Residential Development Doncaster Rd, S81 9QR

Leeds Bradford M1 M621 Brayton M606

M62

Rawcliffe

M62 Dewsbury Huddersfield Crofton M18

Thorne Askern South Kirkby Darton M180

M1 Kirk Sandall Barnsley Doncaster

J1 Swinton Finningley A60 M18 Rotherham A1(M) A631 Langold Lake High J32 Maltby

Bradfield Doncaster Rd Costhorpe J32 Residential

A60 Development J31

A57 CosthorpeA1 Lawn Rd Residential M1 Development The Peak Retford Lawn Rd Worksop District A619 A57 J30

Tideswell A60 Photos for illustrative purposes only. Chesterfield Bakewell Warsop For more information, contact us on:

0333 014 3000 Mansfield Bilsthorpe www.networkspace.co.uk Aferton Rainworth www.networkspace.co.uk Ravenshead Farnsfield Refer to inset plan for continuation notes 1. DO NOT SCALE FROM THIS DRAWING - USE LEGEND FIGURED DIMENSIONS ONLY 2. TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS / SPECIALISTS DRAWINGS. REPORT ANY DISCREPANCIES BEFORE AFFECTED WORK COMMENCES Grasscrete turning Land Use head and parking 3. ALL SETTING OUT DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR BEFORE for Sub Station WORK COMMENCES maintenance, Public Open Space (POS) When required

Road Use LANGOLD COUNTRY PARK

Bus Route 6.0m wide with 2m footway each side

4.8-5.5m wide low level residential road with single

BUS 2m wide footway STOP Entrance Carriageway 25m x 40m Compound to house a 9.0m wide with 2m wide backup electricity generator footway each side

Site Ownership Boundary

Bowling Green Access Phase 2 Development Boundary

Phase 2 Phase 1 Boundary Boundary Works Works Phase 1 Development Boundary

Landscaping New signalled entrance with pedestrian Bunding - 3 metre high bund with 2m crossing shown as per acoustic fence on top. Highways Consultant Included in this area is a 1 metre wide layout design linear drainage swales to boundary edge

Landscaping buffer zone

Existing surrounding

woodland and trees

STOP BUS Key Pedestrian/Cycle access only connections

Key Pedestrian/Cycle access connections

Pedestrian / Cycle control point

Mine Shaft - 'No Build Zone'

SCHEDULE OF AREAS PLAN EXTRACT OF TEMPORARY ACCESS ROAD Network - SCALE 1:1250 Space is seeking to Significant environmental Total red Line Boundary area = 32.976 acres

Nett development area Phase 1 = 4.69 acres redevelop this 30 acre derelict improvementsTotal number of units Phase 1 = 62 Unitswill be brought Nett development area Phase 2 = 19.37 acres industrial site that was formerly aboutTotal numberby of unitsits Phase redevelopment. 2 = 338 Units The Nett development area total = 24.06 acres Total number of units total = 400 Units Colliery for wholly remediationTotal number of parking spaces works = 920 required are

NB: above figures subject to receipt of market advice from client. Nett development/plot sizes exclude main roads and residential use. The proposed considerablelandscape features, plot sizes taken to back and of pavement lines will include the and include low level access roads development will provide a high demolition of derelict buildings; quality residential development the treatmentUNIT RATIO of waste ground 132 Terrace 33% of up to 400 homes along and industrial180 Semi Detached 45% contamination; a 88 Detached 22% with associated highway and remodelledNB: above figures subject tojunction; receipt of market and a new advice from client landscaping requirements; as access road and services.

well linkages into the adjacent rev. description The residentialA 14/08/2015 ZH developmentSK will Unit Ratio Amended Langold Country Park. B 19/08/2015 SK IC Temporary access road area Access road shown 0.533 Ha to become future not onlyC secure04/12/2015 SK andIC enhance, but access route to Langold Parking spaces and road revised country park for Pedestrian & D 18/12/2015 SK IC The planning application is a cyclists only also benefitRoad updated to ipad from design the surrounding E 18/12/2015 SK IC Road updated to ipad design, footpaths bolder hybrid application which seeks high quality environment provided approval in outline for the principle by Langold Country Park and of residential development along the extensive existing recreation with means of access into the grounds. site and detailed permission The application proposals accord for the infrastructure works of with the Networkrequirements Space of national phase one. client Former Firbeck Colliery, policies andCosthorpe guidance and will project

The site will deliver much needed help deliverProposed Sitemuch Plan _Phase 1 needed housing and 2 drawing title

080138_115 high quality housing for the area withindrawing number Bassetlaw and make a revision E N and represents an opportunity significantdrawing status Planning contribution to the five scale 1:750 @A0

13.08.15 to redevelop what is a highly yeardate land supply for the District. ZH drawn by sustainable and underused IC checked by

brownfield site. It lies between Seven Architecture offices at: Portland Chambers, 61 Oxford Street, MANCHESTER, M1 6EQ t: 0845 000 777 1 Clarendon House, Victoria Avenue, HARROGATE, North Yorks, HG1 1DY BUS STOP t: 0845 000 777 2 Carlton-in-Lindrick and Langold Y Neuadd Lwyd, Church Street, DOLWYDDELAN, Conwy, LL25 0SJ Refer to main plan for continuation t: 0845 000 777 3 and will benefit from and help e: [email protected] www.sevenarchitecture.co.uk support the existing services.