopt

children to developmentaccess education policy (E3.1.1.1) Transport  E5 Residents of the BrewarrinaE5.1.2.1 Council Shire will to have write transport to primary to ensure accessCouncil to services: GM Letters written to key TBD

E5.1 E5.1.1 Developstakeholder an integrated and inform transport them of Council stakeholders Sustainable strategy forCSP the priorityBrewarrina Shire       E5.2and viable E5.2.1 E5.1.1.1 Air transport Council servicesto facilitate to ensure two CouncilTransport : CDO Facilitate transport 1 per year

Transportpublic way access tocommunication services and facilitiesbetween (air in agencies / RFDS providers meeting linkstransport to to and air out) transport providers

54

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 58  services and E5.2.1.1 Council to write to primary Council: GM Letters written to key TBD facilities not stakeholder and inform them of stakeholders available CSP priority locally E5.2.2 Local bus network between towns NSW Ministry of and villages (support the provision of Transport networks to ensure access by remote communities to services and facilities e.g. Goodooga to Lightning Ridge).  E5.2.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholders CSP priority

55

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 59

THEME 2: A HEALTHY NATURAL ENVIRONMENT The outcome we seek is to improve the health of our water sources, maintain and improve essential infrastructure that will enable our adaption to the changing world and climate Our Key Challenges Performance Indicators CONSERVING OUR WATER AND ENERGY We will track the achievement of our goals and strategies through reporting and It appears water shortages will be an ongoing challenge of the future and measurement of performance indicators. opportunities to retain and conserve available water supplies must be pursued. Energy renewal and conservation targets should be set, promoted and achieved. Theme 2: Key performance indicators Results of a Community Survey, conducted within three years and then every four SUSTAINABLE LIVING CHALLENGE years thereafter for the life of the Community Strategic Plan, measuring Adapt to water deficiencies and move to permaculture self sufficiency community satisfaction with the natural environment and Council infrastructure within the Shire. MAINTAINING OUR SERVICES AND IMPROVING ACCESS Ensure existing services and associated infrastructure is retained and improved to Outcome Performance indicators for Community meet the current and future needs of our community and visitors. Progress towards waste reduction targets IMPROVING OUR SPORTING AND RECREATION INFRASTRUCTURE Improved water quality in rivers and creeks Improving access to facilities by sharing resources eg Gaining permission to use Improved water quality and water delivery systems school sporting and recreational facilities for use by the wider community. throughout the Brewarrina LGA

56

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 60 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 H.1 Residents of Brewarrina Shire seek to live in a healthy, natural environment H1.1 Adapt to H1.1.1 Use urban water more effectively and Council water efficiently  deficiencies H1.1.1.1 Install and monitor water Council: DTS meters in Brewarrina and Goodooga       H1.1.1.2 Continue to be a member Council: DTS Continued compliance council of the Lower Macquarie Water Utility Alliance addressing trade waste management issues at a regional level       H1.1.1.3 Maintain water supply Council: UM Water supply infrastructure infrastructure to relevant NSW maintained in compliance with Health and NSW Office of Water relevant standards standards       H1.1.1.4 Maintain all sewer infrastructure Council: UM Sewer infrastructure maintained in in accordance with DECCW compliance with relevant regulations, regulations, EPA licence licence conditions and standards conditions, NSW Office of Water standards

57

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 61 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8       H1.1.1.5 Maintain stormwater drainage Council: UM Maintenance provided within budget to minimise the risk of property damage  H1.1.1.6 Increase skill level of water and Council: UM / HR Existing staff trained to compliance  sewer human resources 2 additional staff cross-trained in water and sewer       H1.1.1.7 Take samples and analyse Council: WSS Samples taken and analysed in potable water supplies accordance with NSW drinking water guidelines  H1.1.1.8 Develop and review a 10 year Council: DTS

Water management plan for the Brewarrina Shire to include suggested actions; Council: DTS

• Install new sand filter at the CWP Brewarrina water treatment plant • Undertake program to scour

raw water mains in Brewarrina

• Replace high lift pumps at the

water treatment plat - pumps

are aged and are unable to be re-serviced

58

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 62 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 • Install mag-flow meters at

Brewarrina and Goodooga

• De-silt raw water reservoir at water treatment plan

• Have all pump stations in shire

connected to telemetry • Refurbish old sand filter as a   stand-by unit for emergencies  • Upgrade telemetry software  • De-silt reservoirs at High St  and Church St CWP  • Undertake water main 

replacement program   28 – 42 Bourke Street  29 – 33 Crown Reserve   65 – 69 Barwon Street  42A - 42B Bourke Street   42 – 43 Bourke Street  59 – 66 Barwon Street 53 – 54 Darling Street 04 – 05 Culgoa Street

02 – 03 Burban Street

61 – 69 Bridge Street 59

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 63 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 66 – 67 Bridge Street 17 - 17A Byrock Road 51 - 51A Bathurst Street 66 – 69 Bridge Street 47 – 52 Bathurst Street 50 - 50A Bathurst Street

60

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 64 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8  H1.1.1.9 Develop and review a10 year Council: DTS

sewer management plan for

Brewarrina and villages in the

Brewarrina Shire to include;

• Install safety lids for Brewarrina sewer pump station • Replace control boxes for sewer at Billabong and Newtown pump

stations

• Re-sleeve sewer main behind St

Patrick's School

• Re-sleeve sewer main behind Brewarrina Central School • New oxidation ponds at sewer treatment plant - old ponds are

deteriorating

• Re-sleeve sewer main in Church

St  • Replace sewer pump line from 

 Billabong to St Patrick School laneway  • Upgrade sewer pump stations at  Brewarrina 

• Re-sleeve sewer main behind 61

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 65 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 RSL Club • Re-line man hole in Church St • Undertake sewer capital works program • Replace sewer mains - Collection Billabong • Replace sewer mains - Collection Brewarrina • Replace sewer mains - Transfer Billabong • Replace sewer mains - Transfer Newtown • Replace sewer mains - Transfer Brewarrina • Replace Sewage Pumping Stations - Culgoa St

62

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 66 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 H1.1.2 Use rural water more effectively and OEH efficiently  H1.1.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholders CSP priority H1.2 Viable H1.2.1 Sustain current waste management Council and sustainable and control practices       shire H1.2.1.1 Maintain all solid waste landfill Council: MEHB Landfill sites maintained in industry infrastructure sites to industry standard standard       and services H1.2.1.2 Continue the provision of waste Council: MEHB Services maintained

centres at Brewarrina, Goodooga Increase waste recycling and reuse at and Angeldool with a view to each landfill by 5% per annum  minimise waste to landfill  • New Brewarrina landfill  • New Angledool land fill • Gongolgon transfer station  H1.2.1.3 Investigate the feasibility of a Council: MEHB “manned” tip at Brewarrina  H1.2.1.4 Pre-treatment for all trade Council: WSS / waste discharges by 2014 MEHB

63

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 67 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8       H1.2.1.5 Maintain a regular garbage Council: MEHB Ensure service is monitored, revised collection service to Brewarrina and renewed as required and villages • New tip for Brewarrina  H1.2.1.6 Investigate feasibility of re- Council: MEHB instating in-house garbage services H1.2.2 Manage services to maintain our Council natural environment       H1.2.2.1 Manage our natural environment Council: EHB by providing environmental, health, building and town planning services to the Brewarrina Shire

      H1.2.2.2 Facilitate and assess Council: EHB 90% of development applications applications for development processed within 21 working days Development applications requiring referral/concurrence from Government agencies processed within 40 days       H1.2.2.3 Assess all development Council: EHB 100% compliance

64

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 68 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 applications to ensure compliance with legislative requirements       H1.2.2.4 Process planning certificate Council: EHB 95% of planning certificate applications applications processed within statutory timeframes (7 working days) 100% of urgent planning certificates processes within 2 working days       H1.2.2.5 Conduct building inspections as Council: EHB 100% of building inspections required conducted within 48 hours       H1.2.2.6 Monitor and review Brewarrina Council: MEHB Review planning policies 1 per Shire Council planning annum policies and update existing or develop new planning overlays and guidelines  H1.2.2.7 Undertake Local Environment Council: MEHB Preliminary review completed by Plan (LEP) reviews on a 3–5 2013 yearly basis H1.2.3 Control dogs and cats in our towns Council and villages

65

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 69 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8       H1.2.3.1 Enforce the companion animal Council: Ranger Minimum of two registration days strategy and Local Government conducted per year Act, including: 95% of calls responded to within 24 • Promoting the registration of hrs companion animals 5 campaigns conducted per year • Resolving complaints regarding stock on roads and domestic animals • Conducting public education campaigns aimed at reducing the incidences of littering, stray dogs/cats; and promoting the de-sexing of domestic animals, dog and cat registration, and microchipping       H1.2.3.2 Undertake random “blitz” on Council: Ranger 2 campaigns conducted per year non compliant owners of animals H1.2.4 Control weeds Council       H1.2.4.1 To inspect private and public Council: CWO 50 inspections conducted annually land to detect and assess

66

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 70 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 noxious weed infestations H1.2.4.2 To inspect and spray public land Quarterly road inspections to detect and assess weed infestations

H1.2.5 Council Safety Management (WH&S) Council       H1.2.5.1 Develop, implement and Council: RO Plan, action and reviewed annually regularly review workplace health and safety strategic plan       H1.2.5.2 Review WH&S audit schedule Council: RO WH&S audit schedule reviewed annually H1.2.6 Council Assets Council       H1.2.6.1 Provide engineering and Council: DTS technical services to the Brewarrina shire to maintain community assets   H1.2.6.2 Involve the community in Council: EDO / Implement a community survey by establishing priorities for MANEX December 2012 infrastructure and asset investment and maintenance in the short, medium and long-

67

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 71 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 term   H1.2.6.3 Consult with community Council: MANEX Implement a community survey by regarding levels of service December 2012

      H1.2.6.4 Develop a priority plan for the Council: DTS / Quarterly progress reports infrastructure and maintenance Assets Officer priorities identified in the Delivery Program and Asset Management Plan       H1.2.6.5 Develop an organisation-wide Council: MANEX Quarterly progress reports asset management system       H1.2.6.6 Provide efficient store services Council : Store Six monthly stock takes with <5% $ value variance of stock hand to book value stock

68

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 72 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8  H1.2.6.7 Investigate the redesign of the Council: Tran M Quarterly progress reports depot to consider: • Securely housing Council’s plant, stores and materials in an efficient and cost effective manner • Bunding around chemical storage • Redesigning depot layout to utilise unused buildings • Carrying out roof repairs to workshop • Improving security at Brewarrina depot • Increasing telephone / computer / information access between council chamber and depot • Improving lighting in the workshop • Installing electronic / automatic fuel bowsers • Introducing technology to store - computerised barcode for stocktake

69

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 73 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8  H1.2.6.8 Manage and provide an efficient Council: Tran M Quarterly progress report plant fleet that allows for the effective delivery of Council’s services and will consider the following suggested items: • Replace John Deer mower 651 • Replacing slasher tractor • Purchasing a suitable light truck for water and sewer that has capacity to hold all necessary call-out equipment • Involving plant operators in providing input into purchase of plant and tyres • Purchasing forklift for Brewarrina depot Plant replacement schedule for 2012/13 includes; • Toyota Aurion ATX CWP • Ford Courier 2WD • Toyota Hilux - Roads Crew • Toyota Hilux - Roads Crew 70

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 74 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 • Toyota Hilux - Roads Crew • Holden Commodore SV6 - Corporate Manager • Isuzu FVR900 • Trash Pump (diaphragm sewer pump) • Iseki Ride-on Mower (2006)

      H1.2.6.9 Manage all elements of contract Council: Directors Quarterly progress report services for the effective provision of goods and services for major procurement tenders and contracts       H1.2.6.10 Provide auxiliary services to Council: Tran M Quarterly progress reports the Brewarrina shire that include the management, maintenance and replacement of: • Footpaths • Kerb and gutter • Street lighting 71

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 75 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 • Standpipes  H1.2.6.11 Develop a maintenance plan for Council: Tran M footpaths in Brewarrina and Goodooga, which considers the following community recommendation: • Replacement of tiles in front of paper shop and Post Office       H1.2.6.12 Develop a pedestrian amenity Council: Tran M Quarterly progress reports mobility plan (PAMP) to provide technical assistance and advice relating to the facilitation of effective vehicle, cycle and pedestrian traffic movements and facilities PAMP       H1.2.6.13 Advocate to the RMS regarding Council: DTS Quarterly progress reports the installation of rest areas and amenities along Kamilaroi Highway       H1.2.6.14 Manage and operate quarries Council: Tran M Quarterly progress reports that provide suitable materials

72

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 76 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 to sustain council infrastructure

H1.2.6.15 Provide services to manage and maintain rural roads. Management plans to consider; • Implementing succession plan for urban and rural road crews • Re-sheeting causeway at Narran Lake road (S-Bend) 5 km • Reforming Bora / Whyman Road       H1.2.6.16 Lobby for funding to widen the Council: DTS Quarterly progress report Arthur Hall VC Way and increase 100 km restriction       H1.2.6.17 Lobby for funding to seal the Council: DTS Quarterly progress report Goodooga Road, initial seal - Warranilla worst section  H1.2.6.18Develop a grid replacement Council: DTS Quarterly progress report program for state and regional roads       H1.2.6.19 Lobby for funds to replace grids Council: Tran M Quarterly progress report on state and regional roads    H1.2.6.20 Undertake an assessment of Council: Tran M Have 50% of rural grids assessed by

73

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 77 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 rural grids and advise 2013, landholders of their 70% of grids assessed by 2014 and responsibility to repair and 95% of grids assessed by 2015 maintain grids.  H1.2.6.21 Asset management plan to Council: RS Quarterly progress report consider bridge infrastructure

related issues including:

• Repairing guardrails on bridge

approaches:

ƒ Narran bridge ƒ Charlton bridge ƒ Culgoa bridge • Birrie bridge to be tested for weight limits • Developing a replacement plan for Birrie bridge and lobby for funds to replace bridge • Lobbying for funds to design and construct a footbridge to West Brewarrina H1.2.7 Community buildings (infrastructure) Council       H1.2.7.1 Develop a community building Council: MEHB Ensure service is monitored, revised maintenance strategy, which and renewed as required

74

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 78 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 will consider: • Maintaining the Brewarrina swimming pool for public recreation       • Maintaining Brewarrina, Council: DTS Maintenance provided according to Goodooga airports and schedule Weilmoringle airstrip  • Installing a water storage tank Council: MEHB at Brewarrina airport       • Upgrading the community Council: MEHB centre

H1.2.7.2 Implement 2012/13 Council: MEHB

maintenance / capital works  program for buildings CWP  PAINT • Council Chambers and offices  • 5 King Street 

 SECURITY UPGRADE  • Council Chambers and Offices  • Goodooga water augmentation -  dwelling & contents  75

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 79 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8  • 17-19 Doyle Street, 4 aged units  • Dooral Street, store, carpenters  workshop, tyre store, office  • 13 Wilson Street, dwelling  • King & Barwon Streets, dwelling  • 3 Bourke Street, dwelling  • 5 Bourke Street, dwelling • 38 Church Street, dwelling • 5 King Street, dwelling • 32 Church Street, dwelling • 32 Dooral Street, dwelling • 128 Bathurst Street, dwelling • 2 Church Street, dwelling

H1.2.7.3 The asset management plan is Council: UM  to consider the following community building (infrastructure) issues: • Re-surfacing basketball courts near Geoff New oval and paint in lines  • Improving grandstand facilities Council: UM at Geoff New oval (repair

76

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 80 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 existing grandstand, new grandstand or spectator viewing hill with turf)  • Improving, maintaining and Council: UM repairing fencing around council buildings / reserves (Geoff New oval, shire chambers, VIC, youth centre etc)  • Sealing VIC carpark Council: Tran Man

H1.3 Murray H1.3.1 Employ local Aboriginal people to WCMA Darling undertake projects to improve water quality maintenance in our rivers  force H1.1.1.1 Council write to WCMA and Council : GM Letters written to key TBD encourage the championing of stakeholder Aboriginal involvement in WCMA projects incorporating Aboriginal cultural and heritage values H1.4 Recycle H1.4.1 Recycle glass, paper and plastics Council

77

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 81 THEME 2: A HEALTHY NATURAL ENVIRONMENT

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “H”.

Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8       waste H1.4.1.1 Continue to support the Council : MEHB provision of kerbside recycling services to the community       H1.4.1.2 Conduct community education Council : EHB Two community education campaigns promoting the campaigns conducted per year benefits of recycling and educating the community regarding which items can be recycled H1.5 Encourage H1.5.1 Investigate alternate energy use and NSW Farmers sustainable organic farming options  farming H1.5.1.1 Council to write to and inform Council: GM Letters written to key TBD practices them of CSP priority stakeholder H1.6 Land H1.6.1 Increase opportunities for tourism NSW Farmers owner around sustainability and farm-stays  involvement to H1.6.1.1 Council to write to and inform Council: GM Letters written to key TBD diversify them of CSP priority stakeholder employment opportunities

78

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 82

THEME 3: A CARING COMMUNITY

The outcome we seek is to “stop accepting mediocrity”. Respecting ourselves and taking pride in our community are essential to move forward

Performance Indicators Our Key Challenges FOSTERING A SAFE COMMUNITY We will track the achievement of our goals and strategies through reporting and Lack of economic opportunity or social dislocation has created safety and security measuring performance indicators. issues within the community. The root cause to be identified and opportunities provided to those affected. Theme 3: Key performance indicators Results of a Community Survey, conducted within three years and then every four ENGAGING OUR COMMUNITY years after for the life of the Community Strategic Plan, measuring community A two way flow of information between the council and community will instill satisfaction with environmental management in Brewarrina Shire. community pride and ownership of decisions – utilizing new technologies where relevant. Outcome Performance indicators for Community

INVOLVING OUR CHILDREN AND YOUTH IN DECISIONS AND ACTIVITIES Increased participation rates – sport, arts and culture The voice of our young must be heard whenever we make decisions affecting them Improved public health indicators for the region now or in the future. Need to encouraging parents as role models and improved access to recreation and entertainment is required. Improved crime rate statistics Improved employment figures BUILDING COMMUNITY RESPECT Improved HSC completion rates/TAFE enrolments Work with community members to change attitudes towards property, education, welfare, appearance etc.

CHANGING OUR STANDARDS Stop accepting that changes to our society cannot be made, actively work to change attitudes of how we look, feel and act.

BUILDING UNITY OF PURPOSE WITHIN THE COMMUNITY

79

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 83 Create a common cause, agree on the need to address that common cause and work together for that cause.

80

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 84 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 C.1 Education for all  C1.1 Parents C1.1.1 Education and training for parents to DoCS as role models enhance their life skills and better understand their responsibilities as role models   C1.1.1.1 Council to write to and inform Council: GM Letters written to key TBD them of CSP priority stakeholder  C1.2 Skill C1.2.1 Opportunities for young people and DEEWR / DET development long-term unemployed to gain job skills   C1.2.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority  C1.3 An C1.3.1 Educate the community as to the DoCS / DET / accepted and value of work and earning an income to DEEWR / understood better provide for their families Parents   work ethic C1.3.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority  C1.4 C1.4.1 Innovative approaches, mentoring, DEEWR / DET Alternative less mainstream solutions / attitudes, more and non- options “after primary school” for young

81

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 85 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 traditional people  education C1.4.1.1 Council to write to primary Council: GM Letters written to key TBD pathways stakeholder and inform them of stakeholder CSP priority C1.5 Equitable C1.5.1 Support for families who do not have DEEWR / DET access to the skills or financial ability to support their education children’s education   C1.5.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority  C1.6 C1.6.1 Provide financial incentives for DEEWR / DET Incentives for business to engage more apprentices, employers trainees and support High School / TAFE initiatives to offer students school based training  C1.6.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C1.7 Alternate C1.7.1 Open a catholic high school to further Wilcannia / secondary improve school facilities Forbes school options Diocesan

82

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 86 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 locally  C1.7.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C1.8 Engage C1.8.1 Investigate and address why school is DET children in not attractive to students and parents  education C1.8.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority

C1.8.2 Eliminate bullying DET  C1.8.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority

C1.8.3 Improve discipline DET  C1.8.3.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C1.9 Local C1.9.1 Identify opportunities to encourage DET children local families to send their children to local attend local schools  schools C1.9.1.1 Council to write to primary Council: GM Letters written to key TBD

83

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 87 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 stakeholder and inform them of stakeholder CSP priority C1.10 C1.10.1 Access to speech therapy DET  Children with C1.10.1.1 Council to write to primary Council: GM Letters written to key TBD special needs stakeholder and inform them of stakeholder require access CSP priority to services C1.10.2 Access to occupational health DET therapists  C1.10.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C1.10.3 Special needs assessment specialists DET  C1.10.3.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C1.11 C1.11.1 Improve the range of courses and DET Meaningful training opportunities available through education TAFE  options C1.11.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them stakeholder CSP priority

84

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 88 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 C1.12 Access C1.12.1 Youth activities after school and DoCS / FaCSIA to before and during school holidays  afterschool care C1.12.1.1 Council to write to primary Council: GM Letters written to key TBD / activities stakeholder and lobby for more stakeholder funding to implement the CSP priority C2 A Safe community

C2.1 Crime C2.1.1 Develop and implement a Brewarrina BSC / NSW prevention Shire crime prevention plan Police Service  C2.1.1.1 Work with community Council: CDO Completed and adopted by Council stakeholders to develop a crime 31st October 2012 prevention strategy for Brewarrina for council adoption       C2.1.1.2 Implement and review Council: CDO Report annually on review Brewarrina crime prevention strategy  C2.1.1.3 Develop a “no domestic violence Council: CDO campaign” and implement C2.2 C2.2.1 State Government implement AG Community appropriate sentencing consequences  justice C2.2.1.1 Council to write to primary Council: GM Letters written to key TBD

85

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 89 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 stakeholder and inform them of stakeholder CSP priority C2.2.2 Provide effective diversification AG programs for post offenders  C2.2.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C2.2.3 Provide effective diversionary DOCS programs to include youth activities  C2.2.3.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C2.3 Child C.2.3.1 Provide adequate resources to enable State and protection appropriate intervention for families, when Federal required Government Agencies  C2.3.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C2.4 C2.4.1 Educate the community, provide Federal Reduce support and encourage harm minimisation of Government

86

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 90 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 drug and drug and alcohol Agencies  alcohol C2.4.1.1 Council to write to primary Council: GM Letters written to key TBD abuse stakeholder and inform them of stakeholder CSP priority

C2.4.1.2 Support and maintain alcohol Council: MEHB free zones in Brewarrina C2.5 Security C2.5.1 Work with the Police to facilitate a safe NSW Police and Policing community Service  C2.5.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C2.6 C2.6.1 Agreed community standard on what Community Community is acceptable behaviour in our towns and standards villages       C2.6.1.1 Publish positive news stories in Council: NE 1 per Brewarrina News month

C2.6.2 Work together to promote, educate Community and adopt those standards       C2.6.2.1 Publish positive news stories in Council: NE 1 / Brewarrina News month C2.7 C2.7.1 Encourage community to care for Council

87

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 91 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 Community public facilities   pride and C.2.7.1.1 Support re-opening of caravan Council: TM Resources developed to 3 stewardship of park through promotion as part promote re-opening   our towns and of overall Brewarrina economic Promotional activities 5 villages development & tourism plan undertaken to support [1.2.1.1.6] re-opening C2.7.2 Involve youth in decision making and Council in relation to services and facilities that affect them, such as design and preparation, park and reserve plantings etc.

      C2.7.2.1 Invite SRC representatives from Council: CDO Co-ordinate meetings 2 per schools in the Brewarrina Shire to between Council and year Council meetings to discuss SRC Reps issues pertaining to youth C2.7.3 Develop positive media stories, Council celebrating cultural differences within the shire       C2.7.3.1 Work with members of the local Council: NE Positive news article 1 per community to research, write and published in Brewarrina month distribute articles celebrating News

88

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 92 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 cultural differences in Brewarrina Shire       C2.7.3.2 Develop a twice monthly Council: NE Produce paper on time 22 per newspaper that reflects issues and on budget year relevant to the Brewarrina Shire

C2.8 Effective C2.8.1 Ensure infrastructure and skill NFS / RFS / Emergency capacity to respond to emergencies in the SES / Services Brewarrina Shire Ambulance / Police  C2.8.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C2.8.2 Recruit and maintain active NFS / RFS / emergency response volunteers SES

 C2.8.1.2 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C2.8.3 Manage and control hazards for NFS / RFS / public safety to legislative requirement. SES / Ambulance /

89

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 93 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 Police  C2.8.1.3 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority

C3 A Healthy Community

C3.1 Medical C3.1.1 Maintaining and expand existing State and and dental services Federal services Government Agencies  C3.1.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority

C3.1.2 Retain and attract health State and professionals Federal Government Agencies  C3.1.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority

90

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 94 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 C3.2 Health C3.2.1 Set a standard of health care within Area Health services of a the Shire Service

st  1 world C3.2.1.1 Council to write to primary Council: GM Letters written to key TBD standard stakeholder and inform them of stakeholder CSP priority

C3.2.2 Ensure each town and village has Area Health access to health services that meet that Service standard  C3.2.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority

C3.3 Child C3.3.1 Provide a safe haven for children State Agencies  safety C3.3.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority

C3.3.2 Provide crisis care for children State Agencies  C3.3.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C3.4 A C3.4.1 Delivery of the Brewarrina healthy Council, reduction in communities project WNSWLHD, 91

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 95 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 rates of BAHS, Ochre overweight Health, OBDGP  and obesity C3.4.1.1 Implementation of the HEAL Council: HCC Number of people 3 and program trained who can train improvements others to deliver the in related program  health Number of 'train the 2 behaviours in trainer' courses high risk delivered  groups in Number of people 6 Brewarrina trained who can deliver the program  Number of people 6 trained who are delivering the program  Number of referrals into 180 program  Number of new 18 programs commenced  Number of programs 12 completed

92

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 96 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3  Number of people 180 / 90 participating in the / 50% program, including number and % from key target groups~  Number & % of 90 / 45 participants completing / 50% the program, including number & % from key target groups  Number & % of 50 / 25 participants completing / 50% weekly maintenance activities, including number & % from key target groups  C3.4.1.2 Delivery of Heart Foundation Council: HCC Number of programs 10 “walking groups” delivered  Number of participants 60 / 30 enrolled, including / 50% number & % of

93

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 97 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 participants form key target groups  Number & % of 40 / 20 participants completing / 66% programs  Number of referrals 30  C3.4.1.3 Evaluation of Incentives for Council: HCC Improvements to N/A sport and recreation groups availability and delivery of low cost physical activity options made as a result of incentives  Number of incentives 5 distributed  Number of 5 organisations receiving incentives  Number of people 150 reached through organisations accessing incentives  Increases in 10%

94

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 98 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 participation / access following implementation of incentive initiatives  Increases in services 10% offered following implementation of incentive initiatives  C3.4.1.4 Delivery and evaluation of Council: HCC Number & % of TBD / participant travel and incentives participants receiving 30% program travel and incentives  C3.4.1.5 Implementation and evaluation Council: HCC Number of referrals into of health promotion campaign programs  Number of project 5 events  Number of people 500 attending project events  Number & % of 250 / individuals attending at 50% / least one project event, 150 / including number & % of 60%

95

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 99 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 people from key target groups  Number of resources 1,000 distributed at project events  Number of newspaper 12 articles on project  Number of radio 8 interviews / ads on project  Number of tv interview / 2 ads on project  Number of healthy 12 lifestyle related events in the community (all organisations) in a 12 month period  Number of people 2,500 attending healthy lifestyle related events in the community (all

96

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 100 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 organisations) in a 12 month period  Number & % of 1,500 / individuals attending at 60% least one event in the community in a 12 month period  C3.4.1.6 Delivery and evaluation of health Council: HCC Number of referrals 50 screening campaign from screening activities into programs  Number of screening 5 events  Number of people 250 attending screening events  Number & % of 150 / individuals attending at 60% least one screening event

 Number & % of people 100 /

97

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 101 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 from key target groups 66% accessed through screening events  Number of resources 1,000 distributed at screening events  Number of newspaper 6 articles  Number of radio 6 interviews / ads  Number of tv interview / 2 ads  C3.4.1.7 Delivery of community kitchen Council: HCC Number of people 6 and FOOD cents program trained to deliver program  Number of programs 3 delivered by each trained person  Number of programs 8 provided  Number of participants 80 / 40

98

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 102 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 enrolled, including / 50% number & % of participants form key target groups  Number & % of 60 / 30 participants completing / 50% programs  Number of referrals 40  C3.4.1.8 Implementation of culture camps Council: HCC Number of people 10 involved in delivery of the camps  Number of camps 4 provided  Number of participants 80 / 80 enrolled, including / 100% number & % of participants form key target groups  C3.4.1.9 Planning and implementation of Council: HCC Number of people 4 weight loss challenge trained who can deliver the program

99

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 103 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3  Number of people 4 trained who are delivering the program  Number of new 2 programs commenced  Number of programs 2 completed  Number of referrals into 100 program  Number of people 300 / participating in the 150 / program, including 50% number and % from key target groups  Number & % of 150 / 75 participants completing / 50% the program, including number & % from key target groups  C3.4.1.10 Evaluation of KickStart incentive Council: HCC Improvements to N/A program availability and delivery

100

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 104 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 of low cost physical activity and healthy eating programs and activities, as a result of incentives provided  Number of incentives 5 distributed  Number of 5 organisations / individuals receiving incentives  Number of people 100 reached through organisations / individuals accessing incentives  Increases in services / 5 activities offered following implementation of incentive initiatives

101

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 105 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3  Number of training 5 opportunities undertaken, as a result of incentives received  C3.4.1.11 Develop and implementation of Council: HCC Toolkit developed N/A active health communications toolkit

 C3.4.1.12 Develop and delivery of Council: HCC Number of programs 5 community activity programs offered

 Number of programs 4 provided

 Number of people 80 participating in programs provided  Number of people 4 trained to provide programs

102

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 106 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3  Number of people 3 employed to provide programs

 C3.4.1.13 Delivery of workforce capacity Council: HCC Number & % of health TBD training strategy professionals participating in needs assessment  Number & % of 4 / 100% organisations participating in needs assessment  Number of courses 3 offered  Number & % of people TBD trained  % of people trained from 33% / each target group (ie. 33% / existing, new, 33% community)  Number of people 2

103

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 107 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 attaining employment  C3.4.1.14 Development and delivery of Council: HCC N/A  healthy communities strategy Completion of healthy N/A communities strategy C4 Activities for all

C4.1 Parks C4.1.1 Raise the standard of public reserves, Council and parks and recreational areas to provide a recreational variety of experiences   areas C4.1.1.1 See action E2.8.7.1, Develop Council: UM Implement park plans Targets parks, gardens and recreational and works program as per reserve plans of management plan       C4.2 C4.2.1 Upgrade the community centre or Council Provide a provide a new centre with indoor courts and multipurpos gym e C4.2.1.1 Develop and implement a repairs Council: MEHB Quarterly report on progress community and maintenance plan to be centre with executed as funds allow sporting, social and cultural facilities 104

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 108 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 C4.3 C4.3.1 Encourage a broader range of Community Volunteerism volunteers to be involved with community activities to reduce volunteer burnout

C4.3.1.1 Develop articles for Brewarrina Two articles per year News C4.4 Youth C4.4.1 Involve youth in developing plans and Council Activities strategies and strengthen co-ordination, training and infrastructure       C4.4.1.1 Arrange Brewarrina / Warringah Council: CDO Annually youth exchange C5 Access for All

C5.1 Water C5.1.1 Negotiate access to Queensland water NSW State access to service the flood plain in the Brewarrina Government Shire  C5.1.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C5.2 C5.2.1 Program of activities and events Council       Community C.5.2.1.1 Work with local stakeholders to Council: TM Calendar developed 1 per activities and develop and implement a year       events calendar of events to attract Number of events 4 per 105

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 109 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 visitors to Brewarrina shire conducted year       Number of people 500 attending events       C.5.2.1.2 Actively seek opportunities and Council: TM Number of major events 3 per funding to bring major events to applied for year       Brewarrina shire Number of major events 2 per hosted year       Number of people 500 attending major events       Funding received to TBD conduct major events       Revenue generated from TBD the conduct of major events       C.5.2.1.3 Co-ordinate and implement Council: CDO 1 event annually NAIDOC celebrations on behalf of council C5.2.2 Program of activities and events       C5.2.2.1 Host welcome to Brewarrina Council: CDO Host welcome to 2 per BBQ’s for new residents Brewarrina BBQ year C5.3 C5.3.1 Video conferencing technologies in NSW State 106

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 110 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 Electronic remote communities Government  access to C5.3.1.1 Council to write to primary Council: GM Letters written to key TBD information stakeholder and inform them of stakeholder CSP priority

C5.4 Access to C5.4.1 Support local residents ability to access Council services Services available in regional centres       available in C5.4.1.1 Continue to develop Council: RMS/ regional centres relationships with Centrelink to Admin deliver services in a cost neutral manner to the council area       C5.4.1.2 Continue to provide access to Council: RMS/ Centrelink Services on a Admin scheduled basis in accordance with funding provisions       C5.4.1.3 Continue to develop Council: RMS/ relationships with Roads and Admin Maritime services (RMS) to deliver services in cost neutral manner to the council area       C5.4.1.4 Continue to provide access to Council: RMS/ RMS services on a scheduled Admin

107

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 111 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 basis in accordance with funding provisions       C5.4.1.5 Continue to provide library Council: DCCS services to the Brewarrina shire C6 Sustainable towns and villages

C6.1 C6.1.1 Skilled professionals / service NSW State Committed providers make a commitment to live and Government skills engage in the shire for the “long term”  C6.1.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C6.1.2 State and Federal Governments to NSW and provide housing and support for Federal professionals to locate and operate services Governments within the Shire for a guaranteed period  C6.1.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C6.1.3 Encourage professionals to the villages NSW State Government  C6.1.3.1 Council to write to primary Council: GM Letters written to key TBD

108

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 112 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3 stakeholder and inform them of stakeholder CSP priority C6.1.4 Provide mentoring services to trainees NSW State / newly employed to help grow local people Government into sustainable employment  C6.1.4.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C6.2 Equity C6.2.1 Provide play recreation and youth Council services in infrastructure and services in each village  villages C6.2.1.1 Develop a management plan for Council: UM Kane Mason Oval (improved access in drive, irrigation, kiosk and toilets)  C6.2.1.2 Develop a management plan for Council: UM the Goodooga cemetery  C6.2.1.3 Develop a management plan for Council: UM recreational areas and public spaces in Goodooga C6.3 Access to C6.3.1 Provide opportunities for villages to NSW State healthy food grow community fruit and vegetables Government

109

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 113 THEME 3: A CARING COMMUNITY

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “C”. Community Priorities 2012–2017 Responsible 201 Community 2013 2014 2015 2016 2017 Agency/Officer 2 to Strategies Council Actions 2012–2013 Measures and Targets for Council to to to to to 201 2012 - 2022 2014 2015 2016 2017 2018 3  C6.3.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C6.3.2 Involve young community members to NSW State develop self sufficiency Government  C6.3.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C6.3.3 Provide the opportunity for basic NSW State shopping facilities to be provided in Government Goodooga  C6.3.3.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority C6.4 Clean C6.4.1 Support village communities to keep Council village streets their streets clean  C6.4.1.1 Develop a master plan that Council: MEHB considers all villages

110

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 114

111

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 115

THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

The outcome we seek is inclusive community decision making with stakeholders willing to take part and respect alternate ideas, enabling our community to move forward to allocate limited funds and resources for optimum results.

Performance Indicators Our Key Challenges DEVELOPING LOCAL LEADERS We will track the achievement of our goals and strategies through reporting and Supporting and encouraging local community leaders to stay involved in measurement of performance indicators. community activities (volunteer burnout is an issue). Theme Key 4: performance indicators INVOLVING AND DEVELOPING COMMUNITY LEADERS Results of a community survey, conducted within three years and then every four Provide an environment where quality leaders of the present are attracted to years for the life of the Community Strategic Plan, measuring community both public and private leadership roles, gaining vital ownership of decisions satisfaction with leadership within Brewarrina Sire. and facilitating valued and appreciated contributions to the community Outcome Performance indicators for community GOVERNANCE Ensure that Council implements good policies and procedures, is open and Improved financial sustainability transparent and actively monitors and evaluates progress of this plan. 100% compliance with statutory obligations Improved ranking within the Department of Local Government’s published ‘comparative information on NSW local government councils’

112

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 116

THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 Agency/Officer 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 L1 National support for remote area communities L1.1 L1.1.1 Policy for equality of services and Federal Acceptable facilities to remote communities Government  living L1.1.1.1 Council to write to primary Council: GM Letters written to key TBD standards stakeholder and inform them of stakeholder CSP priority L1.1.2 Ensure a minimum level of services Federal and facilities are available to remote Government communities to ensure acceptable living standards  L1.1.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority L1.1.3 Funding support for the provision of Federal priority facilities and services Government  L1.1.3.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority L2 Integrated Local Leadership

L2.1 L2.1.1 NSW and Queensland government to NSW and

113

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 117 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 Consistent bring consistent rules to service delivery on Queensland cross border the border towns Governments  rules L2.1.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority L2.2 L2.2.1 Co-ordination of government NSW and Effective programmes and services in the shire to Federal delivery of prevent duplication Governments  state and L2.2.1.1 Council to write to primary Council: GM Letters written to key TBD federal stakeholder and inform them of stakeholder government CSP priority funds, L2.2.2 Appoint a lead agency as a “front door” NSW and programs for community to access services Federal and services Governments  L2.2.2.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority L2.2.3 Services planning – plan and lead all NSW and local programmes to prevent duplication Federal Governments  L2.2.3.1 Council to write to primary Council: GM Letters written to key TBD

114

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 118 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 stakeholder and inform them of stakeholder CSP priority L2.2.4 State and federal government agree NSW and that lead agency co-ordinate and manage all Federal government funding for the delivery of Governments services to the Brewarrina community  L2.2.4.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority MERGE WITH 2.2.2 L2.3 L2.3.1 Community Working Parties to be a CWP’s in Community vehicle to bring forward significant Brewarrina leadership community issues (Land Councils, Murdi Shire Paaki, Northern Star, Our Gunya, BBC)  L2.3.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority       L2.3.1.2 Council to attend Working Council: CDO Attend Working Party 11 / year Party Meetings where possible Meetings L2.4 L2.4.1 State and federal agencies involved in NSW and Accountabilit delivering services described in the CSP report Federal y to the to the lead agency on progress with Governments

115

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 119 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 community programmes according to the standards agreed in service plans, and the lead agency report to the community every six months on progress.  L2.4.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority L2.5 L2.5.1 Lead agencies be accountable to the Council Accountabilit Premier of NSW each quarter on progress with y to the NSW services planning and delivery according to state the standards agreed in the service plan       government L2.5.1.1 Implement mandatory IP&R Council: EDO Prepare annual report and request framework feedback from NSW state and federal government on progress from state and federal agencies L2.6 L2.6.1 Train and equip local people with Other Corporate corporate governance and management skills Agencies governance to take ownership of their own programmes / skills organisations  L2.6.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder seeking

116

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 120 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 CSP priority to seek funding to financial support with host corporate governance the view to hosting a workshops with community series of four workshops L3 Leadership Succession Planning

L3.1 L3.1.1 Schools program to develop quality DET Community leaders of the future  leadership L3.1.1.1 Council to write to primary Council: GM Letters written to key TBD stakeholder and inform them of stakeholder CSP priority L3.1.2 Mentoring and training opportunities Council for developing future community leaders       L3.1.2.1 Invite Schools in Brewarrina to Council: CDO Co-ordinate meetings 2 per council meetings to educate between council and year youth on corporate governance SRC representatives and council governance L4.1 L4.1.1 Develop measures and targets to Council Community monitor our progress over time with changes progress to community quality of life       L4.1.1.1 Implement mandatory IP&R Council: EDO Prepare and report annually framework (including community

117

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 121 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 survey) L4.2 CSP L4.2.1 Initiatives taken locally have regard to Council integrates State Plan directions; foster two-way with NSW communications between federal and state State Plan agencies and Brewarrina Shire Council about Brewarrina’s needs       L4.2.1.1 Champion an interagency Council: CDO Interagency meetings 4 per strategy for cross- in Brewarrina year communication L4.3 L4.3.1 Undertake mandatory reporting Council       Continuous L4.3.1.1 Implement mandatory IP&R Council: EDO Prepare and report annually improvement framework

L4.3.2 Maintain a records system that meets Council the needs of the organisation, the community and legislative requirements  L4.3.2.1 Develop a records management Council: AC Completed by 30 June 2013 strategy to ensure efficiency and privacy       L4.3.2.2 Continue to develop the full Council: AC Report quarterly potential of the existing electronic document

118

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 122 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 management system (EDMS) across the organisation       L4.3.2.3 Continue to capture records Council: AC electronically, storing and filing them appropriately for easy and efficient access       L4.3.2.4 Increase organisational efficiency Council: AC Report quarterly by ensuring all staff are conversant with the EDMS and new staff are orientated with its use.  L4.3.2.5 Progress to a system which Council: AC Completed by 30 June 2013 involves storing records both electronically and in hard copy to a system of electronic records management and storage

L4.3.3 Ensure council’s operations comply with all government legislation       L4.3.3.1 Manage freedom of information Council: AC Report on compliance quarterly / GIPA issues to ensure public accountability within Council’s

119

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 123 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 business       L4.3.3.2 Ensure staff are aware of their Council: AC / Prepare and deliver a 1 / year responsibilities in relation to HR staff training package privacy and protected disclosures annually by holding annual training sessions       L4.3.3.3 Ensure staff are aware of their Council: AC / obligations under the Local HR Government Act 1993 and all other relevant legislation       L4.3.3.4 Continue to review all policies Council: AC and procedures to ensure accuracy and currency L4.3.4 Provide responsible management of Council financial resources in accordance with long- term financial management plan       L4.3.4.1 Long-term financial management Council: FM Report quarterly plan is to consider: • Preparing and monitoring the budget in conjunction with other senior staff

120

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 124 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8       • Implementing the Long Term Council: FM Report quarterly Financial Plan       • Continuing to prepare balanced Council: FM budgets for consideration by senior staff and council.       • Continuing to develop rating Council: FM Report monthly strategies that are equitable and contribute to a financially stable future.       • Providing monthly cash balances, Council: FM As determined detailed quarterly budget review and financial reports to council.       • Preparing council’s annual Council: FM As determined financial accounts in accordance with relevant acts and regulations       • Providing, maintaining and Council: FM enhancing the financial accounting structure and related policies and procedures.       • Ensuring council is operating Council: FM within local government

121

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 125 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 accounting regulations.       • Developing a system to ensure Council: FM legal and best practice requirements are met.       • Supporting directors, managers Council: FM and staff in the use of the financial system.       Council: FM       • Maintaining level of outstanding Council: FM rates and charges below 10%       • Ensuring accounting data is Council: FM recorded accurately and returns are filed in accordance with legislative L4.3.5 Foster a culture of continuous improvement       L4.3.5.1 Develop and maintain systems to Council: FM improve audit results       L4.3.5.2 Prepare and have audited Council: FM financial statutory reports to be used to improve processes and

122

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 126 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 procedures       L4.3.5.3 Ensure all accounts and revenue Council: FM are raised within statutory and service levels       L4.3.6 Ensure adequate IT systems are in Council place to support service delivery and accountability requirements       L4.3.6.1 Set up and maintain Council: IT communications and IT systems throughout the council buildings.       L4.3.6.2 Review IT strategy in Council: IT consultation with other staff       L4.3.6.3 Provide ‘help desk’ service to Council: IT other staff offering trouble shooting, maintenance and software upgrades       L4.3.6.4 Oversee installation and Council: IT implementation of upgrade of any future software programs       L4.3.6.5 Continue regular back-ups of all Council: IT organisational software and data

123

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 127 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 L4.3.7 Minimise exposure to risk and promote Council strong risk management culture within council       L4.3.7.1 Develop and implement risk Council: RO management plans, strategies and audits to identify and ameliorate risks to council and staff

      L4.3.7.2 Risk management strategy Council: RO implementation commenced

      L4.3.7.3 Quarterly meetings of the risk Council: RO management advisory group

      L4.3.7.4 Update risk register Council: RO

      L4.3.7.5 Develop a risk audit schedule Council: RO and checklist

      L4.3.7.6 Implement and regularly review Council: RO workplace health and safety

124

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 128 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8 strategic plan

      L4.3.7.7 Ensure council is supported with Council: RO appropriate legal advice and that staff operate in an environment and culture that minimises risk for the benefit of the residents of Brewarrina Shire Council

      L4.3.7.8 Install and manage WH&S Council: RO software to simplify the WHS portfolio and become more compliant

      L4.3.7.9 Continual training of WH&S/Risk Council: RO Officer to ensure legislative compliance in years to come

      L4.3.7.10 Ensure mandatory training is Council: RO completed for all staff

125

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 129 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8       L4.3.7.11 Develop a new WH&S policy to Council: RO comply with the WHS act 2011

      L4.3.7.12 Ensure Managers are aware of Council: RO the changes in the WHS Act 2011and possible harmonization training.

  L.4.3.7.13 Train two staff members to test Council: RO and tag electrical equipment to meet Australian standards

L.4.3.7.14 Develop a disaster management Council: RO plan       L4.3.8 Provide human resource services and Council: HR make Brewarrina Shire Council an employer of choice       L4.3.8.1 Develop a training plan for staff Council: HR       L4.3.8.2 Develop and implement a Council: HR qualification register       L4.3.8.3 Create career pathways for staff Council: HR

126

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 130 THEME 4: A COMMUNITY WITH INTEGRATED LEADERSHIP

Please note: All outcomes, strategies and actions related to this theme are prefaced by the letter “L”. Community Community Priorities 2012–2017 Responsible 201 201 201 201 201 201 2 to 3 to 4 to 5 to 6 to 7 to Strategies Council Actions 2012–2013 Agency/Officer Measures and Targets for Council 201 201 201 201 201 201 2012 - 2022 3 4 5 6 7 8       L4.3.8.4 Review and update human Council: HR resource policies       L4.3.8.5 Develop a recruitment and Council: HR retention strategy

127

131 Brewarrina Shire Council REVENUE POLICY 2012 -2013 REVENUE POLICY

CONTENTS Section One

Statement of Revenue Policy...... 3 Rates Statement ...... 3 Residential...... 3 Residential‐Brewarrina...... 4 Residential‐Other...... 4 Rates Ordinary -...... 6 Interest on Overdue Rates...... 6 Annual Charges...... 7 Water Access and Usage Charges ...... 7 Sewerage Access Charges...... 8 Waste Management Services ...... 9 Domestic Waste Management ...... 9 Other Waste Management Services...... 10

132 Brewarrina Shire Council REVENUE POLICY 2012 -2013

This Page is Blank

133 Brewarrina Shire Council REVENUE POLICY 2012 -2013 Statement of Revenue Policy Council obtains its income from a range of sources including:

• Rates • Charges • Fees • Private Works • Grants • Contributions • Loan borrowing

Council will ensure all rates, fees and charges will be applied equitably. Council supports the user pay principle in assessing the levying of fees and charges and the amounts to which they are set, this is balanced with the needs of those in the community for whom it would impose undue hardship.

The estimated yields of rates are calculated on a 3.6% increase, this is the maximum percentage rates increase specified by the Minister. The Division of Local Government has also advised that Council has a total carry-forward catch-up entitlement of $8,769 and this amount has been added to the total general rates income for 2012/2013. Rates Statement

All rateable land must be categorised as either residential, farmland, mining or business. Council may create sub categories within this classification if necessary. Residential

Land is categorised as residential if:

• The main use is for residential accommodation (but not as a hotel, motel, guesthouse, boarding house, lodging house or nursing home).

134 Brewarrina Shire Council REVENUE POLICY 2012 -2013

• It is vacant land zoned for residential purposes.

• It is rural residential land. Residential‐Brewarrina

• All residential land within the Zone 1C and 2T under the Brewarrina Local Environment Plan 2000.

Residential‐Other

• All residential land in the Shire not contained in the designated schedule area, including land categories "Rural Residential" by definition under the Local Government Act, 1993.

The definition of Rural Residential Land is reproduced below:

"rural residential land" means land that:

a) Is the site of a dwelling; and b) Is not less than 2 hectares and not more than 40 hectares in area; and c) Is either: i) not zoned or otherwise designated for use under an environmental planning instrument; or ii) zoned or otherwise designated for use under such an instrument for non-urban purposes; and d) Does not have a significant and substantial commercial purpose or character.

Farmland

Land is categorised as farmland if its main use is for commercial farming eg grazing, animal feedlots, dairying, pig farming, poultry farming, bee keeping, forestry, oyster or fish farming, or growing crops for profit.

Rural residential land is not categorised as farmland.

135 Brewarrina Shire Council REVENUE POLICY 2012 -2013

Farmland -Intensive Agriculture

• All farmland used in the pursuit of intensive agriculture including poultry farms, piggeries, cattle feedlots and commercial orchards or viticulture.

Farmland -Other

• All land used for the dominant purpose of farming excluding Intensive Agriculture.

Business

• Land is categorised as business if it cannot be categorised as farmland, residential or mining. The main land uses in the business category are commercial and industrial.

Business -Brewarrina

• All land within the boundaries set out in the schedule referred to in the residential section above.

Business -Other

• All land not categorised as farmland, residential or in the above-referred Brewarrina township schedule area.

Mining

• Land is categorised as mining if it is land within a parcel of rateable land valued as one assessment and its dominant use is for a coal mine or metalliferous mine.

• The whole Shire area

136 Brewarrina Shire Council REVENUE POLICY 2012 -2013

Rates Ordinary - Minimum Rate and Ad Valorem

The ordinary rates for 2012/2013 are as follows:

Category Sub-Category Ad valorem Amount Minimum Rate c in $ $ Rate Yield $ Farmland Ordinary 0.5749 67.30 766,837 Irrigable 4.3292 67.30 18,529 Irrigable - low 0.6081 67.30 12,837 Irrigable - medium low 0.7556 67.30 9,505 Irrigable - medium 0.5129 67.30 4,955 Irrigable - medium high 2.9055 67.30 2,644 Irrigable - high 1.2598 67.30 8,025 Residential Brewarrina 4.9600 110.95 70,558 Goodooga 10.1870 87.25 8,318 Angledool 1.0030 67.30 5,475 Gongolgon 1.0030 67.30 875 Business Brewarrina 5.3898 110.95 13,131 Goodooga 10.1870 87.25 608

Interest on Overdue Rates Council proposes to charge interest on overdue rates at a rate of 9% per annum.

137 Brewarrina Shire Council REVENUE POLICY 2012 -2013 Annual Charges

Council provides a range of services on an annual basis for which it charges an annual charge.

• Water Supply • Sewerage Services • Domestic Waste • Other Waste Water Access and Usage Charges Brewarrina Shire Council is implementing a new water management system to conserve water in 2012 following NSW Government dissatisfaction that residents in the Brewarrina Shire have no water meters and use 10 times more water than other towns in NSW. All residential, commercial and Council properties must have water meters installed by June 2012. The new charges replace the ‘rate’ previously charged to all ratepayers. There are three charges which now replace the old ‘rate’.

Access Charge: The access charge is calculated annually. It is made up of approximately 50% of the total cost required per year to supply filtered (potable) water to Brewarrina Shire Council residents.

Usage Charge: The usage charge is calculated and charged half yearly. You will be charged a set price for each kilolitre of water used. The charge associated with this is linked directly to how much filtered (potable) water is used by the householder.

Raw Water Charge: No change will be made to raw water charges (outdoor water supply). You will continue to be charged a standard access charge, which is calculated to provide sufficient funds for Council to operate maintain and repair the raw water supply infrastructure.

138 Brewarrina Shire Council REVENUE POLICY 2012 -2013

Category Sub-Category Charge 2012/2013 Yield Brewarrina Filtered Water Filtered Water Access Charge 20 mm 409.00 196,729 Filtered Water Access Charge 25 mm 638.04 7,018 Filtered Water Access Charge 32 mm 1,047.04 1,047 Filtered Water Access Charge 40 mm 1,636.00 0 Filtered Water Access Charge 50 mm 2,556.25 10,225 Filtered Water Access Charge 80 mm 5,317.00 0 Filtered Water Access Charge 100 mm 10,225.00 10,225.00 Brewarrina Raw Water Raw Water Access Charge 354.00 176,292 Brewarrina Usage Usage (average estimate) $1.80 / kl 173,304 Goodooga Filtered Water Filtered Water Access Charge 20 mm 308.00 28,644 Goodooga Raw Water Raw Water Access Charge 331.20 30,801 Goodooga Usage Usage (average estimate) $1.80 / kl 32,550

Sewerage Access Charges

Charges for the provision of sewerage services in Brewarrina and Goodooga are calculated and charged on an annual basis.

Brewarrina and Goodooga will be levied a charge equal to an 8% increase on the previous year rate, this will bring the cost of providing the service in line with providing the service for Brewarrina. The cost of providing the service to Goodooga is significantly higher than Brewarrina on a per capita basis and future years will see Brewarrina charges stabilize with Goodooga remaining in ‘catch up ‘ mode.

139 Brewarrina Shire Council REVENUE POLICY 2012 -2013

Category Sub-Category Charge 2012/2013 Yield

Brewarrina Sewer Access Charge (connected) 733.90 333,927 Sewer Access Charge (un-connected) 366.95 17,614 Urinals 62.37 998 Water closets (2 – 5) 185.43 20,397 Water closets (over 5) 62.37 6,112 Goodooga Sewer Access Charge 318.80 35,387

Waste Management Services

Domestic Waste Management

Domestic Waste Management (DWM) services include the collection, transportation and disposal of household waste. In accordance with Section 496 of the Local Government Act, 1993, Council proposes to levy an annual charge for the provision of Domestic Waste Management services on each parcel of land in Brewarrina, Goodooga and Gongolgon for which the service is available.

The charges are proposed to be increased by 3.6% in 2012/2013. These charges are the minimum charges that will recoup the perceived costs of making the Domestic Waste Management service available.

Council’s Draft waste management plan has identified the need for a new tip at Brewarrina and investigation into improved waste sites at Goodooga and New Angledool (Weilmoringle has a Lands Council controlled tip and Gongolgon accesses the Brewarrina tip through a weekly waste collection service).

The anticipated waste management charges of $212,000 (2012/13) makes no allowance for the increased cost of implementing the draft waste management plan.

140 Brewarrina Shire Council REVENUE POLICY 2012 -2013

Accordingly, to address this situation it is considered that an increase to the current waste management charge of $50 / per year for three years would generate an additional $103,000 income for waste management which will substantially off-set expected future costs to implement the draft waste management plan.

Charge -including $50 Category Sub-Category Yield 2012/2013 Brewarrina Domestic Waste 400.05 169,223 Goodooga Domestic Waste 348.15 32,378 Gongolgon Domestic Waste 306.10 3,367

Other Waste Management Services

Other waste management services are levied as an annual charge in accordance with Section 501 of the Local Government Act, 1993.

Charge – including Category Sub-Category Yield $50 2012/2013 Brewarrina Commercial Waste 461.20 26,288 Vacant land 69.20 3,321 Non-collected (tip use) 107.60 1,076 Goodooga Commercial Waste 461.20 8,301 Vacant land 69.20 415 Angledool Tip maintenance fee 107.60 2,474

141 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

FEES AND CHARGES 2012/13

GENERAL INFORMATION

Categories of Pricing Policies:

1. Cost Recovery – The price is set to cover the total cost of providing the goods or service. 2. Partial Cost Recovery – The price is set at an amount that is considered to be a reasonable cost for the user to bear. The balance of necessary funds is sourced from general revenues. 3. Statutory – The price is set by government legislation. 4. Nil Cost Recovery – It is considered that council source the necessary funds from general revenue. 5. User Pays – The price is set to cover the total or partial cost of providing the service.

Council may waive or reduce fees:

In accordance with section 610E of the Local Government Act 1993, fees and charges may be waived or reduced in accordance with the following 1iteria:

1. In circumstances where there is commercial hardship suffered by an individual or organisation that will result in loss or reduction to services considered to be important to the entire Shire. 2. To assist chartable or non profit organisations where there is considered to be a benefit to the community of Brewarrina Shire Council.

1

142 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

GENERAL INFORMATION ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­1 Categories of Pricing Policies: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 1

ADMINISTRATION / ENQUIRIES ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­5 Dental Records ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 Fax‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 GIPA ‐Government Information Public Access Act ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 Laminating‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 Other ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 Payments ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 Rates Enquiries‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 Subpoenas‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 Tenders‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5

LIBRARY­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­6 Penalties and Fines‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 Lost / Damaged items ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 Overdue fees ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 Inter Library loan request ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6

COPYING­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­6 Business papers & Minutes postage ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 Copy of Rate Notice ‐ per notice‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 Drainage Diagram ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 Environmental Impact Statements‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 LEP (document) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 LEP Maps ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 State of the Environment Report ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 6 State of Environment Report ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 7 Sewer diagram (photo copy only) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 7

ACCOMMODATION RENTALS ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­7 Council Flats furnished (not permanent staff)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 7 Staff Accommodation (permanent) ‐ per week ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 7 Medical Facilities‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 8

WESTERN LOCAL GOVERNMENT ALLIANCE ‐ STAFF SECONDMENT ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 8

ADVERTISING STRUCTURES (ANNUAL APPROVAL FEE)­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­8 Sign Fee ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 9

COUNCIL OPERATED BUILDINGS AND AND SERVICES­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­10 Council Chambers‐ Hire of‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐10 Aged Care‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐10 Community Centre ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐10 Refundable Deposit ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐10 Day Hire (up to 5pm)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐10 Night Hire (5pm to 12am) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐10 Youth Centre‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11 Day Hire 8 hrs‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11

2

143 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Half Day Hire (4 hours) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12 Night Hire (5‐12pm)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12 EQUIPMENT HIRE‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12 Sound Equipment ( only available with the hire of the Youth centre‐ no outside hire)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12 Projector( only available with the hire of the Youth centre‐ no outside hire) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12

TOURIST INFORMATION CENTRE ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­13 Exhibition Hall ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐13 On call services‐failire to set alarms ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐13 Concessional Rates Non‐Profit Org‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐13

SPORTING ACTIVITIES ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­13 Racecourse Facilities‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐13 Sports Oval (Geoff New Oval)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐13 Sports Ground (GOODOOGA)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐14 Swimming Pool Entry ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐14 Tennis Courts‐ Brewarrina‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐14

CEMETERIES­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­15

COMPANION ANIMALS AND LIVESTOCK­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­16 Registration ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐16 Fines relating to Companion Animals and Livestock‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐16 Impounding Fees ‐ Animals‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐16 Impounding Fees ‐ vehicles or articles‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐17

CARAVANING AND CAMPING SITES ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­17 Four Mile Camping Ground ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 The Boat Ramp ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18

CERTIFICATES & INSPECTIONS ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­18 Construction ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 Building ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 Building ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 Other ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 Zoning ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 Food Premises‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 Food premises inspection fee‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18 Annual administrative charge ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐18

DEVELOPMENT APPLICATIONS­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­19

LOCAL GOVERNMENT ANNUAL APPROVALS ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­19 Hairdressers‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐19 Fuel pumps on council properties ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐19 Street Trading (prior D.A. required) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐19 Amusement Devices ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐19 Other approvals‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐19 SWIMMING POOLS‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20 3

144 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Certificate of Compliance‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20 Swimming Pool Inspections ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20 Public Swimming Pool Inspections ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20 Resuscitation Charts ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20

SEPTIC TANK APPLICATIONS FEE­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­20 Inspection Fee‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20

WASTE MANAGEMENT ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­20 Miscellaneous Waste Management charges ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20 Dead animal disposal ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐21 Collection Charges:‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐21

SEWER SERVICES­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­21

WATER SERVICES ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­22 Connection Fees‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐23 Effluent Water‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐24

ENGINEERING ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­24 PLANT HIRE RATES (External Only) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐24 Earthmoving Equipment ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐24 Large Trucks‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐24 Medium Trucks‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐24 Rollers (per hour)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐25 Backhoes/Tractors ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐25 Small Plant – (No Operator included, approval by AGM, $250 Deposit)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐25 LABOUR ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐25 MATERIALS (Quantities greater than 100m3 quoted separately)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐26 NOXIOUS WEED SPRAYING‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐26 ENGINEERING WORKS‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐27

APPENDIX ONE ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­27

DEVELOPMENT APPLICATIONS‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐27 FEE FOR DEVELOPMENT APPLICATION (CLAUSE 246) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐27 RESIDENTIAL LESS THAN $100,000 IN VALUE‐ CLAUSE 247 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐28 RESIDENTIAL FLAT DEVELOPMENT – (CLAUSE 248)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐28 SUBDIVISION OF LAND (CLAUSE 249)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐28 Development not involving the erection of a building (Clause 250) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐28 Additional fee—designated development (Clause 251) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐29 Advertising (Clause 252) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐29 Additional fees—development requiring concurrence (Clause252A) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐29 ADDITIONAL FEES FOR INTEGRATED DEVELOPMENT (Clause 253) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐29 OTHER FEES AND CHARGES ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐30 MISCELLANEOUS ACTIVITIES‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐30

APPENDIX TWO ­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­30

CONSTRUCTION CERTIFICATES ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐30 4

145 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

ADMINISTRATION / ENQUIRIES

Unit of GST 2012 / 2013 FEE / CHARGE Pricing Activity Title of Fee or Charge Charge YES/NO (GST Inclusive) Policy

Fee for collection of a patients records (by Dental Each Y 26.00 5 Records client only)

Fax Fax (Send or Receive) per sheet Y 3.00 5

GIPA - Application – personal or non-personal each N 31.00 5 Government Information 31.00 / hr subject to reduction for Public Application – processing greater than 3hrs each N hardship Access Act

Laminating A4 Each Y 4.00 5

Laminating Laminating A3 Each Y 5.00 5

ID Cards Each Y 3.00 5

Other Noxious Weeds enquiry (written) each N 55.00 plus 72.00/hr for inspection 5

Dishonoured & present again cheques fees each Y 52.00 5 Payments (includes bank fee)

per Interest on overdue rates and charges N As per max allowed 1 annum

Copy of rate notice Each Y 26.00 5 Rates Enquiries Valuation Listing Computer Printout Each Y 62.00 5 (All valuations per copy)

Rating Officer Per hour Y` 98.00 (incl GST) 5

5 Research Per hour N 134.00

Subpoenas Summons Per hour N 134.00 5

Tenders Tender documents each Y 31.00 2

5

146 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Unit of GST 2012 / 2013 FEE / CHARGE Pricing Activity Title of Fee or Charge Charge YES/NO (GST Inclusive) Policy

LIBRARY

Penalties and Fines Per item N Cost of item + $5 processing fee 5

Lost / Damaged items Per item N Cost of item + $5 processing fee 5

Overdue fees Per item N $0-30 per day (max $5 per item) 5

Inter Library loan request Per item N 1.00 5

COPYING

per Y 65.00 5 Business papers & Minutes postage annum

Copy of Rate Notice - per notice each Y 20.00 5

Drainage Diagram each Y 21.00 5

Environmental Impact Statements each N 31.00 5

LEP (document) each Y 31.00 5

LEP Maps each Y 21.00 5

State of the Environment Report Each Y 26.00 5

MAPS and PHOTOCOPYING and LAMINATING

Maps - A3 each Y 5.00 5

Maps/documents – A3 Black & White page Y 3.00 5

Maps/documents – A3 Colour page Y 6.00 5

Maps/documents – A3 (paper supplied) page Y 1.00 5 Black and White copy

Maps/documents – A3 (paper supplied) page Y 2.00 5 Colour Copy

Maps/documents – A4 single sided B&W page Y 0.60 5

Maps/documents – A4 single sided CLR page Y 1.20 5

Maps/documents – A4 double sided B&W page Y 1.00 5

Maps/documents – A4 double sided CLR page Y 2.00 5

Maps/documents – A4 single sided (paper page Y 0.30 5 supplied) Black and White

6

147 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Maps/documents – A4 single sided (paper page Y 0.60 5 supplied) Colour

Maps – plan printing AO Page Y 25.00 5

Maps – plan printing A1 each Y 20.00 5

Maps – plan printing A2 each Y 15.00 5

Maps – plan printing A3 Each Y 7.00 5

Laminating A1 Each Y 25.00 5

Laminating A2 Each Y 20.00 5

Laminating A3 Each Y 15.00 5

Laminating A4 Each Y 7.00 5 Photocopies -small A4 Black & White each Y 0.30 5 (Community groups supplying paper) Photocopies -small A4 Colour each Y 0.60 5 (Community groups supplying paper)

State of Environment Report each N 25.00 5

Sewer diagram (photo copy only) each Y 0.60 5

ACCOMMODATION RENTALS

Council Flats furnished (not permanent staff) One bedroom- including utilities Per week Y POA 5

Two bedrooms- including utilities Per week Y POA 5

Staff Accommodation (permanent) - per week

128 Bathurst Street Per week Y 74.00 5

2 Church Street Per week Y 74.00 5

5 Bourke Street Per week Y 74.00 5

1-3 Bourke Street Per week Y 74.00 5

27 Bourke Street - flats Per week Y 74.00 5

33 Bourke Street - units Per week Y 74.00 5

7

148 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

132 Dooral Street Per week Y 74.00 5

13 Wilson Street Per week Y 74.00 5

38 Church Street Per week Y 74.00 5

Medical Facilities

Cnr Barwon & King Street Per week Y 120.00 2

32 Church Street Per week Y 100.00 2

47-49 Bathurst Street Per week Y 78.00 2

WESTERN LOCAL GOVERNMENT ALLIANCE - STAFF SECONDMENT

Per Actual employee hourly rate plus Wages Y 1 person 40% oncost 30 cents per kilometre Travel Per km Y 1 (sedan/utility)

Accommodation/meals each Y Actual costs incurred 1

ADVERTISING STRUCTURES (Annual Approval Fee)

Unit of GST 2012/ 2013 FEE / CHARGE Pricing Activity Title of Fee or Charge Charge YES/NO (GST Inclusive) Policy y

31.00 Illuminated Sign each 5 Y Fascia Sign Each 31.00 5 Y Fin Sign Each 31.00 5 Y Roof Sign Each 31.00 5 Y Tap Hamper Sign Each 31.00 5 Y Flush wall Sign Each 31.00 5 Y Projecting Wall Sign Each 31.00 5 Y Flashing Sign Each 31.00 5

8

149 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Y Floodlit Sign Each 31.00 5 Y Pole & Pylon Sign Each 31.00 5 Y Moving Sign Each 31.00 5 Y Advertising Panel Each 31.00 5

Sign Fee – If not exempt from Development each Y 30.00 5 Application

9

150 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

COUNCIL OPERATED BUILDINGS AND AND SERVICES

Council Chambers- Hire of

Business Hours only per hour Y 15.00 2

Aged Care Accommodation Charges To be determined be the Dept Health and Ageing 4

Community Centre

Cleaning and Damages Deposit Y 250.00

Refundable Security Key Deposit Y 250.00 Deposit

Per On call services- failure to reset alarms Y 120.00 1 callout

Day Hire (up to 5pm) Hall only per hour Y 31.00 2

Hall and Kitchen per hour Y 46.00 2

Hall and Kitchen 4 hours Y 160.00 2

Hall Only 4 hours Y 105.00 2

Night Hire (5pm to 12am)

Hall and Kitchen <8 hours Y 185.00 2

Hire of Kitchen only <8 hours Y 85.00 2

Hall Only <8 hours Y 125.00 2

Concessional Rates (Schools,Non-Profits,Funerals) 50% of normal hire

10

151 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

less than Funeral Services and Wakes Y 80.00 2 8 hours Funeral Services and Wakes less than Y 100.00 2 (with Kitchen) 8 hours

Schools - per hour per hour Y 15.00 2

Youth (Circus etc) per hour Y 15.00 2

Department of Sport & Recreation per hour Y 15.00 2

Community Service Organisations per hour Y 15.00 2

Equipment hire (These items only available with hire of Council facility-no outside hire)

P. A. System (including operator) per hour Y 650.00 5 (per hour) Marquee** Per day Y 50.00 5

**Marquee – Refundable Deposit Y 100.00 5

Hire of trestle tables Per item Y 10.00 5

Hire of chairs Per item Y 2.00 5

**Council set up of equip Per hour Y 45.00 5 >100 Crockery - Per Night (5pm-12am) Y 250.00 5 people <100 Crockery - Per Night (5pm-12am) Y 220.00 5 people 50-80 Crockery - Per Night (5pm-12am) Y 175.00 5 people Up to 50 Crockery - Per Night (5pm-12am) Y 11.5.00 5 people Crockery - Per Night (5pm-12am) per night Y 220.00 5

Hire of trestle tables Per item Y 5.00 5 Hire of chairs Per item Y 1.00 5 Hire of Marquee (2) Per day Y 25.00 5 Concessional Rates (Schools,Non-Profits,Funerals) 50% of normal hire

Youth Centre Refundable deposit Damages and cleaning deposit 250.00

Security Key Deposit 250.00

Day Hire 8 hrs

Hall only per day Y 77.00 2

11

152 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Hall and Kitchen per day Y 96.00 2

Half Day Hire (4 hours) Hall only 4 hours Y 39.00 2

Hall and Kitchen 4 hours Y 48.00 2

Hall only Per hour Y 10.00 2

Hall and Kitchen Per hour Y 15.00 2

Hire of trestle tables Per item Y 10.00 2

Hire of chairs Per item Y 2.00 2

Night Hire (5-12pm) Centre and Kitchen <8 hrs Y 125.00 2

Concessional Rates (Schools,Non-Profits)50% of normal hire (excluding council set up)

EQUIPMENT HIRE

Sound Equipment ( only available with the hire of the Youth centre- no outside hire)

Per Hour Y 40.00 2

Per Day/Night < 8 hrs Y 120.00 2

Projector( only available with the hire of the Youth centre- no outside hire)

Per Hour Y 40.00 2

Per Day/Night < 8 hrs Y 120.00 2

< 8 hrs With Operator Y 250.00 2

12

153 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

TOURIST INFORMATION CENTRE

Exhibition Hall - Per day day Y 82.00 1

- Night Hire night < 8hrs 165.00 1 Per call Y 120.00 1 On call services-failire to set alarms out Council Representative Per hour Y 45.00 1

Hairdressing room - out of town only DAY Y 30.00 1 service providers- no competition

50% of actual costs Concessional Rates Non-Profit Org

SPORTING ACTIVITIES

Racecourse Facilities

Jockey Club hire for weekend No charge first 2 Days then 40 Brewarrina Pony Club Volunteer hours per Day used

No charge first 2 Days Brewarrina Show and Rodeo Committee then 40 hire Volunteer hours per Day used

Hire grounds/facilities - per half day Y 155 2

Hire grounds/facilities - per day Y 285 2

Security, damage and cleaning deposit Y 300 2

Sports Oval (Geoff New Oval)

Per Cricket season Y 565.00 5 season Per Football each code (each field) Y 485.00 5 season Per Department of Sport & Recreation Y 360.00 5 season

13

154 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Per Little A's Y 360.00 5 season

PER Hour Per Hour Y 15.00 5

PER DAY Per day Y 155.00 5

PER NIGHT Per night Y 155.00 5

Lights per hour Hr Y 25.00 5

Refundable Security key and Cleaning deposit ea Y 150.00 deposit Hire mobile grandstand per day – No charge community sporting groups

Hire mobile grandstand per day - Y 145.00 5 others, Brewarrina town area

Sports Ground (GOODOOGA)

Per Football season hire 20 volunteer hrs/day season

Day functions day Y 75.00 5

Cleaning deposit Per event Y 100.00 5

Swimming Pool Entry

per Brewarrina pool occasional entry – adult Y 2.00 5 person per Brewarrina pool occasional entry – child Y 1.50 5 person per Brewarrina pool season tickets - single Y 65.00 5 season per Brewarrina pool season tickets - family Y 130.00 5 season

Brewarrina pool entry – school children per Y 0.50 5 (with a School) person

Tennis Courts- Brewarrina

Tennis Courts - Brewarrina No charge

Refundable Deposit Tennis Court nets - deposit Per net N 100.00 1

14

155 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

CEMETERIES

Package: ( Brewarrina or Goodooga)

Land for grave,

1st Interment, Each Y 1030.00 Community Centre Hall Hire including

kitchen facility, tables and chairs.

Supply and fixing of brass plaque. Per hour Y 45.00 Two Marquees at cemetery.

10% discount for pre-purchase

**Council to set up of tables

Purchase of Site - Non-denominational, each Y 415.00 1 (Brewarrina)

Purchase of Site - Beam Cemetery , each Y 415.00 1 (Brewarrina)

Purchase of Site - Non-denominational , each Y 415.00 1 (Goodooga)

Purchase of Columbarium niche each Y 260.00 1

Purchase of Memorial wall (without niche) each Y 155.00 1

Opening & closing of grave – Adult each Y 385.00 1

Opening & closing of grave – Child each Y 360.00 1

Travel from Brewarrina (to Goodooga, each Y (Actual cost +10%) 1 Weilmoringle)

Weekend Surcharge for grave opening / each Y 155.00 1 closing

Council Representative (per hour) each Y 45.00 1

High Monument Fee (more than 900mm each Y 75.00 1 high)

Permission to erect stone or concrete slab, Each Y 50.00 1 head or foot stone, slab over grave

15

156 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Search of records - Enquiry Fee each Y 50.00 1

Administration Fee – Burials on Private land Each Y 115.00 1

Exhumation or 2nd Interment each Y 700.00 1

Cemetery Reservation Deposit (all Each Y **350.00 1 cemeteries)

** Reservation fee does not protect against future price increases. The fee payable at the time of interment will be the fee adopted by the Council in the current Revenue Policy, less any deposit of prepayment made. Second interment will be at the current rate set in the revenue policy.

** Pre-purchasing of site does not included fees for opening and closing the grave.

COMPANION ANIMALS AND LIVESTOCK

Registration

Lifetime Registration - Working Dog (needs each N Nil to meet criteria) Lifetime Registration Dog/Cat (non Each N 150.00 5 desexed) Lifetime Registration Dog/Cat (desexed) each N 45.00 5

Lifetime Registration Dog/Cat (desexed) – each N 20.00 5 pensioner

Lifetime Registration – (non desexed) each N 40.00 5 recognized breeder

Lifetime Micro-chipping - Carried out by each N 45.00 5 Council (Dog or Cat)

Fines relating to Companion Animals and Livestock

Not having a pet Micro-chipped Each N 165.00 5 Fines for having an animal in a public Per 5 place without a leash under effective N 220.00 animal control.

Impounding Fees - Animals

Per dog Dog or cat impounding (registered) N 21.00 1 or cat

Per dog Dog or cat impounding (unregistered) N 62.00 1 or cat

Second or subsequent impounding (plus Per dog $125.00 plus $60.00 for each N 1 sustenance charge) or cat additional release 16

157 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

• Sustenance charge for Dog or Part of or N 15.00 1 Cat Full day

$50.00 Base + Actual cost to Cattle and Horses impounding Per head N 1 transport to holding facility

• Cattle and Horses sustenance Per head N 24.00 1 charge per day

$20.00 Base + Actual cost to Sheep, Goats Impounding Per head N 1 transport to holding facility

Per head • Sheep, Goats, sustenance charge N 15.00 1 per day

Capture with use of tranquilliser gun each N 30.00 1

Advertising of Impoundments Per head N (Current Media Rates) 1

Veterinary fees Per head N (Actual costs +10%) 1

(Actual hourly rate plus 40% on After hours Ranger Call out Fee Per hour N 1 costs) Conveying an impounded animal to a Per head N (Actual costs + 10%) 1 council controlled pound For walking an impounded animal : • to the pound (Actual hourly rate plus 40% on Per head N 1 • to the address of the owner costs) • to a market/saleyard for sale

Any charges for loss or damage (any charge for damages to be the attributable to an impounded animal while it Per head N responsibility of the animal 1 was unattended or trespassing. owner)

Impounding Fees - vehicles or articles Per Abandoned Article-small Y 170.00 1 article Per Abandoned Article – large Y 225.00 1 article Abandoned vehicle Each Y 335.00 1

Disposal fee Each Y Actual costs 1

Release of vehicles and property (if each N 55.00 1 vehicle, storage charge applies)

Storage of vehicles Per day N 50.00 1

CARAVANING AND CAMPING SITES

17

158 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Four Mile Camping Ground Free camp

The Boat Ramp Free Camp

CERTIFICATES & INSPECTIONS

Construction Construction Certificate Application each Y See Appendix 1

Application to occupy incomplete building each N 52.00 1 Building (includes inspection)

Amendment to building alignment each N 52.00 1 (requires Council resolution) Amendment to building application before each N N/applicable 1 approval is granted Application for change of use of a each N 464.00 1 building (SEPP 4) Building Building Certificate (AS SET BY each N see appendix 1 3 REGULATION )

Building Inspection each N 62.00 5

Advertising Development each N 88.00 1

Section 150 Certificate (EPA Act) each N 60.00 3

Section 735A Certificate & Section” each N 53.00 5

121ZP Certificate (EP&A Act) each N 53.00 5

Section 603 Certificate (LGA 1993) each N 65.00 3 Other Section 24 Certificate (Swimming Pools each N 50.00 5 Act 1992)

Section 64 Noxious Weeds Act each N 65.00 5

Section 608 - Service for conveyance each N 20.00 5

Section 172 Certificate each N 50.00 5

Section 149 (2) Certificate (EPA Act) each N 53.00 5 Zoning Section 149 (5) Certificate (EPA Act) each N 80.00 5

Food Premises

Food premises inspection fee hr Y 150.00 5 75.00 ( high), As per Each Y Annual administrative charge 60.00 (med), Clause 183 18

159 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

30 .00 (low) Food Regulation Act 20045

DEVELOPMENT APPLICATIONS

Development application

(as set by regulation) & other See Appendix 2 S planning related fees

LOCAL GOVERNMENT ANNUAL APPROVALS

Hairdressers and Beauty salons each Y 60.00 5 (including inspection)

Fuel pumps on council properties

Single/Double No charge

Street Trading (prior D.A. required)

Monthly approval each Y 25.00 5

Annual approval each Y 55.00 5

Registered charities, churches, community free 5 organisations

Tent erection fee per week No charge

Amusement Devices

• large machine 20.00 5

• small machine 10.00 5

• additional machines - Large 10.00 5

• additional machines - Small 5.00 5

Other approvals

Other approvals not listed 50.00 5

To enclose public land for demolition or 105.00 5 construction purposes 19

160 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Septic tank operation fee - Per Assessment each Y 52.00 5

To operate a Mortuary (includes each Y 105.00 5 inspection) To Operate an undertaking business each Y 105.00 5 (includes inspection) To Operate a Caravan Park or camping each Y 55.00 5 Ground (as above)

Section 611 Annual Charge - Per Kilometre km Y 275.00 5

Charge for pipe, cables & rails on a public m Y POA 5 place

SWIMMING POOLS

Certificate of Compliance Each Y 60.00 5

Swimming Pool Inspections Each Y 95.00 5

Public Swimming Pool Inspections Each Y 95.00 5

Resuscitation Charts Each Y 25.00 5

SEPTIC TANK APPLICATIONS FEE

New Works Each Y 125.00 5

Amendment each Y 55.00 5

Inspection Fee

Brewarrina each Y 62.00 1

Past 25km radius from each Y 75.00 1 Brewarrina(pro rata)

Existing system registration charge each Y 115.00 5

WASTE MANAGEMENT

Miscellaneous Waste Management charges Annual approval to transport waste over or each Y 107.00 1 under a public space

Mixed Waste large vehicles Per cm Y 48.00 1

Car Bodies Free 1 20

161 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Metal Waste Free 1

Green Waste Free 1

Drum Muster Containers Free 1

Asbestos (prior approval required) Per m3 Y 155.00 per m3 + burial fee 1

Asbestos burial fee 155.00 1

Polystyrene/plastic sheeting(hay bales) 80.00 per m3 (min $50) 1

Dead animal disposal 1 Small dog/cat Each Y 10.00 1 Medium sheep / goats Each Y 30.00 1 Large – cattle / horses Each Y 50.00

Collection Charges: Domestic Waste Management Charge house Y 5 (Brewarrina) 350.05 Domestic Waste Management Charge house Y 298.15 5 (Goodooga) Domestic Waste Management Charge house Y 256.10 5 (Gongolgon)

Commercial Waste Management Charge business Y 411.20 5 (Brewarrina & Goodooga)

Vacant Land Charge Lot Y 19.20 5 (Brewarrina & Goodooga) Non-collected service each Y 57.60 5 (Brewarrina, Goodooga)

Angledool Tip Mtce Fee Each Y 57.60 5

SEWER SERVICES

Sewerage connection fee each Y 550.00 1

Sewer headworks charge Each Y 1,000.00 1 Sewer Access Charge – Brewarrina Each Y 733.90 1 (connected) Sewer Access Charge – Brewarrina Each Y 366.95 1 (unconnected)

21

162 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Urinal Each Y 62.37 1

Water Closets 2-5 Each Y 185.43 1

Water Closets – over 5 Each Y 62.37 1

Sewer Access Charge – Goodooga Each Y 318.80 1 Sewer Charge Non-rateable properties Per Y 107.00 1 (excluding schools) closet

Sewer Charge Non-rateable properties Per Y 107.00 1 (schools only) closet

Sewer Charge –serving a Urinal - Non- Per Y 62.37 1 rateable properties cistern

Sewer Charge- Water Closets 2-5 Y 185.43 1

Sewer Charge- Water Closets –over 5 Y 62.37 1

Copy of Drainage diagram Each Y 20.00 1 Connect Private drain or sewer to public Each Y 160.00 1 drain or sewer Application to operate sewerage each Y 40.00 1 management system

Annual renewal fee each Y 15.00 1

Inspection fee each Y 45.00 1

WATER SERVICES Brewarrina

Per h’hold Y 409.00 1 20mm Access Water Charge – Brewarrina Per h’hold Y 638.00 1 25mm Access Water Charge – Brewarrina Per h’hold Y 1047.00 1 32mm Access Water Charge – Brewarrina Per h’hold Y 1636.00 1 40mm Access Water Charge – Brewarrina Per h’hold Y 2556.00 1 50mm Access Water Charge – Brewarrina Per h’hold Y 5317.00 1 80mm Access Water Charge – Brewarrina Per h’hold Y 10225.00 1 100mm Access Water Charge – Brewarrina Per h’hold Y 354.00 5 Raw Water Access Charge - Brewarrina c/p/kl Y 1.08 5 Filtered Water Usage charge- Brewarrina Goodooga Per h’hold Y 308.00 1 20mm Access Water Charge – Goodooga Per h’hold Y 480.00 1 25mm Access Water Charge – Goodooga 22

163 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Per h’hold Y 788.00 1 32mm Access Water Charge – Goodooga Per h’hold Y 1232.00 1 40mm Access Water Charge – Goodooga Per h’hold Y 1925.00 1 50mm Access Water Charge – Goodooga Per h’hold Y 4004.00 1 80mm Access Water Charge – Goodooga Per h’hold Y 7700.00 1 100mm Access Water Charge – Goodooga Per h’hold Y 308.00 5 Raw Water Access Charge – Goodooga c/p/kl Y 1.08 5 Filtered Water Usage charge – Goodooga

Connection Fees

Filtered standard 20mm each Y 624 5

25mm each Y 732 5

32mm each Y 888 5

38mm each Y 1200 5

50mm each Y 1680 5

100mm Each Y POA 5

Plus road opening m Y 300 5

Raw standard 20mm each Y 624 5

each Y 732 5 25mm

each Y 888 5 32mm

each Y 1200 5 38mm

each Y 1680 5 50mm

100mm Each Y POA 5

Plus road opening m Y 300 5

23

164 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Effluent Water

$130 first five megalitres + $18 Special charge for use of effluent water each Y 5 each additional megalitre

ENGINEERING

PLANT HIRE RATES (External Only)

Earthmoving Equipment

hr Y 230.00 5 Graders - Cat 16G hr Y 185.00 5 Graders - Cat 140G hr Y 185.00 5 Loader - Cat 950 hr Y 185.00 5 Loader – Case

Large Trucks

Prime Mover & Low Loader hr Y 175.00 5

Prime mover and tipping (1) trailer hr Y 175.00 5

Prime Mover and water tanker hr Y 175.00 5

Additional trailer hr Y 75.00 5

Medium Trucks

Rigid Truck - Isuzu (con1eting) hr Y No external hire

Rigid Truck – Isuzu (with Hi-Ab) hr Y 145.00 5 one man 1ew

Rigid Truck – Isuzu (tar truck) one hr Y 160.00 5 man 1ew, materials extra Small Trucks

Rigid Truck - 2 tonne tipper - one hr Y 90.00 5 man 1ew

Rigid Truck - Ford Trader hr Y 90.00 5 (Goodooga) - one man 1ew

24

165 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

HIlux 4WD-not for hire- charged as Km Y 1.00 p klm 5 worker support only

Rollers (per hour)

Multi Tyre Roller hr Y 120.00 5

Padfoot Multipac hr Y 120.00 5

Vibrating Smooth Drum – Pannell hr Y 120.00 5 Drawn

Grid Roller - Hyster Drawn hr Y 55.00 5

Backhoes/Tractors

Backhoe hr Y 145.00 5

Skid Steer Loader hr Y 105.00 5

- additional implement for Skid hr Y 35.00 5 Steer

Tractor -Massey Ferguson with hr Y 110.00 5 slasher

Tractor - Deutz with slasher hr Y 100.00 5

Small Plant – (No Operator included, approval by AGM, $250 Deposit)

Coolroom – only to be towed on day Y 95.00 5 sealed roads

Show/Rodeo Com & Jockey Club no charge

Security deposit (refundable) Per hire 250-00

LABOUR

Tradesman with tools –Plumber, mechanic, hr Y 88.00 5 carpenter

Trades assistant(2nd & subsequent hours) Hr Y 60.00 5

Emergency Call outs – Water and Sewer. Basic sewer chokes (min - 1 hr charge) As hr Y 247.00 5 per Council Policy No. 2/2.10/7

25

166 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Overtime rates apply – Weekends, After hours and Public Holidays (All staff) 4hr min Y Per quotation 5

Other Staff Overtime rates apply-weekends, after 4hr min Y 352.00 5 hours, and Public holidays Overtime rates- each additional hour after Hr Y 88.00 4 hours

MATERIALS (Quantities greater than 100m3 quoted separately)

Materials (per cubic metre) 3 Bulk Gravel>100m (ex-pit) 21.00 (ex-pit =when our loader is in the pit) m3 Y 1

Gravel/ uncrushed 36.00 m3 Y 1

Carramar sand (free for footpaths m3 Y 62.00 1 only)

Granite, Uncrushed m3 Y 36.00 1

Granite, crushed m3 Y 55 (when available) 1

5mm and 7mm Aggregate, crushed m3 Y 124.00 1

3 10mm and 14mm Aggregate, m Y 124.00 1 crushed m3 Aggregate / sand mix for Concrete Y 247.00 1

m3 Coonamble Sand Y 124.00 1 m3 crusher Dust Y 72.00 1

These prices are ex-depot delivered within load Y 15 1 2km radius of depot. (<2m3) These prices are ex-depot delivered within load Y 30 1 2km radius of depot. (>2m3) These prices are ex-depot delivered km Y 3 1 outside 2km radius of depot. (<2m3)

These prices are ex-depot delivered km Y 4.00 1 outside 2km radius of depot. (>2m3)

NOXIOUS WEED SPRAYING

Weeds Controller, vehicle & equipment, chemicals - inside 25km radius of hr Y 98.00 1 Brewarrina - Per Hour - Outside 25km radius of hr Y 124.00 1 Brewarrina 26

167 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Property Inspection Hr Y 72.00 1

ENGINEERING WORKS

Double grid replacement each POA

Single grid replacement each POA

Install standard 3.0m layback 3.0m Y 1650.00 1

Road Openings - Permit each Y 50 P1

Appendix One

DEVELOPMENT APPLICATIONS

SECTION 1

FEE FOR DEVELOPMENT APPLICATION (CLAUSE 246)

(cf clause 93 of EP&A Regulation 1994)

(1) The maximum fee for development involving the erection of a building, the carrying out of work or the demolition of a work or a building, and having an estimated cost within the range specified in the Table to this clause is calculated in accordance with that Table. (2) Despite sub clause (1), the maximum fee payable for development for the purpose of one or more advertisements is: (a) $285, plus $93 for each advertisement in excess of one, or (b) the fee calculated in accordance with the Table, whichever is the greater. (3) The fees determined under this clause do not apply to development for which a fee is payable under clause 247.

COST FEE That is, the contract price or if there is no Expressed as percentage of cost contract, the cost of the proposed building as determined by the Council

$110 Up to $5,000

$170, plus an additional $3.00 for each $1,000 $5,000 - $50,000 (or part of $1,000) of the estimated cost.

27

168 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

$352, plus an additional $3.64 for each $1,000 $50,000 - $250,000 (or part of $1,000) by which the estimated cost exceeds $50,000

$1,160, plus an additional $2.34 for each $1,000 $250,000-$500,000 or part of $1,000) by which the estimated cost exceeds $250,000. $1,745, plus an additional $1.64 for each $1,000 (or part of $1,000) by which the estimated cost $500,001-$1,000,000 exceeds $500,000.

$2,615, plus an additional $1.44 for each $1,000 (or part of $1,000) by which the estimated cost $1,000,001-$10,000,00 exceeds $1,000,000.

$15,875, plus an additional $1.19 for each $1,000 (or part of $1,000) by which the More than $10,000,000 estimated cost exceeds $10,000,000

RESIDENTIAL LESS THAN $100,000 IN VALUE- CLAUSE 247

Development involving the erection of a dwelling house with an estimated construction cost of $100,000 or less is $455.00.

RESIDENTIAL FLAT DEVELOPMENT – (CLAUSE 248) An additional fee, not exceeding $760, is payable for development which is required to be referred to a design review panel under State Environmental Planning Policy No 65—Design Quality of Residential Flat Development

SUBDIVISION OF LAND (CLAUSE 249)

The fee payable for development involving the subdivision of land is calculated in accordance with the Table below.

Opening of Public road (New) $665 plus $65 per additional lot Not opening Public Road (Old) $330 plus $53 per additional lot Strata $330 plus $65 per additional lot

Development not involving the erection of a building (Clause 250) • the carrying out of a work, the subdivision of land or the demolition of a building or work

A fee of $285 is payable for development that does not involve the erection of a building, the carrying out of a work, the subdivision of land or the demolition of a building or work.

28

169 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Additional fee—designated development (Clause 251) Despite the provisions of this Division, a consent authority may charge a minimum fee of $555 (to a maximum of $920) for designated development.

Line plan release fee $150 with this application.

Advertising (Clause 252)

Additional fees payable for development that requires advertising

(a) $2,220, in the case of designated development,

(b) $1,105, in the case of advertised development,

(c) $1,105, in the case of prohibited development,

$1,105, in the case of development for which an environmental planning instrument or development control plan requires notice to be given otherwise than as referred to in paragraph (a), (b) or (c).

Additional fees—development requiring concurrence (Clause252A) 1) An additional processing fee up to a maximum of $140, plus a concurrence fee for payment to each concurrence authority, are payable in respect of an application for development that requires concurrence under the Act or an environmental planning instrument (2) For the purposes of this clause, the concurrence fee payable to a concurrence authority for a development application is $320 or such lesser amount as is notified to the consent authority in writing by the concurrence authority, whether generally, in relation to that application or in relation to a class of development applications to which that application belongs.

ADDITIONAL FEES FOR INTEGRATED DEVELOPMENT (Clause 253) (1) An additional processing fee up to a maximum of $140, plus an approval fee for payment to each approval body, are payable in respect of an application for integrated development. (2) The consent authority must forward each approval fee to the approval body concerned at the same time at which it forwards a copy of the development application to the approval body under clause 66. (2A) The approval fee for a development application is not payable to any approval body that has notified the consent authority in writing that payment of the fee is waived, whether generally, in relation to that application or in relation to a class of development applications to which that application belongs. (2B) An approval body may repay to the consent authority the whole or any part of an approval fee paid to it under this clause, in which case the consent authority must remit the amount repaid to the applicant. (3) The additional processing fee is payable in respect only of applications made on or after 1 July 2002. (4) For the purposes of this clause, the approval fee payable to an approval body for a development application is $320 or such lesser amount as is notified to the consent authority in writing by the approval body, whether generally, in relation to that application or in relation to a class of development applications to which that application belongs

Strategic Planning Fee:

The fee is applicable to all development applications over $50,000 in value and is levied at a rate of 0.064 cents in every dollar of the estimated value of the development.

29

170 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

Council will retain $5.00 per application for the processing of the levy.

SECTION 7

OTHER FEES AND CHARGES

1. The fee for a request for a review of a determination is $500.

2. The application fee for modification of consent for local development.

(a) if the fee for the original application was less than $100, 50% of that fee, or

(b) in all other cases, 50% of the fee for the original application or $350, whichever is the lesser.

3. The fee for the modification of development consent is:

(a) if the fee for the original application was less than $100, 50% of that fee, or

(b) in all other cases, $100 or 50% of the fee for the original application, whichever is the greater, plus an additional amount of not more than $500 if notice of the application is required to be given under section 96 (2) of the Act.

3. The fee for Public Entertainment approval 0-250 persons $200 251-500 persons $250 501 or more persons $300

SECTION 8

MISCELLANEOUS ACTIVITIES

Small developments that are not complying or exempt development such as fences, advertising sign, green house, or aviary are $50.00, which includes a Construction Certificate.

Appendix Two

CONSTRUCTION CERTIFICATES

The table below shows the fee payable for application for the erection a building or structure after the development application is approved or if compiling development.

COST FEE APPLICATION FEE $50 That is, the contract price or if there is no Expressed as percentage of cost contract, the cost of the proposed building as determined by the Council Not exceeding $5000.00 Plus 0.5%

Exceeding $5000.00 but not Plus $75.00 , Plus Exceeding $100,000.00 .035% of the amount in excess of 30

171 Brewarrina Shire Council FEES AND CHARGES 2012 -2013

$5000.00 Exceeding $100,000.00 but not Plus $407.50. Exceeding $250,000.00 Plus 0.2% of the amount in excess of $100,000.00 Exceeding $250,00.00 $707.50 Plus 0.1% of the amount in excess of $250,000.00

Inspection Fees:

On site inspections of building works and structures and other matters will charged at the rate of $55.

31

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 172 BUDGET 2012/13

151

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 173

152

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 174

153

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 175

154

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 176

155

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 177

156

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 178

157

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 179

158

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 180

159

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 181

160

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 182

161

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 183

162

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 184

163

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 185

164

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 186

165

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 187

166

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 188

167

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 189

168

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 190

169

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 191

170

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 192

171

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 193

172

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 194

173

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 195

174

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 196

175

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 197

176

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 198

177

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 199

178

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 200

179

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 201

180

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 202

181

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 203

182

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 204

183

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 205

184

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 206

185

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 207

186

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 208

187

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 209

188

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 210

189

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 211

190

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 212

191

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 213 CAPITAL WORKS BUDGET 2012/13

192

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 214

TECHNICAL SERVICES WORKS PROGRAM 2012 ‐ 2017

NOTE

The Forward Works Program has been developed directly from the draft Asset Management Plans that have been written as part of the Integrated Planning Reporting Frameworks.

The projects contained in this plan have not been assessed under the criteria as specified within each Asset Management Plan. Once these criteria have been applied to each project, the proposed year of construction may change. This will be undertaken over the following years as each Asset Management Plan is refined.

There are two Asset Management Plans still to be developed, Airports and Waste & Miscellaneous. These plans shall be developed shortly although they will have little bearing on this year’s budget.

193

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 215

TOWN STREETS

Development Road Road Program Ref Number Name From To Project 2012/13 2013/14 2014/15 2015/16 2016/17

E2.10.2 TSB 006 Bourke St Darling Sandon Reseal $17,784

E2.10.2 TSB 002 Bathurst St Young Belmore Reseal $17,708

E2.10.2 TSG 004 Adams St Walgett Brenda Reseal $21,341

E2.10.2 TSG 003 Adams St Chandos Walgett Reseal $14,227

E2.10.2 TSG 006 Adams St Bankeet Queensland Reseal $8,208

E2.10.2 TSB 026 Wilson St Byron Young Reseal $7,824

E2.10.2 TSG 005 Adams St Brenda Bankeet Reseal $7,114

E2.10.2 TSG 002 Adams St Goodooga Chandos Reseal $6,080

E2.10.2 TSG 010 Brenda St Hammond Doyle Reseal $3,564

E2.10.2 TSG 009 Brenda St Adams Hammond Reseal $3,325

E2.10.2 TSB 002 Bathurst St Darling Sandon Reseal $18,240

E2.10.2 TSB 026 Wilson St Tarrion Bokhara Reseal $14,767

E2.10.2 TSG 008 Brenda St Bokhara Adams Reseal $3,671

E2.10.2 TSB 003 Belmore St Doyle Bathurst Reseal $15,200

E2.10.2 TSB 004 Belmore St Bourke Wilson Reseal $10,792

194

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 216 E2.10.2 TSB 002 Bathurst St Young Belmore Reseal $5,613

E2.10.2 TSB 003 Bathurst St Sandon Young Reseal $4,974

LANEWAY SEALING PROGRAM

Development Road Road Program Ref Number Name From To Project 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22

E2.10.2 TSB 006.4L Belmore Tarrion Seal $11,664

E2.10.2 TSB 026.2L Young Belmore Seal $9,850

E2.10.2 TSB 002.1L Darling Sandon Seal

E2.10.2 TSB 002.4L Belmore Tarrion Seal

RURAL ROADS

Development Road Program Ref Number Road Name Project From To CRC 2012/13 2013/14 2014/15 2015/16 2016/17

E2.10.2 16008 Monkey Bridge Road Gravel Resheet 31.392 40.071 $275,992 274,289

E2.10.2 16003 Narran Lake Road Gravel Resheet 12.821 19.373 $41,278 41,278

E2.10.2 16006 Goodooga‐Langboyd Road Gravel Resheet 30 40 $318,000 318,000

E2.10.2 16008 Monkey Bridge Road Gravel Resheet 12.941 30.113 $546,070 546,070

E2.10.2 16403 Collerina Road Gravel Resheet 3.139 10.564 $46,778 46,778

E2.10.2 16006 Goodooga‐Langboyd Road Gravel Resheet 40 52.283 $390,599 40,719 315,567

E2.10.2 16006 Goodooga‐Langboyd Road Gravel Resheet 20 30 $318,000 318,000

195

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 217 E2.10.2 16006 Goodooga‐Langboyd Road Gravel Resheet 10 20 $318,000 318,000

RURAL ROADS continued

E2.10.2 16437 Brenda Road Gravel Resheet 8.018 22.182 $114,728 114,728

E2.10.2 16437 Brenda Road Gravel Resheet 8.018 22.182 $89,233 89,233

E2.10.2 16022 Cowga Road Gravel Resheet 5.326 10.163 $30,473 30,473

E2.10.2 16012 Kahmoo‐Dunsandle Road Gravel Resheet 21.192 22.884 $13,705 13,705

E2.10.2 16403 Collerina Road Gravel Resheet 10.564 12.014 $9,135 9,135

E2.10.2 16008 Monkey Bridge Road Gravel Resheet 40.071 41.440 $8,625 8,625

E2.10.2 16008 Monkey Bridge Road Gravel Resheet 30.113 31.392 $8,058 8,058

E2.10.2 16438 Fingerpost Road Gravel Resheet 0.000 1.210 $7,623 7,623

E2.10.2 16006 Goodooga‐Langboyd Road Gravel Resheet 0 10 $318,000 318,000

E2.10.2 16003 Narran Lake Road Gravel Resheet 19.373 45.768 $839,361 245,047

E2.10.2 16308 Yarrawin Road Gravel Resheet 0.066 5.048 $40,354 40,354

E2.10.2 16403 Collerina Road Gravel Resheet 12.865 15.251 $15,032 15,032

E2.10.2 16425 West Culgoa Road Gravel Resheet 82.889 84.423 $9,664 9,664

E2.10.2 16403 Collerina Road Gravel Resheet 35.769 36.782 $5,470 5,470

REGIONAL ROADS

Development Road Program Ref Number Road Name Project From To CRC 2012/13 2013/14 2014/15 2015/16 2016/17

196

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 218 E2.10.2 18001 Jobs Gate Road (to) Reseal 4.460 9.573 $116,576 $116,576

REGIONAL ROADS continued

E2.10.2 18070 Goodooga Road Gravel Resheet 93.387 108.910 $493,631 $319,029 $174,602

E2.10.2 18070 Goodooga Road Reseal 15.927 18.175 $51,254 $51,254

E2.10.2 18070 Goodooga Road Reseal 32.131 33.146 $23,142 $23,142

E2.10.2 18001 Jobs Gate Road (to) Reseal 60.568 61.129 $12,791 $12,791

E2.10.2 18070 Goodooga Road Gravel Resheet 116.282 116.833 $6,943 $6,943

E2.10.2 18070 Goodooga Road Gravel Resheet 115.328 115.790 $2,911 $2,911

E2.10.2 18070 Goodooga Road Gravel Resheet 39.583 92.828 $1,693,191 $358,888 $533,490 $533,490 $533,490

PARKS, GARDENS AND SPORTING FIELDS

Development Program Ref Park Name Asset CRC 2012/13 2013/14 2014/15 2015/16 2016/17

E2.8.4.3 Memorial Park Plan of Management 0 $ ‐

E2.4.2.1 Weir Park Plan of Management 0 $ ‐

E2.4.1.1 4 Mile Reserve Plan of Management 0 $ ‐

E2.8.4.1 Brewarrina Cemetery Plan of Management 0 $ ‐

E2.8.4.1 Goodooga Cemetery Plan of Management 0 $ ‐

E2.4.3.1 Boat Ramp Park Plan of Management 0 $ ‐

197

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 219 E2.8.4.3 Geoff New Oval Plan of Management 0 $ ‐

PARKS, GARDENS AND SPORTING FIELDS continued

E2.8.4.3 Skate Park Plan of Management 0 $ ‐

E2.8.4.3 Airport Grounds ‐ Brewarrina Plan of Management 0 $ ‐

E2.8.4.3 Airport Grounds ‐ Goodooga Plan of Management 0 $ ‐

E2.8.4.3 Tennis Court Park Plan of Management 0 $ ‐

E2.8.4.3 Dooreen Peter Park Plan of Management 0 $ ‐

E2.8.4.3 Magpie Oval Plan of Management 0 $ ‐

E2.8.4.3 Bathurst Street Tennis Courts Plan of Management 0 $ ‐

E2.8.4.3 Gongolgon Tennis Courts Plan of Management 0 $ ‐

E2.8.4.2 Brewarrina Racecourse Plan of Management 0 $ ‐

E2.8.4.3 Naveena Street Park Plan of Management 0 $ ‐

E2.8.4.3 Pat White Park Plan of Management 0 $ ‐

E2.8.4.3 High Street Park Plan of Management 0 $ ‐

E2.8.4.3 Gerhards Park Plan of Management 0 $ ‐

E2.8.4.3 Church Street Netball Courts Plan of Management 0 $ ‐

E2.8.4.2 Goodooga Racecourse Plan of Management $ ‐

198

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 220

AIRPORTS

Development Program Ref Name Project 2012/13 2013/14 2014/15 2015/16 2016/17

Brewarrina Reseal air craft parking area 25,000

Goodooga Reseal taxi way 30,000

Goodooga Repair runway – heavy patching 100,000

Brewarrina Upgrade electrical system 100,000

Brewarrina Reseal runway 250,000

WATER

Development Program Ref Road Name Project From To 2012/13 2013/14 2014/15 2015/16 2016/17

Bourke Street Brewarrina Raw D‐BRE 28 ‐ 42 $58,498

Crown Reserve Brewarrina Raw D‐BRE 29 ‐ 33 $30,919

Barwon Street Brewarrina Raw D‐BIL 65 ‐ 69 $24,166

Bourke Street Brewarrina Raw D‐BRE 42A ‐ 42B $4,717

Bourke Street Brewarrina Raw D‐BRE 42 ‐ 43 $79,255

199

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 221 Barwon Street Brewarrina Raw D‐BIL 59 ‐ 66 $16,511

WATER continued

Darling Street Brewarrina Raw D‐BRE 53 ‐ 54 $4,717

Culgoa Street Brewarrina Raw D‐NEW 04 ‐ 05 $34,438

Burban Street Brewarrina Raw D‐NEW 02 ‐ 03 $23,116

Bridge Street Brewarrina Raw D‐BIL 61 ‐ 69 $17,690

Bridge Street Brewarrina Raw D‐BIL 66 ‐ 67 $8,727

Byrock Road Brewarrina Raw D‐NEW 17 ‐ 17A $7,548

Bathurst Street Brewarrina Raw D‐BRE 51 ‐ 51A $4,717

Bridge Street Brewarrina Raw D‐BIL 66 ‐ 69 $3,774

Bathurst Street Brewarrina Raw D‐BRE 47 ‐ 52 $192,949

Bathurst Street Brewarrina Raw D‐BRE 50 ‐ 50A $102,843

SEWER

Development Program Ref Road Name Project From To 2012/13 2013/14 2014/15 2015/16 2016/17

Brewarrina C‐BIL (Collection Billabong) AF1 PS1 $4,023

Brewarrina C_BRE (Collection Brewarrina) A1 PS3 $4,224

200

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 222 Brewarrina T_BIL (Transfer Billabong) PS1 J17 $51,117

Brewarrina T_NEW (Transfer NEW) PS2 A28 $95,555

Brewarrina T‐BRE (Transfer Brewarrina) TW PS3 $111,653

Brewarrina SPS 2 (Culgoa St) $85,310

WASTE MANAGEMENT

Development Program Ref Road Name Project 2012/13 2013/14 2014/15 2015/16 2016/17

Brewarrina New cell $100,000 (Includes $50,000 funds from 2011/12 budget)

TO BE DEVELOPED BASED ON WASTEMANAGEMENT STRATEGY

BUILDINGS, HOUSES AND LAND

Development Program Ref Address 2012/13 2013/14 2014/15 2015/16 2016/17

Community Centre Re‐roof centre and upgrade toilets $250,000

201

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 223

TO BE FINALISED

PLANT REPLACEMENT PROGRAM

Development Plant Program Ref No Plant Name 2012/13 2013/14 2014/15 2015/16 2016/17

67 Ford Courier 2WD 22,409

84 Toyota Hilux ‐ Roads Crew 37,738

85 Toyota Hilux ‐ Roads Crew 37,738

86 Toyota Hilux ‐ Roads Crew 37,738

650 Iseki Ride‐on Mower (2006) 50,075

826 Ride‐On Mower (Goodooga) 3,324

23 Toyota Aurion ATX ‐ (Doctor) 39,066

87 Holden Commodore SV6 ‐ Corporate Manager 34,609

88 Ford FG G6E Euro Sedan ‐ Assistant General Manager 44,406

91 Holden Colorado Double Cab ‐ Workshop 40,230

92 Holden Colorado Double Cab ‐ Ranger 40,230

93 Holden Colorado Double Cab ‐ Town Supervisor 40,230

94 Holden Colorado Double Cab ‐ Roads Supervisor 40,230

95 Holden Colorado Double Cab ‐ 40,230

202

Brewarrina Shire Council Delivery Program 2012 - 2017 and Operation Plan 2012 - 2013 224 127 Isuzu FVR900 (Bridge Gang) 108,928

130 Mitsubishi Fuso dual cab tipper & crane 158,912

801 Bremner Emulsion Sprayer (Goodooga) 345

PLANT REPLACEMENT PROGRAM Continued

802 Concrete Vibrators (2) 11,500

825 ‐ 1 Honda brush cutter (Parks and Gardens) 453

825 ‐ 2 Honda brush cutter (Water and Sewer) 453

825 ‐ 3 Honda brush cutter (Parks and Gardens) 453

827 Mowers 900

827‐1 Honda self propelled (Community Centre) 900

859 Brushcutters x 2 1,512

861 Telescopic Pole Pruner 1,066

860 Blower 540

203