1. EXECUTIVE SUMMARY

M/s. Sai Supreme Chemicals was established with a vision towards Empowering Life and well being, and has rapidly emerged as the premier integrated pharmaceuticals company in . Its business focuses on Contract Manufacturing, Custom Synthesis, and the manufacture and marketing of pharmaceuticals products and services to clients across the globe, and its product portfolio includes a range of Active Pharmaceutical Ingredients (API's), Drug Intermediates and Specialty chemicals.

M/s. Sai Supreme Chemicals has planned to set up a new Pharmaceutical Multiproduct / API manufacturing facility at SIPCOT Industrial Complex, plot No – F7/ Survey No. 21/1 (Part of New Village) and 82 Part (Part of Karumbukuppam Village), SIPCOT Industrial Complex, , Tiruvallur District, TamilNadu. The total land area of the site is 1.04 acres (0.42 Ha).

The project scope involves in the production capacity 143 TPA of Active Pharmaceutical Ingredients such as Propranolol HCL, Atenolol and Bronopol. These products are lifesaving Cardio vascular drugs, these products are in high demand.

The land purchased by the proponent for this proposed project is already leased by M/s. Ansro Seals Pvt Ltd. The lease transfer letter for the same is given in Annexure – 1. Existing building of around 6000 Sq.ft and 145 HP Power grid is already developed by previous land holder and it will be utilized by proponent for storage of raw materials.

The proposed New Pharmaceutical Multiproduct / API manufacturing facility at SIPCOT Industrial Complex, plot No – F7/ Survey No. 21/1 Part of New Gummidipoondi Village and 82 Part of Karumbukuppam Village, Gummidipoondi Taluk, Thiruvallur District, State. The proposed project falls under item no 5(f) Synthetic Organic Chemicals, Category B as per EIA Notification, 2006 and its subsequent amendments. The Project Summary given in Table 1-1.

Table 1-1 Project Summary

S.No. Particulars Details 1. Name of Company M/s. Sai Supreme Chemicals 2. Project Location SIPCOT Inustrial Complex, Plot No. F7/Sy. No. 21/1 Part of new Gummidipoondi village & 82 Part of Karumbukuppam village, Gummidipoondi Taluk, Thiruvallur District, Tamil Nadu -601201, India 3. Site Coordinates Lat: 13°24'32.17"N Lon: 80° 6'51.43"E 4. Project Activity Schedule, The Proposed Project is coming under the SIPCOT Industrial Complex, Category as per EIA notification 2006 & Gummidipoondi Taluk, Thiruvallur District, Tamil Nadu State, Under Category B, amendments schedule 5 (f) Synthetic Organic chemicals. 5. Name of the project New Pharmaceutical Multiproduct/API Manufacturing Facility 6. Land Details Total Land area is 1.04 Acres (0.42 Ha) 7. Proposed Capacity Total Production capacity is 143 TPA

SNO PRODUCTS CAPACITY (TPA) 1. Proparanolol HCL 50 2. Atenolol 45

3. Bronopol 48

Total 143

8. Water The total requirement of raw water for the Proposed Manufacturing unit is 10.9 requirement KLD. Entire water requirement will be met from SIPCOT. S. Description total water Effluent/ Recycle No requirement Sewage KLD KLD KLD 1 Process 2 2 1 2 Boiler 1 1 1.4 3 washing 1 1 4 Cooling 0.7 0.7 tower 5 Scrubber 0.1 0.1 5 Domestic 1.1 0.8 6 Green belt 5 - - Total Water 10.9 4.8 Effluent 2.4 Requirement 0.8 Domestic sewage Fresh Water (10.9 – 2.4) = 8.5 Requirement 9. Waste water and Total water requirement: 10.9 KLD mode of disposal Effluent generate: 4.8 KLD Domestic waste water generate: 0.8 KLD Recycle water: 2.4 KLD Fresh water requirement: (10.9 – 2.4) = 8.5 KLD Domestic sewage 0.8 KLD disposal into soak pit, effluent 4.8 KLD will be treated in ETP and reuse for utility & green belt & remaining rejects 0.24 KLD into solar pond 10. Power Power requirement is being met from TANGEDCO. However, adequate two DG sets are available to back-up power requirement during power restrictions by TANGEDCO.

DETAILS SOURCE Power Fuel Type

Power TANGEDCO 100 HP - Requirement DG Nearest petrol 1 x 40 KVA & 1 x 60 HSD retailer KVA Boiler (1 x 600 Nearest petrol - HSD kg/hr) retailer

11. Air Emission Stack is proposed for boiler and DG emissions. The process off gases will be scrubbed by scrubbers proposed with stack. Hence the pollutant load from these units will be minimal which finally will be vented through chimneys of appropriate height.

S.No. Description of APC measures Stack Source of Proposed height Generation (m ) 1 Boiler (600 kgs/hr) Stack 25 2 Reactor – 3 Nos. wet scrubber 15 (acid fume emission & Organic emission) 3 DG 1 x 40 KVA Stack 5

4 DG 1 x 62.5 KVA stack 5 12. Solid Waste There is no internal disposal facility availability within the site. The solvent recovery system is proposed for recovery. The solvents from organic layers will be distilled out and re-used in the process. The residue will be sent out for incineration.

S.No. Details of Category Quantity TPA Storage and Disposal Waste 1 Used oil/ 5.1 1 Collection, Storage and waste oil Disposal to Authorized Recycling Agencies.

2 Process 28.1 4.8 Collection, Storage and waste Disposal for incineration at common TSDF facilities

3 Spent 28.5 5 Collection, Storage and solvents Disposal to Authorized Recycling Agencies.

4 Discarde 33.3 1500 No s Collection, Storage and d Disposal to Authorized Containe Recycling Agencies rs 5 ETP 34.3 0.7 Collection, Storage and sludge Disposal at common TSDF facilities

6 Spent 35.2 0.576 Collection, Storage and Carbon Disposal to Authorized Recycling Agencies. 7 Municipal - 1 Sent to Local body solid waste 8 Packagin - 1.5 Collection, Storage and g material Disposal to Authorized Recycling Agencies 13. Manpower For proposed project will employ around 25 persons form the local area

14. Project cost Rs. 250 lakhs