CURRICULUM VITAE

1. Family name: STOJIČ

2. First names: Zoran

3. Date of birth: November 20, 1956

4. Passport holder: Slovenian

5. Education:

Institution University of , Faculty for Civil Engineering, Hydraulic Engineering Date: from (month/year): October 1976 - November 1981 to (month/year): Degree(s) or Diploma(s) obtained: Diploma in Hydraulic Engineering (Dipl. Ing.)

Institution IHE - Delft, The Netherlands

Date: from (month/year): October 1993 - September 1994 to (month/year): Degree(s) or Diploma(s) obtained: Diploma in Environmental Science and Technology ( Dpl. EST ) Institution IHE - Delft, The Netherlands

Date: from (month/year): February 1995 - October 1995 to (month/year): Degree(s) or Diploma(s) obtained: Master of Science in Environmental Engineering (M.Sc. EE.)

6. Language skills: (Mark 1 to 5 for competence)

Language Reading Speaking Writing English 5 5 5 German 3 2 2 French 3 3 2 Russian 3 2 2 Montenegrin 5 5 4

7. Membership of professional bodies: Chartered Engineer – Chamber of Slovenian Engineers Chartered Engineer – Ministry of Economic Development of Montenegro Environmental Expert, Licensed– Ministry of Environment and Spatial Planning of Spatial Planning Licence –Montenegro ICOLD, Member of the Committee for Environment (Former) EIA Trainers Network, Corporate member World Energy Council, Environmental Subcommittee Member United Nations Development Programme, Registered Expert Chamber of Commerce, Member of the Board of Governors

1

8. Other skills: Text processors, spread sheet, internet Communication skills Training skills

9. Present position: Senior Consultant and Project Manager

10. Years of working experience: 32

11. Key qualifications: Design Engineering Environmental and Strategic Impact Assessment River Basin Management Wastewater and Sewage Planning Institutional Building in Water Sector Solid Waste Management Landfill Design, Solid Municipal Waste

12. Specific Eastern Countries experience:

Country Date: from (month/year) to (month/year) Montenegro ( FRJ ) September 1985 - December 1986, March 2008-present Serbia August 2011-December 2012 Croatia January 1990 - April 1991 Russia September 1992 - November 1992, June 2008-present

13. Professional Experience Record

Date from - Location Company Position Description Date to Jan.1983 – Ljubljana Elektroprojekt / Senior Responsible for elaboration of Basic and Detailed Design of Civil feb.1999 Slovenia IBE, d.d. Engineer Engineering part of Hydro Power Plants and Landfills. Last seven Mr. Uroš Mikoš Consultant years Environmental Consultant working position. +386 41613597 March.1999 Ljubljana Oikos, d.o.o. Project Intermediate period, during registration of own company. –Dec. 1999 Slovenia Mr. Jure Kobal Manager Preparation of Environmental Impact Statements. +386 41663179 Dec.1999 – Ljubljana Ekonova, d.o.o. Environment Working in a EC Framework contract providing consultancy Dec.2001 Slovenia Mr. Jure Megušar al Consultant support for many different projects, from WWTP, Landfills, Pig +386 41805067 farms, etc. Technical support to the Ministry of Environment and Spatial Planning in Phare and ISPA funding. Jan 2002 – Ljubljana ImosGea / Imos Engineer Engaged mainly by the Ministry of Environment and Spatial present Slovenia Geateh/ Geateh Consultant / Planning, Petrol Co., and Holding Power Utility on resolving the d.o.o Manager conceptual environmental problems and basic design work. Mr. Tadej Zupančič Tasks like concept for big Hydropower developments, SEA case +386 41508282 representing good practise. Advisor to the Minister of Economy Montenegro.

2

14. Other Relevant information

Bibliography Stojič Z, 1992, Development of the Slovene Energy Policy, Review for the World Energy Council National Committee Stojič Z, 1992, Will the Dam Hold - Safety Assessment, Scientific Review Ujma Stojič Z, 1992, Project and Public Relations, Newspaper Delo - Scientia Stojič Z, 1993, Environmental Assessment in Time of Recession, Scientific Review Ujma Stojič Z, 1993, Concession of the Mura River Natural Resources, Gazette of the Power Authority Zadnik B, Stojič Z, 1993, Reservoirs are Acceptable for the Environment: Future of Dams, Newspaper Delo - Science Stojič Z, Povž M, 1994, Fish Facilities for Tamed Streams, ICOLD Congress , Durban Stojič Z, 1995, Project Management for the Environment, Newspaper Delo - Scientia Stojič Z, Povž M, 1995, Spawning Ground under the Mavčiče Hydro Power, SLOCOLD Conference, Ljubljana Stojič Z, 1996, EIA for Small Hydro, Conference on Small Hydro, Ljubljana Kryžanowski A, Stojič Z, 1997, Sediment Mismanagement at the Moste Reservoir, ICOLD Congress , Florence Stojič Z, Kryžanowski A, 1997, River Stream Pollution Caused by the Water Release at Moste Reservoir: A Guide for Bottom Outlet Operating Rules, Wessex Institute of Technology, Conference, Stojič Z, Kryžanowski A, 1997, Mismanagement and Remediation for Sediments in the Moste Reservoir, IAWQ Conference on Contaminated Sediments, Rotterdam Stojič Z, 1997, What is Essential for the Sustainable Water Power? Conference on the Mura River, Murska Sobota Stojič Z, 1997, Approach in the Environmental Impacts Evaluation, Landscape Architects Conference, Ljubljana Stojič Z, (contributing author), 1998, The Regional Impacts of Climate Change - Assessment of Vulnerability, Cambridge University Press, Stojič Z, Kryžanowski A., 2000, Sustainability Aspect of Sediment Management in Hydropower Reservoirs, Hydro 2000 Conference - Bern Stojič Z, Marc D, Hrast N, 2004, Remediation of the Gypsum Landfill Globovnik, Waste Management Conference, Stojič Z, 2004, Acceptability Parameters of Reservoirs, National Conference on Reservoirs, Chamber of Commerce, Ljubljana Stojič Z, Golobič M, 2005, Protection from Natural and Technological Hazards in Spatial Planning, Landscape Architects Conference, Ljubljana Stojič Z, 2005, Causes of Refusing Investment Opportunities, Slovenian Water Management Stojič Z, 2006, Safety and Risk Assessment In Regard To Dam and Impoundement Spatial Planning, Civil Engineers Gazette Kryžanowski A, Stojič Z, et al., 2007, Hydropower Development on the Sava River Middle Section, 17th Water Management Day by the Name of Mišič, Maribor Stojič Z, Javornik L, 2008, The Role of Hydro Power Renewable Energy in the Climate Changes Perspective, Hydro 2008, Ljubljana Stojič Z, Vahtar M, Hudoklin J, 2008, Added Value of Hydropower Plants or How to Engage Land-art in Gaining Non-Material Benefits, Hydro 2008, Ljubljana Stojič Z, 2009, Management of Spatial Aspects of HPP, Efficient use of Energy Resources in Slovenia - 2030, National Assembly of Slovenia Stojič Z, Planinšič-Kolar V, 2010, Biodiversity Aspect in Reservoir Planning Alternatives- a Case of Hydro- Morphology Conservation at the Confluence of Sava and Krka Rivers, IRDO Social Responsibility, Maribor Stojič Z, 2010, Development of Renewable Energy Resources in Montenegro, Small Hydropower Case, GtZ and UNDP Reginal Conference, Budva Montenegro

Miscellaneous Planning the Hydropower in Slovenia? 1993, Consultant and scriptwriter for the National TV Network Broadcast Environmental Impact Assessment for Hydropower Projects, 1996, Co-mentor to the B.Sc. diploma candidate Preparation of the Water Law, 1997, advisor to the state secretary HPP Moste Reconstruction Project VHS Presentation, 1998, Script writer

3

Workshop on Environmental Telematics, Munich, 1999, Co-chair to the Session: Technical and institutional challenges of the data collection Model of Eutrophication of Basins on the Sava River, 2003, Co-mentor to the B.Sc diploma candidate Water Supply Concept Krvavec, 2004 Co-mentor to the B.Sc diploma candidate Sewage Concept in Small villages, 2004 Co-mentor to the B.Sc diploma candidate Factors Determining Localisation of Investments, 2006, Organisation of the Conference Ljubljana, Development of the Vision, 2007, participation in the workshop Workshop for Architecture Students-Litija, 2007, presentation of the HPP impact Interview in a daily newspaper Dnevnik, 2007 Chairman of the New Opportunities for SHP Section, Hidroenergia Conference, Bled 2008 Steering Committee member, Hydro Power Conference 2008 Chairman of the Renewable Resources Conference, Maribor, 2009

Lectures

Environmental Criteria, Instrument of Planning, 1995, Lecture at the Ministry for Environment What is Essential for the Sustainable Water Power?, 1997, Lecture presented at the Workshop “Integral Ecological Water Management and Restoration of the Mura River Basin, Austrian-Slovenian Border Section”, Radenci Hydropower Plants in Cascades on the Drava River in Slovenia, 1998, Lecture at the University of Karlsruhe Seminar, sponsored by UNESCO External Benefits of WWTP, 2001, Presentation at the Europe Centre BEST-Students of Technology Association- Lecture in New Approach in HPP Planning, Ljubljana 2009

4

Annex

15. Professional experience – selected references

Date from - Location Company& Position Description: general-assignment, tasks Date to reference person Estimation of (name & contact number of details) working days Verbund Hydro Power August 2014- Austria/Slovenia Key: Drava River Flooding Event – November 5th 2012 White Paper Report As the consequence of flooding of the Drava River, damage on some 255 houses occurred. Present Mr. Gerd Frik Expert and TL The owner of the reservoirs upstream was deemed responsible by public. In the Study it has

50 m/d been demonstrated that there were causes in the downstream river stretch which in fact [email protected] caused flooding.

+43 50 313 50 610 TASKS: Overall responsibility for timely delivery and quality, drafting conclusions, contact with local administration Hydro-meteorological Development of Basic Parameters for Planning of Small HPP February – Montenegro Key: Institute The geology, hydrogeology and geotechnical parameters for planning purpose were April 2014 Mr. Darko Novaković Team Leader prepared for the following rivers: Vrbnica, Tušina and Bijela in Montenegro. On the basis of those parameters optimization of hydropower potential development was studied. 60 m/d darko.novakovic@met eo.co.me The Working Team included corresponding experts.

+382 20 655 435 TASKS: Preparation of technical concept of sHPP, team management European Commission Quick Appraisal of Sewage and WWTP for Nova Gorica and Kranj (55.000 and 90.00 PE) January 2014 Slovenia Key: DG Regio The appraisal was done for two municipalities for project application of the value more than Team Leader 50 m € in accordance to Guidelines prepared in advance. COWI: Paweł Marczak 20 m/d The Team consisted of economist, technical and environment experts. [email protected] TASKS: Liaison to Client, harmonization of partial reports, overall responsibility for timely delivery and quality of appraisals.

5

Mainstreaming Climate Change into CSF Funds 2014-2020 January 2013 – EU-27, European Commission Key:

Slovenia DG Climate Action December National Team For EU financial perspective 2014-2020, 20 % of funds received nationally will be assigned to 2013 COWI: Malene Sand Leader Climate Change related activities. In order to adjust to such policy an overview was prepared Jespersen for each MS. Partnership agreement which sets strategies nationwide was assessed in that 20 m/d respect preparing at the same time guidance for CC action. [email protected]

Team consisted of experts referential for different funding lines, like cohesion, fisheries etc. who worked under the Team Leader.

TASKS: Team members selection, financial management, time schedule planning, checking of partial reports by team members, integration of partial reports into final report-State of the Play, Partnership Agreement scrutiny, liaison with contractor, contact to National Authorities Report-Evaluation of Tenders for Small HPP in Montenegro January 2013 – Montenegro IFC Key: June 2013 Five team members prepared review of previous Tenders for small Hydropower Plants Mr Denis Mesihovic Team Leader concessions in Montenegro. Together with the Ministry, gaps and improvements were [email protected] 40 m/d analysed in order to advise for the next Tender. Partial reports by experts were put together in the Report by TL, which was consequently delivered to the Beneficiary. TASKS: team management, contact to Beneficiary-Ministry of Economy, preparation and finalisation of the Report, presentation of Report to Ministry.

6

January 2012 - Slovenia LIFE10 NAT/SI/000142 Key: LIFE 10 NAT/SI142 Restoration of the Ljubljanica River corridor and improvement of the in course EC/ Ministry of Biology TL river’s flow regime (phase 2 Agriculture and finished) Environment (SI) 80 m/d Project concerns connectivity of river for fish, specifically Danube Salmon. At the spots migration of fish is blocked, therefore sufficient number of fish population will be maintained Ms Anne Burrill by connecting Ljubljanica into larger habitat. Inventory of spawning spots and fish was Mr Mitja Kaligarič prepared, followed by monitoring of fish population at three consequent years for success of measures taken. mitja.kaligaric@astrale .org Biology related actions like, sampling, fish counting etc. are coordinated and harmonised in actions lead by TL. For each accomplished action a report is prepared.

TASKS: preparation of time schedule, organisation of habitat and species inventory, presentation of intermediate project results at the Conference, directing of local team work, reporting, interviews with media-commercial TV Network, liaison with National and City authorities. November Slovenia SEL-Power Utility Key: River Basin Management Plan for Sava River: Fulfilling Good Status Objectives on Sava 2012- July Team Leader HPPs: Upgrade of fish passes on two gates-15 m head: Mavčiče, Vrhovo, measures in basin, 2013 Mr Blaž Pišek landscaping and vegetation 60 m/d [email protected] According to Water Management Plan required by WF Directive certain measures have to be implemented for good status of water. On heavily modified bodies like storage basins due time is year 2015. Detailed Design, including cost calculation was prepared for Client for four storage basins.

Group of in-house designers was led by TL. Harmonization between Client and Beneficiary was necessary to accomplish task successfully.

TASKS: project management, checking of reports, drafting of conclusions, conduct of design work, contact with permit/consent giving authorities, conceptualization of technical solutions.

7

August 2012- Slovenia HESS-Power Utility Key: EIA-Environmental Impact Assessment for HPP Brežice on Sava River, cross-border impact November Team Leader assessment, issues of deviation from good surface water and groundwater status and 2013 Mr Silvester Jeršič ecology status according to WFD, partial reports for IFI (IMF) 120 m/d Silvester.Jersic@ Project is a complex multipurpose water resources usage development serving for electricity he-ss.si production, agricultural, urban and many other purposes. On the basis of EIA report acceptance an environmental consent will be issued. There is 15 different sectors involved, from nature, waste, noise etc. form whom partial consent has to be obtained. Separately, in a cross-border process an opinion of riparian country is obtained.

All activities regarding EIA working framework lining along: preparation-client-authorities have to be carefully co-ordinated for the positive outcome. Mitigation measures were crucial for nature protection.TL was in charge of negotiation with authorities, elaboration and evaluation of impacts, and presentation of EIA Report to Croatian authorities and banking institution.

TASKS: project management-preparation of bids, consortium agreement, selection of experts, time and finance management, checking of reports prepared by 12 experts for different segments-, elaboration of all water related issues, liaison with 15 consent giving authorities including Municipality, presentation at public hearings, participation at trans boundary negotiations with riparian country, presentation to financial institutions

8

November Montenegro UNDP Key: Model Template for Local Energy Plan with Capacity Building 2011 – Energy January 2012 Ms Snežana Consultant, Municipalities in MNE are responsible for the LEP. There was a decision to prepare Marstijepović Author Municipalities for that work, so template for LEP with instructions and good practice was prepared and presented at the workshops to the representatives held at three locations in snezana.marstijepovic the country. @undp.org 30 m/d Firstly, template for LEP was prepared in a local language, secondly harmonized with Government and thirdly workshops were held. Conclusions ad suggestions from workshops were taken into account in final report.

TASKS: preparation of LEP template: drafting and finalization of LEP template proposal, taking in account comments of the Beneficiary, presentation to local communities on three occasions, final presentation to professional public, organization and participation in workshop for the Beneficiary personnel.

February 2011 Slovenia Municipality Jezersko Key: Detailed Design – System of collection, sewage and treatment in area of Jezersko – December A detailed sewage plan for the area of the municipally has been prepared for the application 2013 Mr. Jure Markič Team Leader to the Cohesion Fund. The WWTP of 800 PE obtained permit and was put in operation. [email protected] 140 m/d Responsibility of the TL for design stages: Basic and Detailed Design is defined by the law, chartered engineer license being required, full cycle assignment: design, tendering of contractor and supervision.

TASKS: project management, client-authorities contacts, conceptualization, design engineering, supervision

9

November Montenegro Ministry of Economy, Key: Feasibility: technical, environmnetal, spatial of hydropower at 22 locations in the Upper 2012 – CMSR-Slovenian donor Team Leader Morača River Basin October 2013 agency 75 m/d On the basis of design done in the past, new HPP developments were proposed. In total, Ms Mojca Kopse there are 22 sites proposed. Energy production was calculated with models on the basis of recent rainfall data. mojca.kopse@ cmsr.si A team of two engineers, three spatial planners and environmental specialist was coordinated for the preparation of technical report containing energy, water-management and financial issues.

TASKS: preparation of technical data like: phasing, maintenance, mitigation measures multipurpose use of resources. September Serbia PM Group Ireland Non-Key: Support Preparation for IPA component III (sewage infrastructure), Project Preparation 2011 – EIA Senior Expert Facility 4 December Mr Jim McNelis EIA are part of regular procedure for obtaining building permit. Work includes training of 2012 130 m/d local stuff and approval of reports. Team consisted of 10 consultants on average. The area is jim.mcnelis@pmgroup regulated with some specific points similar to relevant EU Directive. -global.com Responsible for the preparation of EIAs: Railway section Niš-Brestovac and WWTPs in Kraljevo, Brus and Blace, participation in tendering and design activities (preliminary /conceptual design), elaboration of Pre-Feasibility and Feasibility Reports.

TASKS: know-how transfer to local experts, preparation of reports-specific technical inputs, leading of the local team in preparation of EIA reports, contact with consent giving authorities, approval of EIA reports, local experts’ engagement, co-ordination with design team in selecting mitigation measures.

10

December Montenegro Ministry of Economy Key: Spatial Plan for HPP Komarnica Multipurpose (including water-management) on the Piva 2010 – to be TL and River - Strategic Environmental Assessment finished by the Mr Nikola Jablan Environmental end of Expert SEA for HPP Komarnica was to be prepared according to Montenegrin legislation. 160 MW November power plant is a multipurpose development to be financed by concession holder. 2013 80 m/d TL duties were to lead work of team consisting from 20 experts working on different segments. Public hearing and contacts with authorities were in charge of TL. Mitigation measures and water-management solutions were covered by TL. Leading preparation of Preliminary Design (Concept) layout of the plant, access road, cost calculation, cost-benefit analysis on national level,

TASKS: project management, selection of experts, time and finance management, checking of reports prepared by 7 different experts-, preparation of final report, elaboration of water related issues, liaison with consent giving authorities, presentation at public hearings, presentation to financial institutions, preparation of analysis of reservoir alternatives

June 2010 – in Slovenia Municipality Preddvor Key: Detailed Design – System of collection, sewage and treatment in area of Preddvor progress A detailed sewage plan for the area of the municipally in total lenght of 8 km has been Ms. Klavdija Zima Team Leader prepared for the application to the Cohesion Fund. The WWTP of 500 PE obtained permit and was put in operation. klavdija.zima@ 110 m/d preddvor.si Responsibility of the TL for design stages: Basic and Detailed Design (defined by the law, chartered engineer license being required). Participation in tendering, supervision and elaboration of FS, application for EU Cohesion Fund.

TASKS: project management, client-authorities contacts, conceptualization, design engineering

11

November Montenegro UNDP Non-Key: Technical Assistance for the Preparation of the Short Building Permit Procedure for HPP 2010- Key Expert/ Connections Less than 1 MW December Ms Snežana Consultant/ Beneficiary requested an analysis of procedure for micro HPP in order to prepare for 2010 Marstijepović Author simplified procedure which would enable development of micro HPP mainly for land owners.

snezana.marstijepov 15 m/d Responsibilities: drafting the report containing proposal for improvement of procedure and [email protected] presentation to the ministry official. TASKS: preparation of the report for the regulations amendment, presented to the board of experts form different authorities at ministries’ level . November Slovenia HSE Invest Key: Comparison and Selection of Alternatives of HPP Development on middle Sava River from 2010 – January Team Leader Environmental Point of View 2011 Mr Silvo Smonkar 105 m/d While planning chain of 10 HPP on the most important river in the country, the crucial silvo.smonkar@ question to be answered was, how the proposed scheme fits into environment, and hse-invest.si specifically nature protection. For this reason alternatives of the scheme were analyzed resulting in a proposal of the most acceptable one. Gathering of relevant biology data was key issue.

TL motivated broad scope of experts, mainly biologists in order to produce conclusive study. Negotiations took place with Nature Protection Agency, result was satisfactory. Solution for Natura 2000 was proposed and accepted.

TASKS: project management, contacts with municipalities along river, preparation of report inclusive comparison of alternatives in regard to spatial conditions, biota, and public acceptability, measures for mitigation of impacts on nature, technical concept of reservoir and power production.

12

December Slovenia Technomedica Ltd Key: Application for Obtaining Small HPP Concession on Sava Dolinka River-Basic Design 2010 – April Team Leader Basic Design with Investment program has been requested by authorities for obtaining 2011 Mr Jože Krušič consent. The site of the intake and power house is on the border of National Park, which 15 m/d proved to be real obstacle in licensing of the Plant at that time. With changing policy, joze.krusic@ attitude towards this particular object could be favorable. technomedica.si TL took care of co-ordination between electrical, machine and civil engineering part of design.

TASKS: preparation of concession application which included technical solution of sHPP and measures for mitigation of negative impacts on nature protected area, obtaining main consents from fisheries, nature protection and water management authorities. July 2010 – Slovenia Municipality of Bled Key: Full Cycle Project: Preliminary, Basic and Detailed Design with Supervision for Sewage and February 2013 Team Leader Pumping Stations on Location Bled Mr Matjaž Berčon 140 m/d Sewage planning for the tourist area of Bled was prepared. Works were financed by [email protected] Cohesion Fund, therefore, conditions set by the fund were respected all along planning stages.

Responsibility of the TL for design stages: Basic and Detailed Design is defined by the law, chartered engineer being required.

TASKS: project management, client-authorities contacts, conceptualization, design engineering

13

June 2010 – Slovenia SEL-Power Utility Key: TL Flood Discharge and Basic Minimum Flow Calculation of on the HPP Završnica October 2010 Mr Blaž Pišek 15 m/d Basic minimum flow was required in a stream after hundred years of the plant operation. By carefully analyzing the problem, argumentation for preservation of present condition was [email protected] confirmed.

TL managed the whole process and acted in the Client’s best interest. There was biologist engaged for the inventory of species and assessment of impacts if the water is returned to the stream. Archives were checked in order to obtain historical data.

TASKS: project management, design considerations and analysis of present and future requirements for basic minimum flow, concept of adaptation.

March 2010 – Montenegro Municipality of Key: Spatial Plan of Podgorica Municipality-Baseline Environment Study and Strategic to be Podgorica Team Leader, Environmental Assessment concluded by Environmental the end of the Mr Miljan Barović Expert Baseline Study formed an introduction to SEA, which was needed for spatial plan to be year 2013 accepted. Mitigation measures in regard to traffic situation, energy efficiency, solid waste mbarovic@ 160 m/d and waste water issues were prepared. These measures form an important part of the pggrad.co.me Capital Podgorica spatial plan. Present status of the environment was the basis for development plans. GIS was prepared for the environmental data.

TL was responsible for budget, timely delivery and quality of Baseline Study and SEA.

TASKS: drafting and finalization of Baseline Study and project management of SEA including preparation of report. Coordination of activities with spatial planners and city authorities. Transfer of know-how to city authorities. Public hearings, presentation to city assembly. Advocating for mitigation measures for sustainable development of the city environment.

14

December Montenegro IBI Canada Key: Nature Reserve Durmitor-Strategic Environmental Assessment 2009 - in Team Leader course Trevor McIntyre SEA for Nature reserve has been focused on the impacts prioritized according to the nature 70 m/d protection. Procedure and content of the assessment is regulated. Public hearing was carried tmcintyre@ out on the spot. Data were gathered from previous inventories of the terrestrial systems and IBIGroup.com studies done for the past fifty years.

Leading the group of biodiversity experts, mainly local, was challenging due to the fact that many endemic species are living in the area.

TASKS: project management, selection of experts, time and finance management, checking of reports prepared by different experts-, preparation of final report, elaboration of related water, solid waste and energy pollution issues, liaison with consent giving authorities, presentation at public hearings.

Technical Assistance in Negotiations for the Rest Flow Regulations August 2009- Slovenia Small Hydro National Key: An expert opinion for decision on regulation of acceptable flow was commissioned by Small February 2010 Association Team Leader/ Hydropower Association. Experts for biodiversity were engaged from university. Analysis Mr Marko included cost consequences if rest flow was introduced as proposed. Author Gospodjinacki Report was prepared by two authors. TL set the framework and revised the contents, especially recommendations to authorities for handling this issue.

TASKS: Preparation of report and presentation to Government representatives before the vote in parliament.

15

Multipurpose Water Management Development Including Small Hydropower of Ljuta River August 2009- Bosnia Turboinstitut Ljubljana Key: Basin-Expertise September Herzegovina Mr Vlado Kercan Author of ToR 2009 After site visit ToR for preparation works was to be prepared for water power to be utilized vladimir.kercan@ on the Ljuta River. The scheme of HPP comprised five plants to be included in the turboinstitut.si 10 m/d programme of renewable energy production.

ToR was prepared. Local authorities were consulted for that matter.

TASKS: on the basis of site visit and consultations with authorities, an expertise was prepared about feasibility of HPP development, concept of mitigation measures and cost estimation. Detailed Spatial Plan for Multipurpose Water Management of Moraca River Basin, inputs February 2009- Montenegro Ministry of Economy Non-Key: for Feasibility Study Dec 2010 Ms Vesna Bracanović Expert Planner 45 m/d On the basis of design done in the past, new spatial plan has been developed. Former technical solutions were adjusted to modern requirements. Energy production was vesna.bracanovic@ calculated on the basis of recent hydrology data. In parallel Feasibility Study was carried out, mek.gov.me using data from the technical report for the plan.

A team of three engineers was coordinated for the preparation of technical report containing energy, water-management and financial issues.

TASKS: preparation of cost estimation and technical data like: phasing, maintenance, mitigation measures, discussing electricity market, multipurpose use of resources.

16

Key: Technical Assistance and Capacity Building mainly in Water Sector for the System of Tariffs January 2009- Montenegro UNDP, Ministry of Independent (Feed-inn) for Small Hydropower, Member of the Evaluation Committee, Preparation of in January Economic Affairs Consultant Regulations for Small Hydropower design 2011 Ms Snežana Marstijepović 90 m/d Intensive preparation for development of renewable resources followed regulation of the system which had to adjust to the bigger share of renewable sources. Several tasks were

carried in the framework program set up by UNDP office in Podgorica. Two concession snezana.marstijepovic tenders took place, all proposals were checked technically. @undp.org

Independent consultant responsibility was to provide technical support on the issues foreseen in the contract which was extended on two occasions.

TASKS: giving advice to the representatives of authority through preparation of reports and consultations for three topics: Feed-Inn for renewable energy, technical evaluation, regulations (three decrees) for the use of renewable energy sources Ex-Post Evaluation of LIFE Projects November Slovenia COWI Key:

2008 - April Ms Tine Villadsen Independent EU assignment objective was to get return information about the effect of LIFE projects done 2010 Gundersen Consultant in the past. For Slovenia dozen projects were on the list, each was checked in person, comparing results with set objectives. Projects concerned nature and general environment. [email protected] 20 m/d

Report was prepared by Consultant with conclusions about effectiveness of the funds spent.

TASKS: preparation of evaluation report on the basis of insight to project documentation and interviews with project managers

17

Management of Sediments in Reservoirs of the HPP Chain August 2008 – Slovenia HSE- Holding Power Key:

October 2010 Utility, HESS and SEL Team Leader Reservoir chain of 17 plants is changing conditions of sediment transport. Comprehensive Mr Djordje Žebeljan study objective was to model sediment flow through reservoirs until last one in the border 100 m/d with neighboring Croatia. Historical data about sediment transport were obtained. Sediment Djordje.Zebeljan@ management in particular reservoirs has been proposed. hse.si

Organization of the project included 5 firms with around 20 personnel working on diversified tasks. Timely delivery of results to designers and authorities was essential.

TASKS: project management, contracting of consortium members, reporting, technical meetings, presentation of results to National authorities and in riparian countries, drafting and finalization of project summary, collection of data, conceptualizing of models, interpretation of results. July 2008- Montenegro URBI Montenegro Strategic Environmental Assessment for the Island St Marco and area of Kalardovo-Flower Key: November d.o.o. Podgorica Island-Brdišta 2010 Team Leader Alternatives of housing development were compared in sensitive coastal environment.. SEA Mr. Predrag Bulajić was prepared and presented at public hearing for the selected alternative with luxury hotel. 80 m/d

predrag.bulajic@ TL was responsible on behalf of the local team and assessment of impacts. Alternatives were winsoft.co.me presented on several occasions to the Government.

TASKS: project management, selection of experts, time and finance management, checking of reports prepared by experts for environmental segments, elaboration of all water, sediment, waste and energy related issues, liaison with consent giving authorities, presentation at public hearings, presentation to clients’ financial institutions

18

September Slovenia Municipality Key: Full Cycle Project: Preliminary, Basic and Detailed Design with Supervision for the 2008 – Koper/Capodistria Reconstruction of Internal Sewage with Connection to the Dekani area, and development of November Team Leader sewage in Jelarji and Škofije (Koper/Capodistria) 2013 Mr. Goran Štrancar 215 m/d Sewage planning for the tourist area of Dekani was prepared. Works were financed by goran.strancar@ Cohesion Fund; therefore, conditions set by the fund were respected all along planning komunalakoper.si stages.

Responsibility of the TL for design stages: Preliminary, Basic and Detailed Design (defined by the law, chartered engineer license being is required) including supervision of construction.

TASKS: project management, client-authorities contacts, conceptualization, design engineering February 2007 Slovenia Municipality Loška Key: Full Cycle Project: Preliminary, Basic and Detailed Design – System of collection, sewage and – in progress dolina treatment in area of Loška dolina Team Leader A detailed sewage plan for the area of the municipally has been prepared on the basis of Mr. Bogdan Zevnik Preliminary Design or Concept for the application to the Cohesion Fund. Except Pudob, sewage 170 m/d system in all other settlements have been realised [email protected] Responsibility of the TL for design stages: Basic and Detailed Design is defined by the law, chartered engineer license being required.

TASKS: project management, client-authorities contacts, conceptualization, design engineering

19

Analysis of Alternatives Prepared on the basis of Preliminary Design for the Municipal August 2008 – Slovenia Municipality of Kranj Key: Solid Waste Center In the City of Kranj January 2009 Mr Mitja Herak Team Leader Regional solid waste management center in Kranj was planned as recycling and reuse center, [email protected] 140 m/d without its own disposal. Quantities and composition of waste generated in an area of 80

000 population.

Report was prepared on the basis of four experts inputs. Co-ordination and harmonization was responsibility of TL who approved partial reports of experts and presented results to local authorities.

TASKS: project management, preparation of consortium agreement, selection of experts, time and finance management, checking of reports prepared by 18 experts for environmental segments-, elaboration of all water, sediment, waste and energy related issues, liaison with 15 consent giving authorities, presentation at public hearings, participation at trans boundary negotiations with riparian country, presentation to financial institutions Strategic Environmental Assessment of Detailed Spatial Plan Motorway from Bar to Boljare July 2008 – Montenegro WINSoft Podgorica Key:

October 2008 Mr Predrag Bulajic Team Leader In total the length of motorway is 190 km. Alternatives were compared in sensitive areas such as Skadarsko Lake, which is protected wetland. SEA was prepared and presented at predrag.bulajic@ 85 m/d public hearing for the selected alternative. winsoft.co.me

TL was responsible on behalf of the local team and assessment of impacts. Alternatives were presented on several occasions to the Government.

TASKS: project management, selection of experts, time and finance management, checking of reports prepared by experts for environmental segments, elaboration of all water, sediment, waste and energy related issues, liaison with consent giving authorities, presentation at public hearings, presentation to financial institutions

20

Technical Assistance for the Tender Package of 48 Small Hydropower Plants - Tender June 2008- Montenegro Ministry of Economic Non-Key Procedures, Legal Issues, Price, Concession Matters August 2008 Affairs, UNDP Independent Ms Snežana Consultant Different engagements covered for the a.m. tasks. Concession as legal document was Marstijepović prepared.

snezana.marstijepovic 50 m/d Responsibility of individual consultancy, working closely together with the Client. @undp.org TASKS: assistance in tender preparation, resolving of legal issues concerning concession, review of offers including engineering part and prices. May 2008 – Slovenia HSE- Holding Power Key: Strategic Environmental Assessment HPP Mokrice incl. Transboundary Impact Analysis, August 2013 Utility, HESS Team Leader Support to the Ministry for the bank loan (IMF) Mr Silvester Jeršič 205 m/d SEA report as regulated by legislation was prepared and accepted by the Government. Silvester.Jersic@ he-ss.si Work organization and outputs quality were duty of TL.

TASKS: project management, preparation of consortium agreement, selection of experts, time and finance management, checking of reports prepared by 18 experts for environmental segments-, elaboration of all water, sediment, waste and energy related issues, liaison with 15 consent giving authorities, presentation at public hearings, participation at trans boundary negotiations with riparian country, presentation to financial institutions May 2008 – Slovenia HSE- Holding Power Key: Strategic Environmental Assessment HPP Brežice incl. Transboundary Impact Analysis Dec 2010 Utility, HESS Team Leader SEA report as regulated by legislation was prepared and accepted by the Government. Mr Silvester Jeršič 110 m/d Work organization and outputs quality were duty of TL. Silvester.Jersic@ he-ss.si TASKS: project management, preparation of the contract, selection of experts, time and finance management, checking of reports prepared by experts for environmental segments-, elaboration of all water, sediment, waste and energy related issues, liaison to different consent giving authorities, presentation at public hearings, participation at trans boundary negotiations with riparian country, presentation of conclusions to financial institutions

21

March 2008 – Slovenia HSE- Holding Power Non-Key: Preparation of background paper on Climate Change to support middle Sava HPP chain June 2008 Utility, HESS Independent Mr Silvester Jeršič Consultant Renewable energy sources in the frame of Climate Change were analyzed.

Silvester.Jersic@ 15 m/d Objective set by Client was to prepare argumentation for power production of 17 HPP in total he-ss.si on the Sava River to be considered renewable source as counted in the quota of 20 % of electricity produced from renewables.

TASKS: Report was prepared by Consultant. March 2008 - Slovenia Rižanski vodovod – Non-key Water Supply of Slovenian Istria and Carst Hinterland- Concept update: Water pricing September Water Utility Independent 2008 Consultant Updates of previous documentation were prepared. Mr Zdravko Hočevar 50 m/d Responsible for the water pricing inputs. [email protected] TASKS: preparation of cost-benefit analysis and pricing of the water delivered from that particular source. March 2008 – Slovenia Municipal Co Utility Key: Detailed Design (on the basis of Preliminary and Basic Design) for Water Supply Network September Trebnje Team Leader Bratnica-Veliki Gaber 2013 Mr. Tone Gričar 85 m/d Water supply network has been upgraded and developed, design of water well, reservoir

vodja.investicij@komu Responsibility of the TL for design stages: Basic and Detailed Design is defined by the law, nala-trebnje.si chartered engineer license being required.

TASKS: project management, client-authorities contacts, conceptualization, design engineering

22

September Slovenia Ministry of Defence Key: Pre-Feasibility Study of Investment for Military Barracks 2008 Team Leader Ms Milica Slokar Pre-feasibility Report which is required according to legislation for every investment from 10 m/d public sector was contracted. [email protected] Organization of work delegated to three experts and approval were responsibility of TL.

TASKS: leading of engineer and economist in the preparation of Feasibility Report, approval of the report, Client contact, presentation April 2007 – Slovenia Gorenja vas-Poljane Key: Waste Recycling Facility – Full Cycle Design: Preliminary, Basic, Detailed Dec 2007 Municipality Project Leader This facility will enable local community to dispose of bulk solid waste. Design of the facility Mr Dušan Marc 120 m/d has taken into account loading of heavy trucks. Capacity of the facility is 9.000 people.

[email protected] Technical co-ordination of electrical, mechanical and technological part of design, responsible for timely delivery and budget. Chief

TASKS: engineering design management, securing of consent from authorities December Slovenia and Ministry for Key: Environmental Analysis of Trans-boundary Impact of Natural Gas Facility in the Bay of 2006 – June Italy Environment and Team Leader Triest and Žavlje, EIA 2007 Spatial Planning 135 m/d Top Slovenian research institutes were engaged in the matter of demonstrating Ms Vesna Planinšič transboundary impact of natural gas terminal (two sites alternatively) on the basis of which Kolar authorities called for the so called ”Espoo” process. The report was presented in the Slovenian Parliament and local communities at the border line concerned. vesna.kolar- [email protected] Comprehensive organization including half dozen Slovenian institutions. Timely and financially viable delivery. Harmonization of outputs.

TASKS: preparation of EIA Report: management, directions, approval, synthesis of conclusions prepared partially by several institutions, presentation of the report in the Parliament and to different stakeholders, commissioning of additional research.

23

August 2006 – Slovenia URSCorp Non-Key: Environmental Audit - Revoz ( Renault) Car Manufacturing and Sava Tyres Production May 2007 Individual Ms Charlotte Coipel Consultant A comprehensive analysis of environmental condition covered premises of car manufacturing plant. Assistance to the client has been provided prior to purchasing. Charlotte_Coipel@ 10 m/d URSCorp.com Preparation of Report with conclusions.

TASKS: drafting and finalization of the report in prescribed format, collection of existing environmental data

August 2006 – Slovenia HSE- Holding Power Key: Pre-Investment Documentation - Middle Sava River HPP (10 Plants) June 2007 Utility, HESS Team Leader Objective of the task was to obtain cost estimation for the cascade plants totaling ten plants Mr Silvester Jeršič 65 m/d on the middle section of the Sava River in the pre-investment phase. Basis for cost estimation were environmental and spatial limitations. Costs included food protection works Silvester.Jersic@ and road relocation. Localization of plants in the vicinity of Ljubljana considered recreational he-ss.si potential and water supply. City authorities approved the plan after public hearing.

Overall co-ordination, budget, teaming, timely outputs of Feasibility Study.

TASKS: project management, consortia agreement, engineering, preparation of report, liaison with authorities

24

April 2006 – Slovenia HSE- Holding Power Key: Basic Design, Prefeasibility- Development of the Sava River Banks in the Area of HPP Nov 2007 Utility Team Leader Brežice and Mokrice

Mr Silvester Jeršič 90 m/d An area of around 15 hectares between City of Brežice and HPP embankments has been planned for recreational purposes. Several projects have been foreseen in the area: camping Silvester.Jersic@ for trailers, bathing facilities, theatre, kayak-canoe, cycling and trailing lines, boat access to he-ss.si the city etc.

Comprehensive plan was prepared to be financed from EU CF. Overall responsibility for harmonization of partial engineering designs.

TASKS: Project management, overview of international landscape competition and selection of acceptable solutions, preparation of multipurpose conception, liaison with the Municipality-co-ordination of activities.

March 2005 – Slovenia HSE-Holding Power Key: EIA - Krško Hydropower June 2006 Utility Project Manager and Team Leader A comprehensive analysis was produced covering major impacts of impoundment. The task is Mr Silvester Jeršič to coordinate activities with design team in order to timely incorporate environmental 40 m/d improvements to the project. Silvester.Jersic@ he-ss.si Responsibility for EIA Report, presentation and water management related issues.

TASKS: project management, consortium agreement, selection of experts, time and finance management, checking of reports prepared by experts for different environmental segments, elaboration of all water, sediment and energy related issues, liaison with consent giving authorities, presentation at public hearings, participation at trans boundary negotiations with riparian country

25

Dec 2006 – Slovenia Municipality of Non-Key: Revision of the SEA for Development Plans of the City of Ljubljana June 2010 Ljubljana Independent Consultant The development of the City of Ljubljana in the period 2007-2013 should follow principles of Mr Ivan Stanič sustainability. Yet, city authorities decided to include in an early stage of SEA preparation an 25 m/d outside environmental expert in order act in desired direction on SEA as well on urban plans. ivan.stanic@ ljubljana.si Preparation of the report on revision of SEA: contents and elaborated degree of sustainability in traffic, energy, municipal infrastructure.

TASKS: support to the Municipality in regard to mitigation of impacts, solution seeking with planners in support of sustainable city development

October 2005 - Slovenia Municipality of Tržič Key: Technical Assistance to Municipality Including Capacity Building for Solid Waste June 2006 Team Leader Management Centre Kovor: Pre-Feasibility, Alternatives, Basic Design Mr. Borut Sajovic 60 m/d Project Identification has been produced by Mr. Stojic as a first step in preparation of Kovor obcina.trzic @ trzic. si Waste Management Centre for Cohesion Fund application. A number of meetings have been held with local community in order to promote location of the planned centre. Positive referendum vote in the local community made it possible to go ahead with this development. Many interviews, statements and participation in TV shows were taken part.

Preparation of the technical part of Pre-Feasibility, participation in public campaign

TASKS: support to the Municipality in regard to Waste Management Centre development, negotiations with state authorities

26

August 2005- Slovenia Regional Development Key: Sustainable Development Plan of the City of Ljubljana in the period 2007-13. Nov 2006 Agency of Ljubljana Team Leader A plan for major sectors of the city management has been developed. Existing department Mr Ivan Stanič 50 m/d plans have been used in harmonizing municipality plans as a whole, thus avoiding repetition of the project objectives in different departments. Plan has been presented in the city ivan.stanic@ Council. On the initiative of Mr. Stojic a “Vision of the city development” has been formalized ljubljana.si for the first time.

Overall management including presentations, municipal infrastructure, traffic, etc.

TASKS: preparation of the plan, development of city vision (first time), presentation to City Council, preparation of suggestions for municipal budget

March 2005- Slovenia Sava Power Utility Key: Public Relations Campaign for HPP Moste Dec 2005 Independent Mr Drago Polak Consultant The proposal for reconstruction and construction of additional compensation basin to the existing power plant raised public concern over the locally protected natural area. Public was [email protected] 40 m/d informed quite late in the process, therefore fierce resistance led to a local referendum. Consultant was a member of board of experts who were in charge of programming and implementation of a public relations campaign. The management of the participation process , which was not the one required by law, for stakeholders in the local communities relied on a number of sessions (16 in total) where local citizens participated in finding solutions for a plan which was acceptable to the public.

Preparation of analysis and presentations at local communities for the whole of the campaign.

TASKS: support to the working team, preparation of the approach to local public, presentations and attendance of sessions Q&A with local communities

27

September Slovenia Ministry of Key: Water Supply of Slovenian Istria and Carst Hinterland-Technical Assistance: preparation of 2004 – Dec Environment, Spatial Project Director Basic Design and Institutional Building 2007 Planning and Energy 240 m/d The reservoir of 10 million cubic meters for water supply will realized, storing the waters of Mr Uroš Cerar nearby river during peak flow. The system comprises 25 km long pipeline. Technical support to the Ministry has been continued institutionally after project termination by employment [email protected] of staff on previous TA positions according to requirements of WFD. The works will be financed from Cohesion Fund.

Management of the in house team and outsourced consulting companies: dam design, pipeline design and spatial issues.

TASKS: project management, division of tasks, planning of activities, preparation of several ToR for assignments needed, design engineering management, contacts with UNESCO, approval of documentation

June 2004 – Slovenia, European Commission Non-Key: Sava River Basin: Sustainable Use, Management and Protection of Resources-SARIB June 2007 Croatia, Water- Bosnia, Serbia management The Sava River (945 km) is the biggest tributary to the Danube River. Countries in the same Ms Milena Horvat Consultant catchment will enter the system of water management at different institutional, economic and social levels. The contribution of Mr. Stojič in the project is to develop bases and tools [email protected] 75 m/d for integrated management system.

Water-management inputs for three Work Packages were prepared.

TASKS: support to project management, dissemination of results, reporting on Work Package 2 concerning water and sediment pollution

28

June 2003 – Slovenia Ministry of Key: Extended Decentralised Implementing System-EDIS May 2005 Environment, Spatial Team Leader Planning and Energy After accession to EU, Slovenian administration will manage cohesion and structural funds 55 m/d independently. For that a clear system complete in the frame of EU environment Acquis has Irena Brcko Kogoj to be established for operation. Mr. Stojic has been engaged in water management segment. Specifically in Slovenia, Municipalities are applying to the funds according to Slovenian irena.brcko- Legislation. Therefore a support has to be provided for all 193 Municipalities, including a [email protected] Manual and Training of the civil servants.

EDIS has been transposed to Slovenian legislation framework. Team of 8 experts in total was managed.

TASKS: project management, directing of activities working closely with the Client, approval of documentation, contact and liaison with EU counterparts

29

December Slovenia Ministry of Key: Remediation of the Hazardous Waste Hot-Spots, Technical Assistance in the process of 2002 – Environment, Spatial Project Manager Funding and Engineering support in Preliminary Design December Planning and Energy 2004 250 m/d There are five areas included in the two-year project of technical assistance to the Ministry Mr Uroš Cerar of Environment. The financial source of the project is oil levy amounting to 2,5 million Euro yearly. Waste spots are the following: municipal landfill, landfill of acid tar, used oil handling, [email protected] dump of organic acids production residues and hazardous waste landfill. Each area has a team leader, overall management of the project team which includes administration and public relations was done by Project Manager.

Management of TA team including management of Key Experts. Timely, financially and technical management.

TASKS: overall management, design engineering management, division of assignments in consortium, municipal solid waste expertise, preparation of partial and final report, support to the government in decision making

March 2002 – Slovenia Ministry of Non-Key: Procurement of WWTP Zasavje Region and WWTP Coastal Zone- ISPA June 2003 Environment, Spatial Expert Planning and Energy Procurement and Tendering for the preparation works 35 m/d Ms Nives Nared Consultancy was carried out for preparation of evaluation papers for the selection of bidder.

[email protected] TASKS: Participation in evaluation committee as a member.

30

October 2002 Slovenia Ministry of Non_key: Training of LIFE Applicants Environment, Spatial Independent Planning and Energy Consultant Ministry decided to bring the level of application for a step higher in order to get at least one award per year. For that a seminar has been organized where Mr. Stojič participated in a Mr Dušan Vojnovič 20 m/d lecture on a LIFE projects good practice in EU Countries. He also had contributed to the evaluation of proposals. dusan.vojnovic@ gov.si Workshop was prepared and realized for potential proposal makers

TASKS: selection of presenters, preparation of hand-outs, presentation on three days’ workshop, conclusions

31