AVAILABLE PREMISES FOR THE DEVELOPMENT OF THIRD PLACES PART 2

THE VALLÉE’S > Provide temporary workspaces AVAILABLE PLOTS for employees and visitors wai- ASSETS ting for their train. The expected > Saint-Fons railway station: On the left bank, the Vallée is services will correspond to the . Surface: about 100 m². served by the TER Valence/ needs of a nomadic worker: wifi, . Owner: SNCF – Gares & regional railway line. The electric charging point, private Connexions. and Saint-Fons stations are a area for telephone calls, etc. . Constraints: lease. respective 8 and 4 minutes train . Location: 3 minutes from the > Create workspaces for in- ride from the Lyon Jean-Macé center of Lyon (Lyon Jean-Macé dividuals looking for a local train station, with a 30-minute train station). solution: self-employed, en- frequency during the day, but trepreneurs, teleworkers, as- > “Les nouveaux Constructeurs, lacking any on-site services. sociations, job seekers, stu- le Domaine des Acacias” real dents, etc. estate project in Saint-Fons: . Surface: about 100 m2. STRATEGY In addition, project initiators are . Owner: premises for sale. free to propose other services . Constraints: scheduled com- The objective is to develop third- or tools, in particular around the pletion in 2020. places in the immediate vicinity of mobility of the final stretch. For . Location: opposite the car the Feyzin and Saint-Fons stations, this purpose, connections may park of the Saint-Fons railway either by reclaiming the station be created with the Mobility com- station, 3 minutes from the buildings or by using commercial ponent of the Appel des 30! 2018 center of Lyon (Lyon Jean spaces available in buildings edition. Macé train station). adjacent to these stations. Applicants may respond alone > Feyzin railway station: Project initiators will have to be or as part of a group, in order . Surface: about 100 m². proactive and will be free to de- to extend their offer of services. . Owner: SNCF – Gares & fine their own concept of third The Appel des 30! speed meeting Connexions. places (material resources and scheduled during the Pollutec . Constraints: lease. services), as long as the latter is trade show will give project ini- . Location: 8 minutes from the consistent with the definition of a tiators a chance to connect and center of Lyon (Lyon Jean-Macé third place (see page 77). create a complete solution pac- train station). The partners of the Appel des 30! kage. have identified the following local needs:

- SEPTEMBER 2018 - 80 LOCATIONS OF POSSIBLE OPPORTUNITIES FOR CREATING THIRD PLACES

LYON PerrachePerrache Railway Station

To Part-Dieu Railway Station A7

Boulevard Laurent Bonnevay

SAINT-FONS Vers Grenoble

Domaine des Acacias 100 m2

Railway Station 100 m2

PIERRE-BÉNITE

A450

A7

Boulevard Urbain Sud

IRIGNY

FEYZIN

Railway Station 100 m2

VERNAISON

SOLAIZE

THIRD PLACES

CONTACT To Marseille LYON METROPOLE FABIEN BORDON - Project Manager Sustainable Development PHONEV er+33s 6 68 06 55 33 MAIL [email protected]

- SEPTEMBER 2018 - 81