26 27 14 (16216) - Main Distribution Centre Metering
Section 262714
Main Distribution Centre
2010-11-01Metering
Use this Section to specify requirements for metering installed in main distribution centres specified in the following sections:
Section261836Fused Main Distribution Centre.
Section261837Moulded Case Main Distribution Centre.
Section261838Industrial Air Circuit Breaker Main Distribution Centres.
This Master Specification Section contains:
1.This Cover Sheet
2.Specification Section Text:
1.General
1.1Related Requirements
1.2Delivery, Storage and Handling
2.Products
2.1Analog Metering
2.2Digital AC Metering System
2.3Current and Potential Transformers
3.Execution
3.1Installation
BMS Basic Master SpecificationAlberta Infrastructure
Master Specification System / Page 0
Section 262714
Main Distribution Centre
Plan No:Metering
Project ID:Page 1
1.General
1.1Related requirements
.1Submittal Procedures:Section013300.
.2LEED Requirements:Section013518.
.3Waste Management and Disposal:Section017419.
.4Electrical General Requirements:Section260010.
.5Electrical Operation and Maintenance Data:Section260110.
.6Testing, Adjusting, and Balancing
of Electrical Equipment and Systems:Section260810.
.7Fused Main Distribution Centre:Section261836.
.8Moulded Case Main Distribution Centre:Section261837.
.9Industrial Air Circuit Breaker Main Distribution CentresSection261838.
1.2DELIVERY, STORAGE AND HANDLING
.1Separate waste materials for [reuse] [and] [recycling] in accordance with Section 017419 Waste Management and Disposal.
2.Products
2.1ANALOG METERING
.1Voltmeter:
.1Type: [AC] [] 150 volt full scale deflection.
.2Size: [115] [] mm [square] 250° scale arc.
.3Accuracy: [One] [] per cent.
.4Calibration: [0 - 750] [] volts, zero left.
.5Mounting: [Flush] [Surface].
.6Selector Switch: [4] [7] [] position.
.2Ammeters:
.1Type: [AC] [] 5 Ampere full scale deflection.
.2Size: [115] [] mm [square] 250° scale arc.
.3Accuracy: [One] [] per cent.
.4Calibration: [0 - 300] [] Amperes.
.5Mounting: [Flush] [Surface].
.6Selector Switch: [4] [] position.
.3Triplex Ammeters:
.1Type:[AC] [] 5 Ampere full scale deflection with:
.1Triplex thermal demand.
.2Instantaneous readout for each phase.
.2Size:[115] [] mm square, 250° scale arc for each unit.
.3Accuracy:[±1] <3per cent.
.4Calibration:[0 - 600] [] Amperes.
.5Mounting:[Flush] [Surface].
2.2DIGITAL AC METERING SYSTEM
.1Provide a microprocessor based digital AC metering system capable of providing following electrical measurements:
.1Volts on each phase.
.2Current on each phase.
.3Frequency.
.4Power factor.
.5Kilo-Volt-Amperes.
.6Kilowatts.
.7Total MWH.
.8Programmable KW set point[s] with dry contact relay output[s].
.9KW hour storage for [24] [] hours.
.10Historic minimum and maximum data for all measured parameters.
.11RS232-C output.
.2Technical Features:
.1Display:20 character alphanumeric [10] [] mm high.
.2Readout:two fields:
.1Field 1:Volts and amperes for phases A, B, and C or average selectable by front panel button.
.2Field 2:Any one of KVA, KW, PF frequency or MWH, or automatic sequence of all selectable by front panel button.
.3Display update rate:every [3] [] seconds.
.4Control:4 buttons to provide the following operating modes:
.1Auto sequence.
.2Non-sequence.
.3Display maximum.
.4Display minimum.
.5Reset field parameters.
.5Output:
.1RS232-C serial output for [video terminal] [printer] [modem] connection.
.2Baud rate:300 to 9600 field programmable.
.6Accuracy:
.1One per cent for:
.1Voltage
.2Amperes.
.2One Hertz for frequency.
.3Three per cent for:
.1KVA.
.2KW.
.3MWH.
.7Alarm Contacts:
.1Set Point:adjustable for when measured load exceeds setting.
.2Output:form C dry contacts, 120volt, 5Ampere.
.8Range of Operation:
.1Voltage:120, 208, 480, 600 volts, field programmable.
SPECNOTE:Potential transformers required when voltage exceeds 208 volts.
.2Ampacity: 10 to 9,999 amperes field programmable.
SPECNOTE:Current transformers required with 5 ampere output.
.3Frequency:50 to 70 Hertz.
.4Power Factory:0.50 leading to 0.50 lagging.
.5Kilo-Volt-Amperes:0 to 30,000.
.6Kilowatts:0 to 30,000.
.7MWH:0 to 3,000 repeated.
.9Mounting:Panel mounted.
.10Power supply:100 - 130 volts AC 60 Hz.
2.3CURRENT AND POTENTIAL TRANSFORMERS
.1Current Transformers:
.1Type:metering accuracy class.
.2Ratios:[600:5] [] Amperes.
.3Provide shorting bars for current transformer secondary.
SPECNOTE:Choose instrument transformers and meters to yield 60% meter deflection at full projected demand load.
.2Potential Transformers:
.1Type:metering accuracy class.
.2Ratios:[600:120] [360:120] [] volts.
.3Mounting:Drawout compartment with HRC fuse on primary side.
SPECNOTE:Provide test block for main distribution centre metering.
.3Current Transformer and Potential Transformer Test Blocks: [10] [] pole, complete with [7] [] current transformer and [3] [] potential transformer poles.
.4Test Plugs:[10] [] pin to match current transformer and potential transformer test blocks specified above.
3.Execution
3.1INSTALLATION
.1Install meters in meter section of Main Distribution Centre.
.2Co-ordinate installation of current transformers and potential transformers with installation of instrument transformers for utility metering and protective relaying.
END OF SECTION
2010-11-01 BMS Version