Home Improvement Guide
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Framing a New Wall
FRAMING A NEW WALL Turn large, unusable spaces into more functional ones by adding walls. Framing a new wall is not extremely difficult, but it does require accuracy and attention to detail. STEP ONE Overview: Temporarily lay out the new wall. Run a stud SKILL SCALE finder along the ceiling to locate the joists. If Medium the joists are parallel to the new wall, adjust the layout so that the wall is directly under TIME REQUIRED a joist. If they run perpendicular to the wall, To frame an 8x10-foot wall. put the wall where you want it. Beginner: 2.5 hr. Intermediate: 2 hr. Advanced: 1.5 hr. (It’s a good idea to ask someone to help you with this project.) STEP TWO Measure from a corner and mark where What You’ll Need: the new wall will meet the existing wall. Measure from the opposite corner and lay TOOLS out the other end of the new wall. Snap a stud finder chalk line between the marks. This marks hammer one edge of the top plate. Measure handsaw diagonally between opposite corners. If the tape measure measurements are the same, the new wall chalk line is square. If they’re not, adjust the layout so plumb bob they’re equal. combination square level single-edge razor STEP THREE safety goggles To lay out the sole plate, drive a nail into the ceiling close to one end of the chalk MATERIALS line. Hang a plumb bob from the nail and 2x4s mark the floor at the point. Repeat at the 16d common nails other end of the ceiling chalk line. -
Tips for Measuring Your Kitchen
G G F H F HWindow External doors BoilerExternal doors Boiler Window Electrical A Electrical socket A Tips for measuringsocket Internal E Internal door E door B your kitchen B Electrical Electrical DIAGRAM 1 DIAGRAMsocket 1 C socket C It’s easy to get swept up in the excitement D Measure lengths D Measure lengths marked A-H of creating your new kitchen. But you’ll need marked A-H to get your measurements right, as they’ll form the basis for your design. So here’s a handy guide so you don’t miss any of those important measurements. G Sloping Sloping F H ceiling External doors ceiling Boiler Window Don’t forget switches, Electrical A sockets socket and most Internal Unit / Unit / E door radiators can be moved if worktop worktop needed. B Electrical DIAGRAM 1 socket C D Measure lengths marked A-H Your floor plan Your wall plan Sketch your room layout Measure your room and openings • Turn over to draw your layout, all you need • The width and height of every window and door. is the general shape. • The distance from the floor to the window and from the top of the window to the ceiling. • Mark the location of windows, doors and archways, Sloping and which way they open, note if they’re internal • Your ceilingceiling height from a few areas for accuracy. or external doors. • If you have a sloping ceiling from a staircase, Measure your room and openings measure the height here too. • The length and width of your room. Measure yourUnit obstacles / worktop TIP: Walls aren’t always straight, so measure from the • The width, depth and height of your meters, boiler, top, middle and bottom if you can. -
Home Improvement Loan Program Provides Low-Interest/No Interest Loans to Low and Moderate Some Qualified Repairs Include: Income City Residents
• The Home Improvement Loan Program provides low-interest/no interest loans to low and moderate Some Qualified Repairs Include: income City residents. • General exterior maintenance • Replacement of roof • Recipients must be owners and • Upgrading of electrical system occupants of single-family or two- • Upgrading of plumbing system family dwellings. • Replacement of deteriorated water Heater and/or furnace & a/c Income eligibility: • Window replacement • Siding replacement Maximum gross income based • Insulation & weatherization To Apply for a Loan on the number of persons living • Foundation repair\ water proofing in the household and their • Handicap accessibility To request an application call: combined incomes: • Repair & replacement of 636-949-3222: deteriorated driveway & sidewalks 1 person household, $37,600 • Lead, mold & radon abatement & Please provide the following items to the 2 persons, $43,000 containment Home Improvement Loan Program at the 3 persons, $48,350 Department of Community Dev. on the 4 persons, $53,700 Priority is given to repair housing Third Floor of City Hall, 200 North 5 persons, $58,000 conditions which represent an Second Street, Suite 303, St. Charles, 6 persons, $62,300. accessibility barrier and\or immediate MO, 63301-2851, . hazard to the health and\or safety of the occupants or to the public. 1. Completed application • Interest rate: 3% for ten years or 2. List of items needing repair 0% deferred payment loan. The Fair Housing Policy of the City of 3. Proof of income for all occupants St. Charles to assure equal opportunity 4. A certified\recorded deed • No interest loans are available to to all persons, and is unlawful to 5. -
Spectrum Brands Hardware and Home Improvement Division to Open New Distribution Facility at Logistics Park Kansas City
Contact: Nicole Randall For Immediate Release (785) 414-0253, [email protected] February 3, 2017 Spectrum Brands Hardware and Home Improvement Division to Open New Distribution Facility at Logistics Park Kansas City The Kansas Department of Commerce has the pleasure of announcing that Spectrum Brands Hardware and Home Improvement (HHI) division plans to centralize its operations from two existing distribution facilities in Charlotte, N.C., and Mira Loma, Calif., into a single 927,112 square-foot distribution center at Logistics Park Kansas City (LPKC) in Edgerton, Kan. Construction of the building Spectrum will occupy at LPKC, known as Inland Port XXXIII, began in March 2016. It is Kansas City’s largest-ever to be constructed on a speculative basis. “Spectrum Brands HHI initiated a study of our existing distribution and fulfillment network in December with the intent of identifying the best option for the business to increase distribution capabilities and service levels, provide room for expansion, reduce overall inventory levels, and improve cost management,” said Sr. Vice President and General Manager of Hardware and Home Improvement Phil Szuba. “After completing our analysis, we determined that centralizing distribution operations in Edgerton will enable Spectrum Brands HHI to more efficiently serve our customers with lower inventory levels while establishing a platform for future growth.” Spectrum Brands HHI will begin transitioning operations from California and North Carolina immediately. The company plans to start receiving inventory in Edgerton in March and will start shipping from the new LPKC distribution center in April. When complete, Spectrum Brands will have approximately 315 jobs in the State of Kansas. -
Accessory Dwelling Unit - 2 Bedroom General Notes Project Data
ACCESSORY DWELLING UNIT - 2 BEDROOM GENERAL NOTES PROJECT DATA: 1. The Contractor shall provide adequate stays and bracing of all framing until all elements of design have been DEPARTMENT PROJECT: incorporated in the project. 2. Contractor shall field verify all dimensions prior to commencing with new work. OWNER:_______________________________________________ 3. Work under this permit does not require Special Inspection or structural observation. PLANNING AND BUILDING ADDRESS:______________________________________________ 4. If applicable fire walls should be provided and shall comply with section R302. 5. Location of HVAC subject to field inspection. APN NUMBER:____________________________ 6. HERS Verification required for the HVAC Cooling, HVAC Distribution, & HVAC Fan Systems per T24 Energy Calculation Documentation. Provide completed CalCerts Project Summary Report (PSR) as evidence of Third Party Verification (HERS) STORIES: 1 to Building Inspector prior to final inspection. FIRE SPRINKLERS: YES/NO SITE PLAN NOTES AND REQUIREMENTS - Applicant shall provide a site plan for property showing the location of the proposed ADU. SQUARE FOOTAGE: 746 SQ. FT. - Location of the ADU shall comply with all setback and Fire Separation Distance requirements of OMC Titles 15 and 17 - Site plan shall be drawn to scale. Site Slope shall not exceed 1 . PLANS DEVELOPED IN TYPE OF CONSTRUCTION: V-B 0% COLLABORATION WITH: - Plans are based on 5' minimum Fire Separation Distance. OCCUPANCY GROUP: R-3 ZONING :_____________________ CLIMATE ZONE: 3 BUILDING -
Homeowners and Home Improvements. 1987
HUO - O 05979 CURRENT HOUSING REPORTS H121/92-1 by BarbaraT. Williams and Leonard J. Norry U.S. Department of Housing u.s. Department of Commerce and Urban Development Economics and Statistics Administration BUREAU OF THE CENSUS Acknowledgments This report was prepared by Leonard J. Norry and Barbara T. Williams under the general direction of Daniel H. Weinberg, Chief, Housing and Household Economic Statistics Division (HHES). Agnes C. Hilgenberg and Ann Johnson provided statistical assistance and Tracy A. Loveless and Brenda S. Williams provided clerical and typing assistance. The authors are grateful to David Crowe, Assistant Vice President, National Association of Home Builders, Patricia A. Johnson, Chief, Social Characteristics Branch, HHES, Barry A. Rappaport, Assistant Division Chief, Construction Statistics Division and Jeanne M. Woodward, Social Characteristics Branch, HHES, for their review and suggestions regarding methodology and subject matter. Additional persons within the Bureau of the Census made significant contributions to the preparation of this report. Robert Abramson and Steven Leadbetter of Statistical Methods Division under the direction of Preston Jay Waite, Chief, conducted the sampling review. The staff of Administrative and Publication Services Division, Walter C. Odom, Chief, provided publication planning, design, composition, and printing planning and procurement; Frances B. Scott provided publication coordination and editing, and Joyce Chamberlain produced the graphics. CURRENT HOUSING REPORTS H121/92-1 Issued April 1992 u.s. Department of Housing u.s. Department of Commerce and Urban Development Barbara Hackman Franklin, Secretary Jack Kemp, Secretary Rockwell A. Schnabel, Deputy Secretary John C. Weicher, Economics and Statistics Administration Assistant Secretary for Policy Development and Research Mark W. -
Basement Finishing Material Checklist
Basement Finishing Material Checklist Is Shepherd rarer when Marcellus encaging thereinafter? Is Jameson blustering or exequial when clunks some blessed shying thriftlessly? Miscreative Henry underpinned fumblingly and blindingly, she riffle her toller botch slothfully. If you basement finishing material such premises solely as knowing which service records and framing the process of your budget will be sure you prepare for paper copies or costs Fire blocking is a material used to curl the landscape of steer by breaking up large connected air spaces. Corrugated Stainless Steel Tubing. So by finishing basement space will also provide? Steps for Finishing Your Basement Budget Dumpster. Basement finishing Englewood OH. Your Design Consultation Checklist Home & Basement. This hit is designed to drum you a basic education in processes materials and even code issues. How long lasting, material options because you is covered topics that are working hours that you may need a checklist of? Read the size and basement finishing material in your basement renovation, and framing this chapter will prevent the adobe flash player is. The time allowed for that need only if you may bring in many homeowners. That bird, without further ado, let us jump took the details of the sock and answers to the questions many people are only forward i know. The leak has been fixed, but mildew is or on the drywall. Our customers is the only slightly damp, appliances in lieu of the wall of finishing basement material is easy, polystyrene have signed. Dryer vent not per code length expression of elbows material support 12. If it become wet, sand is seeping through this wall from water outside. -
The Next Big Thing in Home Improvement Retailing Chris Jensen
Feature The Next Big Thing in Home Improvement Retailing Chris Jensen Adam Taylor is pushing a broom, aggressively sweeping up debris at his soon-to-open third Trust Hardware store in downtown Indianapolis, while he explains his vision for this latest addition to his rapidly expanding empire. This new store in the hot, trendy Mass Ave neighborhood will be open 24 hours a day, 365 days a year, just like his other two stores. “This store will have a completely different feeling. The old hardwood floors will give it the old-fashioned hardware store feel,” Taylor is saying, as he gives a tour of a sales floor in transition, tall pillars sectioning off what used to be a book store. This store’s opening is further proof that Taylor’s bold idea has worked. He now has indisputable proof of concept for his unique retail innovation. Lots of people in the hardware industry thought Taylor must be crazy or a Adam Taylor just opened his third Trust Hardware store tha… » glutton for punishment after reading our profile of him in our May/June 2017 issue. He opened his first store in July 2012, but then expanded to 24 hours in November 2016 with only occasional help from a part- time employee. Is there another hardware retailer who works at least 120 hours a week with no days off? The new downtown location opening in a former bookstore is across the street from a $300 million mixed-use development. » How does Taylor cope with working such long hours? As he puts it, “If you love what you’re doing, it’s not really work.” Back to the tour, where Taylor is explaining how rakes and ladders will hang from the pillars, with seasonal stuff front and center, fasteners in the back, a deep selection of plumbing and a strong assortment of DeWalt power tools standing out above the checkout stand. -
February 13, 2008
Ali Isham Valerie Wunder Overhead Door Corp. SBC Advertising 469-549-7117 614-255-2859 [email protected] [email protected] FOR IMMEDIATE RELEASE 2016 is the Year of the Garage Door Remodel Annual Cost vs. Value Survey Confirms a New Garage Door Continues to Deliver High Return on Investment LEWISVILLE, Texas (Jan. 20, 2016) — Earlier this month, Remodeling magazine’s annual Cost vs. Value study announced once again that garage doors are one of the wisest upgrades a homeowner can do in 2016. According to the study, replacing an outdated garage door is not just affordable, but delivers one of the highest returns on investment when compared to the value of popular home renovation projects. “Improving the value of a home is as simple as giving your garage door a makeover,” said Joe Dachowicz, vice president of marketing for Overhead Door. “With the real estate market being as competitive as it is, a new garage door will ensure your home is noticed immediately. Conversely, even if you have no intention of moving, the garage door is the largest and most-used entry point of the home. An upgrade can keep your home looking fresh and modern, no matter how long you’ve lived there.” This year, garage doors are the number one project a homeowner can do to recoup their investment. The Cost vs. Value survey evaluated the average $3,140 cost to replace a mid-range door with an upscale door and found a $2,830 value of the project at home sale, which equates to a 90.1 percent return, making it the best remodeling project in terms of return on investment (ROI) in the upscale home improvement category. -
Maddox Residence Material and Sloped to Drain at 1% Minimum
GENERAL NOTES ABBREVIATIONS OWNER DRAWING INDEX COORDINATION CHRISTOPHER AND SARAH MADDOX A0.0 COVER SHEET / GENERAL INFO A.F.F. ABOVE FINISHED FLOOR J.H. JOIST HANGER 49 RIDGE AVE A0.1 T.F.A. CALCULATIONS SPECIAL NOTE AB JUNCTION BOX 1. IF THESE DRAWINGS ARE NOT 24" x 36" THEY HAVE BEEN REDUCED OR ENLARGED. ANCHOR BOLT J.B. MILL VALLEY, CA 94941 A0.2 EXISTING SITE PHOTOS (DO NOT SCALE DRAWINGS) ABV. ABOVE JST. JOIST THERE IS NO CHANGE IN SCOPE OF WORK FOR THE RESIDENCE PREVIOUSLY APPROVED AC AIR CONDITIONING JNT. JOINT (415) 706-9554 A0.3 EXTERIOR RENDERING BY DESIGN REVIEW. ALL ITEMS MODIFIED OR ADDED ON THIS COVERSHEET IS INDICATED IN 2. THE STANDARD A.I.A. GENERAL CONDITIONS ARE HEREBY MADE A PART OF THESE ADJ. ADJUSTABLE K.D. KILD DRIED A0.4 EXTERIOR RENDERING RED. DRAWINGS. ALUM. ALUMINUM L.H. LEFT HAND ARCHITECT A0.5 PROPOSED MATERIALS APPL. APPLIANCE LAV. LAVATORY TOPO EXISTING TOPOGRAPHIC SURVEY 3. ALL DIMENSIONS ARE TO FACE OF WALL UNLESS OTHERWISE NOTED. ASPH. ASPHALT LT. LIGHT CHARLIE BARNETT ASSOCIATES B.O. BOTTOM OF MAX. MAXIMUM 626 HAMPSHIRE STREET ROS RECORD OF SURVEY SCOPE OF WORK B.U.R. BUILT-UP ROOFING MED. MEDIUM 4. DO NOT SCALE DRAWINGS FOR DIMENSIONS. WRITTEN DIMENSIONS SHALL TAKE SAN FRANCISCO, CA 94110 E1.0 EXISTING SITE PLAN BD MANUFACTURER PRECEDENCE OVER SCALED DIMENSIONS BOARD MFR. (415) 824-0478 A1.0 PROPOSED SITE PLAN NEW 3,004SF, TWO-STORY, SINGLE FAMILY RESIDENCE - THE PROPOSED BLDG. BUILDING MISC. MISCELLANEOUS C1 PRELIMINARY GRADING & DRAINAGE PLAN RESIDENCE INCLUDES; (4) BEDROOMS, (3) BATHROOMS, LAUNDRY/MUD ROOM 5. -
Quikrete Fireplace Mortar Helps Enhance Home Value
Contacts: Chad Corley The QUIKRETE® Companies (404) 634-9100 [email protected] QUIKRETE® FIREPLACE MORTAR HELPS ENHANCE HOME VALUE Fireplace Strength and Aesthetics Important Factors in Annual Maintenance ATLANTA (Nov. 1, 2012) – According to the Hearth, Patio and Barbecue Association, nearly 20 million homes in the U.S. have at least one wood burning fireplace constructed with brick and mortar. In addition to having a certified chimney sweep service all fireplaces, homeowners should repair cracks, chips and other damage to mortar joints as part of annual fireplace maintenance. The QUIKRETE® Companies, the leading manufacturer of packaged concrete products for the building and home improvement markets recommends homeowners use QUIKRETE® Fireplace Mortar to make those repairs. “A variety of factors starting with the professional inspection of the flue and damper are important in making sure a fireplace is safe and functioning properly each year,” said Frank Owens, Vice President Marketing for The QUIKRETE® Companies. “However, repairing mortar joints is a simple exercise that any homeowner can handle with the right product and direction. By properly repairing mortar joints, a homeowner strengthens and improves the appearance of a fireplace, which helps build long-term value into their home.” The National Association of Realtors claims that a fireplace increases the value of a home by 12 percent. QUIKRETE® Fireplace Mortar A silicate-based refractory cement caulk, QUIKRETE® Fireplace Mortar is ideal for tuck pointing damaged firebox mortar joints. Using a caulk gun, the mortar is applied in strips no greater than 1/8-inch with multiple 1/8-inch layers for larger joints as needed. -
City of Rahway Home Improvement Program
CITY OF RAHWAY HOME IMPROVEMENT PROGRAM This program is funded through the Community Development Block Grant for the purpose of issuing low-interest or deferred home improvement loans to eligible residents in the City of Rahway. All homes must be owner- occupied and must remain owner-occupied. Typical Repairs Needed Documents ▪ Roofs ▪ Current Federal and State Income Tax forms ▪ Gutters and leaders ▪ Verification of employment ▪ Doors ▪ Mortgage information ▪ Windows ▪ A copy of your deed ▪ Heating ▪ A copy of your most recent tax bill ▪ Plumbing ▪ A copy of your homeowners insurance ▪ Painting policy ▪ Steps and walkways ▪ Additional documents may be required to ▪ Electrical verify family size and income ▪ Walls ▪ Bathrooms ▪ Vinyl Siding 3% INTEREST LOAN PROGRAM 0% DEFERRED LOAN PROGRAM This program is available to owner-occupants of This program is available to owner-occupants of one or two family dwelling whose gross income one or two family dwelling whose gross income do not exceed the limits of the chart below: do not exceed the limits of the chart below: Number of Family Gross Income Number of Family Gross Income Members: Limit: Members: Limit: 1 $41,700.00 1 $29,550.00 2 $47,700.00 2 $33,750.00 3 $53,650.00 3 $38,000.00 4 $59,600.00 4 $42,200.00 5 $64,350.00 5 $45,600.00 6 $69,150.00 6 $48,950.00 This program charges 3% interest on a 15 year A mortgage in the amount of the repair contracts loan. A mortgage in the amount of the repair will be placed on your home and repayment for contracts will be placed on your home to secure the total improvements will be due and payable the loan.