Building Stone Quarry of Mr T M Thomas
1
Building Stone Quarry of Mr T M Thomas
CHECKLIST FOR MINING PROJECTS:
Sl. No Details Page
Description
No.
1 Category/Sub category & Schedule “B” & 1(a)
Check list Enclosed
2. Form IM Enclosed
Mining Plan approval Letter Enclosed 1-2
Approved Mining Plan Pre- Enclosed
feasibility report District Enclosed
Survey Report Environment Enclosed Management Plan Included in Mining Plan page 39-53 of 42 -56 Approved Mining Plan
3. Whether the project site falls within
ESZ-1 of WGEEP report or ESA of No. The project site falls in safe zone. -
HLWG
4. Proof of ownership of land Tax certificate & Possession certificates 65 -66 are enclosed as Annexure No. 6 & 7
5. Proof of authorized signatory Attested Copy of Photo ID of the 61 Authorized Signatory
6. Cadastral map duly signed by village Enclosed certified copy of Litho map
officer (original) 101
enclosed as Plate No. 13
7. Recent photographs of the project site Enclosed in page 38 & 43 of Mining 41 with digital dates of the camera
Plan 42
8. Area survey plan approved by village
officer (original) Enclosed as Plate No. 1 94
9. Panoramic view of the site /Google Incorporated in Mining Plan Page 17 image with date 13 GPS readings in WGS 84 datum Incorporated incorporated in all plates
In the mining Plan
10. Distance of the mining area from the 128.6 m –NW Plate No.1
nearest human settlement
11. Right & nature of the land (as perAs per the records, the entire area is a
2
Building Stone Quarry of Mr T M Thomas
records) private property
12. Is the property land/government -
Own patta land
land/own land
Sl. No Details Description
13. Extent of land in Hectares 0.9970 Ha -
14. Proposed production capacity 1,25,000 TPA -
15. Expected life of the mine (in years) 3 years -
16. Ultimate depth of mining (in MSL) 60 m -
17. Quantity of topsoil estimated to be 6472 m3 page 27(30) of Approved MP 30
removed
18. Method of mining Open cast mining -
19. Underground mining if any proposed Not applicable -
20. Analysis reports from accredited Enclosed as Annexure No.12, 13, 14 81- 87
laboratories (original) & 15
21. Attested copy of accreditation
certificate of laboratory conducting Enclosed as Annexure No.15 88
Environmental Analysis
22. Waste management proposals Provided -
23. Mined area management Post mining closure plan Enclosed as
96
Plate No. 11
24. Attested true copy of NABET Project proponent has engaged RQP accreditation certificate (Original to be well versed in MoEF rules notification
produced for verification at the time of circulars for the preparation of Pre 80 presentation with photo ID of the feasibility and environmental
EIA Co-ordinator) management plan.RQP certificate is enclosed as Annexure No.17
a) Accreditation with serial number of RQP No: DMG/KERALA/RQP/1/2015 80 QCI / NABET enclosed as Annex.17 of Mining Plan
b) Undertaking responsibility for the Enclosed in page 11 of this Checklist 11 proposal submitted Not Applicable c) Joint undertaking with the project proponent for implementation of EMP - and EC conditions
3
Building Stone Quarry of Mr T M Thomas
25. Affidavits for: 1.Constitution of
(indicating the Environment
name of project Monitoring Cell
and location) 2.Providing fire fighting system
3.Providing
systems to
minimize dust emissions
4. To provide
adequate safety
measures for the construction
workers during
the construction phase
5. To upload the - Affidavit uploaded separately following in the website of the project: a) EC order b) Status of compliance of the stipulated EC conditions c) Results of monitoring data and update the same periodically
AND d) Send the copy of the EC to the LSG concerned
26. Proposals for Corporate Social Incorporated in EMP in approved responsibility (amount, activities and 55-56 Mining Plan. duration with specific details)
4
Building Stone Quarry of Mr T M Thomas
Sl. Details Description Page
No No.
27. Total cost of the project with details Total Project cost - Rs30.0 lakhs
-
of insurance, funding etc Funding – Own Fund
28. Soft copy of the proposal (in PDF CD enclosed -
format)
29. Details of Authorised Signatory T M Thomas,
(Name, Postal Address, Pin code, Managing Partner, Malabar
Telephone No., Fax No., Email ID) Granite Metals
Mannannur P.O, Kavalappara,
Vanniyamkulam, Palakkad Dt-
679523 -
Mobile No. +91 8281018555 or
9544947145,
Land line: 0466-2227417
Email:
30. Details of NABET approved EIA Project proponent has engaged RQP
consultant organization. well versed in MoEF rules notification
circulars for the preparation of Pre
80
feasibility and environmental
management plan.RQP certificate is
enclosed as Annexure No.17
T M Thomas, Managing Partner, Malabar Granite Metals Mannannur P.O, Kavalappara, Vanniyamkulam, Palakkad Dt- 679523 Mobile No. +91 8281018555 or 9544947145, Land line: 0466-2227417 Email: [email protected]
5
Building Stone Quarry of Mr T M Thomas
UNDERTAKING
I, Prince Abraham , holder of RQP certificate No.DMG/KERALA/RQP/1/2015 from
Indian B ureau of M ines, G ovt. of India, hereby declare that I am solely responsible for the proposal submitted in respect of Building Stone Quarry of Mr Thomas TM, in Survey
No.43/1pt, 43/2pt of Vaniyamkulam-II Village, Ottappalam Taluk, Palakkad District of Kerala
State over an area of 0.9970 Ha and the details furnished in this proposal are correct and complete to best my knowledge & belief.
PRINCE ABRAHAM Thekkummoottil House, Vallamkulam Thiruvalla, Kerala – 689541 email: [email protected] Mob: 9995407570 DMG/KERALA/RQP/1/2015
6
INDEX - MINING PLAN
Sl .No CONTENTS PAGE No. Chapter-1 Introduction 9 Chapter-2 Location & Accessibility 12 Chapter-3 Geology, Exploration & Reserves 17 Chapter-4 Mining 26 Chapter-5 Blasting 29 Chapter-6 Mines Drainage 33 Chapter-7 Stacking of Mineral rejects and Disposal of waste 36 Chapter-8 Use of Mineral 37 Chapter-9 Mineral Processing/ Beneficiation 37 Chapter-10 Site Services & Employment Potential 38 Chapter-11 Environment Management Plan 39 Chapter-12 Progressive Mine closure plan 54
LIST OF ANNEXURES
Annx. No. DETAILS 1 Copy of LoI on the Quarry Permit vide Order No. DOP/1367/2018/A1 dated 06/06/2018 of Geologist Palakkad. 2 Copy of the Aadhaar No. 5345 4136 8720 & PAN No.AHYPM5226C of Mr T M Thomas, Proponent. 3 Copies of Aadhaar No 4395 7544 2531 & PAN of Mrs. Suja Thomas, Aadhaar No 866855086116 of Prince T Abraham, Partners of the Malabar Granite Metals 4 Copy of PAN No.AIYPA2214L of Prince T Abraham, Partner 5 Copy of PAN No of the Malabar Granite Metals 6 Copy of Tax Receipts, 8038389 dated 16/06/2017 of Vaniyamkulam-II 7 Possession certificate No. 30464175 of 15/02/2018 issued by VO Vaniyamkulam-II 8 Non-assignment Certificate No. 301/2018 dated 13/04/2018 issued by VO Vaniyamkulam-II 9 Demarcation Certificate No 300/18 dated 13/04/2018 issued by VO Vaniyamkulam-II 10 Copy of Resolution dated 15/02/2018 authorizing T M Thomas, Managing Partner, Malabar Granite Metals 11 Copy of Partnership deed of Malabar Granite Metals. 12 Air quality Monitoring Reports by Poluchem Laboratories P Ltd. 13 Water quality Monitoring Reports by Poluchem Laboratoreis P Ltd. 14 Noise Monitoring Reports by Poluchem Laboratoreis P Ltd. 15 Soil Analyses Report 16 Laboratory accreditation certificate of Poluchem Laboratoreis P Ltd. 17 Copy of RQP Certificate No DMG/KERALA/RQP/1/2015
7
Sl No. PLATES 1 Survey Plan approved by Tahsildar, Ottappalam 2 Location Plan 3 Surface Plan 4 Geological Plan 5 Geological Cross Section & Reserves 6 Production plan 7 Production Cross Sections 8 Conceptual Plan (FMCP) 9 Conceptual Cross Sections 10 Drainage Plan 11 Environmental Plan 12 Copy of litho Map of Velliyad, Walluvanad Taluk, Malabar District
T M Thomas PRINCE ABRAHAM RQP
Proponent, Managing Partner, Malabar Granite Metals Mannannur P.O, Kavalappara, Vanniyamkulam, Palakkad Dt- 679523 Mobile No. +91 8281018555 or 9544947145, Land line: 0466-2227417 Email: [email protected]
8