Proposed Shut Downs for the Month of 03/2018 in Respect of Project Director (Gsc) Pesco Peshawar

Total Page:16

File Type:pdf, Size:1020Kb

Proposed Shut Downs for the Month of 03/2018 in Respect of Project Director (Gsc) Pesco Peshawar PROPOSED SHUT DOWNS FOR THE MONTH OF 03/2018 IN RESPECT OF PROJECT DIRECTOR (GSC) PESCO PESHAWAR TIME (In Hours) NAME OF S NO DATE GSS/POWER AREA EFFECTED PURPOSE OF PTW FROM TO DURATION HOUSE 11KV ICF 11kV NCR During this shut down the mentiond 11kv 40MVA PTF T-2 11kV Jail Express Pannel Board will be affected due to 1 11/3/2018 8:00 10:00 2:00 At 132 KV GSS disconnection of 11kv Bus Bar from existing Pesh: Cantt 11kV Old M.E.S 11kV Palosai-II Bus Coupler for safety 11kV M.E.S-II 11KV ICF 11kV NCR During this shut down the mentiond 11kv 40MVA PTF T-2 11kV Jail Express Pannel Board will be affected due to 2 11/3/2018 13:00 15:00 2:00 At 132 KV GSS 11kV Old M.E.S disconnection of 11kv Bus Bar from existing Pesh: Cantt 11kV Palosai-II Bus Coupler for safety 11kV M.E.S-II 11 KV Saddar Road 11 KV KTH From 0800 hrs 40MVA PTF T-1 11 KV Islamia College Installation of new 11KV Incoming Pannel Dated 11/03/18 3 8:00 0:00 16:00 At 132 KV GSS 11 KV ICF-II 1200/2400 for T-1 T/F. Lying of cables, To 0000 hrs Pesh: Cantt 11 KV Warsak Road-II wiring & testing of new pannels. 12/3/2018 11 KVP.A.F 11kV Tehkal Payan 11 KV Saddar Road 11 KV KTH During this shut down the mentiond 11kv 40MVA PTF T-1 11 KV Islamia College Pannel Board will be affected due to 4 18/03/2018 8:00 10:00 2:00 At 132 KV GSS 11 KV ICF-II disconnection of 11kv Bus Bar from existing Pesh: Cantt 11 KV Warsak Road-II Bus Coupler for safety 11 KVP.A.F 11kV Tehkal Payan 11 KV Saddar Road 11 KV KTH During this shut down the mentiond 11kv 40MVA PTF T-1 11 KV Islamia College Pannel Board will be affected due to 5 18/03/2018 13:00 15:00 2:00 At 132 KV GSS 11 KV ICF-II disconnection of 11kv Bus Bar from existing Pesh: Cantt 11 KV Warsak Road-II Bus Coupler for safety 11 KVP.A.F 11kV Tehkal Payan 11KV ICF 11kV NCR From 0800 hrs 40MVA PTF T-2 Installation of new 11KV Incoming Pannel Dated 18/03/18 11kV Jail Express 6 8:00 0:00 16:00 At 132 KV GSS 1200/2400, a/w Lying of cables, wiring & To 0000 hrs Pesh: Cantt 11kV Old M.E.S testing of new 11KV pannel. 19/3/2018 11kV Palosai-II 11kV M.E.S-II New Droppers will be provided newly 9:00 12:00 3:00 132KV GSS installed 132KV Bus Bar from existing 7 25/03/2018 JAMRUD AL-HAFIZ CRYSTOPLAST energized 132KV Bus Bar MAYKA STEEL 11KV R.M.I KIDNEY CNETRE NWG HOSPITAL Mumand stell Mill HAYATABAD II EXPRESS NO.! HAYATABAD-3 EXPRESS III FRONTIER TECH WOOD PREMIER CHIP BOARD EXPRESS NO.2 PPI-2 REGI MODEL TOWN EXPRESS-4 PPI OMROC INDUSTRIAL STATE HAYAT ABAD-1 Olampia KARKHANO KACHA GHARHI Page 1 of 11 AC1-138/160218 PROPOSED SHUT DOWNS FROM 01-03-2018 TO 31-03-2018 (GSO Circle PESCO Peshawar) Time Name of GSS / Sr; # Date P/TF / Transmission LinePurpose 11kv Feeders to be affected during the shut down From To Duration Power House The load of 132 KV GSS Pabbi will be shifted to Nowshehra Industrial through NSI-4 with 25 MW shedding will be carried out at For Routine/Preventive 132 KV T/L Section Pabbi if required 1 3-Mar-18 9.00 16.00 7.00 132 KV Peshawar City Maintenance / Protection Peshawar City - Pabbi 132KV GSS Pabbi: 11kv Scarp-1, Tarnab, Sheikh Baba, Taru Jaba, Dagai, Testing Akbar Pura, Spinkhak, Banda Nabi, New Jalozai-1, New Jalozai-2, Pana Kot, Pabbi City, Aman Kot-1, PSO, Banda Mohib, Sheikhan 40 MVA P/TF T-5 a/w I/C & Routine/preventive 2 3-Mar-18 9:00 14:00 05.00 132kv Jalala 11kv O/G Lound Khur , Old Shergarh, old Badragha, Jehangir abad, Hatyan. O/Gs due/protection testing 30 MW load shedding will be carried out at Peshawar city if required. 132KV GSS Peshawar City 132 KV T/L Section For Routine/Preventive Nishterabad, Gulbahar-1, Gulbahar-2, Zaryab, Phandu Road, Surezai, Jaghra, 132 KV GSS Peshawar 3 3-Mar-18 9.00 16.00 7.00 Rahaman Baba - Peshawar Maintenance / Protection Chamkani, Urmar, Chughal Pura, Lala, Sikandarpura, Hashtnagri, Baghbanan, City City Testing Islamabad, Faqirabad-2, Sheikh Abad, Sethi Town 132 KV Rahman Baba: 11kv Kachori, New Hazar Khawani, Urmer 2, Yaktoot, Rashid Gari, Akhoon Abad, Ring Road, Beri Bagh, Pandu Road 2, Surizai Bala 132 KV T/L Kohat- Gumbat Repairing of injured 132 KV GSS Gumbat 4 3-Mar-18 9:00 17:20 8:20 132 KV Kohat (KHN-11) conductor. Khushal Garh, Jawakai, Gumbat, Patyala The load of Jamrud will be shifted to Warsak Power House with 70 MW shedding will be carried out at Jamrud and connected grid i.e. Landi Kotal if required 132 KV Peshawar University: 11kv Regi, Acedemy Town. Agriculture University, Rahat Abad-1, Danish Abad, Circular Road, Hayat Abad 4, Sufaid Dheri, Gharib Abad, E/College, Canal Town, University Campus, Taj Abad, Gul Abad, Achini 2, Achini 1, Hayat Abad 5, HMC, Malakandher, Old bara Road, 132 KV Line Hayat Abad - For Routine/Preventive 132 KV Peshawar Abdara Regi, Acedemy Town. Agriculture University, Rahat Abad-1, Danish 5 5-Mar-18 9.00 16.00 7.00 Jamrud - Peshawar Maintenance / Protection University Abad, Circular Road, Hayat Abad 4, Sufaid Dheri, Gharib Abad, E/College, University Testing Canal Town, University Campus, Taj Abad, Gul Abad, Achini 2, Achini 1, Hayat Abad 5, HMC, Malakandher, Old bara Road, Abdara 132 KV Jamrud: 11kv Kachi Gari, Express-2, Hayat Abad-1, Kharhano Markete, PPI-1, RMI, Express-1, Olympia Mills, Hayat Abad-3, Reggi Model Town, Kidney centre, PCB, Hayat abad-2, Express-3, PPI-2, OMROC, Muhamnd steel, General Hospital, F. Tech wood, Al-Hafiz, Express-4, MYKA Steel, Industrial State 6 5-Mar-18 9.00 14.00 5.00 132 KV GSS Lachi LCH - T2 20/26 For General Maintenance 11kv Lachi Rural, Lachi Town, Shakardara 20/26MVA P/TF T-1 a/w I/C Routine/preventive 7 5-Mar-18 9:00 12:00 03.00 132kv GSS Hussai 11kv O/G Shawa, Rustam, Sudam, Palo Dehari. Karnal Sher Cadite Colloge. & O/Gs due/protection testing 66KV Line Tank-Old Tank- For Routine/Preventive 8 5-Mar-18 09.00 16.00 07.00 132KV Tank No area will be effected as P/TF:T-2 15MVA will live from Daud Khel side. Pezu -Taja Zai TNK-7 Maintenance Page 2 of 11 AC1-138/160218 PROPOSED SHUT DOWNS FROM 01-03-2018 TO 31-03-2018 (GSO Circle PESCO Peshawar) Time Name of GSS / Sr; # Date P/TF / Transmission LinePurpose 11kv Feeders to be affected during the shut down From To Duration Power House 132 KV GSS Tarnawa (IESCO). 1-132 KV GSS A/Abad(11 KV O/G Link Road,Bagnoter,Cantt,Dhamtor,Thandayani,Sherwan,Town,Kehal,Nawasher). 2-132 KV GSS AMC(11 KV O/G Jhangi,APS,Mandian,Tanawal,BPK,). 132 KV T/Line Haripur- Routine/preventive 3-132 KV GSS Mansehra(11 KV O/G Attar Shesha,City- 9 05-03-2018 9:00 16:00 07 hrs 132 KV GSS Haripur Burhan,HRP-4 due/protection testing 2,Perhana,Baffa,Dadar,Khaki,Qalanderabad,Ghazikot,City- 3,Muradpur,Mangloor,Shinkiari,Lassan Nawab,Pakhal). 4-132 KV GSS Balakot(11 KV O/G Balakot,Ghari Habibullah,Bohi). 5-132 KV GSS Oghi(11 KV O/G Darband,Sussal Gali,Oghi). 6-132 KV GSS N/Gali (11 KV O/G Ayubia,N/Gali,Makkol,POF). 66 KV GSS Haripur (11 KV O/G Mirpur,Rehana,NRTC,TIP Bayynia) and 66 66 KV T/Line Wah-Haripur Routine/preventive 10 06-03-2018 9:00 16:00 07 hrs 132 KV GSS New Wah KV GSS Havellian( 11 KV O/G Town,Industrial,POF-2,POF-I,City,CAD Kokal) ,Wah-11 due/protection testing will be affected. 1-132 KV GSS M/Abad(11 KV O/G State Bank,HPT,City-2,Kohalla-2,City- 1,Water Supply,City-3,Noseri,CMH,Koharri,Barrarkot,Secretariate, Ghari 132 KV T/Line M/Abad- Dopatta, City-4,Kohalla-1,Airport,City-05,Pattika), Routine/preventive 11 06-03-2018 10.00 14.00 04 hrs 132 KV GSS M/Abad Balakot , 2-132 KV GSS Noseri(11 KV O/G Athmuqam,Punjkot,Pattika) and Jagran due/protection testing MZB-1 Power House will be affected. while 132 KV GSS Rampura will be fed through 132 KV GSS Bagh. 40 MW shedding will be carried out at Rahman Baba and Peshawar City if 132 KV T/L Section Sheikh For Routine/Preventive required. 12 6-Mar-18 10:00 16:00 6.00 132 KV Rahman Baba Muhammadi - Rahman Maintenance / Protection 132 KV Rahman Baba: 11kv Kachori, New Hazar Khawani, Urmer 2, Yaktoot, Baba Testing Rashid Gari, Akhoon Abad, Ring Road, Beri Bagh, Pandu Road 2, Surizai Bala For Routine/Preventive 132 KV Sakhi 132 KV Power Transformer 11kv Nishat, Pajjagi, B.W. University, Chaghar Matti, 13 6-Mar-18 9.00 14.00 5.00 Maintenance / Protection Chashma T-1, T-2 Pir Bala, Opzai, Industrial, Bashir Abad 2, Testing 132 KV GSS 11kv Pehalwan Qalla, Fatma Khel, Shabqadar Fort, Adezai, Kangra, Industrial 14 6-Mar-18 9.00 14.00 5.00 PTF T-4 20/26 MVA For General Maintenance Shabqadar 2 132 KV T/L Kohat- Sheikh Repairing of injured 15 6-Mar-18 8:30 17:40 9:10 132 KV Kohat Mohammadi line CCT-04 NIL conductor.
Recommended publications
  • Annual Development Programme
    ANNUAL DEVELOPMENT PROGRAMME 16 - PROGRAMME 2015 PROGRAMME DEVELOPMENT ANNUAL GOVERNMENT OF KHYBER PAKHTUNKHWA PLANNING & DEVELOPMENT DEPARTMENT JUNE, 2015 www.khyberpakhtunkhwa.gov.pk FINAL ANNUAL DEVELOPMENT PROGRAMME 2015-16 GOVERNMENT OF KHYBER PAKHTUNKHWA PLANNING & DEVELOPMENT DEPARTMENT http://www.khyberpakhtunkhwa.gov.pk Annual Development Programme 2015-16 Table of Contents S.No. Sector/Sub Sector Page No. 1 Abstract-I i 2 Abstract-II ii 3 Abstract-III iii 4 Abstract-IV iv-vi 5 Abstract-V vii 6 Abstract-VI viii 7 Abstract-VII ix 8 Abstract-VIII x-xii 9 Agriculture 1-21 10 Auqaf, Hajj 22-25 11 Board of Revenue 26-27 12 Building 28-34 13 Districts ADP 35-35 14 DWSS 36-50 15 E&SE 51-60 16 Energy & Power 61-67 17 Environment 68-69 18 Excise, Taxation & NC 70-71 19 Finance 72-74 20 Food 75-76 21 Forestry 77-86 22 Health 87-106 23 Higher Education 107-118 24 Home 119-128 25 Housing 129-130 26 Industries 131-141 27 Information 142-143 28 Labour 144-145 29 Law & Justice 146-151 30 Local Government 152-159 31 Mines & Minerals 160-162 32 Multi Sectoral Dev. 163-171 33 Population Welfare 172-173 34 Relief and Rehab. 174-177 35 Roads 178-232 36 Social Welfare 233-238 37 Special Initiatives 239-240 38 Sports, Tourism 241-252 39 ST&IT 253-258 40 Transport 259-260 41 Water 261-289 Abstract-I Annual Development Programme 2015-16 Programme-wise summary (Million Rs.) S.# Programme # of Projects Cost Allocation %age 1 ADP 1553 589965 142000 81.2 Counterpart* 54 19097 1953 1.4 Ongoing 873 398162 74361 52.4 New 623 142431 35412 24.9 Devolved ADP 3 30274 30274 21.3 2 Foreign Aid* * 148170 32884 18.8 Grand total 1553 738135 174884 100.0 Sector-wise Throwforward (Million Rs.) S.# Sector Local Cost Exp.
    [Show full text]
  • Junior Religiuos Teacher
    MA Islamic Study/Theology/Dars-e-Nizami will be preferred District: Chitral (Posts-2) Scoring Key: Grade wise marks 1st Div: 2nd Div: 3rd Div: Age 25-35 Years 1. (a) Basic qualification Marks 60 S.S.C 15 11 9 Date of Advertisement:- 22-08-2020 2. Higher Qualification Marks (One Step above-7 Marks, Two Stage Above-10 Marks) 10 F.A/FSc 15 11 9 JUNIOR RELIGIOUS TEACHER/THEOLOGY TEACHER BPS-11 (FEMALE) 3. Experience Certificate 15 BA/BSc 15 11 9 4. Interviews Marks 8 MA/MSc 15 11 9 5. Professional Training Marks 7 Total;- 60 44 36 Total;- 100 LIST OF CANDIDATES FOR APPOINTMENT TO THE POST OF JUNIOR RELIGIOUS TEACHER/THEOLOGY TEACHER BPS-11 (FEMALE) BASIC QUALIFICATION Higher Qual: SSC FA/FSC BA/BSc M.A/ MS.c S. # on Name/Father's Name and address Total S. # App Remarks Domicile li: 7 Malrks= Total Marks Total Marks Marks Marks Marks Date of Birth of Date Qualification Division Division Division Division Marks Ph.D Marks Marks M.Phil Marks Marks of Experience of Marks Professional/Training InterviewMarksMarks8 One Stage Above7 Stage One Two StageTwoAbove 10 Year of Experience of Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Rukhsar D/O Noor Zamin Khan anderie post office degree college termerghara 1 1 11/10/1993 MA Islamiyat Dir Lower 2nd 11 1st 15 1st 15 2nd 11 52 52 03439700618 Rabia Khurshid D/O Haji Khurshid Afreen Khan Kalakhel Post office kalakhel mastee 2 2 11/20/1991 MA Islamiyat Bannu 1st 15 1st 15 2nd 11 1st 15 56 56 khan Bannu 03369771362 3 3 Aqsa Rani D/O Mumtaz Akhtar Garee shabaz District Tank 03419394249 2/4/1993
    [Show full text]
  • Public Notice Auction of Gold Ornament & Valuables
    PUBLIC NOTICE AUCTION OF GOLD ORNAMENT & VALUABLES Finance facilities were extended by JS Bank Limited to its customers mentioned below against the security of deposit and pledge of Gold ornaments/valuables. The customers have neglected and failed to repay the finances extended to them by JS Bank Limited along with the mark-up thereon. The current outstanding liability of such customers is mentioned below. Notice is hereby given to the under mentioned customers that if payment of the entire outstanding amount of finance along with mark-up is not made by them to JS Bank Limited within 15 days of the publication of this notice, JS Bank Limited shall auction the Gold ornaments/valuables after issuing public notice regarding the date and time of the public auction and the proceeds realized from such auction shall be applied towards the outstanding amount due and payable by the customers to JS Bank Limited. No further public notice shall be issued to call upon the customers to make payment of the outstanding amounts due and payable to JS Bank as mentioned hereunder: Customer ID Customer Name Address Amount as of 8th April 1038553 ZAHID HUSSAIN MUHALLA MASANDPURSHI KARPUR SHIKARPUR 343283.35 1012051 ZEESHAN ALI HYDERI MUHALLA SHIKA RPUR SHIKARPUR PK SHIKARPUR 409988.71 1008854 NANIK RAM VILLAGE JARWAR PSOT OFFICE JARWAR GHOTKI 65110 PAK SITAN GHOTKI 608446.89 999474 DARYA KHAN THENDA PO HABIB KOT TALUKA LAKHI DISTRICT SHIKARPU R 781000 SHIKARPUR PAKISTAN SHIKARPUR 361156.69 352105 ABDUL JABBAR FAZALEELAHI ESTATE S HOP NO C12 BLOCK 3 SAADI TOWN
    [Show full text]
  • PIPOS Peshawar
    Khyber Medical University, Peshawar List of Students (Govt Instts Only) Securing 60 % or Above Marks in all Semester Exam of BSc Prothetics & Orthotic Sciences (Last held) S.NO Sr. No Name of College Student's Name Father's Name Contact No. Residence Address CNIC No. Roll No. Marks Obtained %age Date of Declaration of Result 3rd Semester Final Result 1 1 Amna Akhtar Akhtar Ali 3475847887 Saeed Abad No.1 Dalazak road, H No. E/786 Street No. 1 17301-1456199-6 313 580/800 72% 2 2 Hafiz M Israr Ghulam Muhammad 3339212299 Tehsil /P.O Mir Ali North Waziristan Agency 21505-8424576-9 314 543/800 67% 3 3 Sania Hadi Abdul Hadi 32181834961 H# 238, street#11, sector K2, Phase 3 Hayatabad 54401-0629812-6 315 602/800 75% 4 4 Qurat-ul-Ain Rehamt Ullah Khan 3338929400 Near Sardar floor Mills H. No. 1508/134 Muhallah Chahpipal DIK 12101-6609333-0 317 560/800 70% 5 5 Omer Ashfaq Ashfaq Ahmad 3323176536 A-201 afnan Arcade Gulistan-e-Jauhar BIK-15 Karachi 42201-6716438-5 318 568/800 71% 6 6 Pakistan Institute Benazir Kakar Bismillah Khan Kakar 3337847542 H# 238, street#11, sector K2, Phase 3 Hayatabad 54203-9522698-0 319 628/800 79% 7 7 of Prosthetic and Nasir Khan Maqool Ahmad 3469401540 Durushkhela (Bala) Teh: Matta Distt: Swat 15601-4772319-7 320 552/800 69% Dated: 20-07-2012 8 8 Orthetic Sciences Zara Muzaffar Khan Dr. Muzaffar Khan 3337915089 House#238 street No. 11, Sector K2, Phase 3, Hayatabad Peshawar 54400-2565876-0 321 601/800 75% 9 9 Asif Niaz Rasool Dayaz 3339291172 Tehsil Mir Ali village and P.O Eidak North Waziristan Agency 21505-5662717-3 322 556/800 70% 10 10 Syeda Zillay Huma Syed Shafiq Ahmad 3418847463 Frontier Homeopathic Medical College Near RMC hayatabad 82101-3425905-8 323 595/800 74% 11 11 Usama Muhammad Muhammad Anwar 3219773974 Moh: Shiekan Village Khudrizi PO pabbi Distt Nowshera 17201-1189715-1 324 585/800 73% 12 12 Aqsa Khan Muhammad Saleem Khan3326976755 Moh: Bhoora Shah, DIK 12101-5356336-8 325 607/800 76% 13 13 Aizaz Ali Shah Zahir Shah 3139785351 House#424 street No.
    [Show full text]
  • F Government of Khyber Pakhtunkhwa
    GOVERNMENT OF KHYBER PAKHTUNKHWA COMMUNICATION & WORKS DEPARTMENT No. SOR/V-39/W&S/03/Vol-II Dated: 25/05/2021 To, The Chief Engineer (Centre), Communication & Works, Peshawar. SUBJECT: 2ND REVISED ADMINISTRATIVE APPROVAL FOR THE SCHEME "CONSTRUCTION OF TECHNICALLY & ECONOMICALLY FEASIBLE 198 KM ROADS IN PESHAWAR DIVISION" ADP NO.1702/200247 (2020-21). In exercise of the powers delegated vide Part-I Serial No.5 Second Schedule of the Delegation of Powers under the Financial Rules and Powers of Re-appropriation Rules, 2018, the Khyber Pakhtunkhwa Provincial Government is pleased to accord the 2" Revised Administrative Approval for the implementation of the scheme under ADP NO.1702/200247 (2020-21)"Construction of Technically & Economically Feasible 198 KM Roads in Peshawar Division" ADP No.1702/200247 (2020-21)for the period of 26 months from (2020-21) to (2022-23) at a total cost of Rs. 4456.033 million (four thousand four hundred fifty six and thirty three thousand) as per detail given below: S.No. Name of work Total Cost (Rs in M) District Charsadda A Construction / Improvement and Widening of Road from Hassanzai to Munda Head (I) Works and Matta Mughal Khel via Katozai of Road from Shabqadar Chowk to Battagram, From Sokhta to Kotak and Dalazaak Bypass Dalazak Village District Charsadda 1 Construction/improvement and widening of Hassanzai road 3.00 km 69.92 2 Construction/Improvement and Widening of road from Shabqadar Chowk Battagram road (3.70km) 80.00 3 Advertisement charges 0.08 Total 150.00 (II) Construction / Improvement and
    [Show full text]
  • Overview - Swabi
    Overview - Swabi Tor Ghar Legend Takhto Sar ! Shamma Khui ! Shama Shapla !^! ! National ! Khanpur ! ! Shahole !! Natian ! Khanpur Ajarh Province Post Gadai ! Natian ! Rizzar !!! District ! Mir Dandikot Sherdarra ! Shahe ! Sherdarah ! Settlements Mir Shahai Dandai ! Tor Gat ! Naranji Administartive Boundaries Mardan ! Badrai Chatara ! Buner ! Kund International Miralai ! Mehr Kamar Burai ! ! Bako ! Ali Dhand Bural ! Birgalai Mir Dai ! ! Pirgalai Khisha Khesha ! Naogram ! Provincial Kaniza Dheri ! ! Lakha Tibba Dheri Lakha Madda Khel Jabba ! Tiga Dheri Ghulama ! Mazghund ! Sikandarabad ! Muz Ghunar ! Jabba District Parmulai Bagga ! Jabba Purmali ! Ganikot ! ! Ganrikot Kodi Dherai Kodi Dheri ! Utla Bahai Baho Leran ! ! Satketar ! Palosai ! Gabai Amankot ! Salketai Ghabasanai ! Tehsil Bar Amrai Gabasanrai ! ! ! Gumbati Dheri Gumbat Dherai Amral Bala Bar Amral Bala ! Gunj Gago ! Dheri ! ! ! ! ! ! ! ! ! Sangbalai ! Dherai ! Gani Chhatra Bar Dewalgari ! ! Line of control ! Punrawal Shewa ! Gangodher ! Aziz Dheri Banda ! Shingrai ! ! ! Katar Dheri ! Seri ! Kuz Amrai ! Achelai Rasoli Dheri Inian Dheri ! Gangu Dheri Shingrai Kuz Dewalgari ! ! Khalil ! ! ! Gangudhei Seri Injan Asota Sharif Asota Gangudher Makia ! ! Coastline Dheri Nuro Banda Chini Rafiqueabad ! Dheri ! Nakla Jogia ! Takhtaband Dheri Dagi ! Banda ! ! Spin ! Girro Sherghund Kani Aro Bore Badga ! Banda ! Katgram ! ! Sheikhjana ! Shaikh Jana Dakara Banda Roads ! Sukaili ! ! Ismaila Tali ! Adina ! ! ! Nawe Kili Pal Qadra ! Mangal Dheri Sandwa ! Chai ! Kalu Khan ! Shewa Chowk Aio Kolagar
    [Show full text]
  • Contesting Candidates in Khyber Pakhtunkhwa Assembly
    FORⅣl-33 つOC‐ 1See rule 56(1)l LIST OF CONTESTING CANDIDATES :Bye/ Election to the : f] NationalAssembly Provincial Assem bly ofthe: E Puniab I slnal E Khyber Pakhtunkhwa E Balochistan No. and Name oI Constituency: EK-LebltEl Serial Name ofthe Contesting Candidates Address of the Svmbolallocated Party No in the Urdu Alphabetical Order Corltesting Candidrtes Affiliation, if an 1 4 5 l Amir UHah Village lzh CarumchashmaTehsil Chitrali Cap(No 59) Independent &DlstHct Chital イ| 0ソ J吹 "レ 2 lsrar-ud-Din V‖ lagc Karimabad Tehs‖ & Bat(No 19) Pakistan Tehreek-elr Di゛rict Chltral cl)t,t/t " Siraj ud Din Villagc Parabcg Garumchashma lron (No.l47) Pakistan Rah‐ e‐ Haq I Tehsil&District Chitral げり1し / び/1 4 Sardar Ahmad Khan ViHage Gologh Dcnin Tchsil& Lantcm(No 162) ´■vami National Paぃ District Chitral l υじ′171ぅ / ♂」 5 VHlagcヽ Varjun Tchsn Mastu」 (No.l49) Independent ヽ Saadat Hussain Makhfi Jeep Dlstlict Chiral ご〆 し,レ ´ 6 Sohrab Khan Villagc Kashindel Tehsil Drosh Eagle (No.93) A‖ Paklstan Muslim Distict Chital League υじYし〆 ツレ 7 Sved Sardar Hussain Shah V‖ 1電c CrccnLsht TchJI Mastu」 Study Tablc with Chair Independent District Chitral (No263し DVrl- )J / -t - 元′ァぁ6嘘 8 Shaflq ur Rehman vinage cOldoor Tchsil& Pick Up (No.20l) Independent Dlst百 ct Chiral 〆力t/ ジイ 9 ShahzadaAman ur Rehman Shahi QHla TChSil&Dist● ct Pitcher (No.204) Independent Chitral sf )tutt"tV り Abdur Rehman ViHagc Thoriandch´ ッun Tchsil Apple (No.l l) lndependent &Dlst市 ct Chital 〆力′ ll Abdulヽ Mali Khan Abid Villagc Wali Abad Dcnin Tchsil Tiger (No.284) Pakistan Muslim Leag &Dlstact
    [Show full text]
  • INSTITUTE of GEOGRAPHY URBAN and REGIONAL PLANNING UNIVERSITY of PESHAWAR-PAKISTAN (November, 2012)
    EXPANSION OF BUILT UP AREA AND ITS IMPACT ON URBAN AGRICULTURE: A CASE STUDY OF PESHAWAR-PAKISTAN SAMIULLAH INSTITUTE OF GEOGRAPHY URBAN AND REGIONAL PLANNING UNIVERSITY OF PESHAWAR-PAKISTAN (November, 2012) i DEDICATED TO MY PARENTS WHOSE PRAYERS HAVE ALWAYS BEEN A CONSTANT SOURCE OF INSPIRATION AND ENCOURAGEMENT FOR ii Approval Sheet This dissertation titled “Expansion of built up area and its impact on urban agriculture: A case Study of Peshawar-Pakistan” is submitted to the Institute of Geography, Urban and Regional Planning, University of Peshawar in partial fulfillment for Degree of Doctor of Philosophy in Geography is hereby approved. External Examiner Internal Examiner iii Acknowledgement I am thankful to Almighty Allah Who enabled me to complete my dissertation. It was not possible without the support of various people. My sincere appreciation goes to my parents, my friends, and my teachers in the Institute of Geography. First of all I would like to pay my thanks to my respected supervisor Prof. Dr. Mohammad Aslam Khan, HEC Professor, who not only guided me at every step but also helped me greatly in writing this thesis. He not only made himself readily available for me but always encouraged and responded timely to my draft more swiftly than my expectations. His verbal and written explanations at all times were exceptionally perceptive, useful and appropriate. I would also like to thank my closest friend Dr. Atta-ur-Rahman, Assistant Professor, Institute of Geography, who helped a lot throughout my thesis from concept generation to final print of the script. In addition my thanks go to Dr.
    [Show full text]
  • Mardan (Posts-1) Scoring Key: Grade Wise Marks 1St Div: 2Nd Div: 3Rd Div: Age 25-35 Years 1
    At least 2nd Division Master in Social Sciences (Social Work/ Sociology will be preferred) District: Mardan (Posts-1) Scoring Key: Grade wise marks 1st Div: 2nd Div: 3rd Div: Age 25-35 Years 1. (a) Basic qualification Marks 60 S.S.C 15 11 9 Date of Advertisement:- 22-08-2020 2. Higher Qualification Marks (One Step above-7 Marks, Two Stage Above-10 Marks) 10 F.A/FSc 15 11 9 SOCIAL CASE WORKER (BPS-16) 3. Experience Certificate 15 BA/BSc 15 11 9 4. Interviews Marks 8 MA/MSc 15 11 9 5. Professional Training Marks 7 Total;- 60 44 36 Total;- 100 LIST OF CANDIDATES FOR APPOINTMENT TO THE POST OF SOCIAL CASE WORKER BPS-16 BASIC QUALIFICATION Higher Qual: SSC FA/FSC BA/BSc M.A/ MS.c S. # on Name/Father's Name and address Total S. # Appli: Remarks Domicile Malrks= 7 Total Marks Marks Marks Marks Marks Date of Birth Qualification Division Division Division Division Marks P.HD Marks M.Phil Marks of Experience Professional/Training One Stage Above 7 Two Two Stage Above 10 Interview Marks 8 Marks Year of Experience 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Mr. Farhan Raza S/O Abid Raza, Koz Kaly Madyan, P.O Madyan, Tehsil and District Swat, 0314- Mphil Agriculture Rual 71 3/2/1992 Swat 1st 15 1st 15 1st 15 1st 15 10 70 70 9818407 Sociology Mr. Muhammad Asif Khan S/O Muhammad Naeem Khan, Rahat Abad Colony, Bannu Road P.O PHD Business 494 16-04-1990 Lakki Marwat 1st 15 1st 15 1st 15 1st 15 10 70 70 Sheikh Yousaf District D.I.Khan.
    [Show full text]
  • FLOOD RISK ASSESSMENT REPORT a Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level
    2015 FLOOD RISK ASSESSMENT REPORT A Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level A PROPOSAL IN VIEW OF LESSONS LEARNED ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 205-C 2nd Floor, Evacuee Trust Complex, F-5/1, Islamabad 195-1st Floor, Deans Trade Center, Peshawar Cantt; Peshawar Landline: +92.51.282.0449, +92.91.525.3347 E-mail: [email protected], Website: www.alhasan.com ALHASAN SYSTEMS PRIVATE LIMITED A Hi-Tech Knowledge Management, Business Psychology Modeling, and Publishing Company 205-C, 2nd Floor, Evacuee Trust Complex, Sector F-5/1, Islamabad, Pakistan 44000 195-1st Floor, Dean Trade Center, Peshawar Can ; Peshawar, Pakistan 25000 Landline: +92.51.282.0449, +92.91.525.3347 Fax: +92.51.835.9287 Email: [email protected] Website: www.alhasan.com Facebook: www.facebook.com/alhasan.com Twi er: @alhasansystems w3w address: *Alhasan COPYRIGHT © 2015 BY ALHASAN SYSTEMS All rights reserved. No part of this publica on may be reproduced, stored in a retrieval system, or transmi ed, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior wri en permission of ALHASAN SYSTEMS. 58 p.; 8.5x11.5 = A3 Size Map ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 CATALOGING REFERENCE: Disaster Risk Reduc on – Disaster Risk Management – Disaster Risk Assessment Hyogo Framework for Ac on 2005-2015 Building the Resilience of Na ons and Communi es to Disasters IDENTIFY, ACCESS, AND MONITOR DISASTER RISKS AND ENHANCE EARLY WARNING x Risk assessments
    [Show full text]
  • DFG Part-L Development Settled
    DEMANDS FOR GRANTS DEVELOPMENTAL EXPENDITURE FOR 2020–21 VOL-III (PART-L) GOVERNMENT OF KHYBER PAKHTUNKHWA FINANCE DEPARTMENT REFERENCE TO PAGES DFG PART- L GRANT # GRANT NAME PAGE # - SUMMARY 01 – 23 50 DEVELOPMENT 24 – 177 51 RURAL AND URBAN DEVELOPMENT 178 – 228 52 PUBLIC HEALTH ENGINEERING 229 – 246 53 EDUCATION AND TRAINING 247 – 291 54 HEALTH SERVICES 292 – 337 55 CONSTRUCTION OF IRRIGATION 338 – 385 CONSTRUCTION OF ROADS, 56 386 – 456 HIGHWAYS AND BRIDGES 57 SPECIAL PROGRAMME 457 – 475 58 DISTRICT PROGRAMME 476 59 FOREIGN AIDED PROJECTS 477 – 519 ( i ) GENERAL ABSTRACT OF DISBURSEMENT (SETTLED) BUDGET REVISED BUDGET DEMAND MAJOR HEADS ESTIMATES ESTIMATES ESTIMATES NO.
    [Show full text]
  • General Terms and Conditions
    GOVENMENT OF KHYBER PAKHTUNKHWA PUBLIC HEALTH ENGINEERING DEPARTMENT NOTICE INVITING TENDERS (Single Stage single Envelop e-Bidding System) Public Health Engineering Division Swabi Government of Khyber Pakhtunkhwa invites Electronic Bids from eligible firms / contractors in accordance with KPPRA procurement rules 2014 on single stage two envelop procedure, contractors/firms must be registered with PEC (up to date), KPPRA and Provincial Enlistment Committee. REGIONAL DEVELOPMENT PROGRAM ADP# 668 FOR THE YEAR 2019-20 OF PK-44 A DISTRICT SWABI. BID SECURITY IN SHAPE OF CALL S.NO NAME OF SCHEME COST DEPOSIT+ STAMP DUTY INSTALLATION OF HAND PUMPS AT U/C SALEEM KHAN, 1 MANERI BALA, MANERI PAYAN, SWABI KHASS AND THE 3038000/- 67100 OTHER AREA OF PK-44 INSTALLATION OF HAND PUMPS AT U/C SWABI 2 MANERI, PUNJPIR, THANDKOI, MARGHUZ AND THE 3472000/- 75700 OTHER AREA OF PK-44 INSTALLATION OF HAND PUMPS AT U/C BAMKHEL, 3 3472000 75700 JHANDA, PABENI AND THE OTHER AREA OF PK-44 REGIONAL DEVELOPMENT PROGRAM ADP# 668 FOR THE YEAR 2019-20 OF NA-18 B DISTRICT SWABI. BID SECURITY IN SHAPE OF CALL S.NO NAME OF SCHEME COST DEPOSIT + STAMP DUTY SANITATION SCHEME AT UC SALEEM KHAN, MANERI 4 3997000 BALA AND ADJACENT AREA 86200 SANITATION SCHEME AT UC MANERI PAYAN, SWABI 5 3996000 KHAS AND ADJACENT AREA 86200 SANITATION SCHEME AT UC SWABI MANERI, PANJPIR 6 3998000 AND ADJACENT AREA 86200 SANITATION SCHEME AT UC THAND KOI, MARGHUZ 7 3998000 AND ADJACENT AREA 86200 SANITATION SCHEME AT UC JHANDA, BAMKHEL, 8 3996000 PABENI AND ADJACENT AREA 86200 INSTALLATION OF
    [Show full text]