Welcome to this public exhibition for The Triangle,

The site today - VIEWED FROM THE CABLE CAR

Red Door Ventures welcomes you to this public exhibition for the development of the Triangle site to The Team the west of Royal Docks. Developer: Red Door Ventures This is our first round of consultation for the scheme, with Architect: dRMM another round of consultation planned for later this year. Landscape Architect: BD Landscape The emerging plans will create a high quality mixed-use Planning Consultant: DP9 development where people can live, work and play. Before we progress the scheme further we want to share our initial Consultation: Your Shout proposals for the site, answer your questions and hear your feedback.

If you have any questions please feel free to speak to a member of the project team. About The Site The Triangle

Canning Town Located to the west of Royal Docks Royal Victoria opposite the Siemens Crystal, the site is bordered by Way, Tidal Basin Road and Siemens Brothers Way. The Hoola and Pump Tower The Pump Tower developments are to the north of the The Hoola site. Excel Centre Tidal Basin Road

The site covers an area of Silvertown Way Cement Works 0.42 ha approximately 0.42 hectares. Emirates Cable Car The Crystal

The site is within a three minute walk to Siemens Brothers Way

Victoria Dock DLR Station, and a similar Royal Victoria Docks distance from the proposed Thames City / Canary Wharf Wharf DLR station to the west. City Airport

The site is currently vacant, having Watersports Centre & ‘Beach’ most recently been used as a site office for a building contractor. Greenwich The site is in a designated strategic Site Context site which is identified for its potential to deliver a high density mixed use development

Transport Map

The Site - Viewed from the southern end The Site - Looking South-west across the site Local Context

1950 5 5 4 3 9 0 6 4 0 0 0 0 m 97 98 99 00 01 02 03 m 2015 5 5 3 4 9 0 6 4 0 0 0 0 m 97 98 99 00 01 02 03 m

180900m 180900m The Triangle 180900m 180900m 1890 5 5 3 4 9 0 8 7 0 0 0 0 m 99 00 01 02 03 04 05 06 m

180800m 180800m 08 08 08 08

07 07 07 07 07 07

06 06 06 06 06 06

05 05 05 05 05 05

18 00m 18 00m 180400m 04 180400m 04 04 © Landmark Information Group Ltd and Crown copyright 2017. FOR EDUCATIONAL USE ONLY. 04 5 5 3 4 9 0

6 97 98 99 00 01 02 03 4 0 0

0 © Crown copyright and database rights 2017 Ordnance Survey (Digimap Licence)0 . FOR EDUCATIONAL USE ONLY. m m 5 5 3 4 9 0

6 97 98 99 00 01 02 03 4 0 0 0 0

1937 1950 - 1980 m Present Day m Scale 1:2500 Jan 06, 2017 14:28 0 20 40 60 80 100 120 140 160 180 200 m James Crawford South Bank Scale 1:2500 Jan 06, 2017 14:50 Cricket Ground + Houses Paintworks Complex VacaUniversitynt site Projection: British National Grid 0 20 40 60 80 100 120 140 160 180 200 m James Crawford London South Bank University Projection: British National Grid

180300m 180300m

© Landmark Information Group Ltd and Crown copyright 2017. FOR EDUCATIONAL USE ONLY. 5 5 3 4 9 0 7 8 99 00 01 02 03 04 05 06 0 0 0 0 m m

Scale 1:2500 Jan 06, 2017 14:26 0 20 40 60 80 100 120 140 160 180 200 m James Crawford London South Bank University Projection: British National Grid

1872 1950s Prior to the expansion of the docks Aerial view looking south east

LEAMOUTH PENINSULA NORTH (PROPOSED RESIDENTIAL) Brunel Street Works (PROPOSED Mixed use)

LIMMO SITE (PROPOSED Mixed Use)

LEAMOUTH PENINSULA South THE PUMP TOWER (PROPOSED Mixed use) THE HOOLA

THE CRYSTAL Future Silvertown Thames Wharf North Tunnel (PROPOSED Residential) (PROPOSED Mixed use)

Lyle Park West Thames Wharf South (PROPOSED Residential) (PROPOSED Mixed use) Minoco (PROPOSED Mixed use)

Peruvian Wharf (PROPOSED Residential)

Manhattan Wharf (PROPOSED Residential)

Greenwich Peninsula (Under construction. Mixed use)

Wider development Context Emerging Proposals The Triangle

Key elements of the proposals include: Revitalisation of a vacant brownfield site; Increase in employment space; Range of commercial uses including retail, cafe and gym; Approximately 244 new homes for rent; with 35% affordable housing provided on site (subject to viability); Shared amenity spaces for residents; Improved pedestrian connections from Tidal Basin Road across the site and along the slip road, with potential to connect with the proposed creative workshops below the Silvertown Way Flyover.

23 STOREYS 21 24 (18 Residential) STOREYS STOREYS 24 STOREYS

14 STOREYS (12 Residential)

9 STOREYS

(6 Residential)

Proposed massing Emerging Proposals The Triangle

Residential

Resident amenities

resi Office Office Foyer foyer Office Gym Resident services

Section looking northeast through the residents terrace to the east

Residential Residential Resident amenities

Retail

resi foyer Cafe resi foyer Gym

Resident services

Section looking south along the northern boundary

Podium overview from Siemens brothers way Podium overview from Silvertown Way

The terrace along tidal basin road looking east View of silvertown way slip road looking south

Entrance Residents’ Courtyard Gym landscape garden landscape dRMM + residents’ dRMM More Architects, lobby Architects, London Sky Health dRMM Trafalgar and Fitness Architects, place Centre Kings Cross Art house

Residents’ Residents’ Communal Second Home Lobby garden roof terrace co-working space dRMM dRMM dRMM Architects, Architects, Architects, SelgasCano Kings Cross Trafalgar Trafalgar Art house place place Emerging Proposals The Triangle

RED DOOR VENTURES

THIS DRAWING IS COPYRIGHT OF dRMM LIMITED.

DO NOT SCALE FROM THIS DRAWING. DRMM LIMITED TAKES NO RESPONSIBILITY Residential FOR ANY DIMENSIONS OBTAINED BY MEASURING OR SCALING FROM THIS DRAWING AND NO RELIANCE MAY BE PLACED ON SUCH DIMENSIONS. IF NO DIMENSION IS GIVEN, IT IS THE RESPONSIBILITY OF THE RECIPIENT TO ASCERTAIN THE DIMENSION SPECIFICALLY FROM THE ARCHITECT OR BY SITE MEASUREMENT. THE SIZING OF ALL STRUCTURAL & SERVICE ELEMENTS MUST ALWAYS BE CHECKED AGAINST THE RELEVANT ENGINEERS' DRAWINGS. ANY OMISSIONS OR DISCREPANCIES BETWEEN DRAWING INFORMATION SHOULD BE BROUGHT TO THE ATTENTION OF THE CONTRACT ADMINISTRATOR.

ALL INTERNAL LAYOUTS ARE INDICATIVE ONLY. ALL THE FURNITURE SHOWN IS FOR ILLUSTRATION ONLY.

ALL DRAWINGS TO BE READ IN CONJUNCTION WITH RELEVANT SPECIFICATIONS AND RELEVANT CONSULTANT REPORTS / INFORMATION.

FOR CDP PACKAGES DRAWINGS REPRESENT DESIGN INTENT ONLY. DETAILED DESIGN RESPONSIBILITY LIES WITH SPECIALIST SUB-CONTRACTOR. FOR EXTENT OF CDP PACKAGES REFER TO SPECIFICATIONS.

PRELIMINARY

NOTES

1 BED

2 BED

3 BED

AOD 16,475

AOD 18,875 Projecting balconies Inset balconies Rooftop terraces

244 35% 2 2

NumbREVISION NOTES er of Target Rooftop accessible homes Affordable communal podium Housing terraces gardens

REV DESCRIPTION BY CHK QA DATE 0 .2017 244 SITE PLAN - KEY

.06

INFORMATION 28 balconies / North facing • 1 BED FOR Winter gardens single aspect

AUTHOR • 2 BED dRMM ARCHITECTS

TITLE Homes GENERAL ARRANGEMENT PLAN • 3 BED LEVELS 03 PROJECT SCALE SIZE RDV THE TRIANGLE 1:200 A1 1:400 A3

DRAWING NO REVISION

411-L03-203 00 Typical Residential floor Plan

Landscape Strategy

B

1

1. 2. 3.

7

6 3 5 B A 4 A

2 4. 5. 6.

Landscape masterplan 7.

PM AM PM AM Improved wind 2 mitigation 5 New flight paths for New flight paths for 3 Evening birds, bats and flying 7 Canopy walk birds, bats and flying Long views maintained communal insects 1 insects residential 4 terrace Planting integrated Shot view to flyover Blue roof attenuation With level changes to keep filtered by trees Activity rich level surfaces clear Internal visual communal Clear-stem trees to Potential new crossing relationship residential terrace retain views through site Cooling shade to Silvertown flyover play: Level access to all areas creative spaces Evening commercial terrace Sheltered, lush, intimate morning fitness 6 commercial garden ecological enhancements ‘Defensive’ street furniture Widened pavement on slipway To allow filtered movement of Maximise level planes for New trees in planters flexible spaces more flexibility and use Spill-out spaces quiet spaces pedestrians and restrict vehicles ‘Defensive’ street furniture to Level access to entrances from slipway ‘Defensive’ Street Furniture shared surface to Shared Surface section A section B Have Your Say The Triangle

Looking west from the residents’ garden along silvertown way

Estimated Timeline

September Autumn Spring Spring 2017 2017 2018 2019

Second round of Submission of Target planning Anticipated consultation planning application decision start on site

Next steps Thank you for attending the exhibition today. SHARE YOUR THOUGHTS We would like to know what you think and would be Write to: grateful if you could take the time to fill in a feedback FREEPOST RTXU-JGSR-KHLE form. Feedback will be given careful consideration and Your Shout, 107 Southbank House, a report will be prepared detailing the issues raised and Black Prince Road, London, SE1 7SJ the responses from the project team. Fill in a feedback form Call Your Shout on 0800 458 6976 If you have any questions please feel free to speak to a member of the project team. E-mail [email protected] Visit thetriangleconsultation.co.uk