In the High Court of Karnataka Kalaburagi Bench

Total Page:16

File Type:pdf, Size:1020Kb

In the High Court of Karnataka Kalaburagi Bench - 1 - W.P.No.204746/2015 IN THE HIGH COURT OF KARNATAKA KALABURAGI BENCH DATED THIS THE 15 TH DAY OF SEPTEMBER 2015 BEFORE THE HON’BLE MR. JUSTICE H.G.RAMESH WRIT PETITION NO.204746/2015 (S-RES) BETWEEN: MAHESH P PATIL S/O SHARANU AGE: ABOUT 31 YEARS OCC:ASST.ENGINEER(M) R/O H.NO.T-5,351, RTPS COLONY SHAKTI NAGAR RAICHUR – 584 170 .... PETITIONER (BY SRI AMEET KUMAR DESHPANDE, ADVOCATE) AND: 1. STATE OF KARNATAKA REPRESENTED BY ITS PRINCIPAL SECRETARY DEPARTMENT OF ENERGY VIDHANA SOUDHA BANGALORE – 560 001 2. KARNATAKA POWER CORPORATION LTD. REPRESENTED BY ITS MANAGING DIRECTOR NO.82, SHAKTI BHAVAN RACE COURCE ROAD BANGALORE – 560 001 3. SRIDHAR S UPADHE AGE ABOUT: 31 YEARS EMPLOYEE CODE:2626 OCC:ASST.ENGINEER (E) O/O ECES VARAHI HYDRO-ELECTRIC PROJECT KARNATAKA POWER CORPORATION LIMITED HOSANGADI,TQ:KUNDAPUR - 2 - W.P.No.204746/2015 DIST. UDAPI – 576 282 4. ASHWINI JAYAPRAKASH AGE ABOUT: 31 YEARS EMPLOYEE CODE:2633 OCC:ASST.ENGINEER (E), R/O ECES VARAHI HYDRO-ELECTRIC PROJECT, KARNATAKA POWER CORPORATION LIMITED HOSANGADI,TQ:KUNDAPUR DIST. UDAPI-576282 5. PAVITRA B G AGE ABOUT: 28 YEARS EMPLOYEE CODE:2624 OCC:ASST.ENGINEER (E), R/O SUPERINTENDENT ENGINEER, ECEC, KPCL, GANESH GUDI, TQ:SUPA DIST:UTHARKANNADA – 581 401 6. SRINIVAS H N AGE ABOUT: 32 YEARS EMPLOYEE CODE:2685 OCC:ASST.ENGINEER (E) R/O CHIEF ENGINEER (GSW) 2ND FLOOR, SUDHARSHAN COMPLEX SHESHADRI ROAD, BENGALURU – 560 009 7. APPANNA N K AGE ABOUT: 32 YEARS EMPLOYEE CODE:2888 OCC:ASST.ENGINEER (E), R/O SHARAVATI HYDRO-ELECTRIC PROJECT (ECES) KARNATAKA POWER CORPORATION LIMITED JOGFALLS, TQ:SAGAR DIST:SHIMOGA – 577 201 8. NAGANJAN S L AGE ABOUT: 33 YEARS EMPLOYEE CODE:2889 OCC:ASST.ENGINEER (E) R/O SUPERINTENDENT ENGINEER ECEC,KPCL, GANESH GUDI, TQ. SUPA DIST:UTHARKANNADA – 581 401 - 3 - W.P.No.204746/2015 9. DURGAPRASAD EMPLOYEE CODE:2893 AGE ABOUT: 33 YEARS OCC:ASST.ENGINEER (E) O/O SHARAVATI HYDRO-ELECTRIC PROJECT (ECES) KARNATAKA POWER CORPORATION LIMITED JOGFALLS, TQ.SAGAR DIST:SHIMOGA – 577 201 10. UMADEVI G EMPLOYEE CODE:2895 AGE ABOUT: 30 YEARS OCC:ASST.ENGINEER (E) O/O CHIEF ENGINEER (ELECTRICAL DESIGN) 3RD FLOOR, NO.22/23 SUDARSHAN COMPLEX SHESHADRI ROAD, BANGALORE – 560 009 11. NEELAM J GAONKAR EMPLOYEE CODE:2794 AGE ABOUT: 34 YEARS OCC:ASST.ENGINEER (E) O/O CHIEF ENGINEER,GAS SOLAR WIND [CE(GSW)], 2ND FLOOR NO.22/23, SUDARSHAN COMPLEX SHESHADRI ROAD, BENGALURU – 560 009 12. MOHAN B EMPLOYEE CODE:2495 AGE ABOUT: 34 YEARS OCC:ASST.ENGINEER (E), O/O SHARAWATI HYDRO-ELECTRIC PROJECT (ECES) KARNATAKA POWER CORPORATION LIMITED JOGFALLS, TQ:SAGAR DIST. SHIMOGA – 577 201 13. SWETHA G N EMPLOYEE CODE:2898 AGE ABOUT: 27 YEARS OCC:ASST.ENGINEER (E) O/O SHARAWATI HYDRO-ELECTRIC PROJECT (ECES), KARNATAKA POWER CORPORATION LIMITED, JOGFALLS, TQ:SAGAR DIST SHIMOGA – 577 201 - 4 - W.P.No.204746/2015 14. UDAY KUMAR E EMPLOYEE CODE:10045 AGE ABOUT: 28 YEARS OCC:ASST.ENGINEER (E) R/O SUPERINTENDENT ENGINEER ECEC,KPCL,GANESH GUDI TQ.SUPA DIST.UTHARKANNADA – 584 401 15. GOPAYYAKAWALI EMPLOYEE CODE:10054, AGE ABOUT: 28 YEARS OCC:ASST.ENGINEER (E), O/O SHARAVATI HYDRO-ELECTRIC PROJECT (ECES) KARNATAKA POWER CORPORATION LIMITED, JOGFALLS, TQ.SAGAR DIST. SHIMOGA – 577 201 16. PADMINI S K EMPLOYEE CODE:10055 AGE ABOUT: 27 YEARS OCC:ASST.ENGINEER (E) R/O SUPERINTENDENT ENGINEER ECEC,KPCL, GANESH GUDI TQ.SUPA DIST:UTHARKANNADA - 581401 17. ARUN MADALGI EMPLOYEE CODE:10062, AGE ABOUT: 27 YEARS OCC:ASST.ENGINEER (E), R/O SUPERINTENDENT ENGINEER ECEC,KPCL, GANESH GUDI TQ.SUPA, DIST:UTHARKANNADA – 581 401 18. VAGESH HIREMATH EMPLOYEE CODE:2686 AGE ABOUT: 31 YEARS OCC:ASST.ENGINEER (E) R/O H.NO.T-5,144, RTPS COLONY SHAKTI NAGAR-584170 RAICHUR 19. KUMAR RAMESH BABU G EMPLOYEE CODE:2797 - 5 - W.P.No.204746/2015 AGE ABOUT: 33 YEARS OCC:ASST.ENGINEER (E) O/O CE(O & M),NEAR TO KUDITHINI BELLARY THERMAL POWER STATION KPCL, BELLARY – 583 101 20. ARUNAKUMARI S EMPLOYEE CODE:2900 AGE ABOUT: 30 YEARS OCC:ASST.ENGINEER (E) O/O CE(O & M), KUDITHINI BELLARY THERMAL POWER STATION KPCL, BELLARY – 583 101 21. SATYANARAYANA EMPLOYEE CODE:2284 AGED ABOUT 30 YEARS OCC:ASST.ENGINEER (M) O/O CHIEF ENGINEER (FM) CHP DEPT., RTPS/(BTPS) KPCL SHAKTINAGAR RAICHUR – 584 170 22. SHANTAMANI EMPLOYEE CODE:2894 AGE ABOUT: 30 YEARS OCC:ASST.ENGINEER (E) O/O CHIEF ENGINEER GAS SOLAR WIND [CE(GSW)] 2 ND FLOOR NO.22/23, SUDARSHAN COMPLEX SHESHADRI ROAD BENGALURU – 560 009 23. DHANUNJAY EMPLOYEE CODE:2690 AGE ABOUT: 32 YEARS OCC:ASST.ENGINEER (E) O/O SUPERINTENDENT ENGINEER (E) ALMATTI DAM POWER HOUSE (ADPH), KPCL, POST:RAMPUR, TQ & DIST.BAGALKOT 24. SADANAND EMPLOYEE CODE:2856 - 6 - W.P.No.204746/2015 AGE ABOUT: 34 YEARS OCC:ASST.ENGINEER (M) O/O TD,KARNATAKA POWER CORPORATION LIMITED,NO.82, SHAKTI BHAVAN RACE COURSE ROAD, BENGALURU - 01 25. MOULASAB EMPLOYEE CODE:2866, AGE ABOUT: 35 YEARS OCC:ASST.ENGINEER (M) O/O BATCH-3, UNIT 5&6 SE(O)2 RTPS COLONY, SHAKTI NAGAR RAICHUR – 584 170 26. VINOD REDDY P EMPLOYEE CODE:2295 AGE ABOUT: 37 YEARS OCC:ASST.ENGINEER (M) O/O CE(FM), RTPS COLONY SHAKTI NAGAR, RAICHUR -584170 27. SUNIL KUMAR B EMPLOYEE CODE:2526 AGE ABOUT: 34 YEARS OCC:ASST.ENGINEER (M), O/O BM-1, RTPS COLONY SHAKTI NAGAR, RAICHUR-584170 28. SRIDEVI C EMPLOYEE CODE:2710 AGE ABOUT: 29 YEARS OCC:ASST.ENGINEER (M) O/O CE(O & M),KUDITHINI BELLARY THERMAL POWER STATION,KPCL, BELLARY – 583 101 29. SHARANABASAPPA EMPLOYEE CODE:9960, AGE ABOUT: 31 YEARS OCC:ASST.ENGINEER (M) R/O H.NO.T-5,154 RTPS COLONY SHAKTI NAGAR,RAICHUR-584170 - 7 - W.P.No.204746/2015 30. NITESH EMPLOYEE CODE:2809 AGE ABOUT: 27 YEARS OCC:ASST.ENGINEER (M), O/O BATCH-3, UNIT 3&4 SE(O) 1 RTPS COLONY SHAKTI NAGAR,RAICHUR -584170 31. RAJU EMPLOYEE CODE:2815 AGE ABOUT: 31 YEARS OCC:ASST.ENGINEER (M) O/O CHIEF ENGINEER ENGINEERING THERMAL DESIGN 2ND FLOOR, NO.22/23 SUDARSHAN COMPLEX SHESHADRI ROAD, BANGLORE – 560 009 32. NAGARAJ EMPLOYEE CODE NO.2289 AGE ABOUT: 35 YEARS OCC: ASSISTANT ENGINEER(M) O/O:EEBM-2, CHIEF ENGINEER RTPS, KPCL, SHAKTHINAGAR-584170 RAICHUR. 33. BRIJESH M. EMPLOYEE CODE NO.2432 AGE ABOUT: 34 YEARS OCC: ASSISTANT ENGINEER(M) O/O:BATCH-3, UNIT 1 & 2, CHIEF ENGINEER(O&M), RTPS, KPCL, SHAKTINAGAR-584170 RAICHUR 34. SUGURESH EMPLOYEE CODE NO.2810, AGE ABOUT: 32 YEARS OCC:ASSISTANT ENGINEER (M) O/O:BATCH-1, UNIT1 &2 CHIEF ENGINEER (O&M) RTPS KPCL, SHAKTINAGAR-584170 RAICHUR 35. TIPPESWAMI EMPLOYEE CODE NO.10100, - 8 - W.P.No.204746/2015 AGE ABOUT: 31 YEARS OCC:ASSISTANT ENGKINEER (M) O/O:EETM-2,CHIEF ENGINEER (O&M) RTPS KPCL, SHAKTINAGAR-584170 RAICHUR 36. SATAYANARAYANA P.M. EMPLOYEE CODE:2857, AGE ABOUT: 31 YEARS OCC:ASSISTANT ENGINEER (M) O/O:SHARAVATI HYDRO-ELECTRIC PROJECT (ECES) KARNATAKA POWER CORPORATION LIMITED JOGFAALLS TQ:SAGAR, DIST:SHIMOGA – 577 201 37. DARSHAN KUMAR S.M. EMPLOYEE CODE:2858 AGE ABOUT: 32 YEARS OCC:ASSISTANT ENGINEER (M) R/O:SUPERINTENDENT ENGINEER ECEC, KPCL, GANESH GUDI TQ. SUPA, DIST. UTHARKANNADA-581401 38. LAXMINARAYAN EMPLOYEE CODE: 2860 AGE ABOUT: 32 YEARS OCC:ASSISTANT ENGINEER (M) O/O: SHARAVATI HYDRO-ELECTRIC PROJECT (ECES), KARNATAKA POWER CORPORATION LIMITED JOGFALLS, TQ:SAGAR. DIST:SHIMOGGA – 577 201 39. JAIWANT NAIK EMPLOYEE CODE:2862, AGE ABOUT: 32 YEARS OCC:ASSISTANT ENGINEER (M) R/O:SUPERINTENDENT ENGINEER ECEC,KPCL, GANESH GUDI TQ:SUPA, DIST: UTHARKANNADA- 581 401 40. POOJA B.K. EMPLOYEE CODE:2870 AGE ABOUT: 30 YEARS OCC:ASSISTANT ENGINEER (M) O/O: CHIEF ENGINEER ENGINEERING THERMAL DESIGN, 2 ND FLOOR, - 9 - W.P.No.204746/2015 NO. 22/23 SUDARSHAN COMPLEX, SHESHADRI ROAD, BANGALORE-560009. 41. BASAVARAJ D. HEREKODI EMPLOYEE CODE:2491 AGE ABOUT: 34 YEARS OCC:ASSISTAANT ENGINEER (M) O/O:SHARAVATHI HYDRO-ELECTRIC PROJECT (ECES) KARNATAKA POWER CORPORATION LIMITED JOGFALLS, TQ: SAGAR, DIST:SHIMOGA- 577 201 42. SURESH BABU B EMPLOYEE CODE:10097 AGE ABOUT: 30 YEARS OCC:ASSISTANT ENGINEER (M) O/O:CHIEF ENGINEER, RTPS/(BTPS) KPCL, SHAKTINAGAR- 584170 RAICHUR 43. RAGHUNAYAK J EMPLOYEE CODE:2788 AGE ABOUT: 32 YEARS OCC: ASSISTANT ENGINEER(M) O/O:EE(I&C) DEPT., BTPS, KPCL NEAR TO KUDUTHINI VILLAGE DIST. BELLARY-583152 44. REVADHAL SWAPNA EMPLOYEE CODE:2790 AGE ABOUT: 31 YEARS OCC: ASSISTANT ENGINEER(I) O/O:EE (I&C-3) DEPT., RTPS KPCL, SHAKTINAGAR-584140 RAICHUR 45. ASHIYA BEE EMPLOYEE CODE:2791 AGE ABOUT: 31 YEARS OCC: ASSISTANT ENGINEER(I) O/O:EE (I&C) DEPT., BTPS,KPCL NEAR TO KUDUTHINI VILAGE DIST:BELLARY -583132 46. SUNITA EMPLOYEE CODE:2875 - 10 - W.P.No.204746/2015 AGE ABOUT: 30 YEARS OCC: ASSISTANT ENGINEER(INSTRUMENTATION) O/O:CHIEF ENGINEER ENGINEERING THERMAL DESIGN 2ND FLOOR, NO.22/23 SUDARSHAN COMPLEX SHESHADRI ROAD, BANGALORE-560009. 47. ANILL KUMAR P.D. EMPLOYEE CODE: 2880 AGE ABOUT: 34 YEARS OCC: ASSISTANT ENGINEER(M) R/O:HOME NO. TYPE-5, 281 RTPS COLONY, KPCL SHAKTINAGAR-584170 RAICHUR 48. MD. MUKITULLA AMJADH EMPLOYEE CODE:2884 AGE ABOUT: 31 YEARS OCC: ASSISTANT ENGINEER(I) O/O:EE (I&C-4) DEPT, RTPS, KPCL SHAKTINAGAR-584170, RAICHUR 49. RESHMA H.A. EMPLOYEE CODE: 2785 AGE ABOUT: 31 YEARS OCC: ASSISTANT ENGINEER(I), O/O:EE (I&C-2) DEPT, RTPS, KPCL, SHAKTINAGAR-584170, RAICHUR 50. SANDEEP B.U. EMPLOYEE CODE:2786 AGE ABOUT: 33 YEARS OCC: ASSISTANT ENGINEER(I) O/O:SUPERINTENDENT ENGINEER ECEC, KPCL, GANESHGUDI TQ:SUPA, DIST:UTTARKANNADA – 581 401 51. KRISHANAMURTHI KELAMANE EMPLOYEE CODE:2792 AGE ABOUT: 37 YEARS OCC: ASSISTANT ENGINEER(I) O/O:EE (I &C-1)DEPT., RTPS, KPCL SHAKTINAGAR-584170, RAICHUR.
Recommended publications
  • Live Storage Capacities of Reservoirs As Per Data of : Large Dams/ Reservoirs/ Projects (Abstract)
    LIVE STORAGE CAPACITIES OF RESERVOIRS AS PER DATA OF : LARGE DAMS/ RESERVOIRS/ PROJECTS (ABSTRACT) Completed Under Construction Total No. of No. of No. of Live No. of Live No. of Live No. of State/ U.T. Resv (Live Resv (Live Resv (Live Storage Resv (Live Total No. of Storage Resv (Live Total No. of Storage Resv (Live Total No. of cap data cap data cap data capacity cap data Reservoirs capacity cap data Reservoirs capacity cap data Reservoirs not not not (BCM) available) (BCM) available) (BCM) available) available) available) available) Andaman & Nicobar 0.019 20 2 0.000 00 0 0.019 20 2 Arunachal Pradesh 0.000 10 1 0.241 32 5 0.241 42 6 Andhra Pradesh 28.716 251 62 313 7.061 29 16 45 35.777 280 78 358 Assam 0.012 14 5 0.547 20 2 0.559 34 7 Bihar 2.613 28 2 30 0.436 50 5 3.049 33 2 35 Chhattisgarh 6.736 245 3 248 0.877 17 0 17 7.613 262 3 265 Goa 0.290 50 5 0.000 00 0 0.290 50 5 Gujarat 18.355 616 1 617 8.179 82 1 83 26.534 698 2 700 Himachal 13.792 11 2 13 0.100 62 8 13.891 17 4 21 J&K 0.028 63 9 0.001 21 3 0.029 84 12 Jharkhand 2.436 47 3 50 6.039 31 2 33 8.475 78 5 83 Karnatka 31.896 234 0 234 0.736 14 0 14 32.632 248 0 248 Kerala 9.768 48 8 56 1.264 50 5 11.032 53 8 61 Maharashtra 37.358 1584 111 1695 10.736 169 19 188 48.094 1753 130 1883 Madhya Pradesh 33.075 851 53 904 1.695 40 1 41 34.770 891 54 945 Manipur 0.407 30 3 8.509 31 4 8.916 61 7 Meghalaya 0.479 51 6 0.007 11 2 0.486 62 8 Mizoram 0.000 00 0 0.663 10 1 0.663 10 1 Nagaland 1.220 10 1 0.000 00 0 1.220 10 1 Orissa 23.934 167 2 169 0.896 70 7 24.830 174 2 176 Punjab 2.402 14
    [Show full text]
  • Integrated State Water Plan for Lower Bhima Sub Basin (K-6) of Krishna Basin
    Maharashtra Krishna Valley Development Corporation Pune. Chief Engineer (S.P) W.R.D Pune. Integrated state water Plan for Lower Bhima Sub basin (K-6) of Krishna Basin Osmanabad Irrigation Circle, Osmanabad K6 Lower Bhima Index INDEX CHAPTER PAGE NO. NAME OF CHAPTER NO. 1.0 INTRODUCTION 0 1.1 Need and principles of integrated state water plan. 1 1.2 Objectives of a state water plan for a basin. 1 1.3 Objectives of the maharashtra state water policy. 1 1.4 State water plan. 1 1.5 Details of Catchment area of Krishna basin. 2 1.6 krishna basin in maharashtra 2 1.7 Location of lower Bhima sub basin (K-6). 2 1.8 Rainfall variation in lower Bhima sub basin. 2 1.9 Catchment area of sub basin. 3 1.10 District wise area of lower Bhima sub basin. 3 1.11 Topographical descriptions. 5 1.11 Flora and Fauna in the sub basin. 6 2.0 RIVER SYSTEM 2.1 Introduction 11 2.2 Status of Rivers & Tributaries. 11 2.3 Topographical Description. 11 2.4 Status of Prominent Features. 12 2.5 Geomorphology. 12 2.6 A flow chart showing the major tributaries in the sub basin. 13 3.0 GEOLOGY AND SOILS 3.1 Geology. 16 3.1.1 Introduction. 16 3.1.2 Drainage. 16 3.1.3 Geology. 16 3.1.4 Details of geological formation. 17 K6 Lower Bhima Index 3.2 Soils 18 3.2.1 Introduction. 18 3.2.2 Land capability Classification of Lower Bhima Sub Basin (K6).
    [Show full text]
  • FM Holds Inter-Ministerial Meeting on Banning Sugar Futures Sugarcane
    NEWS FLASH –24th August, 2016 SUGAR FM holds inter-ministerial meeting on banning sugar futures Finance Minister Arun Jaitley on Monday held an inter-ministerial consultation on imposing ban on sugar futures trading in an effort to curb speculation and check price rise of the sweetener during festival season. MoS for Food C L Chaudhary, secretaries from Food, Consumer Affairs, Agriculture and finance ministries were present in the meeting. The meeting comes in the backdrop of the Food and Consumer Affairs Ministry recommending the regulator Sebi to ban sugar futures trade to check prices. Sugar prices in the retail markets have risen in last few weeks and are ruling at Rs 42 per kg in the national capital. “We discussed about banning sugar futures trading in the meeting called by the FM. It was an initial discussion and nothing was decided,” Chaudhary told Press Trust of India after the meeting. Food Secretary Vrinda Sarup echoed the same and said: “Nothing has been finalised on banning sugar futures.” Sugar is largely traded on leading agri-commodity bourse National Commodity and Derivatives Exchange (NCDEX). The exchange has already raised the margin amount to be deposited by both sellers and buyers on its platform. To check prices, the government recently imposed an export duty of 20 per cent on sugar as part of its efforts to curb outbound shipments and boost domestic supply. India’s sugar production is estimated to decline to 25 million tonnes in the 2015-16 season (October-September) from 28.3 million tonnes in the previous year. The outlook for the next year is not encouraging as sugar production is pegged lower at 23.26 million tonnes.
    [Show full text]
  • KPCL POWER PROJECTS in KARNATAKA Installed Capacity Sl.No Power Stations Units X MW
    KPCL POWER PROJECTS IN KARNATAKA Installed capacity Sl.No Power Stations Units x MW A. HYDRO PROJECTS Cauvery River Basin Sir Sheshadri Iyer Hydro Electric Station 4x6 1 42.00 ( Shivanasamudram) 6x3 2 Shimsha Hydro Electric Station 2x8.6 17.20 Total 59.20 Sharavathy valley Project 3 Linganamakki Dam Power House 2 x 27.5 55.00 4 4x21.6 Mahathma Gandhi Hydro Electric Station 139.20 4x13.2 5 Sharavathi Generating Station 10 x 103.5 1035.00 Total 1229.20 Gerusoppa Hydro Electric Project 6 Gerusoppa Dam Powerhouse 4 x 60 240.00 Kali Hydro Electric Project 7 Supa Dam Powerhouse 2x50 100.00 8 Nagjari Powerhouse 5x150+1x135 885.00 9 Kadra Dam Powerhouse : 3 x 50 =150 3 x 50 150.00 10 Kodasalli Dam Powerhouse : 3 x 40=120 3 x 40 120.00 Total 1255.00 Varahi Hydro Electric Project 11 Mani Dam Powerhouse 2x4.5 9.00 12 Varahi UGPH :4 x 115 =460 4 x 115 460.00 Total 469.00 Krishna Basin Project 13 1X15 Almatti Dam Power House 290.00 5x55 Mini Hydro Electric Project Bhadra Project 14 1x7.2 Bhadra Right Bank Canal Powerhouse 13.20 1x6 15 2 x12 Bhadra Left Bank Canal Powerhouse 26.00 1x2 16 2x9 Munirabad Power House(Thunga Bhadra Basin) 28.00 1x10 17 Ghataprabha Dam Powerhouse 2 x 16 32.00 18 Mallapur Mini Hydel Scheme 2x4.5 9.00 19 Sirwar Mini Hydel Scheme 1x1 1.00 20 Kalmala Mini Hydel Scheme 1 x 0.40 0.40 21 Ganekal Mini Hydel Scheme 1 x 0.35 0.35 Total 109.95 Total Hydro 3652.35 B.
    [Show full text]
  • 6. Water Quality ------61 6.1 Surface Water Quality Observations ------61 6.2 Ground Water Quality Observations ------62 7
    Version 2.0 Krishna Basin Preface Optimal management of water resources is the necessity of time in the wake of development and growing need of population of India. The National Water Policy of India (2002) recognizes that development and management of water resources need to be governed by national perspectives in order to develop and conserve the scarce water resources in an integrated and environmentally sound basis. The policy emphasizes the need for effective management of water resources by intensifying research efforts in use of remote sensing technology and developing an information system. In this reference a Memorandum of Understanding (MoU) was signed on December 3, 2008 between the Central Water Commission (CWC) and National Remote Sensing Centre (NRSC), Indian Space Research Organisation (ISRO) to execute the project “Generation of Database and Implementation of Web enabled Water resources Information System in the Country” short named as India-WRIS WebGIS. India-WRIS WebGIS has been developed and is in public domain since December 2010 (www.india- wris.nrsc.gov.in). It provides a ‘Single Window solution’ for all water resources data and information in a standardized national GIS framework and allow users to search, access, visualize, understand and analyze comprehensive and contextual water resources data and information for planning, development and Integrated Water Resources Management (IWRM). Basin is recognized as the ideal and practical unit of water resources management because it allows the holistic understanding of upstream-downstream hydrological interactions and solutions for management for all competing sectors of water demand. The practice of basin planning has developed due to the changing demands on river systems and the changing conditions of rivers by human interventions.
    [Show full text]
  • Why Do Interstate Water Disputes Emerge and Recur? an Anatomy of Ambiguities, Antagonisms and Asymmetries
    Pre-publication Draft Why do interstate water disputes emerge and recur? an anatomy of ambiguities, antagonisms and asymmetries Srinivas Chokkakula Centre for Policy Research, New Delhi [email protected] (To be published under RULNR monograph series, CESS, Hyderabad) Srinivas Chokkakula Pre-publication Draft Acknowledgements This monograph has taken much longer than initially planned. The research presented here is part of my dissertation work, and I have planned to publish this soon after submitting the dissertation (for my Ph D from the University of Washington, Seattle, USA) in 2015. The earlier draft received some useful and critical inputs, which set me on revising it substantially and also increasing its scope. It is now considerably improved and I hope that it will be received with interest. I express my deep gratitude to two individuals on this account: Dr Radha D’Souza for her critical review and discussion of the draft, and Dr Gopinath Reddy at CESS for his extraordinary patience and undeserving belief in me and my work. I am also thank Prof Gopal Kadekodi for his comments on an earlier version of the draft. I thank my colleagues at the Centre for Policy Research (CPR), New Delhi, for conversations, inputs and support at different stages of producing this research. I am grateful to Dr Pratap Bhanu Mehta and Dr Partha Mukhopadhyay for their unstinting support. I have been fortunate to benefit from generous conversations with late Prof Ramaswamy Iyer on the subject. I have also benefitted from interactions with several professional colleagues engaged directly with interstate water disputes resolution. I want to particularly acknowledge the enthusiastic the generous support of Mr Mohan Katarki.
    [Show full text]
  • Ans: a 2. Which
    Techofworld.In Techofworld.In 1. Which of the following hydroelectric project constructed on the river Krishna? A. Almatti Dam B. Baspa Hydro-Electric Project C. Bhadra Reservoir Project D. Chamera Hydro-Electric Project Ans: A Explanation: The Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. Hence, A is the correct option. 2. Which of the following power project of Gujarat equipped with power generating sets manufactured by Bharat Heavy Electricals Limited? A. Subarnarekha Project B. Ukai Project C. Sardar Sarovar Project D. Ramganga River Project Ans: B Explanation: The Ukai Dam, constructed across the Tapti River, is the second largest reservoir in Gujarat after the Sardar Sarovar. It is also known as Vallabh Sagar. Constructed in 1972, the dam is meant for irrigation, power generation and flood control. It was manufactured by Bharat Heavy Electricals Limited was inaugurated on October 12, 1977.Hence, B is the correct option. Techofworld.In Techofworld.In 3. Match the following Set I a. Tungabhadra Project b. Tehri Dam Project c. Subarnarekha Project d. Sharavati Project Set II 1. Located near the Gersoppa falls 2. Jharkhand, Odisha, West Bengal 3. River Bhagirithi 4. Joint undertaking by the governments of Andhra Pradesh and Karnataka Code: a b c d A. 1 2 3 4 B. 4 3 1 2 C. 4 3 2 1 D. 4 1 3 2 Ans: C Explanation: The correct matching is given below: Tungabhadra Project: It is joint undertaking by the governments of Andhra Pradesh and Karnataka. Tehri Dam Project: The World’s fifth and Asia’s largest hydroelectric project has been constructed on river Bhagirithi, a tributary of Ganga in Tehri district of Uttaranchal.
    [Show full text]
  • List of Dams in India: State Wise
    ambitiousbaba.com Online Test Series List of Dams in India: State Wise State DAM and Location Rajasthan • RanapratapSagar Dam(Chambal River), at Rawatbhata • Mahi Bajaj Sagar Dam (Mahi River) at Banswara district • Bisalpur Dam (Banas River), At Tonk district • Srisailam Dam(Krishna River), at Kurnool Andhra Pradesh district • Somasila Dam (Penna River), at Nellore district • Prakasam Barrage (Krishna River), at Krishna and Guntur • Tatipudi Reservoir(River Gosthani ), at Tatipudi, Vizianagaram • Gandipalem Reservoir (River Penner) • Ramagundam dam (Godavari), in Karimnagar • Dummaguden Dam (river Godavari) Telangana • Nagarjuna Sagar Dam (Krishna river), at Nagarjuna Sagar Nalgonda • Sri Ram Sagar (River Godavari) • Nizam Sagar Dam (Manjira River) • Dindi Reservoir (River Krishna), at Dindi, Mahabubnagar town • Lower Manair Dam (Manair River) • Singur Dam (river Manjira) Bihar • Kohira Dam (Kohira River), at Kaimur district • Nagi Dam (Nagi River), in Jamui District Chhattisgarh • HasdeoBango Dam (Hasdeo River), at Korba district Gujarat • SardarSarovar Dam(Narmada river), at Navagam • Ukai Dam(Tapti River), at Ukai in Tapi district IBPS | SBI | RBI | SEBI | SIDBI | NABARD | SSC CGL | SSC CHSL | AND OTHER GOVERNMENT EXAMS 1 ambitiousbaba.com Online Test Series • Kadana Dam( Mahi River), at Panchmahal district • Karjan Reservoir (Karjan river), at Jitgadh village of Nanded Taluka, Dist. Narmada Himachal Pradesh • Bhakra Dam (Sutlej River) in Bilaspur • The Pong Dam (Beas River ) • The Chamera Dam (River Ravi) at Chamba district J & K
    [Show full text]
  • O0 Y Public Disclosure Authorized Report No
    Document of The World Bank FOR OFFICIAL USE ONLY FL o0 y Public Disclosure Authorized Report No. 1835a-IN INDIA Public Disclosure Authorized STAFF PROJECT REPORT APPRAISAL OF THE KARNATAKAIRRIGATION PROJECT Public Disclosure Authorized March 15, 1978 Public Disclosure Authorized South Asia Projects Department Agriculture Division C This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS US$1.00 = Rupees (Rs) 8.60 1/ WEIGHTS AND MEASURES (METRICSYSTEM) 1 meter (m) = 3.28 feet (ft) 1 kilometer (km) = 0.62 miles (mi) 1 hectare (ha) 3 - 2.47 acres (ac) I million cubic meters (Mm ) = 810 acre-feet (ac-ft) 1 thousand million cubic 3 feet (TMC) = 28.32 Mm I cubic foot per second 3 (cusec) = 0.0283m /s 1 liter per hectare (1/ha) = 14 ft /1,000 ac I ton = 1,000 kilograms (kg) 2,205 pounds 1/ Until September 24, 1975, the Rupee was officially valued at a fixed Pound Sterling rate. Since then it has been fixed against a "basket" of currencies. As these currencies are floating, the US Dollar/Rupee exchange rate is subject to change. Conversions in this report have been made at US$1 to Rs 8.60. FOR OFFICIAL USE ONLY INDIA APPRAISAL OF THE KARNATAKAIRRIGATION PROJECT Table of Contents Page No. I. BACKGROUND...................................... 1............ Agriculture in India ...... ......................... 1 Irrigation in India .............................................2 Agriculture and Irrigation in Karnataka ............ 2 Project Formulation .......... ............................... 4 II. THE PROJECT AREAS .......................................4 A.
    [Show full text]
  • Government of Karnataka Performance Budget
    GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR AND MEDIUM) PERFORMANCE BUDGET 2008-09 JULY 2009 1 INDEX SL. PAGE PROJ ECT NO NO. A CADA 5 B PROJECTS UNDER KRISHNA BHAGYA J ALA NIGAM 14 1 UPPER KRISHNA PROJ ECT 15 1.1 DAM ZONE ALMATTI 17 1.2 CANAL, ZONE NO.1, BHEEMARAYANAGUDI 23 1.3 CANAL ZONE NO.2, KEMBHAVI 27 1.4 O & M ZONE, NARAYANAPUR 32 1.5 BAGALKOT TOWN DEVELOPMENT AUTHORITY, 35 BAGALKOT C KARNATAKA NEERAVARI NIGAM LIMITED 42 1 MALAPRABHA PROJ ECT 43 2 GHATAPRABHA PROJ ECT 46 3 HIPPARAGI IRRIGATION PROJ ECT 50 4 MARKANDEYA RESERVOIR PROJ ECT 53 5 HARINALA IRRIGATION PROJ ECT 56 6 UPPER TUNGA PROJ ECT 59 7 SINGTALUR LIFT IRRIGATION SCHEME 62 8 BHIMA LIFT IRRIGATION SCHEME 66 9 GANDORINALA PROJ ECT 72 10 TUNGA LIFT IRRIGATION SCHEME 75 11 KALASA – BHANDURNALA DIVERSION SCHEME S 77 12 DUDHGANGA IRRIGATION PROJ ECT 79 13 BASAPURA LIFT IRRIGATION SCHEME 82 14 ITAGI SASALWAD LIFT IRRIGATION SCHEME 84 15 SANYASIKOPPA LIS 87 16 KALLUVADDAHALLA NEW TANK 89 17 TILUVALLI LIS 90 18 NAMMURA BANDARAS 92 19 DANDAVATHY RESERVOIR PROJECT 93 20 BENNITHORA PROJ ECT 94 21 LOWER MULLAMARI PROJ ECT 97 22 VARAHI PROJ ECT 100 23 UBRANI – AMRUTHAPURA LIFT IRRIGATION SCHEME 102 24 GUDDADAMALLAPURA LIFT IRRIGATION SCHEME 104 25 AMARJ A PROJ ECT 106 2 SL. PAGE PROJ ECT NO NO. 26 SRI RAMESHWARA LIFT IRRIGATION SCHEME 109 27 BELLARYNALA LIFT IRRIGATION SCHEME 111 28 HIRANYAKESHI LIFT IRRIGATION SCHEME 114 29 KINIYE PROJECT 116 30 J AVALAHALLA LIFT IRRIGATION SCHEME 117 31 BENNIHALLA LIFT IRRIGATION SCHEME 118 32 KONNUR LIFT IRRIGATION SCHEME 119 33
    [Show full text]
  • Development of House Boat Facilities Camps on PPP Model at Various
    Sector Specific Inventory & Institutional Strengthening for PPP Mainstreaming - Tourism Department DEVELOPMENT OF HOUSEBOAT FACILITIES ON PUBLIC PRIVATE PARTNERSHIP MODEL AT VARIOUS LOCATIONS IN KARNATAKA PRELIMINARY FEASIBILITY REPORT APRIL 2012 One state. Many worlds. Sector Specific Inventory & Institutional Strengthening for PPP Mainstreaming - Tourism Department DISCLAIMER The information in this Report has been prepared based on information collected from secondary sources. Wherever information was not readily available, reasonable assumptions have been made, in good faith to draw meaningful inferences and these have been mentioned in the respective sections of the report. All such assumptions are subject to further corroboration based on availability of information. The information and analysis presented in this Report is not and does not purport to be comprehensive or to have been independently verified. This report has been prepared by Feedback Infrastructure Private Limited for its client, Infrastructure Development Department (IDD) for its use for furthering the project. No external agency shall use any part of this report without the prior permission from IDD. The information contained in this Report is selective and is subject to updating, expansion, revision and amendment. It does not, and does not purport to, contain all the information that may be required. This Report includes certain statements, estimates, projections and forecasts. Such statements, estimates, projections, targets and forecasts are based on reasonable assumptions made by the management, officer and employees of Feedback Infrastructure Private Limited. Assumptions and the base information on which they are made may or may not prove to be correct. No representation or warranty is given as to the reasonableness of forecasts or the assumptions on which they may be based and nothing in this Report is, or should be relied on as, a promise, representation or warranty.
    [Show full text]
  • Achievers Coaching Centre Shivamogga 7812926702
    Achievers coaching centre shivamogga 7812926702 Q 1) Which state government has launched Zero Budget Natural Farming (ZBNF) project to promote organic farming? A) Himachal Pradesh B) West Bengal C) Punjab D) Assam Himachal Pradesh Jai Ram Thakur, the Chief Minister of Himachal Pradesh, has launched Zero Budget Natural Farming (ZBNF) project to promote organic farming. The purpose of the project is to increase agriculture produce and the income of farmers by the year 2022. The ZBNF is a farming practice that believes in natural growth of crops without adding any fertilizers and pesticides or any other foreign elements. The word ―Zero Budget‖ refers to the zero net cost of production of all crops (inter crops, border crops, multi crops). The inputs used for seed treatments and other inoculations are locally available in the form of cowdung and cow urine. A ZBNF practicisng farmer has lower cost of inputs and thus has better capacity to increase the incomes. At the same time, ZBNF crops helps in retaining soil fertiliting and is climate change resilient. Q 2) Who has been appointed the new director general of the Sports Authority of India (SAI)? A) Neelam Kapoor B) Rajiv Saxena C) Parag Kishore D) Nandani Jain Neelam Kapoor Neelam Kapoor, a 1982 batch officer of the Indian Information Service (IIS), has been appointed as the new director general of the Sports Authority of India (SAI). At present, she is the Principal Director General of the Directorate of Field Publicity. The Appointments Committee of the Cabinet approved her appointment to the post till her superannuation, i.e.
    [Show full text]