DEVOLL HYDROPOWER PROJECT PROJEKTI HIDROENERGJETIK I DEVOLLIT

REPLACEMENT ROADS INFRASTRUCTURE INFRASTRUKTURA E RRUGEVE ZEVENDESUESE

Banja-Gramsh Road and Trashovica Bridge Rruga Banje-Gramsh dhe Ura e Trashovices

ESIA DRAFT REPORT - DRAFT RAPORTI I VNMS

EXECUTIVE SUMMARY - PERMBLEDHJA EKZEKUTIVE

September / Shtator 2014

Table of Contents / Tabela e Permbajtjes

1. Project Background and Purpose / Historiku dhe Qellimi i Projektit...... 1 2. Legal Framework / Kuadri Ligjor...... 2 3. Project Description / Pershkrimi i Projektit...... 4 4. Baseline Conditions and Impacts/ Kushtet Baze dhe Ndikimet...... 8 5. Mitigation Strategy / Strategjia e Masave Zbutese...... 14 6. Mitigations and Conclusions / Masat Zbutese dhe Konkluzionet...... 14 7. Environmental & Social Management and Monitoring / Administrimi dhe Monitorimi Mjedisor dhe Social...... 18 8. Next Steps / Hapat Vijues...... 18

1 | P a g e / F a q e

NON-TECHNICAL SUMMARY PERMBLEDHJE JO-TEKNIKE

1. PROJECT BACKGROUND AND PURPOSE 1. HISTORIKU DHE QELLIMI I PROJEKTIT Hydropower Sh.A. (“DHP”) on 19.12.2008 Devoll Hydropower Sh.A. (“DHP”) ne 19.12.2008 was awarded the right to develop hydropower ju dha e drejta e zhvillimit te projekteve te projects on Devoll river in , through a hidrocentraleve mbi lumin Devoll ne Shqiperi, Concession Agreement signed with the permes Marreveshjes Koncesionare te firmosur Government of Albania. This Concession me Qeverine Shqiptare. Kjo Mareveshje Agreement, in force since 1stof April 2009, gives Koncesionare, ne fuqi qe prej 1 Prillit 2009, i jep DHP a Build, Own, Operate and Transfer (BOOT) DHP Koncesionin per Ndertim, Zoterim, Operim Concession for developing and utilising the dhe Transferim (BOOT) per zhvillimin dhe hydropower potential in Devoll river. shfrytezimin potencial te fuqise hidrike ne lumin Devoll. The Concession Area is located about 60-80 km southeast of . Zona e Koncesionit ndodhet rreth 60-80 km ne jug- juglindje te Tiranes. In the framework of this Concession, more specifically to the construction and operation of the Ne kuadrin e ketij koncesioni, vecanerisht te Banja Hydropower Plant, the existing Banja- ndertimit dhe shfrytezimit te Hidrocentralit te Gramsh Road will become either unsuable or Banjes, rruga ekzistuese Banje – Gramsh do te inundated. behet ose e paperdorshme ose do te jete nen uje. Based in the Concession Agreement, the Bazuar ne Marreveshjen Koncesionare, Qeveria Government of Albania the obligation for the Shqiptare ka detyrimin per te ndertuar teresisht construction of the entire Replacement Infrastrukturen Zevendesuese qe do te jete nen Infrastructure that shall be inudanted or become uje ose qe do te behet e paperdorshme per shkak unusable because of the implementation of the te zbatimit te projektit te DHP. Pervec DHP project. Further to the Concession Marreveshjes se Koncesionit, permes nje Agreement, through an Agreement signed Marreveshjeje te firmosur midis Ministrise se between the Ministry of Energy and Industry, the Energjise dhe Industrise dhe Autoritetit Rrugor Albanian Road Authority and DHP, on 14.02.2014, Shqiptar dhe DHP, ne 14.02.2014, DHP do te DHP shall construct the Banja – Gramsh road and ndertoje rrugen Banje – Gramsh dhe Uren e Trashovice Bridge. Trashovices. Following this agreement, DHP engaged the JV Bazuar ne kete marreveshje, DHP angazhoi JV ITALCONSULT and SGAI, as the Design ITALCONSULT dhe SGAI, si Kompani Company for the Banja - Gramsh Road and Projektuese per Rrugen Banje – Gramsh dhe Uren Trashovice Bridge, which prepared the e Trashovices, te cilet pergatiten Projektin Preliminary Design accompanied with the Paraprak se bashku me Raportet Ekzaminues dhe Environment and Social Scopping and Screening Qellimor Mjedisor dhe Social te cilet detajuan Reports which detailedthe impact assesments. vleresimin e ndikimeve. DHP, Designer and the Albanian Road Authority in DHP, Projektuesi dhe Autoriteti Rrugor Shqiptar cooperation, performed a Public Hearing on ne bashkepunim, realizuan nje Degjese Publike ne 30.07.2014, on which were disclosed these 30.07.2014, ne te cilen u publikuan keto ndikime impacts and three alternatives were proposed for dhe u propozuan tre alternativa per Rrugen the Replacement Road Banja - Gramsh and the Zevendesuese Banje – Gramsh dhe Ura e Trashovice bridge. Trashovices. Based on the conclusion of the Public Hearing, as Bazuar ne perfundimin e Degjeses Publike, si well the approval of the Albanian Road Authoritiy’s edhe miratimin e Keshillit Teknik te Autoritetit Technical Council on the costal shore alternative, Rrugor Shqiptar mbi alternativen pergjate vijes se the Designer developed the Detailed Design of bregut, Projektuesi zhvilloi Projektin e Detajuar te such road and bridge. kesaj rruge dhe ures. The present summary comprises a brief Prezantimi aktual perfaqeson nje vleresim te evaluation of the Environmental and Social Impact permbledhur te alternatives se vijes se bregutqe Assesment (ESIA) of the project. ka zhvilluar Projektuesi si Projekt te Detajuar te kesaj rruge dhe ures edhe Vleresimin e Ndikimit This document is prepared in the frame of the on- Mjedisor e Social (VNMS) e ketij projekti going consultations on the ESIA with planning authorities. In particular it constitutes the vehicle Ky dokument eshte pergatitur ne kuadrin e by which the Designer has saught opinions from vazhdimesise se konsultimit mbi VNMS me autoritetet planifikuese. Ne vecanti ai perben

2 | P a g e / F a q e

planning authorities and other stakeholders with mjetin me te cilin Projektuesi ka kerkuar opinionet which final designs are to be developed. nga autoritetet planifikuese dhe grupet e tjera te interesit me te cilet do te zhvillohet planifikimi

perfundimtar.

2. LEGAL FRAMEWORK 2. KUADRI LLIGJOR The ESIA process has been undertaken in Procesi ESIA eshte realizuar ne perputhje me compliance with the requirements of Albanian kerkesat e Legjislacionit Shqiptar, Direktivat e Law, the European Union Directives and in the Bashkimit Evropian dhe ne kontekstin e context of the IFC performance standards. Standarteve te performances se IFC. The legal framework for ESIA procedure in Kuadri ligjor per procedurat e VNMS ne Shqiperi Albania is based on: bazohet ne:  Law No. 10440 “On Environmental Impact  Ligjin No. 10440 mbi “Vleresimin e Ndikimit ne Assessment” dated 7th of July 2011. Mjedis” date 07 Korrik 2011.  Decision of the Council of the Ministers, no. Vendimin e Keshillit te Ministrave, nr. 247, date 247, dated 30.04.2014 “On prescription of the 30.04.2014 “Për përcaktimin e rregullave, të regulations, requirements and procedures kërkesave e të procedurave për informimin dhe related to the information and involvement of përfshirjen e publikut në vendimmarrjen the community on environmental and decision mjedisore”. making”. Ligji prezanton dy nivele te vleresimit: The Law introduces two levels of assessment:  Procesin e thelluar dhe  Profound process and  Procesin paraprak (ne vija te pergjithshme)  Summary (outlined) process Kategori te ndryshme projektesh dhe projekte te Different categories of project and size limits of permasave te ndryshme paraqiten ne Shtojcat e project, falling into each category are presented in ligjit te ndara sipas kategorive. the Appendices to the law. Bazuar ne Kuadrin Ligjor te mesiperm si edhe per Based in the above Legal Framework as well to be te qene ne perputhshmeri me Standartet e in line with IFC’s Performance Standards, a Performances se IFC me referencat e Bankes harmonization between national and international Boterore, ishte i nevojshem nje harmonizim midis requirements was necessary. kerkesave kombetare dhe nderkombetare. During this process, the relevant Laws and Ligjet dhe Rregulloret respektive qe qeverisin Regulations governing presently are: aktualisht gjate procesit jane:  Concession Agreement, Law no. 10083,  Marreveshja Koncesionare, Ligji nr. 10083, dated 23.02.2009, “On the approval of the date 23.02.2009, “Per miratimin e Kontrates Concession Agreement entered into se Koncesionit ndermjet Ministrise se between Ministry of Economy, Trade and Ekonomise, Tregtise dhe Energjetikes, si Energy, as Contracting Authority and EVN Autoriteti Kontraktues, dhe EVN AG, Statkraft AG, Statkraft AS and Devoll Hydropower AS dhe Devoll Hydropower Sh.A. si Sh.A. as co-concessionaire related to design, bashkekoncesionare, per projektimin, finance, construction, ownership, operation, finacnimin, ndertimin, marrjen en pronesi, maitenance and transfer of Devoll shfrytezimin, mirembajtjen dhe transferimin e Hydropower Project on the Devoll River in projektit te hidrocentralit ne lumin Devoll ne Albania”, as amended. Republiken e Shqiperise”, i ndryshuar.  Replacement Agreement signed between the  Mareveshja Zevendesuese nenshkruar mes Minstry of Energy and Industry, the Albanian Ministrise se Energjise dhe Industrise, Road Authority and DHP, on 14.02.2014 Autoritetit Rrugor Shqiptar dhe DHP, me “Related to design, tender of the Replacement 14.02.2014 “Lidhur me projektimin, tenderimin Infrastructure (Roads and bridges)…” e Infrastruktures Zevendesuese (Rruget dhe urat)…”  Law no. 10 440, dated 7.07.2013 “On the Environmental Impact Assesment”  Ligji nr. 10 440, date 7.07.2013 “Mbi Vleresimin e Ndikimit ne Mjedis”

3 | P a g e / F a q e

 Law no. 10431, dated 9.06.2011 “On  Ligji nr. 10431, date 9.06.2011 “Per Mbrojtjen Environment Protection” e Medisit”  Draft ESIA Report disclosure and Public  Publikimi i Draft Raportit te VNMS-se dhe Hearing performed for the Preliminary Design Degjesa Publike e realizuar per Projektin of the Road Banja Gramsh and coastal shore Paraprak te Rruges Banje - Gramsh dhe alternative selected, dated 30.07.2014; perzgjedhja e alternatives pergjate bregut, date 30.07.2014;

Standardet e Performances se IFC jane: IFC Performance Standards consist of: • Standarti i Performances 1: Vleresimi Social • Performance Standard 1: Social and dhe Mjedisor dhe Sistemi i Administrimit Environmental Assessment and Management System • Standarti i Performances 2: Kushtet e Punesimit dhe Punes • Performance Standard 2: Labour and Working Conditions • Standarti i Performances 3: Parandalimi dhe Pakesimi i Ndotjes • Performance Standard 3: Pollution Prevention and Abatement • Standarti i Performances 4: Shendeti, Mbrojtja dhe Sigurimi i Komunitetit • Performance Standard 4: Community Health, Safety and Security • Standarti i Performances 5: Blerja e Tokes dhe Zhvendosja e Pavullnetshme e Banimit • Performance Standard 5: Land Acquisition and Involuntary Resettlement • Standarti i Performances 6: Konservimi i Biodiversitetit dhe Administrimi i • Performance Standard 6: Biodiversity Qendrueshem i Burimeve Natyrore Conservation and Sustainable Natural Resource Management • Standarti i Performances 7: Popullatat • Performance Standard 7: Indigenous People Indigjene • Performance Standard 8: Cultural Heritage • Standarti i Performances 8: Trashegimia Kulturore

Bazuar ne keto standarde procedura do te Following the stated standards the procedure zbatohet duke ndjekur keto hapa: shall be implemented on these steps: • Ekzaminimin: nje process prej te cilit palet e • Scoping: the process by which stakeholders interesuara konsultohen te kontribuojne ne are consulted to contribute to the identification identifikimin e ceshtjeve kyc qe duhet te of key issues to be investigated as part of the investigohen si pjese e VNMS. ESIA. • Angazhimi i Grupeve te interesit: nje • Stakeholder Engagement: a comprehensive perafrim gjitheperfshires per komunikim dhe approach to the communication and konsultim me palet e interesuara te consultation with the identified stakeholders identifikuara gjate ciklit jetesor te projektit. throughout the whole project lifecycle. • Fokusi mbi Ceshtjet Sociale: ndersa • Focus on Social Issues: whereas the legjislacioni Shqiptar i referohet kryesisht Albanian legislation mainly refers to ndikimeve mjedisore, perafrimi i IFC fokuson environmental impacts the IFC approach also gjithashtu mbi identifikimin e ndikimeve mbi focuses on the identification of impacts on the komunitetet e ndikuara. communities.

3. PROJECT DESCRIPTION 3. PERSHKRIMI I PROJEKTIT The existing main public road between Banja and Rruga kryesore publike ekzistuese midis Banjes Gramsh follows the North Shore of the Devoll dhe Gramshit pervijon Bregun Verior te Lumit River and is approximately 19 km long. Most of this Devoll dhe eshte rreth 19 km e gjate. Shumica e road will be inundated when the Banja dam is rruges do te permbytet kur te perfundoje diga e completed and a replacement road, including new Banjes, dhe per kete arsye nevojitet ndertimi i nje bridges, has to be constructed. The new shore line rruge zevendesuese perfshire ketu edhe ura. Vija of the reservoir at 175 m.a.s.l, will be long and will e re e bregut te rezervuarit ne kuoten 175 m mbi feature many deep inlets into steep valleys, which nivelin e detit do te jete e gjate dhe do te perbehet will create challenges with regards to stability of nga mjaft futje te thella ne luginat e thepisura, ku

4 | P a g e / F a q e

steep slopes. There will also be several large do te krijohen sfida persa i takon qendrueshmerise bridges with length up to 350 m. te shpateve te pjerreta. Do te kete gjithashtu edhe ura te medha me gjatesi deri ne 350 m. Three main alignment alternatives for the Banja – Gramsh Replacement Road (A coastal shore, B Ishin tre alternativa kryesore per Rrugen hilly and C mountainous) and two alternatives for Zevendesuese Banje - Gramsh (A pergjate bregut, the Trashovice bridge(one lane and double lane) B kodrinore dhe C malore) dhe dy alternativa per were proposed to the Community during the Public uren e Trashovices (me nje dhe me dy karexhata) Hearing perfomed on 30.07.2014 in Gramsh. qe iu propozuan ne komunitetit gjate Degjeses Publike me 30.07.2014 ne Gramsh. The Public decision as well the Technical Council of ARA concluded on the coastal shore alternative Vendimi i Publikut si edhe Keshilli Teknik i ARRSH and Trashovice Bridge with two lanes. perzgjodhi alternativen e rruges pergjate bregut dhe Uren e Trashovices me dy karexhata. Based on these conclusions the Designer developed the Detailed Design of the road and Bazuar ne keto perfundime Projektuesi zhvilloi bridge with the following charachteristics. Projektin e Detajuar te rruges dhe ures me karakteristikat vijuese. The technical specific charachteristics of these objects are given as below: Karakteristikat specifike teknike te ketyre objekteve jane si me poshte:  The length of the road shall be 15, 234 km.  Gjatesia e rruges do te jete 15, 234 km.  The standard cross-section of this road is planned to be as per the agreed standard  Seksion terthor tip i kesaj rruge planifikohet with the Albanian Road Authority të jete sipas standartit te marreveshjes me Replacement Agreement, Appendix 1. A Autoritetin Rrugor Shqiptar per Marreveshjen modified Cat IV, Class C’2 with a Zevendesuese, Aneksi 1. Per kete rruge carriageway width of 5.5 m and 0.5 m of parashikohet nje Kat IV, Klasa C’2 e shoulders on each side and surfaced with modifikuar me gjeresi karexhate 5.5 m dhe asphalt is envisaged for this road. shpatulla 0.5 m ne cdo ane, me siperfaqe të asfaltuar.  Number of lanes = 2;  Numri i karexhatave = 2;  Lane Width = 2.75 m;  Gjeresia e karexhates = 2.75 m;  Lane cross fall = 2.5%  Kendi i pjerresise per karexhate = 2.5%  Shoulder width = 0.50 m;  Gjeresia e Shpatullave = 0.50 m;  Shoulder cross fall = 2.5%  Kendi i pjerresise per shpatull = 2.5%  Verge: a 0.50 m wide  Gjeresia e bankines 0.50 m  Embankment slopes: 1:3 for H < 3.00 m – 2:3 for H > 3.00 m;  Raportet e shpateve me mbushje: 1:3 per H < 3.00 m – 2:3 per H > 3.00 m; Trashovice bridge charachteristics: Karakteristikat e Ures se Trashovices: During the inundation of the Banja reservoir, the existing pedestrian wood bridge connecting Gjate mbushjes se rezervuarit te Banjes, ura Gramsh to Trashovice village will be flooded. aktuale prej druri e kembesoreve qe lidh Gramshin me fshatin Trashovice do te permbytet. The wood pedestrian bridge will be replaced by a vehicular bridge connecting Gramsh and Ura prej druri e kembesoreve do te zevendesohet Trashovice, which as concluded in the First Public me nje rruge automobilistike per te lidhur Gramshin Hearing and approved by ARA Technical Council dhe Trashovicen,qe sic edhe u percaktua ne in addition, shall be a double lane bridge. Degjesen e Pare Publike dhe u miratua ne vijim nga Keshilli Teknik i ARRSH, do te jete nje ure me Below it is provided a detailed analysis on the dy karexhata. developed detailed design, as well as a combined evaluation of criteria related to technical features Me poshte jepet analiza e detajuar mbi projektin e and environmental & social impacts.Project Area detajuar qe eshte zhvilluar, si edhe nje vleresim i kombinuar per kriteret lidhur me vecorite teknike

dhe ndikimet mjedisore dhe sociale.

5 | P a g e / F a q e

Project Area Zona e Projektit The road project is located in the District Projekti i rruges shtrihet ne Qarkun e Elbasanit, ne area, in the territory of Gostime Comune territorin e Komunes Gostime (Fshati Shushice e (Shushice e Vogel village), Tregan Commune Vogel), Komunes Tregan (Fshati Kaçivel), (Kaçivel Village), Pishaj Commune (Cingar i Komunes Pishaj Commune (Fshatrat Cingar i Poshtem, Drize, Ceruje, Qerret, Çekin, Pishaj and Poshtem, Drize, Ceruje, Qerret, Çekin, Pishaj dhe Trashovice villages) and Gramsh Municipality. Trashovice) dhe bashkise Gramsh.

6 | P a g e / F a q e

Overview of the Detailed Design (Road & Trashovice Bridge) Pamje teresoree Projektitte Detajuar (Rruga dhe Ura e Trashovices)  Detailed Design Road Alignment–Red, Brown and Yellow  Trajektorja e Projektit te Detajuar te Ruuges– e Kuqe,Kafe dhe e Verdhe  Trashovice Bridge– Green  Ura e Trashovices– e Gjelbert

7 | P a g e / F a q e

4. BASELINE CONDITIONS AND IMPACTS 4. KUSHTET BAZE DHE NDIKIMET

4.1 COASTAL SHORE ROAD AND TRASHOVICE 4.1 RRUGA PERGJATE BREGUT DHE URA E BRIDGE TRASHOVICES The alignment, in the majority of the route follows the Gjurma, ne pjesen me te madhe te tij, ndjek pjesen e lower part of the Banja – Gramsh coastal shore of ulet te vijes se bregut Banje – Gramsh, qe ne te the future Banja Reservoir. It has a length of approx ardhmen do te perbeje Rezervuarin e Banjes. Ka nje 15.23 km and considers a driving time along this gjatesi rreth 15.23 km dhe konsiderohet qe koha e alignment of less than 19 min, considering that the udhetimit neper kete gjurme te jete ne me pak se 19 existing road with 16.75 km is covered in average for min, duke konsideruar qe ne rrugen ekzistuese prej approx 22 min. The driving time is calculated to be 16.75 km kryhet per rreth 22 min. Koha e udhetimit more stable, which means that less than 3% of perllogaritet te jete me e qendrueshme, qe do te thote driving time will be below the speed of 50 km/h, se vetem per me pak se 3% e kesaj kohe udhetimi instead of the actual of around 17% on the existing do te kryhet nen shpejtesine 50 km/h, nderkohe qe road. It can be considered that this alignment will be kjo e tanishmja rezulton ne rreth 17% te kohes. Mund an added value for the future constructed landscape te konsiderohet qe kjo gjurme te perbeje ne te architecture of the region, as regards to the type of ardhmen nje vlere te shtuar ne peisazhin arkitekturor terrain and type of habitats that this alignment pass te rajonit, lidhur me llojin e terrenit dhe te habitateve through. Although the construction structures permes te cilave ajo kalon. Edhe pse strukturat (mainly bridges and other structures) are much more ndertimore ne kete shtrirje (kryesisht ura dhe in number and locations, the best engineering struktura te tjera) jane me te shumta ne numer dhe practices have been selected during the design and vendodhje, jane perzgjedhur praktikat me te mira implementation so as to produce minimal impacts to inxhinierike per t’u perdorur gjate projektimit dhe the environment and communities. zbatimit, keshtu qe do te prodhohen ndikime minimale ne mjedis dhe komunitete. This alignment is the most appropriate option for the local communities as a Replacement Road, as it Kjo gjurme eshte opsioni me i pershtatshem per increases the safety considerations while reducing komunitetet lokale si Rruge Zevendesuese, sepse rrit the driving time, resulting in a road which is better karakteristikat te sigurise dhe ne te njejten kohe than the existing one. redukton kohen e udhetimit, duke sjell enje rruge qe eshte me e mire se rruga ekzistuese. As regards the main negative impact that this alignment could have is the loss of a few agriculture Per sa i takon ndikimit kryesor negativ qe mund te parcels of land. The identification of affected kete kjo rruge, eshte humbja e disa parcelave te persons and activities in the early phase and tokes bujqesore. Identifikimi i personave dhe following the Albanian legislation with guidance from aktiviteteve te prekura ne nje faze te hershme dhe ne IFC principles through the process of ESIA zbatim te legjislacionit Shqiptar dhe udhezim nga consultation , no migration trend is expected due to parimet e IFC gjate procesit te konsultimit te VNMS, land loss with a minimal impact for a short period nuk priten tendenca migrimi per shkak te humbjes se during construction. tokes dhe priten ndikime minimalene kohe te shkurter gjate ndertimit. Due to the low terrain and reusing part of the existing route (parts above the buffer zone of banje HPP Per shkak te terrenit te ulet dhe duke riperdorur pjese reservoir which may be rehabilitated), it is te rruges ekzistuese (pjeset qe jane mbi zonen e considered an alignment with low geological and soil sigurise se rezervuarit te HEC Banje qe mund te stability risks. rehabilitohen), konsiderohet qe Alternativa te paraqes rrezik te ulet gjeologjik dhe te This alignment would fullfil the needs of the local qendrueshmerise se terrenit. community similar to the current road due to its location close to all the affected communities. Kjo gjurme permbush nevojat e komunitetit lokal njelloj me rrugen ekzistuese per shkak te vendodhjes From the environmental point of view, there is lilttle se saj afer me te gjithe komunitetet. to no impact on wildlife habitat disturbance, erosion etc. Impacts during construction and operation Nga kendveshtrimi mjedisor, ka ndikim te ulet ose phases will be most easily mitigated with this aspak ne habitatet e gjallesave te egra, erozion, etj.. alignment. Ndikimet gjate fazave te ndertimit dhe shfrytezimit do te jene me lehtesisht te zbutura ne kete gjurme. From the social point of view, the alignment is a similar or better replacement to the existing road and Nga kendveshtrimi social, gjurma eshte nje will serve the same community that will lose access zevendesim i ngjashem ose me i mire se rruga due to the existing road inundation. Hence,there will ekzistuese dhe do t’i sherbej te njejtit komunitet qe be no access or mobility issues for locals. The one do te humbas lidhjet per shkak te permbytjes se benefit is that the driving time is the shorter rruges ekzistuese. Rrjedhimisht, nuk do te kete

8 | P a g e / F a q e

compared with the other alternatives and it is problematika lidhjeje (aksesi), apo levizshmerie per considered less than the current driving time on the banoret e zones Perfitimi kryesor eshte se koha e existing road. udhetimit eshte me e shkurter krahasuar me alternativat e tjera dhe konsiderohet edhe me e The main features of the alignment are listed below: shkurter se koha e tanishme e udhetimit ne rrugen Technical Features ekzistuese. Length (m) 15,234 Me poshte jane listuar tiparet kryesore te gjurmes: Bridges length (m) 2,275 Vecorite Teknike % alignment with Ds < Gjatesia (m) 15,234 0.89% 50km/h Gjatesia e urave (m) 2,275 Traveling time (min) 18.36 % e shtrirjes me % Travel time respect 0.89% -15.5% Ds < 50km/h existing Koha e udhetimit (min) 18.36 Tortuosity Value 1.08 % Kohe udhetimi -15.5% krahasuar me te tashmen Environmental and Social Impacts Vlera e lakimit / 1.08 Negative and Positive perdredhjes Impacts - + (* - Low; ** - Medium; *** - Ndikimet Mjedisore dhe Sociale High) Ndikimet Negative dhe Soil and Water Impacts * * Pozitive - + Biological Impacts * * (* - Ulet; ** - Mesem *** - Geological Risks ** ^* Larte) Village Impacts * ** Ndikime ne Toke dhe Ujra * * Economy Impacts * ** Ndikime Biologjike * * Cultural Heritage Impacts - * Rreziqet Gjeologjike ** ^* Landscape & Built Heritage Ndikimet ne Fshatra * ** * * Impacts Ndikimet ne Ekonomi * ** Natural Resources Impact * * Ndikimet ne Trashegimine - * Air & Noise Impacts * * Kulturore Ndikimet ne Peisazh & Traffic & Access Impacts * * * * Ndertimet

Ndikimet ne Burimet * * Natyrore Ndikimet ne Ajer & * * Zhurmat Ndikimet ne Trafik & * * Perqasje

4.2 PHYSICAL IMPACTS 4.2 NDIKIMETFIZIKE Main impacts during which could be encountered during construction include: temporary physical Ndikimet kryesore qe mund te hasen gjate ndertimit interference with features and resources, changes perfshijne: nderhyrje e perkohshme fizike me to groundwater quality and flows, the planned or vecorite dhe burimet, ndryshimet ne cilesine dhe unforeseen disturbance of contaminated soils, prurjet e ujerave nentokesore, shqetesimi i accidental or inadvertent release of contaminated planifikuar apo i paparashikuar i dherave te ndotur, leshimi aksidental apo i pakujdesshem i materialeve

9 | P a g e / F a q e

materials during the transport of contaminated spoil te ndotura gjate transportimit te dheut te ndotur off-site. jashte zones. The impacts associated with permanent landtake Ndikimet qe lidhen me marrjen e perhershme te and operation will comprise permanent physical tokes dhe me shfrytezimin perbejne nje nderhyrje te interference with features and resources, including perhershme fizike ne vecorite dhe burimet, perfshire direct loss of or damage to abstraction well humbjen direkte apo demtimin e infrastruktures se infrastructure and drains which will be mitigated as puseve te marrjes se ujit dhe te kullimit te cilet do te required under Albanian law. zbuten ne baze te kerkesave te legjislacionit shqiptar.

4.3 BIOLOGICAL IMPACTS 4.3 NDIKIMET BIOLOGJIK During the construction phase there are several Gjate fazes se ndertimi ka disa ndikime te vogela, sic minor impacts, such as: temporary and permanent jane: marrje e perkohshme dhe e perhershme e landtake for construction sites, temporary tokes, ndarje e perkohshme e habitateve dhe fragmentation of habitats and changes in surface ndryshime ne hidrologjine siperfaqesore dhe and groundwater hydrology, depositing of materials nentokesore, depozitimin e materialeve ne sheshe, at sites, littering or accidental spillage of fuels or ndotja apo derdhjet aksidentale te karburantit e materials, dust deposition (e.g. on foliage or soil materialeve te tjera, depozitimi i pluhurit (psh mbi surface), disturbance of species from noise, gjethe apo siperfaqen e dheut), shqetesim i specieve vibration and light emissions, non-specific nga zhurma, dridhjet dhe drita, shqetesim jo-specifik disturbance to species (e.g. birds) due to presence per specie (psh zogjte) per shkak te pranise se of construction crews and equipment. punetoreve dhe makinerive te ndertimit During the operational phase the main impacts that Ndikimet kryesore qe do te shfaqen gjate fazes se will occur are: permanent landtake due to shfrytezimit jane: marrje e perhershme e tokes nga construction of new structures, permanent changes ndertimi i strukturave te reja, ndryshime te to the hydrology of surface and ground waters, soil perhershme ne hidrologjine siperfaqesore dhe degradation due to operational spillage, loss of nentokesore, degradim i dherave prej derdhjeve nga access to sites of amenity value because of their shfrytezimi, humbje e perqasjes ne zonat me vlera nature conservation interest, reinstatement and/or pamore per shkak te interesit per mbrojtjen e natyres creation of new habitat. se tyre, rivendosje dhe/ose krijim i habitatit te ri. The major biological issues have been studied and Problematikat kryesore biologjike jane studiuar dhe are contained in the main ESIA developed for the jane referuar ne Raportin kryesor te VNMSte Devoll Hydropower Project. zhvilluar per Projektin Hidroenergjetik te Devollit.

4.4 SOCIAL IMPACTS 4.4 NDIKIMET SOCIALE POPULATION AND DEMOGRAPHICS POPULLSIA DHE DEMOGRAFIA For all communes/villages situated along the Per te gjitha komunat/fshatrat qe gjenden pergjate Project, impacts are evaluated for land use, road projektit ndikimet vleresohen lidhur me perdorimin infrastructure, water supply network, power e tokes, infrastrukturen rrugore, rrjetin e furnizimit supply, health, education, culture and sport me uje, furnizimin me energji, shendetin, edukimin, facilities as well as agriculture and business to kulturen dhe sportin, si dhe bujqesine dhe biznesin ensure that none are significantly affected by the per te siguruar qe asnje nuk ndikohet ndjeshem creation of the road, and if so, these are mitigated. nga krijimi I rruges, dhe nese ndikohet, ndikimet. Potential impacts during the construction stage may Ndikimet potenciale gjate fazes se ndertimit do te comprise: permbajne:  temporary landtake from community areas;  marrje te perkohshme e tokes prej zonave te komunitetit;  temporary severance or diversion of public rights-of-way or key access routes; and  ndarje apo devijim i perkohshem i te drejtes se publikut per te kaluar apo i rrugeve kyc te  temporary impacts on local amenity due to perqasjes; dhe noise, dust, traffic and visual intrusion (each will be assessed and reported separately within the  ndikime te perkohshme mbi komoditetet lokale full ESIA). per shkak te zhurmes, pluhurit, trafikut dhe

10 | P a g e / F a q e

Potential impacts associated with the operation of nderhyrjeve pamore (secila do te vleresohet dhe the scheme may comprise: trajtohet vecmas ne VNMS-ne e plote).  permanent landtake from community areas; Ndikimet potenciale qe lidhen me fazen e shfrytezimit te skemes do te permbajne:  permanent severance or diversion of public rights-of-way or key access routes;  marrjen e perhershme te tokes ne zonat e komunitetit;  permanent impacts on local amenity due to noise, dust, traffic and visual intrusion (each to  ndalimi/devijimii perhershem i te drejtes se be assessed and reported separately within the publikut per te kaluar apo hyrene rruget kyc; ESIA);  ndikime te perhershme mbi komoditetet lokale  Improvement of accessibility to the adjacent per shkak te zhurmes, pluhurit, trafikut dhe properties and communities; nderhyrjeve pamore (secila do te vleresohet dhe trajtohet vecmas ne VNMS);  reduction of accidents and pollution.  permiresim i qasjes tek pronat dhe komunitetet The assessment considers both primary and ne afersi; secondary impacts. Primary impacts include demolition of, or landtake from, a facility and  reduktim i aksidenteve dhe ndotjes. severance/diversion of a public right- of-way or key Vleresimi merr ne konsiderate si ndikimet paresore, access route. Secondary impacts can arise from the ashtu dhe ato dytesore. Ndikimet paresore perfshijne accumulation of primary impacts e.g. impairment to prishjen apo marrjen e tokes nga nje strukture, si dhe amenity by noise, visual intrusion or traffic. The humbjen e te drejtes se publikut per kalimne nje rruge cumulative effects of different impacts are also kyc. Ndikimet dytesore mund te vijne nga grumbullimi considered. i ndikimeve paresore, p.sh. demi i komoditetit prej The significance of an effect will be based on the zhurmes, nderhyrjes pamore, ose trafikut. Jane magnitude of the impact and the nature of the merre ne konsiderate dhe efektet kumulative te resource/receptor, taking into account the ndikimeve te ndryshme. availability of alternative resources in the locality. Rendesia e nje efekti do te mbeshtetet tek madhesia e ndikimit dhe natyra e burimit/receptorit, duke marre ne konsiderate disponibilitetin e burimeve alternative

ne zone.

ECONOMY AND WEALTH EKONOMIA, DHE MIREQENIA

AGRICULTURE BUJQESIA The main impacts on agriculture will be: Ndikimet kryesore ne bujqesi do te jene: humbje e temporary/permanent loss of access to fields, perkohshme / perhershme e perqasjes tek fushat temporary/permanent deviation of access to bujqesore, ndryshim i perkohshem / perhershem i fields, temporary/permanent landtake, reloaction perqasjes tek fushat bujqesore, marrje e of livestock drinking point, permanent spliting of perkohshme / perhershme e tokes, rivendosje the original properties, and permanent pikave ku pi uje bagetia, copezim i perhershem i disturbance of drainage and/or irrigation works. pronave fillestare, shqetesim i perhershem i punimeve te ujitjes dhe/ose kullimit. CESHTJET SOCIAL-EKONOMIKE SOCIO – ECONOMIC ISSUES Potential impacts during the construction stage to be Ndikimet potenciale qe duhen marre ne konsiderate considered will be: gjate fazes se ndertimit do te jene:  temporary or permanent disruption to  nderprerje e perkohshme apo e perhershme e businesses due to temporary landtake or other bizneseve, nga marrja e perkohshme e tokes dhe construction effects; efektet e ndertimit;  direct changes in the demand for construction  ndryshimet e drejtperdrejta ne kerkesen per employees; punetore ndertimi;  indirect changes in the demand for employees  ndryshimet e terthorta ne kerkesen per punetore due to the purchase of materials or services and per shkak te blerjes se materialeve apo the spending of incomes associated with sherbimeve dhe shpenzimit te te ardhurave qe construction of the project. lidhen me ndertimin e projektit.

11 | P a g e / F a q e

Potential impacts associated with the operation of Ndikimet potenciale qe lidhen me shfrytezimin e the Replacement Roads Project will be related to Projektit te Rrugeve Zevendesuese do te lidhen me employment and regeneration issues. ceshtjet e punesimit dhe te rigjenerimit. Employment impacts will consist of: Ndikimet ne punesim do te perbehen nga:  displacement or disruption of existing  zhvendosje apo nderprerje e bizneseve businesses and / or provision of new businesses ekzistuese dhe/ose hapje direkt e bizneseve te directly due to permanent landtake; reja nga marrja e perhershme te tokes;  indirect changes in the demand for employment  ndryshime indirekte ne kerkesen per punesim, due to reductions in spending associated with per shkak te reduktimit te shpenzimeve, qe lidhet the displacement of businesses by the project; me zhvendosjen e bizneseveper arsye te projektit;

VENDE ME RENDESI SOCIO- KULTURORE SITES OF SOCIO- CULTURAL IMPORTANCE ARKEOLOGJIA ARCHAEOLOGY Ekziston mundesia e gjetjeve te rastesore per mbetje There is a potential of chance finds for arkeologjike ne zone. Kjo do te zbutet ne perputhje archaeological remains in the area. This will be me kriteret dhe rregulloret shqiptare. mitigated in accordance with the required Albanian regulations. PEISAZHI DHE TRASHEGIMIA NDERTIMORE

LANDSCAPE, TOWNSCAPE AND BUILT HERITAGE Ndikimet mbi peisazhin dhe trashegimine ndertimore vleresohen gjate ndertimit dhe gjate shfrytezimit. Impacts on landscape/townscape character and built heritage are assessed during construction and Ndikimet ne karakterin e peisazhit dhe trashegimine during operation. ndertimore mund te ndodhin ne ato zona karakteristike qe ndikohen direkt ose indirekt nga Impacts on landscape or townscape character and propozimet. Ndikimet direkte ndodhin si rezultat i built heritage are likely to occur within those ndryshimeve fizike te vecorive te peisazhit apo te character areas affected directly or indirectly by trashegimise ndertimore, ndersa ndikimet indirekte proposal. Direct impacts may occur as a result of mund te ndodhin si rezultat i nderhyrjes pamore qe physical changes to landscape, townscape or built ndikon ne karakterin e peisazhit apo ne pozicionimin heritage features whereas indirect impacts may e tipareve te trashegimise ndertimore. Pra shtrirja occur as a result of visual intrusion that could affect fizike mbi te cilen ndodh ndikimi do te varet nga the character of the landscape/townscape or the vleresimi i karakteristik baze dhe nga shtrirja pamore setting of built heritage features. The physical extent e punimeve te propozuara. Ndikimet do te jene te over which impacts may occur will therefore be perkohshme ose te perhershme. dependent upon the baseline character appraisal as well as the extent of the visual envelope of the proposed works.Impacts will be either temporary or BURIMET NATYRORE permanent. Ndikimet kryesore qe lidhen me fazen e ndertimit NATURAL RESOURCES perfshijne: ndryshim i perkohshem i drejtimit te Main impacts associated with the construction rrjedhave ujore per shkak te ndertimit te urave; phase include: temporary changes to the flow of nderveprim i perkohshem fizik me vecorite/burimet, watercourses due to the establishment of bridges; perfshire demtim direkt te habitateve ujore dhe temporary physical interfaces with rrjedhave ujore; ndryshime ne sasite e ujerave features/resources, including direct damage to siperfaqesore prej shkarkimit te ndotesve; modifikimi aquatic habitats and watercourses; changes to i strukturave mbrojtese nga permbytjet. surface water quality due to contaminant release; Ndikimet e pritshme gjate shfrytezimit perfshijne: modification of flood defence structures. ndryshime te perhershme te ujerave siperfaqesore, During operation, the expected impacts include: ku ndryshimet ne rrjedhje mund te prekin erozionin permanent changes to surface water, where altered dhe depozitimin e sedimenteve, si dhe habitatet flow conditions could affect sediment erosion and ujore; nderveprim i perhershem fizik me vecorite dhe deposition as well as aquatic habitats;permanent burimet, perfshire humbje direkte apo demtim te physical interference with features and resources, rrjedhave ujore dhe te habitateve ujore; ndryshimet including direct loss of or damage to watercourses ne cilesine e ujerave siperfaqesore prej ndotjes, qe and aquatic habitats; changes to surface water mund te shkaktohet nga emetimet aksidentale apo quality due to contamination, which may result from rutine sic eshte mirembajtja, dhe prej depertimit accidental or routine emissions such as tendotesve ne ujerat nentokesore apo siperfaqesore

12 | P a g e / F a q e

maintenance, and where contaminants could enter prej kullimit te trasese se rruges; shqetesim i ground or surface waters via the carriageway perhershem i shkarkimit te permbytjeve (efekti drainage; and permanent disturbing of flood barriere). discharge (barrier effect) CILESIA E AJRIT

Ndikimet qe u vleresuan perfshijne: AIR QUALITY  emetimin e pluhurit dhe pjesezave ne ajer, qe Impacts that have been assessed include: lidhen me punimet e prishjes dhe ndertimit ne zone;  dust and airborne particulate emissions associated with demolition and construction  cdo ndryshim ne shkarkimet e trafikut rrugor works sites; per shkak te rritjes se koheve te udhetimit, qe rezultojne nga mbyllja e perkohshme apo e  any changes in road traffic exhaust emissions perhershme e rrugeve; due to increased journey times resulting from temporary or permanent closure of roads;  cdo rritje te shkarkimeve nga marmitat per shkak te shtimit te trafikut gjate shfrytezimit  any increases in exhaust emissions due to increases in operational road traffic; ZHURMA DHE DRIDHJET

NOISE AND VIBRATION Ndikimet kryesore gjate ndertimit jane: zhurmat dhe dridhjet ne kantierin e punimeve, zhurma e trafikut Main impacts during construction are: construction te ndertimit te rruges, zhurma si pasoje e site noise and vibration, construction road traffic ndryshimeve ne rrjedhen e trafikut. noise, and noise impacts due to changes in traffic flow. Gjate fazes se shfrytezimit: zhurma dhe dridhjet per shkak te perdorimit te seksioneve rrugore te rinj ose During operation phase: noise and vibration from ndryshuar, dhe strukturave mbeshtetese use of new or altered sections of roads and korresponduese, nese ka; zhurma nga ndryshimet corresponding supporting structures if relevant, ne rrjedhen e trafikut; dhe zhurma e dridhjet qe vijne noise from changes in road traffic flow, and noise nga ndryshimet ne tiparet e sherbimeve dhe and vibration resulting from changes in service ndryshimeve ne natyren e trafikut. patterns and changes in traffic nature. KENAQESIA PAMORE VISUAL AMENITY Ndikimet qe lidhen me ndertimin: hapje e pamjeve Impacts associated to the construction: opening te reja, bllokim i pamjeve ekzistuese apo nderhyrje up of new views, blocking of existing views or tek pamjet, ndryshim ne tiparet apo cilesine e intrusion into views, change in character or quality pamjeve; nderhyrje e trafikut tek pamjet,ndryshimi of views; intrusion of traffic into views, change in i pamjeve gjate nates views at night. Ndikimet qe lidhen me shfrytezimin: hapje e Impacts associated to the operation: opening up pamjeve te reja,ndryshim ne tiparet apo cilesine e of new views, change in character and quality of pamjeve, nderhyrje tek pamjet, perfshire pikat e views, intrusion into views including new reja te referimit dhe ato fokale; nderhyrje tek, apo landmarks and focal points; intrusion into, or shfaqje e pamjeve ekzistuese;ndryshime ne screening of, existing views, change in light levels nivelet e ndricimit dhe fokusit pamor gjate nates. and visual focus at night. TRAFIKU DHE PERQASJA TRAFFIC AND ACCESS Ndikimet qe pritet te ndodhin, pra dhe te Impacts that are expected to occur and, therefore vleresohen, gjate ndertimit, perfshijne: ndryshimet assessed, during construction, include: changes ne rrjedhen e trafikut rrugor prej mbylljesse in road traffic flows arising from temporary road perkohshme te rruges; rritje e perkohshme e closures; temporary increases in public road trafikut ne rruget publike; rritja e perkohshme e traffic; temporary increases in traffic flows due to trafikut prej makinerive te ndertimit ne rruge; construction vehicles crossing roads; temporary ndryshimet e perkohshme ne levizjen e mjeteve changes in the routeing of agricultural circulation; bujqesore; ndryshimet e perkohshme ne levizjen e temporary changes to pedestrian routes and kembesoreve; rritje e trafikut dhe modifikimeve te footways; increased traffic and network rrjetit rrugor. Rregullat e sigurise se trafikut do te modifications. Traffic safety regulations will be menaxhohen ne perputhje me rregulloret managed in accordance with the relevant perkatese e lgjislacionit shqiptar Albanian legislation. Ndikimet gjate shfrytezimit perfshijne: ndryshimet e perhershme te niveleve te rrjedhes se trafikut

13 | P a g e / F a q e

Impacts during operation include: permanent rrugor; ndryshimet e perhershme ne levizjen e changes in road traffic flow levels; permanent mjeteve bujqesore;ndryshimet e perhershme ne changes the routeing of agricultural circulation; levizjen e kembesoreve. permanent changes to pedestrian routes and footways. 5. STRATEGJIA E MASAVE ZBUTESE 5. MITIGATION STRATEGY Administrimi i Projektimit Mjedisor Environmental Design Management Nje pjese themelore e procesit te VNMS eshte A fundamental part of the ESIA process is the reagimi prej rezultateve te zhvilluara ne procesin e feedback of the emerging results into the design and projektimit dhe vendimarrjes. Menyra me me kosto decision-making processes. The most cost-effective efektive per aplikimin e masave zbutese eshte way of applying mitigation is by designing it into the permes projektimit te tyre ne projekt. Pasi efektet e project. As potential significant adverse effects are rendesishme potenciale te kunderta u identifikuan identified these were fed into the design process so ato u perfshine ne procesin e projektimit keshtu qe ku that, where possible, they can be mitigated until the eshte e mundur ato mund te zbuten deri sa efektet e residual effects are deemed to be “as low as mbetura te konsiderohen si “aq te ulta sa te jene reasonably practicable” (ALARP). The iterative praktikisht te arsyeshme” (ALARP). Vazhdimesia “predict-evaluate-mitigate” sequence is at the core perseritese “parashiko-vlereso-zbut”eshte zemra e of ESIA and design. This sequence is applied to the VNMS dhe projektimit. Kjo vazhdimesi aplikohet ne identification of positive opportunities (predict- identifikimin e mundesive pozitive (parashiko- evaluate-enhance). vlereso-realizo). The ALARP principle is most applicable in the Parimi ALARP eshte me i aplikuar ne kontekstin e context of addressing individual effects. Determining adresimit te efekteve individuale. Duke percaktuar se what is ‘reasonably practicable’ is something that the cfare eshte “praktikisht e arsyeshme” eshte dicka qe ESIA team cannot achieve in isolation. Factors such ekipi i VNMS nuk mund ta arrije i izoluar. Faktore sic as safety, technical feasibility, constructability and jane siguria, besueshmeria teknike, ndertueshmeria operability all feature in ALARP. The other key factor dhe shfrytezueshmeria te gjitha pasqyrohen ne is cost. In defining ALARP for an impact/mitigation ALARP. Faktori tjeter kyc eshte kostua. Ne measure, the proportionality of the cost to the benefit percaktimin e ALARP per nje mase must be given proper consideration. ndikuese/zbutese, proporcionaliteti i kostos ne perfitim duhet te jepet me konsideratat e duhura.

6. MITIGATIONS AND CONCLUSIONS 6. MASAT ZBUTESE DHE KONKLUZIONET

ARCHAEOLOGY ARKEOLOGJIA From the information provided by the literature it is Prej informacionit te dhene nga literatura raportohet reported (incl. the data from the National (perfsh. Te dhenat nga Agjensia Kombetare e Archaeological Agency) that the new road will go Arkeologjise) se rruga e re do te kaloje permes through areas with potential for archaeological zonave me potencial per te patur mbetje remains, although it will not affect the already arkeologjike, megjithese rruga nuk do te preke zonen identified archaeological site of Tumulus of Ceruja. arkeologjike, tashme te identifikuar, te “Varreve te Cerujes”. A clear procedure has been also explained in the new Cultural Heritage Law passed in the Albanian Nje procedure e qarte eshte shpjeguar gjithashtu ne Parliament in 2003 and amended in 2006. During Ligjin e Ri per Trashegimine Kulturore te miratuar ne the works for the construction of the road, in case of parlament ne vitin 2003 dhe ndryshuar ne vitin 2006. identification of artefacrs, the site works will be Gjate punimeve per ndertimin e rruges, ne rast suspended temporary and collaboration with identifikimi te artefakteve, punimet ne terren do te certified archaeologists will be established in order nderpriten perkohesisht dhe bashkepunimi me to minimise potential damage to sites and arkeologe te certifikuar do te vendoset me qellim monuments. In all the planning stages of this public minimizimin e demit potencial ne zona dhe infrastructure it should be considered that the new monumente. Ne te gjitha fazat e planifikuara te kesaj road goes through an area that has been an infrastrukture publike duhet te merret ne konsiderate important human settlement throughout the history, se rruga kalon permes nje zone e cila ka qene nje and thus, modern investment should be respectful to vendbanim i rendesishem njerezor pergjate historise, the earlier achievements of humanity. dhe prandaj, investimi modern duhet te respektoje arritjen e meparshme te njerezimit.

14 | P a g e / F a q e

LANDSCAPE AND VISUAL AMENITY PEISAZHI DHE KENAQESIA PAMORE As with any road development, the Project by means Si ne cdo ndertim infrastrukturor rrugor, edhe of its very presence and notwithstanding the various Projekti, me vete pranine e tij dhe pavaresisht impacts from severance through to visual impact will ndikimeve te ndryshme qe nga hapja e rruges e deri have a permanent and therefore residual impact on ne ndikimin pamor, do te kete nje ndikim te the character of its immediate environs along its perhershem, dhe rrjedhimisht nje ndikim te mbetur ne entirety. karakterin e mjedisit prane gjithe gjatesise se tij. The permanent nature of the impact will also affect Fakti qe ndikimi eshte i perhershem do te preke surrounding residential and other property in these gjithashtu edhe zonat e banimit dhe hapesira te tjera and other areas especially where such property is at perreth, vecanerisht kur keto hapesira gjenden ne proximity to the proposed road and remote from afersi te rruges se propozuar dhe larg rrugeve te other roads. However, in mitigation considerable tjera. Megjithate, tek masat zbutese, perpjekje e effort has been given to minimizing such adverse or konsiderueshme i eshte kushtuar minimizimi te residual impacts and will be in line with the national ndikimeve te tilla te pafavorshme apo te mbeten dhe regulations for such. do te jene ne perputhje me rregulloret kombetare rreth kesaj. CLIMATE KLIMA The insignificant impact of construction on the local climate will not leave any residual impacts on natural Ndikimi i paperfillshem i ndertimit mbi klimen lokale vegetation and cultivated lands. nuk do te shkaktoje ndonje ndikim qe do te mbartet mbi bimesine natyrore dhe token bujqesore. Residual impacts on global climate are expected as the project and other human activities will contribute Priten ndikime mbartese mbi klimen globale, pasi to CO2 emissions. This contribution could be projekti dhe aktivitetet humane do te kontribuojne ne partially compensated through national forestry clirimin e gazit karbonik CO2. Ky kontribut do te activity, such as reforestation. kompensohet pjeserisht permes aktiviteteve pyjore kombetare, sic eshte pyllezimi.

RELIEVI, GJEOLOGJIA, TOKA DHE UJERAT RELIEF, GEOLOGY, SOIL AND GROUNDWATER NENTOKESORE Despite mitigation residual impacts are possible. Megjithe masat zbutese ka disa ndikime qe mbeten. These include: Keto ndikime jane:  Depending on ground conditions encountered,  Ne varesi te kushteve tokesore qe ndeshen, ka construction dewatering is likely to be required. mundesi qe te kerkohet largimi i ujerave gjate  Ground may be contaminated by spills. ndertimit.  Soft ground areas will require removal and  Toka mund te ndotet prej derdhjeve. replacement or engineered measures.  Zonat ku toka eshte e bute do te kerkojne  Highly fractured or weathered areas of rock may zhvendosje & rivendosje, ose masa inxhinierike. require monitoring and maintenance.  Zonat shkembore te thyera apo te gerryera mund  Deterioration of materials for re-use may occur. te kerkojne monitorim dhe mirembajtje.  Mund te ndodhe prishja e materialeve per ri-

perdorim.

HYDROGRAPHY AND SURFACE WATER HIDROGRAFIA DHE UJERAT SIPERFAQESORE Measures to mitigate impacts of the proposed Masat per zbutjen e ndikimeve te shtrirjes se alignment on flooding, aquatic ecology and water propozuar mbi rrjedhat ujore, ekologjine dhe cilesine quality and fisheries have been incorporated into the e ujit, si dhe peshkimin, jane perfshire ne projektin e drainage design. kullimit. In non karstic areas, where the road cuts into the Ne zonat jo-karstike, ku rruga pritet me topografine existing topography, the base of the cutting may be ekzistuese, baza e prerjes mund te jete poshte nivelit below the existing water table. This can result in the ekzistues te ujit. Kjo mund te rezultoje ne uljen e lowering of the water table in the vicinity of the cut nivelit te ujit ne afersi te prerjes dhe ne dehidratimin and the dewatering of shallow wells. The best e puseve te ceket. Praktikat me te mira inxhinierike engineering practices have been applied in detailed jane aplikuar per projektin e detajuar dhe e njejta gje design and the same is going to be monitored during do te monitorohet gjate zbatimit te punimeve. implementation iof works.

15 | P a g e / F a q e

In extreme rainfall events there may be temporary Ne rastet e rreshjeve ekstreme mund te kete flooding of points where the route will cross fiords. permbytje te perkoheshme te pikave ku rruga kryqezohet me fiordet.

HABITATET DHE BIODIVERSITETI HABITAT AND BIODIVERSITY Ndikimet qe lidhen me fazen e ndertimit te rruges se The impacts related to the construction phase of the re, kane nje magnitude te ulet mbi habitatet e prekura new alignment, have a minor magnitude over the dhe biodiversitetin, kjo duke konsideruar qe masat impacted habitats and biodiversity, provided that the zbutese te propozuara (te cilat jane gjithashtu pjese proposed mitigation measures (being also part of e Planit te Kontraktorit per Menaxhimin e Mjedisit) the Contractor’s Environmental Management Plan) jane zbatuar ne menyre korrekte dhe ne kohen e are implemented in a timely and correct manner. duhur. As regards operation the proposed road would result Persa i perket shfrytezimit, rruga e propozuar do te in higher traffic speeds and a slight increased rezultoje ne rritje te shpejtesise se trafikut si dhe ne volume of traffic. Traffic signs can be used to alert rritje te lehte te volumit te trafikut. Mund te perdoren drivers to areas in more populated areasthereby shenja trafiku per te paralajmeruar shoferet ne zonat reducing the risk of accidents. ku mund te ndodhe kjo gje, duke reduktuar keshtu Higher noise levels along the proposed road rrezikun e aksidenteve. scheme can be expected to result in a minor Nivelet me te larta te zhurmes pergjate shtrirjes se increase in the disturbance of birds. This impact is propozuar te rruges pritet qe te rezultojne ne nje rritje not predicted to be significant. Traffic signs can be te vogel te shqetesimit te zogjve. Nuk pritet qe ky used to alert drivers to areas where this is likely to ndikim te jete i rendesishem. Mund te perdoren occur. shenja trafiku per te paralajmeruar shoferet ne zonat ku mund te ndodhe kjo gje-

AIR QUALITY CILESIA E AJRIT During the construction phase the emission of dust Gjate fazes se ndertimit emetimi i pluhurit shoqerohet is associated with various activities such as the me aktivitete te ndryshme sic jane skarifikimi i removal of vegetation and topsoil, the excavation of bimesise dhe heqja e shtreses se siperme te dheut, earth material and the placement of the same germimi i tokes dhe perdorimi i materialit qe eshte material in embankments and the construction of marre nga germimi, per ne argjinatura dhe ndertimin structures. The emission of dust depends firstly on e strukturave. Emetimi i pluhurit fillimisht varet nga the weather conditions and on the level of activity kushtet e motit dhe nga niveli i aktivitetit, si dhe nga and the type of operations being carried out. Also lloji i operacioneve te kryera. Gjithashtu pluhuri dust is raised by the wheels of the local vehicles and ngrihet edhe nga gomat e mjeteve lokale dhe te the heavy construction vehicles as they pass along renda te ndertimit kur ato kalojne neper kantierin e the construction site during dry weather conditions. ndertimit gjate motit te thate. It is assumed that contractor’s compliance with its Supozohet qe perputhshmerite e kontraktorit me Environmental Management Plan is likely to reduce Planin e Menaxhimit Mjedisor te tij do te bejne te airborne dust arising under normal weather mundur pakesimin e ngritjes se pluhurit ne ajer ne conditions from construction activities. kushte normale te aktiviteteve ndertimore. Pollutants typical for road traffic (COx, NOx, CxHy, Ndotesit tipike per trafikun rrugor (COx, NOx, CxHy, fine particulate matter (PM10), heavy metals and grimcat e imeta (PM10), metalet e renda dhe pluhuri) dust) generally affect areas adjacent to the current ne pergjithsi ndikojne ne zonat perreth rrugeve roads. Diesel vehicles, in particular, tend to produce aktuale. Mjetet e transportit me nafte, ne vecanti, increased levels of particulates that are increasingly kane tendence te rritin nivelin e grimcave, te cilat identified as a significant threat to health. This is of identifikohen gjithnje e me rrezik serioz per particular interest in a country where a very high shendetin. Kjo eshte vecanerisht e rendesishme ne population of old diesel powered vehicles is found. vendet ku ka nje numer te madh te automjeteve qe Law enforcement and the economy improvement perdorin nafte te cilesise se dobet.Forcimi i ligjit dhe will minimise this impact, but that need to be permiresimi i ekonomise do te minimizojne kete implemented in the right time when both factors will ndikim, por kjo ka nevoje te zbatohet ne kohen e match. duhur kur te dy faktoret perputhen. Part of the areas along the studied alignments is Nje pjese e zonave pergjate shtrirjes eshte generally open, rural areas, with rather small villages pergjithesisht e hapur, jane zona rurale, me fshatra and settlements, and they are therefore not prone to dhe vendbanime te vogla, keshtu qe nuk kane significant air quality problems. However, as the probleme te dukshme te ndotjes se ajrit. Megjithate, perderisa projekti kalon permes disa zonave te

16 | P a g e / F a q e

project passes through several inhabited areas, the banuara, emetimet nga makinat duket se kane nje emissions from the vehicles are likely to have a ndikim te vogel negativ tek keta receptore gjate fazes slight negative impact on those receptors during se ndertimit. construction phase. ZHURMA NOISE Gjate fazes se ndertimit te rruges do te kete disa During the construction phase of the project there ndikime tek vendbanimet dhe bizneset ne afersi te will be some impact on nearby residential and rruges, per shkak te emetimit te zhurmes nga trafiku business properties due to noise emissions from site ne kantier dhe aktivitetet e tjera. Aplikimi i barrierave traffic and other activities. The application of binding per zhurmen dhe oreve te punimeve, se bashku me noise limits and hours of operation, along with marrjen e masave te duhura per kontrollin e zhurmes, implementation of appropriate noise control do te siguroje se ndikimi i zhurmes eshte mbajtur me measures, will ensure that noise impact is kept to a minimum. minimum. KOMUNITETI LOKAL DHE CESHTJET SOCIAL- LOCAL COMMUNITY AND SOCIO-ECONOMICS EKONOMIKE With the expected creation of the Banje reservoir the Me krijimin e pritur te rezervuarit te Banjes rruga e re new road is expected to encourage the tourist pritet te inkurajoje industrine turistike e cila ka nje industry which has such huge potential in Historical potencial te madh ne Turizmin Historik dhe and Archaeological Tourism, Scientific tourism, Sun- Arkeologjik, Turizmin Shkencor, Turizmin Diell-Uje, Water tourism, Nature or Ecotourism, Business Turizmin Natyror apo Ekoturizmin, Turizmin e tourism etc. The following are some overall Biznesit etj. Me poshte jepen disa rekomandime te recommendations towards the local end central pergjithshme per qeverisjen vendore dhe qendrore te government of Albania, which can help maintain this Shqiperise, te cilat mund te ndihmojne ne mbajtjen e investment as much as possible as a powerful ketij investimi, sa me shume qe te jete e mundur, si sustainable development instrument: nje instrument i fuqishem i zhvillimit te qendrueshem:  Native and foreign business should be directed  Bizneset e vendit dhe ato te huaja duhet te towards the most important economic sectors by orientohen drejt sektoreve me te rendesishem the help of targeted projects. ekonomike, me ndihmen e projekteve te planifikuara.  The traditional profitable productions should be stimulated.  Duhet te stimulohen prodhimet tradicionale fitimprurese.  Tourist sector should be better assisted, stimulated and restructured (coastal, urban,  Sektori i turizmi duhet te ndihmohet me shume, familiar, cultural, historic etc.) making the te stimulohet dhe ristrukturohet (turizmi pergjate community more aware and improving the bregut, ai urban, familiar, kulturor, historik etj.) tourist infrastructure. duke e bere komunitetin me te ndergjegjshem dhe duke permiresuar infrastrukturen turistike.  Population increase should be preceded by studies and plans regarding regulation and  Rritja e popullsise duhet te paraprihet nga protection of nature through stimulation of new studime dhe plane qe lidhen me rregullimin dhe policies. mbrojtjen e natyres permes stimulimit te politikave te reja.  The interests and priorities should be well- harmonized in order for economic development  Interesat dhe prioritetet duhet te to increase the positive and not to impact on the mireharmonizohen me qellim qe zhvillimi environment. ekonomik te rrite efektet pozitive dhe te mos ndikoje ne mjedis.  The extension of the city on agricultural lands and sectors of ecological interest (specific  Duhet te ndalohet zgjerimi i qytetit ne toka ecosystems) should be forbidden. bujqesore dhe sektore me interes ekologjik (ekosisteme specifike).

7. ENVIRONMENTAL & SOCIAL MANAGEMENT 7. ADMINISTRIMI DHE MONITORIMI MJEDISOR & AND MONITORING SOCIAL Preparation by DHP of the final documents on the Pergatitja nga ana e DHP e dokumentave finale mbi Resettlement Action Plans (RAP) and Planet e Veprimeve per Risistemimin (RAP) dhe Environmantal and Social Management and Planin e Menaxhimit dhe Monitorimit te Mjedisit dhe Monitoring Plan (ESMMP) will follow in the coming Social (PMMMS) do te vijoje ne aktivitetet qe vijne. activities. These documents are not required by the Keto dokumente muk kerkohen nga legjislacioni

17 | P a g e / F a q e

Albanian Law and will be used for internal shqiptar dhe do te perdoren vetem per perputhshmeri compliance only. te brendshme.

8. NEXT STEPS 8. HAPAT VIJUES Following the draft ESIA Report, the next steps on Ne vijim te draft VNMS Raportit, hapat vijues te the process will be: procesit do te jene si me poshte:  Preparation of the final ESIA report after  Hartimi i raportit final te VNMS pas marrjes se te receiving all the comments/opinions provided by gjitha komenteve/opinioneve te shprehura nga the stakeholders during the public hearing. grupet e interesit gjate degjeses publike.

18 | P a g e / F a q e