a 2021 ALLEY RECONSTRUCTION PROJECT

Sign up for project updates at www.ShakopeeMN.gov/subscribe

CONTRACT CITY PERSONNEL Shakopee City Council awarded a contract for the 2021 Alley Engineering Office: 952-233-9369

Reconstruction to the low bidder, BKJ Land Co, of Jordan, MN During Normal Business hours (8:00 a.m. to 4:30 p.m.) on May 4th, 2021. 30% of the cost of the improvements will be Email: [email protected] assessed to benefiting properties. City Inspector: Adam Bentson Mobile Phone: (612) 749-4574 PROJECT SCOPE Email : [email protected] The project consists of removing the bituminous alley surface and replacing it with pavement and and gutter. Project Coordinator: Darin Manning Lighting improvements will also be made in the alleys. Mobile Phone: (612) 369-4571 Disturbed ends will be restored with like materials. Email Address: [email protected]

The contractor anticipates beginning the project the week of Project Engineer: Micah Heckman June 14. The existing bituminous surface will be removed, and Email Address: [email protected] the alleys will be graded for the new concrete pavement. Restoration of driveway ends, and any disturbed turf will In order to maintain the project schedule, the City follow the concrete paving. The contractor anticipates has authorized the contractor to work from 7 a.m. to completing the work within five weeks of removing the 7 p.m., Monday through Friday. Extended hours existing bituminous alley surface, weather dependent. beyond 7 p.m. and work on Saturdays (9 a.m. to 5

There will be times during the day where access through the p.m.) may occur when necessitated and approved by alleys is limited. During concrete paving the alleys will be the city. closed for a period of 7 days to allow the concrete to cure. On all other days, however, the contractor is required to provide ***EMERGENCY CONTACTS*** access through the alleys at the end of each workday. The During working hours: Adam Bentson: (612) 749-4574 contractor will be coordinating with garbage services to ensure pickup. After working hours and weekends:

BKJ Land Co: (952) 567-4628 Scott County Dispatch: (952) 445-1411

ROAD & DRIVEWAY ACCESS UTILITY OUTAGES It is our intent to maintain access to the driveways throughout For the most expedient service if an outage occurs, the project. There will be occasional short-term disruptions please contact the following providers as needed: due to grading and paving operations.

Comcast: 1-800-934-6489

WE NEED YOUR HELP! Century Link: 877-348-9007

Please do not walk or drive on new concrete for 7 days. When CenterPoint Energy: 612-372-5050 the contractor is working in your alley, please be patient and for everyone’s safety, please follow the directions given by the Shakopee Public Utilities: 952-445-6681 workers.

*A project location map is located on backside of this sheet.

2021 ALLEY RECONSTRUCTION PROJECT LOCATION MAP

Project Location: Alleys from Fuller to Lewis Street between 1st and 2nd Avenue.