Stirling Civil Engineering Limited

Kampala Head Oce () Quarry & Crusher, Mukono (Uganda)

Iganga Kaliro Road (Uganda) Mkapa Bridge, Ru ji (Tanzania)

PLOT 3,BUVUMA, PORTBELL ROAD, LUZIRA, P.O BOX 796 UGANDA TEL: +256 414 504688, +256 414 504941 Email: stirling @africaonline.co.ug Website: www.stirlingcivileng.com Stirling Stirling Civil Engineering Limited

The Company’s presence in East Africa is continuous since 1948 with stable organizations and strongly rooted in local industry with fully autonomous managerial staff.

Further advantage is the Company own offices, logistic bases and equipment, in particular in Uganda Stirling has a formidable fleet of earthmoving machines, 5 crushing plant and 3 asphalt plant.

The vast experience accumulated over decades of activity has placed Stirling amongst the top international construction companies, ensuring to its Clients compliance with all technical, economic, logistic and managerial contractual requirements.

WORKS

ROADS – BRIDGES The Company since the 50’s is leader for projects of transportation infrastructures.

AIRPORTS The Company has completed important international projects by using its own know-how, professional experience and highly qualified personnel.

DAMS – WATER WORKS The Company carried out several projects for earthworks and concrete works on dams, irrigation and water treatment plants.

LOGISTICS

MUKONO, Uganda Operating base on 6 hectares, with the administrative department, a completely equipped workshop, warehouse and residential structures for the staff, 5.2 hectares stone quarry.

KAMPALA, Uganda Head Office and warehouse.

1

Stirling Civil Engineering Limited

UGANDA Uganda Branch Plot 3 – 5 Buvuma, Port Bell Road P.O .Box 796, Kampala Tel. +256 41 504688 / 941 [email protected]

Mukono Yard Kampala-Jinja Highway , Mukono Tel. +256 41 290838 [email protected]

P.O.Box 7600 TANZANIA Tanzania Branch Dar Es Salaam

[email protected]

KENYA Kenya Branch P.O.Box 40770-00100 GPO Nairobi [email protected]

ENGLAND Legal Address 310 Harrow Road Company registration Wembley HA9 6LL No. 00777296 [email protected]

Stirling Stirling

2

Stirling

Stirling Civil Engineering Limited

MAJOR PLANT / EQUIPMENT OWNED BY THE COMPANY

DOZER 5 GRADER 6 EXCAVATOR 3 WHEEL LOADER 5 ROLLER 16 PAVER FINISHER 5 STABILISER 3 MILLING MACHINE 2 ASPHALT PLANT 1 CRUSHER 2

TRACK DRILL 1 MOTOR COMPRESSOR 3 PRIME MOVER 5

TIPPER SEMITRAILER 5

TIPPERS 8 CRANE 3 DIESEL TANK 2 WATER TANK 4

BITUMEN DISTRIBUTOR 4

3 Stirling STIRLING CIVIL ENGINEERING LIMITED

PRODUCT OFFERING

CRUSHED STONES BASE ASPHALT

DOUBLE SURFACE DRESSING ROAD CHIPPING -ALL SIZE MC30 POTHOLE PATCHING ASPHALT PREMIX RAILWAY BALLAST DRAINAGE & WALKWAYS MC 70 HARD CORE BOX CULVERTS

AGGERGATES ROAD CONSTRUCTION ASPHALT CONCRETE BITUMEN CUTBACK

PLOT 3,BUVUMA, PORTBELL ROAD, LUZIRA, P.O BOX 796 KAMPALA UGANDA TEL: +256 414 504688, +256 414 504941 4 Email: stirling @africaonline.co.ug Website: www.stirlingcivileng.com Stirling Stirling Civil Engineering Limited

LAST 15 YEARS PROJECTS

UGANDA Project title Period Description Of Works

Mpologamo (Budumba) Railway 2001-2002 Conversion of a 100m long railway bridge bridge conversion. into road and rail

Kabale - road 2001-2002 22km road, gravel subbase-base and single surface dressing.

Mbarara - - road 2000-2002 137 km road, double seal surface dressing.

Improvement of Trunk roads in Kampala 2001-2002 5 km road, crushed stone base, asphalt concrete binder and wearing course.

Construc on of Lugazi Water Supply System 2001-2002 25.000 m lines transmission and distribu on.

Olweny Swamp rice rehab n project 2001-2002 250.000 m3 excava on for channels, drains and spill way.

Jinja _ Kamuli road repairs 2001-2002 58 km road, gravel subbase-base, double seal surface dressing.

Tororo - Mbale & Kumi - Soro road repairs 2000-2002 106.5 km road, gravel subbase-base, double seal surface dressing.

Rehab n of Malaba - Bugiri roads, 2000-2003 84 km road, crushed stone base, lime Strabag-S rling JV stabiliz on, DBM pavement.

Upgrading of Kyotera roads, 2000-2002 44km road, lime stabiliz on, double seal S rling-Strabag JV Mutuluka roads, surface dressing.

Owen falls Dam - Phase ll 2000-2002 Cofferdam 200 m, core drilling in concrete, rolled concrete.

Repairs to the Northern Corridor Route, 2000 -2002 130 km road, double seal surface dressing. Busega - road

5 Stirling Stirling Civil Engineering Limited

UGANDA Project title Period Description Of Works Kibuli Road 2002 3 km road, gravel subbase-base, single surface dressing.

Emergency Repairs to - Ntungamo 2002 38 km road, gravel wearing course and

Resealing of Mukono-Kayunga / Bukoto 2002-2003 92 km road, spot rehabilita on and Niero Road drainage improvement.

Up-grading of Gayaza - Kalagi road 2003-2005 19,5 km road, gravel sub base-base, single surface dressing & Pre-Coated Stone Chipping.

Supply of New Stone Ballast 2005 30.000 m3, repairs to Kampala - Malaba Railway Line.

Up-grading of Busunju - Kiboga Road 2003-2007 69 km road to bitumen standard.

Up-grading of Kiboga - Hoima Road 2003-2007 76 km road to bitumen standard.

Construc on of Kampala Northern Bypass, 2004-2008 21 km road to bitumen standard with ve Salini (S rling-Spencon JV) grade intersec ons and 3.5 km dual carriageway.

CHOGM 2007 Infrastructure Projects Package 2 2007 Rehab n of various road in Kampala Lot 1 to bitumen standard.

Backlog Roads Maintenance Programme (BRMP) 2008-2010 80 km road: 50km Mechanical modi ca on Package 4 and double surface dressing full width 9m 30km shoulder gravelling and Reseal.

Backlog Roads Maintenance Programme (BRMP) 2008-2010 60 km road: 12km Mechanical modi ca on Package 5 and double surface dressing full width 9m 48km shoulder gravelling with single seal.

Backlog Roads Maintenance Programme (BRMP) 2008-2011 96 km road: Sholder gravelling, Potholes Package 6 repair & Drainage clearing.

Reconstruc on and Rehabili on of Busega - 2009-2011 27 km Road to Bitumen Standard Muduuma Road. Lot 1

Reconstruc on of Mukono - Jinja Road 2011 - 2015 52 km Road to Bitumen Standard Reconstruc on of New Taxi Park Terminal 2013

Reconstruc on of Kabakanjagala, Kalinda, 2013 Sekabaka Kintu Roads

6

Stirling Stirling Civil Engineering Limited

Reconstruc�on of Nabunya & Kabusu Roads 2013 - 2014

Upgrade of Gravel Roads Lot 1 - Kimera Road 2013 - 2014 Upgrada�on of Gravel roads to paved Roads

Upgrade of Gravel Roads Lot 1 - Soweto Road 2013 - 2014 Upgrada�on of Gravel roads to paved Roads

Road works in the Namanve Industrial park 2014 Up grading of various roads to BITUMEN Standard

Rehabilita�on of selec�ove na�onal roads Lot 3 - 2015 - 2016 The works include; breaking up exis�ng pavement Iganga - Kaliro Road layers, mechanically stabilised sub base and shoulders, crushed stone class CRR for base, prime coat to the base and shoulder sec�ons using cut- back bitumen, first and second seal coat to the repaired sec�ons using bitumen 80/100, 20mm and 10mm chippings,

Rehabilita�on of Kireka - Kyaliwajjala Namugongo 2015 Upgrada�on of Gravel roads to paved Roads Road (8kms) Construc�on of roads in North Estate At Kampala 2016 Scarifying and re compac�ng of exis�ng pavement Industrial and business park Ref No. layers, providing, cu�ng to spoil and filling to UIA/WRKS/2014 -15/00027 selected road sec�ons, laying and construc�ng a combined mechanically stabilised layer cons�tu�ng of approved crushed aggregate class CRS Reconstruc�on of selected Roads in The works include; reconstruc�on of exis�ng roads, 2016 - 2017 Makerere University Asphalt concrete surfacing as per specified thickness, Drainage works and road furniture

Paving of roads and associated drainage for ugandan 2016 - 2017 The works include; reconstruc�on of exis�ng roads, Chris�an University, Main campus Mukono Asphalt concrete surfacing as per specified thickness, Drainage works and road furniture

ONGOING PROJECTS

(KCCA) Lot 1 design and Build various roads 2016 up to date The works include; Reconstruc�on of road pavement in kampala: upto Asphalt layer, walk way, drainage system, Namirembe – Luwuum – 1.5km,Archer – 0.75km, signaliza�on and road furniture Mengo Hill – 0.75km, Nakivubo channel – 0.5km, Mpabaana – 0.75km, Luzige – 0.3km, Mutebi – 0.45km and Semugooma – 0.4km in Central Division.

(KCCA) Lot 4 design and Build various roads 2016 up to date The works include; Reconstruc�on of road pavement in Kampala. upto Asphalt layer, walk way, drainage system, Magambo 0.9km, Dembe – Kilowoza-3.00, signaliza�on and road furniture Kiziri-0.7km, Kigoowa -1.9km, Kimera-1.4km, Kisalita-0.7km, Kisosonkole-1.0km and Robert Mugabe-1.8km

7 Stirling Stirling Civil Engineering Limited

LAST 10 YEARS PROJECTS TANZANIA Project title Period Description Of Works Mwanza Airport Extension & Up-Grading 1999-2001 Extension and resurfacing, asphalt binder, wearing course

Kilimanjaro Intern nal Airport 2000-2001 Resurfacing of runway, including 3 aircra turning areas and stop ways.

Mkapa Bridge (Rufiji) 2000-2003 Construc on of a new bridge, with its floodplain crossing; 8 minor bridges and 13.5 km crossing roads.

Dar Es Salaam - Bagamoyo Road 2000-2003 Construc�on of 45 km road from Wazo Hill to Bagamoyo Road.Reconstruc�on of road to Bitumen standard with superpave asphalt.

Dar Es Salaam - Rehabili on of Mandela 2007-2009 Reconstruc�on of road to Bitumen Road Standard.

8 Stirling Stirling Civil Engineering Limited

UGANDA ONGOING PROJECT (KCCA) Lot 1 design and Build various roads in Kampala Upgrading of NMT Pilot corridor:Namirembe – Luwuum – 1.5km,Archer – 0.75km, Mengo Hill – 0.75km, Nakivubo channel – 0.5km, Mpabaana – 0.75km, Luzige – 0.3km, Mutebi – 0.45km and Semugooma – 0.4km in Central Division.

COMPACTING OF STONE BASE

SUBBASE

9 Stirling Stirling Civil Engineering Limited UGANDA ONGOING PROJECT (KCCA) Lot 4 design and Build various roads in Kampala, Magambo-0.9km, Dembe-Kilowoza-3.0km, Kiziri-0.75km, Kigoowa-1.9km, Kimera-1.4km, Kisalita-0.7km, Kisosonkole-1.0km, and Robert Mugabe-1.8km

10 Stirling Stirling Civil Engineering Limited

UGANDA

RECONSTRUCTION OF IGANGA - KALIRO ROAD (2015)

11 Stirling Stirling Civil Engineering Limited

UGANDA

MAKERERE UNIVERSITY ROADS , KAMPALA (2017)

Makerere Roads

Reconstruction, Pothole Repair and Patching of selected Roads in Makerere University

12 Stirling Stirling Civil Engineering Limited

UGANDA

UGANDA CHRISTIAN UNIVERSITY ROADS, MUKONO (2017)

13 Stirling Stirling Civil Engineering Limited

UGANDA

ROAD WORKS IN NAMANVE INDUSTIRAL & BUSINESS PARK (2016)

Namanve Roads

Phase II, Aaphalt works

14 Stirling Stirling Civil Engineering Limited

UGANDA

RECONSTRUCTION OF MUKONO – JINJA ROAD FROM (2012 )

OF MUKONO

ASPHALT WORK

MILLING OPERATIONS

15 Stirling Stirling Civil Engineering Limited UGANDA RECONSTRUCTION OF THE NEW TAXI PARK , KAMPALA (2013 )

ROCK FILL WORK

16 Stirling Stirling Civil Engineering Limited

UGANDA

RECONSTRUCTION OF KABAKANJAGALA ROAD (2013 )

17 Stirling Stirling Civil Engineering Limited

UGANDA

RECONSTRUCTION AND REHABILITATION OF BUSEGA – MUDUUMA ROAD LOT 1 (2009-2011)

BUSEGA- MUDUMA ROAD

27 km Road to Bitumen Standard

BACKLOG ROADS MAINTENANCE PROGEAMME (BRMP) PACKAGE 6 (2008 – 2011)

NTUNGAMO – KABALE – KATUNA ROAD.

96 km road: Shoulder gravelling, Potholes repair & Drainage.

18 Stirling Stirling Civil Engineering Limited

UGANDA

BACKLOG ROADS MAINTENANCE PROGEAMME(BRMP) PACKAGE 5 (2008- 2010)

MBARARA- ROAD.

PACKAGE 4

MBARARA- ROAD.

MBARARA- KATETE ROAD.

19 Stirling Stirling Civil Engineering Limited

UGANDA

UPGRADING OF BUSUNJU – KIBOGA - HOIMA ROAD (2003 – 2007)

BUSUNJU – KIBOGA - HOIMA ROAD Upgrading of 145 km road to Bitumen standard

20 Stirling Stirling Civil Engineering Limited

UGANDA

KAMPALA NORTHERN BYPASS ( 2004 – 2007) Salini (Stirling-Spencon Joint Venture)

KAMPALA NORTHERN BYPASS

Construction of 21 km of road with 3.5 km of dual carriageway, width 11m, including: lime stabilised gravel subbase, crushed stone base, asphalt binder and asphalt concrete wearing course.

KAMPLA NORTHERN BYPASS

KAMPLA NORTHERN BYPASS

21 Stirling Stirling Civil Engineering Limited

UGANDA

KABALE-KATUNA ROAD

Filling the geocell mattress.

KABALE-KATUNA ROAD

Primary geogrid

22 Stirling Stirling Civil Engineering Limited

UGANDA

JINJA - OWEN FALLS DAM – PHASE 2

JINJA-OWEN FALLS DAM – PHASE 2

Cofferdam 200 m long, deep 5 m. Core drilling in concrete, rolled concrete 20.000 m3.

JINJA-OWEN FALLS DAM -PHASE 2

JINJA-OWEN FALLS DAM -PHASE 2

23 Stirling Stirling Civil Engineering Limited

TA NZANIA

BA GAMOYO ROAD (2000 – 2003) Bagamoyo - Wazo Hill,( Dar Es Salaam)

Construction of the road between Bagamoyo- Wazo Hill, length 45km-width 10m. First project in Africa with asphalt superpave and antiaging design.

BAGAMOYO - WAZO HILL ROAD

24 Stirling Stirling Civil Engineering Limited

TANZANIA

MKAPA BRIDGE (2000 – 2003) (Rufiji River)

Construction of a new reinforced concrete bridge across the Rufiji River in southern Tanzania and its floodplain; with 1 main brid ge (970 m), 8 minor bri dges (130 m), crossing r oads (13.5 km), hydraulic and relief structure s.

MKAPA BRIDGE (2000 – 2003) – THE OPENING CEREMONY(Rufiji River) OPENING CEREMONY 2ND AUGUST 2003 The official opening of the Mkapa Bridge which is 970.5 m long and the 13 km approach roads has been done by HIS EXELLENCY BENJAMIN WILLIAM MKAPA, the President of the United Republic of Tanzania on 2nd August 2003. The President and the Prime Minister with the Engineer (Gauff) and Company’s Management.

25 Stirling Stirling Civil Engineering Limited

TANZANIA

IGAWA - IGURUZI ( Tanzania)

IGAWA - IGURUZI

Rehabilitation and total reconstruction of 55 km road. Stone base, asphalt wearing course.

26 Stirling Stirling Civil Engineering Limited

TANZANIA

KILIMANGIARO INTERNATIONAL AIRPORT (Moshi/Arusha)

Resurfacing of the main runway (3.6 km x 45 m wide), including 3 aircraft turning areas and part of stop ways. Minor repairs to runway shoulders. Aprons, taxi way markings, parking areas, access and internal roads, equipments and facilities.

REHABILITATION OF MWANZA AIRPORT RUNWAY (Mwanza) MWANZA AIRPORT

Main runway (3.6 km x 65 m wide). Reconstruction of runway shoulders along sections of the runway and resurfacing of the runway with asphalt binder and wearing course.

27 Stirling

PLOT 3,BUVUMA, PORTBELL ROAD, LUZIRA, P.O BOX 796 KAMPALA UGANDA TEL: +256 414 504688, +256 414 504941 Email: stirling @africaonline.co.ug Website: www.stirlingcivileng.com

28 Stirling Civil Engineering Limited