API Well No: 43013503280000 Received: 4/29/2010

FORM 3 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES AMENDED REPORT DIVISION OF OIL, GAS AND MINING

1. WELL NAME andandFENDUEMRAL NUMBER APPLICATION FOR PERMIT TO DRILL FEDERAL 12-1D-652-1D-65 2. TYPE OF WORK 3. FIELD OR WILDCAT

DRILL NEW WELLWELLI REENTER P&A WELL DEEPEN WELL I BRUNDAGE CANYON

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAME Oil Well Coalbed Methane Well: NO 6. NAME OF OPERATOR 7. OPERATOR PHONE BERRY PETROLEUM COMPANY 303 999-4044 8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL 4000 South 4028 West Rt 2 Box 7735, Roosevelt, UT, 84066 [email protected] 10.10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP (FEDERAL, INDIAN, OR STATE)A7T7E326 FEDERALFEDERAL I INDIANINDIAN I STATE FEE FEDERAL INDIANINDIAN STATE I FEEFEEl UTU-77326 13.13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')

15.15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')

18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT 17.17. INDIAN ALLOTTEE OR TRIBE NAME MULTIPLE FORMATIONS (if box 1212 == 'INDIAN')

YES (Submit(Submit Commingling Application) NO VERTICAL DIRECTIONAL HORIZONTAL I

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 19161916 FSL 10001000 FWL NWSW 11 6.0 S 5.0 W U

Top of Uppermost Producing Zone 19601960 FSL 766 FWL NWSW 11 6.0 S 5.0 W U

At Total Depth 19701970 FSL 650 FWL NWSW 11 6.0 S 5.0 W U

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNIT DUCHESNE 10001000 19221922 25. DISTANCE TO NEAREST WELL IN SAME POOL 25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH (Applied For Drilling or Completed) MD: 5936 TVD: 5935 18001800

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER / WATER RIGHTS APPROVAL NUMBER IF APPLICABLE 7424 UTB000035UTBOOOO35 43-11041

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP DRILLED)

NAME Kathy K. Fieldsted TITLE Sr. Regulatory & Permitting Tech. PHONE 435 722-1325

SIGNATURE DATE 04/29/2010 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL I 43013503280000

Permit Manager API Well No: 43013503280000 Received: 4/29/2010

Proposed Hole, Casing, and Cement String Hole Size Casing Size Top (MD) Bottom (MD) Surf 12.2512.25 8.625 0 350 Pipe Grade Length Weight Grade J-55 ST&C 350 24.0

API Well No: 43013503280000 Received: 4/29/2010

Proposed Hole, Casing, and Cement String Hole Size Casing Size Top (MD) Bottom (MD) Prod 7.875 5.5 0 5936 Pipe Grade Length Weight Grade J-55 LT&C 5936 15.5

'APIWellNo:43013503280000'

SELF-CERTIFICATION STATEMENT

The following self -certification statement is provided per federal requirements dated May 7, 2007.

Please be advised that Berry Petroleum Company is considered to be the operator of the following well.

Federal 12-lD-65 NW 1/4, SW 1/4, 1916' FSL 1000' FWL, Section 1, T. 6 S., R. 5 W., U.S.B.&M. BHL: NW 1/4, SW 1/4, 1970' FSL, 650' FWL Lease USA UTU-77326 Duchesne, County, Utah

Berry Petroleum Company is responsible under the terms of the lease for the operations conducted upon the lease lands.

Kathy K 'Fieldsted Sr. Regulatory & Permitting Tech. Berry Petroleum Company 4000 South 4028 West Route 2, Box 7735 Roosevelt, Utah 84066 435-722-1325 'APIWellNo:43013503280000'

BERRY PETROLEUM COMPANY Federal 12-lD-65 Surface location: NW 1/4, SW 1/4, 1916' FSL 1000' FWL, Section 1, T. 6 S., R. 5 W., U.S.B.&M. BHL: NW 1/4, SW 1/4, 1970' FSL, 650' FWL Duchesne County, Utah

ONSHORE ORDER NO. 1

DRILLING PROGRAM

1,2 Estimated Tops of Geological Markers and Formations Expected to Contain Water, Oil and Gas and Other Minerals

FORMATION DRILL DEPTH * DRILL DEPTH * Measured @SHL (TVD) @BHL (TVD) Depth

Uinta Surface On Surface Green River Fm 1,359' 1,345' 1,360' Green River Upper Marker 1,904' 1,899' 1,605' Mahogany 2,509' 2,493' 2,510' Tgr3 Marker 3,548' 3,536' 3,550' *Douglas Creek Mbr 4,295' 4,272' 4,298' *Black Shale Mbr 4,886' 4,870' 4,889' *Castle Peak Mbr 5,213' 5,206' 5,216' Uteland Butte Mbr. 5,631' 5,622' 5,635' Wasatch 5,835' 5,824' 5,839' TD 5,935' 5,924' 5,936'

Base of Moderately Saline Water (less than 10,000 ppm) 2,381' 2,392'

*PROSPECTIVE PAY Berry is locating the well at the proposed surface location and directionally drilling to the proposed bottom hole location primarily because of severe topographical limitations. By drilling directionally, Berry Petroleum Company will improve field development efficiency by potentially combining multiple surface hole locations together. This will significantly reduce total surface disturbance plus combine the use of access roads and existing pipelines. Furthermore, Berry hereby certifles that it is the sole working interest owner of all the surrounding 40 acre locations. The proposed well bore will at no point throughout the objective pay section (top Douglas Creek to top Wasatch) approach within 460' of any of the potential offsetting 40 acre well sites.

3 Pressure Control Equipment : (Schematic Attached)

The BOP and related equipment shall meet the minimum requirements of Onshore Oil and Gas Order No. 2 for equipment and testing requirements, procedures, etc., for a 2M system when the well is drilled to the base of the Uteland Butte Limestone formation, and individual components shall be operable as designed. The attached diagram depicts the use of an annular in conjunction with double rams. However, an annular, double rams or both may be used depending on the drilling rig contracted. Chart recorders will be used for all pressure tests.

Test charts, with individual test results identified, shall be maintained on location while drilling and shall be made available to a BLM representative upon request. All required BOP tests and/or drills shall be recorded in the IADC report. The anticipated bottom hole pressure will be less than 3,000 psi. 'APIWellNo:43013503280000'

Berry Petroleum Company Drilling Program Federal 12-lD-65 Duchesne County, Utah

4 Proposed Casing and Cementing Program

The proposed Casing Program will be as follows:

Purpose Depth Hole Size Casing Size Type Connection _Weight

Surface 350' 12 ¼" 8 5/8" J-55 ST&C or LT&C 24# Production 5936' 7-7/8" 5 ½" J-55 LT&C 15.5#

Surface Fill Type & Amount

O'-350' 350' Approximately 200 sx Class "G" (Type III) cement + additives or a similar slurry with a minimum weight of 15.8 ppg and approximate yield of 1.15 cuft/sk, minimum 24 hr compressive strength = 500 psi (Cement will be circulated to surface and topped off, if necessary.)

Production with lost circulation Type & Amount

O'-5936' SEE ATTACHED CEMENT PROCEDURES

Production without lost circulation Type & Amount

0'- 5936' SEE ATTACHED CEMENT PROCEDURES

For production casing, actual cement volumes will be determined from the caliper log plus a minimum of 15% excess. 'APIWellNo:43013503280000'

Berry Petroleum Company Drilling Program Federal 12-lD-65 Duchesne County, Utah

5 Drilling Fluids Program

Interval Weight Viscosity Fluid Loss Remarks

0'-350' 8.3-8.6 27-40 NC Spud Mud or air 350'-TD 8.6-8.9 27-40 NC KCL Water

6 Evaluation Program

Logging Program: HRI-GR-SP with SDL-DSN-PE: surface casing to TD. Preserve samples from all show intervals.

Sampling: 10' dry cut samples: Douglas Creek to TD. Preserve samples From all show intervals.

Surveys: As deemed necessary

Mud Logger: As deemed necessary

Drill Stem Tests: As deemed necessary

Cores: As deemed necessary

7 Abnormal Conditions

No abnormal temperatures or pressures or other hazards are anticipated.

8 Anticipated Starting Dates and Notification of Operations

Drilling Activity:

Anticipated Commencement Date: Upon approval of the APD, Drilling Days: Approximately 6 days. Completion Days: Approximately 7 days. 'APIWellNo:43013503280000'

Berry Petroleum Company Drilling Program Federal 12-lD-65 Duchesne County, Utah

SCHEMATIC DIAGRAM OF 2,000 PSI BOP STACK

| FlowLine |

Fill-UpLine

I

Annular Preventer

I i BlindRanis

P pe Rams

Adjustable Choke

To Mued/GasSeparator and/or Pit

3'eed Line To Pit

Blowout Preventer Stack Outlet

To Mud/Gas Separator and/or Pit 2" Line

Adjustable Choke 'APIWellNo:43013503280000'

BERRY PETROLEUM COMPANY Federal 12-1D-65 Surface location: NW 1/4, SW 1/4, 1916' FSL 1000' FWL, Section 1, T. 6 S., R. 5 W., U.S.B.&M. BHL: NW 1/4, SW 1/4, 1970' FSL, 650' FWL Duchesne County, Utah

ONSHORE ORDER NO. I

MULTI POINT SURFACE USE & OPERATIONS PLAN

1 Existing Roads

To reach the Berry Petroleum Company well, Federal 12-lD-65 located, in Section 1-T6S-R5W:

Start in Myton, Utah. Proceed west on US Highway 40, 8.6 miles to the Antelope Creek/Sowers Canyon Road at the Bridgeland turnoff. Turn south and proceed 10.1 miles on the Brundage Canyon Road. Proceed southwest 7.2 miles on the main road, from there turn east on the access +/- 6-1-65 road for apprx. 1.4 miles, then proceed south for .35 miles to the Fed location then go +/- southwest for .3 miles to the proposed Federal 12-lD-65 location.

The existing oilfield service road may need some surface material to prevent or repair holes in the road due to heavy truck traffic during the drilling and completion operation. If repairs are made the operator will secure material from private sources.

Please see the attached map for additional details.

2 Planned Access Road

See Topographic Map "B" for the location of the proposed access road.

On National Forest Service (NFS) lands, access roads will conform to standards outlined in the BLM and Forest Service publication. Surface Operatine Standards and Guidelines forOil and Gas Exploration and Development"Gold ßook" 4 Edition, 2006.

Surface disturbance and vehicular traffic will be limited to the approved location and approved access route. Any additional area needed will be approved in advance.

New access roads will be crowned (2 to 3%), ditched, and constructed with a running surface of 22 feet and a maximum disturbed width of 35 feet. Graveling or capping the roadbed will be performed as necessary to provide a well constructed, safe road. Prior to construction or upgrading, the proposed road shall be cleared of any snow and shall be allowed to dry completely.

The disturbed width needed may be wider than 35 feet to accommodate larger equipment where deep cuts are required for road construction; intersections or sharp curves occur; or, as proposed by the operator. Approval will be required from the Forest Supervisor, Vernal, Utah (FS).

Appropriate water control structures will be installed to control erosion.

Unless otherwise specified, the following specifications will apply:

The road grade in the Project Area will be 10% or less, wherever possible. The 10% grade would only be exceeded in areas where physical terrain or unusual circumstances require it. Turn-out areas will not be constructed unless they were deemed necessary for safety reasons. 'APIWellNo:43013503280000'

Berry Petroleum Company Multi Point Surface Use & Operations Plan Federal 12-lD-65 Duchesne County, Utah

There will be no major cuts and fills, culverts, or bridges. If it becomes necessary to install a culvert at some time after approval of the APD, the operator will submit a Sundry Notice requesting approval of the USFS Authorized Officer.

The access road will be centerline flagged during time of staking.

There will be no gates, cattle guards, fence cuts, or modifications to existing facilities without prior consent of the FS.

Surfacing material may be necessary, depending upon weather conditions.

The road surface and shoulders will be kept in a safe and usable condition and will be maintained in accordance with the original construction standards. Best efforts will be made such that all drainage ditches and culverts will be kept clear and free flowing and will be maintained according to the original construction standards. The access road ROW will be kept free of trash during operations. All traffic will be confined to the approved running surface. Road drainage crossings shall be of the typical dry creek drainage crossing type. Crossings shall be designed so they will not cause siltation or accumulation of debris in the drainage crossing, nor shall the drainages be blocked by the roadbed. Erosion of drainage ditches by runoff water shall be prevented by diverting water off at frequent intervals by means of cutouts. Should mud holes develop, the holes shall be filled in and detours around the holes avoided. When snow is removed from the road during the winter months, the snow should be pushed outside the borrow ditches, and the cutouts kept clear so that snowmelt will be channeled away from the road.

3 Location of Existing Wells

See Topographic Map "C" for the location of existing wells within a lmile radius.

4 Location of Tank Batteries, Production Facilities and Production Gathering and Service Lines

All permanent (on site for six months or longer) structures constructed or installed will be painted a flat, non-reflective, earth tone color to match one of the standard environmental colors, as determined by the five state Rocky Mountain Inter-Agency Committee. All facilities will be painted within six months of installation. Facilities required to comply with the Occupational Safety and Health Act (OSHA) will be excluded. The required paint color is desert brown (10YR 6/4) unless otherwise designated by the Authorized Officer.

A containment dike will be constructed completely around those production facilities which contain fluids (i.e., production tanks, produced water tanks). This dike will be constructed of compacted subsoil, be impervious, and hold 150% of the capacity of the largest tank. The use of topsoil for the construction of dikes will not be allowed. A Spill Prevention, Control, and Countermeasure (SPCC) Plan is required by the Environmental Protection Agency, the containment dike may be expanded with the BLM/VFO Authorized Officer's approval to meet SPCC requirements.

A description of the proposed pipeline and a map illustrating the proposed route is attached. 'APIWellNo:43013503280000'

Berry Petroleum Company Multi Point Surface Use & Operations Plan Federal 12-ID-65 Duchesne County, Utah

All site security guidelines identified in Federal regulation 43 CFR 3126.7, will be adhered to. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease production will have prior written approval form the Authorized Agency Officer.

Gas meter runs will be located approximately 100 feet from the wellhead. Where necessary, the gas line will be anchored down from the wellhead to the meter.

5 Location and Type of Water Supply

Water for the drilling and completion will be pumped or trucked from the Berry source wells located in Sec. 23, T5S, R5W or Sec. 24, T5S, R5W, permit # 43-11041, or from Duchesne City Culinary Water Dock located in Sec, 1, T4S, R5W or from East Duchesne Water, Arcadia Feedlot, Sec. 28, T3S, R3W or Myton (Moon) Pit, SE/NE Sec. 27, T3S, R2W or from Petroglyph Operating Company 08-04 Waterplant, Sec. 8, T5S, R3W or from Kenneth V. & Barbara U. Richens source well located in Sec. 34, T3S, R2W, permit #43-1723 or Brundage Canyon Field produced water or Leo Foy source well located in Sec. 34, T5S, R5W, permit # 43-11324.

6 Source of Construction Materials

All construction materials for this location site and access road shall be borrow material accumulated during construction of the location site and access road.

Additional gravel or pit lining material will be obtained from a private source.

The use of materials under Authorized Agency jurisdictionwill conform with 43 CFR 3610.2-3.

7 Methods of Handling Waste Materials

Drill cuttings will be contained in a closed loop system or a reserve pit and buried in the reserve pit or spread on location.

Drilling fluids, including salts and chemicals, will be contained in a closed loop system or a reserve pit. Upon termination of drilling and completion operations, the liquid contents of the reserve pit will be used at the next drill site or will be removed and disposed of at an approved waste disposal facility. For wells completed from October 1 through April 30, any hydrocarbons in the pit shall be removed from May 1 to September 30 in accordance with 43 CFR 3162.7-1.

Unless specified in the site specific APD, the reserve pit will be constructed on the location and will not be located within natural drainages, where a flood hazard exists or surface runoff will destroy or damage the pit walls. The reserve pit will be constructed so that it will not leak, break, or allow discharge of liquids.

If it is determined at the onsite that a pit liner is necessary, the reserve pit will be lined with a synthetic reinforced liner a minimum of 12 millimeters thick, with sufficient bedding used to cover any rocks. The liner will overlap the pit walls and be covered with dirt and/or rocks to hold it in place. Trash or scrap that could puncture the liner will not be disposed of in the pit.

Reserve pit leaks are considered an unacceptable and undesirable event and will be orally reported to the Authorized 'APIWellNo:43013503280000'

Berry Petroleum Company Multi Point Surface Use & Operations Plan Federal 12-lD-65 Duchesne County, Utah

Drain tanks will be installed with a 3" sand or dirt pad underneath a 20 millimeter thick liner which will extend 12" over the top edges of the pit. There will be room around the outside walls of the tank for visual inspection. There will be an escape route for animals from the bottom of the pit to ground level.

After first production, produced wastewater will be trucked to one of the following approved waste water disposal sites: R.N. Industries, Inc. Sec. 4, T2S, R2W, Bluebell; MC & MC Disposal Sec. 12, T6S, Rl9E, Vernal; LaPoint Recycle & Storage Sec. 12, T5S, Rl9E, LaPoint or Water Disposal Inc. Sec. 32, TlS, RlW, Roosevelt, used in the operations of the field or, unless prohibited by the Authorized Officer, disposed of to the approved pit for a period not to exceed 90 days. The use of such pit is hereby approved as part of this Application for Permit to Drill.

All production fluids will be disposed of at approved disposal sites. Produced water, oil, and other byproducts will not be applied to roads or well pads for control of dust or weeds. The indiscriminate dumping of produced fluids on roads, well sites, or other areas will not be allowed.

Any spills of oil, gas, salt water, or other noxious fluids will be immediately cleaned up and removed to an approved disposal site.

A chemical portable toilet will be furnished with the drilling rig.

Garbage, trash, and other waste materials will be collected in a portable, self-contained, fully enclosed trash cage during operations. Trash will not be burned on location.

All debris and other waste materials not contained in the trash cage will be cleaned up and removed from the location promptly after removal of the completion rig.

Any open pits will be fenced during the operations. The fencing will be maintained until such time as the pits are backfilled.

No chemicals subject to reporting under SARA Title III (hazardous materials) in an amount equal to or greater than 10,000 pounds will be used, produced, stored, transported, or disposed of annually in association with the drilling, testing, or completing of wells. Furthermore, extremely hazardous substances, as defined in 40 CFR 355, in threshold planning quantities, will not be used, produced, stored, transported, or disposed of in association with the drilling, testing, or completing of wells within these areas.

8 Ancillary Facilities

There are no ancillary facilities planned for at this time and none are foreseen in the future.

9 Wellsite Layout

The attached Location Layout diagram describes drill pad cross-sections, cuts and fills, and locations of the mud tanks, reserve pit, pipe racks, trailer parking, spoil dirt stockpile(s) and surface material stockpile(s).

The diagram describes rig orientation, parking areas, and access roads as well as the location of the following: 'APIWellNo:43013503280000'

Berry Petroleum Company Multi Point Surface Use & Operations Plan Federal 12-lD-65 Duchesne County, Utah

The reserve pit.

The stockpiled topsoil, which shall not be used for facility berms. All brush removed from the well pad during construction will be stockpiled with the topsoil.

The flare pit, which will be located downwind from the prevailing wind direction.

The access road.

All pits will be fenced according to the following minimum standards:

39-inch net wire shall be used with at least one strand of barbed wire on top of the net wire. Barbed wire is not necessary if pipe or some type of reinforcement rod is attached to the top of the entire fence.

The net wire shall be no more than two inches above the ground. The barbed wire shall be three inches over the net wire. Total height of the fence shall be at least 42 inches.

Corner posts shall be cemented and/or braced in such a manner as to keep the fence tight at all times.

Standard steel posts shall be used between the corner braces, between the corner posts. Distance between any two posts shall be no greater than 16 feet.

All wire shall be stretched using a stretching device before it is attached to the corner posts.

The reserve pit fencing will be on three sides during drilling operations and on the fourth side when the rig moves off location. Pits will be fenced and maintained until cleanup.

10 Plans for Restoration of the Surface

The dirt contractor will be provided with approved copies of the Surface Use Plan and these Standard Operating Procedures prior to construction activities.

Upon well completion, within 30 days the location and surrounding area will be cleared of all unused tubing, materials, trash, and debris not required for production.

On lands administered by the Forest Service, abandoned well sites, roads, and other disturbed areas will be restored as near as practical to their original condition. Where applicable, these conditions may include the re-establishment of appropriate soil conditions, and the re- establishment of vegetation as specified.

All disturbed areas will be re-contoured to the approximate natural contours.

Any drainage rerouted during the construction activities shall be restored to its original line of flow or as near as possible.

Prior to backfilling the reserve pit, the fence surrounding the reserve pit will be removed. The pit liner will be folded and torn after the pit dries and prior to backfilling the reserve pit, 'APIWellNo:43013503280000'

Berry Petroleum Company Multi Point Surface Use & Operations Plan Federal 12-lD-65 Duchesne County, Utah

Before any dirt work associated with reserve pit restoration takes place, the reserve pit shall be as dry as possible. All debris in it will be removed. Other waste and spoil materials will be disposed of immediately upon completion of operations. The reserve pit will be reclaimed within 180 days from the date of well completion, weather permitting. Once reclamation activities have begun, the activities will be completed within 30 days.

After the reserve pit has been reclaimed, no depressions in the soil covering the reserve pit will be allowed. The object is to keep seasonal rainfall and runoff from seeping into the soil used to cover the reserve pit. Diversion ditches and water bars will be used to divert runoff as needed.

Prior to the construction of the location, the top 12 inches of soil material (if present) will be stripped and stockpiled. Placement of the topsoil will be noted on the location plat attached to the site specific APD. Topsoil shall be stockpiled separately from subsoil materials. Topsoil salvaged from the reserve pit shall be stockpiled separately near the reserve pit.

When restoration activities have been completed, the location site and new access road cuts and shoulders shall be reseeded. Prior to reseeding, all disturbed areas, including the old access road, will be scarified and left with a rough surface.

The Authorized Officer or the appropriate surface management agency shall be contacted for the required seed mixture. Seed will be broadcast and the amount of seed mixture per acre will be doubled. The seeded area will then be "walked" with a dozer to assure coverage of the seeds. The seed mixture will reflect the recommendation from the Archeology study done on the site specific APD.

At final abandonment, all casing shall be cut off at the base of the cellar or 3 feet below final restored ground level, whichever is deeper, and cap the casing with a metal plate a minimum of 0.25 inches thick. The cap will be welded in place and the well location and identity will be permanently inscribed on the cap. The cap also will be constructed with a weep hole.

11 Surface Ownership

United States Forest Service

12 Other information

All lease and/or unit operations will be conducted in such a manner that full compliance is made with all applicable laws, regulations, Onshore Oil and Gas Orders, the approved Plan of Operations, and any applicable Notice to Lessees. The operator is fully responsible for the actions of his subcontractors. A copy of these conditions will be furnished to the field representative to ensure compliance.

The operator will control noxious weeds along access road use authorizations, pipeline route authorizations, well sites or other applicable facilities. A list of noxious weeds may be obtained from the Forest Service, BLM, or the appropriate County Extension Office. On NFS administered land, it is required that a Pesticide Use Proposal be submitted and approved prior to the application of herbicides or other pesticides or possibly hazardous chemicals. 'APIWellNo:43013503280000'

Berry Petroleum Company Multi Point Surface Use & Operations Plan Federal 12-lD-65 Duchesne County, Utah

Drilling rigs and/or equipment used during drilling operations on this location will not be stacked or stored on National Forest Service-administered lands after the conclusion of drilling operations or at any other time without authorization by the NFS. If authorization is obtained, such storage is only a temporary measure.

Travel is restricted only to approved travel routes.

Unless previously conducted, a class III archaeological survey will be conducted on all Forest Service lands. All personnel will refrain from collecting artifacts and from disturbing any significant cultural resources in the area. The operator is responsible for informing all persons in the area who are associated with this project that they may be subject to prosecution for knowingly disturbing historic or archaeological sites or for collecting artifacts. All vehicular traffic, personnel movement, construction, and restoration activities shall be confined to the areas examined, as referenced in the archaeological report, and to the existing roadways and/or evaluated access routes. If historic or archaeological materials are uncovered during construction, the Operator is to immediately stop work that might further disturb such materials and contact the Authorized Officer.

Within five working days, the Authorized Officer will inform the operator as to:

Whether the materials appear eligible for the National Historic Register of Historic Places;

The mitigation measures the operator will likely have to undertake before the site can be used (assuming in-situ preservation is not necessary); and,

The time frame for the Authorized Officer to complete an expedited review under 36 CFR 800.11 to confirm, through the State Historic Preservation Officer, that the findings of the Authorized Officer are correct and that the mitigation measures are appropriate.

If the operator wishes, at any time, to relocate activities to avoid the expense of mitigation and/or the delays associated with this process, the Authorized Officer and/or the surface owner will assume responsibility for whatever recordation and stabilization of the exposed materials may be required. Otherwise the operator will be responsible for mitigation costs. The Authorized Officer and/or the surface owner will provide technical and procedural guidelines for the conduct of mitigation. Upon verification from the Authorized Officer that required mitigation has been completed, the Operator will then be allowed to resume construction.

On surface administered by the NFS, all surface use will be conducted in accordance with the STIPULATION FOR LANDS OF THE NATIONAL FOREST SYSTEM UNDER JURISDICTION OF THE DEPARTMENT OF AGRICULTURE, including:

If the surface is owned by another entity (FEE OWNER) and the mineral rights are owned by the BLM, a right-of-way will be obtained from the other entity.

Operator's employees, including subcontractors, will not gather firewood along roads constructed by the operator. 'APIWellNo:43013503280000'

Berry Petroleum Company Multi Point Surface Use & Operations Plan Federal 12-lD-65 Duchesne County, Utah

All roads constructed by the operator will have appropriate signs. Signs will be neat and of sound construction. The sign will state: (a) that the land is located within the Ashley National Forest boundary (b) the name of the Operator, (c) that firearms are prohibited, (d) only authorized personnel are permitted.

All well site locations will have appropriate signs indicating the name of the operator, the lease serial number, the well name and number, the survey description of the well (either footages or the quarter/quarter section; the section, township, and range).

13 Operator's Representative and Certification

A) Representative

NAME: Kathy K. Fieldsted Sr. Regulatory & Permitting Tech.

ADDRESS: Berry Petroleum Company 4000 South 4028 West Rt. 2 Box 7735 Roosevelt, UT 84066

PHONE: 435-722-1325 or 435-823-1920

E-MAIL: [email protected]

All lease and/or unit operations will be conducted in such a manner that full compliance is made with all applicable laws, regulations, Onshore Oil and Gas Orders and any applicable Notice to Lessees. The operator will be fully responsible for the actions of its subcontractors. A complete copy of the approved "Application for Permit to Drill" and the Standard Operating Procedures will be furnished to the field representative(s) to ensure compliance and shall be on location during all construction and drilling operations. The drilling permit will be valid for a period of two years from the date of approval. After permit termination, a new application will be filed for approval for any future operations.

B) Certification:

I hereby certify that I, or persons under my direct supervision, have inspected the proposed drill site and access route; that I am familiar with the conditions which presently exist; that the statements made in this plan are, to the best of my knowledge and belief, true and correct; and that the work associated with the operations proposed herein will be performed by Berry Petroleum Company and its contractors and subcontractors in conformity with this plan and the terms and conditions under which it is approved. This statement is subject to the provisions of 18 U.S.C. 1001 for the filing of a false statement.

DATE Kathy K. F el sted Sr. Regulat : & Permitting Tech. Berry Petroleum Company 'APIWellNo:43013503280000'

PPETRO Q SERVICES INOORPORATED Berry Petroleum Ashley Forest 5 ½ Production String Well Name: Federal 12-1D-65

With Loss Circulation T.D. 5936 ft Hole Size 7 7/8 in Casing Size 5 ½ in Casing Weight 15.50 lb/ ft Tail Cement Coverage 5960 ft to 3500 ft Tail Cement Excess 15 % Lead Cement Coverage 3500 ft to surface Lead Cement Excess 15 %

Hifill Lead Cmt 200sks 11.0 #/gal 3.82 cuft/sk 23.0 gallsk Premium Type V Cmt 100 % (BWOC) Gel 16 % (BWOC) Gilsonite 10 #/sk GR 3 3 #/sk Salt 3 % (BWOC) Flocele ¼ # /sk

Premium Lite Tail 300 sks 13.1#lgal 1.69 cuft/sk 8.8 gal/sk Premium Class G Cmt 65 % (BWOC) Poz 35 % (BWOP) Gel 6% (BWOC)

CDI 33 .2 % (BWOC)

CFL 175 .2 % (BWOC) Flocele ¼ # /sk Salt 10 % 'APIWellNo:43013503280000'

PPETRO Q SERVICES INOORPORATED Berry Petroleum Ashley Forest 5 ½ Production String Well Name: Federal 12-1D-65

Total Mix Water (Cement Only) 7240 gallons

Water ahead 10 bbls(8.33 ppg) Mud Flush 20 bbls(8.34 ppg) Water Spacer 10 bbls(8.33 ppg) Lead Cement 136 bbls(11 ppg) Tail Cement(With No loss Circulation) 89.7 bbls(14.2 ppg) Wash Pump and Lines and Drop Top Plug Displacemnet (KCL) 140.7 bbls(8.4 'APIWellNo:43013503280000'

PPETRO Q SERVICES INCORPOPATED Berry Petroleum Ashley Forest 5 ½ Production String Well Name: Federal 12-1D-65

T.D. 350 ft Hole Size 12 ¼ in Casing Size 8 5/8 in Casing Weight 24 lbs/ft Cement Coverage 350ft to Surface Cement Excess 50%

Cement 200 sacks 15.8#lgal 1.15cuft/sk 5.0gallsk G Cement 100% BWOC Calcium Chloride 2% BWOC Flocel 1/4# per sack

Total mix water (cement only) 1000 gallons Water ahead 10 bbls(8.33 ppg) Gel Sweep 20 bbls(8.44 ppg) 200 sacks of Cement 40.9 bbls(15.8 ppg) Drop Rubber Top Plug Displacement 19.3 bb1s(8.33 'APIWellNo:43013503280000'

PPETRO Q I SERVICES INOORPORATEO Berry Petroleum Ashley Forest 5 ½ Production String Well Name: Federal 12-1D-65

No loss of circulation T.D. 5936 ft Hole Size 7 7/8 in Casing Size 5 ½ in Casing Weight 15.50 lb/ ft Tail Cement Coverage 5960 ft to 3500ft Tail Cement Excess 15 % Lead Cement Coverage 3500 ft to surface Lead Cement Excess 15 %

Hifill Lead Cmt 200 sks 11.0 #/gal 3.82 cuft/sk 23.0 gal/sk Premium Type V Cmt 100 % (BWOC) Gel 16% (BWOC) Gilsonite 10 #/sk GR 3 3 #/sk Salt 3 % (BWOC) Flocele ¼ # /sk

50/50 Poz Tail Cmt 400 sks 14.2 #/gal 1.26 cuft/sk 5.75 gallsk Premium Class G Cmt 50 % (BWOC) Poz 50 % (BWOP) Gel 2 % (BWOC) Salt 10 % (BWOW)

CDI 33 .2 % (BWOC)

CFL 175 .2 % (BWOC) Flocel ¼ 'APIWellNo:43013503280000'

BERRY PETROLEUM COMPANY FEDERAL #1l-1D-65, #12-lD-65, #l3-1D-65 & #14-lD-65 LOCATED IN DUCHESNE COUNTY, UTAH SECTION 1, T6S, R5W, U.S.B.&M.

I

PHOTO: VIEW OF LOCATION STAKES FROM CORNER #5 CAMERA ANGLE: NORTHWESTERLY

PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: SOUTHWESTERLY

d , Uintah Engineering & Land Surveying L,0CATION PHOTOs 10 2 1 08 PHOTO e 85 South 200 East Vemal. Utah 84078 *105111 u TE^* 789-1017 * La ips. (435) FAX (435) 789-1813 TAKENBY:S.H. DRAWNBY:J.H. 'APIWellNo:43013503280000'

BERRY PETROLEUM COMPANY LOCATION LAYOUT FOR as FEDERAL #11-1D-65, #12-1D-65, CONSTRUCT #13-1D-65 & #14-1D-65 DDI RSION SECTION 1, T6S, R5W, U.S.B.&M.

------NW 1/4 SW 1/4

' 6 J6

10

SCALE: 1" = 50' Round Corners 10-20-08 DATE: os Needed DRAWN BY: S.P. A yo REVISED: 12--19-08 S.P / REVISED:04-12-10 C.C No 161319 RO

oreŒ. .. F

be /ocated o min.the¯ .. g% of 100' frorn o NIN Well Head I I I a. C-6.2 O 28 7'N PIPE RACKS

C-21. J C-2.2 O 24.7' loo' Sto. 1+75 DOG HOUSE 1 - (5 e C-1.8' F-5.2' o I E 24.3' -- a 7 7 J' - - C-5 30 2 I IWATER 159 R 277 e C-1.5' E 24.0 UMP

MUD SHED TOILET

HOPPER Toe of PowER Fill Slope

TOOLS Approx FUEL Top of SM W¾ Cut Slope yeas

5TORAGE

E 1 4 Sta 0+00 2 F-11.5' ¯¯¯¯ C-1J.2' 7· F-1.0 " El 25 Reserve Pit Bockfi// Proposed Access (stm. PR) & Spoils Stockpi/e El 21.5' Rood

Dev Ungraded Ground at /17-10 Location Stoke = 7424. J' , UINTAH ENCINEERING LAND SURVEYlNG Dev Groded Ground at /11-10 Locotion Stoke = 7422.5 as s, zoo ,,,, . ,,,... u, s,,,, . ,,ss, 'APIWellNo:43013503280000'

BERRY PETROLEUM COMPANY CROSS SECTIONS FOR X-Section TYPICAL scale FEDERAL #11-1D-65, #12-1D-65, #14-1D--65 So, #13-1D-65 & 1" = SECTION 1, T6S, R5W, U.S.B.&M. DATE: 10-20-08 DRAWN BY: S.P. NW 1/4 SW 1/4 110' 100'

. CUT

10' 70 40' 100 All

Ill -- -- Slope = 1 1/2: 1

10 70 40 100

inished Grade

110' 100

OTE: S M. 0+ 00 APPROX/MATE ACREAGES Topsoil should not be / WELLS/7E O/STURBANCE = ±2.159 ACRES Stripped Below Finished * NOTE: Grade on Substructure Area. ACCESS ROAD D/STURBANCE = ±1.105 ACRES FILL QUANT/TY /NCLUDES' P/PEL/NE D/S7URBANCE = ±1.124 ACRES 5% EOR COMPACT/ON TOTAL = ±4.388 ACRES APPROXIMATE YARDAGES EXCESS MATERIAL = 12,710 Cu. Yds.

Topsoil & Pit Backfill = J,660 Cu. Yds. (6") Topsoil Stripping = 1,770 Cu. Yds (1/2 Pit Vol.) Rernaining Location = 15,500 Cu. Yds. EXCESS UNBALANCE = 9,050 Cu. Yds. (After Interim Rehabilitation) TOTAL CUT = 17,210 CU.YDS. ENGINEERING LAND SURVEYING FILL = 4,500 CU.YDS. UINTAH & 85 So. 200 East * Vemal, Utah 84078 * (435) 'APIWellNo:43013503280000'

BERRY PETROLEUM COMPANY LOCATION LAYOUT FOR FEDERAL #11-1D-65, #12-10-65, CONSTRUCT #13-1D-65 & #14-1D-65 RSION SECTION 1, T6S, R5W, U.S,B.&M.

- -- - -NW 1/4 SW 1/4

' 6 E 36 E Jp5 Sto J+50 1

SCALE: 1" = 50' Round Corners 10-20-08 DATE: as Needed DRAWN BY: S.P REVISED:12-19-08 S P. ggy REVISED:04-12-10 C C. AND

/ 19

Wel/ Head I I yl i

28 7 PIPE RACKS C-11. J' El JJ 8' B 70 C 2 9' E 25 4' C-2 2' 100· O 24 7' 1+ " DOGHOUSE C-1.8' 1 F-5.2' E 24 J' - O 17 3 \ IwATER x 9 .0 7

MUD SHED TOILET

HOPPER Apprey Toe of PowER Fill Slope

TOOLS Appro FUEL Cut Slope

SToRAGE TANK / F- J.1' E 19 4' Sto. 0+00 A p F-11.5' , |* ' C- 7 F-7.0' ?? J.27, O 25 Ð 21 5 Proposed Access Rood

Dev Ungraded Ground at /11-10 Location Stake = 7424. J' , UINTAH ENGINEERING & LAND SURVEYINC = Dev Graded Ground ///-10 . • at Locotion Stoke 7422.5 ,, s, 2,, ,,,, Vernal, Utah 84078 (435) 'APIWellNo:43013503280000'

I BERRY PETROLEUM COMPANY TYPICAL CROSS SECTIONS FOR X-Section scale FEDERAL #11-1D-65, #12-1D-65, #13-1D-65 #14-1D-65 So, & 1" = SECTION 1, T6S, R5W, U.S.B.&M. DATE: 10-20-08 NW 1/4 SW 1/4 DRAWN BY: S.P. 110' 100'

Preconstruction

Slope 1 1 2: 1 CUT

SM. 1+75

70 40' 100'

inished Grade CU

110' 100

SM. 0+00 /OTE: APPROX/MATE ACREAGES Topsoil should not be WELLS/TE D/STURBANCE = ±2.159 ACRES Stripped Below Finished * NOTE: = ACRES Grade on Substructure Area. ACCESS ROAD D/STURBANCE ±1.105 E/LL QUANT/TY /NCLUDES' P/PEL/NE O/STURBANCE = ±7.124 ACRES 5.% FOR COMPACT/ON TOTAL = ±4.388 ACRES

APPROXIMATE YARDAGES EXCESS MATERIAL = 8,150 Cu. Yds.

Topsoil = 7,620 Cu. Yds. (6") Topsoil Stripping = 1,620 Cu. Yds.

= 11,020 Cu. Yds. Rernaining Location EXCESS UNBALANCE = 6,5]O Cu. Yds. (After Interirn Rehabilitation) TOTAL CUT = 12,640 CU.YDS. UINTAHENGINEERING & LANDSURVEYING FILL = 4,490 CU.YDS. 85 So. 200 East * Vernal, Utall. 84078 * (435) 'APIWellNo:43013503280000'

MYTON 18.7 MI. +/ 5 4

T6S

PROPOSED LOCATION: #12-ID-65 FEDERAL #11-1D-65, $ , #13-ID-64 & #14-1D-65 ,I

LEGEND: BERRY PETROLEUM COMPANY N FEDERA L #11-10-65, #12-1D-65, O·PROPOS ED LO CATION #13-ID-65 & #14-ID-65 SECTION 1,T6S, R5W, U.S.B.&M. NW 1/4 SW 1/4

¯¯ Uintah Engineering & Land Surveying T 0 POGR A PH I C ) Og 85 South 200 East Vernal, Utah 84078 $ A Ÿ ONTI DAY YEAR (435) 789-1017 * FAX (435) 789-1813 SCALE:1:100,000 DRAWNBY:J.H. VISED:00-00-00 'APIWellNo:43013503280000''APWellNo:43013503280000'

-ss ¿. TSS 0.3 ML +/- 0.1 MI.+/ 0.6 MI. +/- T6S FED .35 +/-

FE PROPO 1-65 #8-1 -65

PROPOSED ACCESS FOR THE #8-1D-p00' +/-

PROPOSED LOCATION:

¯ FEDERAL #11-1D-65, #12-1D-65 ¯¯ ¯¯¯ ' #13-1D-64 & #14-1D-65 om /

LEGEND: BERRY PETROLEUM COMPANY EXISTING ROAD N FEDERAL #11-ID-65, #12-ID-65,

------PROPOSED ACCESS ROAD #13-1D-65 & #14-ID-65 SECTION 1, T6S, R5W, U.S.B.&M. NW 1/4 SW 1/4 Uintah Engineering & Land Surveying TOPOGR A PH I cl 0 2 1 0 85 8 South 2OO East Vernat, Utah 84078 I Á .\fDNTil DM' YEAR (435) 789-1017 * FAX (435) 789-1813 - SCALE:1" = 2000' DRAWNBY:J.H. REVISED: 'APIWellNo:43013503280000'

UT 3 D 5

TSS T6S

FED

ST PIPELINE PRO,POSED F

#8- -65

I

PROPOSED LOCATION: FEDERAL #11-1D-65, #12-1D-65, #13-1D-64 & #14-1D-65

× 7464

APPROXIMATE TOTAL PIPELINE DISTANCE = 1,632' +/- LEGEND: BERRY PETROLEUM COMPANY PROPOSED ACCESS ROAD N FEDERAL #11-1D-65, #12-1D-65, ------PROPOSED PIPELINE #13-1D-65 & #14-1D-65 ------EXISTING PIPELINE SECTION 1, T6S, R5W, U.S.B.&M. NW 1/4 SW 1/4 Uintah Engineering & Land Surveying TOPOGR A PH I cl 0 2 1 0 8 85 South 200 East Vernal., IJtah 84078 Ì I A Ÿ 10NT DAY YEAR (435) 789-1017 * FAX (435) 789-1813 - SCALE:1"= 1000' DRAWNBY:J.H. REVISED: 'APIWellNo:43013503280000'

BERRY PETROLEUM COMPANY T6S, RS W, U. S. B. &M. Well location, FEDERAL #12-1D-65, located as shown in the NW 1/4 SW 1/4 of Section 1, T6S, R5W, U.S.B.&M., Duchesne County, Utah, BASIS OF ELEVATION TSS N895J'477 - 2644.22' (Meas.) SB951'21T - 261391' (Meas.) Mark Stone ELEVATION SOUTHEAST CORNER OF SECTION l'6S prie or stones Set set workedstone SPOT AT THE 18, T5S, R4W, U.S.B.&M TAKEN FROM THE DUCHESNE SE, QUADRANGLE, UTAH, DUCHESNECOUNTY, 7.5 MINUTE QUAD 5 4 (TOPOGRAPHIC MAP) PUBLISHED BY THE UNITEDSTATES DEPARTMENT OF THE INTERIOR. GEOLOGICAL SURVEY. LOT 4 LOT 3 LOT 2 LOT 1 WW SAID ELEVATION IS MARKED AS BEING 6559 FEET. BASIS OF BEARINGS BASIS OF BEARINGS IS A C.P.S. OBSERVATION.

I

Set Marked Stone o o o o o . o Bottom --- o -

850 SC A LE 1000 /12-1D--65 TEDERÆ CERTIFICATE till! Elev. Ungraded Ground = 7424 THIS IS TO CERTIFY THAT THE ABOVE P PC FIELD NOTES OF ACTUAL SURVEYS MA SUPERVISION AND THAT THE SAME A 180 ND CORREC BEST OF MY KNOWLEDGEAND BELig No. 161319 o -

LINE TABLE RECIST DL SWon LlNE BEARING LENGTH 04-12-10 REGISTR REVISED: C.C STATE O 7p L1 S81'Ol'47"E 354.62' REVISED: 12-19-08 S.P )

Set Maked Sto e IÃNTAH SGINEERING & IAND SJRVEYlNG

NB9°42'49"W - Set Morked Stone - 521954' (Meos.) 85 SOUTH 200 EAST VERNAL, UTAH 84078 Pile of Stones 789-1017 LEGEND: (435) SCALE DATESURVEYED: DATE DRAWN: 10-17-08 = 90 SYMBOL 1" = 1000' 07-08-08 NAQg) (TARC(T ÇTTÇM H () NAD 8.1 (AtlAPAC 10CATION) .. REFERENC£S = PROPOSED WELL HEAD. LATITUDE = 3959'13.31" (39.987031) LATITUDE = 3959'1276" (39.986878) 110'24°12.15" S.H. T.P. S.P PLAT LONGFTUDE = (110.403373) LONGITUDE = 11024'07.65" (110.402125) G.L.O.

= BOTTOM (SURFACE A SECTION CORNERS LOCATED. NAD 27 (TARGET HOI.E) NAD 27 59'12.90°LOCATION) WFATHFR flLE LATITUDE = 39'59'13.44 (39.987067) LATITUOE = 39 (39.986917) COOL LONG1TUDE = 110'24'09.60" (110.402667) LONGITUDE= 11024'05.10" (110.401417) BERRY PETROLEUM 'APIWellNo:43013503280000''API ellNo:430 [3503280000'

4-36 U UT #15 36 T5S UT UT #2-2, #1-2D #4•1 U2

UT . # I-2 #3-2D #8

PROPOSED I OCATION: FEDERAL #11-1D-65, #12-1D-65, --

#13-1D-64 & #14-1D-65 xus

RR ·

LEGEND: BERRY PETROLEUM COMPANY DISPOSAL WELLS WATER WELLS N FEDERAL #11-1D-65, #12-ID-65, #13-1D-65 #14-1D-65 O PRODUCING WELLS ABANDONED WELLS & SECTION 1, T6S, R5W, U.S.B.&M SHUT IN WELLS -@- TEMPORARILY ABANDONED NW 1/4 SW 1/4 Uintah Engineering & Land Surveying TOPOGR A PH I c 1 2 1 85 South 200 East VernaL, Utah 84078 0 0 8 M A P MONTI DAY YEAR (435) 789-1017 * FAX (435) 789-1813 - SCALE:1" = 2000' DRAWNBY:J.H. REVISED:00-00-00 'APIWellNo:43013503280000'

Well Planning Proposal FOR

Berry Petroleum Co. Federal 12-1D-65 Duchesne Co., UT

Well File: Design #1 (3/25/10)

Presented By:

Pat Rasmussen Regional Manager

Bret Wolford Well 'APIWellNo:43013503280000'

Project: Duchesne Co., UT (UT27C) Site: Federal Sec.1 Pads (Sec.1-T6S-R5W) Well: Federal 12-1D-65 Weilbore: Wellbore #1 3D9e° GREATWNfTE Ltt 9 12 901 N Longitude: 110° 24' 5.101 W Ground Level: 7422.00 WELL @7436.00ft (Original Well Elev)

PROJECT DETAILS: Duchesne Co., UT (UT27C) REFERENCE INFORMATlON

Geodetic System: US State Plane 1927 (Exact solution) Co-ordinate (N/E) Reference: Well Federal 12-1D-65, True North Datum: NAD 1927 (NADCON CONUS) Vertical (TVD) Reference: [email protected] (Original Well Elev) Ellipsoid: Clarke 1866 Section (VS) Reference: Slot -(0.00N, 0.00E) Zone: Utah Central 4302 Measured Depth Reference: WELL @ 7436,00ft (Original Well Elev) Calculation Method: Minimum Cuivature Sysiem Datum: Mean Sea Level

WELLDETAILS: Federal12-1D-65 g -. ._.. ., __ _ .._. ._._ Ground Level: 7422.00 ný +N/-S +El-W Northing Easting Latittude Longitude Sloi 0,00 0.00 604170,201 2307811.331 39 SS 12.901 N 110 24 5,101 W

400- WELLBORE TARGET DETAILS(MAP CO-ORDINATES AND LATILONG)

Name TVD +N/-S +El-W Northing Easting Latitude Longitude Shape 39° 110° Fed 12-1D-65 Tgt 5924.00 55.64 -349.92 604221.539 2307460,754 59'13.451 N 24' 9.597 W Polygon

SECTION DETAILS

MD Inc Azi TVD +N/-S +El-W DLeg TFace VSec Annotation rrd14486 hoidal796 9MD 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 450.000.00 0.00450.00 0.00 0.00 0.000.00 0.00KOPIStartBuild2.00

- --- - 2.00° 12 O ------647.50 3.95 322.00 647.34 5,36 -4.19 2,00 322.00 4.98 Start Turn TFO -112,09

796.39 3,95 277.69 795,91 10,09 -12.43 2.00 -112.09 13.86 Start 4744.56' hold at 798.39 MD 5540.95 3.95 277.69 5529.20 53.82 -336.42 0.00 0.00 340.70 Start Drop -1.00° - _ 5936.07 3,00 0.00 5924 00 55 64 -349.92 1.00 180.00 354,32 TD at 5936.07 Green¯¯ R var . .______FORMATlON TOP DETAILS

TVDPath MDPath Formation D [ 1357,76 1359.57 Green River 1901.87 1904.99 Green River Upr Mkr -- -- . ------000 2505.89 2510.44 Mahogany Green Rlvar Upr Mkr 3543.20 3550.22 Tgr3 Mkr 4288.99 4297.79 Douglas Creek 4879.03 4889.23 Black Shale 5057.74 5068,37 1/2 Through Obj. 5205.50 5216.48 Castle Peak 40 5622.84 5634.76 Uteland Butte Ls. 5826.67 5838.73 Wasatch

Mahogany y| Azimuths to True North - ¯ Magnetic North: 11.EB 2800------Magnetic Field Strength: 52327,6snf

Model: IGRF200610

H4

50- - 4 N .92 SHL - - 1970 FSL & 550' FWL 1916 F8L & 1000 FWL SEC.1-T68-RSW SEC1-T6S-R5W Targetis460 Within Tgr3 Mht NWSW 1/4 1/4

00------. .- - 45Fnold 96JUMD

TFO 09 4000 ------

Ad00- - - -- Dodglas Creek

- Black Shale Federal 12-10 ¯------i 4800 1-1D-65 I

1009 'GC -500 250 0 250 500 ¯ West(-)/East(+) 12 a (500 ftlin) I - . . . . . , , , , . . Plan: Design #1 (Federal 12-1D-65/Wellbore #1) -UCD -800 -400 t 400 800 1200 1600 03° Vertical Section at 279 (800 fthn) Created By: Bret Wolford Date: 15:38, March 25 'APIWellNo:43013503280000'

Berry Petroleum Company Duchesne Co., UT (UT27C) Federal Sec.1 Pads (Sec.1-T6S-R5W) Federal 12-1D-65

Wellbore #1

Plan: Design #1

Standard Planning Report

25 March, 2010

AGREATUNTE »mECHOME SEÆWS, 'APIWellNo:43013503280000'

Great White Directional Services, LLC GREATWHITE Planning Report « ..,«---

Database: EDM 2003.21 Single User Db Local Co-ordinate Reference: Well Federal 12-1D-65 Company: Berry Petroleum Company TVD Reference: WELL @7436.00ft (Original Well Elev) Project: Duchesne Co., UT (UT27C) MD Reference: WELL @7436.OOft (OriginalWell Elev) Site: Federal Sec.1 Pads (Sec.1-T6S-R5W) North Reference: True Well: Federal 12-1D-65 Survey Calculation Method: Minimum Curvature Wellbore: Wellbore #1 Design: Design #1

Project Duchesne Co., UT (UT27C)

Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Utah Central 4302

Site Federal Sec.1 Pads (Sec.1-T6S-R5W) 39° Site Position: Northing: 605,769.134ft Latitude: 59' 28.309 N 110° From: Lat/Long Easting: 2,311,038.090 ft Longitude: 23' 23.392 W ° Position Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 0.71

Well Federal 12-1D-65 39° Well Position +NI-S -1,559.18 ft Northing: 604,170.201 ft Latitude: 59' 12.901 N 110° +El-W -3,246.15 ft Easting: 2,307,811.331 ft Longitude: 24' 5.101 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 7,422.00ft

Wellbore Wellbore #1

Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (*) (nT) IGRF200510 03/25/10 11.58 65.72 52,328

Design Design #1 Audit Notes: Version: Phase: PLAN Tie On Depth: 0.00

Vertical Section: Depth From (TVD) +NI-S +El-W Direction (ft) (ft) (ft) (°) 0.00 0.00 0.00 279.03

Plan Sections

Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +El-W Rate Rate Rate TFO (ft) (°) (°) (ft) (ft) (ft) (°l100ft) (°I100ft) (°/100ft) (°) Target

0.00 0.00 0.00 0.00 0 00 0.00 0.00 0.00 0.00 0.00 450.00 0.00 0.00 450.00 0.00 0.00 0.00 0.00 0 00 0.00

647.50 3 95 322.00 647.34 5.36 -4.19 2.00 2.00 0.00 322.00

796.39 3.95 277.69 795 91 10.09 -12.43 2.00 0.00 -29.76 -112.09

5,540.95 3.95 277.69 5,529.20 53.82 -336.42 0.00 0.00 0.00 0.00

5,936.07 0 00 0.00 5,924.00 55.64 -349.92 1.00 -1 00 0.00 180.00 Fed 12-1D-65 Tgt

03/25/10 3:35 49PM Page 2 COMPASS 2003 21 Build 'APIWellNo:43013503280000'

Great White Directional Services, LLC GREATMilTE Planning Report « --me.

Database: EDM 2003.21 Single User Db Local Co-ordinate Reference: Well Federal 12-1D-65 Company: Berry Petroleum Company TVD Reference: WELL @ 7436 00ft (Original Well Elev) Project: Duchesne Co., UT (UT27C) MD Reference: WELL @ 7436.00ft (Original Well Elev) Site: Federal Sec 1 Pads (Sec.1-T6S-R5W) North Reference: True Well: Federal 12-1D-65 Survey Calculation Method: Minimum Curvature Wellbore: Weilbore #1 Design: Design #1

Planned Survey

Measured Vertical Vertical Dogleg Build Turn Depth Depth +NI-S +El-W Section Rate Rate Rate Inclination Azimuth (°l100ft) (°l100ft) (°I100ft) (II) (°) (°) (II) (ft) (ft) (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 100 00 0.00 0.00 0.00 0.00 0.00 0.00 200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0 00 0.00 300.00 0 00 0.00 300.00 0.00 0.00 0 00 0.00 0 00 0.00 8 5/8" Casing 350.00 0.00 0.00 350.00 0.00 0.00 0.00 0.00 0.00 0.00 400.00 0.00 0.00 400.00 0.00 0.00 0.00 0.00 0.00 0.00 KOP / Start Build 2.00° 450.00 0.00 0 00 450.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 1.00 322 00 500.00 0.34 -0.27 0 32 2.00 2.00 0 00

600.00 3.00 322.00 599.93 3.09 -2.42 2.87 2.00 2.00 0.00 2.00° Start Turn TFO -112.09 647.50 3.95 322.00 647.34 5.36 -4.19 4.98 2.00 2.00 0.00

-0.50 -29.17 700 00 3.69 306.68 699.73 7.80 -6.66 7.80 2.00 Start 4744.56' hold at 796.39 MD 796.39 3.95 277.69 795.91 10.09 -12.43 13.86 2.00 0.28 -30.08 800.00 3.95 277.69 799.51 10.12 -12.68 14.11 0.00 0.00 0.00 900.00 3.95 277 69 899.28 11.05 -19.51 21.00 0.00 0.00 0.00 1,000.00 3.95 277.69 999.04 11.97 -26.34 27.89 0.00 0.00 0.00 1,100.00 3.95 277.69 1,098.80 12.89 -33.16 34.78 0.00 0.00 0.00 1,200.00 3.95 277.69 1,198.56 13.81 -39.99 41.67 0.00 0.00 0.00 1,300.00 3.95 277.69 1,298.33 14.73 -46.82 48.55 0.00 0.00 0.00 Green River 1,359.57 3.95 277 69 1,357.76 15.28 -50.89 52.66 0.00 0.00 0.00 1,400.00 3.95 277.69 1,398.09 15.65 -53.65 55.44 0.00 0.00 0.00 1,500.00 3.95 277.69 1,497 85 16 58 -60.48 62.33 0.00 0.00 0.00 1,600.00 3.95 277.69 1,597 61 17.50 -67.31 69.22 0.00 0 00 0.00 1,700.00 3.95 277.69 1,697.38 18.42 -74.14 76.11 0.00 0.00 0.00 1,800.00 3.95 277.69 1,797.14 19.34 -80.97 83.00 0.00 0.00 0.00 1,900.00 3 95 277.69 1,896.90 20.26 -87.79 89.89 0 00 0.00 0.00 Green River Upr Mkr 1,904.99 3.95 277.69 1,901.87 20.31 -88.13 90 23 0 00 0.00 0.00 2,000.00 3.95 277.69 1,996.66 21 18 -94.62 96.78 0.00 0.00 0.00 2.100.00 3.95 277.69 2,096.42 22 11 -101 45 103.66 0 00 0.00 0.00 2,200.00 3.95 277.69 2,196.19 23.03 -108.28 110.55 0.00 0.00 0.00 2,300 00 3.95 277 69 2,295.95 23 95 -115 11 117.44 0.00 0.00 0.00

2,400 00 3.95 277.69 2.395.71 24.87 -121.94 124.33 0.00 0.00 0.00 2,500.00 3.95 277.69 2,495.47 25 79 -128.77 131.22 0.00 0.00 0.00 Mahogany 2,510.44 3.95 277.69 2,505.89 25.89 -129.48 131.94 0 00 0.00 0.00 2,600.00 3.95 277.69 2,595.24 26 71 -135 60 138 11 0.00 0.00 0 00 2,700.00 3.95 277.69 2,695.00 27.64 -142.42 145.00 0.00 0.00 0.00 2,800.00 3.95 277.69 2,794.76 28.56 -149.25 151.89 0.00 0.00 0.00 2,900 00 3.95 277.69 2,894.52 29.48 -156.08 158 77 0.00 0.00 0.00 3,000.00 3.95 277.69 2,994.29 30.40 -162.91 165.66 0.00 0.00 0.00 3,100.00 3.95 277.69 3,094.05 31.32 -169.74 172.55 0 00 0.00 0.00 3,200.00 3.95 277.69 3,193.81 32.24 -176.57 179.44 0.00 0.00 0.00 3,300.00 3.95 277.69 3,293 57 33.17 -183 40 186.33 0.00 0.00 0.00 3,400.00 3.95 277.69 3,393.33 34 09 -190 22 193.22 0 00 0.00 0 00 3,500.00 3.95 277.69 3,493.10 35.01 -197 05 200.11 0.00 0 00 0.00 Tgr3 Mkr 3,550 22 3.95 277.69 3,543.20 35.47 -200 48 203.57 0.00 0.00 0.00 3,600.00 3.95 277.69 3,592.86 35.93 -203.88 207.00 0.00 0.00 0.00

03/25/10 3 35 49PM Page 3 COMPASS 2003 21 Build 'APIWellNo:43013503280000'

Great White Directional Services, LLC GREMI&filTE Planning Report « -...-w

Database: EDM 2003.21 Single User Db Local Co-ordinate Reference: Well Federal 12-1D-65 Company: Berry Petroleum Company TVD Reference: WELL @ 7436.00ft (Original Well Elev) Well Elev) Project: Duchesne Co , UT (UT27C) MD Reference: WELL @ 7436.00ft (Original Site: Federal Sec 1 Pads (Sec.1-T6S-R5W) North Reference: True Well: Federal 12-1D-65 Survey Calculation Method: Minimum Curvature Wellbore: Wellbore #1 Design: Design #1

Planned Sunrey

Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate (°l100ft) (°l100ft) (°I100ft) (II) (°) (°) (It) (ft) (ft) (ft) 3,700.00 3.95 277.69 3,692.62 36.85 -210.71 213.88 0.00 0.00 0.00

3,800.00 3.95 277.69 3,792.38 37.77 -217.54 220.77 0.00 0.00 0.00 3,900 00 3.95 277 69 3,892.15 38.69 -224.37 227.66 0.00 0.00 0.00 4,000.00 3.95 277.69 3,991.91 39.62 -231.20 234.55 0.00 0.00 0.00

4,100.00 3.95 277.69 4,091.67 40.54 -238.03 241.44 0.00 0.00 0.00

4,200.00 3.95 277.69 4,191.43 41.46 -244.85 248.33 0.00 0.00 0.00 Douglas Creek 4,297.79 3.95 277.69 4,288.99 42.36 -251.53 255.06 0.00 0.00 0.00 4,300.00 3 95 277.69 4,291.20 42.38 -251.68 255.22 0.00 0.00 0.00 4,400 00 3.95 277.69 4,390.96 43.30 -258.51 262.10 0 00 0.00 0.00 4,500.00 3.95 277.69 4,490.72 44.22 -265.34 268.99 0.00 0.00 0.00

4,600.00 3.95 277.69 4,590.48 45.15 -272.17 275.88 0.00 0.00 0.00 4,700.00 3.95 277.69 4,690.24 46 07 -279.00 282.77 0.00 0.00 0.00 4,800.00 3.95 277.69 4,790.01 46.99 -285.83 289.66 0.00 0.00 0.00 Black Shale

4,889.23 3.95 277.69 4,879.03 47.81 -291.92 295.81 0 00 0.00 0.00 4,900.00 3.95 277.69 4,889.77 47.91 -292.66 296.55 0.00 0.00 0.00 5,000.00 3.95 277.69 4,989.53 48.83 -299.48 303.44 0.00 0.00 0.00 1/2 Through Obj. 5,068.37 3.95 277.69 5,057.74 49.46 -304.15 308.15 0.00 0.00 0.00 5,100.00 3.95 277.69 5,089.29 49.75 -306.31 310.33 0.00 0.00 0.00

5,200.00 3.95 277.69 5,189.06 50.68 -313.14 317 21 0.00 0.00 0.00 Castle Peak 5,216.48 3.95 277.69 5,205.50 50 83 -314.27 318.35 0.00 0.00 0.00

5,300.00 3 95 277.69 5,288.82 51.60 -319.97 324.10 0.00 0.00 0.00 5,400.00 3 95 277.69 5,388.58 52.52 -326.80 330.99 0 00 0.00 0 00 5,500.00 3.95 277.69 5,488.34 53.44 -333.63 337 88 0.00 0.00 0.00 Start Drop -1.00°

5,540.95 3.95 277.69 5,529.20 53.82 -336.42 340.70 0.00 0.00 0.00 5.600.00 3 36 277.69 5,588 13 54.32 -340.16 344.47 1.00 -1.00 0.00 Uteland Butte Ls. 5,634.76 3 01 277.69 5,622 84 54.58 -342.07 346.40 1.00 -1 00 0.00 5,700.00 2 36 277.69 5,688.00 54.99 -345.10 349.45 1.00 -1.00 0.00 5,800.00 1.36 277.69 5,787.95 55.42 -348.32 352.70 1.00 -1.00 0.00 Wasatch

5,838.73 0.97 277.69 5,826.67 55.53 -349.10 353.49 1.00 -1.00 0.00

5,900.00 0.36 277.69 5,887.93 55.62 -349.81 354.20 1.00 -1.00 0.00

TD at 5936.07 - Fed 12-1D-65 Tgt

-1.00 5,936.07 0.00 0.00 5,924.00 55.64 -349.92 354.32 1.00 0.00

03/25/10 3 35 49PM Page 4 COMPASS 2003 21 Build 'APIWellNo:43013503280000'

Great White Directional Services, LLc GREATWMTE Planning Report , ...,- se.

Database: EDM 2003.21 Single User Db Local Co-ordinate Reference: Well Federal 12-1D-65 Company: Berry Petroleum Company TVD Reference: WELL @ 7436.00ft (Original Well Elev) Project: Duchesne Co., UT (UT27C) MD Reference: WELL @ 7436.00ft (Original Well Elev) Site: Federal Sec 1 Pads (Sec 1-T6S-R5W) North Reference: True Well: Federal 12-1D-65 Survey Calculation Method: Minimum Curvature Wellbore: Wellbore #1 Design: Design #1

Design Targets

Target Name

- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting

- (°) (*) Shape (ft) (ft) (ft) (ft) (ft) Latitude Longitude 39° 110° Fed 12-1D-65 Tgt 0.00 0.00 5,924.00 55.64 -349.92 604,221.539 2,307,460.754 59' 13.451 N 24' 9.597 W

- plan hits targetcenter - Polygon Point 1 5,924.00 197.50 -190.10 604,416.69 2,307,268.24 Point 2 5,924.00 195.80 189.60 604,419.65 2,307,647.93

Point 3 5,924.00 -197.50 190.60 604,026.39 2,307,653.77

Point 4 5,924.00 -195.70 -190.10 604,023.52 2,307,273.07

Casing Points

Measured Vertical Casing Hole Depth Depth Diameter Diameter (II) (II) Name (") (") 350.00 350.00 8 5/8" Casing 8-5/8 12-1/4

Formations

Measured Vertical Dip Depth Depth Direction Dip(°) Name Lithology

1,359.57 1,359.00 Green River -1.35 279.03

1,904.99 1,904.00 Green River Upr Mkr -1.35 279.03 2,510.44 2,509.00 Mahogany -1.35 279.03

3,550.22 3,548.00 Tgr3 Mkr -1.35 279.03

4,297.79 4,295.00 Douglas Creek -1.35 279.03

4,889.23 4,886.00 Black Shale -1.35 279.03

5,068.37 5,065.00 1/2 Through Obj. -1.35 279.03

5,216.48 5,213.00 Castle Peak -1.35 279.03

5,634.76 5,631.00 Uteland Butte Ls. -1.35 279.03 5,838.73 5,835.00 Wasatch -1.35 279.03

Plan Annotations

Measured Vertical Local Coordinates Depth Depth +NI-S +El-W (ft) (It) (ft) (ft) Comment 2.00° 450.00 450.00 0.00 0.00 KOP / Start Build 2.00° 647.50 647.34 5 36 -4.19 Stad Turn TFO -112.09

796.39 795.91 10.09 -12.43 Start 4744.56' hold at 796.39 MD

-1.00° 5,540.95 5,529.20 53.82 -336.42 Start Drop 5,936.07 5,924.00 55.64 -349.92 TD at 5936.07

03/25/10 3:35:49PM Page 5 COMPASS 2003 21 Build 'APIWellNo:43013503280000' Berry Petroleum Company Brundage Canyon Field 4000 South 4028 West Rt. 2 Box 7755 Roosevelt, UT 84066 State of Utah Ph: (435) 722-1325 Fax: (435) 722-1321 Division of Oil, Gas and Mining www.bry.com P.O. Box 145801 Salt Lake City, UT 84115-5801

Re: Directional Drilling R649-3-11 Federal 12-lD-65: 1,916' FSL, 1,000' FWL (NWSW) (surface) 1,970' FSL, 650' FWL (NWSW) (bottomhole) Section 1, T6S-R5W Duchesne, County, Utah

Pursuant to the filing of Berry Petroleum's Application for Permit to Drill regarding the above referenced well, we are hereby submitting this letter in accordance with Oil & Gas Conservation Rule R649-3-11 pertaining to the Exception to Location and Siting of Wells.

• The Federal 12-1D-65 well is to be located within the Brundage Canyon Field Area. • Berry is locating the well at the surface location and directionally drilling from this location to minimize surface disturbance and Berry will be able to utilize the existing road and pipelines in the area. • Furthermore, Berry hereby certifies that it is the sole working interest owner with 460 feet of the entire directional well bore and the remainder of the Ute Tribal section. Therefore, based on the above stated information Berry Petroleum Company requests the permit be granted pursuant to R649-3-11.

Res Sec f illy Submitte ,

Kathy K. ieldsted Regulatory & Permitting Specialist

Corporate Headquarters - 1999 Broadway, Ste. 3700 • Denver, CO 80202 'APIWellNo:43013503280000' SE. QUAD SECTION 84078 DRAWN: STATES 10-17-08 YlNG OF Section MINUTE DATE FEET. locoted SURVEY. DUCHESNE o - o County, CORREC N of 161319 UTAH 7,5 UNITED PLAT THE 6559 No. CORNER PETROLElm 1/4 THE COMPANY OBSERVATION. SURVEfEO. C.L.O. IAND BY FROM COUNTY, BEING GEOLOGICAL VERNAL, SW 07-08-08 Duchesne BERRY & PLE DATE R(rinENCES LE , #12-10-65, ELEVATION AS C.P.S. - ABOVË 789-1017 o svATE REos . A BEARINGS 1/4 SAME SOUTHEAST A TAKEN OF THE AND SURVEYS CERTIFICATE 15 THE INTERIOR. SC OF PUBLISHED DUCHESNE NW THE (435) &M. FAST THAT MARKED o o C.C. S.P THAT AT THE PETROLEUM ACTUAL S.P FEDERAL IS U.S.B.&M., BASIS the MAP) U.S.8 200 UTAH, AND OF KNOREDGE BIGINEERING OF BASIS CERTIFY BEARINGS in o MY TO T.P R5W. R4W, OF NOTES OF 15 1000 12-19-08 04-12-10 ELEVATION COOL ELEVATION BERRY location. SOUTH = THIS SUPERVISION FIELD BEST T5S. GNTAH shown T6S, S.H BASIS 1¯ 85 18. SPOT OUADRANGLE. (TOPOGRAPHIC SAID DEPARTMENT os 1. Utah. Well .417. REVISED: REVISED. %CATHER 4 ' (1104D‡175) (31L90se78) (09,804417} (39.98691À 5 WW si-e stone 1 LOCAllen) LOCARON) 3959'121s¯ uwsee 395912.90' u.«».a 110'24'0765' Itp¯¿A'0510" LOT 354.6¶ LENGTH . . =· = ser ser (SumFACF (SURCACE 27 85 2613.91°(Meas.) TABLE Mao LArsTuoE LONGTUcc NAg LAliTUDE LONCITUDC - ) LtNE 2 BEARlNC 5800f47"F 7424 (Meos sto=• LOT (NO402&SF) (39957039 (1104033751 NOLO Hg) = arrr SB9°57217 54° L1 LINE Ty st BOTTOM 5219 U.S.B.&M. " asse-usi* 395913df(39987067} it0¯?+t2,15" 00WO960" - Ground = - - - Thir ftAscFI 49~W /12-10-65 3 81 MftTIIDE 42 (Meca) LantuoE I NAD « LAlifuDE l.DMCauDE LOT R5W, Ungraded NB9 ERAL v. 264422 El EE LOCATED. - HEAD. T6S, 4 st-e WELL Bottom - CORNERS Stones sec... LOT of or NS95J477 Maurea ooo SYMBOL set Pas se. SECTION PROPOSED 90 = = T6S TSS A LEGEND: 'APIWellNo:43013503280000' Plat Prooject COMPANY MAP Location UM 2010 Forest 12-1D-65 20, SU Drilling TTR Federal PETRO National Directional BERRY Ashley donna Erna 'APIWellNo:43013503280000'

UTE TRIBAL 13-35D-55 430E133RIBALUTE TRIBAL 13-36D-55 H H4301334117 '4301333624 15-36-55 APINaNme Number:eE EcR430135032802 UTE TRIBAL 14-36-55 UTE430E133RIBAL TRIBAL 15-36-55 4301333049 â ' 44301332355â ' -65 â UTE TRIBAL 16-35-55 ' UTE TRIBAL 13-31-5413 31 54 WeWell Name: FEDERALL 12-1D-651 T 5 S R 5 W 35 36 ' T 5 S R 4 W 4301332352 UTE TRIBAL 16-36-55 4301332688 Township 06.0 SRange 05.0 W Section 1 4301332356 31 Meridian: UBM Operator: BERRY PETROLEUM COMPANY

Map Prepared: 1-2D-65 FEPÆRALFEDERAL 2-2-65 FEDERAL 1-2D-65 â Map Produced by Diana Mason 43073333854301333385â 4301333966 '' â

Units Wells Query STATUSSTAlus D AcrivEACTIVE Statusstatus EXPLORATORYExPLaRATaRY APD - AprovedApraedPernit Permit

GAS STORAGE H DRL - Spuded (Drilling Commenced) NF PP OIL 3L580-1D-65 4 GIW - Gas Injection FEDERAL4F3E0D1E3 8-1D-65 NF SECONDARY 4301350350 !* GS - Gas Storage !!! PI OIL 3-2D-65 N LA - Location°3^ Abandoned3"6°" FEDERAL 3-2D-65 FEDERAL 7-1D-65 D-65 PP GASGAs 6 4F3E0D1ER2A6L969-1-65 FEDERALFEDE 9-1D-65 4F343013340013E3R4 16-2-65 FEDERAL 6-1-65 ! LOCoc - New Locationto to ' 4301334015 â 43013503424301 03 2 â PP GEOTHERMLsorseem FEDERAL 6-2-65 4301332699 â 7 OPS - Operation Suspended ' PP OIL 4301332557 ' SECONDARYsecomonar ª PA - Plugged66^6336°366 Abandoned PGW - Producing Gas Well TERMiNATEDTERMINATED * casweii Fields ' POWPow - ProducingProducingaliweii Oil Well Sectionssecuons O RET - ReturnedReturnedAPD APD 6 SGW - Shut-in Gas Well 2 1 Township ¸ BRUNDAGE CANYON FIELDFIELD · SOW - Shut-in Oil Well 6 TA - Temp. Abandoned FEDERAL 10-2-65 " TW - Test Well 4301333542 â ' FEDERAL 12-1D-65 FEDERAL 14-1D-65 ¸ WDW - Water Disposal ¸ WIW - Water Injection Well 4301350328 â 4301354301350330 â â â !!!!FEDERALEDERAL 13-1D-65 FEDERAL 11-1D-65 =* WSW - Water Supply Well 4301350327 443013503291350329 T 6 S R 5 W T 6 S R 4 W

CacheCacheRich BoxBoxElder Elder Rich Location Map Weber Morganr Davis â â SummitSumm DaggettDa â Saltalt LakeLak TooeleTaœ\e Wasatchate Duchesne Utah Uintah

Juab - Carbon

Sanpeteban e Millard Emery Grand Sevier

Beaver Piute Wayne

Iron GarfieldGarfeld San Juan 11 12 7 Kane F FEDERAL 7-11D-65 â 4301334061 1,2001200 600 0 1,2001200Feet Feet 'FEDERAL 6-11-65 4301333491 1:10,650 WORKSHEET APPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 4/29/2010 API NO. ASSIGNED: 43013503280000 WELL NAME: FEDERALFEDERAL 12-1D-6512-1D-65 OPERATOR: BERRY PETROLEUM COMPANY (N2480) PHONE NUMBER: 435 722-1325 CONTACT: Kathy K. Fieldsted

PROPOSED LOCATION: NWSW 11 060S 050W Permit Tech Review:

SURFACE: 19161916 FSL 10001000 FWL Engineering Review:

BOTTOM: 19701970 FSL 0650 FWL Geology Review:

COUNTY: DUCHESNE LATITUDE: 39.98691 LONGITUDE: -110.40159 UTM SURF EASTINGS: 551092.00 NORTHINGS: 4426266.00 FIELD NAME: BRUNDAGE CANYON LEASE TYPE: 11 - Federal LEASE NUMBER: UTU-77326 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 11 - Federal COALBED METHANE: NO

I RECEIVED AND/OR REVIEWED: LOCATION AND SITING: PLAT R649-2-3.

Bond: FEDERAL - UTB000035UTBOOOO35 Unit:

Potash R649-3-2. General

Oil Shale 190-5190-5

Oil Shale 190-3190-3 R649-3-3. Exception

Oil Shale 190-13190-13 Drilling Unit

R649-3-11 Water Permit: 43-11041 Board Cause No: R649-3-11

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I Comments: Presite Completed

Stipulations: 4 -- Federal Approval - dmason 1515 -- Directional -- dmason 23 -- Spacing -- dmason API Well No: 43013503280000API Well No: 43013503280000

State of Utah DEPARTMENT OF NATURAL RESOURCES

-/ MICHAEL R. STYLER Exoutim Drotor GAR . H BE RT comrmr Division of Oil, Gas and Mining GREGORY S. BELL JOHN R. BAZA Lieuterant Gowrær Busion Director Permit To Drill ******************kkkkkkkkkkkkkkkkkk Well Name: FEDERAL 12-1D-65FEDERAL 12-lD-65 API Well Number: 4301350328000043013503280000 Lease Number: UTU-77326UTU-77326 Surface Owner: FEDERAL FEDERAL Approval Date: 5/12/20105/12/2010 Issued to: BERRY PETROLEUM COMPANY, 4000 South 4028 West Rt 2 Box 7735, Roosevelt, UT 84066BERRY PETROLEUM COMPANY, 4000 South 4028 West Rt 2 Box 7735, Roosevelt, UT 84066

Authority: Pursuant to Utah Code Ann. §40-6-1 et seq., and Utah Administrative Code R649-3-1 et seq., thePursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., the Utah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listed well. This permit is issued in accordance with the requirements of R649-3-11. The expectedwell. This permit is issued in accordance with the requirements of R649-3-11. The expected producing formation or pool is the GREEN RIVER Formation(s), completion into any other zonesproducing formation or pool is the GREEN RIVER Formation(s), completion into any other zones will require filing a Sundry Notice (Form 9). Completion and commingling of more than one poolwill require filing a Sundry Notice (Form 9). Completion and commingling of more than one pool will require approval in accordance with R649-3-22.will require approval in accordance with R649-3-22. Duration: This approval shall expire one year from the above date unless substantial and continuous operationThis approval shall expire one year from the above date unless substantial and continuous operation is underway, or a request for extension is made prior to the expiration dateis underway, or a request for extension is made prior to the expiration date General: Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas Conservation General Rules, and the applicable terms and provisions of the approved Application for permit to drill.General Rules, and the applicable terms and provisions of the approved Application for permit to drill. Conditions of Approval: State approval of this well does not supercede the required federal approval, which must be obtainedState approval of this well does not supercede the required federal approval, which must be obtained priorprior to drilling. to drilling.

In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit aIn accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit a complete angular deviation and directional survey report to the Division within 30 days followingcomplete angular deviation and directional survey report to the Division within 30 days following completion of the well. completion of the well.

This proposed well is located in an area for which drilling units (well spacing patterns) have not beenThis proposed well is located in an area for which drilling units (well spacing patterns) have not been established through an order of the Board of Oil, Gas and Mining (the “Board”). In order to avoid theestablished through an order of the Board of Oil, Gas and Mining (the "Board"). In order to avoid the possibilitypossibility of waste or injury to correlative rights, the operator is requested, once the well has beenof waste or injury to correlative rights, the operator is requested, once the well has been drilled, completed, and has produced, to analyze geological and engineering data generateddrilled, completed, and has produced, to analyze geological and engineering data generated therefrom, as well as any similar data from surrounding areas if available. As soon as is practicabletherefrom, as well as any similar data from surrounding areas if available. As soon as is practicable after completion of its analysis, and if the analysis suggests an area larger than the quarter-quarterafter completion of its analysis, and if the analysis suggests an area larger than the quarter-quarter section upon which the well is located is being drained, the operator is requested to seek ansection upon which the well is located is being drained, the operator is requested to seek an appropriate order from the Board establishing drilling and spacing units in conformance with suchappropriate order from the Board establishing drilling and spacing units in conformance with such analysis by filing a Request for Agency Action with the Board. analysis by filing a Request for Agency Action with the Board.

Notification Requirements: API Well No: 43013503280000API Well No: 43013503280000

The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringThe operator is required to notify the Division of Oil, Gas and Mining of the following actions during drilling of this well:drilling of this well: • Within 24 hours following the spudding of the well – contact Carol Daniels at 801-538-5284• Within 24 hours following the spudding of the well- contact Carol Daniels at 801-538-5284 (please leave a voicemail message if not available)(please leave a voicemail message if not available) OROR submit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websitesubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas website at https://oilgas.ogm.utah.govat https://oilgas.ogm.utah.gov

Reporting Requirements: All reports, forms and submittals as required by the Utah Oil and Gas Conservation General RulesAll reports, forms and submittals as required by the Utah Oil and Gas Conservation General Rules will be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:will be promptly filed with the Division of Oil, Gas and Mining, including but not limited to: • Entity Action Form (Form 6) – due within 5 days of spudding the well• Entity Action Form (Form 6) - due within 5 days of spudding the well • Monthly Status Report (Form 9) – due by 5th day of the following calendar month• Monthly Status Report (Form 9) - due by 5th day of the following calendar month • Requests to Change Plans (Form 9) – due prior to implementation• Requests to Change Plans (Form 9) - due prior to implementation • Written Notice of Emergency Changes (Form 9) – due within 5 days• Written Notice of Emergency Changes (Form 9) - due within 5 days • Notice of Operations Suspension or Resumption (Form 9) – due prior to implementation• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation • Report of Water Encountered (Form 7) – due within 30 days after completion• Report of Water Encountered (Form 7) - due within 30 days after completion • Well Completion Report (Form 8) – due within 30 days after completion or plugging• Well Completion Report (Form 8) - due within 30 days after completion or plugging

Approved By:

Gil HuntGil Hunt Associate Director, Oil & Gas Associate Director, Oil & Sundry Number: 14485 API Well Number: 43013503280000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEAS7EnDE65IGNATION DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING UTU-77326

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well FEDERAL 12-1D-6512-1D-65

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013503280000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t BRUNDAGE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 19161916 FSL 10001000 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NWSW Section: 01 Township: 06.0S06.05 Range: 05.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR / NOTICE OF INTENT Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME 5/15/2011 CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion: OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION Report Date: WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. BERRY PETROLEUM WOULD LIKE TO REQUEST THAT APPROVED APPLICATION TO DRILL THE ABOVE SUBJECT WELL BE EXTENDED FOR THE PERIOD OF ONE (1) YEAR. Approved by the Utah Division of Oil, Gas and Mining

Date: 04/21/2011

By:

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 4/20/2011

Apr. 20, 2011 Sundry Number: 14485 API Well Number: 43013503280000

UTAH DNR The UtahUtah DivisionDivision of Oil, Gas, and MiningMining

- State of Utah - Department of Natural Resources

Electronic PermittingPermitting System - Sundry Notices TI, GA% Pr NINTPM

RequestRequest for PermitPermit ExtensionExtension Validation Well NumberNumber 43013503280000

API: 43013503280000 Well Name: FEDERAL 12-1D-6512-1D-65 Location: 19161916 FSLFSL 10001000 FWLFWL QTR NWSW SEC 01 TWNP 060S RNG 050W MER U Company Permit Issued to: BERRY PETROLEUM COMPANY Date Original PermitPermit Issued: 5/12/2010

The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies that the information as submitted in the previously approved application to drill, remainsremains valid and does not require revision. Following is a checklist of some items related to the application, which should bebe verified.

• If located on private land, has the ownership changed, if so, has the surface agreement been updated? Yes © No

• Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or siting requirements for this location? Yes © No

• Has there been any unit or other agreements put in place that could affect the permitting or operation of this proposed well? Yes © No

• Have there been any changes to the access route including ownership, or rightof- way, which could affect the proposed location? Yes © No

' Has the approved source of water for drilling changed? Yes © No

• Have there been any physical changes to the surface location or access route which will require a change in plans from what was discussed at the onsite evaluation? Yes © No

' Is bonding still in place, which covers this proposed well? U Yes No

Signature: Kathy K. Fieldsted Date: 4/20/2011 Title: Sr. Regulatory & Permitting Tech. Representing: BERRY PETROLEUM COMPANY

Apr. 20, 2011 DIVISION OF OIL, GAS AND MINING

SPUDDING INFORMATION

Name of Company: BERRY PETROLEUM COMPANY

Well Name: FEDERAL 12-1D-65

Api No: 43-013-50328 Lease Type FEDERAL

Section 01 Township 06S Range 05W County DUCHESNE

Drilling Contractor RIG # SPUDDED: Date 05/11/2011

Time 11:00 AM

How DRY

Drilling wi/I Commence:

Reported by KATHY FIELDSTED

Telephone # (435) 722-1325

Date 05/11/2011 Signed Sundry NumberNumber: : 1511515115 API Well NumberNumber: : 43013503280000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEAS7EnDE65IGNATION DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING UTU-77326

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well FEDERAL 12-1D-6512-1D-65

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013503280000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t BRUNDAGE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 19161916 FSL 10001000 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NWSW Section: 01 Township: 06.0S06.05 Range: 05.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: 5/13/20115/13/20 11 REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE NOTE THAT THE FEDERAL 12-1D-6512-1D-65 WAS SPUD ON MAY 13,13, 2011 BY LEON ROSS DRILLING AT APPROX 9:00 AM. Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 05/18/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 5/16/2011

RECEIVED May.May. 1616,, 2011 STATE OF UTAH FORM 6 DEPARTMENT OF NATURALRESOURCES DIVISIONOF OIL,GAS AND MINING

ENTITYACTION FORM

Operator: BERRY PETROLEUM COMPANY Operator Account Number: N 2480 Address: 4000 S. 4028 W. city ROOSEVELT UT 722-1325 state zip 84066 Phone Number: (435)

Well 1 API Number Well Name QQ Sec Twp Rng County 11-1D-65 4301350327 FEDERAL NWSW 1 6S 5W DUCHESNE Action Code Current Entity New Entity Spud Date Entity Assignment Number Number Effective Date

Comments: SPUD LEON ROSS DRILLING

Well 2 API Number Well Name QQ Sec Twp Rng County 12-1D-65 4301350328 FEDERAL NWSW 1 6S SW DUCHESNE Action Code Current Entity New Entity Spud Date Entity Assignment Number Number EffectiveDate A ) ) 5/13/2011 Comments SPUD BY LEON ROSS DRILLING

Well 3 API Number Well Name QQ Sec Twp Rng County 4301350330 FEDERAL 14-1D-65 NWSW 1 6S 5W DUCHESNE Action Code Current Entity New Entity Spud Date Entity Assignment Number Number Effective Date A $ $9 5/13/2011 Comments:

ACTION CODES: A - Establish new entity for new well (single well only) KATHY K FIELDSTED B - Add new well to existing entity (groupor unit well) N (Ph e Print) C - Re-assign wellfrom one existingentitytoanother existingentity ,) D - Re-assign well from one existingentity to a new entity signature E - Other (Explain in 'comments' section) RECElVED SR RE PERMITTING 5/16/2011 Title Date (smooo) MAÏl § 201)

DIV.0FOIL,GAS& Sundry Number: 16900 API Well Number: 43013503280000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEAS7EnDE65IGNATION DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING UTU-77326

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well FEDERAL 12-1D-6512-1D-65

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013503280000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t BRUNDAGE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 19161916 FSL 10001000 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NWSW Section: 01 Township: 06.0S06.05 Range: 05.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION 7/25/2011 WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED DRILLING HISTORY FOR THE FEDERAL 12-1D-65.12-1D-65.

Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 07/26/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 7/25/2011

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repon Report Date: 7/16/2011 Report #: 1, DFS: ' Well Name: FEDERAL 12-iD-65 Depth Progress: 0 APill)Wi Stirfac Legal Location ÈPud Ome NoliÏe APD Sia e Ai E Number TolalAFE Amoud 43013503280000 NWSW SEC 1. T6S-R5W 5/13/2011 Utah C11 032027 Spud Dale Rig Release Date KB,Ground Distance (ft) IGround Elevation ilthB} DaiiyCost Cum Casi To Dale 39,996 7/18/2011 4:00:00 PM 7/24/2011 2:00:00 PM 20.00 | 7,422 39,996 Addi¯ve To OparaEens al Repoit Time ÖperallonsNext i4 Hours DailyMed Cosi Mud Ôoit Oate N/U BOP Test BOP M/U BHA & Replace transmission on #2 floor motor |Depth Start (ftKB) Depth End (ftKB) operat.onssammary I 336 336 Deptn (TVD)IftKB) Depth End LTV I(IIKSI Moved rig f/ Fed. 14-1D-65 to Fed. 12-1D-65. N/U BOP, Stan 336 336 Remarks ¯ Formation Ta Enepm itivel Fuel used: 295 Fuel on hand: 2617 Target Wasatch Weaiher Temperature t'F) Road C ndiison Hole Condilum Clear 55.0 Dusty Cased Dañy Contacts i Job Contact Mobile I Last Casing Set Comment¯¯ ¯¯ ¯ ¯ ¯ ¯ Kim D. Gritz 303-550-3391 ÕasÍ g Descnption Set Depth (ftKB) OD (in) Surface 336 8 5/8 8 5/8" casing pre-set _Rigs Con1ractor Rig Number Time Log Patterson 779 Operaton Comment Start Time End Time | Dur (hrs) - Mud Pumps f/ Fed. 14-1D-65 Fed. 06:00 |13:00 7.00 Rig Up & Tear Down |Movel Skid rig to Continental-Emsco, F-1000 112-1D-65. Howcroft Field Services,lnc #1, Pump Rabog (npi Rod Diameler (m) Sirake Lengin (in moved rig with 4 bed trucks, 2 × forklifts,2 x | 1900.0 10.00 iPushers & 3 x Swampers. .. i LinerSize (in) Vo1ÏStkOR ibbUstk) & Tear Down Raise derrick,rig up floor, finish hooking up 6 1/2 3.490 13:00 08:00 19.00|Rig Up ·Ef! the back yard Pressure (psi) $low Spd iStrokes (spm) (%) No 08:00 11:00 3.00 NU)NDBOP Set stack &NIU BOP. Choke &killlines. # 2, Continental-Emsco, F-10_00 Pump Rating (hp) Rod Diameter (in) Slroke Length 00) Mud Checks (Ibf/100tt2) Type Trme Depth (ftKB) Densily (Ib/gal) Vis (s/qt) PV Calc (cp) Yield Point 1.000.0 1 10.00 OP Ibblisik) i Liner Size (in) ValaStk ;Se1·d5 Gel110s) (tbfMcGF Gel (10m) Gbf/10 Gel (30mi (iort10 Filtrate (mL/30min) |Filter Cake (/32") |pH Lib) Pressure (psi) iSlow Spd StroKes (spm) fn

MáÏ(IbiboF) PercenÍOilFN Perr.eniúŸaier(%) ilandesimetL) Calcium(mg/Li KCLO.) EleclocStabfvi No Mud Additive Amounts CEC for Cuttings ole Mud Add (bbi) Mud Lost to Hole (bbl) Rost (Surf) (bbl) Mud Vol (Res) (bbl) IMud Vol (Act) (bbl) Description Í Consumed Daily Cost

Air Data Job Supplies Diesel Fuel, (ft=/min) ParasiteACFM (ft /min) Drillpipe ACFM ECD Bit (Ib/gal) IECD Parasite (Ibigall Suppl ÍiemDesenplion Und Label Diesel Fuel Total Received Total Consumed Tolal RelMmed Corrosion Inhibitor Injected in 24hr Period Igls Injected down Parasite (gal) gls Injected in Mud (gal) gls Biocide injected in MuÏ1(gal) 3,653.0 Diesel Fuel Consumption Date Consumeu Drill Strings _ _ _ _ ,7/19/2011 425.0 BHA#1 '7/20/2011 625.0 BHA#1, [inl} Bit Run |Drill Bit |lADC Bit Dull TFA inel Norì 7/21/2011 915.0 1-1-NO-A-1-0-NO-TD 0.90 1 177/8in, FX65M, 11573537 7/23/2011 1,347.0 Ñozzles(/32") String Length (ft) Stang WI (1000lbfi BRAROP ift 7/25/2011 341.0 14/14/14/14/14/14 6,023.47 67.7 Drill.String Cornponents max Lobe Bit-Bend ft min gpm gpm (gpm) Jts item Description OD (in) Len (ft) config Slages rpm/gpm (ft) (gpm) SN I 1 Mud Motor7/8 3.5 6 1/2 27.58 stage 1 NMDClpony 6 1/4 11.99 ' 1 NMDC 6 1/2 30.85 1|Gap Sub | 6 1/2 5.64 24 HWDP i 4 1/2 736.41 163 Drill pipe 4 1Ï2 5,167.00 Kelly 4 1/2 43.00 Drilling Parameters Werrbore Stad (MKB) Depth End (f1KBiCum Dep1hff1i DrillTime it si Cum DnlF Tirne Im ROP rNinry FirtwRale {gpor Original 336.0 336.0 Hole WOB [10l)D1Dry RPM wpmi SPP (ps4 Rot HL (1000Ibf) PU HL 000:bfi SO HL (100Dltfj 'Drilling Torque Off Otm Tq

T L5Uff nn) (lig tim) feturn) i Q {g ing (RY Motor RPM upm; T fing)PF) P LBNAnnH T (en) l'F] PISuit Afl0) Q (g Q (g

Deviation Surveys Fed. 12-10-65 Ift Azim :0ate DEcilption ESTk I, Incrin MD Tie in tÏi NSne m TVDTo m 0.00 7/18/2011 Fed. 12-1D-65 0.00 0.00 0.00 0.00

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/16/2011 Report #: 1, DFS: ' Well Name: FEDERAL 12-1D-65 Depth Progress: 0 Survey Data MC AKB) me:. i Om 01 fvD itŒE; NS:Ill EW il:i VS fili OL

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/17/2011 Repoñ#:2,DFS: Well Name: FEDERAL 12-1D-65 Depth Progress: 0 APIIL)WL Surface Legal Locabon ISpud Date NotscP APD State AFE Numeer Tolal AFE umouni 43013503280000 NWSW SEC 1, T6S-R5W 5/13/2011 Utâh C11 032027 Soud Data Big Release Dale KB·Ground Distance ini Glutind Elevakon (ItKB) De,y Cost Cum Cost ToDale 7/18/2011 4:00:00 PM i 7/24/2011 2:00:00 PM 20 00 7.422 58.119 98,115 Operation al Report Time Operallorm Next 2d Horirs Dai:yMod Cos! MudAdditiveCost To Date Replace transmission #2 floor motor ETA +/- 14:00 .Replace transmission on #2 floor motor. Misc. rig i repairs & maint Dépth Start (ItKB) Depth End (ftKB) Opeaiions summary 336 336 Finished N/U Bop & test, fab. & install flowline modifications. Rig on down timeto replace transmissionon #2 Deminstart(Ivoa ittKB Depth End (Tvoa (RKea floor motor 336 . 336 Target FCrmmion Targel DepEh (flKB) Remarks Fuel used: 295 Fuel on hand: 8677 Wasatch Weather Tetilperature i F) Road Ca<9dition Hole Condition Daily Contacts |Dusty Cased Joecomaci a Mob.ie Kim D. Gritz 303-550-3391 Last Casing Set

ÌasangÜ s up ton Sei Depth (flKB) .OD (ml Commerit , R[gS Surface 336 8 5/8 8 5/8" casingpre-set comrector sigNumbe< Patterson 779 Time L.oS. . . Mud Pumps . Commeni Start Time i End Time I Dur ihre) | Operation 1 Continenta 06 00 09:30 3.50 NU/ND BOP N/U BOP. Choke & kil] lines Stroke Length im 09 30 12:30 3.00 Test BOP Test Pipe,blinds &valve to 250 low / 2000 1.000.0 10.00 1500 (bblislM hi, Annular to 1500 , casing to psi. f/ Liner size4 ] VobSib OR 30 min- 6 1/2 I 3.490 Slow Sttokes (Spm) Eff (5.0 12:30 18:30 6.00 Miscellaneous Fab &install modified flowline. Pressure Ips( $pd No 18 30 06:00 11.50 Repair Rig Misc. rig repairs & mâlnt. wait on replacement transmission#2 floor motor. # 2, Continental-Emsco, F-1000 Pump Raling inp) Red Ozameler (ini .Sitoke Lengih Drt) 1,000.0 10,00 Mud Checks Liner $rze lmi Voitsik OR (bbVstki Type Time Depib flKBI Density (lbigall Ÿistelqtj PV(alc icpi Yield Foint ilÑf100ff)

Pressure (psl Stúw Spd Sirokes (spm) Elf (ni Gel (10s, ilbif100f ,Gel (10m) (luffl0 Gel (?Om]LibffiO FMia e (mU30mini Fill i Ogk ()32") pH Solitis (N,} No

MBT (tb/Obl) Percen! Oil (k Percent Water fa) Chlorides img/LJ Caloum (mgiti MCLV r.I Elecine Slab M Mud Additive Amounts De ton il _Consismed Daily Cosi CEC for Cullings Whole Mud Add (bbi) Mud Lost to Hole (bbl) MudLäst (Sur i(bbl) Mud Vol (Res) (bbl) Mud Vol (Act) (blM) Job Supplies Air Data Diesel Fuel, Supply liem Descopinon UnsiLebel Paravte ACFM(ftYasin) DollpipeACFM(tfiram; ECD 841 tibigal) ECD Parasste

BHA #1, BHA #1 .. _ 915.0 , 7/21/2011 .. _ . ______TFAfine (In"| Sit Run .DnlI Bit ilA C Bil Ouli Nor) 7/23/2011 1,347.0 1 177/8in. FX65M, 11573537 1 1-1-NO-A-1-0-NO-TD 0.90 7/25/2011 341.0 13 starteLength (fla sinnew (100016 eMA soP 14/14/14/14/14/14 6.023.47 67.7 prill s_tringqqmpogynt

Lobe BR-BendR min gpm gpm Item (rn) Len 11 conh9 rpmigpm (fi) (gpmi (OPml SN JIs i Desceptiort OD ( , Slages 1 Mud Motor 7/8 3.5 6 1/2 27.56 stage 1 NMOC/pony 61/4. 11.99 1 NMDC i 6 1/2 30.85 1 Gap Sub 6 1/2 5.64

24 HWDP i 4 1/2 Ì3Š.411 163 Drillpipe 4 1/2 6.167.00 Kelly 4 1/2 43.00 Drilling Parameters Wellcore Slart 40KBI Dep1h End iflK6i Cum Depih (rt} Onli Time ihrs) Cum DralTurne Int ROP fithri Flow Rate (gpm

WÒB (100ÖlbfiRPM (

Q [g anil lffl MolorRPhi;rpm) ,T ilon ("Fa :P (SH Ann) ; ,T inb: (F; PlSurf Anni T Isurf sana ,Q (lig rim; (g Q (g retum;

Deviation Surveys Fed. 12-1D-65 Aam Date Description EWTie in melan MDTae in {lt INSTie in TVDTie Irr tit 0.00 Í 7/18/2011 Fed. 12-1D-65 0.00 0.00 0 00 0.00

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repon Report Date: 7/17/2011 Report #: 2, DFS: Well Name: FEDERAL 12-1D-65 Depth Progress: 0 SurverDg MD iftKB In:I 1 km (1 TVD (ftKB) NS ift EW die VSifli OLS I ;100

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/18/2011 Report #: 3, DFS: 12-1D-65 Depth Progress: 0 Well Name:¯ FEDERAL ¯ ;API/UWI ŠurfadeLegal Locahon Spud Date Nobce APO State AFE Numbet TolaiAFE Amount 43013503280000 NWSW SEC 1. T6S-RSW 5/13/2011 Utah C11 032027 Rrg Release Date KB·Giovnd Osiance (ft} Ground Elevation (fibB) DailyCosi Cum Cost To Date 7/18/2011 4:00:00 PM 7/24/2011 2:00:00 PM 20.00 7.422 8.535 106.650 OpersbonsF Repott Time Operations Next 24 Hours Daily Mud¾ Mud Additive Cost To Date Prod. install #2 floor motor w/ newtransmission Install motor , M/U BHA & Drill 7 7/8" hole. Operalions Summary eptnn(ffB) D h Eid (fth Rig on down timeto replace transmission on #2 floor motor.Replaced transmission #2 floor motor 336 336 Remarks iDepth Start (TVD) (flKB) Depth End (TVD) (ftKB) Fuei used: 343 Fuel on hand: 8334 336 336 Depth (ILKB) W ather Temperature ( F) Road Condition Condition Targel Formation Target Raining 45 0 IWet Cased Wasatch Last Casing Set Dally Contacts ¯ ¯¯l ¯_ de¯sänpiion dontact hiobile Casi g Set Depth litKB] 00 (in) Comment jo Surface 336 8 5/8 |8 5/8" casing pre-set KimD. Gritz 303-550-3391 Rigs RigNum Operallon or eni End Time Durints) ! Pa SO 06:00 06:00 24.00 Repair Rig Prepare & remove #2 floor motor Replace transmission. Install motor Mud Pymps

· ------#1, Continental-Emsco F-1000 Pump Raung (hp) Rod Diameteriin Sitoke ength mi Mud Checks Type Tima Depth glKB) Density (IbigaD Vis (${41) PV Calc (Op} Yteld Ù m(LLÌ/100Íl Linst Size (in} Ï ol/S:icOR (bblistki 3.490 0Ë\(1Ösí(Ibf/100f G Ï(10úl) (Ibf/10 :Òel Õri(ÏbÏliO ÈÏ\tÏaÏeUKÙŠdmiÑlFille?Cake (132" DH Šclis (%} Pressure (pst) Šlce d |Strokes lepm) Efff%) (mg/LI¯ No BT (Ibibbl) Peroem Oil (%i Peteent Walar I%1 Chiondes Òëlciu Ï ÏÑ.Õi_{% Elecine Stab (V) _ # 2, Continental-Emsco, F-1000 Pump Reling (hpl Rod D=ameter (iril Stroke Lengin in) CEC for Collirigs Whole Mud Add (obl] Mud Lost to Hole (bbl) Mud Lost (Surf) (bbl) Mua Voi(Real (bbli Mud Vol(Ac6 (bbt) 1.000.0 10.00 LitlerSize irn Vo1ÑkhR (bbÏfsiki Air Data Sirokes (spm) Ett (%I (it*/m ¯ - Pressure (psil Sfo Spd ParBCËlÄ fúiÑiln) OnflpipeACFM ECD BIt libigal) ECD Parasite gbtgal) No | Mud Adgl Amounts inhlbitor in 24hr Period orrosion Injected censù es Dariydost , gis injected down Parastofgel) gis Inlacted in Mud (gal) igtsBioods injected in Mud (gal)

Job Supplies Diesel Fuel, Drill Striggs ______Supply 11em Desemplion UNI Labei BHA #1, BHA #1 Iina) Bit Run :Drill Bit IADC Bit Dull TFAlincI Noz} Diesel Fuel Tota1Retumed 1 !7 7/8in, FX65M, 11573537 1-1-NO-A-1-0-NO-TD 0.90 iTolarRecewed Tota1Consumed Nozzles 037) Stang Length {fti Sidng Wt (100DIbt) BMA ROP It 3,653.0 i 14/14/14/14/14/14 6,023.47 | 67.7 Diesel Fuel Consumption care i consumed Drill String Components ma 7/19/2011 426.0 I Lobe Bit-Bendft mangp gpm i7/20/2011 625.0 moescrioiden oD(in) Len(ft) |Config Stages rpm/gpm (f0 (Opm (gpmi SN ·7/21/2011 915.0 Mud Motor7/8 3.5 6 1/2 27.58 1 7/23/2011 1.347.0 stage - - 7/25/2011 341,0 1 NMDC/peny 61/4 11.99 - I 1 NMDC 6 1/2 Š0.85 1 Gap Sub 6 1/2 5.64 24 HWDP 4 1/2 736.41 i 63 Drillpipe 4 1/2 5,167.00 Kelly 4 1/2 43.00

Drillingb¯ë Parameters Simrt[flKB) Depin End (ItKB) Cum Deplo ilt} OnflTime(tirs) Com Onil Time int ROPfft/hr Fiow Ñi (y

I 1Ó0ÒlbliÄÌÑ (ŸÍtri $PP (psi) ÀotHL(1Ü0ÕlbriFÙÑLt100ÖÏbiÏSÖÑL Ï1000ÏbfDr/II:ng Torque ÒIf Blin T4 (Ït•/ ¯ (g ing) Motor RPM [

Deviation Surveys Fed. 12-1D-65 ¯ Äzrrn 19 beso tion ÖŸ¾ein ÑD Tie \ÑÏfi STie in ITVÜTie In (ft 0.00 7/18/2011 Fed. 12-1D45 0.00 0.00 0 00 0.00 0.00 Survey

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Report Report Date: 7/19/2011 Report #: 4, DFS: 0.6 WeH Name: FEDERAL 12-1D-65 Depth Progress: 994 ¯ Tatai Aincur:I i Pitu.vt saria e aga ocation épo i Date N.91ice APD 5141 AFE Miimiler AFE 43013503280000 NWSW SEC 1. T6S-R5W :5/13/2011 Utah C11 032027 ¯ ¯ Sprid Date Rig Release Dale KB Grc,ind Disianœ (fli Gro(ÏrÏfŠÃnÏ 0 liÜ Daily Cost UtÏECDÉlTo DaÏe 7/18/2011 4:00:00 PM 7/24/2011 2:00:00 PM 20.00 7,422 41,197 147.847 rations at Report Time Operations Next 24 Hours Dady Mud Cosi Mud Addiime Cos1To Date Drilling 7 7/8" production hole @1330' Drill 7 7/8" Prod. hole. 1.776 1,776 ÖperationsSummary ÖepthStart (ftKB) Depth End (ftKB) Replaced transmission #2 floor motor & installed. M/Udirectional wl EMWD BHA, tripped in w/ 6 x 4 1/2" 336 1,330 | HWDP, drilled out float equip. & shoe track, Drilled 7 7/8" production hole fl 336' to 1330'. Depth Start (TVD) (ftKB) Depth End (TVD) (ftKB) ¯ ¯¯ ¯ 1,327 Remarys 336 Fo TÃÏon Target Depth (ftKSI Fuel used: 475 Fuel on hand: 785g get ¯ ¯ Waalhar Temperalere ."F) Road Candi1ion Male condition Wasatch Partly cloudy 48.0 Wet Good Daily Contacts Joe comaci Mossie Last Casing Set ¯ ¯ 303-550-3391 idg estnetton set Depth (fixe) oD i.n) commen: KimD. Gritz pre-set Surface 336 8 5/8 .8 5/8" casing Rigs ¯ Comractor Rig Number Time Log Patterson 779 End Time Dur thrsi Operation bominrii Slan Time ¯ Mud Pumps 09:30 3.50 Repair Rig Finish motor installation. Replace nuÏds 06:00 1, Continental-Emsco. F-1000 Hook up drive lines Make adjustments. Rig # Pump1 O(hp) Rod o=ametertini siroke1L Ib fin off of down time @ 09:30 hrs. 7/18/11 09:30 12:00 2.50 Directional Work M/U Directional assembly Orient & test uner size Un) vovss oR moitsik) EMWD. 6 1/2 3.490 Pressure (psi) Slow$pd Strokes (spm) Ëfl (%) 12:00 14 2.5 Trips Trip in picking up 4 1/2" HWDP. Tagged Š0 296· cement @ No _Continental-Emsco, F-1000 14:30 116:00 1.5 I Out Cement/Retainers Drill out cement FC,Shoe track & Shoe .#2, 336. @ PumpRatinginp; Rodolamete

17:00 06:00 13.00 Drilling Drill 7 7/8" production hole wl slides & Pressosa (psis stowsuo strokes(spmi Eff i .t rotating fl 396' to 1330' w/ 420 gpm, 45 No 10-12 150-250 ¯ rpm, k wob. psi. diff Additive Amounts ¯¯ ¯¯ - ¯ ¯ ¯-- ¯ ¯- ¯ Desciiption Consuméd ÖaÏlyÓost Mud Checks Engineer 1.0 295.00 Type Time Deplb(fiKB) Densily (Ibigal) Vcs (8/ql) PV Cale (Op} YieFd Poin (Infl100lt } GypSum 100.0 1.066.00 leDr 06m TBX 1.0 414.54 a ÕèÏ (bf/10 liit Ï Ü där Faler taiËe i PÑ ŠÑëà a 8.0 Job Sqpplies bg M3T ilbíbbl] Percent Oil (%) Percent Water (%) Chlorides (mg/L) Calcium (mglL) KCL l¾) E:ectric StaD rVJ Qi_S Myl rilt $upply rn Desenplion Unit Label 99.0 Il - Diesel Fuel EC f t rigs Whole Mud Ada {bbil Muu LosÏto Hole (bbl) Mud Losi Su

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/19/2011 Report #: 4, DFS: 0.6 Well Name: FEDERAL 12-1D-65 Depth Progress: 994 Drilling Parameters Wellbore SIM títKB) Depth End (flKB) Cum Depth (ft) Dnll Time (hrs) Cum DrillTime In1 ROP (ftint; Flow Rate (gpm) Original 336.0 1,330.0 994.00 13.00 13.00 . 76.5 420 Hole woB (1000\bf) RPM (rpm; SPP (psi) Rot HL (1000\bf) PU HL (1000lbf) SO HL (1000lbf) D:iltingTorque ÒtF B†mÌq 15 55 950.0 60 60 60 4,000.0 4,500.0 (°F) Q (ginj) (fP/... Motor RPM (rpm) T (Inj) P (BH Ann) (.. T (bh) VF) P(Surt Ann) ... T (suit ann) ...Q (lig rtm) (g... Q (g retum) 88 1 Deviation Surveys Fed. 12-1D-65 Azim... Date Deschption EWTie In . Inclin... MD Tie in (ft NSTie in T\/DTie In [fi 0.00 7/18/2011 Fed.12-1D-65 0.00 0.00 0.00 i 0.00 0.00 ¯Survey Data Mo (nwa) inci c) Arm ei Tvo itinaa NS (fl. EW (fi) všir:) Ot.s clicott

-0.10 399.00 1.09 187.55 398.98 -3.76 -0.50 0.27

461.00 1.01 228.33 460.97 -4.71 -0.98 0.23 1.19

523.00 1 93 290.29 522.95 -4.71 -2.37 1.60 2.75

585.00 3.91 308.92 584.87 -3.02 -5.00 4.46 3.50

646.00 5.14- 300.40 645.66 -0.33 -8.97 8.81 2.29

706.00 5.31 295.74 705.43 2.23 -13 79 13.97 0.76

768.00 5.14 295.57 767.17 4.68 -18.88 19.38 0.28

830.00 4.75 293.55 828.94 6.90 -23.74 24,53 0.69

893.00 4.61 288.36 891 73 8.74 -28.53 29.55 0.71 956.00 4.31 288.45 954.54 10.29 -33.18 34.38 0.48

1,020.00 4 39 283.79 1,018.35 11.63 -37.84 39.20 0 57 1,083.00 4.04 279.31 1,081.18 12.57 -42.37 43.82 0.76 1,146.00 3.96 283.18 1,144.03 13.42 -46.68 48.21 0.45

1,210.00 5.71 277.81 1,207.80 14.36 -61.99 53.60 2.82

1,305.00 5.80 274.29 1,302.32 15.36 -61.46 63 11

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/20/2011 . Report #: 5, DFS: 1.6 I ' ' _ Well Name: FEDERAL 12-1D-65 Depth Progress: 1,778 ÃPÏlUWI Surface Legal Location |Spud Date Notice APD State lAFE Number TotalAFEAmounl 43013503280000 NWSW SEC 1. T63-R$W 5/1312011 Utah C11 032027 Spud Data Rig Release Date KB.Ground Destance if0 Ground Sievabon (ftKB) DailyCom CátiÕÏsTioÖiii 7/18/2011 4:00.00 PM 7/24/2011 2:00:00 PM 20.00 7.422 30,888 178,736 OpemÍlorÏsat Repon Trme OpeFaborie Next 24 Hours OmlyMud Cost ÑiudAd¢fillve Cos(ÏoÒate Drilling@ 3108' Drill 7 7/8" Prod. hole. 3,597 5,373 Operations Summary Depth Start (ftKB) Depth End (ftKB) OfillSlide & rotate f/1330' to 3108' w/rig service and surveys. 1,330 3,108 Remarks Depin Sutri (TVD) (ftKB) IDepth End (TVD) (ftKB) Safety Meeting: Last day of hitch staying focused on job. 1.327 3,100 Lost 120 bbi last 24 hr. taigeiFormauon Ta

. 1,000.0 10,00 Mud Checks ¯ Vol/SikOR IbWsik) Typ Ime Depih (flKB} Densily Ibigal} ÌVis (afql) PV Calc (cp) YieldPoini ÏIbf/ÏÓ0 Liner Si e i ni DAP 06:00 8.35 26 Pressure (psi) Sion Spd Sirokes (spm) Ett (%) GeÍ(fDs ÏÍË:r/100fGel (10m) 06ÏJ10 Get (30ml (101/10. iFiltrate (mL/30mm) Filter CakeÏÏ3fÏ Solids (%) I 8.5 No B¯f67 la¯ PercentOil( ) PercanlWaterrhi Cliiondesimg/L) Calaum(mg/L) iKCLt%) EreiÎc$inbÏŸ MudAdditiveAmounts 720.000 i bescapun tonsumed DailyCost i 99.0 600.000ÄÏud¯Lost Cati r cunirgië YvoolaMudAdà bbn Múd t.06ttoHole (tittli SuiÏ)(bbij MudVoi(Res] [bbl Mud Vol (Act) (bbl) o get 45.0 299.25 120.0 Bicarb 7.0 105.84 Air Data __ _ _ CitricAcid 6.0 920.40 __ 295.001 17/19/2011 06 00 Engineer 1.0 IParamte ACFM (ft3/min) IDrillpipe ACFM (it"Imm) ECD Bit (Ib/gal) ECD Parasite (Ib/gal) Gypsum 135.0 1,439.10 i 8.35 Sawdust 30.0 123.00 Corrosion Inhibitor Infected in 24hr Period Tax 1.0 414.54 Iri - - gis injected down Parasite (gal) gis injected Mud (gal) gls Biocide in ected in Mud (gal) -- - Job Supplies

. _ _ . Diesel Fuel, uniyäE fi escÏ Und Laber Drill Strings ¯ ¯ Diesel Fuel BHA #1, BHA #1 (in2 TotalRace van TotalCor.sumed TotalRetumed Bit Run iDrill Bit IADCBit Dull |TFA (incl Noz)

3,653.0 . i 1 7 7/8in. FX65M, 11573537 1-1-NO A-1-0-NO-TD 0.90 i INozzles (/32") Stang 1.ength (f Sinng WL (10COVi HA ROP (ft ges¢ Fue1_Consumptiori Ome Consumed 14/14/14/14/14/14 6,023.47 67.7 .. .. 7/19/2011 425.0

, Drit! Strigg Components man i 7/20/2011 625.0 Lobe Bli-Sendit mingpm 01"". 7/21/2011 915.0 Description (in} (It confi9 (fi) (gpm) (OP I SN Jts Item OD , Len $lages rpm/gpm | 7/23/2011 1.347.0 1 Motor 7/8 3.5 1/2 27.58 Mud 6 7/25/2011 341.0 stage ¯ ¯ NMDClpony IT 11.99 1 NMDC 6 1/2 30.85 6 1/2 5.64 24 HWDP i 4 1/2 736.4 163 Drillpîpe 4 1/2 5,167.00 Kelly 4 1/2 43.00 Drilling Parameters Wellbore IStart (ftKB) Depth End (ftKB) Cum Depth (ft) Dnll Time (hrs) :Cum Dnil Time ÏriËËOP (ft/hr) Flow Rate (gom) Original i 1.330.0 I 3.108.0 : 2.772.00 23.50 36.50 76,7 420 Hole NOS [1000mÍl RPM (rpm) ŠPP (psi) Rot if T6001bf) PÙ l lL(1000tbË]SO HL (1000lbf Onllmgforque ÖÏfŠlmTq

. 103 88 22 55 950.0 97 3,000.0 ¯Q (fl*f Q (girr i Motet RPM Itp T (In}}VF) P (BHAnn) i T (bh;UF) PISur1Ann {s ni d ligi og (g reiam)

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Report Report Date: 7/20/2011 Report #: 5, DFS: 1.6 Well Name: FEDERAL 12-10-65 Depth Progress: 1,778 Deviation Surveys Fed. 12-10.65 (-WTielr1 Az·m DMI3 Destiptiori Inc.Il MOTielnilt NGTicia TVOTiein u 0.00 7/18/2011 Fed.12-1D-65 i 0.00 0.00 0.00 0.00 0.00 Survey Data tilbBI Cil00h: MD ilW 1 Atri i , TVD(hKB NS 01: EW in VS ini 01.5 1,399.00 4.92 266 12 1.395.91 15.44 -70 21 71 77 i24 1,494.00 4.17 273 94 1,490 61 15 41 -77.72 79.18 1.02 1,589.00 4 65 281 85 1,585.33 16.43 -84.94 86.47 0.81

1,684.00 4.26 276 23 1,680.05 17.61 -92 22 93 84 0.62

1,780.00 4.43 278.86 1,775.77 18.57 -99.42 101.11 0.27 1,875 00 4.97 280.19 1,870.45 19.86 -107.10 108.89 0.58

1,970.00 4.65 274.82 1,965.12¡ 20.91 -114.99 116.84 0 58

2,065.00 4 79 288.71 2,059.80 22.51 -122.58 124.59, 1 21

2,160.00 4.04 283.70 2.154.51 24.57 -129.59 131.84 0.89 2,255.00 3.56 272.19 2,249.31 25.48 -135.79 138.10 0.95

2,350.00 4.35 271.40 2,344.08 25.68 -142.34 144.60 0.83

2,445.00 4.39 283 53 2,438.81 26 62 -149.47 151.80 0.97

2,541.00 4.35 291.00 2,534.53 28.78 -156.45 159.02 0.59

2,636.00 3.82 283.18 2,629.29 30 79 -162.89 165.70 0.81

2,731.00 4.61 290.12 2,724.03 32.83 -169.56 172.61 0.99

2,826.00 4.13 283.86 2,818.75 34.96 -176.46 179.76 0.71 2.921.00 4.44 295 57 2,913.49 37.37 -183.10 186.70 0.97

3.016.00 4.39 294.86 3,008.21 40.48 -189.72 193.72

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repon Report Date: 7/21/2011 Report #: 6, DFS: 2.6 ' _ Well Name: FEDERAL 12-1D-65 Depth Progress: 1,455 APVUWI Surface Legal Location Spud Date Noteca APD Sta•e AFE Mumber TelalAFE Amouni 43013503280000 NWSW SEC 1, T6S-R5W 5/13/2011 Ulâh C11 032027 Spud Date Rig Weiease Dale KB-Ground Dislance file Gretrad Elevallon iltWSi DadyCost Cum Cosi ToDale 7/18/2011 4:00:00 PM 7/24/2011 2:00:00 PM 20.00 7.422 31,976 210,711 0peratronsat Ripo

Surface 336 8 5/8 8 5/8" casing pre-set Mud Pumps # 1, Continental-Emsco, F-1000 IRod Fametel SiroÑeLenin (in Timg LO ' ¯ ¯ Pump Rating (hp) (m) scanTime End Time Der thus) Operation Óomm Ï 10.00 | i ___ 1,000.0 _ _ ¯ I IVoÏ!Stk 06:00 13:00 7.00 Drilling Drill Slidelrotate w/surveys f/ 3108' to 3616 . Linerssailin! OR (boustk) 1/2 3.490 120 stk. 420 gpm, 850 psi. 22k wob. 55 ¯ie 6 rotary, avgrop 72.4 fpli. (Psi) Slow$pd Strekes (spmi Eff (%} No 13.00 14:00 . 1-ÒÒLubricate Rig Rig service &install driveline. F-1000 14:00 14:30 0.50 Condition Mud &Circulate Buildvolume alid mix tempills, lost 450 bbi #2, Continental-Emsco, Rating (hp) Rod Œameter (in) ;Stroke Lengih lini WÌlilO SOfVicing fig Pump 1,000.0 10.00 14:30 18:00 3 50 Drilling Drill Slideirotate w/sumeys f/ 3615' to 3805 ,t.iner size(4 vovstkoR (bbitstky i 100 stk, 350 gpm, 800 psi, 22k wob,65 6 1/2 3.490 rotagr, i avg rop 54.3 fph. Presswe (psg Slow Spel Sirok s (spm) Elf (%)

, 18:00 06:00 . 12.00 Drilling Drill Slide/rotate w/sumeys fl 3805' to 4563 No 120 stk, 420 gpm, 950 psi, 22k wob, 65 NIudAdditive Amounts rotary, avg rop 63.2fph. oss föllon C no men siirco i Anco gel 15.0 99.75. Mud Checks Bicarb 2.0 30.24 Type time Depiti (flKB) Densdy (Ibigal Vis (s/ql) PV Calc (cp) YieldPoint (101/10 Chemseal 11.0 120.45 tinOffio il10 0 m503Dimnj i¯iEi ¯ Dap 45.0 1,035.00 Ge osamitioor a io i om nitrat ¥iiieic eii .sands(si Engineer 1.0 295.00 ' 7.0 0.1 225.0 2,398.50 MBT(Ihmb i Peicent Oil (%) Percent Water(%) Clilondes (mg/L) |Calcium (mg/L) iKCL (%) Ëiaciocstab Gypsum 99.9 600.000 600.000 Pallets 5.0 90.00 Muito¯ro i ¯ 0ECiäi Catimgs Whole Mod Aad tholi H Mud Losi (Suri) [bbl) Mud Vol(Res} (Túii Ÿ61(Actiibb Sawdust 10.0 41.00 450.0 Shrink Wrap 5.0 90.00 Air Data Tax 1.0 414.54 Job Supplies PareseteACFM sft4 if0 OnllpipeACFM ¡Fftmm} 6G B IIb/gall ECD Parasite {Ibigal Olesel Fuel, Supply liem Desonption Und Label . Corrosion Inhlbitor injected in 24hr Period _Diesel Fuel gls in acteddown Parasite (gall 019ÏÀje6¾dI d DiÍ gis Biocide I ec ed in Mua (gal Ï0ÏalÑecéÑè¿ TolaiCcrisumed ÏolÃÏÑeiume --- - _ 3.653.0 Diese[ Fuel Consumption .Drill Strings - ______Consumen

B I R IADCBd Dull IÈÄ NO ÚÀ'} 1 \7 7/8in, FX65M, 11573537 1-1-NO-A-1-0-NO-TD 0.90 i 7/21/2011 915.0 Nories U32 ŠmngLength {n) Inng Ú 00tÍÒËbŠHA RÓP 01 14/14/14/14/14/14 6.023.47 67 7 7/23/2011 1,347.0 7/25/2011 341.0 Drill Strlng componente | | | man | Lobe Bit-Bend ft mm gpm gpm Jis item Descripilon OD titu Len ilt) |Confl9 Slages fpm/gpm (II) 190*) $N 1 Mud Motor 7/8 3.5 6 1/2 27 58 stage 1 NMOÒlpony 6 1/4 11.99 1 NMOC 6 1/2 30.85 1 Gap Sub 6 1/2 5.64 24 HWDP 4 1/2 736.41 163 Drill pipe 4 1/2 5.167.00 RäÏÏy 4 1/2 43.00

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repon Report Date: 7/21/2011 Report #: 6, DFS: 2.6 Well Name: FEDERAL 12-1D-65 Depth Progress: 1,455 Drilling Parameters Wellbore Slart (IIKBI Death End illkBi Cum Depth tit Onll time inrs} Cum Dail Time mi RCP (It/ht; FJew Rale igpm] Original 3,108.0 4,563.0 4,227.00 22.50 59.00 64.7 420 Hole WOB (1000lbf) RÑÍ [tom] SPP 10511 lÑotHL(10ÒÒlbílPU Ñl.(1600Ibf} SÒNL(100DihFF OrirungTwqtie ÒÏí8tm Ïq 22 | 65 | 950.0 112 i 128 I 102 | 4,200.0 2,750.0 (°F) O{g inip ilt i Motor RPM (rpm) ,T (In]) 9 (BH Antt} ( T ibb) s'F) P(Surf Acini T (surf atini O (hq sim) Ig Q (g telum) 88 Devlation Surveys Fed. 12-1D-65 Azim Òate :Descombon EWTieÏn inclin MDTie In ill NSTe Irl TŸDhe In [fi 0 00 7/18/2011 .Fed. 12-1D-65 0.00 0.00 0.00 0.00 0.00 Survey Ðata ¯Tvo ot¯ii, so (nKB) inct Arm (9 NS irti Ew (n) vs (n) 6 Ni fi)

3,111.00 4.39 288.88 3.102.93 43.19 -196.46 200.80 0.48 3,206.00 3.99 286.87 3,197.67 45.33 -203.06 207.66 0.45

3,301.00 3.82 283.79 3,292.45 47.04 -209.29 214.08 0.28

3,397.00 3.69 272.71 3,388.25 47.95 -215.49 220.34 0.77

3.492.00 4.09 287.04 3,483.03 49.08 -221.78 226.73 1.10

3,587.00 4.00 278.25 3,577.80 50.55 -228.30 233.40 0.66

3,682.00 3.87 280.19 3,672.57 51.60 -234.73 239.92 0.20

3,777.00 3.471 273.51 3,767.38 52.34 -240.76 245.99. 0.62

3,872.00 3.47 270.08 3,862.20 52.52 -246.50 251.69 0.22

3,967.00 3.56 263.31 3.957.03 52.18 -252.31 257.37 0.45

4.062.00 3.52 253.12 4,051.85 50.99 -258.03 262.83 0.66

4.157.00 3-34 249.60 4,146.68 49.18 -263.41 267.86 0.29

4.252.00 3.38 241.16 4,241,51 46.66 -268.46 272.49 0.52

4.347.00 3.47 246.88 4,336.34 44.38 -273.56 277.13 0.37

4,442.00 3.60 246.09 4,431.18 42.04 -278.93 282.07 0.15

4,537.00 4.26 262.08 4,525.94 40.35 -285.16 287.95 1.34

li

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repo Report Date: 7/22/2011 Report #: 7, DFS: 3.6 Well Name: FEDERAL 12-1D-65 Depth Progress: 1,207 APl/UWI Surface Legal Location Spud Date Notice APD State iA E Number TotalAFEAmount 43013503280000 NWSW SEC 1, T6S-R5W 5/13/2011 Utah C11 032027 pu Öate Rig Release Date KB-Ground Distance (ft) Ground Elevallon ittKEli DadyCost Cum Cosi To Date 7/18/2011 4:00:00 PM 7/24/2011 2:00:00 PM 20.00 7,422 38.881 249,592 ations at Report Time Operations Nexl 24 Hours IDady Med Cost Mud ACD4vo ÒostÏoDate Drilling @ 5770' TD, circ sweeps around, shol1trip, circ, poch. log, tih 6,060 16.048 circ. lyldn dp bepmstat1{ÙB) Deplh Erid (fiKBI Operations Summary 4,563 5,770 Drill Slidelrotate w/surveys fl 4563' to 4723'. Rig service & Repair leak on #1 & #2 Transrnission. Drill f/ 4723 Ðpi Stad (TVD) (ftKB) Depth End (TVD) (ftKB) to 5041'. Repair air leak on #2 draw works. Drill fl 5041' to 5770'_ 4,552 5.757 ¯¯ ¯ ¯ Targe1Feimahon TaigetDeptt1(flKBI emarks Safety Meeting: Picking up drill pipe from V-door, Wasatch Lost 80 bbl last 24 hr Daily Contacts Contacl MobHe Total 650 bblS Job 435-823-1921 Fuel used: 806 Fuel on hand: 5513 George Urban

Weattier Temperature (°F) 'Road Condition Hole Condition . _$$ contractor R Number Clear 530 .Wet Good Patterson 779 Last Casing Set¯ ¯ S¯IDepthtflKB) ÒíÏsi Deshipiä OD(in) !Comment ud Pury1ps Sui1ace 336 8 5/8 8 5/8" casing pre-set #1, Continental-Emsco, F-1000 Pump Rating (hp) IRod Diameter (in) Stroke Length (in) Time Log _ 1,000.0 10.00 ¯ ¯ 'Vol/Stk OR (bbl/stk) SiaWÍmoEnd Ì me Our INS) Operation Comment Lin r Šlze (in) 6 1/2 3.490 06:00 10:30 4.50 Drilling Drill Slidelrotate w/surveys fl 4563' to 4723' , 120 stk, 420 gpm, 950 psi, 22k wob. 65 Pressure (psi) Slow Spd |Strokes (spm) Eff (%) rotary. No Continental-Emsco, F·1000 10:30 ii 00 0.50 Lubricale Rig Rig service found leak on tranny N29. Pump Rðllng:Jiol Rod Dreimittgr(in) Stroke Length (in) Rig leak #1 #2 Transmission. 11:00 12:30 Ï.50 Repair RepaÏr on & - 1,000.0 10.00 fl 4723' 5041 12:30 18:00 5.50 Drilling DrillSlide/rotate w/surveys to ' Un SiBÑ Vol/StkOR (bbl/stk) 120 stk, 420 gpm, 1050 psi, 22k wob, 65 6 1/2 3.490 rotary. avg fph 57.8 Pressure (psi) Slow Spd IStrokes (spm) Eff (%i 18 00 9:00 1.00 Repair Rig Repair air leak on #2 draw works. 1,100.0 Yes 120 95 19:00 19:30 0.50 Rig Up &Tear Down Rig service tighten bolts on drive line. IMud Additive Amounts Desenpiron consumee cost 19:30 06:00 10.50 Drilling Drill Slide/rotate w/surveys f/ 5041' to 5770. oily 120 stk, 420 gpm, 1100 psi, 22k wob, 65 co drili 3.0 197.94 rotary. avg fph 69.4 Anco gel 15.0 99.75 Dap 40.0 920.00 ks Engineer 1.0 295.00 Type Time Depth (ftKB) Density (Ib/gal) Vis (s/ql) PV Calc (cp) Yield Point (Ibf/100fF) Gypsum 240.0 2,558.40 GD eÏÏl00 O ilterc2a6keÌÏ52 PolySwell 1.0 155.48 s (IbÏi00Ï bÏ/10 Gel liiiia ('mUT0riiin pH Solids(%) ) Sawdust 25.0 102.50 7.0 0.1 ¯Te¯¯OH%) 1.0 414.54 b¾ 'PerceniWater(%) Chlendos(mg/L) Calcium(mg/L) ,KCL(%} ElectncStab{ Tax 99.9 600.000 400.000 Trucking 1.0 951.00 CEC for Cuttings |Whole Mud Add (bbl) Mud Lost to Hole (bbl) .Mud Lost (Suff) (bbl) Mud Vol (Res) (bbl) Mud Vol (Act) (bbl) Walnut - Medium 35.0 365 75 80.0 b Supplies Air Data gesel Fuel, Dasenption Unli Latel 7/21/2011 OS:00 ¯ ¯ ISupply Ilem Parasde ACFMçfPtmin) OnitpipeACFM (fPknin! ECD Bilfibigal} ECDTiriiiie (iGuáñ Diesel Fuel 8.40 al Received | Consumed TolalReikrtõed 3.653.0 Corrosion InhibitoEinjected in 24hr Period gls Injected down Pamsile (gal) ,gis In>ected in Mud lgaT] gle Bloode In ecleti in Mud (gal) Diesel Fuel Consumption ... . . Date - L _ Consumed 7/19/2011 425.0 Drill Strings 625.0 _ _ _ _ _ 7/20/2011 #1, BHA #1_ 17/21/2011 915,0 BNA ______.. _. _ . _ . . TFA(hnd (afl Of Run Onli Brt IIADCBit Dull Nozi 7/23/2011 1,347 0 1 7 7/8in, FX65M, 11573537 1-1-NO-A-1-0-NO-TD 0.90 _7/25/2011 341.0 Nozzles (132") Sinng Length ilt} Sinng W (1000lbi) BHA ROP 14/14/14/14/14/14 6,023.47 67.7

III (gpm) Jts item Désenption OD (in LGO L¶Q COOfi9 Stages moigpm [gpm; SN 1 Mud Motor 7/8 3.5 6 1/2 27.58 stage 1 NMDCIpony 6 1/4 11.99 1 NMDC 6 1/2 30.85 1 Gap Sub 6 1/2 5.64 24 HWDP 4 1/2 736.41 163 Drill pipe 4 1/2 5,167.00 i ly 4 1/2

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/22/2011 Report #: 7, DFS: 3.6 Well Name: FEDERAL 12-1D-65 Depth Progress: 1,207 Drilling Parameters Welliioie $180(fibsal Depth End (ftKB) Cum Depth (ft) Diill Time (hrs) Cum Crl.I isnie lill ÈÕŒ\ltmËjÏ iow Rate (gprn; Original 4,563.0 5,770.0 5,434.00 20.50 79.50 58.9 420 Hole WOB (10Colbr) RPM irpm) SPP ipsil Rot HL (1Ò00Ibf) PU HL (1000lbf) So HL DÜ00loliD/illing farque Off Sim TO 24 65 1,150.0 140 150 130 4.900.0 2.750.0 i*Fi O 19 ini; i:',' Molor RPM LIprib T 10p (F) P (BHAUn i l i Ibb) P(Sufi AurU T (5011 ann) Q I:q ftm) ig O (g relutn) 88 Deviation Surveys Fed.12-1D 65 Arim Date Ôescriphon EWTie Fn Inclin MÓTie In R NŠTie in T\ÏDTie Iruft 0.00 7/18/2011 Fed. 12-1D-65 0.00 0.00 0.00 0.00 0.00

4 632.00 4.09 274.82 4,620.69 40.15 -292.02 294.70 0.99

4 728.00 3.55 265.07 4,716.48 40.18 -298.39 301.00 0.88

4.823.00 3.25 279.48 4.811.31 40.37 -303.98 306.55 0.95

4.918.00 3.16 265.07 4.906.17 40.59 -309.24 311.78 0.85

5.013.00 3.12 245 29 5.001.03 39.28 -314.20 316.47 1.14

5.108.00 2.99 241.87 5.095.89 37.03 -318.73 320 60 0.24

5,203.00 2.94 234.66 5,190.76 34.46 -322.91 324.31 0.40-

5.298 00 2.86 228 51 5.285.64 31.48 -326.67 327.56 0.34

5.373.00 3.08 229.47 5.360.54 28.93 -329.60 330.06 0.30

5.488.00 3.08 226.57 5.475.38 24.80 -334.19 333.94 0.14

5.583.00 2.94 228.51 5,570.25 21.43 -337.87 337.05 0.18

5.678.00 2.94 223.41 5.665.12 18.04| -341.37 339.97

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date:7/23/2011 Report #: 8, DFS: 4.6 12-1D-65 Progress: Well Name: FEDERAL ¯ Depth 253 APi/UWI Surface Legal L:Kanon Spud Date Nonce ÃOUSiate AFE Number Total Al E Amouni 43013503280000 NWSW SEC 1, T6S-RSW 5/13/2011 Utah i C11 032027 Spud Dale Rig Release Dale KB·Ground Drstance (11] Grouna ElevalconUlkBI iDa Cosi ,Cum Cast To Dale I 7/18/2011 4:00:00 PM 7/24/2011 2:00 00 PM 20.00 7.422 59.307 308,899 Òpemtons it ÑeportTime Opetalions Next 24 Hours I Daly Mud Cost MLMIÃdoillveC st To Date TlH TIH.circ.ly/dn dp, run 5 1/2 casing &cement. 6,502 22,550 Operatteils Si.ammary Depth Slart lilKei Depih End iltKS) Drilif/ 5770' to 6023·, TD. Circ. pump 2-20 bbl sweeps around. Rig repair pull right angle drive box off#1 5,770 6.023 motor and send in for repair.Run #2 motor only. 4 1/2 hr down time. set kellyback and pooh, lyldn dirc. tools. Depin sieri(Tvot ifixe) Derth End iTvoifitusi pjsm wlloggersand log, r/d loggers. lih, 5.757 Formation Target Depin fitKB) Remirks Targel Safety Meetlng:Tripping pipe Wasatch IFuel used: 541 Fuel on hand: 4972 Dally Contacts depth 6015' COfuae MobLl9 , Loggers y _ 435- 23-1921 IDrillersdepth 6023' George Urban

Tedperalute Fi Road Cont(1hen Hole Condition Ѿ . Weamer f conwacier Rig Numeer Clear 53.0 Dry Good - Patterson 779 Cai¯ÕesenphonLast Casing Set . Sei Depih (ftWB OD (m) comment Mud_Pumps Continental-Emsco, F-1000 Surface 336 8 5/8 i8 5/8" casing pre-set i_, Pump Rahng {npi Red Olameter (in) Stroke Leng(n (in] Time Log 1,000.0 10.00 Voystk OR (bbIlstk) Einie| End Time Der thisi i Öóialton Commeni Liner Size (in) 06:00 10:30 4.50 Drilling Drillfi 5770' to 6023', 120 stk, 420 gpm, i 6 1/2 3.490 .Elf 1150 psi, 24k wob, 65 rotary. avg fph 56. Pressum rpsi) ,siow sud Sitokes (spm) [L) No 10:30 12:00 1.50 Condition Mud & Circulate Circ. 2 sweeps around. F-1000 1Ž:00 16:Š0 4.Š0 Repair Rig ÒiÍve\Ínema6ng a clar king noise.found # 2, Continentat-Emsco, mpi Rod D=ameterlini simkei.enom tin; womi gear on rightangle drive missing1/3 Pump Ratmo 10.00 of ils teeth. Pull right angle drive box on #1 1.000.0 i_inersize gn) \/ausik oR (obusiki eng. and send in W/mechanic's to Patterson shop for rebuild. Presswe(psd S]owSpd Sirekes(spoi Ett(N 16:30 22:00 5.50 Trips ,Set kelly back and trip out w/#2 motor only. No 22:00 23:30 1.50 Directional Work Lyldndirectional tools & bit. Mud Additive Amounts ossenpuon consumen Daly cost I23:30 iO4:00 4.$0 Wire Line LDOS PJSM w/Pioneer logging. rig up and log. i Run Tripple Combo and rig down loggers. Anco drill 3.0, 197.94 Loggers depth 6015' Anco gel 10.0 66.50 |Drillers depth 6023' Dap 40.0 920.00 ¯ - - Engineer 1.0 295.00 04:00 06:00 2,00 Trips TIH Gypsum 410.0 4.370 60 _Mud Checks Poly Swell 1.0 155.48

,Time Ciepm(flKB) Densdy ilb/gal) Vis (s/qll PV Õalc , Yleid Poinl (1tift10DFI Type , le) ) Sawdust i 20.0 82.00 mDl]30min)RIIer¯k 1.0 414.54 (OslTIÑÏÓÓl I10 IÑ10 ,Gel m) b110 FsilÏaf (Ö ) pH Solids6 -- - 7.0 0,5 .Job Supplies Label?> MOT Ob Ïbb Percent Oil (¾) Percenl1Nutar(%) Thlondes (mg/L) Calaum (mg)L) KCL (%) Electric$Ulb (v _Diesel Fuel,

ParssiteACFM(IWmin) OnligipeACFM[frimm) ECOBit(ibigal) ECDParasite(Ib/gal) - - 7/19/2011 425.0 ------7/20/2011 625.0 Corrosion inhlbitor Injected in 24hr Period _ _-7/21/2011 915.0 gls mjecteddown Pafas=to (gall gis Injected in Mud (gal) gisSincide injec‡ed in Mud [gal) 7/23/2011 1,347.0

- - - - - . · ' 7/25/2011 341.0 Drill Strings BHA#L BHA#1 BI Run .DilliBFI IADCBit Dull ,TFA cl Nog (IS' 1 17 7/8in. FX65M. 11573537 1-1-NO-A-1-0-NO-TD 0.90 Norles (r32) Stang Lengitt ift Sirmg WL r 1000 bi .BHA ROP (ft 14/14/14/14/14/14 6,023.47 67.7 Drill String Componente I max i i I LODe | Bli·Bend 11 mm gpm gpm | igpm) (in) conf9 rptrugpm (fi) (gpm; SN Jin Item Descepton OO Len (tti Stages , 1 Mud Motor 7/8 3.5 6 1/2 27.56 stage 1 NMOClpony 6 1/4. 11.99 ¯ 1 NMDC 6 1/Ž" 30.85 i Gap Sub 6 1/2 5.64 24 I-iWDP 4 1Ï2 ÏŠ6Ã1 16f Drillpipe 4 1/ž

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/23/2011 Report #: 8, DFS: 4.6 Well Name: FEDERAL 12-1D-65 Depth Progress: 253 Drill String Components max Lobe Bit-Bend ft min gpm gpm | (gpm) Jts item Descriplion OD (in) Len (ft) Iconfig Stages rom/gpm | (ft) (gpm) I SN Kelly 4 1/2 43.00 Drilling Parameters Wellbore 'Start títKB) Depth End (ftKB) Cum Òeptn(ft) ÒniiTime (nrs) Cum DDII Time Int ROP (it/hr) Flow Raie (gpm) Original 5,770.0 6,023.0 5,687.00 4.50 84.00 56 2 420 Hole WÔB (f6001bf) RPM (rpm) SPP (pSI) Rot HL (1000101) PLI EFL(1000Ibfi $Ò HL (1000\tW) OnliingTorque Off Bim Tq

(In1 ().0 Anin (0 176P(Surf Q3,7 .m0 Q (ginj P/ Motor RPM rpm) T P (BH ¡T (on;eF) Ann) . T surf ann) ( q m) (g.

Deviation Surveys Fed. 12-1D-65 Azim Öate Description EWTie in inclin MDTle In (ft |NSTie In |TVÒTie In (it 0.00 | 7/18/2011 |Fed.12-1D-65 0.00 0.00 I 0.00 I 0.00 I 0.00 Survey Data

MD (ftKB) inci f) , Azm Vi ÌVÕ(ÏÏÑEL( NS (fly EW itti VS (ft) DLS ("l100ft)

5,773.00 2.98 216.90 5,759.99 14.30 -344.53 342.50 0.36

5,868.00 2.85 215.14 5,854.87 10.39 -347.37 344.70 0.17

5.900.00 2.76 217.43 5,886.83 9.13 -348.30 345.41 0.45

i

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/24/2011 Report #: 9, DFS: 5.6 Well Name: FEDERAL 12-1D-65 Depth Progress: 0 Amount APl/UWI Surface Legal Location Spud Date Notice APD State AFE Number Total AFE 43013503280000 NWSW SEC 1. T6S-R5W 5/13/2011 |Utah C11 032027 Spad Dme Reg Release Date KB-Ground Distance (ft) |Ground Elevation (ftKB) Daily Cost Cum CostTo Date 7/18/2011 4:00:00 PM 7/24/2011 2:00:00 PM 20.00 7,422 121,900 430,799 Additive Cos! To Date ions at Report Time Operationâ Nex124 Houis Darly Med Cost Mua N/D BOPE N/D bop, set slips, clean mud tanks, release rig arid 22,550 rig down. ¾pth Start (ftKB) Depth End (ftKB) 6,023 perations Summary 6,023 Depth End (TVO) (itKB) TlH, pump and circ. out 20 bbl sweep. HPJSM w/WFT ly/dn crew r/u and lyldn 166 jts dp &24 jts. swdp. Rig Depth Start (TVD) (ftKB) up WFT casing running tools. Ran 136 jts. 5 1/2 15.50 lb J-55 casing. Circ and rig down WFT casing tools. Depin HPJSM & R/U ProPetro cementers test lines to 2500 psi & pump cement as follows: Taiwaarmairon Target HKB) 10 bbls. Fresh water spacer - 20 bbls. Mud Flush - 10 bbis Fresh water spacer Wasatch

- -3% Lead cemeni: 200 sk (136 bbl) HiFill16% Gel 10#lsk Gilsonite - .3#lsk GR3 Salt (BWOC) 1/4#lsk Daily Contacts Flocele. Wl. 11 Ib. Yield 3.84. MWR23 gallsk Job Conteci Mobile

- - CDI- .2% 435-823-192 TailCement: 385 sk.(116.5 bbl) HiFill65% G Cmt 35% Poz 6% Gel - 10#lsk. Gilsonite - .2% 133 George Urban I

CFL 175 - 10% Salt (BWOW) 1/4#/sk Flocele. Yield 1.70 Wt. 13.1 ppg. MWR 7.7 gallsk Displaced wl 141 bbis. 2% KCL.Full returns through cul job dénvattof Rig Number Bumped plug @ 02:56 w/ 580 psi over. FCP: 1220 psi. 21 bbls cement to surface. Floats held., rig down Patterson 779 cementers. N/O BOPE. Mud Pumps # 1, Continental-Emsco, F-1000 Ñamarks Pump Reling inp) Red Diameter (ini Š1täkelength (in) Safety Meeting:Running casing &cementing. 1,000.0 10.00 Fuel used 641 Fuel on hand: 4972 orieridei.nl valisikoR (bblistk) \Ñeather Temperalute (Fþ Road Condihon HoFe Condillon 6 1/2 3.490 Clear 54.0 Dry Good P'*s66teloslo slo*So 6"°**si6Pm; Erical No Last Casing Set ¯ÍÖD Caing Öesenglion Set Depitt iflKBa (in) IComment # 2. Continental-Emsco, F·1000 Pump Rating inos Rod osametercini stroket.engstiians Production 5,991 5 1/2 |136 jts 5 1/2 15 50# J-55 LT&C - -- -- _ ¯ 1.000.0 10.00 ime Log_ Unef See (iÑ Vol/StkOR (bbl/stk) Start Time End Time Dur (hrs) Operation Ommen! 06 00 09:30 3.50 Trips TlH Pressure (psi) Slow Spd SI-okes (spm) EFr %) 09:Š0 11:00 1.50 Condition Mud & Circulate Circ. sweep around. No 11 00 1TOO 6.00 LD Drilipipe JSM w/WFT lyldn crew and lyldn 166 jts Mud Additive Amounts dp &24 jts. swdp. Desenpuon consumed dailydos! 17:00 18 00 1.00 Run Casing &Cement Rig up WFT casing runriing tools 18:00 23:30 5.50 Run Casing & CemenÏ Ran 136 joint's 5 1/2" 15.50 lb. J-55 LTSCto Job Supplies a depth of 5991'. Marker jt. @3560', FC @ Dieset Fuel, supplynem Desenotion unii1.abei 5944', FS @ 5990 Diesel Fuel 1.00 Mud Circulate Circ and rig down WFT casing tools 23:30 00:30 ) Condition & .atai Recesad Tomi consumed Tatalmelumes 00:30 04:00 | 3.50 Run Casing & Cement PJSM & RIU NoPetro cementers test lines 3,653.0 2500 & cement as follows. to psi pump Diesel Fuel Consumption 10 bbls. Fresh water spacer -20 bbls Mud nai. Consumed Flush - 10 bbls Fresh water spacer 7/19Ïž011 Ã2Š.0 Lead 200 (136 bbl) HiFill 16% cement: sk 7/20/2011 625.0 -3% Gel - 10#lsx. Gilsonite - .3#lsk GR3 915.0 Salt (BWOC) 1/4#/sk Flocele. Wt. 11 lb, 7/21/2011 Yield 3.84, MWR 23 gallsk 7/23/2011 1,347.0 Tail Cement: 385 sk.(116.5 bbl) HiFill 65% G 7/25/2011 ¯¯ ¯341.0 - Cmt 35% Poz - 6% Gel - 10#lsk. Gilsonite

CDI- - - .2% 133 .2% CFL 175 10% Salt (BWOW) 1/4#lsk Flocele. Yield 1.70 Wt. 13.1 ppg. MWR 7.7 gallsk Displaced w/ 141 bbls. 2% KCL, Full returns through out job. Bumped plug @02:56 wl 580 psi over. FCP: 1220 psi. 21 bbls. cement to surface. Floats held. Rig down cementers.

00:00 2.00 NUINDBOP Nio BOPE

Checks Mud (icílt00ti=> Type Time Depth (ftKB) Densdy [liggar) vis is/gii PV Cale(cpi Yiei/Point

Gal(les) [bfilcGI Gel Momalbul0 Gel (30myihine Fiirrate (mL/30min) FJ1er Cake il32 i pR Solida i%)

MBTt b|DDii Percent Oil (%) |Percent Water (%) Chlondes (mg/L) Calcium (mg/L] KCt. I M Eiectne Stau tv)

Òfor Óullings Whole r,1ueAda ibeli Mud Lost to Hole iubli Mod L,est (Suffi {bbli Mua Vol IRes) {bbli Mod Vol

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/24/2011 Report #: 9, DFS: 5.6 i Well Name: FEDERAL 12-1D-65 Depth Progress: 0 Air Data

Parasile ACFM (flVmin} Onl10pe ACFM(R4min) .ECO $4 dorgall ECD Parasile (Iblaa4 I

Corrosiond¯o Inhibitor injected in 24hr Perlocl In¾ied ÑNarÃÑfi( ä4 gle M etted in Mud gal) ¡gis Bacide injected m Mud (galÏ l

.Drill Striggy

Bit Run DnliBil lACC Bil Dull TFA (ind Nog in=)

i Nozzles U32i Stfing Length (rt) Sinna Wt (1000lne BRARDP R . I

Drill String Components max l.obe Bit-Serigt: ingpm GPm (gpm) Jts Itern Description OD Lin) Len ifr} config Slages (pm/g : (N (gpm) SN

Dr1|ÏingParameters eÍÏÏÏ¢e $larl (flNB) Depih End (It Cum Depih f9 DnllTime (hrsj Cum Dnil Time Ïr3ŸRÓPiÏtÏhF Ïiig rn}

ÕB ÏÏÖDÓtbr)RPM «pm) SPP (pal) A t IIL I f tirj PÜ HL t1000160SO HL(ÏQCDIbËDr ng Torque IOffStm Tq

(•F1 Molor RPM (rpm; T (Inn CF) iP (BN Ann) ( T (un) P(SurtAnn) . |T (suriaan ¡Q iliq nm)(g 0 (g return) i I Deviation Surveys Feel. 12-10-65 i

Äzim ,Dale i Desertplion E'NTie M , , inerri MDTie in (R NGTiein TŸDTe in (ÍÏ | 0.00 7/18/2011 |Fed.12-1045 0.00 0.00 0.00 0.00 0.00 Survey Data •Ïf00It ÑD litKB) [ Mci (") I Arm ('f TVD(flKBI I NS (fi) EW IRE VS (fc ØLŠ I

i

Jul. 25, 2011 Sundry Number: 16900 API Well Number: 43013503280000

Berry Daily Drilling Repod Report Date: 7/25/2011 Report #: 10, DFS: 6.1 Well Name: FEDERAL 12-1D-65 Depth Progress: 0 APVUW1 ISurface Legal Location Spud Date Nonce APD.State AFE Number Tolal AFE Amouni 43013503280000 NWSW SEC 1. T6S-R5W 5/13/2011 Utah C11 032027 Spud Dale Rig Release Date KB-Ground Dislance (fil Grotind Eleva1100fflKB) DailyCost Cum ÖihiTS0aTS ' 453,859 . 7/18/2011 4:00:00 PM 7/24/2011 2:00:00 PM 20.00 7,422 23,060 Operatient at Report Time Operakons Next 2d Hours DarlyMud Cost Mud AdC9Iive CoslTo Date Wait on trucks. ¯ ,Rig skid to Fed 11-1D-65, rig up test bop, pklup bha. 22,550 Opersbons Summary Depth Start irtKBi Depth End (ftKB) N/D set slips, clean mud tanks & rig down. 6,023 6,023 Remarks DepthSmritTVD}UtKB) DepihEnd(TVDþ ItKB) Safety Meeting: setting slips. I Rig released @14:00 hrs on 7-24-2011 Targel Formation TargetDepthtítKB1 Fuel used: 341 Fuel on hand: 4225 Wasatch Ïe (tiet tempetaluteCF; Road Condihon Hele Condikon Dally COntðCt8 PC $3,0 Dry Good Job Contact Moblie ,George Urban 435-823-1921 Last Casing Set ¯ ¯¯ ¯ Cãs be trait S pth(flKB) ODIin) Cominent Rigs Production 5,991 5 1/2 136 jts 5 1/2 15.50# J-55 LT&C contractot .Rig N bar Patterson 779 Time L.og d Pips Start Time End T:me Dur this) Opemhan Comment , | | # 1, Continental-Emaco F-1000 ,08:00 2.00IL UIND NID and wl78k wt. 06:00 BOP bop set slips Aumpifaiing Ñ Red Drame er lin) SuoKe Lengin in '08-00 14:00 6.00 Miscellaneous Clean mud tanks 1,000.0 10.00 7-25-2011 Rig released @ 14:00 hrs on Liner Sire (ir IIdikOR (bbVs9.| 14:00 18:00 4.00 Rig Up & Tear Down Rig down prep for skid to 11-1D-65 6 1/2 3.490 ressure (psi) ŠlowSpd Strokes (spm) Ett ; Mud Checks NO Type Time Depiti (flKB) Densi1y (Ib/gal) Vis (s/ql) PV Calc (cp) 'I1eld Poini {lbfilDOIF) #_2,_Continental-Emsco, F-1000 .Pump Ratang (hp) Rod Daameler (10) Stroke f.ength r . . _ _...... Geltl0sliluftt00f Gell10mifibil10 Gel(30m IbilID Filltale(mL/30mini FillerCakeff321 ipH Sohde 1.00Û.0 10.ÛÛ Lmer Size (m) Vot1StkOR bolistki MBT(Ibibbb Perceni Oil i%) Percent Water % l Chiondes (mg/L) Calcium imgit) KCL 1%} I Ereeme Sieb (V) Mucϯot¯ÑoÍë Ñu¯ bi)_ Pressure psi} Slow SNpd Strokes (spm) Elf i%) ÒÈf o tilÏiás 7Ÿno1ÎMud Aid Ibbli Ï (6ÑÏ Üúd of ÏŠd) IbbÏ) oi (he 6 Ni Ÿoi(A i I Mud Additive Amounts Air Data _ _ Descopisen onsume ally I site ACFM (fl•/mint DreipipeACFM(fetmin) ECD Sit {Intgal) ECD Parasile Ilbigen - - Diesel Fuel. Corrosion Inhibitor Injected in 24hr Period supplyliemDesenption Una Label gis injecied down Parasite (gali gis Iqecled in Mud [gal) gis Blocide Injected in Mod igal] Diesel Fuel Tolal Recerved TotalConsumed Telai Relutned 3,653.0 Strings --- Driti ------Diesel Fuel Consumptlon . _ _ _ Onte i Consumed Dnll Bit IADCBil Oull TFA (ind Bit Run Noz1tirf) 7/19/2011 426.0 7/20/2011 625.0 Noules (13T) Sinng Length (11) String Wt |10001bf} BHA ROP fi 7/21/2011 915.0 - ¯ ¯ ¯ ¯ - - - 7/23/2011 1,347.0 DrBIString Components max 7125/2011 341.0 i Lobe - I Bit·Bend ti min gpm gpro

*0 (gpmi , Jts | IIem Descophon OD (in) Len (til Stages rpmigpm gi; , (gpm) se

Dr]Iling Parameters WetiMie Slart títKB} Depih End (flKB) Cum Depth (ft) |Dnll Time (hrs) Cum OrpilTrme Inl ROP (ftillt) Flow Rale (gpol

wiÒ$(1000Ïóf MPM(rpm} ŠP si) Rot ML(100Dibri PU HL(1000lbli 50 HL110 lbf) DolliragTorque Off Bim Tq

(°F) relumi 0 (g ini) (flV MeiofRÉM (pn ) Ì (In]) (F) |P (BH Ann) ( T (bn) PisurfÀnni T surf ann) O (hq ryn) (g O 3

Deviation Surveys Fed. 12-10-65 Avm Õate IDesenplian EWTÏŒÍn IncÍn úD Tie In (ff INSTie in TvDTie In fi 12-1D-65 0.00 7118/2011 'Fed. 0.00 0.00 0.00 0.00 , 0.00 Survey Data i MD (ftKB) Inci () 42m C) TVD(ftWB) N5 111) EW [ti) VS (fil DLS (1100

Jul. 25, 2011 O Berry Petroleum Company RT 2 Box 7735 3846 S Hwy 40 Roosevelt, Utah (435) 722-1325

Ÿ.3-cy-so34g July 15, 2011 g/ di

State of Utah OG&M Carol Daniels Salt Lake City, Utah

Re: BOP Test

Begin at approx. 8:00 am on Saturday July 16, 2011

Federal 12-lD-65 4909 FSL, 1000 FWL NWSW

Section 1 T6S R5W

Lease # UTU 77326

If you have any questions or need more information, please call me at 713-574- 8816

Sincerely Kim D. Gritz Drilling Consultant

Thank You RECEIVED JUL1 9 2011

DIV.OFOIL,GAS& O Berry Petroleum Company RT 2 Box 7735 3846 S Hwy 40 Roosevelt, Utah (435) 722-1325

July 23, 2011

State of Utah OG&M Carol Daniels Salt Lake City, Utah

Re: Cement production casing.

Begin at approx. 01:00 am on Sunday July 24, 2011

Federal 12-lD-65 1916 FSL, 1000 FWL NWSW

Section 1 T6S R5W

Lease # UTU 77326

If you have any questions or need more information, please call me at 713-574- 8816

Sincerely George Urban Drilling Consultant RECEIVED JUL2 6 2011 DIV.0FOIL,GAS& Sundry Number: 17089Federal APIApproval Well ofNumberthis : 43013503280000 Action is Necessary

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEAS7EnDE65IGNATION DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING UTU-77326

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well FEDERAL 12-1D-6512-1D-65

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013503280000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t BRUNDAGE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 19161916 FSL 10001000 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NWSW Section: 01 Township: 06.0S06.05 Range: 05.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR NOTICE OF INTENT Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME 8/8/2011 CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion: OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION Report Date: WILDCAT WELL DETERMINATION OTHER OTHER: Cmpl Procedure

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED COMPLETION PROCEDURE FOR THE FEDERAL 12-1D-65.12-1D-65. Accepted by the Utah Division of Oil, Gas and Mining

Date: 08/16/201108/16/2 1

By:

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 8/1/2011

Aug. 01, 2011 Sundry Number: 17089Federal APIApproval Well ofNumberthis : 43013503280000 Action is Necessary

UTAH DNR The Utah DivisionDivision of Oil, Gas, and MiningMining

- State of Utah - Department of Natural Resources

Electronic Permitting System - Sundry Notices OTI GAS & MlNTNG

Sundry Conditions of Approval Well Number 43013503280000

Compliance with R649-3-22 should be attained prior to commingling production from the Wasatch and Green RiverRiver formations.

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000

Berry Petroleum Company 1999 Broadway, Suite 3700 Denver, CO 80202 Main (303) 999-4400

Fax (303) 999-4401 .

www.bry.com . I Date: August 1, 2011 I

Well Name: Federal 12-1D-65 APl#: 43-013-50328 Location: Sec 1-T6S-R5W County, State: Duchesne County, Utah

SHL: 1916 FSL& 100 FWL BHL: Elevations: 7445 ft KB; 7425 ft GL RTD: 6023 ft PBTD: 5945 ft; float collar Surf Csg: 8 5/8" 24# J-55 @375 ft; cmt w/ ?? sks cmt Prod Csg: 5 1/2" 15.5# J-55 @ 5992 ft; cmt w/ 200 sks lead &385 sks tail Mkr Jnts: ? ft Tbg: SN: TOC: E×isting Perforations:

Green River Frac Procedure: I 1. MIRU wireline unit. Perforate Wasatch f/ 5871to 5873 & Uteland Butte f/ 5656 to 5841ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD, See attached table. RD wireline off wellhead. 2. RU frac equip, Frac Stage 1 down 5 ½" csg per design (see attached table). Record ISIP. RD frac equip off wellhead. 3. PU wireline unit. Set CBP @ ~5620ft. Perforate Castle Peak f/ 5433 to 5445 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD. See attached table. RD wireline off wellhead. 4. RU frac equip. Frac Stage 2 down 5 ½" csg per design (see attached table). Record ISIP. RD frac equip off wellhead. 5. RU wireline unit. Set CBP @ ~5410 ft. Perforate Castle Peak f/ 5248 to 5377 ft & Black Shale f/ 5197 to 5198 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD. See attached table. RD wireline off wellhead. 6. RU frac equip. Frac Stage 3 down 5 ½" csg per design (see attached table). Record ISIP. RD frac equip off wellhead. 7. RU wireline unit. Set CBP @ ~5150 ft. Perforate Black Shale f/ 4997 to 5006 ft & 3,Point f/ 4764 to 4877 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0.36" EHD. See attached table. RD wireline off wellhead. 8. RU frac equip. Frac Stage 4 down 5 ½" csg per design (see attached table). Record ISIP. RD frac equip off wellhead. 9. RU wireline unit. Set CBP @ ~4710 ft. Perforate Douglas Creek f/ 4463 to 4599 ft w/ 2 spf, 120 deg phase, 19 gm charges, 0,36" EHD. See attached table. RD wireline off wellhead. 10. RUfrac equip. Frac Stage 5 down 5 ½" esg per design (see attached table). Record ISIP. RD frac equip off wellhead. 11. RU wireline unit. Set killCBP @ ~4400 ft. 12. RDMO wireline unit. RDMO frac equip. NU BOPE. 13. MIRU service unit. RU drlg equip and drill out CBP's and circulate clean to PBTD ft. Record fluid rates and pressures while cleaning out well. RD drlg equip. 14. RIH w/tall joint, SN & tbg anchor on 2 7/8" tbg. Set EOT~1jt below btm perf. ND BOPE. 15. RIHw/ pump & rods. Seat pump, space out. Fill tbg & pressure test to 500 psi. 16. RDMO service unit. 17. Start well

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000

Uinta Wellbore Schematic FEDERAL 12-10-66 APilUWI Surface Legal Localion APO Stain Field Name 43013503280000 [NWSW SEC 1. T6S-RSW Utah Asliley Forest spudDale KB Graurd Disisoco (ft) Ground Etova ion(ftKB) 7/18/2011 20 00 7,425

Welt Config Obv sted -Original Hele 7729f2011 h58:27AM , Schamelic,Actual . | 0

21

- Surface Casing Cement. 20-375, 5/16/2011 375 -- 6 5/8, 24 00, J-55 375

450

1,360

1,606

2,510

3,550

3.561 I 3,564 TGR3, 3,564 i /

3,572

4,298

4,313 Douglas Creek, 4 313

4,633 3-Poinl, 4 633

4,889

4.912 Black Shale, 4,912

5,068

5.216

5,230 Castle Peak, 5 230

5,635

5,653 Uleland Buite. 5,653

5.839

5,843 Wasalch, 5.843

5,936 | 5,946

5,947

5,991 Production Casmg Cemenl, 20-5 992, 7/2Al2011 ' 15.50, J-55, 5,992 5,992 i S 1/2

6.023 -----··· · -- TD,6,023

www.peloton.com Page 1/1 Report Printecl: Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000 Ibs net 7,200 Sand 20,400 34,000 00,000 44,200 per Volume 7/29/2011 (1700 HISURA 250 250 250 250 250 Acid 1,250 (gals) Volume APi Pay 12 16 26 20 74 148 (ft) Net GR<80 : RömáT 6 9 5 52 11 Perfed 20 (ft) Si Thickness Net . 12 136 787 180 24Z (ft) 217 Gross . Interval Thickness / 12 18 10 24 40 104 Stage Holes 4 2 2 6 2 4 2 2 2 2 2 2 2 2 2 4 4 4 2 2 2 2 2 2 2 4 2 2 4 6 4 4 2 4 4 4 Total Holes 12-1D-65 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 SPF 2 1 2 1 1 1 1 1 1 1 2 2 1 1 2 3 1 1 1 1 1 1 I 1 2 1 2 1 1 2 3 2 1 1 2 2 Federal Feet 4,518 4,465 5,377 5.358 5,343 5,338 5,331 5,313 5,281 5,278 5,249 5,198 5,006 4,999 4,877 4,779 4,766 4,599 5,873 5,841 5,775 5,768 5,717 5,679 5,657 5,445 5,436 5,289 5,815 5,803 5,792 5,784 5,759 5,727 5,709 5,697 Bottom Top 4,463 5,005 4,997 4,764 4,597 4,516 5,375 $.357 5,342 5,337 5.330 5,312 5,288 5,280 5,277 5,248 5.197 4,874 4,778 5,871 5,791 5,783 5,774 5,767 5,758 5,726 5,715 5,708 5,695 5,677 5,656 5,443 5,433 5,840 5,813 5,802 Creek Creek Butte Butte Butte Butte Butte Butte Creek Butte Butte Butte Butte Butte Butte Butte Butte Peak Peak Peak Peak Peak Peak Peak Peak Peak Peak shale Shale Wasatch Point Point Point Zone 3 3 3 Black Black 81ackshale Castle Castle Castle Castle Castle Castle Casde9eak CastlePeak Castle Castie Castle Casse Douglas Douglas Douglas Uteland Uteland Uteland Uteland Uteland Uteland Uteland Uteland Uteland Uteland Uteland Uteland Uteland Uteland Upper Bmt 5,006 4,599 5.377 5,445 5,873 Stage Top 433 WWWWMMEREWEEmild 4,764 4,463 5 5197 5,656 Stage 5 5 5 1 1 3 3 3 3 3 3 3 3 3 4 4 1 1 1 1 1 1 1 1 1 1 1 1 2 3 4 4 4 1 1 1 % Totals Stage

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000

STIMULATIORT COMPARTY, LLC 757-7610 68 INVERNESSCIRCLE EAST, STE. G-101 ENGLEWOOD, CO 80112 PH (303) 757-7789 FAX (303)

BERRY PETROLEUM FEDERAL 12-1D-65 DUCHESNE,UTAH LEGAL DESCRIPTION 5 STAGE 185,800 16/30 SAND

Prepared for SUSAN SEARS 1999 BROADWAY, SUITE 3700 Denver, 80202 (303) 999-4400

Prepared by JOE SANDERS (303) 757-7789 EXT 107

Service Point - Vernal, Utah Contact: Tim Anderson (970) 867-2766

I

8/1/2011

Filename - Berry Petroleum FEDERAL 12-1D-86 5 STAGE 186K 1G-30 sand 072911 E MAIL.xis

Flle Location - C:\Documents and Settings\sms\Local Settings\Temporary Internet Files\Content.OutlooklZLQP45NS\

Created with StimProp Complete - Version 2.01 11,02.2010 I

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000

I

1 | i

7/29/2011

Susan Sears Berry Petroleum 1999 Broadway, Saile 3700 Denver, Colorado 80202

Thank you for the opportunity to present the following treatment proposal This recommendation is submitted for your consideration

Welf Data Casing: 5 1/2 in 17 lb/fl, J-55 Tub¡ng:

Stage Info Stage 1 Stage 2 Staqo 3 slage 4 Stago 5 Siege i Formation UTELANDBUTTES CASTLE PEAKS CASTLE PEAKS BLACKSHALE)3 POINT DOUGLASCREEK | PackeriECT Depik TVO(For Deviated Weilboray 4.463 Perf #1 - Top 5.658 5,433 5,197 4.764 Olm 5,873 5,445 5,377 5,CD6 4,699 SPF: 2 2 2 2 2 Perff2 -Top:

SPF

Perf 43 - Top: Bim 3 PF Perf #4 -Top. Sim: SPF: Perf #6 -Too: Birri. SPF• Tolai Shots: 40 10 24 18 12 Per! Diameler. 0.36 0.36 0 35 0.36 0.35 Shi (den Fy 153761 147,902 145.166 137.93 131.558 Estimaleci Frac Gracilenl: 0 85 0.85 0,05 0.85 0 BS

Treatment Summary

Primary Fluid SpGr 1 01 1.01 1 01 1.01 1 01 Treat Vie: Casing Casing Casing Casing Casing Primary Fluid Type: MavFrac MavFrac MavFrac MavFrac MavFrac CO2 (yln): N N N N N | 3,200 Estimated Treat psr. 3,110 _ 4,160 3.190 2.250 Eslimated Perf Fric (psi). 176 1.586 489 218 1.101 Acid Volume (gls): 500 250 250 250 Talal Clean FluidlFoam (ple).] _ 36,750 11.953 18,634 16,367 10,140 Pad Volume (qis 11,250 4,700 6.847 E,847 4.700 SLF Volume (glsi 25.500 7,253 11,767 9.520 5,440 Estimated Flush Volume (gls) 5,406 5.183 1 5.047 4,514 4,463 Proppant Volume (Ibs): 60,000 27,200 | 44,200 34.000 20,400 Estimated Pump Time(min): 29.1 16.8 | 17 S. 28,8 14 3

*NOTE: Total clean fluid/foam volume does not include flush volume

I

I

Page 2 16-30 Berry Petroleum FEDERAL 12 1D 65 5 STAGE 166K sand 07291I E MNL

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000 6 12 881 27.1 738 886 892 1.016 1.015 Clean bbis Starf LLC 9 6 12 5.0 6.0 e.o 8.0 946 274 780 957 951 142 †25.7 1,016 261,9 4043 1.080 1,060 Clean Siurry bb bbis Surf Surf / 5 0 B,0 ao 5 B COMPARTY, - Stage - - . - - - - 1,080 165 123 251.9 1063 Cumulative Siurry bbts CO2 Tons Surf 3110pci 5 0 0 0 ao 5 5.0 - - - - . - - - sTP. 123.7 165 sesa 2519 - Stage Foam Est N2 sof bbis DH Blurry STIMITLATION 1 0 0 a.2 1.2 0 0.1 3.1 4.1 6.5 5.0 50 12,I 29,1 357 345 40 40 40.0 40.0 Rate rnia Avg opm Time stage Clean | 0 O O 50 GO 400 d 400 40 400 40 Rate Avg CO2 bym tons Stage (cale) >> Slurry | - . ------Surface Rate N2 sof Avg opm Teials Stage _ CO2 | - « ------. 21.000 39.000 Rate Ibs Avg _ salm Stage N2 Proppant 60.000 29.000 50.000 60.000 60.000 90.000 Ibs Total Page CO2% <<-Tokris->> Ramp 5.077 3.081 Avg Rate N2% Ibimin 50 . 3 200 5.0 5.0 40.0 40,0 aco 40.0 40.0 Avg bpm 40.0 Rate Bindr Cone Proppant p | Ran - End 7% Cane 4O 30 8.3% 13 ppq Prease F Internal Constam Ramp Prop design) psi deg. sof/bbi scilbbi | 0 65 2 90 1477 060 Start Cone Cone 2 3,5 10 30 Downhet Avg gpg Ramp Prop Prop HOLES Iole s 40 250 2eo 211 250 250 211 2SD 260 mu 5.355 0.000 Temp Down G.000 5.196 11.000 15,500 Factor Factor k Gravity: 11.000 19.600 42,856 Fluid Fluki Foami Foami TOTAL Pressure: gals gals 07-Wil Volume Volume Specinc Clean Clean Clean Clean Bottomhole N2 Treating CO2 | 15-59wd I% 55656-5873 6 3% . toSW pt Proppant % 26 35 26 25 58 25 E- CIn Gel maon 100.0% 100 100,0% 100.0% 1000*4 Fisiid Calculated | Bottomhole sW.E Bottomhole i PETROLEUM os NAD 1D is 16 es 16 15 16r3Ò i650 16/30 16f30 Prop Prop Mesh HCl%i 29-Jul-11 HCI%f BERRY UFEE rCOBRM2 HCL HCL PAD PAD SAND SAND Stage Stage FLUSH FLUSH 14A1 SM FLUSH PAD Hei. PAD FLUSN BCL i I

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000 12 112 220 285 289 292 474 414 Clean bb15 Surf LLC-- I G 12 1.3 0.0 - 112 23d 314 315 321 11 443| 443 54.5 100.0 10f,9 122.1 Siurry clean __sis. ICK obig bbts _ Surf Surt 9 0 1 1.3 60 COMPANY. - - - - . stage - - 11 79.4 100 1226 122 ER Sturry CO2 bbis Tens Surt _ __ _ 1 1.3 AY 8.0 ------11.9 79.4 100.0 122.6 122 Stage Foam M2 sci bols _ DH Slurty _ STIMULATION 4 1 0 D 3.3 4.1 2 25 00 02 4 50 165 300 284 246 30 30 300 Rate Avg min bpm Tirne Stage clean _ _ 0 5,0 30.0 30.0 30.0 30 30.0 30.0 Rate Avg bprn CO2 torre Sage _ (cale) > _ Slurry _ _ . ------Surface Rate N2 scf Avg bpm_ Stage _ CO2 | | =Totale= ------__- 13,600 15,600 » Hate _ Ibs Avg sctm Stage N2 === Totals Proppant 13.600 27.200 27,200 TF.gog 27,200 Ibs _ = Total CO2% _

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000 12 183 338 570 444 448 454 579 Cleam bbis Surf LLC i 5 9 12 4 6.0 670 163 11 362 491 495 502 617 617 151,1 175.4 105.2 115.6 Siurry Clears bbis bbis Surf Surf te 4.5 COMPANY, 5.0 - - - - - Sta - - 017 11.9 1511 1992 ‡250 715.5 Cumulative Slurry CO2 bols Tons Surf | 9 $ 0 & 6 ------1: 199.2 120.0 151.1 1156 . stage Foam N2 scf bbis DH . slurry STIMULATION 1 0 3.0 5.0 32 2.9 2.4 0.1 0 50 17.5 400 352 326 400 400 40 Rate min Avg bgm Tirrie stage clean 50 40.0 40,0 40.0 40.0 40.0 40.0 Rate Avg bgm CO2 tons stage Slutry >> - - · - Surface(carc) Rate N2 sof Avg bpm stage Totuis CO2 =- << ------22.100 22.100 » Rate lbs Avg scfm Stage N2 === Totals Proppant 4d.200 22.100 44.200 44.200 44.200 *4.200 ibs - Total CO2¾ << Ramp 4.438 6.852 Avg N2¾ Rate Ibimirt I 3.00 5.00 SO 400 400 400 40.0 40.0 40.0 Avg ggq Rate bpm Binar Conc _ I _ Cene 5.0 5.0 ppg 11.9¾ 18.8% Phase F internal Constant RampEnd Prop scf/bbl psi deg. sof/bbi | i 1 7 _ 66 900 2 _ 1392 Conc Conc 5 3 2:3DBO,0 TO 50 Downhole(deslqn}-RampPrappant ppg ppg Avg RampStart Prop Prop loie HOLES 24 191 $00 250 191 500 250 MAIL 7.367 6.347 4.420 4.555 Temp 7,367 a.420 4.856 Down 6,347 Factor Factor E Gravity 23.931 Fluid Fluid Foamt Possure: gals_ gats TOTAL 072911 Volume Specific Clean Clean sand C3eanFoam! Clean Bottomhole N2Volume Treating I CO2 | 1 1&40 597-5377 156K Proppant % 25 25 25 25 25 880% &1.6¾ ppt Gel Can 1000% 100,0% 100.0% 100.0¾ 100.0½ Fluid I Calculated Bottomhole STAGE Bottomhole _ 5 E $5 15 PAD 16.30 16r30 16J3D 15f30 Prop Mesh Prop 12-1D45 29-Jul-11 Mesh HCI%t HCf¾t _ _ BERRYPETROLEUM 35% _ FEDERAL PAD PAD HCL SAND SAND Potroleum Stone FLUSH FLUSH .Singe LOSt9 PAD PAD SAND SAND f MCL FLUSH Burry

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000 12 163 394 503 503 325 390 400 bbis SurtCinan ** B 12 3.9 8.0 503 163 11.9 540 430 436 540 54 >7 426 1036 151.1 1619 51uny bbis bbis w Surtclean Surf EPUTY 9 S 6.0 State sen - - - . - - - 11.9 79.4 103.5 151.1 W29 CO2 bbis Tot:s SurfSiurry n,""'T •¯""'" 9 3 50 - . . - - . - - 11.9 79.4 103.5 151.1 103.9 Foam N2 set bbis DH * . sfurrystage oggggy * a ð 6 3 02 0.3 52 2.4 7.6 92 4.0 50 2e 16 20 200 240 17 20 Rate niin Avg Time stage clean _Opm _ 0 0 0 50 20 20.0 20.0 20.0 20 20 Rate Avg hpm CO2 tons Stage » slurry . | - _ - - - . - Surface(cale) Rale N2 sci Avg hym_ Taimis Stage CO2 <<-= - · - - - 13,600 20.400 Rate Ibs Avg sefm stage N2 -» COD Totais 54 34,000 34.00D 34.000 20,4 RODO ibs =-- Total CO2¾ «c RampProppant >JtG 3.426 Avg N2% Rate ibimin I | I 3.00 5.00 0 0 5.0 ppq 20 200 20.0 20 Avg 20.0 20.0 bpm Rate Bindr Conc -- - RampPtoppant End 4¾ Conc US 5.0 5.0 . 11,9% 15 Phase F Iftternal Constant Ramp Prop deg. scf/bbi psi 9 55 2 90.0 1307 . 3050,olsef/bbl Start Cons 3 & 1,0 5.0 Dowaholegdesign)- Avg ppa ..ÑŸ9 Ramp P¢cpCene Prop . - HOLES -- 18 155 250 500 155 500 250 --- MAL 4,349 6.347 6.800 2.120 Temp Dowohole - 6,3d7 4,349 Factor Factor 2,720 E 8.800 Gravity: 21.131 Fluid Foamt Foami Pressure: gais 072911 -965 Volume Volume 4764.5005 Specific Clean CleanFluid sand - Clean Clean Bottomhole N2 Treating . CO2 | . à 1 1 1 | 1640 0% POINT 15eK Proppant % 25 25 25 3 25 25 88.04 81.E¾ Cin Gel 100.0¾ 100,0% 100,0% 100 103.0¾ Flum Calculated Bottombole sTAGE Bottomhole 12-1D-65 s PETROLEUM SHALE/ 15 15 PAD 1930 16ßO 12-1Duis 16/30 16/30 Prop Ptop Mosh 29-Jul-11 HCI%F NCFAI BERRY FEDERAL BLACK 40¾ «-.RL..AÑŽ. I FEDERAL _ Î.. . Ci PAD FAD 8 Detrolmum SAND SAND stago FI.LISH FLUSM LUSN -- FLUSN f BCL PD PAD SAÞÐ SAND Be

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000 12 112 133 241 3dá 3d8 Clean bbis Surf 12 348 11.9 112 204 263 370 370 45.6 21.0 1AO 105.3 Slurry bbis bbis Suticlean Surf | _ Stage $70 - - - - - , 11.9 SES 91.9 100.0 1063 ERICK 1(gMIA172.LLO bbis CO2 Tons surtslurry 0 AY - - - - - . 119 595 919 1053 100 Foam N2 sci bbis DH TIMO'LITI t. SierryStage 3,5 2.4 3.3 2.0 3.1 5.0 1d.3 30.0 26.4 30.0 24.5 Rate min Avg bgm Time Sesage Clean _ 0 0 D 50 30 30 30 300 Rate Avg CO2 tons bpm stage Sturry I · - - - - Surfam(cale) Rate N2 sel Avg bpm Tolait.--->> stage CO2 << - - - - - 10200 10.200 >> Rate Ibs Avg scim Stage N2 === 1 Totals Proppant 20.400 10.200 20.400 20.400 Ibs === Total CO2¾ << Hamp 5.139 3.329 Avg N2¾ Rate Ibimin _ _ I | 5.05 3-00 50 30.0 ppg 30.0 30.0 Avg Rate bpm .30.0 Bindr Cone . i I | RampProppant Conc $:0 6.0 ppa 15·1% 119% Phase interani Constani RampEnd Prop gesign). psi deg.F scf/bbl SCt/bbl 65 2 1241 &900 Cone 5 $ 1.0 50 Downtd gpg ppq Avg Rampstart Prop PropCane tois SOC 500 MAIL 4.200 3.400 2.040 4.463 HOLES Temp Down E 3.400 FactoE Factor| 4.200 2.040 4.463 Gravity: 14,603 Fluid 12 Foamt Pressure gais gala 07291 Volume Volume Specific mand Clean CleanFluid Clean CleanFeami Bottomhole ¯ N2 Treating CO2 I [ 1630 4463-4599 186K Proppant % 25 26 25 25 51£% BOOK ppt Cin Get to-o½l 100.OK| 100.0% Fluki Calculated ' Bottomhole STAGE Bottomhole 12-1D-65 5 CREEK 1D PAD lar3D 16td0 12 1&f3D 16/30 Prop Prop Mean Mosh HCl%i 29-Jul-11 NCt%f BERRYPETROLEUM FEDERAL 35% DOUGLAS I I FEDERAL PAD PAD Patroinum SAND SANO Stage Stage FLUSH BAND PAD PAD FLUSN Berry SAND I I l

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000

l i

FLUID SPECIFICATIONS AND REQUIREMENTS

Tank Requirements: 7 - 500 bbl tanks Tank Bottoms: 30 bbl/tank

Fluid1: 25 lb Gelled Water 116,207 Gallons Additives: 257 2% CL-57 Liquid KCI Replacement 2001 25 ppl MAV-3 Guar Gel 106 2 Opt NE-6 Non-Emulsifier 141 0.05 qpt BREAKER-503L LiquidEnzyme Breaker 582 0.15 ppt MAVCIDE Il Biocide 592 2.5 gpt MAVLINKBW Borate X-Linker(Winterized)

Fluid Required (Not Including Tank Bottoms): 116,207 Gallons 2,767 Bbis Tank Bottoms: 180 Bbis Total Fluid Requred: 2,947 Bbis

ACID REQUIREMENTS Acid Requirements: Acid 1: 15 % HCL 1,250 Gallons Additives: 106 2 gpt NE-6 Non-Emulsifier 610 6 ppt IC-100 Iron Control 303 4 gpt MAVHIB-3 Acid Inhibitor(Moderate Temp)

i

Berry Petroleum FEDERAL 12-1D-65 5 STAGE 186K16-30 sand 072911

Aug. 01, 2011 Sundry Number: 17089 API Well Number: 43013503280000

CO2 AND N2 REQUIREMENTS

PROPPANT REQUIREMENTS .

I SAND 16/30 Gold 185,800 lbs Total: 185,800 lbs

I

I I I

Berry Petroleum FEDERAL 12-1D-65 5 STAGE 186K 16-30 sand 072911 lÑi! lilfis

Aug. 01, 2011 Sundry Number: 17847 API Well Number: 43013503280000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEAS7EnDE65IGNATION DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING UTU-77326

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well FEDERAL 12-1D-6512-1D-65

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013503280000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t BRUNDAGE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 19161916 FSL 10001000 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NWSW Section: 01 Township: 06.0S06.05 Range: 05.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION 8/24/2011 WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE SEE THE ATTACHED COMPLETION HISTORY FOR THE FEDERAL 12-1D-65.12-1D-65. Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 08/29/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 8/25/2011

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

' Report # 1, Report Date: Well Name: FEDERAL 12-1D-65 IAPi/UWI ŠuFfaceI.egal Locaton Spud Date FanidName IAPOState i 43013503280000 NWSW SEC 1. T6S-R5W 7/18/2011 4:00:00 PM Ashley Forest IUtah Well Configuration Type iOnginai KB Elevation (ftKB) KB-Ground Distance (ft) KB-Casing Fiange Distance (ft) KB-Tubing Head Distanc (ft) I Deviated 7,445 20.00 Pnmary Job Type Secondary Job Type Initial Completion Objective | ¯ Contractor RU Number

AFE Number 'Totai AFE Amouni DaityCost Com Cost To Date C11 032027 ¯ 41,765 41.765fline¯nrej ¯ WiiãÏ6er T OF) 50ad Condition Tubing Åreisur liii Ôãšlrigyissurã(p g ¯ ' ¯ ¯ Job Coniaci 7me Ñ

00:00 ·00:00 | |DRPG Drilloutplugs Report Fluids Summary Fluid | To weil Ibbi) From well{nbly To lease (404 om lease (bbt) i Daily Costs | Code I | Code 2 | Code 3 | st Cost Desertption 152 125 ICC 1.000 (CC-CONTRACTSUPERVISION 152 305 iCC 3.690 ICC-RlGCOST-COMPLETION 152 380 ICC 1,875 ICC-SURFACE RENTALS i I 154 3630 TCC TCC-TUBING&ATTACHMENTS , 35,000 i Safety Cheeks __ _ I Time | Desengbon Type Commem

| Logs Date Type ToptilkB) SimglKB) Cased? I | No

Perforations ¯Ò Dale 20ne Top OIKB) Sim dtKB) | ÎÊÏt

¯ Dale 2one Tye Stim/Treat Company

Sig I | | No. I Staga Type | Top (RKB) I Sm (flMB) V (pumped) (bbl) i i ther in Hote ossenvison nuroaty __ _ _ po _ _1. _ _ _Top (BKB) ilm (HKŠ)

ement ¯ Description | __ _ _ StartDate Cement Camp I II

I I

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 2, Report Date: 8/1/2011 Well Name: FEDERAL 12-1D-65 APl/UWI Surface Legal Location Spud Date Fleid Name .APO Slate I l 43013503280000 NWSW SEC 1, T6S-R5W 7/18/2011 4:00:00 PM Ashley Forest Utah Well Configuration Type Original KB Elevallon (flKB) KB-Ground Distanæ (ft) KO-CarungFlange Ostance (ft) KB-TublngHead Ekstance(ft) Deviated 7,445 | 20.00 Piimary Job Type Semndary Job Type iInitial Completion ¯ ¯ ¯¯ ¯¯ ¯ ¯¯ Obiective ¯¯¯ \ Conitaclor Rig Number

AFE Number foralAFEAnmun1 DailyCost Cum Cost To Date C11 032027 ¯ ¯ 41.765 Weather |T CF) 1RoacÎCiiiÏi ŸubingÈi is e (psù Ces g reBSUf6 (gÏ5Q WS)

Dur hrs) [ Code 1 Operaton Commem

oport Fluids Summa Fluki To weI [bbl) | Fr m weU[bbi | To ease Dh0 | From lease (Dbl)

Safety Checks

i Logs cal. Type 15 fine (nKei i õãsiiif I No

Perforations Dalb _ 2erte Top(fiKB) O (ItkB CurrentStanis

Date | ane Ty Sum/freal Company

Stage Type Top (1188} (riKB) V pumped) ( i Other in Hole Desemphon Run Dale | D op litKB ŠtraRKB)

Cement Description __ _ Start Dale Co entÒomp

I .

I I

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 3, Report Date: 8/6/2011 12-1D-65 Well Name: FEDERAL ¯ APIIUWI Surface Lagni Loc.ation Spud Date Field Name APD State 43013503280000 ¯ NWSW SEC 1, T6S-R5W I 7/18/2011 4:00:00 PM¯ Ashley Forest IUtah IWaliÕonharabt n Type Onginal MS Elevatton (fiKO) B 0toúndDistance (Ït) KB ÒaangFiange Òistance(fi) KB-Tubog Head Distance ilt) IDeviated 7,445 20.00

iPomary Job Type ISecondary Job Type i InitialCompleton lObjectve

Çanirector ArgNumbar

AFE Number Total AFE Amount Daly Cost Gum Cost To Õale C11 032027 41.765 WealhBf han T OF) Road Cond Tubing Pressure (psi) Casing Preggúre (PSt) , Rig Time (hts) ¯_ _ Job Coniaci | __ Title Mabile I I

Time Log E¯r 1¯[ SiariTidie i e är(Ñ Code ration | ___ __ Comment I 00:00 00:00 LOGG ËLogging MIRU PSI and run a CBL from 5840 to surface. Bond looked good. Cement top at 260' Short joint at 3467-3478' 00:00 00:00 PFRT Perforating PU & RIH wl a 3-1/2" csg gun, 2 spf and perforated the Upper Wasatch/Uteland Butte from 5656 - 5815, 34 shots as follows: 5813-5815, 5802-5803, 5791-5792, 5783-5784, 5774-5775, 5767-5768, 5758-5759, 5726-5727, 5715-5717, 5708-5709, 5695-5697, 5677-5679, 5656-5657. POOH w/guns SWI RD Pioneer I

Report Fluicis Summary Bluid i To weitibbi) From won(601) _ To Isase (boi} From tease tbbij l Daily Costs Code 1 I _ Code 2 ode 3 Cosi______CosL 005£60004

Safety Checks me | Desonpuon Type Comment

No Perforat ons

Na _ _ Slage pa Top IRKB}___ _ _ I Bim flKEl V (pumped) (bbli

Other In Hofe Dettophon Run Date OD (n) Top IKB) Stm [ftKS) I Cement ¯ ¯ Desenpbun $tartDale Emani Comp

I

I

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 4, Report Date: 8/10/2011 / Wen Name: FEDERAL 12-1D-65 . ÁPUUWI Surface L.egalLocation ,Spud Date Faeid Name JD State 43013503280000 NWSW SEC 1, T6S-R5W 7/18/2011 4 00:00 PM Ashley Fores1 Utah Well Configuralion Type Onginal KB Elevation (ftKB) KB-Ground Dislance (ft) |KB-Casing Flange Distance (It) KB-Tubing Head Distance (ft)

Deviated 7,445 20.00 i

¯ ¯ ¯ ¯ ¯ ¯ ¯ I Pnmary Job T pe Secondary Job Type InitialCompletion ¯ ¯ Objective

Contractor Rig Numbei I AFE Numner TotalAFE Amount DellyCosi |Cum Cost To Date C11 032027 41,765 (*F) Weather T IRoad Condition Tubing Pressure (psi) Casing Pressure (psi) Rig Time (hrs)

Time Log ¯ ¯_ ŠtanTime End Time i Dur thisl Òede1 Operarmn I Communi 00:00 00:00 FRAC Frac. Job 1:06 Safety Meeting. RU Maverick pressure test lines to 5000 psi. Boakdown Uteland Butte perforations from 5656-5815 @2860 psi. pump 262 bbls pad, 464 bbis 1# to 5#16/30 sand, ramped 143 bbls 3#to 4#16/30 sand, 124 bbis of flush with acid. ISIP 2000 psi. SWI RD Maverick. Avg rate 19 bpm @ 2078 psi. Max rate 40.4 bpm @2892 psi. 60,000# of 16/30 sand, 1022.6 total bbls fluid. FG .78 i 00:00 00:00 PFRT Perforaling RU Pioneer w/ CBP & 3-1/2" csg guns, 2 spf Set CSP @5610'& perforate the I Castle Peak from 5436-5443, 10 holes as follows: 5433-5436, 5443-5445. POOH with guns SWI RD Pioneer 00:00 00:00 FRAC Frac. Job RU Ma erick pressure test lines to 5000 psi. Brendown Castle Peak perforations from 5443-5445 @4400 psi. pump 262 bbis pad. 108 bbis 1# to 5# 16/30 sand. ramped 65 bbis 5# 16/30 sand. 122 bbis of flush with acid. ISIP 870 psi. SWF RD Maverick. Avg rate 19 bpm @2297 psi, Max rate 33.2 bpm @4403 psi. 27,200#0f

16/30 sand, 405.3 total bb1sfluid. FG .59 00:00 00'00 PFRT Perforating RU Pioneer wl CBP &3-1/2" csg guns, 2 spf. Set CBP @5400' &perforate the Castle Peak from 5197-5377, 24 holes as fc110ws: 5375-5377. 5357-6358. 5342-5343, 5337-5338, 6330-6331. 5312-5313. 6288-5289, 5280-5281, 5277-5278, 5248-5249. 5197-5198 POOH with guns SWI RD Pioneer 00:00 00:00 FRAC Frac. Job RU Maverick pressure test lines to 5000 psi. Breakdown Castle Peak perforations from 5197-5377 @1360 psi. pump 151 bbts pad. 175 bbis 1# to 5# 16/30 sand, ramped 105 bbis 5# 16/30 sand, 113 bbis of flush with acid. ISIP 1160 psi. SWI RD Maverick. Avg rate 26.4bpm @ 1390 psi. Max rate 44.3 bpm @2261 psi. 44.200# of

16/30 sand, 557.6 totalbols fluid.FG .65 00:00 00:00 PFRT Perforating RU Pioneer w/ CBP &3-1/2" esg guns. 2 spf. ŠetCBP @5130' &perforate the Black Shale/3-Point from 4764-5006, 16 holes as follows: 4764-4766, 4778-4779, 4874-4877, 4997-4999, 5005-5006 POOH with guns SWI RD Pioneer

00.00 00:00 i FRAC Frac. Job RU Maverick pressure test lines to 5000 psi. Breakdown Black Shale/3-Point perforations from 4764-5006 @ 1890 psi. pump 151 bbls pad, 162 bbis 1# to 5# 16/30 sand, ramped 6 bbls 5#16/30 sand, 104 bbls of flush with acid. ISIP 1500 psi. SWI RD Maverick. Avg rate 21.9 bpm @ 1912psi. Max rate 40.6 bpm @2838 psi.

34,000# of 16/30 sand, 494.4 total bbls fluid. FG .74 00:00 00:00 PFRT PerfoÏating RU Pioneer w/ CBP &3-1/2" csg guns, 2 spf. Set CBP @4650' & perforate the Douglas Creek from 4463-4599, 12 holes as follows: 4463-4465, 4516-4518, 4597-4599 POOH with guns SW1RD Pioneer 00:00 00:00 FRAC Frac. Job RU Maverick pressure test lines to 5000 psi. Breakdown Douglas Creek perforations from 4463-4599 @2890 psi. pump 100 bbis pad. 161 bbis 1# to 5#16/30 sand, 106 bbls of flush with acid. ISIP1220 psi. SWI RD Maverick.Avg rate 12.6 bpm @2289 psi. Max rate 27.4 bpm @3672 psi. 20.400 # of 16/30 sand. 367 2 total bbla fluid. FG .70

Report Fluids Summary

Daily Costs

Safety Checks me Desenption Type Comment

www.peloton.com Page 1/2 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 4, Report Date: 8/10/2011 Well Name: FEDERAL 12-1D-65 ÁPFluW1 Surface Legal Location Spud Date Field Name .APD State 43013503280000 NWSW SEC 1. T6S-R5W 7/18/2011 4:00:00 PM Ashley Forest Utah Well Corifiguration Type Ongmat KB Elevation (RKB) KB&oums Distance (ft) KB-Casmg Flange Distance (ft) KB Tubing Head Distance (it) Deviated 7,445 20,00 Logs Dale Type i Top flKB) Im (nKB) | Cased' No

No i Slage Type Top (ftKB) Stm (fikB) V (pumped) (nbl) I

Other in Hole Descopgen Run De OD (m) Tep Sim (RKB)

Coment Desetiphan alanDate Coment Comp i

I

www.peloton.com Page 2/2 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 5, Report Date: 8/22/2011 Well Name: FEDERAL 12-1D-65 ¯ AP¯D ¯ ¯ ¯ ¯¯ .APIfDWI surfaceLegal Location Spud Date -Freld Name Sole ll 43013503280000 NWSW SEC 1. T6S-RSW 7/18/2011 4:00:00 PM |Ashley Forest Utah IV2ÏÒontinlionŸ|pe Cnginal KB EIOvah00 {r!KB) KB.Oround Dislance (It) sKB-Caang Flange Dislance (II) KB-TubingHead Oislance (0) ,Deviated 7.445 _ _ 20.00 Pnmary Job Type Secondary Job Type initial Completion

C ter IRig Number

AFE Number |Total AFE Arneunt ,Dany Cosi ,CemCost To Date C11 032027 5.500 Weämer¯ ¯ | ¯ C¯erÃg 47265 T OF) Road Condit on Tubing Fressure [psi) Pressure (pm; Rig Time hre)

- -- --J ¯ ¯ ¯ ¯ ¯ ¯¯ ¯¯ ¯¯¯ ¯ ¯¯ CMM Title J Mobile \ |

Timen¯Tlfrie"iLog S EndTime Dtir(htoi Opembon Comment 00:00 100:00 |Safety Nieeting. MISIRU, ND frac valve, NU BOP, PU RIH w/ 4-3/4" bit and bit sub, Itag Kill plug @4000' Ru swivel, pump and return lines, break circ, Drill Plug, Circ clean RIH clean snad and drill second plug, circ clean, SWIFN, uS mm ___ _ _ From welF(bbl] | TO lease (bbi) | From lease (bbf) I Daily Costs Ode 1 Cose 2 Cada3 i Cost | Cost puen 152 2385 I1CC 1,000\lCC-RENTALS-FISHINGTOOLS 152 2305 ICC 4,500 ICC-RIGCOST-COMPLETION Safety Checks

Lags Dale Type Top 8) | Òased? No Perforations | Date one | T0p B) I Bim (IIKB) Current atus

¯ ¯ Oate 26ne Type ŠlimnreaiÒompany

$tgl No I Stage Type Top flKB) B IKB Y (pumped) (bul}

| Other in Hole Desenption Run Date | OD Top (flKB) BIm (RKB) I Cement Descnplion StaF1 Date I Cement Como

I

www.peloton.com Page 1/1 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 6, Report Date: 8/23/2011 Well Name: FEDERAL 12-1D-65 APi/UWi Surface Legal Locanon Spud Date IFold Name APD State 43013503280000 ¯ NWSW SEC 1, T6S-RSW I 7/18/2011 4:00:00 PM Ashley Forest Utah Weil ConfiguraisonType Onginal KB Elevifion (ftKB) KB-Ground Distance (ft) KB-Casing Flange Distance (ft) KB-TubingHead Distance (ft) Deviated 7,445 20.00 i

Primary Job Type Secolidary Job Type Iriitial Completion ¯ Obteclive ¯ ¯ ¯ ¯

Con1ractor Rig Number

AFE Number Tota1AFEAmouol DailyCosi Cum Cosi To Dale C11 032027 70,830 118,095 Weather T PF) Road Condil Tuttog Pressure (psil Casing Feressure (psi) .FiegTime {hre) I ¯ ¯ Job Contact | Tsile Mobile 1 I Time Log sta TWiie End Time I Dur Ors: i Code 1 _ Operallon Comment I 00 00 13:30 13.50 DRPG iDiillout plugs CREW TRAVEL.CHANGECLOTHES. SAFETY MEETING. I SICP-0 SITP-0 I CONTINUEIN HOLE &TAG@5,088' (42' ABOVE CBP @5,130'). R/U POWER SWIVEL & BREAKClRC. CIO &D/O. I i i TAG@ CBP@ 5.088· \ 5.130' (42' SAND & D/O CBP) 5.380' 5,400' (20' SAND & DIO CBP) I 5,590' 5,610' (20' SAND & D/O CBP) I 5,810' (C/O TO PBTD 5,895')

CIRCULATEWELL CLEAN. R/D POWER SWlVEL. L/D 3 JOINTS & POOH. L/D i 4-3/4" BIT AND SUB. I

RlH W/ 1 JOINT, SEATINGNIPPLE, TAC,& 115 JOINTS.

SWI

CREW CHANGE AND TRAVEL.

Report Fiulds Summary Fluid To well ibb1 From well it,bli To Jesse ibbli From lease (bbit

152 2125 ICC 1,000 ICC-CONTRACTSUPERVISION 152 2305 ICC 4,190 ICC-RIGCOST-COMPLETION 152 2380 ICC 220 ICC-SURFACE RENTALS 154 3530 TCC 35,000 TCC-TUBING&ATTACHMENTS 152 2111 .ICC 420 ICC-TRUCKING&HAULING 154 3535 .TCC 30,000 TCC-SUCKER ROD, PUMPS, SINKER BARS Safety Checks T1tne Desertption Type CommkDt

No

Perforations

Date 20110 700 .iti SI Stni IflKB1 CMfTOnl Alal5

www.peloton.com Page 1/2 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 6, Report Date: 8/23/2011 Well Name: FEDERAL 12-1D-65

APilUvy Surface -egal t.ocaban Špudbate .F.em Name ,ÁPD State 43013503280000 NWSW SEC 1. T6S-R5W 7/18/2011 4:00:00 PM Ashley Forest Utah Well Configuration Type Onginal KB Elevation (ttKB) KB-Otounddistance (ft) KB-ÒasmgFlange distance(ft) Tuoing i leaa Oistance(n) Deviated 7,445 20.00

Other in e ¯¯Aun Úat¯ Downgkon : 00 (in Tbp(flKBI birn(ftKB)

Cement ¯ ¯¯¯ ¯$6r!¯Dale ¯ ¯ Destilpilon me

\

\

i I '

I

i

I www.peloton.com Page 2/2 Report Printed

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 7, Report Date: 8/24/2011 Well Name: FEDERAL 12-1D-65 APUUWi Surface Legal Location Spud Date Field Name APD State 43013503280000 INWSW SEC 1, T6S-R5W 7/18/2011 4:00:00 PM Ashley Forest Utah

Well CCAFIGL1fallOD Typá Onginal KB ËlevalIDO (ItKB} KB G(Ognd Islanc (It) KB.Casing Flangé Distance (ft) KOTubing Head Opstance (TI Deviâted 7.445 i 20.00 i

Primary Job Type Seconday Job Type Initial Completion Óbientwe

Number , AFE TotalAFE Amount DailyUost Cum Cost To Dale C11 032027 5,440 123.535 Weainer T CF) Road Condilo i Tuning Pressure (ps Casing Ptsssute psi) Äg Time [6rs)

Jb Contact TilÏe out1e

DO:00 13:00 13.00 RURP Run Rods & Pump CREW TRAVEL, CHANGE CLOTHES, SAFETY MEETING.

SICP-0 SITP-0

CONTINUE IN HOLE W/ 63 JOINTS FOR A TOTAL OF 179. R/D TBG EQUIPMENT & FLOOR. NDBOP SET TAC @ 5,763'AND LAND TBG IN 17,000#TENSION. CHANGE OUT EQUIPMENT FROM TUBINGTO RODS. P/U PUMP (2-1/2X1-1/2X15.5 EAGLE) & PRIME. RIH WITH RODS & SPACE OUT STROKE PUMP AND TEST TO 600 PSI, HELD. HANGHEAD &RODS. RDWOR MOVE TO 11-1D-65.

CREW CHANGE AND TRAVEL.

¯ 13:00 13:00 RURP Run Rods &Pump TBG OÏÏAIL i KB 20.00 |178JTS 2-7/8" 5,742.97 5,762.97 (TACTOP) TAC (35 K SHEER) 2.75 5,765.72 (S/N TOP) S/N 1.10 1 JT (SAME) 32.47 5,799.25 (EOT) i ROD DETAIL

1-1/2" X 22' POLISH ROD 1X2' 7/8" PONY SUB 186 7/8" 4-PER RODS 124 3/4" 4-PER RODS 15 3/4" 6 PER RODS 4 1-1/2" WT BARS 5-STAB SUBS PUMP (2-1/2"-1-1/2" 15.5 EAGLE #BP1547

13:00 13:00 RURP Run Reds & Pump FINALREPORT

LOAD FLUID 3,067.1 BBLS EOT 5,799.25' PBTD 5.895'

Report Fluids Summary Fluid Towonlobli fromweli1601) T-te-seIbni: Fromle35emol]

Daily Costs Cade 1 Cole : Come 3 Cey cost evaphon 152 2125 10C 1,000 ICC-CONTRACTSUPERŸISlÒN 152 2305 ICC 4,440 ICC-R1GCOST-COMPLETION Safety Checks Ennü Derirlio lye Cemnl ril

Logs

No

www.peloton.com Page 1/2 Report Printed:

Aug. 25, 2011 Sundry Number: 17847 API Well Number: 43013503280000

Berry Daily Completion and Workover

Report # 7, Report Date: 8/24/2011 , Well Name: FEDERAL 12-1D-65

¯ Ña¯e ¯ l APIIUWI ,Šurface Legal Location Spua Ôate †Ïeld SPD Slale 43013503280000 NWSW SEC 1, T6S-R5W 7/18/2011 4:00:00 PM Ashley Forest Utah Well Configur tion Type Onginal KŠËlevalion(Ï;B) KB-GroWad Distance (it) KB-Casing Flange Distance (ft) B Tubing Head Distanc (ft) Deviated 7,445 20.00 Perforations I . Date _Žone i Top (flKB)_ 13im( ) Cunen!

Type Sbm/Treat Company i i

No slageType | Top (IKB) nKB v (pumped) (bM)

Other In Hole Resonplan Run Dale Top B Bim (ftKB _ _

Coment

I I

I i I i

I

I . i

I

www.peloton.com Page 2/2 Report Printecl:

Aug. 25, 2011 Sundry Number: 18010 API Well Number: 43013503280000

FORM 9 STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES 5.LEASE5.LEAS7EnDE65IGNATION DESIGNATION AND SERIAL NUMBER:

DIVISION OF OIL, GAS, AND MINING UTU-77326

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: SUNDRY NOTICES AND REPORTS ON WELLS Do not use this form for proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME: DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER: Oil Well FEDERAL 12-1D-6512-1D-65

2. NAME OF OPERATOR: 9. API NUMBER: BERRY PETROLEUM COMPANY 43013503280000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT: 999-4044 4000 South 4028 West Rt 2 BoxBo× 7735 , Roosevelt, UT, 84066 303 999-4044 ExtE×t BRUNDAGE CANYON

4.4.LOCATIONOFVVELL LOCATION OF WELL COUNTY: FOOTAGES AT SURFACE: DUCHESNE 19161916 FSL 10001000 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: SECTION, TOWNSHIP, RANGE, STATE: Qtr/Qtr: NWSW Section: 01 Township: 06.0S06.05 Range: 05.0W Meridian: U UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENT CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME Approximate date work will start: CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENTSDUat REPORT ofUWENrkRCEPmOp DEEPEN FRACTURE TREAT NEW CONSTRUCTION Date of Work Completion:tion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION SPUD REPORT Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLINGDRILLINR REPORTRErt Report Date:D e. WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION 8/31/2011 WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETEDC( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc. PLEASE NOTE THAT THE FEDERAL 12-1D-6512-1D-65 WENT TO SALES ON AUGUST 31, 2011. Accepted by the Utah Division of Oil, Gas and Mining FOR RECORD ONLY 09/08/2011

NAME (PLEASE PRINT) PHONE NUMBER TITLE Kathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech. SIGNATURE DATE N/A 8/31/2011

Aug. 31, 2011 STATE OF UTAH AMENDED REPORT FORM 8 DEPARTMENT OF NATURALRESOURCES (highlight changes) DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER: UTU77326 6. IFINDIAN,ALLOTTEEORTR1BENAME WELL COMPLETION OR RECOMPLETION REPORT AND LOG

1a. TYPE OF WELL: O WAESLL 7. UNITor CA AGREEMENT NAME LL DRY OTHER

b. TYPE OF WORK: 8. WELL NAMEand NUMBER: HORSZ. EP- -TRY EFSFŸR. 12-1D-65 L OTHER FEDERAL 2.NAMEOFOPERATOR: 9.APINUMBER: BERRY PETROLEUM COMPANY 4301350328 3. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WlLDCAT 4000 S. 4028 W. CITY ROOSEVELT STATE UT ZIP 84066 (435) 722-1325 BRUNDAGE CANYON 4. LOCATlONOF WELL (FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN ATSURFACE: NWSW 1916' FSL 1000' FWL NWSW 1 6S 5W U AT TOP PRODUCING INTERVALREPORTED BELOW NWSW 1960' FSL 766' FWL

12. COUNTY 13. STATE AT TOTALDEPTH: NWSW 1972' FSL 650' FWL DUCHESNE UTAH 14. DATE SPUDDED: 15. DATET.D. REACHED: 16 DATE COMPLETED 17. ELEVATIONS(DF, RKB, RT, GL): 5/13/2011 7/25/2011 8/24/2011 ABANDONED READYTO PRODUCE 2 7422 GL 18. TOTAL DEPTH: MD 19. PLUG BACKTD MD 5,895 20. IF MULTlPLECOMPLETIONS, HOW MANY?* 21. DEPTH BRIDGE MD PLUG SET: TVD TVD TVD 22. TYPE ELECTRIC AND OTHER MECHAN1CALLOGS RUN (Submit copy of each) 23. WAS WELL CORED? NO YES (Submit analysis) ELECTRIC WAS DST RUN? NO YES (Submit report) DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASING AND LINER RECORD (Report all strings set in well)

STAGED TMENTER CNEMEONFSACKES VOLSWMRE HOLE SIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM (MD) CEMENT TOP ** AMOUNTPULLED BL)

12.5 8.625 J-55 24.0 375 G 200 7.875 5.5 J-55 15.5 5,992 PL 200 260 PLHS 385

25. TUBING RECORD

SIZE DEPTH SET (MD) PACKER SET (MD) SlZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) 2.875 | 5,799 26. PRODUCING INTERVALS 27. PERFORATION RECORD

FORMATIONNAME TOP (MD) BOTTOM (MD) TOP (TVD) BOTTOM (TVD) INTERVAL(Top/Bot -MD) SIZE NO. HOLES PERFORATION STATUS

(A) Sgueezed UTELAND BUTTE 5,656 5,873 5,656 5,873 .360 40 open (B) OPen Squeezed CASTLE PEAK 5,197 5,445 5,197 5,445 .360 34 2 (c) Open Squeezed 3 POINT 4,764 5,006 4,764 5,006 .360 18 (D) Open Squeezed

28. ACID, FRACTURE, TREATMENT, CEMENT SQUEEZE, ETC.

DEPTH 1NTERVAL AMOUNTANDTYPE OF MATERIAL 5656 TO 5873 FRAC Wl60,000 LBS SAND & 1022.6 BBLS FLUID 5197 TO 5445 FRAC Wl71,400 LBS SAND &962.9 BBLS FLUID 4764 TO 5006 FRAC Wl34,000 LBS SAND &494.4 BBLS FLUID 29. ENCLOSED ATTACHMENTS: 30. WELL STATUS:

O ELECTRICALIMECHANlCALLOGS GEOLOGIC REPORT DST REPORT DIRECTlONALSURVEY PUMPING SUNDRY NOTICE FOR PLUGGINGAND CEMENT VERIF1CATION CORE ANALYSIS OTHER: FRECE IVED

(5/2000) (CONTINUED ON BACK)

DE 31. INITIALPRODUCTION INTERVALA (As shown in item #26)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: PROD. METHOD: 8/31/2011 9/14/2011 24 RATES: - 61 338 16 GAS PUMPII

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAV1TY BTU - GAS GASIOIL RATIO 24 HR PRODUCTION OIL- BBL: GAS- MCF: WATER - BBL: 1NTERVALSTATUS: 125 170 RATES: - PUMPING

INTERVALB (As shown in item #26)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCT10N OIL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD: RATES: -¥

CHOKE SIZE: BG. PRESS. CSG. PRESS. API GRAV1TY BTU - GAS AS/OIL RATlO 24 HR PRODUCTION 01L - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS: RATES: ->

INTERVALC (As shown in item #26)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION 01L - BBL: GAS - MCF: WATER - BBL: PROD. METHOD: RATES: ->

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS ASIO1LRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS: RATES: ->

INTERVALD (As shown in item #26)

DATE FlRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD: RATES: -+

CHOKE SIZE: BG. PRESS. CSG. PRESS. AP1GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS: RATES: -+

32. DISPOSITION OF GAS (Sold, Used for Fuel, Vented, Etc.) SOLD 33. SUMMARYOF POROUS ZONES (Include Aquifers): 34. FORMATION(Log) MARKERS:

Show all important zones of porosity and contents thereof: Cored intervals and all dri11-stemtests, including depth interva1 tested, cushion used, timetoolopen, flowing and shut-in pressures and recovenes.

Formation Descriptions, Contents, etc. Name edpDepth) (Measu GR 1,915 MAHOGANY 2,512 TGR3 3,564 DOUGLAS CREEK 4,314 BLACKSHALE 4,913 CASTLE PEAK 5,231 UTELAND 5,653 WASATCH 5,843

35. ADDITIONALREMARK: (Include plugg ng procedure)

36. I hereby certify that the foregoing and attached information is complete and correct as determined from all available records.

NAME(PLEASE PR1NT) BROOKE BROADHEAD TITLE REGULATORY ASSISTANT

SIGNATURE DATE 10/3/2011

This report must be submitted within 30 days of • completing or plugging a new well • reentering a previously plugged and abandoned well • drillinghorizontal laterals from an existing well bore e significantly deepening an existing well bore below the previous bottom-hole depth • recompleting to a different producing formation e drillinghydrocarbon exploratory holes, such as core samples and stratigraphic tests

* ITEM 20: Show the number of completions if production is measured separately from twoor more formations.

**ITEM24: Cement Top -Show how reported top(s)of cement were determined (circulated (CIR), calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).

Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-5340 1594 West North Temple, Suite 1210 Box 145801 Fax: 801-359-3940 Salt Lake City, Utah 84114-5801 A GREATWMTE DIRECTIONAL SERVICES LLC

Survey Certification Sheet

Report Date: 8-23-11

GWDS Job #: 03045-432-21 / Directional

Operator: Berry Petroleum Co. Well Name: Federal 12-1D-65 API#: 43-013-50328 County/State: Duchesne Co., UT Well SHL: 1916' FSL & 1000' FWL (NWSW) Sec. 1-T6S-R5W Well SHL: 39° 59' 12.901" N (NAD27) 110° 24' 5.101" W (NAD27)

Drilling Rig Contractor: Patterson 779 (RKB: 20')

Surveyed Dates: 7/18/11-7/22/11 Surveyed from a depth of: OH: 399.00' MD to 5900.00' MD

Type of Survey: MWD Surveys (STB=50')

The data and calculations for this survey have been checked by me and conform to the calibration standards and operational procedures set forth by Great White Directional Services, LLC. I am authorized and qualified to review the data, calculations and this report, and that the report represents a true and correct Directional Survey of this well based on the original data corrected to True North and obtained at the well site. Wellbore Coordinates are calculated using minimum curvature method.

Bret Wolford

Great White Directional Services, LLC - Well Planner

PO Box 427 • MILLS,WY 82644 • 63 CASPERVIEWCOURT • MILLS,WY 82644 OFFICE (307) 472-7400 • FAX (307) Project: Duchesne Co., UT (UT27C) Site: Federal Sec.1 Pads (Sec.1-T6S-R5W) Well: Federal 12-1D-65 Wellbore: Wellbore #1 GREATWHITE Design: Design #3 m ..«crmesmange Latitude: 39° 59' 12.901 N Longitude: 110° 24° 5.101 W Ground Level: 7422.00 WELL @7442.00usft (Patterson 779)

PROJECT DETAILS: Duchesne Co., UT (UT27C) REFERENCE INFORMATION

S)olution) Geodetic SDyasm US St Plane 1C CEx Co-ordinate (NIE) Reference: Well Federal 12-1D-65, True North Vertical (TVD) Reference: WELL @ 7442.00usit (Patterson 779) Ellipsoid: Clarke 1866 Section (VS) Reference: Slot - (0.00N, 0.00E) Zone: Utah Central 4302 Measured Depth Reference: WELL @7442.00usft (Patterson 779) Calculation Method: Minimum Curvature System Datum: Mean Sea Level

WELL DETAILS: Federal 12-1D-65

Ground Level: 7422.00 Slot +NI-S +El-W Northing Easting Latittude Longitude 39°59'12.901N 110°24'5.101W 0.00 0.00 604170.174 2307811.331

on (MAP CO-ORDINATESAND LATILONG) - s WELLBORE TARGET DETAILS Longitude Shape TVD +NI-S +El-W Northing Easting Latitude Name 39° 110° 24' 9.597 W Polygon -349.92 2307460.754 59' 13.451 N Fed 12-1D-65 Tgt 5930.00 55.65 604221.526

----- 800 SECTION DETAILS

Annotation Inc Azi TVD +NI-S +El-W Dieg TFace VSect at7eeze MD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 450.00 0.00 0.00 0.00 0.00 0.00 Statt Build 2.00 450.00 0.00 0.00 StartDLS2.00TFO-112.18 ------4.19 4.98 --- 2.00 322.00 1200 - 647.50 3.95 322.00 647.34 5.36 -112.17 at 796.30 MD -12.42 13.85 Start 4751.13hold 796.29 3.95 277.69 795.82 10.09 2.00 Start -1.00 -336.46 0.00 0.00 340.74 Drop ---- - 5547.43 3.95 277.69 5535.69 53.84 5942.05 -349.92 TD at 5942.05 0.00 0.00 5930.00 55.65 1.00 180.00 354.32

FORMATIONTOP DETAILS 1600 TVDPath MDPath Formation 1365.75 1367.58 Green River 1909.86 1912.99 Green River Upr Mkr -- 2513.88 2518.44 Mahogany 2000 3551.20 3558.22 Tgr3 Mkr 4296.98 4305.78 Douglas Creek 4887.02 4897.22 Black Shale 5065.73 5076.36 1/2 Through Obj. 5213.49 5224.47 Castle Peak 5642.75 Uteland Butte Ls. --- 5630.83 ------2400 5834.67 5846.72 Wasatch

Azimuths to True North 11.42° * Magnetic North: e c §2800 ao Magnetic Field Strength: 52214.3snl 65.69° o - Dip Angle: o Date: 06/24/2011 Model: IGRF200510 3200 -

55.64 N, 349.92'W - 750 SHL 970' FSL & 650' FWL 1916' FSL & 100 FWL SEC.1-T6S-R5W SEC.1-T6S-R5W

23600 - - --

500-

4000- - --

4400- Lastewoss

0-

La 4800-

Isra mr -250 ------

Crook (f) Douglas

5200-- c..tice..k s.« shal•

ir2 Through ob

-500 -

5600 - - -

------750 - - - e and Bu to Ls ------edera11 1

- 6000 III IIII IIII IIII I li Il

-250 0 2 0 500 1000 -750 -500 West(-)/East(+) (500 usftlin)

seco Plan: Design #3 (Federal 12-1D-65/Wellbore #1)

-400 1200 1600 -1200 -800 0 400 800 Vertical Section at 279.04°(800 usftlin) Created By: Bret Wolford Date: 7:37, July 23 Berry Petroleum Company Duchesne Co., UT (UT27C) Federal Sec.1 Pads (Sec.1-T6S-R5W) Federal 12-1D-65

Wellbore #1

Survey: Survey #1

Standard Survey Report

23 July, 2011

A MEMWillTE R mRECHONM SERHŒ¾ Great White Directional Services, LLC GREATWHITE Survey Report

12-1D-65 Company: Berry Petroleum Company Local Co-ordinate Reference: Well Federal Project: Duchesne Co., UT (UT27C) TVD Reference: WELL @ 7442.00usft (Patterson779) Site: Federal Sec.1 Pads (Sec.1-T6S-R5W) MD Reference: WELL @7442.00usft (Pattersori 779) Well: Federal 12-1D-65 North Reference: True Weilbore: Wellbore #1 Survey Calculation Method: Minimum Curvature Design: Wellbore #1 Database: EDM 5000.1 EDMDBBW

Project Duchesne Con UT (UT27C)

Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCONCONUS) Map Zone: Utah Central 4302

Site Federal Sec.1 Pads (Sec.1-T6S-R5W) 39° Site Position: Northing: 605,769.134 Usft Latitude: 59' 28.309 N 110° From: Lat/Long Easting: 2,311,038.090 usft Longitude: 23' 23.392 W ° Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: 0.71

Well Federal 12-1D-65 39° Well Position +NI-S 0.00 usft Northing: 604,170.174 usft Latitude: 59' 12.901 N 110° +El-W 0.00 usft Easting: 2,307,811.331 usft Longitude: 24' 5.101 W Position Uncertainty 0.00 usít Wellhead Elevation: usft Ground Level: 7,422.00 usft

Wellbore Wellbore #1

Magnetics Model Name Sample Date Declination Dip Angle Field Strength () (*) (nT) IGRF200510 2011/06/24 11.42 65.69 52,211

Design Wellbore #1

Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00

Vertical Section: Depth From (TVD) +NI S +El-W Direction (*) (usft) (usft) (usft) 0.00 0.00 0.00 279.04

Survey Program Date 2011/07/23

From To (usft) (usft) Survey (Weilbore) Tool Name Description

399.00 6,023.00 Survey #1 (Wellbore #1) MWD MWD - Standard

Suivey

Measured Vedical Vertical . Dogleg Build Turn Depth +N/-S +El-W Section Rate Rate Rate Depth Inclination Azimuth (°l100usft) (°!100usft) (usft) (=) (=) (usft) (usft) (usft) (usft) /100usft)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 First GWDS Survey

399.00 1.09 187.55 398.98 -3.76 -0.50 -0.10 0.27 0.27 0.00

-0.13 461.00 1.01 228.33 460.97 -4.71 -0.98 0.23 1.19 65.77

523.00 1.93 290.29 522.95 -4.71 -2.37 1.60 2.75 1.48 99.94

585.00 3.91 308.92 584.87 -3.02 -5.00 4.46 3.50 3.19 30.05

-13.97 646.00 5.14 300.40 645.68 -0.33 -8.97 8.81 2.29 2.02

-7.77 706.00 5.31 295.74 705.43 2.23 -13.79 13.97 0.76 0.28

-0.27 -0.27 768.00 5.14 295.57 767.17 4.68 -18.88 19.38 0.28

-0.63 -3.26 830.00 4.75 293.55 828.94 6.90 -23.74 24.53 0.69

-0.22 -8.24 893.00 4.61 288.36 891.73 8.74 -28.53 29.55 0.71

956.00 4.31 288.45 954.54 10.29 -33.18 34.39 0.48 -0.48 0.14

-7.28 1,020.00 4.39 283.79 1,018.35 11.63 -37.84 39.20 0.57 0.12

2011/07/23 7:36:02AM Page 2 COMPASS 5000.1 Build Great White Directional Services, LLC GREMWHITE Survey Report --

12-1D-65 ny: Berry Petroleum Company Local Co-ordinate Reference: Well Federal Project: Duchesne Co., UT (UT27C) TVD Reference: WELL @7442.00usft (Patterson 779) Site: Federal Sec.1 Pads (Sec.1-T6S-R5W) IvlDReference: WELL @7442.00usft (Patterson 779) Well: Federal 12-1D-65 North Reference: True Weilbore: Wellbore #1 Survey Calculation Method: Minimum Curvature Design: Wellbore #1 Database: EDM 5000.1 EDMDBBW

Survey

Measured Vertical Vertical Dogleg Build Turn . Depth +N/-S +El-W Section Rate Rate Rate Depth Incliliation Azimuth (°1100usft) (°l100usft) (°l100usft) (usft) (•) (•) (usft) (usft) (usft) (usft)

-0.56 -7.11 1,083.00 4.04 279.31 1,081.18 12.57 -42.37 43.82 0.76

-0.13 1,146.00 3.96 283.18 1,144.03 13.42 -46.68 48.21 0.45 6.14

-8.39 1,210.00 5.71 277.81 1,207.80 14.36 -51.99 53.60 2.82 2.73

-3.71 1,305.00 5.80 274.29 1,302.32 15.36 -61.46 63.11 0.38 0.09

-0.94 -8.69 1,399.00 4.92 266.12 1,395.91 15.44 -70.21 71.77 1.24

-0.79 1,494.00 4.17 273.94 1,490.61 15.41 -77.72 79.18 1.02 8.23 1,589.00 4.65 281.85 1,585.33 16.43 -84.94 86.47 0.81 0.51 8.33

-0.41 -5.92 1,684.00 4.26 276.23 1,680.04 17.61 -92.22 93.84 0.62

1,780.00 4.43 278.86 1,775.77 18.57 -99.42 101.11 0.27 0.18 2.74 1,875.00 4.97 280.19 1,870.45 19.86 -107.10 108.89 0.58 0.57 1.40

-0.34 -5.65 1,970.00 4.65 274.82 1,965.11 20.91 -114.99 116.84 0.58 2,065.00 4.79 288.71 2,059.80 22.51 -122.58 124.59 1.21 0.15 14.62

-0.79 -5.27 2,160.00 4.04 283.70 2,154.51 24.57 -129.59 131.84 0.89

-0.51 -12.12 2,255.00 3.56 272.19 2,249.31 25.48 -135.79 138.10 0.95

-0.83 2,350.00 4.35 271.40 2,344.08 25.68 -142.34 144.60 0.83 0.83 2,445.00 4.39 283.53 2,438.80 26.62 -149.47 151.80 0.97 0.04 12.77

-0.04 2,541.00 4.35 291.00 2,534.53 28.78 -156.45 159.02 0.59 7.78

-0.56 -8.23 2,636.00 3.82 283.18 2,629.29 30.79 -162.89 165.70 0.81

2,731.00 4.61 290.12 2,724.03 32.83 -169.56 172.61 0.99 0.83 7.31

-0.51 -6.57 2,826.00 4.13 283.88 2,818.75 34.96 -176.46 179.76 0.71 2,921.00 4.44 295.57 2,913.49 37.37 -183.10 186.70 0.97 0.33 12.31 3,016.00 4.39 294.86 3,008.21 40.48 -189.72 193.72 0.08 -0.05 -0.75

-6.29 3,111.00 4.39 288.88 3,102.93 43.19 -196.46 200.80 0.48 0.00

-0.42 -2.12 3,206.00 3.99 286.87 3,197.67 45.33 -203.06 207.66 0.45

-0.18 -3.24 3,301.00 3.82 283.79 3,292.45 47.04 -209.29 214.09 0.28

-0.14 -11.54 3,397.00 3.69 272.71 3,388.25 47.95 -215.49 220.34 0.77 3,492.00 4.09 287.04 3,483.03 49.08 -221.78 226.74 1.10 0.42 15.08

-0.09 -9.25 3,587.00 4.00 278.25 3,577.80 50.55 -228.30 233.40 0.66

-0.14 3,682.00 3.87 280.19 3,672.57 51.60 -234.73 239.92 0.20 2.04

-0.42 -7.03 3,777.00 3.47 273.51 3,767.38 52.34 -240.76 245.99 0.62

-3.61 3,872.00 3.47 270.08 3,862.20 52.52 -246.50 251.69 0.22 0.00

-7.13 3,967.00 3.56 263.31 3,957.03 52.18 -252.31 257.37 0.45 0.09

-0.04 -10.73 4,062.00 3.52 253.12 4,051.85 50.99 -258.03 262.83 0.66

-0.19 -3.71 4,157.00 3.34 249.60 4,146.68 49.18 -263.41 267.87 0.29

-8.88 4,252.00 3.38 241.16 4,241.51 46.86 -268.46 272.49 0.52 0.04 4,347.00 3.47 246.88 4,336.34 44.38 -273.56 277.13 0.37 0.09 6.02

-0.83 4,442.00 3.60 246.09 4,431.16 42.04 -278.93 282.07 0.15 0.14 4,537.00 4.26 262.08 4,525.94 40.35 -285.15 287.95 1.34 0.69 16.83

-292.02 -0.18 4,632.00 4.09 274.82 4,620.69 40.15 294.70 0.99 13.41

-0.56 -10.16 4,728.00 3.55 265.07 4,716.48 40.18 -298.39 301.00 0.88

-0.32 4,823.00 3.25 279.48 4,811.31 40.37 -303.98 306.55 0.95 15.17

-0.09 -15.17 4,918.00 3.16 265.07 4.906.17 40.59 -309.24 311.78 0.85

-0.04 -20.82 5,013.00 3.12 245.29 5,001.03 39.28 -314.20 316.47 1.14

-0.14 -3.60 5,108.00 2.99 241.87 5,095.89 37.03 -318.73 320.59 0.24

-0.05 -7.59 5,203.00 2.94 234.66 5,190.76 34.46 -322.91 324.31 0.40

-0.08 -6.47 5,298.00 2.86 228.51 5,285.64 31.48 -326.67 327.56 0.34 5,393.00 3.08 229.47 5,380.52 28.25 -330.38 330.72 0.24 0.23 1.01

-3.05 5,488.00 3.08 226.57 5,475.38 24.84 -334.18 333.93 0.16 0.00

-0.15 5,583.00 2.94 228.51 5,570.25 21.47 -337.86 337.03 0.18 2.04

-5.37 5,678.00 2.94 223.41 5,665.12 18.08 -341.35 339.96 0.28 0.00

-6.85 5,773.00 2.98 216.90 5,760.00 14.34 -344.51 342.49 0.36 0.04

-0.14 -1.85 5,868.00 2.85 215.14 5,854.87 10.43 -347.35 344.68 0.17 i Last GWDS Survey

-0.28 5,900.00 2.76 217.43 5,886.83 9.17 -348.28 345.40 0.45 7.16

2011/07/23 7:36:02AM Page 3 COMPASS 5000.1 Build

STATE OF UTAH AMENDED REPORT FORM 8 DEPARTMENT OF NATURAL RESOURCES (highlight changes) DIVISION OF OIL, GAS AND MINING 5. LEASEDESlGNATIONANDSERALNUMBER: UTU77326 6. IF INDlAN,ALLOTTEEOR TRIBE NAME WELL COMPLETION OR RECOMPLETION REPORT AND LOG

1a. TYPE OF WELL: O GWAESLL 7. UNITor CA AGREEMENT NAME LL DRY OTHER

b. TYPE OF WORK: 8. WELLNAMEand NUMBER: EEW ORZ. EEP- EFSFVR. RY OTHER FEDERAL 12-1D-65 2.NAMEOFOPERATOR: 9.APINUMBER: BERRY PETROLEUM COMPANY 4301350328 3. ADDRESSOF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WLDCAT 4000 S. 4028 W. ciTY ROOSEVELT STATE UT ze 84066 (435) 722-1325 BRU NDAGE CANYON 4. LOCATION OF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: AT SURFACE NWSW 1916' FSL 1000' FWL NWS 1 6S 5W U AT TOP PRODUCING INTERVALREPORTED BELOw NWSW 1960' FSL 766' FWL 19¯ñ2,' 12. COUNTY 13. STATE AT TOTALDEPTH NWSW FSL 658' FWL DUCHESNE UTAH 14. DATESPUDDED: 15. DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB. RT. GL): 5/13/2011 7/25/2011 8/24/2011 ABANDONED READYTO PRODUCE 2 7422 GL 18. TOTALDEPTH: MD 6,023 19. PLUG BACK T.D.: MD 5,895 20, IF MULTIPLECOMPLETIONS, HOW MANY?* 21. DEPTH BRIDGE MD PLUG SET TVD TVD TVD

22. TYPE ELECTRICAND OTHER MECHANCAL LOGS RUN (Subnit copy of each) 23. WAS YES ELECTRIC WELLCORED? NO (Submit analysis) WAS DST RUN? NO YES (Submit report)

DIRECTIONAL SURVEY? NO YES (Submit copy)

24. CASING AND LINER RECORD (Report all strings set in mell)

STAGE CEMHENTER CNEMENFSACKES UMRE ** HOLE SIZE SIZEIGRADE WEIGHT (#lft.) TOP (MD) BOTTOM (MD) CEMENT TOP AMOUNT PULLED VO BL)

12.5 8.625 J-55 24.0 375 G 200 7.875 5.5 J-55 15.5 5,992 PL 200 260 PLHS 385

25. TUBING RECORD

SIZE DEPTH SET (MD) PACKER SET(MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET(MD) 2.875 5,799

26. PRODUCINGINTERVALS 27. PERFORATION RECORD

FORMATION NAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM (TVD) INTERVAL (ToplBot -MD) SlZE NO. HOLES PERFORATION STATUS

(A) Deen Squeezed UTELAND BUTTE 5,656 5,818 5,656 5,818 .36 34 (3) open Squeezed CASTLE PEAK 5,197 5,445 5,197 5,445 .36 34 (c) 3 POINT 4,764 5,006 4,764 5,006 .36 18 open squeezed

(D) DOUGLAS CREEl 4,463 4,599 4,463 4,599 .36 12 open Squeezed

28. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.

DEPTH INTERVAL AMOUbtf AND TYPE OF MATERIAL 5656 TO 5818 FRAC Wl60,000 LBS SAND & 1022.6 BBLS FLUID 5197 TO 5445 FRAC Wl71,400 LBS SAND & 962.9 BBLS FLUID 4764 TO 5006 FRAC Wl34,000 LBS SAND & 494.4 BBLS FLUID

29. ENCLOSED ATTACHMENTS: 30. WELL STATUS:

O ELECTRICAL/MECHANICAL LOGS GEOLOGIC REPORT DST REPORT DIRECTIONAL SURVEY PUMPlNG SUNDRY NOTICE FOR PLUGGINGAND CEMENT VERIFICATION CORE ANALYSIS OTHER:

(5/2000) (CONTINUED ON BACK) OCT1 2 2011

DIV.OFOlL,GAS& 31. INITIALPRODUC110N INTERVALA (As shown in item #26)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD: 8/31/2011 9/14/2011 24 RATES: -+ 61 338 16 GAS PUMPll

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GAS/OIL RATIO 24 HR PRODUCTON OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS: 125 170 RATES: -+ PUMPING

INTERVALB (As shown in item #26)

DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD: RATES: -+

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GAS/OIL RATIO 24 HR PRODUCTON OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS: RATiiS: ->

INTERVALC (As shown in item #26)

DATEFlRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD: RATES: ->

CHOKE SlZE: TBG. PRESS. CSG. PRESS. PI GRAVITY BTU- GAS GAS/OILRATIO 24 HR PRODUCTON OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS: RATES: -+

INTERVAL D (As shown in item #26)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTlON OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD: RATES:

CHOKE SIZE: TBG. PRESS. CSG. PRESS. Pi GRAViTY BTU - GAS GASIOILRATIO 24 HR PRODUCTON OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS: RATES:

32. DISPOSITION OF GAS (Sold, Used for Fuel, Vented, Etc.) SOLD

33. SUMMARYOF POROUS ZONES (Include Aquifers): 34. FORMATION(Log) MARKERS:

Show all impo11antzones ofporosity and contents thereof:Cored intervals and all drill-stem tests, including depth interval tested,cushion used, timetoolopen,flowing and shut-in pressures and recoveries.

o o m Formation Descriptions, Contents, etc. Name edp (Measu Depth) GR 1,915 MAHOGANY 2,512 TGR3 3,564 DOUGLAS CREEK 4,314 BLACK SHALE 4,913 CASTLE PEAK 5,231 UTELAND 5,653 WASATCH 5,843

35. ADDITIONALREMARK: (Include plugg ng procedure)

36. I hereby certifythat the foregoing and attached Information is complete and correct as determined from allavailable records.

NAME(PLEASE PRINT) BROOKE BROADHEAD TITLE REGULATORY ASSISTANT

SIGNATURE DATE 10/11/2011

This report must be submitted within 30 days of • completing or plugging a new well • reentering a previously plugged and abandoned well • drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth • recompleting to a different producing formation • drillinghydrocarbon exploratory holes, such as core samples and stratigraphic tests

* ITEM 20: Show the number of completions ifproduction is measured separately from two or more formations.

** ITEM 24: Cement Top -Show how reported top(s)of cement were determined (circulated (CIR), calculated (CAL), cement bond log (CBL), temperature survey (TS)).

Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-5340 1594 West North Temple, Suite 1210 Box 145801 Fax: 801-359-3940 Salt Lake City, Utah 84114-5801 A GREMWMTE DIREC7/0NAL SERVIC"FS ZZC"

Survey Certification Sheet

Report Date: 8-23-11

GWDS Job #: 03045-432-21/ Directional

Operator: Berry Petroleum Co. Well Name: Federal 12-1D-65 API#: 43-013-50328 County/State: Duchesne Co., UT Well SHL: 1916' FSL & 1000' FWL (NWSW) Sec. 1-T68-R5W Well SEL: 39° 59' 12.901" N (NAD27) 110°24' 5.101" W (NAD27)

Drilling Rig Contractor: Patterson 779 (RKB: 20')

Surveyed Dates: 7/18/11-7/22/11 Surveyedfrom a depthof: OH: 399.00' MD to 5900.00' MD

Type of Survey: MWD Surveys(STB=50')

The data and calculations for this survey have been checkedby me and conform tothe calibration standards and operational procedures set forthby GreatWhite Directional Services, LLC. I am authorized and qualified to review the data, calculations and this report, and that the report represents a true and correct DirectionalSurvey of thiswell basedon the originaldata corrected toTrue North and obtained at the well site. WellboreCoorditiatesare calculatedusing minimum curvature method.

Bret Wolford

GreatWhiteDirectionalServices,LLC - Well Planner

PO Box 427 • MILLS,WY82644•63 CASPERVIEWCOURT • MlLLS,WY 82644 OFFICE(307) 472-7400 •FAX (307) ProJect:Duchesne Co., UT(UT27C) Site: Federal Soc.1 Pads (Sec.1-T6S-R5W) Well: Federal 12-iD-85 Weilbore: Wellbore#1 Design: Design #3 at Latitude: 39*59'12.901 N Longitude: iW24'6.101W Ground Level: 7422.00 WELL l7442.00usit(Patterson 779)

PROJECTDETAILS:Duchesne Ca, UT(UT21C} REFERENCE INFORMAlloN

GoodeUs System: US State Plane 192F (Em=Isoludon) Coordhtate (NtE)Reference:Wet Federal 12-10 65 True North Vertical(Ivo)Reference: [email protected](Palletson719) Socion (VS)Reference: $lot-(0.00N, 0.00E) 2one: UtahCenital 4302 Measured Depth Reference: [email protected](Paltetson778) Calculation Method: Mininnan Cusvature System Datum:lilean Sea Level

WELL DETAILS:Faderal 12-10-85.

Ground Level: 7422.00 eues Long|tude Slot esossumag +NMI +FJ-W Nortigog Easting Latilfude 0.00 0.00 604170.174 2307811.331 39'Wf2.901N 110'24'5.101W

CO·ORDINATESANDt.ADI.0MG) ots tes WELLSORETARGETDETAILS(MAP Shape +3F-8 *Ef-W Easung Latitude Longgude Karne TVD Northing 39*W13.451N it0'24*9.491W Polygon Fad12-1045Tgt 5930.00 55.65 ·345.02 602221.528 2307480.764

SECTION DETAILS

.I' 4NI.S +E1.W Dieg TFace V8ect Annotation sagenmaa.» snug MD Ina A21 TVD 0,00 0.00 0.011 0.00 0.00 0.00 0.00 0.00 0,00 StaitSuffdt.00 450,00 0-00 0.00 450.00 0.00 0.00 B.00 0.00 0.00 2,00 TFO -il2.18 5.36 •4.19 2.00 32100 4.98 Start DLS 947.50 3.95 322.00 647.34 Start4751.13holdat790.30MO -ft2,17 -12.42 13.85 7!IS.29 3.95 277.99 755.82 10.09 2.00 startarop-1,00 -339.46 0.00 0.00 340,74 ----- 5547.43 3.95 277.89 5535.65 43.84 at aa42-os ss.ss .aso sa 1.co sao.en ass.aa to - 6942.es o.oo o.co ssao.ca ,

FORMATIORTOP DETAILS

I TVOPath MOPath Formation 1385.75 1387.55 Green RNer . GreenRherUprMkr .1 1912.59 . 1909.86 2513.88 2418.44 Mahogany ?PCC 3551.20 3558,22 Tgr3Mkr ver t «km| 4286.95 4305.78 Douglas Cleak 4887.02 48972.2 BlackShale sess.ra sore.sa ti2Tilrougitolg 5213.A9 $224,47 Casile Peak 5630.83 5842.75 Uteland BUIIeLt. 2400 5834.67 5848.72 Wasatch

TM AtimuthstoTrueblosth MagneUo Neith:11A2 2800-- MagnetiaFielt

-

Dale: 0&24120ti Model:IGitF2005tE 200-

. I 55.84'N,3tes2'W ygg 1916'FSI.&t00°FWLmm. 1970"FSL&BSŒFWL -• " SEC.1•T6S4tSW -- SEc.f•TGB.asN Targetis480'With1n I- NWSWil4tl4

s.rtestuhonansaals† otsmorro.tal aesses 4000

oss

... 4400 - ..--

as to 4800

(f) i Do- as creek · t 5200 -

I

6600 -

6000 -

-2 2 4 500 -1' 00 -750 s500 0 West(-)/Easl(+)(500usittin)

100 Pian: Design #3 (Federal 12-iD-65/Wellbore#1)

-1200 -800 -410 0 44 890 1200 16]O VerticalSection at279.04'(800 usfdin) Created By: Bret Wolford Date: 7:37, July 23 Berry Petroleum Company Duchesne Co., UT (UT27C) Federal Sec.1 Pads (Sec.1-T68-R5W) Federal 12-1D-65

Wellbore #1

Survey: Survey #1

Standard Survey Report

23 July, 2011

AMEATMllTE BRECTEML SEM1Τ, Great White Directional Services, LLC Survey Report

Gompany: Berry Petroleur, Company Local Co-ordinate Reference: Well Federal 12-1D-65 Project: Duchesno Co., UT (UT27C) TVD Reference: WELL@7442 00usft (Patterson 77 Site: Federal Sec.1 Pads (Sec.1-T6S-R5W) . MD Reference: WELL @ 7442.000811(Patterson 179) Wall: Federal 12-1D-65 North Reference: True Welloore: Wellboro#1 Survey Calculation Method: Minimum Curvature Design: Weubore #1 Database: EOM SOOO1 EDMDBBW

Project Duchesne Co., UT(UT27C)

Map system: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD1927 (NADCONCONUS) Map Zone: Utah Centraf4302

Site Federal Sec.1 Pads (Sec.1-TSS-R5W)

39° Site Position: Northing: 605,769.1340sft Latitude: 59'28.309 N From: Laf/Long Easting: 2,311,038.090usft Longitude: 110' 23' 23.392 W ° Position Uncertainty: 0.00 usft Slot Radlus: 13-3/16" Grid Convergence: 0,71

39° Well Position +NI-S 0.00 usft Northing: 604,170.174 usft Latitude: 59'12.901 N 110° +El-W 0.00 usft Easting: 2,307,811.331 usft Longitude: 24' 5.101 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 7,422.00 usft

Wellbore Wellbore#1

Magnetics Model Name Sample Date DecHnation Dîp Angle field Strangth (*) f) (nT) IGRF200510 2011/06/24 11.42 65.69 52,211

Design Wellbore#1

Audit Notes: Version: 1.0 Phase: ACTUAL fie on Depth: 0.00

Verlical Section: Depth From (TVD) +NI-S +El-W Direction (usft) (usft) {usft) (°) 0.00 0.00 0.00 279.04

Survey Program Date 2011/07/23

Fro.m To (usft) (usit) Survey(Weilboro) Too1Name Description

399.00 6,023.00 Survey #1 (Wellbore#1) MWO MWO - Standard

Survey

Measured Vertical Vertical Dagleg Bulld Turn Deptli inclination Azimuth Depth +NI-S +El-W Section Rate Rata Rato (*I100ustt) (*/100usft) (usft) (°) (°) fusft) (usft) (usft) (usft) ('l100usft)

First GWDS Survey

399.00 1.09 187.55 398.98 -3.76 -0.50 -0-10 0.27 0.27 0.00

461.00 1.01 228.33 460.97 4.71 -0.98 0.23 1.19 -0.13 65.77

523.00 1.93 290.29 522.95 -4.71 -2.37 1.60 2.75 1.48 99.94

585.00 3.91 308.92 584.87 -3.02 -5.00 4.46 3.60 3.19 30.05

646.00 5.14 300.40 645.68 -0.33 -8.97 8,81 2.29 2.02 -13.97

706.00 5.31 295.74 705.43 2.23 -13.79 13.97 0.76 0.28 -7.77 768.00 5.14 295.57 767.17 4.68 -18.88 19.38 0.28 -0.27 -0.27 830.00 4.75 293.55 828.94 B.90 -23.74 24.53 0.69 -0.63 -3.26

-0.22 -8.24 893.00 4.61 288.36 891,73 8.74 -28.53 29.55 0.71

-0.48 956.00 4.31 288.45 954.54 10.29 -33.18 34.39 0.48 0.14

-7.28 1,020.00 4.39 283.79 1,018.35 11.63 -37,84 39.20 0.57 0.12

2011/07/23 7:36:02AM Page 2 GOMPASS6000.1 Build Great White DIrectional Services, LLC GREMWHITE Survey Report , -..es.a

12-10-65 Cornpany: Berry Polioleum Company Local Co-ordinate Reference: Well Federal WELL 7442.00usft (Patterson 779} Project: Duchesne Co , UT (UT27C) TVD Reference; @ Site: Federal Sec.1 Pads (Sec.1-T6S-RSW) MD Reference: WELL @7442.000sft (Patterson 779) Well: Federal 12-iD-65 North Reference: True Wellbore: Wellbole #1 Survey Calculation Method: Mir.imum Cuivature Design: Wellbore #1 Database: EDM6000.1 EDMD8BW I Survey

Measured Vertical Vertical Dogleg Build Turn Rate Depth Inclination Azimuth Depth +NI·S +El-W Section Rate Rate (usft) (') ("} (usft) (usit) (usft) {usft) ('1100usft} ('l100usít) ('1100usft)

-0.56 -7,11 1,083.00 4.04 279.31 1,081.18 12.57 -42.37 43.82 0,76 1,146.00 3.98 283.18 1,144.03 13.42 46.68 48.21 0.45 -0.13 6.14

-8.39 | 1,210.00 5.71 277.81 1,207.80 14.36 -51.99 53.60 2,82 2.73

-3.71 1,306.00 5.80 274.29 1,302.32 15.36 -61.46 63.11 0.38 0.09

-0.94 -8,69 1,399.00 4.92 266.12 1,395.91 15.44 -70.21 71.77 1.24

-0.79 -77.72 8.23 1,494.00 4.17 273.94 1,490.61 15.41 79.18 1.02 1,589.00 4.65 281.85 1,585.33 16.43 -84.94 86.47 0.81 0.51 8.33

-5.92 -0.41 1,684.00 4.26 278.23 1,680.04 17,61 -92.22 93.84 0.62

1,780.00 4.43 278.86 1,775.77 18.57 -99.42 101.11 0.27 0.18 2.74 1,875.00 4.97 280.19 1,870.45 19.86 -107.10 108.89 0.58 0.57 1.40

-0.34 -5.65 1,970.00 4.65 274.82 1,965.11 20.91 -114.99 116.84 0.58

-122.58 14.62 2,065.00 4.79 288.71 2,059.80 22.51 124.69 1.21 0.15 -0.79 .5.27 2,160.00 4,04 283.70 2,154.51 24.57 -129.59 131.84 0.89

-0.61 -12.12 2,255.00 3.56 272.19 2,249.31 25.48 -135.79 138.10 0.95

-0.83 2,350.00 4.35 271.40 2,344.08 25.68 -142.34 144.60 0.83 0.83 2,445.00 4.39 283.53 2,438.80 26.62 -149.47 151.80 0.97 0.04 12.77

-0.04 2,541.00 4.35 291.00 2,534.53 28.78 -156.45 159.02 0.59 7.78

-0.56 -8.23 2,636.00 3.82 283.18 2,629.29 30.79 -162.89 165.70 0.81

2,731.00 4.61 290.12 2,724.03 32.83 -189.56 172.61 0.99 0.83 7.31

-0.51 -6.57 2,826.00 4.13 283.88 2,818.75 34.96 -176.46 179.76 0.71 2,921.00 4.44 295.57 2,913.49 37.37 -163,10 186.70 0.97 0.33 12.31

-0.05 -0.75 3,016.00 4.39 294.86 3,008.21 40.48 -189,72 193.72 0.08

-6.29 3,111.00 4.39 288.88 3,102.93 43.19 -196.46 200.80 0.48 0.00

-0.42 -2-12 3.206.00 3.99 286.87 3,197.67 45.33 -203,06 207.66 0.45

-0.18 -3.24 3,301.00 3.82 283.79 3,292.45 47.04 -209.28 214.09 0.28

-0.14 -11.54 3,397.00 3.69 272.71 3,388,25 47.95 -215,49 220.34 0.77 3,492.00 4.09 287.04 3,483.03 49.08 -221,78 226.74 1.10 0.42 15.08 -0.09 -9.25 3,587,00 4.00 278.25 3,577.80 50.55 -228.30 233.40 0.66

-0.14 -234.73 2.04 3,682.00 3.87 280.19 3,672.57 51.60 239.92 0.20

-0.42 -7.03 3.777.00 3.47 273.51 3,767.38 52.34 -240.76 245.99 0.62

-3.61 3.872.00 3.47 270.08 3,862.20 52.52 -246,50 251.69 0.22 0.00

-7.13 3,967,00 3.58 263.31 3,957.03 62.18 -252.31 257.37 0.45 0.09

-0.04 -10.73 4,062.00 3.SÉ 253.12 4,051.85 60.99 -258.03 262.83 0.66

-0.19 -3.71 4,157.00 3.34 249.60 4,146.68 49.18 -263.41 267.87 0.29

-8.88 4,252.00 3.38 241.16 4,241,51 46.86 -288.48 272.49 0.52 0.04 6.02 4,347.00 3.47 246.88 4,336.34 44.38 -273.56 277.13 0.37 0.09

-0.83 4,442.00 3.60 246.09 4,431.16 42.04 -278.93 282.07 0.15 0.14 4,537.00 4.26 262.08 4,525.94 40.35 -285.15 287.95 1.34 0.89 16.83

-0.18 4,632.00 4.09 274.82 4,620,69 40.15 -292.02 294.70 0.99 13.41

-0.56 -10.18 4,728.00 3.55 265.07 4,716.48 40.18 -298.39 301.00 0.88

-0.32 4,823.00 3.25 279.48 4,811.31 40.37 -303.98 306.55 0.96 15.17

-0.09 -15.17 4,918.00 3.16 265.07 4,908.17 40.59 -309.24 311.78 0.85

-0.04 -20.82 5,013.00 3.12 245.29 5.001.03 39.28 -314.20 316.47 1.14

-0.14 -3.60 5,108.00 2.99 241.87 5,095.89 37.03 -316.73 320.59 0.24

-0.06 -7.59 6,203.00 2.94 234.66 5,190.76 34.46 -322.91 324.31 0.40

-0.08 -6.47 5,298.00 2.86 228.51 5,285.64 31.48 -326.67 327.56 0.34 1.01 5,393.00 3.08 229.47 5,380.52 28.25 -330.38 330.72 0.24 0.23 5,488.00 3.08 226.57 5,475.38 24.84 -334.18 333.93 0.16 0.00 -3.05

-0.15 5.583.00 2.94 228.51 5,570.25 21.47 -337.86 337.03 0.18 2.04

-5.37 5,678.00 2.94 223.41 5,665.12 18.08 -341.35 339.96 0.28 0.00

-6.85 5,773.00 2.98 216.90 5,760.00 14.34 -344.51 342.49 0.36 0.04

-0.14 -1.85 5,868.00 2.85 215.14 5,854.87 10.43 -347.35 344.68 0.17 Last GWDS Survey

-0.28 5.900.00 2.76 217.43 5,886,83 9.17 -348.28 345.40 0.45 7.16

2011/07/23 7:36:02AM Page 3 COMPASS 5000.1 Sw7d Great White Directional Services, LLC GREATINUTE Survey Report s --ma.a

Company: Berry Petroleum Ccmpany Local co-ordinateReference: Well Federal 12-1D-65 Project: Duchesr.o Co., UT (UT27C) TVD Reference: WËLL @7442.00esk (Patterson 779) Site: Federal Soc 1 Pads (Sec.1-T6S-RSW} MD Reference: WELL @7442 00usft (Patterson 779) Well: Federa112-10-65 North Raference: True Wellbore: Weilbare ill Survey Calculation Method: MinimumCurvatura Design: Wellbore #1 Database: EDM 5000.1 EDMDBBW I Survey

Moasured Vertical Vertical Dogleg Bulld Turn Depth +NI-S +El-W Section Rate Rate Rate Inclination Azimuth Depth (°/100usít) (usit) (•) g•) (usit) (usit) (usft) (usft) ('l100usft) (/100usft)

Proþto TD

6,023.00 2.76 217.43 6,009.69 4.47 -351.88 348.21 0.00 0.00 0.00

Survey Annotations

Measured Vertical Local Coordinates Depth Depth +NI-S +El-W (usit) (usft) (usit) (usft) Comment

399.00 398.98 -3.76 -0.50 FirstGWDSSurvey

5,900.00 5,886.83 9.17 -348.28 Last GWDS Survey

6,023.00 8.009.69 4.47 -361.88 Proj. la TD

Checked By: Approved By: Date:

2011/07/23 7:36:02AM Page 4 COMPASS5000.1 Build