Unity Works Wakefield
Curtains to hall windows open Curtains to all hall windows closed
Project Solution
This hall was built for the Wakefield Industrial Dearnleys proposed flame retardant black-out Co-operative Society and has recently curtains fitted to heavy duty cord operated undergone an extensive refurbishment to create tracks with roller gliders to ensure easy a multi-purpose venue. operation. These were fitted to all windows in the main hall space. Windows in the main hall required black-out as well as more standard sized windows in For the meeting rooms Astralux 3000 roller meeting rooms. blinds were used with a FR dim-out fabric.
The solution needed to be sympathetic to the This project also included the repair and interior design of this unique building. recovering of 2 nbr awnings.
Benefits Details
Products: Astralux curtains and tracks - 19 Effective dim-out of performance space nbr
Effortless operation of curtains due to track Astralux 3000 roller blinds - 15 design nbr
Proven roller blind system with simple FR room darkening fabric. chain operation Subsequent to the main contract Flame retardant materials a further 60 nbr blinds have been installed. Very durable solutions Contractor: Triton Construction
More pictures
Please contact us for more reference sites or any further information
Dearnleys Limited, 120-128 Wrenthorpe Road, Wrenthorpe, Wakefield, West Yorkshire, WF2 0JN T: 01924 371791 F: 01924 386001 E: [email protected] W: www.dearnleys.com
Unity Works Wakefield
Roller blinds to meeting rooms
Curtains & tracks fitted to stained glass windows Flame retardant black-out curtains
Please contact us for more reference sites or any further information
Dearnleys Limited, 120-128 Wrenthorpe Road, Wrenthorpe, Wakefield, West Yorkshire, WF2 0JN T: 01924 371791 F: 01924 386001 E: [email protected] W: www.dearnleys.com