Conceptual Plan

CONCEPTUAL PLAN FOR PROPOSED ELECTRONIC MANUFACTURING CLUSTER

At

Kuppanur, Akkaraisengapalli & Vadklur Village, , district,

Submitted to State Level Environmental Impact Assessment Authority Tamil Nadu

Project Proponent Environment Consultant

M/s. ADD-ELCINA Electronics Park Pvt. Ltd M/s. Vimta Labs Ltd. Villa No. B-9, Yemalur House owner #8, Azad Road, R.S.Puram, Association Coimbatore – 641 002 Epsilon ventures, Yemalur Main road & , Karnataka 142, IDA, Cherlapally, Hyderabad – 500 051 www.vimta.com QCI-NABET & NABL Accredited and ISO 17025 Certified Laboratory, Recognised by MoEF, New Delhi

M/s. ADD-ELCINA Electronics Park Private Limited, Coimbatore, Tamil Nadu Conceptual Plan

TABLE–1 PROJECT AT A GLANCE

Name & Address of M/s. ADD-ELCINA Electronics Park Private Limited Project Proponent 21, Door No. 1515A, Nethaji Street, Sathyamanagalam road, Ganapathy, Coimbatore Name & Address of Mr. Anil Kumar Sethi Applicant Director M/s. ADD-ELCINA Electronics Park Private Limited The ICON, No. 8, 5th Floor, 80 ft Main road, HAL 3rd Stage, Indira Nagar, Bangalore

Email id ---- Contact no. ---- Proposed Project Proposed Electronic Manufacturing Cluster Category 8(b), “B2” Project location Kuppanur Village SF.No. 70, 71, 72, 207, 208, 209, 210/1A, 210/1B, 210/2, 239, 240, 241, 242, 243, 244, 313

Akkaraisengapalli village SF.No. 556, 558, 559, 560, 561, 562, 563, 564, 565/2, 567/3

Vadklur Village SF.No. 304, 313/2, 314

Annur Taluk, , Tamil Nadu Total Plot Area Land area: 63.79 ha (157.6 acres) Procured – 57.67 ha (142.5 acres) To be procured – 6.12 (15.11 acres) Total Built-up Area 21,169 sq. m Environmental Setting Site co-ordinates Latitude Latitude 11o19.087’N 77o3.671’N 11o18.713’N 77o3.781’N 11o18.632’N 77o4.359’N 11o18.214’N 77o4.875’N 11o18.131’N 77o5.113’N 11o18.178’N 77o5.601’N 11o16.975’N 77o5.671’N 11o16.889’N 77o4.973’N 11o17.418’N 77o4.925’N 11o17.761’N 77o4.084’N 11o18.162’N 77o3.500’N

Elevation 394 m AMSL

M/s. ADD-ELCINA Electronics Park Private Limited, Coimbatore, Tamil Nadu Conceptual Plan River R.Bhavani 5.21 km, West

Waterbodies Annur Lake 5.0 km, SE Vadakkalur Lake 1.8 km, SE Masakkaanan Kuttai 3.0 km, SE

Reservoir Bhavani sagar reservoir 9.6 km, NNW

Reserve Forests Odunthurai R.F 9.0 km, WNW Medur Pethikuttai Forest 5.4 km, NNW

Mountain Mount Sirumugai 2.1 km, North Mount Othimalai 6.13 km, North

Densely populated area Annur 5.66 km, SSE Nearest major Mannur - 0.2 km, West. habitation Proposed facilities Electronic manufacturing cluster Total occupancy 6379 Persons (Including visitors) Parking Details 21099 sq.m Water requirement Total water requirement 7200 KLD

Total fresh water requirement 2400 KLD Source of fresh water: New Area Development Corporation Limited (NTADCL) and borewells (Refer Annexure–XVIII)

Treated water from STP – 4,800 KLD Water Supply Source New Tiruppur Area Development Corporation Limited & Borewells Sanitation details Proposed sewage treatment plant (STP) capacity of 5400 KLD. Solid-waste The solid wastes will be collected and segregated. The Management biodegradable & non-biodegradable waste will be given to authorized recyclers. Power requirement Power demand: 30 MW Source: TANGEDCO through Irumburai substation. MoU has signed by GoTN with this substation

M/s. ADD-ELCINA Electronics Park Private Limited, Coimbatore, Tamil Nadu Conceptual Plan Emergency Back-up DG Sets - Used for Common areas, External lighting and Lifts Fuel Requirement: Ultrapure low sulphur content diesel

Back-up:

Fuel consumption in S.No DG Set capacity Nos Litres/hr/DG 1 82.5 KVA 1 26.4 2 100 KVA 3 32.0 3 200 KVA 2 64.0 4 500 KVA 2 160.0

Individual lessee will be managing their power back up facility based upon their requirements Air Pollution/Noise DG Sets will be provided with stack height of 3m above the generation Sources building height. Also provided with suitable acoustic enclosure to minimize noise. Total investment of the Estimated total project cost for infrastructure development under project/activity. this project is Rs. 196/- Crores

Funds allocated for  Capital cost: Rs. 166 Lakhs EMP  Recurring cost: Rs. 56.5 Lakhs/annum Name of the M/s. VIMTA LABS LIMITED Environmental Branch office: Consultant involved No. 8 – Azad Road R. S. Puram, Coimbatore – 641002

Regd. office: 142, IDA, Phase-II, Cherlapally, Hyderabad-500 051  QCI/NABET Accredited EIA Consultancy Organization, NABL Accredited, ISO 17025 Certified and MoEF Recognized Laboratory

M/s. ADD-ELCINA Electronics Park Private Limited, Coimbatore, Tamil Nadu Conceptual Plan

I. PROPOSED PROJECT

The project is developing an area for electronic manufacturing cluster.

II. AREA STATEMENT

Plot area as per doc : 63.79 ha (157.6 Acres) Procured : 57.67 ha (142.49 Acres) Yet to be procured : 6.12 ha (15.11 Acres) Total Built-up area : 21,169 Sq.m.

TABLE–2 LANDUSE SPLIT-UP

Sr. Land Use Area (Sq.m) Area (ha) Area (%) Usage Type No. 1 Industrial Plots 385714 38.57 60.5 Processing area 2 Services Area 12536 1.25 2 Processing area 3 Roads 116232 11.62 18.2 Processing area 4 Parking Area 21099 2.11 3.3 Processing area 5 Common amenities 37755 3.78 5.9 Processing area (2.5) + Non processing area (3.4) 6 Greenbelt 64516 6.45 10.1 Non-processing area Total 637852 63.79 100 Kuppanur Village SF.No. 70, 71, 72, 207, 208, 209, 210/1A, 210/1B, 210/2, 239, 240, 241, 242, 243, 244, 313

Akkaraisengapalli village SF.No. 556, 558, 559, 560, 561, 562, 563, 564, 565/2, 567/3

Vadklur Village SF.No. 304, 313/1, 313/2, 314

Annur Taluk, Coimbatore district, Tamil Nadu

III. WATER AND WASTEWATER MANAGEMENT

The total water required for the project is 7,200 KLD. The fresh water requirement of (2,400 KLD) will be met from New Tiruppur Area Development Corporation Limited and 4,800 KLD from STP as treated water.

The total wastewater generation of the area development will be about 5,323 KLD. The generated wastewater will be treated in the STP (90% efficiency) of 5400 KLD and the treated wastewater will be utilized for process, domestic requirement and in common amenities

Surface run-off collected from the terrace floor run-off will be diverted to the rainwater recharging structures.

M/s. ADD-ELCINA Electronics Park Private Limited, Coimbatore, Tamil Nadu Conceptual Plan

IV.GREENBELT / LANDSCAPING

The project will be developed with 6.45 ha green cover. In the upcoming future developments more green belt area will be developed covering 35% of the total area.

V. SOLID WASTE MANAGEMENT

The total waste generated from the entire project amounts to around 0.32 TPD. Out of which biodegradable will be about 0.19 TPD (i.e. 60%) and non-biodegradable will be about 0.13 TPD (i.e. 40%). The solid wastes will be collected and segregated. The biodegradable & non-biodegradable waste will be given to authorized recyclers. STP sludge generated from the STP will be used as manure for garden.

TABLE–3 SOLID WASTE GENERATION DETAILS

Per capita No. of Total Solid Waste S. No. Source Considered Persons (TPD) (in TPD) 1 General Garbage Industrial Plots 6379 0.05 0.32 Total Garbage 2 STP sludge ------0.88

TABLE–4 SOLID WASTE MANAGEMENT

Quantity Mode of Disposal S. Description of Mode of Organic Inorganic No. waste Collection (60%) (40%) 1 General Garbage 0.19 TPD Manual Authorized waste collectors 0.13 TPD Manual 2 STP sludge 0.88 Manual On own land for Gardening

VI. FIRE SAFETY MEASURES ADOPTED

Firefighting system to the Industrial plots is designed based on the recommendations of NBC 2005. Following safety measures are envisaged.

 An exclusive UG Sump at the ground level & OHT on the stair case core of each block at the terrace level will be adopted.  An electrical driven fire pump and one diesel pump shall be provided.  One no. of Sprinkler pump exclusively for sprinkler system.  One no. of wet riser will be provided.  FHC is envisaged with hydrant valve and hose reel at each staircase landing level.  Separate pump riser & distribution network is proposed for sprinkler system.  Portable fire extinguishers are proposed to be placed at strategic locations.  Fire brigade inlet connection for external pumping arrangement is envisaged  A yard hydrant of building peripheral length is provided  Installation control valve is envisaged for sprinkler system  Automatic sprinkler system is envisaged for entire building

M/s. ADD-ELCINA Electronics Park Private Limited, Coimbatore, Tamil Nadu Conceptual Plan

The above safety requirements are same for all the blocks

VII. CONCLUSION

The establishment of the Electronic Manufacturing Cluster by M/s. ADD-ELCINA Electronics Park Private Limited at Kuppanur, Akkaraisengappali & Vadklur villages, Annur taluk, Coimbatore district Tamil Nadu, is best suited with the kind of climate that the area has. The project would cater to the people working in this area.

Ground water point of view

The project consumes about 2400 KLD of fresh water in a day which will be sourced from New Tiruppur Area Development Corporation Limited (NTADCL) and Borewells. The generated sewage from the project will be treated and used for green belt maintenance. Efficient recharge system replenishes the depleted ground water. Hence, there won’t be any impact on ground water quality / quantity.

Soil quality point of view

The soil analysis was already carried out, and was found to be good. There are no chances of soil contamination and no discharge of wastewater from unit operations which may contaminate the ground water table.

Air quality point of view

Air emissions will be only from DG Sets, for which stacks are provided with a height of 3m above building height for all DG Sets. Added to this, the fuel used is Ultrapure low sulphur content diesel and thus the emissions will be lowest.

Noise quality point of view

The generation of noise from project is negligible, as the only noise generating equipments are the DG Sets which comes with an inbuilt acoustic enclosure which has noise levels <75 dB.

Floral & Faunal diversity point of view

No kind of Floral & Faunal destruction is envisaged for the current project. As a matter of fact, the project is going to add further to the existing situation as landscape development is proposed for about 6.45 ha. More area will be developed for green belt during future development.

Hazardous waste point of view

The project will generate any hazardous waste in the form of e-waste. However, the authorization of the Tamil Nadu Pollution Control Board will be obtained as per the norms of the E-waste management and Hazardous Waste Management Rules. The waste oil from the DG Sets will not be discarded in any open area. Hence there is no threat to the soil and the neighboring area due to waste oil.

M/s. ADD-ELCINA Electronics Park Private Limited, Coimbatore, Tamil Nadu Conceptual Plan

Final Conclusion

The project would development have very less negative impact on the surrounding area or on the environment. The project would indeed help the economy and socio economic condition of the area and it is very highly recommended for the establishment of the project to favour exports and imports. The project would not have any negative impact on the soil, water, air or noise environment.